Anda di halaman 1dari 62

Perencanaan Rubahan Anggaran Tahun 2016 untuk Dana Kapitasi

Puskesmas : Jemaras
Kekurangan Pagu Anggaran 2016 : 558,747,872.00
Jml Kekurangan BOP+Silpa 2015 : 356,950,622.00
Jml. Kekurangan Jaspel 2016 : 201,797,250.00
Nama Ka. Puskesmas : Hj. Maemunah,SKM,M.Si
NIP Ka. Puskesmas : 19651227 198902 2 001
Jml Peserta Tambahan 2016 : 56,055 Orang
Norma Kapitasi : 6,000

336,330,000.00

ISI YANG WARNA KUNING


18
No Urut Puskesmas

56,055

NA KUNING
RENCANA KERJA ANGGARAN PERUBAHAN

SATUAN KERJA PERANGKAT DAERAH

PEMERINTAH KABUPATEN CIREBON

TAHUN ANGGARAN 2016

Urusan Pemerintahan : 1.02. KESEHATAN

Organisasi : 1.02.01. DINAS KESEHATAN Puskesmas Jema

Program : 1.02.33. Program Jaminan Kesehatan Nasional (JKN)

Kegiatan : 1.02.33.18. Kegiatan Pelayanan Kesehatan bagi Peserta JKN pada Puskesmas Jemaras

Waktu Pelaksanaan : 02 Januari 2016 sampai dengan 31 Desember 2016

Lokasi Kegiatan : Puskesmas Jemaras

Sumber Dana : APBD II melalui Dana BPJS

Indikator & Tolok Ukur Kinerja Belanja Langsung

Indikator Tolok Ukur Kinerja

Capaian Program Terpenuhinya Kebutuhan Pelayanan Kesehatan Tingkat Pertama Peserta JKN di Puskesmas Jema

Masukan Jumlah Dana

Terlayaninya Kebutuhan Pelayanan Kesehatan Tingkat Pertama Peserta JKN pada FKTP Puskesm
Keluaran
Jemaras

Hasil Terwujudnya Pelayanan Kesehatan Tingkat Pertama bagi Peserta JKN di Puskesmas Jemaras

Kelompok Sasaran Kegiatan : Masyarakat Kab. Cirebon Terutama Peserta JKN di Puskesmas Jemaras

RINCIAN RENCANA KERJA DAN ANGGARAN PERUBAHAN BELANJA LANGSUNG


MENURUT PROGRAM DAN KEGIATAN SATUAN KERJA PERANGKAT DAERAH
RINCIA
KODE REKENING URAIAN
Volume

5 BELANJA DAERAH
5 2 BELANJA LANGSUNG
5 2 1 BELANJA PEGAWAI
5 2 1 01 Honorarium PNS
5 2 1 01 02 Honorarium Tim Pengadaan Barang dan Jasa
Pengadaan Bahan Obat-obatan
- Panitia Pengadaan Bahan Obat-obatan dan Medis Habis Pakai 0 Orang 0
- Panitia PHP Bahan Obat-obatan dan Medis Habis Pakai 0 Orang 0
Pengadaan Peralatan dan Mesin
Pengadaan Alat-alat Berat
Pengadaan Mesin Genset 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Peralatan Kantor
Pengadaan Mesin Hitung/Kalkulator 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Tabung Pemadam Kebakaran 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Televisi 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Mesin Potong Rumput 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Pompa Air 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Perlengkapan Kantor
Pengadaan Lemari 0
- Pejabat Pengadaan : 0
RINCIA
KODE REKENING URAIAN
Volume

- Pejabat Penerima Hasil Pekerjaan : 0


Pengadaan Filing Kabinet 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan White Board 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Kipas Angin 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan AC Split 400,000
- Pejabat Pengadaan : 1
- Pejabat Penerima Hasil Pekerjaan : 1
Pengadaan Papan Plang Puskesmas 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Mesin/Kartu Absen 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Penyedot Debu 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Teralis Besi 400,000
- Pejabat Pengadaan : 1
- Pejabat Penerima Hasil Pekerjaan : 1
Pengadaan Komputer
Pengadaan Komputer PC 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Komputer Notebook 400,000
- Pejabat Pengadaan : 1
- Pejabat Penerima Hasil Pekerjaan : 1
Pengadaan Printer 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Scanner 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan UPS / Stabiliser 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Perangkat Lunak Sistem Operasi 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Perangkat Lunak Anti Virus 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Meubelair
Pengadaan Meja Kerja 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Meja Rapat 400,000
- Pejabat Pengadaan : 1
- Pejabat Penerima Hasil Pekerjaan : 1
Pengadaan Meja Komputer 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Kursi Kerja 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Kursi Rapat 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Kursi Tunggu 0
- Pejabat Pengadaan : 0
RINCIA
KODE REKENING URAIAN
Volume

- Pejabat Penerima Hasil Pekerjaan : 0


Pengadaan Kursi Lipat 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Kursi Susun 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Rak/Lemari Arsip Kayu 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Rak Buku/Kembang 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Meubelair Lainnya 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Peralatan Dapur
Pengadaan Kulkas/Lemari Es/Freezer 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Penghias Ruangan Rumah Tangga
Pengadaan Gordyn 400,000
- Pejabat Pengadaan : 1
- Pejabat Penerima Hasil Pekerjaan : 1
Pengadaan Karpet 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Alat-alat Studio
Pengadaan Camera 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Handycame 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Proyektor 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Sound System 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan VCD/DVD Player 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Microphone/Wireless/Pengeras Suara Lainnya 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan CCTV 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Layar Proyektor/Screen Projektor 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Alat-alat Komunikasi
Pengadaan Telepon 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Faximile 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Media Pengumuman 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Alat-alat Kedokteran
Pengadaan Alat - Alat Kedokteran Umum 0
- Pejabat Pengadaan : 0
RINCIA
KODE REKENING URAIAN
Volume

- Pejabat Penerima Hasil Pekerjaan : 0


Pengadaan Alat - Alat Kedokteran Gigi 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Alat - Alat Kedokteran Kebidanan dan Penyakit Kandungan 400,000
- Pejabat Pengadaan : 1
- Pejabat Penerima Hasil Pekerjaan : 1
Pengadaan Alat - Alat Laboratorium
Pengadaan Alat -alat Laboratorium Biologi 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Alat -alat Laboratorium Kimia 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0

Pengadaan Konstruksi/Bangunan Gedung


Rehab/Perbaikan Sedang Ruang Puskesmas 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Konstruksi Fisik/Bangunan Bukan Gedung
Penataan Halaman Puskesmas
Hotmik/Paping Blok/Flour Halaman 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pembuatan Taman 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pembuatan Pagar 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pembuatan Kanopi Puskesmas
Pembuatan Kanopi 400,000
- Pejabat Pengadaan : 1
- Pejabat Penerima Hasil Pekerjaan : 1
Pembuatan Tempat Parkir dan Garasi
Tempat Parkir Mobil/Motor 400,000
- Pejabat Pengadaan : 1
- Pejabat Penerima Hasil Pekerjaan : 1
Garasi Mobil Pusling/Ambulance 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Sarana dan Prasarana Sanitasi
Pembuatan WC/Toilet 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pembuatan Sarana Air Bersih (SAB) 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pembuatan SPAL 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pembuatan Bak Sampah 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0

Pengadaan Alat Listrik (Pembelian Lampu, dll) 0


- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0
Pengadaan Sofa 0
- Pejabat Pengadaan : 0
- Pejabat Penerima Hasil Pekerjaan : 0

Pejabat Pembuat Komitmen (Tidak diberikan kepada PA/KPA yang merangkap sbg PPK)
5 2 1 01 06 Honorarium/Uang Saku Peserta Kegiatan/Rapat : (PNS/Non PNS dihadiri Eselon II / Masyarakat)
- Uang Saku Peserta Kegiatan/Rapat (Minimal 3 Jam diluar Jam kerja pada Hari Kerja)
Kegiatan …………………………1
- Peserta : 6 org x 1 hari x Rp. 30,000.00 6
RINCIA
KODE REKENING URAIAN
Volume

Kegiatan …………………………2
- Peserta : org x hari x Rp. 30,000.00 0
Kegiatan …………………………3
- Peserta : org x hari x Rp. 30,000.00 0
5 2 1 02 Standar Upah
5 2 1 02 05 Upah :
Pemasangan Kanopi, Pagar dan Teralis Besi Puskesmas (Sesuaikan dengan Belanja Kanopi, Pagar, Teralis) Pekerjaan masing - masing
Dibawah 10 Jt - Pemasangan Kanopi :
- Tukang : org x hr 75,000.00 0
- Pembantu Tukang : org x hr 60,000.00 0
Dibawah 10 Jt - Pemasangan Pagar Minimalis :
- Tukang : org x hr 75,000.00 0
- Pembantu Tukang : org x hr 60,000.00 0
Dibawah 10 Jt - Pemasangan Pintu Minimalis :
- Tukang : org x hr 75,000.00 0
- Pembantu Tukang : org x hr 60,000.00 0
Dibawah 10 Jt - Pemasangan Teralis Besi Minimalis :
- Tukang : org x hr 75,000.00 0
- Pembantu Tukang : org x hr 60,000.00 0
5 2 1 03 Uang Lembur (Pekerjaan sangat penting, mendesak & Pelaksanaannya tdk dapat ditangguhkan diluar Jam Kerja, Paling Banyak 3 Ja
5 2 1 03 01 Uang Lembur PNS (dan Paling Banyak 8 Jam sehari pada hari Libur, hrs ada Surat Tugas, Absensi & Hasil Output Pekerjaan)
Uang Lembur PNS (diluar jam kerja pada hari kerja) Jam
- Lembur PNS : Gol I : org x hr 0
- Lembur PNS : Gol II : org x hr 0
- Lembur PNS : Gol III : 6 org x 12 hr 2 144
- Lembur PNS : Gol IV : org x hr 0
5 2 1 03 02 Uang Lembur Non PNS
Uang Lembur Non PNS Jam
- Lembur Non PNS : 3 org x 5 hr 3 45

5 2 2 17 Belanja Kursus, Pelatihan, Sosialisasi, Dan Bimbingan Teknis PNS


5 2 2 17 01 Belanja Kursus-kursus Singkat/Pelatihan
Pendidikan, Pelatihan dan Bimbingan Teknis :
a. Biaya Diklat ( at Cost )
Diklat 1 Pengelola Aset
- Peserta : 1 org x Rp. 5,000,000 1
Diklat 2 ……………….
- Peserta : org x Rp. 0
b. Uang Saku Diklat ( Disesuaikan lama Hari )
Uang Saku Diklat 1 … (Pilih Salah Satu)
- dibawah 7 hari : 1 org x Rp. 600,000 1
- 8 hari s/d 15 hari : org x Rp. 750,000 0
- Lebih dari 15 hari : org x Rp. 1,000,000 0
Uang Saku Diklat 2 … (Pilih Salah Satu)
- dibawah 7 hari : org x Rp. 600,000 0
- 8 hari s/d 15 hari : org x Rp. 750,000 0
- Lebih dari 15 hari : org x Rp. 1,000,000 0
5 2 2 BELANJA BARANG DAN JASA
5 2 2 01 Belanja Bahan Pakai Habis
5 2 2 01 01 Belanja Alat Tulis Kantor (ATK)
- ATK untuk dukungan Biaya Operasional Puskesms Rp. 1

5 2 2 01 04 Belanja Perangko/Materai dan Benda Pos lainnya


- Materai : (Kebutuhan 1 Tahun)
Bh x Rp. 7,000 0
Bh x Rp. 4,000 0
5 2 2 01 12 Belanja Kelengkapan (Aksesoris) Komputer : (Mouse, Keyboard, Flask disk, Hardisk External, Modem, Speaker PC, Charger, dll)
- Kelengkapan / Aksesoris Komputer Rp. 1
5 2 2 02 Belanja Bahan / Material
5 2 2 02 04 Belanja Bahan Obat - Obatan -
- Belanja Bahan Obat-Obatan Rp. 1
- Belanja Bahan Medis Habis Pakai Rp. 1
5 2 2 03 Belanja Jasa Kantor
5 2 2 03 06 Belanja Kawat/Faksimili/Internet
- Belanja Internet dan Aplikasi e-Pusk 12 Bln Rp. 12
- Belanja Pulsa Internet utk Modem Rp. 1
RINCIA
KODE REKENING URAIAN
Volume

5 2 2 03 08 Belanja Sertifikasi
- Jasa Kalibrasi Alat-alat Kesehatan Rp. 0 1
5 2 2 03 09 Belanja Jasa Transaksi Keuangan
- Jasa Transaksi Keuangan (Kliring Bank) 12 Bln Rp. 12
5 2 2 03 17 Belanja Jasa Kesehatan
- Jasa Pelayanan Kesehatan (Jaspel) Rp. 201,797,250.00 1
5 2 2 05 Belanja Perawatan Kendaraan Bermotor (Servis & Suku Cadang) Max (01+02) : 10,000,000
5 2 2 05 01 Belanja Jasa Service/Pemeliharaan Kendaraan Dinas
- Servis Mobil Pusling Unit x Rp. 0
5 2 2 05 02 Belanja Penggantian Suku Cadang Mesin
- Penggantian Suku Cadang Mobil Pusling 0 Unit 10,000,000 0
5 2 2 05 03 Belanja Bahan Bakar Minyak dan Pelumas (Bensin/Pertamax dan Olie Mesin)
- Mobil Pusling 0 12 Bln 1,155,000 0
5 2 2 06 Belanja Cetak dan Penggandaan
5 2 2 06 01 Belanja Cetak
- Cetak untuk dukungan Biaya Operasional Puskesms Rp. 5,000,000 1
5 2 2 06 02 Belanja Penggandaan (Foto Copy)
- Penggandaan untuk dukungan Biaya Operasional Puskesms Rp. 460,000 1
5 2 2 06 03 Belanja Penjilidan
- Penjilidan untuk dukungan Biaya Operasional Puskesms Rp. 1
5 2 2 11 Belanja Makanan dan Minuman
5 2 2 11 02 Belanja Makanan dan Minuman Rapat
- Kegiatan Dalam Gedung :
Rapat Evaluasi Program JKN
- Makan : 35 Org x 2 Kl x 1 Thn 27,500 70
- Snack : 35 Org x 2 Kl x 1 Thn 9,000 70
Rapat Bimbingan Teknis Program JKN
- Makan : 45 Org x 2 Kl x 1 Thn 27,500 90
- Snack : 45 Org x 2 Kl x 1 Thn 9,000 90
Rapat Pertemuan Pembuatan PKP, Laporan Tahunan dan Perencanaan
- Makan : 45 Org x 2 Kl x 1 Thn 27,500 90
- Snack : 45 Org x 2 Kl x 1 Thn 9,000 90
Rapat Sosialisasi ……………
- Makan : Org x Kl x 1 Thn 27,500 0
- Snack : Org x Kl x 1 Thn 9,000 0
- Kegiatan Luar Gedung :
Rapat Lintas Sektor Tk. Kec.
- Makan : Org x Kl x 1 Thn 27,500 0
- Snack : Org x Kl x 1 Thn 9,000 0
Pertemuan Penyuluhan
- Makan : Org x Kl x 1 Thn 27,500 0
- Snack : Org x Kl x 1 Thn 9,000 0
Kegiatan Prolanis
- Makan : Org x Kl x 1 Thn 27,500 0
- Snack : Org x Kl x 1 Thn 9,000 0
Kegiatan Sosialisasi ………
- Makan : Org x Kl x 1 Thn 27,500 0
- Snack : Org x Kl x 1 Thn 9,000 0
Kegiatan ...........
- Makan : Org x Kl x 1 Thn 27,500 0
- Snack : Org x Kl x 1 Thn 9,000 0
5 2 2 15 Belanja Perjalanan Dinas
5 2 2 15 01 Belanja Perjalanan Dinas Dalam Daerah
- Perjalanan Dinas dari Puskesmas ke Desa
- Kunjungan Rumah dalam rangka kegiatan Preventif dan Promotif :
kl Rp. 30,000 0
- Penyuluhan Luar Gedung :
kl Rp. 30,000 0
- Sosialisasi …………
kl Rp. 30,000 0
- Perjalanan Dinas dari Puskesmas ke Dinas Kesehatan
Konsultasi Program Kegiatan Pilih Salah Satu
- Zona I : : kl Rp. 50,000 0
- Zona II : : 24 kl Rp. 75,000 24
- Zona III : : kl Rp. 100,000 0
RINCIA
KODE REKENING URAIAN
Volume

5 2 2 15 02 Belanja Perjalanan Dinas Luar Daerah ( at Cost )


- Perjalanan Dinas Luar Daerah (Kalau Bisa Kode Rekening ini Jangan digunakan) 1
5 2 2 20 Belanja Pemeliharaan
5 2 2 20 03 Belanja Pemeliharaan Gedung/Kantor (Sarananya sudah ada diperbaiki, diganti yg rusak atau ditambah yang belum ada)
Pemeliharaan Sarana dan Prasarana
- Pemeliharaan Sanitasi Puskesmas (Kamar Mandi, Toilet, Wastafel, Saluran, dll) 1
- Pemeliharaan Ruang/Gedung Puskesmas (Pengecatan, Penggantian Kunci, Engsel, Pintu, Jendela) 1
5 2 2 20 05 Belanja Pemeliharaan Perlengkapan dan Peralatan Kantor ( sudah ada dipelihara, diperbaiki atau diganti bagian yg rusak - ru
- Pemeliharaan Perlengkapan dan Peralatan Kantor (Pemeliharaan AC, Genset, Kursi, Meja, Almari, dll) 1
- Pemeliharaan Alat - Alat Kesehatan 1
5 2 2 20 09 Belanja Pemeliharaan Komputer dan Jaringannya (Servis omputer, Kabel Jaringan, Hub, Switch, Acces Point, dll)
- Pemeliharaan Komputer dan Jaringannya 1
5 2 2 30 Belanja Jasa Tenaga Ahli / Instruktur / Narasumber PNS
5 2 2 30 01 Jasa Tenaga Ahli / Instruktur / Narasumber PNS
- Narasumber dalam rangka Bintek Bidang Kesehatan : (Kegiatan JKN di Puskesmas)
- Eselon II : org kl/Thn Jam 450,000 0
- Eselon III : org kl/Thn Jam 400,000 0
- Eselon IV : org kl/Thn Jam 350,000 0
- Notulen : org kl/Thn 150,000 0

Narasumber Kegiatan Prolanis : Bln


- Narasumber Edukasi : org x kl x 350,000 0
- Instruktur Senam : org x kl x 200,000 0
- Pembantu Instruktur : org x kl x 50,000 0
Tim Pendampingan Akreditasi Puskesmas (Bagi Pusk. yang akan diakreditasi 2017) :
- Tim Pendampin 3 org 1 kl 8 Bln x 200,000 24
Pengajar untuk Pendampingan Penggunaan Alat EKG dan USG (yang memiliki Alat) :
1 Org x 3 Jam 1 kl / hr x 200,000 3
Pengajar untuk Pendampingan Penggunaan Alat Incubator (yang memiliki Alat) :
Org x Jam kl / hr x 200,000 0
Pengajar untuk Pendampingan Kegiatan Simulasi Alat Pemadam Kebakaran
Org x Jam kl / hr x 200,000 0
Pengajar untuk Pendampingan Pelaksanaan Simpus / Prog E-Puskesmas :
Org x Jam kl / hr x 200,000 0
5 2 3 Belanja Modal
5 2 3 02 Belanja Modal Pengadaan Alat-alat Berat
5 2 3 02 10 Belanja Modal Pengadaan Mesin Genset
- Mesin Genset Unit 15,000,000 0
5 2 3 10 Belanja Modal Pengadaan Peralatan Kantor
5 2 3 10 02 Belanja Modal Pengadaan Mesin Hitung/Kalkulator
- Mesin Hitung/Kalkulator 3 Unit 200,000 3
5 2 3 10 11 Belanja Modal Pengadaan Tabung Pemadam Kebakaran
- Tabung Pemadam Kebakaran 1 Unit 1,500,000 1
5 2 3 10 12 Belanja Modal Pengadaan Televisi
- Televisi Unit 7,500,000 0
5 2 3 10 13 Belanja Modal Pengadaan Mesin Potong Rumput
- Mesin Potong Rumput Unit 2,500,000 0
5 2 3 10 15 Belanja Modal Pengadaan Pompa Air
- Pompa Air Unit 2,500,000 0
5 2 3 11 Belanja Modal Pengadaan Perlengkapan Kantor
5 2 3 11 02 Belanja Modal Pengadaan Lemari
- Lemari 2 Unit 3,500,000 2
5 2 3 11 04 Belanja Modal Pengadaan Filing Kabinet
- Filling Kabinet 2 Unit 4,500,000 2
5 2 3 11 05 Belanja Modal Pengadaan White Board/Papan Tulis Putih
- Papan / White Board 2 Unit 2,500,000 2
5 2 3 11 07 Belanja Modal Pengadaan Kipas Angin
- Kipas Angin 2 Unit 1,000,000 2
5 2 3 11 08 Belanja Modal Pengadaan AC Split
- AC Spliit 3 Unit 5,000,000 3
5 2 3 11 11 Belanja Modal Pengadaan Papan Nama
- Pengadaan Papan Plang Puskesmas Unit 5,000,000 0
5 2 3 11 14 Belanja Modal Pengadaan Mesin / Kartu Absen
- Pengadaan Mesin/Kartu Absen/Mesin Pendaftaran 1 Unit 7,500,000 1
5 2 3 11 15 Belanja Modal Pengadaan Penyedot Debu
RINCIA
KODE REKENING URAIAN
Volume

- Cleaner Vacum 1 Unit 3,500,000 1


5 2 3 11 16 Belanja Modal Pengadaan Teralis Besi Pilih salah satu 28,576,000.00
Dibawah 10 Jt - Teralis Besi Kanopi m2 0 0
Dibawah 10 Jt - Pagar Minimalis m2 0 0
Dibawah 10 Jt - Pagar/Pintu Minimalis m2 0 0
Dibawah 10 Jt - Teralis Besi Minimalis 76 m2 376,000 76
5 2 3 12 Belanja Modal Pengadaan Komputer
5 2 3 12 02 Belanja Modal Pengadaan Komputer PC
- Komputer PC Unit 7,500,000 0
5 2 3 12 03 Belanja Modal Pengadaan Komputer Notebook
- Komputer Notebook 6 Unit 7,500,000 6
5 2 3 12 04 Belanja Modal Pengadaan Printer
- Printer 2 Unit 3,000,000 2
5 2 3 12 05 Belanja Modal Pengadaan Scanner
- Scanner 1 Unit 1,500,000 1
5 2 3 12 08 Belanja Modal Pengadaan UPS/Stabilizer 0.00
- Pengadaan UPS Komputer PC Unit 1,000,000 0
- Pengadaan Stabiliser Komputer PC Unit 500,000 0
5 2 3 12 11 Belanja Modal Pengadaan Perangkat Lunak Sistem Operasi
- Software Program Obat/Windows Unit 3,000,000 0
5 2 3 12 14 Belanja Modal Pengadaan Perangkat Lunak Anti Virus
- Software Program Antivirus 1 Unit 500,000 1
5 2 3 13 Belanja Modal Pengadaan Meubelair
5 2 3 13 01 Belanja Modal Pengadaan Meja Kerja
- Meja Kerja 2 Unit 2,500,000 2
5 2 3 13 02 Belanja Modal Pengadaan Meja Rapat
- Meja Rapat 4 Unit 3,500,000 4
5 2 3 13 05 Belanja Modal Pengadaan Meja Komputer
- Meja Komputer Unit 1,500,000 0
5 2 3 13 09 Belanja Modal Pengadaan Kursi Kerja
- Kursi Kerja 2 Unit 1,500,000 2
5 2 3 13 10 Belanja Modal Pengadaan Kursi Rapat
- Kursi Rapat 10 Unit 600,000 10
5 2 3 13 13 Belanja Modal Pengadaan Kursi Tunggu
- Kursi Tunggu 2 Unit 3,000,000 2
5 2 3 13 14 Belanja Modal Pengadaan Kursi Lipat
- Kursi Lipat Unit 500,000 0
5 2 3 13 15 Belanja Modal Pengadaan Kursi Susun
- Kursi Susun Unit 250,000 0
5 2 3 13 17 Belanja Modal Pengadaan Rak/Lemari Arsip Kayu
- Lemari Arsip Kayu 1 Unit 3,500,000 1
5 2 3 13 20 Belanja Modal Pengadaan Rak Buku/Kembang
- Rak Buku 1 Unit 2,500,000 1
5 2 3 13 99 Belanja Modal Pengadaan Meubelair Lainnya 8,200,000.00
- Belanja Modal Pengadaan Kursi KIP/K Unit 1,000,000 0
- Belanja Modal Pengadaan Meja Reseptionis 10 Unit 820,000 10
5 2 3 14 Belanja Modal Pengadaan Peralatan Dapur
5 2 3 14 05 Belanja Modal Pengadaan Kulkas/Lemari Es/Freezer
- Lemari Es Unit 4,000,000 0
5 2 3 15 Belanja Modal Pengadaan Penghias Ruangan Rumah Tangga
5 2 3 15 03 Belanja Modal Pengadaan Gordyn
- Gordyn 76 m2 300,000 76
5 2 3 15 04 Belanja Modal Pengadaan Karpet
- Karpet 1 m' 1,000,000 1
5 2 3 16 Belanja Modal Pengadaan Alat - Alat Studio
5 2 3 16 01 Belanja Modal Pengadaan Camera
- Camera Unit 5,000,000 0
5 2 3 16 02 Belanja Modal Pengadaan Handycame
- Handycame 1 Unit 6,000,000 1
5 2 3 16 03 Belanja Modal Pengadaan Proyektor
- Proyektor Unit 7,500,000 0
5 2 3 16 04 Belanja Modal Pengadaan Sound System
- Speaker System 1 Unit 4,000,000 1
5 2 3 16 05 Belanja Modal Pengadaan VCD/DVD Player
- VCD/DVD Player Unit 1,750,000 0
RINCIA
KODE REKENING URAIAN
Volume

5 2 3 16 06 Belanja Modal Pengadaan Microphone/Wireless/Pengeras Suara Lainnya


- Microphone/Wireless/Pengeras Suara 1 Unit 5,000,000 1
5 2 3 16 07 Belanja Modal Pengadaan CCTV
- CCTV 1 Unit 7,500,000 1
5 2 3 16 10 Belanja Modal Pengadaan Layar Proyektor/Screen Projektor
- Layar Proyektor/Screen Projektor Unit 2,500,000 0
5 2 3 17 Belanja Modal Pengadaan Alat - Alat Komunikasi
5 2 3 17 01 Pengadaan Telepon
- Telepon / Hand Phone (HP) 1 Unit 750,000 1
5 2 3 17 02 Pengadaan Faximile
- Faximile Unit 2,500,000 0
5 2 3 17 10 Belanja Modal Pengadaan Media Pengumuman 2,600,000.00
- Visualisasi Data (Running Text, Poster, Baligho, Neon Box, dll) 4 Thn 500,000 4
- Papan Informasi Tempat / Ruang Pelayanan, dll 12 Thn 50,000 12
5 2 3 19 Belanja Modal Pengadaan Alat - Alat Kedokteran
5 2 3 19 01 Pengadaan Alat - Alat Kedokteran Umum
- Alat - alat Kedokteran Umum Rp. 5,321,622 1
5 2 3 19 02 Pengadaan Alat - Alat Kedokteran Gigi
- Alat - alat Kedokteran Gigi Rp. 9,668,000 1
5 2 3 19 07 Pengadaan Alat - Alat Kedokteran Kebidanan dan Penyakit Kandungan
- Alat - alat Kedokteran Kebidanan dan Penyakit Kandungan Rp. 16,000,000 1
5 2 3 20 Belanja Modal Pengadaan Alat - Alat Laboratorium
5 2 3 20 01 Pengadaan Alat -alat Laboratorium Biologi
- Alat - alat Laboratorium Biologi Rp. 1
5 2 3 20 02 Pengadaan Alat -alat Laboratorium Kimia
- Alat - alat Laboratorium Kimia Rp. 5,000,000 1
5 2 3 25 Belanja Modal Pengadaan Instalasi listrik, Gas, Telepon dan Air
5 2 3 25 01 Belanja Modal Pengadaan Instalasi Listrik (Penambahan Daya Listrik)
- Penambahan Daya Listrik Rp. 1
- Penambahan Instalasi Listrik Rp. 1
5 2 3 26 Belanja Modal Pengadaan Konstruksi/Pembelian*) Bangunan
5 2 3 26 01 Belanja Modal Pengadaan Konstruksi/Pembelian Gedung Kantor (sebelumnya tdk ada kemudian dibuat atau diadakan)
- Rehab/Perbaikan Sedang Ruang/Bangunan Puskesmas Rp. 1
5 2 3 26 09 Belanja Modal Pengadaan Konstruksi Fisik/Bangunan Bukan Gedung
- Penataan Halaman Puskesmas
- Hotmik/Paping Blok/Flour Halaman Rp. 1
- Pembuatan Taman Rp. 1
- Pembuatan Pagar Rp. 1
- Pembuatan Kanopi Puskesmas
- Pembuatan Kanopi Puskesmas Rp. 11,746,000 1
- Pembuatan Tempat Parkir dan Garasi
- Tempat Parkir Mobil/Motor Rp. 24,240,000 1
- Garasi Mobil Pusling/Ambulance Rp. 9,696,000 1
- Sarana dan Prasarana Sanitasi
- Pembuatan WC/Toilet Rp. 1
- Pembuatan Sarana Air Bersih (SAB) Rp. 1
- Pembuatan SPAL Rp. 1
- Pembuatan Bak Sampah Rp. 1

5 2 2 01 03 Belanja Alat Listrik (Pembelian Lampu, dll) dan Elektronik Rp. 1


5 2 2 01 05 Belanja Peralatan Kebersihan & Bhn Pembersih (Tong Sampah, Sapu, Sabun, dll) 1
5 2 3 11 09 Belanja Modal Pengadaan Loker : unit 3,500,000 0
5 2 3 13 08 Belanja Modal Pengadaan Sofa : (Kurang dari 10 jt) 1 set 6,000,000 1
5 2 3 14 04 Belanja Modal Pengadaan Dispenser (Meja) : 1 bh 500,000 1
5 2 3 14 08 Belanja Modal Pengadaan Mesin Cuci : unit 5,000,000 0

Mengetahui / Menyetujui :
Kepala Dinas Kesehatan
Kabupaten Cirebon
RINCIA
KODE REKENING URAIAN
Volume

Dr. H. Ahmad Qoyyim, MARS


NIP.19600412 198711 1 002

PERHATIAN :
- Untuk Mengisi harus melihat DPA 2016 Murni, Jangan sampai di DPA 2016 Murni sudah ada dan jumlahnya sudah cukup tapi ma

- Koordinasi dengan kepala puskesmas untuk mengisinya

- Sesuaikan dengan kebutuhan puskesmas, format masih dapat ditambah dengan cara inset (atau Koordinasi dg Medoi)

- Klo masih ada kegiatan yg belum masuk dalam format mohon dibicarakan dengan ka. Puskesmas

- Harga masih dapat dirubah, tapi tetap menggunakan standar harga pemda tapi klo gak mau dirubah juga sudah benar

- Jangan lupa bapak/ibu harus punya rincian baik kegiatan apa saja, maupun barang apa saja yg mau dibeli sebagai bagian tak te

- Gunakan standar harga dan standar biaya pemda sebagai pegangan bapak/ibu dalam menyusun RKA (dapat Foto copy di Progra
Formulir

RKA-SKPD 2.2.1

EBON

18
Puskesmas Jemaras

s Jemaras

Target Kinerja

Peserta Tambahan BPJS dalam 1 Thn : 56,055


di Puskesmas Jemaras
Orang

558,747,872.00

pada FKTP Puskesmas Peserta Tambahan BPJS dalam 1 Thn : 56,055


Orang

kesmas Jemaras 100%

A LANGSUNG
AT DAERAH
RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)

Jangan Diisi
paket 0.00 0.00
paket 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000
op 400,000.00 400,000.00
op 300,000.00 300,000.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000
op 400,000.00 400,000.00
op 300,000.00 300,000.00

0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000
op 400,000.00 400,000.00
op 300,000.00 300,000.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000
op 400,000.00 400,000.00
op 300,000.00 300,000.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00

400,000 300,000
op 400,000.00 400,000.00
op 300,000.00 300,000.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000
op 400,000.00 400,000.00
op 300,000.00 300,000.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

400,000 300,000
op 400,000.00 400,000.00
op 300,000.00 300,000.00

400,000 300,000
op 400,000.00 400,000.00
op 300,000.00 300,000.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

ob 600,000.00 0.00

oh 30,000.00 180,000.00
RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)

oh 30,000.00 0.00

oh 30,000.00 0.00

rjaan masing - masing dibawah 10 Juta

oh 75,000.00 0.00
oh 60,000.00 0.00

oh 75,000.00 0.00
oh 60,000.00 0.00

oh 75,000.00 0.00
oh 60,000.00 0.00

oh 75,000.00 0.00
oh 60,000.00 0.00
erja, Paling Banyak 3 Jam sehari pada hari kerja
utput Pekerjaan)

ohj 8,000.00 0.00


ohj 10,000.00 0.00
ohj 12,000.00 1,728,000.00
ohj 14,000.00 0.00

ohj 8,000.00 360,000.00

ok 5,000,000.00 5,000,000.00

ok 0.00 0.00

ok 600,000.00 600,000.00
ok 750,000.00 0.00
ok 1,000,000.00 0.00

ok 600,000.00 0.00
ok 750,000.00 0.00
ok 1,000,000.00 0.00

thn 0.00 0.00

bh 7,000.00 0.00 Nilai : 7.000,- (Nilai Belanja diatas Rp. 1.000.000,-)


bh 4,000.00 0.00 Nilai : 3.000,- (Nilai Belanja antara Rp. 250.000,- s/d Rp. <1.000.0
eaker PC, Charger, dll)
thn 0.00 0.00

thn 0.00 0.00


thn 0.00 0.00

bln 0.00 0.00 Rincian : Aplikasi e-Puskesmas : Sewa/Bulan : 500.000 dan Konek
thn 0.00 0.00
RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)

thn 0.00 0.00

bln 0.00 0.00


Pembulatan
thn 201,797,250 201,797,250.00 201,797,250

Pemeliharaan Kendaraan Dinas (Servis dan Penggantian Suku Cad


unit/thn 0.00 0.00 Pusling
Untuk Servis dan Penggantian Suku Cadang Total Maxsimal Rp. 10
unit/thn 10,000,000.00 0.00
Untuk Belanja Bensin / Pertamax dan Olie Mesin
unit/bln 1,155,000.00 0.00 Bensin : 1 Liter
Olie Mesin Mesran : 1 Liter

thn 5,000,000.00 5,000,000.00

thn 460,000.00 460,000.00

thn 0.00 0.00

ok/thn 27,500.00 1,925,000.00 Makan


ok/thn 9,000.00 630,000.00 Snack

ok/thn 27,500.00 2,475,000.00


ok/thn 9,000.00 810,000.00

ok/thn 27,500.00 2,475,000.00


ok/thn 9,000.00 810,000.00

ok/thn 27,500.00 0.00


ok/thn 9,000.00 0.00

ok/thn 27,500.00 0.00


ok/thn 9,000.00 0.00

ok/thn 27,500.00 0.00


ok/thn 9,000.00 0.00

ok/thn 27,500.00 0.00


ok/thn 9,000.00 0.00

ok/thn 27,500.00 0.00


ok/thn 9,000.00 0.00

ok/thn 27,500.00 0.00


ok/thn 9,000.00 0.00

kl/thn 30,000.00 0.00

kl/thn 30,000.00 0.00

kl/thn 30,000.00 0.00

kl/thn 50,000.00 0.00


kl/thn 75,000.00 1,800,000.00
kl/thn 100,000.00 0.00
RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)

thn 0.00

ang belum ada)

thn 0.00
thn 0.00
nti bagian yg rusak - rusak ringan )
thn 1,000,000.00 1,000,000.00
thn 2,000,000.00 2,000,000.00

thn 0.00

okj 450,000.00 0.00


okj 400,000.00 0.00
okj 350,000.00 0.00
ok 150,000.00 0.00

okb 350,000.00 0.00


okb 200,000.00 0.00
okb 50,000.00 0.00

okb 200,000.00 4,800,000.00

okb 200,000.00 600,000.00

okb 200,000.00 0.00


okb
okb 200,000.00 0.00

okb 200,000.00 0.00

Unit 15,000,000.00 0.00

Unit 200,000.00 600,000.00

Unit 1,500,000.00 1,500,000.00

Unit 7,500,000.00 0.00

Unit 2,500,000.00 0.00

Unit 2,500,000.00 0.00

Unit 3,500,000.00 7,000,000.00

Unit 4,500,000.00 9,000,000.00

Unit 2,500,000.00 5,000,000.00

Unit 1,000,000.00 2,000,000.00

Unit 5,000,000.00 15,000,000.00

Unit 5,000,000.00 0.00

Unit 7,500,000.00 7,500,000.00


RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)
Unit 3,500,000.00 3,500,000.00

m2 0.00 0.00 Kanopi


m2 0.00 0.00 1.Besi Standar (m2) : Rp. 356.600
m2 0.00 0.00 2.Bahan Standar/Solar (m2) : 840.400
m2 376,000.00 28,576,000.00 3.Bahan Twint Light (m2) : Rp. 741.600

Unit 7,500,000.00 0.00

Unit 7,500,000.00 45,000,000.00

Unit 3,000,000.00 6,000,000.00

Unit 1,500,000.00 1,500,000.00

Unit 1,000,000.00 0.00


Unit 500,000.00 0.00

Unit 3,000,000.00 0.00

Unit 500,000.00 500,000.00

Unit 2,500,000.00 5,000,000.00

Unit 3,500,000.00 14,000,000.00

Unit 1,500,000.00 0.00

Unit 1,500,000.00 3,000,000.00

Unit 600,000.00 6,000,000.00

Unit 3,000,000.00 6,000,000.00

Unit 500,000.00 0.00

Unit 250,000.00 0.00

Unit 3,500,000.00 3,500,000.00

Unit 2,500,000.00 2,500,000.00

Unit 1,000,000.00 0.00


Unit 820,000.00 8,200,000.00

Unit 4,000,000.00 0.00

m2 300,000.00 22,800,000.00

m' 1,000,000.00 1,000,000.00

Unit 5,000,000.00 0.00

Unit 6,000,000.00 6,000,000.00

Unit 7,500,000.00 0.00

Unit 4,000,000.00 4,000,000.00

Unit 1,750,000.00 0.00


RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)

Unit 5,000,000.00 5,000,000.00

Unit 7,500,000.00 7,500,000.00

Unit 2,500,000.00 0.00

Unit 750,000.00 750,000.00

Unit 2,500,000.00 0.00

Thn 500,000.00 2,000,000.00


Thn 50,000.00 600,000.00

thn 5,321,622.00 5,321,622.00

thn 9,668,000.00 9,668,000.00

thn 16,000,000.00 16,000,000.00

thn 0.00 0.00

thn 5,000,000.00 5,000,000.00

thn 0.00 0.00


thn 0.00 0.00

t atau diadakan)
thn 0.00 0.00

thn 0.00 0.00


thn 0.00 0.00
thn 0.00 0.00

thn 11,746,000.00 11,746,000.00

thn 24,240,000.00 24,240,000.00


thn 9,696,000.00 9,696,000.00

thn 0.00 0.00


thn 0.00 0.00
thn 0.00 0.00
thn 0.00 0.00

thn 0.00 0.00


thn 0.00 0.00
unit 3,500,000.00 0.00
set 6,000,000.00 6,000,000.00
bh 500,000.00 500,000.00
unit 5,000,000.00 0.00

JUMLAH 558,747,872.00

0.00 Siiip

Cirebon, 27 September 2016

Kepala Fasilitas Kesehatan Tingkat Pertama


Puskesmas Jemaras
RINCIAN PERHITUNGAN JUMLAH
Satuan Harga Satuan (Rp)
Hj. Maemunah,SKM,M.Si
NIP. 19651227 198902 2 001

udah cukup tapi masih tetap ditambah lagi

bagai bagian tak terpisahkan dari RKA ini

Foto copy di Program)


nja antara Rp. 250.000,- s/d Rp. <1.000.000,-)

esmas : Sewa/Bulan : 500.000 dan Koneksi Jaringan Bandwith : 2 MBps utk Internet / Bulan : 450.000
Dinas (Servis dan Penggantian Suku Cadang) hanya untuk Mobil Pusling saja (Kendaraan Roda 2 Tidak Ada)
10,000,000 Unit/Tahun
ntian Suku Cadang Total Maxsimal Rp. 10.000.000

8,500
63,300

27,500
9,000
Pagar Minimalis Pagar/Pintu Minimalis Teralis Besi Minimalis
1.Besi Hitam (m2) : Rp. 791.000 1.Jarak 3,5 cm (m2) : Rp. 741.600 1.Besi 12 mm (m2) : Rp. 376.000
2.Galvanis (m2) : Rp. 988.800 2.Jarak 7 cm (m2) : Rp. 741.600
3.Jarak 5 cm (m2) : Rp. 741.600
PEMERINTAH KABUPATEN CIREBON
DINAS KESEHATAN
Jl. Sunan Muria No. 6 Telp. (0231) 320273

LAPORAN REALISASI PENDAPATAN DAN BELANJA DANA KAPIT


DINAS KESEHATAN KABUPATEN CIREBON
TAHUN 2015

NO. NAMA PUSKESMAS REALISASI PENDAPATAN REALISASI BELANJA

1 Astanajapura 2,169,417,000 2,030,531,481

2 Astanalanggar 895,724,000 840,742,434

3 Astapada 1,716,516,000 1,659,948,898

4 Babakan 1,471,985,000 1,687,492,473

5 Beber 1,957,295,500 2,180,649,793

6 Bunder 689,000,500 617,499,350

7 Cibogo 854,338,500 1,125,921,538

8 Ciledug 1,519,996,500 1,458,557,350

9 Ciperna 993,168,500 923,157,278

10 Ciwaringin 972,393,500 955,713,032

11 Dukupuntang 1,369,452,000 1,837,445,600

12 Gebang 2,512,555,000 2,756,229,053

13 Gegesik 1,699,402,500 1,448,413,517

14 Gembongan 657,231,500 596,997,787

15 Gempol 1,013,133,000 1,072,326,610

16 Gunungjati 1,530,669,500 1,351,242,562

17 Jagapura 1,039,055,000 999,660,376

18 Jemaras 1,028,340,500 1,113,749,264

19 Kalibuntu 784,236,000 711,283,987

20 Kaliwedi 1,842,093,000 1,600,209,278


NO. NAMA PUSKESMAS REALISASI PENDAPATAN REALISASI BELANJA

21 Kamarang 1,875,499,500 1,277,533,248

22 Karangsari 2,462,634,000 2,582,894,910

23 Karangsembung 1,435,369,500 1,361,802,437

24 Kedaton 2,082,806,500 1,725,423,454

25 Kedawung 2,070,480,000 1,634,791,467

26 Kepuh 958,869,000 734,861,227

27 Klangenan 1,334,107,500 1,039,637,918

28 Kubangdeleg 898,164,000 1,007,496,615

29 Losari 1,245,156,000 1,536,734,991

30 Lurah 935,783,000 672,933,791

31 Mayung 647,590,000 712,305,294

32 Mundu 3,072,153,000 3,727,955,400

33 Pabuaran 1,183,899,000 1,203,212,795

34 Palimanan 1,447,986,000 1,455,145,626

35 Pangenan 1,476,593,000 1,521,932,770

36 Pangkalan 614,568,000 560,368,487

37 Panguragan 1,735,932,000 1,370,937,262

38 Pasaleman 1,051,084,500 1,092,747,230

39 Plered 1,403,628,000 1,242,945,915

40 Plumbon 2,120,226,000 1,752,270,048

41 Sedong 1,482,947,500 1,052,546,288

42 Sendang 752,700,000 625,210,060

43 Sidamulya 1,148,757,500 1,233,818,841

44 Sindangjawa 977,440,500 1,056,908,367

45 Sindanglaut 1,736,878,000 1,435,373,203

46 Sumber 1,470,316,000 1,412,485,207

47 Suranenggala 1,661,967,000 1,648,488,469


NO. NAMA PUSKESMAS REALISASI PENDAPATAN REALISASI BELANJA

48 Susukan 1,777,295,500 1,324,313,134

49 Susukanlebak 1,575,921,500 1,425,805,618

50 Talun 1,426,527,000 1,146,855,200

51 Tegalgubug 1,995,972,000 2,052,130,852

52 Tersana 703,021,500 909,085,256

53 Waled 1,202,194,500 894,894,963

54 Wangunharja 1,631,931,500 1,511,821,083

55 Waruroyom 2,436,756,500 1,839,556,390

56 Watubelah 1,376,194,000 1,532,640,344

57 Winong 1,062,430,500 1,187,026,550

JUMLAH 81,187,782,500 77,470,662,371

Sumber, 31 Des
KEPALA DINAS
KABUPATEN

H. MOH. SOFY

NIP. 19580129 1
CIREBON
N
320273

LANJA DANA KAPITASI JKN


EN CIREBON

Kekurangan
2016
SILPA SALDO JASA BUNGA Pagu 2016 Murni +/-

888,269,269 18,379,633 2,137,963,500 31,453,500

325,698,416 7,622,560 628,751,500 266,972,500

666,296,152 15,404,366 1,322,210,000 394,306,000

314,538,177 10,995,784 1,440,227,000 31,758,000

202,419,557 9,138,121 1,714,482,000 242,813,500

304,106,200 5,876,108 558,277,000 130,723,500

42,803,930 6,737,942 565,532,500 288,806,000

635,769,000 14,145,026 1,507,210,500 12,786,000

410,314,872 8,687,309 828,840,000 164,328,500

358,177,518 8,317,919 656,500,000 315,893,500

193,204,250 13,444,390 1,219,246,000 150,206,000

513,505,797 16,571,316 2,461,791,000 50,764,000

837,744,233 14,996,591 932,410,000 766,992,500

316,237,563 6,655,461 875,265,300 -

329,246,040 9,398,332 632,125,000 381,008,000

672,402,188 12,495,218 1,206,933,500 323,736,000

394,309,674 8,968,912 830,634,750 208,420,250

215,637,986 6,781,136 692,011,750 336,328,750

298,060,563 6,022,823 756,000,000 28,236,000

954,423,172 17,394,458 1,120,997,750 721,095,250


SILPA SALDO JASA BUNGA Pagu 2016 Murni +/-

1,239,812,502 16,973,015 1,343,345,000 532,154,500

787,403,940 20,764,624 1,428,000,000 1,034,634,000

661,664,913 14,315,017 1,041,456,000 393,913,500

1,054,219,896 19,224,046 1,533,936,000 548,870,500

1,163,788,883 19,215,097 1,184,270,500 886,209,500

520,622,305 7,515,822 570,174,500 388,694,500

818,060,032 12,539,163 1,081,912,500 252,195,000

228,124,035 8,766,080 798,286,250 99,877,750

426,729,059 14,704,991 1,579,122,000 -

563,901,859 8,042,470 618,003,750 317,779,250

184,942,756 5,665,792 576,000,000 71,590,000

319,007,450 21,563,229 1,813,500,000 1,258,653,000

459,797,255 11,023,934 960,000,000 223,899,000

529,122,309 12,607,263 1,500,320,000 -

437,017,380 12,427,950 1,235,085,000 241,508,000

269,204,963 4,956,379 462,150,000 152,418,000

1,002,551,788 16,218,103 932,100,000 803,832,000

270,955,920 7,477,774 978,000,000 73,084,500

631,371,735 11,367,160 950,268,000 453,360,000

1,157,789,602 19,374,947 1,565,185,000 555,041,000

904,538,262 12,359,896 1,122,880,000 360,067,500

347,317,990 5,719,949 382,083,000 370,617,000

318,734,109 9,117,715 930,345,500 218,412,000

221,765,683 7,567,534 704,137,750 273,302,750

955,292,447 15,050,461 1,442,250,000 294,628,000

566,166,543 12,595,576 876,000,000 594,316,000

702,691,581 16,578,801 1,278,000,000 383,967,000


SILPA SALDO JASA BUNGA Pagu 2016 Murni +/-

868,742,516 12,112,974 987,623,000 789,672,500

653,208,832 13,491,106 1,156,456,000 419,465,500

796,433,373 12,361,407 1,188,000,000 238,527,000

706,960,398 17,662,055 1,191,333,000 804,639,000

93,894,794 6,563,740 546,000,000 157,021,500

660,347,787 9,892,824 766,350,000 435,844,500

661,743,867 13,766,232 1,344,000,000 287,931,500

1,452,605,360 22,038,668 1,449,000,000 987,756,500

428,819,706 13,193,788 1,094,785,500 281,408,500

193,148,950 8,233,633 780,000,000 282,430,500

32,131,665,337 691,082,620 61,477,767,300 20,314,349,000


32,822,747,957

Sumber, 31 Desember 2015


KEPALA DINAS KESEHATAN
KABUPATEN CIREBON

H. MOH. SOFYAN, SH. MH


Pembina Utama Muda
NIP. 19580129 198903 1 002
Yang Dipakai Yang Dipakai
Kekurangan Kekurangan Kekurangan Kekurangan
2016 2016 BOP 2016 + JASPEL 2016
JASPEL (60%) BOP SILPA 2015 JASPEL (60%)

18,872,100 12,581,400 919,230,302 18,872,100

160,183,500 106,789,000 440,109,976 160,183,500

236,583,600 157,722,400 839,422,918 236,583,600

19,054,800 12,703,200 338,237,161 19,054,800

145,688,100 97,125,400 308,683,078 145,688,100

78,434,100 52,289,400 362,271,708 78,434,100

173,283,600 115,522,400 165,064,272 173,283,600

7,671,600 5,114,400 655,028,426 7,671,600

98,597,100 65,731,400 484,733,581 98,597,100

189,536,100 126,357,400 492,852,837 189,536,100

90,123,600 60,082,400 266,731,040 90,123,600

30,458,400 20,305,600 550,382,713 30,458,400

460,195,500 306,797,000 1,159,537,824 460,195,500

- - 322,893,024 -

228,604,800 152,403,200 491,047,572 228,604,800

194,241,600 129,494,400 814,391,806 194,241,600

125,052,150 83,368,100 486,646,686 125,052,150

201,797,250 134,531,500 356,950,622 201,797,250

16,941,600 11,294,400 315,377,786 16,941,600

432,657,150 288,438,100 1,260,255,730 432,657,150


JASPEL (60%) BOP SILPA 2015 JASPEL (60%)

319,292,700 212,861,800 1,469,647,317 319,292,700

620,780,400 413,853,600 1,222,022,164 620,780,400

236,348,100 157,565,400 833,545,330 236,348,100

329,322,300 219,548,200 1,292,992,142 329,322,300

531,725,700 354,483,800 1,537,487,780 531,725,700

233,216,700 155,477,800 683,615,927 233,216,700

151,317,000 100,878,000 931,477,195 151,317,000

59,926,650 39,951,100 276,841,215 59,926,650

- - 441,434,050 -

190,667,550 127,111,700 699,056,029 190,667,550

42,954,000 28,636,000 219,244,548 42,954,000

755,191,800 503,461,200 844,031,879 755,191,800

134,339,400 89,559,600 560,380,789 134,339,400

- - 541,729,572 -

144,904,800 96,603,200 546,048,530 144,904,800

91,450,800 60,967,200 335,128,542 91,450,800

482,299,200 321,532,800 1,340,302,691 482,299,200

43,850,700 29,233,800 307,667,494 43,850,700

272,016,000 181,344,000 824,082,895 272,016,000

333,024,600 222,016,400 1,399,180,949 333,024,600

216,040,500 144,027,000 1,060,925,158 216,040,500

222,370,200 148,246,800 501,284,739 222,370,200

131,047,200 87,364,800 415,216,624 131,047,200

163,981,650 109,321,100 338,654,317 163,981,650

176,776,800 117,851,200 1,088,194,108 176,776,800

356,589,600 237,726,400 816,488,519 356,589,600

230,380,200 153,586,800 872,857,182 230,380,200


JASPEL (60%) BOP SILPA 2015 JASPEL (60%)

473,803,500 315,869,000 1,196,724,490 473,803,500

251,679,300 167,786,200 834,486,138 251,679,300

143,116,200 95,410,800 904,205,580 143,116,200

482,783,400 321,855,600 1,046,478,053 482,783,400

94,212,900 62,808,600 163,267,134 94,212,900

261,506,700 174,337,800 844,578,411 261,506,700

172,758,900 115,172,600 790,682,699 172,758,900

592,653,900 395,102,600 1,869,746,628 592,653,900

168,845,100 112,563,400 554,576,894 168,845,100

169,458,300 112,972,200 314,354,783 169,458,300

12,188,609,400 8,125,739,600 40,948,487,557 12,188,609,400


-
53,137,096,957
JUMLAH
Tambahan
Jml Peserta

938,102,402 5,242 5,242 -


600,293,476 44,495 44,495 -
1,076,006,518 65,718 65,718 -
357,291,961 5,293 5,293 -
454,371,178 40,469 40,469 -
440,705,808 21,787 21,787 -
338,347,872 48,134 48,134 -
662,700,026 2,131 2,131 -
583,330,681 27,388 27,388 -
682,388,937 52,649 52,649 -
356,854,640 25,034 25,034 -
580,841,113 8,461 8,461 -
1,619,733,324 127,832 127,832 -
322,893,024 0 -
719,652,372 63,501 63,501 -
1,008,633,406 53,956 53,956 -
611,698,836 34,737 34,737 -
558,747,872 56,055 56,055 -
332,319,386 4,706 4,706 -
1,692,912,880 120,183 120,183 -
Jml Peserta

1,788,940,017 88,692 88,692 -


1,842,802,564 172,439 172,439 -
1,069,893,430 65,652 65,652 -
1,622,314,442 91,478 91,478 -
2,069,213,480 147,702 147,702 -
916,832,627 64,782 64,782 -
1,082,794,195 42,033 42,033 -
336,767,865 16,646 16,646 -
441,434,050 0 -
889,723,579 52,963 52,963 -
262,198,548 11,932 11,932 -
1,599,223,679 209,776 209,776 -
694,720,189 37,317 37,317 -
541,729,572 0 -
690,953,330 40,251 40,251 -
426,579,342 25,403 25,403 -
1,822,601,891 133,972 133,972 -
351,518,194 12,181 12,181 -
1,096,098,895 75,560 75,560 -
1,732,205,549 92,507 92,507 -
1,276,965,658 60,011 60,011 -
723,654,939 61,770 61,770 -
546,263,824 36,402 36,402 -
502,635,967 45,550 45,550 -
1,264,970,908 49,105 49,105 -
1,173,078,119 99,053 99,053 -
1,103,237,382 63,995 63,995 -
Jml Peserta

1,670,527,990 131,612 131,612 -


1,086,165,438 69,911 69,911 -
1,047,321,780 39,755 39,755 -
1,529,261,453 134,107 134,107 -
257,480,034 26,170 26,170 -
1,106,085,111 72,641 72,641 -
963,441,599 47,989 47,989 -
2,462,400,528 164,626 164,626 -
723,421,994 46,901 46,901 -
483,813,083 47,072 47,072 -
###
RENCANA KERJA ANGGARAN PERUBAHAN

SATUAN KERJA PERANGKAT DAERAH

PEMERINTAH KABUPATEN CIREBON

TAHUN ANGGARAN 2016

Urusan Pemerintahan : 1.02. KESEHATAN

Organisasi : 1.02.01. DINAS KESEHATAN Puskesmas Kaliw

Program : 1.02.33. Program Jaminan Kesehatan Nasional (JKN)

Kegiatan : 1.02.33.18. Kegiatan Pelayanan Kesehatan bagi Peserta JKN pada Puskesmas Jemaras

Waktu Pelaksanaan : 02 Januari 2016 sampai dengan 31 Desember 2016

Lokasi Kegiatan : Puskesmas Jemaras

Sumber Dana : APBD II melalui Dana BPJS

Indikator & Tolok Ukur Kinerja Belanja Langsung

Indikator Tolok Ukur Kinerja

Capaian Program Terpenuhinya Kebutuhan Pelayanan Kesehatan Tingkat Pertama Peserta JKN di Puskesmas Jema

Masukan Jumlah Dana

Terlayaninya Kebutuhan Pelayanan Kesehatan Tingkat Pertama Peserta JKN pada FKTP Puskesm
Keluaran
Jemaras

Hasil Terwujudnya Pelayanan Kesehatan Tingkat Pertama bagi Peserta JKN di Puskesmas Jemaras

Kelompok Sasaran Kegiatan : Masyarakat Kab. Cirebon Terutama Peserta JKN di Puskesmas Jemaras

RINCIAN RENCANA KERJA DAN ANGGARAN PERUBAHAN BELANJA LANGSUNG


MENURUT PROGRAM DAN KEGIATAN SATUAN KERJA PERANGKAT DAERAH
RINCI
KODE REKENING URAIAN
Volume

5 BELANJA DAERAH
5 2 BELANJA LANGSUNG
5 2 1 BELANJA PEGAWAI
5 2 1 01 Honorarium PNS
5 2 1 01 02 Honorarium Tim Pengadaan Barang dan Jasa
D 01 Pengadaan Bahan Obat-obatan
01 a D 01a - Panitia Pengadaan Bahan Obat-obatan dan Medis Habis Pakai 0 Orang 0
01 b D 01b - Panitia PHP Bahan Obat-obatan dan Medis Habis Pakai 0 Orang 0
Pengadaan Peralatan dan Mesin
Pengadaan Alat-alat Berat
D 02 Pengadaan Mesin Genset 0
02 a D 02a - Pejabat Pengadaan :Pengadaan Mesin Genset 0
02 b D 02b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Mesin Genset 0
Pengadaan Peralatan Kantor
D 03 Pengadaan Mesin Hitung/Kalkulator 0
03 a D 03a - Pejabat Pengadaan :Pengadaan Mesin Hitung/Kalkulator 0
03 b D 03b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Mesin Hitung/Kalkulator 0
D 04 Pengadaan Tabung Pemadam Kebakaran 0
04 a D 04a - Pejabat Pengadaan :Pengadaan Tabung Pemadam Kebakaran 0
04 b D 04b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Tabung Pemadam Kebakaran 0
D 05 Pengadaan Televisi 0
05 a D 05a - Pejabat Pengadaan :Pengadaan Televisi 0
05 b D 05b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Televisi 0
D 06 Pengadaan Mesin Potong Rumput 0
06 a D 06a - Pejabat Pengadaan :Pengadaan Mesin Potong Rumput 0
06 b D 06b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Mesin Potong Rumput 0
D 07 Pengadaan Pompa Air 0
07 a D 07a - Pejabat Pengadaan :Pengadaan Pompa Air 0
07 b D 07b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Pompa Air 0
Pengadaan Perlengkapan Kantor
D 08 Pengadaan Lemari 0
08 a D 08a - Pejabat Pengadaan :Pengadaan Lemari 0
RINCI
KODE REKENING URAIAN
Volume

08 b D 08b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Lemari 0


D 09 Pengadaan Filing Kabinet 0
09 a D 09a - Pejabat Pengadaan :Pengadaan Filing Kabinet 0
09 b D 09b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Filing Kabinet 0
D 10 Pengadaan White Board 0
10 a D 10a - Pejabat Pengadaan :Pengadaan White Board 0
10 b D 10b - Pejabat Penerima Hasil Pekerjaan :Pengadaan White Board 0
D 11 Pengadaan Kipas Angin 0
11 a D 11a - Pejabat Pengadaan :Pengadaan Kipas Angin 0
11 b D 11b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Kipas Angin 0
D 12 Pengadaan AC Split 400,000
12 a D 12a - Pejabat Pengadaan :Pengadaan AC Split 1
12 b D 12b - Pejabat Penerima Hasil Pekerjaan :Pengadaan AC Split 1
D 13 Pengadaan Papan Plang Puskesmas 0
13 a D 13a - Pejabat Pengadaan :Pengadaan Papan Plang Puskesmas 0
13 b D 13b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Papan Plang Puskesmas 0
D 14 Pengadaan Mesin/Kartu Absen 0
14 a D 14a - Pejabat Pengadaan :Pengadaan Mesin/Kartu Absen 0
14 b D 14b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Mesin/Kartu Absen 0
D 15 Pengadaan Penyedot Debu 0
15 a D 15a - Pejabat Pengadaan :Pengadaan Penyedot Debu 0
15 b D 15b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Penyedot Debu 0
D 16 Pengadaan Teralis Besi 400,000
16 a D 16a - Pejabat Pengadaan :Pengadaan Teralis Besi 1
16 b D 16b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Teralis Besi 1
Pengadaan Komputer
D 17 Pengadaan Komputer PC 0
17 a D 17a - Pejabat Pengadaan :Pengadaan Komputer PC 0
17 b D 17b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Komputer PC 0
D 18 Pengadaan Komputer Notebook 400,000
18 a D 18a - Pejabat Pengadaan :Pengadaan Komputer Notebook 1
18 b D 18b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Komputer Notebook 1
D 19 Pengadaan Printer 0
19 a D 19a - Pejabat Pengadaan :Pengadaan Printer 0
19 b D 19b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Printer 0
D 20 Pengadaan Scanner 0
20 a D 20a - Pejabat Pengadaan :Pengadaan Scanner 0
20 b D 20b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Scanner 0
D 21 Pengadaan UPS / Stabiliser 0
21 a D 21a - Pejabat Pengadaan :Pengadaan UPS / Stabiliser 0
21 b D 21b - Pejabat Penerima Hasil Pekerjaan :Pengadaan UPS / Stabiliser 0
D 22 Pengadaan Perangkat Lunak Sistem Operasi 0
22 a D 22a - Pejabat Pengadaan :Pengadaan Perangkat Lunak Sistem Operasi 0
22 b D 22b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Perangkat Lunak Sistem Operasi 0
D 23 Pengadaan Perangkat Lunak Anti Virus 0
23 a D 23a - Pejabat Pengadaan :Pengadaan Perangkat Lunak Anti Virus 0
23 b D 23b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Perangkat Lunak Anti Virus 0
Pengadaan Meubelair
D 24 Pengadaan Meja Kerja 0
24 a D 24a - Pejabat Pengadaan :Pengadaan Meja Kerja 0
24 b D 24b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Meja Kerja 0
D 25 Pengadaan Meja Rapat 400,000
25 a D 25a - Pejabat Pengadaan :Pengadaan Meja Rapat 1
25 b D 25b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Meja Rapat 1
D 26 Pengadaan Meja Komputer 0
26 a D 26a - Pejabat Pengadaan :Pengadaan Meja Komputer 0
26 b D 26b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Meja Komputer 0
D 27 Pengadaan Kursi Kerja 0
27 a D 27a - Pejabat Pengadaan :Pengadaan Kursi Kerja 0
27 b D 27b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Kursi Kerja 0
D 28 Pengadaan Kursi Rapat 0
28 a D 28a - Pejabat Pengadaan :Pengadaan Kursi Rapat 0
28 b D 28b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Kursi Rapat 0
D 29 Pengadaan Kursi Tunggu 0
29 a D 29a - Pejabat Pengadaan :Pengadaan Kursi Tunggu 0
RINCI
KODE REKENING URAIAN
Volume

29 b D 29b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Kursi Tunggu 0


D 30 Pengadaan Kursi Lipat 0
30 a D 30a - Pejabat Pengadaan :Pengadaan Kursi Lipat 0
30 b D 30b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Kursi Lipat 0
D 31 Pengadaan Kursi Susun 0
31 a D 31a - Pejabat Pengadaan :Pengadaan Kursi Susun 0
31 b D 31b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Kursi Susun 0
D 32 Pengadaan Rak/Lemari Arsip Kayu 0
32 a D 32a - Pejabat Pengadaan :Pengadaan Rak/Lemari Arsip Kayu 0
32 b D 32b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Rak/Lemari Arsip Kayu 0
D 33 Pengadaan Rak Buku/Kembang 0
33 a D 33a - Pejabat Pengadaan :Pengadaan Rak Buku/Kembang 0
33 b D 33b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Rak Buku/Kembang 0
D 34 Pengadaan Meubelair Lainnya 0
34 a D 34a - Pejabat Pengadaan :Pengadaan Meubelair Lainnya 0
34 b D 34b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Meubelair Lainnya 0
Pengadaan Peralatan Dapur
D 35 Pengadaan Kulkas/Lemari Es/Freezer 0
35 a D 35a - Pejabat Pengadaan :Pengadaan Kulkas/Lemari Es/Freezer 0
35 b D 35b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Kulkas/Lemari Es/Freezer 0
Pengadaan Penghias Ruangan Rumah Tangga
D 36 Pengadaan Gordyn 400,000
36 a D 36a - Pejabat Pengadaan :Pengadaan Gordyn 1
36 b D 36b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Gordyn 1
D 37 Pengadaan Karpet 0
37 a D 37a - Pejabat Pengadaan :Pengadaan Karpet 0
37 b D 37b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Karpet 0
Pengadaan Alat-alat Studio
D 38 Pengadaan Camera 0
38 a D 38a - Pejabat Pengadaan :Pengadaan Camera 0
38 b D 38b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Camera 0
D 39 Pengadaan Handycame 0
39 a D 39a - Pejabat Pengadaan :Pengadaan Handycame 0
39 b D 39b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Handycame 0
D 40 Pengadaan Proyektor 0
40 a D 40a - Pejabat Pengadaan :Pengadaan Proyektor 0
40 b D 40b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Proyektor 0
D 41 Pengadaan Sound System 0
41 a D 41a - Pejabat Pengadaan :Pengadaan Sound System 0
41 b D 41b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Sound System 0
D 42 Pengadaan VCD/DVD Player 0
42 a D 42a - Pejabat Pengadaan :Pengadaan VCD/DVD Player 0
42 b D 42b - Pejabat Penerima Hasil Pekerjaan :Pengadaan VCD/DVD Player 0
D 43 Pengadaan Microphone/Wireless/Pengeras Suara Lainnya 0
43 a D 43a - Pejabat Pengadaan :Pengadaan Microphone/Wireless/Pengeras Suara Lainnya 0
43 b D 43b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Microphone/Wireless/Pengeras Suara Lainnya 0
D 44 Pengadaan CCTV 0
44 a D 44a - Pejabat Pengadaan :Pengadaan CCTV 0
44 b D 44b - Pejabat Penerima Hasil Pekerjaan :Pengadaan CCTV 0
D 45 Pengadaan Layar Proyektor/Screen Projektor 0
45 a D 45a - Pejabat Pengadaan :Pengadaan Layar Proyektor/Screen Projektor 0
45 b D 45b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Layar Proyektor/Screen Projektor 0
Pengadaan Alat-alat Komunikasi
D 46 Pengadaan Telepon 0
46 a D 46a - Pejabat Pengadaan :Pengadaan Telepon 0
46 b D 46b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Telepon 0
D 47 Pengadaan Faximile 0
47 a D 47a - Pejabat Pengadaan :Pengadaan Faximile 0
47 b D 47b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Faximile 0
D 48 Pengadaan Media Pengumuman 0
48 a D 48a - Pejabat Pengadaan :Pengadaan Media Pengumuman 0
48 b D 48b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Media Pengumuman 0
Pengadaan Alat-alat Kedokteran
D 49 Pengadaan Alat - Alat Kedokteran Umum 0
49 a D 49a - Pejabat Pengadaan :Pengadaan Alat - Alat Kedokteran Umum 0
RINCI
KODE REKENING URAIAN
Volume

49 b D 49b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Alat - Alat Kedokteran Umum 0
D 50 Pengadaan Alat - Alat Kedokteran Gigi 0
50 a D 50a - Pejabat Pengadaan :Pengadaan Alat - Alat Kedokteran Gigi 0
50 b D 50b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Alat - Alat Kedokteran Gigi 0
D 51 Pengadaan Alat - Alat Kedokteran Kebidanan dan Penyakit Kandungan 400,000
51 a D 51a - Pejabat Pengadaan :Pengadaan Alat - Alat Kedokteran Kebidanan dan Penyakit Kandungan 1
51 b D 51b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Alat - Alat Kedokteran Kebidanan dan Penyakit Kandungan 1
Pengadaan Alat - Alat Laboratorium
D 52 Pengadaan Alat -alat Laboratorium Biologi 0
52 a D 52a - Pejabat Pengadaan :Pengadaan Alat -alat Laboratorium Biologi 0
52 b D 52b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Alat -alat Laboratorium Biologi 0
D 53 Pengadaan Alat -alat Laboratorium Kimia 0
53 a D 53a - Pejabat Pengadaan :Pengadaan Alat -alat Laboratorium Kimia 0
53 b D 53b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Alat -alat Laboratorium Kimia 0

Pengadaan Konstruksi/Bangunan Gedung


D 54 Rehab/Perbaikan Sedang Ruang Puskesmas 0
54 a D 54a - Pejabat Pengadaan :Rehab/Perbaikan Sedang Ruang Puskesmas 0
54 b D 54b - Pejabat Penerima Hasil Pekerjaan :Rehab/Perbaikan Sedang Ruang Puskesmas 0
Pengadaan Konstruksi Fisik/Bangunan Bukan Gedung
D 55 Penataan Halaman Puskesmas
D 55a Hotmik/Paping Blok/Flour Halaman 0
D 55a1 - Pejabat Pengadaan :Hotmik/Paping Blok/Flour Halaman 0
D 55a2 - Pejabat Penerima Hasil Pekerjaan :Hotmik/Paping Blok/Flour Halaman 0
D 55b Pembuatan Taman 0
D 55b1 - Pejabat Pengadaan :Pembuatan Taman 0
D 55b2 - Pejabat Penerima Hasil Pekerjaan :Pembuatan Taman 0
D 55c Pembuatan Pagar 0
D 55c1 - Pejabat Pengadaan :Pembuatan Pagar 0
D 55c2 - Pejabat Penerima Hasil Pekerjaan :Pembuatan Pagar 0
D 56 Pembuatan Kanopi Puskesmas
D 56a Pembuatan Kanopi 400,000
D 56a1 - Pejabat Pengadaan :Pembuatan Kanopi 1
D 56a2 - Pejabat Penerima Hasil Pekerjaan :Pembuatan Kanopi 1
D 57 Pembuatan Tempat Parkir dan Garasi
D 57a Tempat Parkir Mobil/Motor 400,000
D 57a1 - Pejabat Pengadaan :Tempat Parkir Mobil/Motor 1
D 57a2 - Pejabat Penerima Hasil Pekerjaan :Tempat Parkir Mobil/Motor 1
D 57b Garasi Mobil Pusling/Ambulance 0
D 57b1 - Pejabat Pengadaan :Garasi Mobil Pusling/Ambulance 0
D 57b2 - Pejabat Penerima Hasil Pekerjaan :Garasi Mobil Pusling/Ambulance 0
D 58 Sarana dan Prasarana Sanitasi
D 58a Pembuatan WC/Toilet 0
D 58a1 - Pejabat Pengadaan :Pembuatan WC/Toilet 0
D 58a2 - Pejabat Penerima Hasil Pekerjaan :Pembuatan WC/Toilet 0
D 58b Pembuatan Sarana Air Bersih (SAB) 0
D 58b1 - Pejabat Pengadaan :Pembuatan Sarana Air Bersih (SAB) 0
D 58b2 - Pejabat Penerima Hasil Pekerjaan :Pembuatan Sarana Air Bersih (SAB) 0
D 58c Pembuatan SPAL 0
D 58c1 - Pejabat Pengadaan :Pembuatan SPAL 0
D 58c2 - Pejabat Penerima Hasil Pekerjaan :Pembuatan SPAL 0
D 58d Pembuatan Bak Sampah 0
D 58d1 - Pejabat Pengadaan :Pembuatan Bak Sampah 0
D 58d2 - Pejabat Penerima Hasil Pekerjaan :Pembuatan Bak Sampah 0
D 59 Pengadaan Alat Listrik (Pembelian Lampu, dll) 0
D 59a - Pejabat Pengadaan :Pengadaan Alat Listrik (Pembelian Lampu, dll) 0
D 59b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Alat Listrik (Pembelian Lampu, dll) 0
D 60 Pengadaan Sofa 0
D 60a - Pejabat Pengadaan :Pengadaan Sofa 0
D 60b - Pejabat Penerima Hasil Pekerjaan :Pengadaan Sofa 0

D 59 Pejabat Pembuat Komitmen (Tidak diberikan kepada PA/KPA yang merangkap sbg PPK) 0
5 2 1 01 06 Honorarium/Uang Saku Peserta Kegiatan
5 2 1 01 06 - Uang Saku Peserta Kegiatan/Rapat (Minimal 3 Jam diluar Jam kerja pada Hari Kerja)
D 1 Honorarium/Uang Saku Peserta Kegiatan/Rapat : (PNS/Non PNS dihadiri Eselon II / Masyarakat)Keg
D 1a - Peserta : 6 org x 1 hari 6
RINCI
KODE REKENING URAIAN
Volume

D 2 Honorarium/Uang Saku Peserta Kegiatan/Rapat : (PNS/Non PNS dihadiri Eselon II / Masyarakat)Keg


D 2a - Peserta : org x hari 0
D 3 Honorarium/Uang Saku Peserta Kegiatan/Rapat : (PNS/Non PNS dihadiri Eselon II / Masyarakat)Keg
D 3a - Peserta : org x hari 0
5 2 1 02 Standar Upah
5 2 1 02 05 Upah
Pemasangan Kanopi, Pagar dan Teralis Besi Puskesmas (Sesuaikan dengan Belanja Kanopi, Pagar, Teralis)
D 1 Upah :- Pemasangan Kanopi :
D 1a - Upah :- Pemasangan Kanopi : Tukang : org x hr Rp. 75000 0
D 1b - Upah :- Pemasangan Kanopi : Pembantu Tukang : org x hr Rp. 60000 0
D 2 - Pemasangan Pagar Minimalis
D 2a - Upah :- Pemasangan Pagar Minimalis : Tukang : org x hr Rp. 75000 0
D 2b - Upah :- Pemasangan Pagar Minimalis : Pembantu Tukang : org x hr Rp. 60000 0
D 3 - Pemasangan Pintu Minimalis
D 3a - Upah :- Pemasangan Pintu Minimalis : Tukang : org x hr Rp. 75000 0
D 3b - Upah :- Pemasangan Pintu Minimalis : Pembantu Tukang : org x hr Rp. 60000 0
D 4 - Pemasangan Teralis Besi Minimalis
D 4a - Upah :- Pemasangan Teralis Besi Minimalis : Tukang : org x hr Rp. 75000 0
D 4b - Upah :- Pemasangan Teralis Besi Minimalis : Pembantu Tukang : org x hr Rp. 60000 0
5 2 1 03 Uang Lembur
5 2 1 03 01 Uang Lembur PNS
5 2 1 03 01 Uang Lembur PNS (diluar jam kerja pada hari kerja)
D 1 - Lembur PNS : Gol I : org x hr Jam 0
D 2 - Lembur PNS : Gol II : org x hr Jam 0
D 3 - Lembur PNS : Gol III : 6 org x 12 hr 2 Jam 144
D 4 - Lembur PNS : Gol IV : org x hr Jam 0
5 2 1 03 02 Uang Lembur Non PNS
Uang Lembur Non PNS
5 2 1 03 02 - Lembur Non PNS : 3 org x 5 hr 3 Jam 45
D 1
5 2 2 17 Belanja Kursus, Pelatihan, Sosialisasi, Dan Bimbingan Teknis PNS
5 2 2 17 01 Belanja Kursus-kursus Singkat/Pelatihan
5 2 2 17 01 Pendidikan, Pelatihan dan Bimbingan Teknis
D 1 a. Biaya Diklat
D 1a Pendidikan, Pelatihan dan Bimbingan Teknis :Diklat 1 Pengelola Aset
D 1a1 - Peserta : 1 org x Rp. 5000000 1
D 1b Pendidikan, Pelatihan dan Bimbingan Teknis :Diklat 2 ……………….
D 1b1 - Peserta : org x Rp. 0
D 2 b. Uang Saku Diklat
D 2a Uang Saku Diklat 1 …
D 2a1 - dibawah 7 hari : 1 org x Rp. 600000 1
D 2a2 - 8 hari s/d 15 hari : org x Rp. 750000 0
D 2a3 - Lebih dari 15 hari : org x Rp. 1000000 0
D 2b Uang Saku Diklat 2 …
D 2b1 - dibawah 7 hari : org x Rp. 600000 0
D 2b2 - 8 hari s/d 15 hari : org x Rp. 750000 0
D 2b3 - Lebih dari 15 hari : org x Rp. 1000000 0
5 2 2 BELANJA BARANG DAN JASA
5 2 2 01 Belanja Bahan Pakai Habis
5 2 2 01 01 Belanja Alat Tulis Kantor (ATK)
D 1 01 01 - ATK untuk dukungan Biaya Operasional Puskesms 1

D 1 01 04 Belanja Perangko/Materai dan Benda Pos lainnya


D 1a - Materai : Bh x Rp. 7000 0
D 1b - Materai : Bh x Rp. 4000 0
5 2 2 01 12 Belanja Kelengkapan (Aksesoris) Komputer
D 1 01 12 - Kelengkapan / Aksesoris Komputer 1
5 2 2 02 Belanja Bahan / Material
D 1 02 04 Belanja Bahan Obat - Obatan -
D 1a - Belanja Bahan Obat-Obatan 1
D 1b - Belanja Bahan Medis Habis Pakai 1
5 2 2 03 Belanja Jasa Kantor
D 1 03 06 Belanja Kawat/Faksimili/Internet
D 1a - Belanja Internet dan Aplikasi e-Pusk 12
D 1b - Belanja Pulsa Internet utk Modem 1
5 2 2 03 08 Belanja Sertifikasi
RINCI
KODE REKENING URAIAN
Volume

D 1 03 08 - Jasa Kalibrasi Alat-alat Kesehatan 1


D 1 03 09 Belanja Jasa Transaksi Keuangan
D 1 03 09 - Jasa Transaksi Keuangan (Kliring Bank) 12
D 1 03 17 Belanja Jasa Kesehatan
D 1 03 17 - Jasa Pelayanan Kesehatan (Jaspel) 1
5 2 2 05 Belanja Perawatan Kendaraan Bermotor (Servis & Suku Cadang) Max (01+02): 10,000,000
5 2 2 05 01 Belanja Jasa Service/Pemeliharaan Kendaraan Dinas
D 1 05 01 - Servis Mobil Pusling 0
D 1 05 02 Belanja Penggantian Suku Cadang Mesin
D 1 05 02 - Penggantian Suku Cadang Mobil Pusling 0
D 1 05 03 Belanja Bahan Bakar Minyak dan Pelumas (Bensin/Pertamax dan Olie Mesin)
D 1 05 03 - Mobil Pusling 0
5 2 2 06 Belanja Cetak dan Penggandaan
5 2 2 06 01 Belanja Cetak
D 1 06 01 - Cetak untuk dukungan Biaya Operasional Puskesms 1
D 1 06 02 Belanja Penggandaan (Foto Copy)
D 1 06 02 - Penggandaan untuk dukungan Biaya Operasional Puskesms 1
D 1 06 03 Belanja Penjilidan
D 1 06 03 - Penjilidan untuk dukungan Biaya Operasional Puskesms 1
5 2 2 11 Belanja Makanan dan Minuman
11 02 Belanja Makanan dan Minuman Rapat
D 1 1 - Kegiatan Dalam Gedung :
D 1a a Rapat Evaluasi Program JKN
D 1a1 1 - Makan : 35 Org x 2 Kl x 1 Thn x Rp. 27500 70
D 1a2 2 - Snack : 35 Org x 2 Kl x 1 Thn x Rp. 9000 70
D 1b b Rapat Bimbingan Teknis Program JKN
D 1b1 1 - Makan : 45 Org x 2 Kl x 1 Thn x Rp. 27500 90
D 1b2 2 - Snack : 45 Org x 2 Kl x 1 Thn x Rp. 9000 90
D 1c c Rapat Pertemuan Pembuatan PKP, Laporan Tahunan dan Perencanaan
D 1c1 1 - Makan : 45 Org x 2 Kl x 1 Thn x Rp. 27500 90
D 1c2 2 - Snack : 45 Org x 2 Kl x 1 Thn x Rp. 9000 90
D 1d d Rapat Sosialisasi ……………
D 1d1 1 - Makan : Org x Kl x 1 Thn x Rp. 27500 0
D 1d2 2 - Snack : Org x Kl x 1 Thn x Rp. 9000 0
D 2 2 - Kegiatan Luar Gedung :
D 2a a Rapat Lintas Sektor Tk. Kec.
D 2a1 1 - Makan : Org x Kl x 1 Thn x Rp. 27500 0
D 2a2 2 - Snack : Org x Kl x 1 Thn x Rp. 9000 0
D 2b b Pertemuan Penyuluhan
D 2b1 1 - Makan : Org x Kl x 1 Thn x Rp. 27500 0
D 2b2 2 - Snack : Org x Kl x 1 Thn x Rp. 9000 0
D 2c c Kegiatan Prolanis
D 2c1 1 - Makan : Org x Kl x 1 Thn x Rp. 27500 0
D 2c2 2 - Snack : Org x Kl x 1 Thn x Rp. 9000 0
D 2d d Kegiatan Sosialisasi ………
D 2d1 1 - Makan : Org x Kl x 1 Thn x Rp. 27500 0
D 2d2 2 - Snack : Org x Kl x 1 Thn x Rp. 9000 0
D 2e e Kegiatan ...........
D 2e1 1 - Makan : Org x Kl x 1 Thn x Rp. 27500 0
D 2e2 2 - Snack : Org x Kl x 1 Thn x Rp. 9000 0
5 2 2 15 Belanja Perjalanan Dinas
5 2 2 15 01 Belanja Perjalanan Dinas Dalam Daerah
D 1 1 - Perjalanan Dinas dari Puskesmas ke Desa
D 1a a - Kunjungan Rumah dalam rangka kegiatan Preventif dan Promotif : kl x Rp. 30000 0
D 1b b - Penyuluhan Luar Gedung : kl x Rp. 30000 0
D 1c c - Sosialisasi ………… kl x Rp. 30000 0
D 2 2 - Perjalanan Dinas dari Puskesmas ke Dinas Kesehatan
D 2a a Konsultasi Program Kegiatan
D 2a1 1 - Zona I : kl x Rp. 50000 0
D 2a2 2 - Zona II : 24 kl x Rp. 75000 24
D 2a3 3 - Zona III : kl x Rp. 100000 0
5 2 2 15 02 Belanja Perjalanan Dinas Luar Daerah
5 2 2 15 02 - Perjalanan Dinas Luar Daerah 1
5 2 2 20 Belanja Pemeliharaan
5 2 2 20 03 Belanja Pemeliharaan Gedung/Kantor
RINCI
KODE REKENING URAIAN
Volume

D 1 20 03 Pemeliharaan Sarana dan Prasarana


D 1a - Pemeliharaan Sanitasi Puskesmas (Kamar Mandi, Toilet, Wastafel, Saluran, dll) 1
D 1b - Pemeliharaan Ruang/Gedung Puskesmas (Pengecatan, Penggantian Kunci, Engsel, Pintu, Jendela) 1
D 1 20 05 Belanja Pemeliharaan Perlengkapan dan Peralatan Kantor
D 1a - Pemeliharaan Perlengkapan dan Peralatan Kantor (Pemeliharaan AC, Genset, Kursi, Meja, Almari, dll) 1
D 1b - Pemeliharaan Alat - Alat Kesehatan 1
5 2 2 20 09 Belanja Pemeliharaan Komputer dan Jaringannya
5 2 2 20 09 - Pemeliharaan Komputer dan Jaringannya 1
5 2 2 30 Belanja Jasa Tenaga Ahli / Instruktur / Narasumber PNS
5 2 2 30 01 Jasa Tenaga Ahli / Instruktur / Narasumber PNS
D 1 1 - Narasumber dalam rangka Bintek Bidang Kesehatan : (Kegiatan JKN di Puskesmas)
D 1a a - Nara sumber PNS Eselon II : org kl/Thn Jam x Rp. 450000 0
D 1b b - Nara sumber PNS Eselon III : org kl/Thn Jam x Rp. 400000 0
D 1c c - Nara sumber PNS Eselon IV : org kl/Thn Jam x Rp. 350000 0
D 1d d - Notulen : org kl/Thn x Rp. 150000 0
D 1
D 2 2 Narasumber Kegiatan Prolanis :
D 2a a - Narasumber Edukasi : org x kl x Bln x Rp. 350000 0
D 2b b - Instruktur Senam : org x kl x Bln x Rp. 200000 0
D 2c c - Pembantu Instruktur : org x kl x Bln x Rp. 50000 0
D 3 3 Tim Pendampingan Akreditasi Puskesmas (Bagi Pusk. yang akan diakreditasi 2017) :
D 3a a - Tim Pendamping : 3 org 1 kl 8 Bln 24
D 4 4 Pengajar untuk Pendampingan Penggunaan Alat EKG dan USG (yang memiliki Alat) :
D 4a a 1 Org x 3 Jam 1 kl / hr x Rp. 200000 3
D 5 5 Pengajar untuk Pendampingan Penggunaan Alat Incubator (yang memiliki Alat) :
D 5a a Org x Jam kl / hr x Rp. 200000 0
D 6 6 Pengajar untuk Pendampingan Kegiatan Simulasi Alat Pemadam Kebakaran
D 6a a Org x Jam kl / hr x Rp. 200000 0
D 7 7 Pengajar untuk Pendampingan Pelaksanaan Simpus / Prog E-Puskesmas :
D 7a a Org x Jam kl / hr x Rp. 200000 0
5 2 3 Belanja Modal
5 2 3 02 Belanja Modal Pengadaan Alat-alat Berat
5 2 3 02 10 Belanja Modal Pengadaan Mesin Genset
D 1 02 10 - Mesin Genset 0
5 2 3 10 Belanja Modal Pengadaan Peralatan Kantor
5 2 3 10 02 Belanja Modal Pengadaan Mesin Hitung/Kalkulator
D 1 10 02 - Mesin Hitung/Kalkulator 3
D 1 10 11 Belanja Modal Pengadaan Tabung Pemadam Kebakaran
D 1 10 11 - Tabung Pemadam Kebakaran 1
D 1 10 12 Belanja Modal Pengadaan Televisi
D 1 10 12 - Televisi 0
D 1 10 13 Belanja Modal Pengadaan Mesin Potong Rumput
D 1 10 13 - Mesin Potong Rumput 0
D 1 10 15 Belanja Modal Pengadaan Pompa Air
D 1 10 15 - Pompa Air 0
5 2 3 11 Belanja Modal Pengadaan Perlengkapan Kantor
5 2 3 11 02 Belanja Modal Pengadaan Lemari
D 1 11 02 - Lemari 2
D 1 11 04 Belanja Modal Pengadaan Filing Kabinet
D 1 11 04 - Filling Kabinet 2
D 1 11 05 Belanja Modal Pengadaan White Board/Papan Tulis Putih
D 1 11 05 - Papan / White Board 2
D 1 11 07 Belanja Modal Pengadaan Kipas Angin
D 1 11 07 - Kipas Angin 2
D 1 11 08 Belanja Modal Pengadaan AC Split
D 1 11 08 - AC Spliit 3
D 1 11 11 Belanja Modal Pengadaan Papan Nama
D 1 11 11 - Pengadaan Papan Plang Puskesmas 0
D 1 11 14 Belanja Modal Pengadaan Mesin / Kartu Absen
D 1 11 14 - Pengadaan Mesin/Kartu Absen/Mesin Pendaftaran 1
D 1 11 15 Belanja Modal Pengadaan Penyedot Debu
D 1 11 15 - Cleaner Vacum 1
D 1 11 16 Belanja Modal Pengadaan Teralis Besi Pilih salah satu 0.00
D 1a - Teralis Besi Kanopi 0
D 1b - Pagar Minimalis 0
RINCI
KODE REKENING URAIAN
Volume

D 1c - Pagar/Pintu Minimalis 0
D 1d - Teralis Besi Minimalis 76
5 2 3 12 Belanja Modal Pengadaan Komputer
5 2 3 12 02 Belanja Modal Pengadaan Komputer PC
D 1 12 02 - Komputer PC 0
D 1 12 03 Belanja Modal Pengadaan Komputer Notebook
D 1 12 03 - Komputer Notebook 6
D 1 12 04 Belanja Modal Pengadaan Printer
D 1 12 04 - Printer 2
D 1 12 05 Belanja Modal Pengadaan Scanner
D 1 12 05 - Scanner 1
D 1 12 08 Belanja Modal Pengadaan UPS/Stabilizer 0.00
D 1a - Pengadaan UPS Komputer PC 0
D 1b - Pengadaan Stabiliser Komputer PC 0
5 2 3 12 11 Belanja Modal Pengadaan Perangkat Lunak Sistem Operasi
D 1 12 11 - Software Program Obat/Windows 0
D 1 12 14 Belanja Modal Pengadaan Perangkat Lunak Anti Virus
D 1 12 14 - Software Program Antivirus 1
5 2 3 13 Belanja Modal Pengadaan Meubelair
5 2 3 13 01 Belanja Modal Pengadaan Meja Kerja
D 1 13 01 - Meja Kerja 2
D 1 13 02 Belanja Modal Pengadaan Meja Rapat
D 1 13 02 - Meja Rapat 4
D 1 13 05 Belanja Modal Pengadaan Meja Komputer
D 1 13 05 - Meja Komputer 0
D 1 13 09 Belanja Modal Pengadaan Kursi Kerja
D 1 13 09 - Kursi Kerja 2
D 1 13 10 Belanja Modal Pengadaan Kursi Rapat
D 1 13 10 - Kursi Rapat 10
D 1 13 13 Belanja Modal Pengadaan Kursi Tunggu
D 1 13 13 - Kursi Tunggu 2
D 1 13 14 Belanja Modal Pengadaan Kursi Lipat
D 1 13 14 - Kursi Lipat 0
D 1 13 15 Belanja Modal Pengadaan Kursi Susun
D 1 13 15 - Kursi Susun 0
D 1 13 17 Belanja Modal Pengadaan Rak/Lemari Arsip Kayu
D 1 13 17 - Lemari Arsip Kayu 1
D 1 13 20 Belanja Modal Pengadaan Rak Buku/Kembang
D 1 13 20 - Rak Buku 1
D 1 13 99 Belanja Modal Pengadaan Meubelair Lainnya 0.00
D 1a - Belanja Modal Pengadaan Kursi KIP/K 0
D 1b - Belanja Modal Pengadaan Meja Reseptionis 10
5 2 3 14 Belanja Modal Pengadaan Peralatan Dapur
5 2 3 14 05 Belanja Modal Pengadaan Kulkas/Lemari Es/Freezer
D 1 14 05 - Lemari Es 0
5 2 3 15 Belanja Modal Pengadaan Penghias Ruangan Rumah Tangga
5 2 3 15 03 Belanja Modal Pengadaan Gordyn
D 1 15 03 - Gordyn 76
D 1 15 04 Belanja Modal Pengadaan Karpet
D 1 15 04 - Karpet 1
5 2 3 16 Belanja Modal Pengadaan Alat - Alat Studio
5 2 3 16 01 Belanja Modal Pengadaan Camera
D 1 16 01 - Camera 0
D 1 16 02 Belanja Modal Pengadaan Handycame
D 1 16 02 - Handycame 1
D 1 16 03 Belanja Modal Pengadaan Proyektor
D 1 16 03 - Proyektor 0
D 1 16 04 Belanja Modal Pengadaan Sound System
D 1 16 04 - Speaker System 1
D 1 16 05 Belanja Modal Pengadaan VCD/DVD Player
D 1 16 05 - VCD/DVD Player 0
D 1 16 06 Belanja Modal Pengadaan Microphone/Wireless/Pengeras Suara Lainnya
D 1 16 06 - Microphone/Wireless/Pengeras Suara 1
D 1 16 07 Belanja Modal Pengadaan CCTV
D 1 16 07 - CCTV 1
RINCI
KODE REKENING URAIAN
Volume

16 10 Belanja Modal Pengadaan Layar Proyektor/Screen Projektor


D 1 16 10 - Layar Proyektor/Screen Projektor 0
5 2 3 17 Belanja Modal Pengadaan Alat - Alat Komunikasi
5 2 3 17 01 Pengadaan Telepon
D 1 17 01 - Telepon / Hand Phone (HP) 1
D 1 17 02 Pengadaan Faximile
D 1 17 02 - Faximile 0
D 1 17 10 Belanja Modal Pengadaan Media Pengumuman
D 1a - Visualisasi Data (Running Text, Poster, Baligho, Neon Box, dll) 4
D 1b - Papan Informasi Tempat / Ruang Pelayanan, dll 12
5 2 3 19 Belanja Modal Pengadaan Alat - Alat Kedokteran
5 2 3 19 01 Pengadaan Alat - Alat Kedokteran Umum
D 1 19 01 - Alat - alat Kedokteran Umum 1
D 1 19 02 Pengadaan Alat - Alat Kedokteran Gigi
D 1 19 02 - Alat - alat Kedokteran Gigi 1
D 1 19 07 Pengadaan Alat - Alat Kedokteran Kebidanan dan Penyakit Kandungan
D 1 19 07 - Alat - alat Kedokteran Kebidanan dan Penyakit Kandungan 1
D 1 20 Belanja Modal Pengadaan Alat - Alat Laboratorium
D 1 20 01 Pengadaan Alat -alat Laboratorium Biologi
D 1 20 01 - Alat - alat Laboratorium Biologi 1
D 1 20 02 Pengadaan Alat -alat Laboratorium Kimia
D 1 20 02 - Alat - alat Laboratorium Kimia 1
D 1 25 Belanja Modal Pengadaan Instalasi listrik, Gas, Telepon dan Air
D 1 25 01 Belanja Modal Pengadaan Instalasi Listrik (Penambahan Daya Listrik)
D 1a - Penambahan Daya Listrik 1
D 1b - Penambahan Instalasi Listrik 1
5 2 3 26 Belanja Modal Pengadaan Konstruksi/Pembelian*) Bangunan
5 2 3 26 01 Belanja Modal Pengadaan Konstruksi/Pembelian Gedung Kantor
D 1 26 01 - Rehab/Perbaikan Sedang Ruang/Bangunan Puskesmas 1
D 1 26 09 Belanja Modal Pengadaan Konstruksi Fisik/Bangunan Bukan Gedung
D 1a a - Penataan Halaman Puskesmas
D 1a1 1 - Hotmik/Paping Blok/Flour Halaman 1
D 1a2 2 - Pembuatan Taman 1
D 1a3 3 - Pembuatan Pagar 1
D 1b b - Pembuatan Kanopi Puskesmas
D 1b1 1 - Pembuatan Kanopi Puskesmas 1
D 1c c - Pembuatan Tempat Parkir dan Garasi
D 1c1 1 - Tempat Parkir Mobil/Motor 1
D 1c2 2 - Garasi Mobil Pusling/Ambulance 1
D 1d d - Sarana dan Prasarana Sanitasi
D 1d1 1 - Pembuatan WC/Toilet 1
D 1d2 2 - Pembuatan Sarana Air Bersih (SAB) 1
D 1d3 3 - Pembuatan SPAL 1
D 1d4 4 - Pembuatan Bak Sampah 1

5 2 2 01 03 Belanja Alat Listrik (Pembelian Lampu, dll) dan Elektronik 1


5 2 2 01 05 Belanja Peralatan Kebersihan & Bhn Pembersih (Tong Sampah, Sapu, Sabun, dll) 1
5 2 3 11 09 Belanja Modal Pengadaan Loker : unit 0
5 2 3 13 08 Belanja Modal Pengadaan Sofa : 1 set 1
5 2 3 14 04 Belanja Modal Pengadaan Dispenser (Meja) : 1 bh 1
5 2 3 14 08 Belanja Modal Pengadaan Mesin Cuci : unit 0

Mengetahui / Menyetujui :
Kepala Dinas Kesehatan
Kabupaten Cirebon

H. MOH. SOFYAN, SH, MH.


NIP.19580129 198903 1 002
BAHAN Formulir PILIH

RAH RKA-SKPD 2.2.1 1

NTAH KABUPATEN CIREBON 1

AHUN ANGGARAN 2016 1

1
18
Puskesmas Kaliwedi 1

ta JKN pada Puskesmas Jemaras 1

rja Belanja Langsung 1

rja Target Kinerja 1

Peserta Tambahan BPJS dalam 1 Thn : 56,055


t Pertama Peserta JKN di Puskesmas Jemaras 1
Orang

558,747,872.00 1

Pertama Peserta JKN pada FKTP Puskesmas Peserta Tambahan BPJS dalam 1 Thn : 56,055
1
Orang

agi Peserta JKN di Puskesmas Jemaras 100% 1

kesmas Jemaras 1

N PERUBAHAN BELANJA LANGSUNG 1


TUAN KERJA PERANGKAT DAERAH 1
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
1
1

paket 0.00 0.00


paket 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000 1
op 400,000.00 400,000.00 1
op 300,000.00 300,000.00 1
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000 1
op 400,000.00 400,000.00 1
op 300,000.00 300,000.00 1

0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000 1
op 400,000.00 400,000.00 1
op 300,000.00 300,000.00 1
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000 1
op 400,000.00 400,000.00 1
op 300,000.00 300,000.00 1
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00

400,000 300,000 1
op 400,000.00 400,000.00 1
op 300,000.00 300,000.00 1
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0
op 0.00 0.00
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00
400,000 300,000 1
op 400,000.00 400,000.00 1
op 300,000.00 300,000.00 1

0 0
op 0.00 0.00
op 0.00 0.00
0 0
op 0.00 0.00
op 0.00 0.00

0 0 0.00
op 0.00 0.00
op 0.00 0.00

0 0 0.00
op 0.00 0.00
op 0.00 0.00
0 0 0.00
op 0.00 0.00
op 0.00 0.00
0 0 0.00
op 0.00 0.00
op 0.00 0.00
1
400,000 300,000 1 700,000.00
op 400,000.00 400,000.00 1
op 300,000.00 300,000.00 1
1
400,000 300,000 1 700,000.00
op 400,000.00 400,000.00 1
op 300,000.00 300,000.00 1
0 0 0.00
op 0.00 0.00
op 0.00 0.00

0 0 0.00
op 0.00 0.00
op 0.00 0.00
0 0 0.00
op 0.00 0.00
op 0.00 0.00
0 0 0.00
op 0.00 0.00
op 0.00 0.00
0 0 0.00
op 0.00 0.00
op 0.00 0.00
0 0 0.00
op 0.00 0.00
op 0.00 0.00
0 0 0.00
op 0.00 0.00
op 0.00 0.00
0.00
ob 600,000.00 0.00
1
1
1 180,000.00
oh 30,000.00 180,000.00 1
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
0.00
oh 30,000.00 0.00
0.00
oh 30,000.00 0.00

0.00
oh 75,000.00 0.00
oh 60,000.00 0.00
0.00
oh 75,000.00 0.00
oh 60,000.00 0.00
0.00
oh 75,000.00 0.00
oh 60,000.00 0.00
0.00
oh 75,000.00 0.00
oh 60,000.00 0.00
1
1
1 1,728,000.00
ohj 8,000.00 0.00
ohj 10,000.00 0.00
ohj 12,000.00 1,728,000.00 1
ohj 14,000.00 0.00
1
1 360,000.00
ohj 8,000.00 360,000.00 1
1
1
1
1
1
1 5,000,000.00
ok 5,000,000.00 5,000,000.00 1
0.00
ok 0.00 0.00
1
1 600,000.00
ok 600,000.00 600,000.00 1
ok 750,000.00 0.00
ok 1,000,000.00 0.00
0.00
ok 600,000.00 0.00
ok 750,000.00 0.00
ok 1,000,000.00 0.00

0.00
thn 0.00 0.00

0.00
bh 7,000.00 0.00
bh 4,000.00 0.00
0.00
thn 0.00 0.00

0.00
thn 0.00 0.00
thn 0.00 0.00

0.00
bln 0.00 0.00
thn 0.00 0.00
0.00
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
thn 0.00 0.00
0.00
bln 0.00 0.00
1 201,797,250.00
thn 201,797,250 201,797,250.00 1

0.00
unit/thn 0.00 0.00
0.00
unit/thn 10,000,000.00 0.00
0.00
unit/bln 1,155,000.00 0.00
1
1 5,000,000.00
thn 5,000,000.00 5,000,000.00 1
1 460,000.00
thn 460,000.00 460,000.00 1
0.00
thn 0.00 0.00
1
1
1
1 2,555,000.00
ok/thn 27,500.00 1,925,000.00 1
ok/thn 9,000.00 630,000.00 1
1 3,285,000.00
ok/thn 27,500.00 2,475,000.00 1
ok/thn 9,000.00 810,000.00 1
1 3,285,000.00
ok/thn 27,500.00 2,475,000.00 1
ok/thn 9,000.00 810,000.00 1
0.00
ok/thn 27,500.00 0.00
ok/thn 9,000.00 0.00

0.00
ok/thn 27,500.00 0.00
ok/thn 9,000.00 0.00
0.00
ok/thn 27,500.00 0.00
ok/thn 9,000.00 0.00
0.00
ok/thn 27,500.00 0.00
ok/thn 9,000.00 0.00
0.00
ok/thn 27,500.00 0.00
ok/thn 9,000.00 0.00
0.00
ok/thn 27,500.00 0.00
ok/thn 9,000.00 0.00

0.00
kl/thn 30,000.00 0.00
0.00
kl/thn 30,000.00 0.00
0.00
kl/thn 30,000.00 0.00
1
1
1 1,800,000.00
kl/thn 50,000.00 0.00
kl/thn 75,000.00 1,800,000.00 1
kl/thn 100,000.00 0.00
0.00
thn 0.00 0.00
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
0.00
thn 0.00 0.00
thn 0.00 0.00
1 3,000,000.00
thn 1,000,000.00 1,000,000.00 1
thn 2,000,000.00 2,000,000.00 1
0.00
thn 0.00 0.00

0.00
okj 450,000.00 0.00
okj 400,000.00 0.00
okj 350,000.00 0.00
ok 150,000.00 0.00

0.00
okb 350,000.00 0.00
okb 200,000.00 0.00
okb 50,000.00 0.00
1 4,800,000.00
okb 200,000.00 4,800,000.00 1
1 600,000.00
okb 200,000.00 600,000.00 1
0.00
okb 200,000.00 0.00
okb 0.00
okb 200,000.00 0.00
0.00
okb 200,000.00 0.00

0.00
Unit 15,000,000.00 0.00
1 2,100,000.00
1 600,000.00
Unit 200,000.00 600,000.00 1
1 1,500,000.00
Unit 1,500,000.00 1,500,000.00 1
0.00
Unit 7,500,000.00 0.00
0.00
Unit 2,500,000.00 0.00
0.00
Unit 2,500,000.00 0.00
1 77,576,000.00
1 7,000,000.00
Unit 3,500,000.00 7,000,000.00 1
1 9,000,000.00
Unit 4,500,000.00 9,000,000.00 1
1 5,000,000.00
Unit 2,500,000.00 5,000,000.00 1
1 2,000,000.00
Unit 1,000,000.00 2,000,000.00 1
1 15,000,000.00
Unit 5,000,000.00 15,000,000.00 1
0.00
Unit 5,000,000.00 0.00
1 7,500,000.00
Unit 7,500,000.00 7,500,000.00 1
1 3,500,000.00
Unit 3,500,000.00 3,500,000.00 1
1 28,576,000.00
m2 0.00 0.00
m2 0.00 0.00
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
m2 0.00 0.00
m2 376,000.00 28,576,000.00 1
53,000,000.00
0.00
Unit 7,500,000.00 0.00
1 45,000,000.00
Unit 7,500,000.00 45,000,000.00 1
1 6,000,000.00
Unit 3,000,000.00 6,000,000.00 1
1 1,500,000.00
Unit 1,500,000.00 1,500,000.00 1
0.00
Unit 1,000,000.00 0.00
Unit 500,000.00 0.00
0.00
Unit 3,000,000.00 0.00
1 500,000.00
Unit 500,000.00 500,000.00 1
1 48,200,000.00
1 5,000,000.00
Unit 2,500,000.00 5,000,000.00 1
1 14,000,000.00
Unit 3,500,000.00 14,000,000.00 1
0.00
Unit 1,500,000.00 0.00
1 3,000,000.00
Unit 1,500,000.00 3,000,000.00 1
1 6,000,000.00
Unit 600,000.00 6,000,000.00 1
1 6,000,000.00
Unit 3,000,000.00 6,000,000.00 1
0.00
Unit 500,000.00 0.00
0.00
Unit 250,000.00 0.00
1 3,500,000.00
Unit 3,500,000.00 3,500,000.00 1
1 2,500,000.00
Unit 2,500,000.00 2,500,000.00 1
1 8,200,000.00
Unit 1,000,000.00 0.00
Unit 820,000.00 8,200,000.00 1
0.00
0.00
Unit 4,000,000.00 0.00
1 23,800,000.00
1 22,800,000.00
m2 300,000.00 22,800,000.00 1
1 1,000,000.00
m' 1,000,000.00 1,000,000.00 1
22,500,000.00
0.00
Unit 5,000,000.00 0.00
1 6,000,000.00
Unit 6,000,000.00 6,000,000.00 1
0.00
Unit 7,500,000.00 0.00
1 4,000,000.00
Unit 4,000,000.00 4,000,000.00 1
0.00
Unit 1,750,000.00 0.00
1 5,000,000.00
Unit 5,000,000.00 5,000,000.00 1
1 7,500,000.00
Unit 7,500,000.00 7,500,000.00 1
RINCIAN PERHITUNGAN 1
JUMLAH 1
1
Satuan Harga Satuan (Rp) 1
1
0.00
Unit 2,500,000.00 0.00
1 3,350,000.00
1 750,000.00
Unit 750,000.00 750,000.00 1
0.00
Unit 2,500,000.00 0.00
1 2,600,000.00
Thn 500,000.00 2,000,000.00 1
Thn 50,000.00 600,000.00 1
1 35,989,622.00
1 5,321,622.00
thn 5,321,622.00 5,321,622.00 1
1 9,668,000.00
thn 9,668,000.00 9,668,000.00 1
1 16,000,000.00
thn 16,000,000.00 16,000,000.00 1

0.00
thn 0.00 0.00
1 5,000,000.00
thn 5,000,000.00 5,000,000.00 1

0.00
thn 0.00 0.00
thn 0.00 0.00

0.00
thn 0.00 0.00
1 45,682,000.00
0.00
thn 0.00 0.00
thn 0.00 0.00
thn 0.00 0.00
1 11,746,000.00
thn 11,746,000.00 11,746,000.00 1
1 33,936,000.00
thn 24,240,000.00 24,240,000.00 1
thn 9,696,000.00 9,696,000.00 1
0.00
thn 0.00 0.00
thn 0.00 0.00
thn 0.00 0.00
thn 0.00 0.00

thn 0.00 0.00


thn 0.00 0.00
unit 3,500,000.00 0.00
set 6,000,000.00 6,000,000.00 1
bh 500,000.00 500,000.00 1
unit 5,000,000.00 0.00
1
JUMLAH 558,747,872.00 1 0.00
1,260,255,730.00 1

Cirebon, 2016 1

Kepala Fasilitas Kesehatan Tingkat Pertama 1


Puskesmas Kaliwedi 1
1
1
1
1
1
Idem Deh, SKM. 1
NIP. 19600124 198309 2 001 1
1

Anda mungkin juga menyukai