DATA PONDASI

INPUT DIMENSI PEDESTAL (i)


PANJANG (X) 950 mm
LEBAR (Y) 950 mm
TINGGI DARI ±0 250 mm
KEDALAMAN DARI ±0 1100 mm (Check kedalaman foot)

INPUT TULANGAN PEDESTAL (ii)


JUMLAH TULANGAN 48 (NOTE : kelipatan 4) n = 13
COVER 40 mm
DIA LONGBAR 16 mm
DIA STIRRUP 10 mm
JARAK STIRRUP 150 mm n = 13

DATA Jumlah Jarak COORDINATE


X 13 70.333 X Y Z SKET
Y 13 70.333 0 0 0

DATA Jumlah Jarak Jml Jarak Sisa Penambahan Jumlah dipakai


Ties 8 150 1200 110 1 9

OUTPUT
Luas penampang kolom 902500 mm^2 Luas penampang kolom 902500 mm^2
Luas penampang tulangan 9650.973 mm^2 Luas penampang tulangan 9552 mm^2
RASIO (manual) 1.069 % RASIO (data) 1.058 %

TABEL TULANGAN
ASTM A615M
Longbar Pedestal 48-D16
Size (mm) Ab (mm^2) Wb (kg/m) Dia (mm) Ab (mm^2) Wb (kg/m)
Stirrup Pedestal 9-D10-150
Data Data Data Data Manual Manual
10 71 0.56 9.5 79 0.62
13 129 0.994 12.7 133 1.04
16 199 1.552 15.9 201 1.58
19 284 2.235 19.1 284 2.23
22 387 3.042 22.2 380 2.98
25 510 3.973 25.4 491 3.85
29 645 5.06 28.7 661 5.19
32 819 6.404 32.3 804 6.31
36 1006 7.907 35.8 1018 7.99
43 1452 11.38 43 1452 11.40 SKET
57 2581 20.24 57.3 2552 20.03

INPUT DIMENSI FOOTING (i) Longbar Footing (TOP) D16-200


PANJANG (X) 1950 mm
LEBAR (Y) 1950 mm
TEBAL (Z) 400 mm
Spacer n = 1-1000 mm
KEDALAMAN DARI ±0 1500 mm

INPUT TULANGAN FOOTING (ii)


COVER 50 mm Longbar Footing (BOTTOM) D16-200
DIA LONGBAR 16 mm SKET
JARAK LONGBAR 200 mm
DIA SPACER 16 mm

DATA Jumlah Jarak Jml Jarak Sisa Penambahan Jumlah dipakai


X 9 200.000 1800 50.000 1 10
Y 9 200.000 1800 50.000 1 10
Longbar Pedestal 48-D16
+ 0.25 m 0.95 m Stirrup Pedestal 9-D10-150

± 0.00 m

n = 13

n = 13

Longbar Footing (TOP) D16-200


- 1.10 m

Spacer n = 1-1000 mm
- 1.50 m
1.95 m Longbar Footing (BOTTOM) D16-200

SKET

BARBENDING
Jumlah Pedestal 1 Jumlah Ties 1 stirrup 10 Jumlah spacer 1
Jumlah Footing 1 Extend longbar footing 50 mm Jarak spacer 1000 mm
Extend spacer footing 200 mm Rek. Spacer 1

Dia A B C Length Weight T. Weight


QTY Sket Note
mm mm mm mm m kg/m kg/m

B A Longbar
16 50 1660 300 2.01 48 1.579 152.342
C Pedestal
B A Stirrup
10 50 870 870 3.58 9 0.617 19.880 C
Pedestal

Ties
10 50 870 50 0.97 90 0.617 53.864
C A Pedestal
B

Longbar
16 250 1850 250 2.35 40 1.579 148.426
C A Footing
B
C
B B Spacer
16 200 236 200 1.072 1 1.579 1.693
Footing
A A

Volume of concrete = 2.739 kg/m3

Weight of steel = 376.204 kg/m


INPUT DIMENSI PILE (i)
DIAMETER 400 mm
PANJANG (Y) 3000 mm

INPUT TULANGAN PILE (ii)


JUMLAH TULANGAN 8
COVER 40 mm
n=8
DIA LONGBAR 16 mm
DIA STIRRUP 10 mm
JARAK STIRRUP 150 mm

DATA Jumlah Angle Jarak D Jarak R


Longbar 8 45 320 160

SKET
OUTPUT
Luas penampang kolom 125663.7 mm^2 Luas penampang kolom 125663.7 mm^2
Luas penampang tulangan 1608.495 mm^2 Luas penampang tulangan 1592 mm^2
RASIO (manual) 1.280 % RASIO (data) 1.267 %

DATA Jumlah Jarak Jml Jarak Sisa Penambahan Jumlah dipakai Type
Ties 19 150 2850 110 1 20 Spiral

Longbar Pile 8-D16


Stirrup Pile 20-D16-150 (Spiral)
3.00 m

0.40 m
SKET
BARBENDING
Jumlah Pile 1 Extend longbar pile 300 mm

Dia A B C Length Weight T. Weight


QTY Sket Note
mm mm mm mm m kg/m kg/m
C
B Longbar
16 50 2960 300 3.31 8 1.579 41.812 C
A Pile

Dia ALL/A DIA/B SPACE/C Length Weight T. Weight


QTY Sket Note
mm mm mm mm m kg/m kg/m
A
10 2960 320 150 20.06 1 0.617 12.376 B Spiral Pile
C

Volume of concrete = 0.38 kg/m3

Weight of steel = 54.188 kg/m


SUMMARY

Dia A B C Length Weight T. Weight


QTY Sket Note P = 950
mm mm mm mm m kg/m kg/m L = 250
B A Longbar
16 50 1660 300 2.01 48 1.579 152.34
C Pedestal
L = 1100
B A Stirrup
10 50 870 870 3.58 9 0.617 19.88 C
Pedestal T = 400
Lebar foot - 1950
Ties
10 50 870 50 0.97 90 0.617 53.86 C
B A Pedestal

Longbar
16 250 1850 250 2.35 40 1.579 148.43
C A Footing
B L = 3000
C Spacer
16 200 236 200 1.072 1 1.579 1.69 B B
A A Footing

Volume of concrete = 2.739 kg/m3


D = 400
Weight of steel = 376.204 kg/m

Dia A B C Length Weight T. Weight


QTY Sket Note
mm mm mm mm m kg/m kg/m
C Longbar
16 50 2960 300 3.31 8 1.579 41.81 C L = 950 T = 400
B A Pile
Dia ALL/A DIA/B SPACE/C Length Weight T. Weight
QTY Sket Note P = 950
mm mm mm mm m kg/m kg/m D = 400 Lebar foot - 1950
A
10 2960 320 150 20.05772 1 0.617 12.38 B Spiral Pile Pedestal view Pile view Foot view
C n= 1 n= 1 n= 1
Volume of concrete = 0.38 kg/m3

Weight of steel = 54.188 kg/m