I Perkerasan Lapis Pondasi Slasah Jalan Ciuyah-Karang jengkol m2 3.750,00 01 23.671.812,50 155.531.250,00 179.203.062,50
II Pasangan Batu (Talud) m3 128,48 02 4.258.908,94 53.386.440,26 57.645.349,20
III Gorong-Gorong Plat Beton m 4,50x2,00 03 3.319.278,57 21.082.309,73 24.401.588,30
31.250.000,00 230.000.000,00 261.250.000,00
Terbilang *** Dua ratus enam puluh satu juta dua ratus lima puluh ribu rupiah)***