I PEKERJAAN PERSIAPAN
II PEKERJAAN STRUKTUR
A PEKERJAAN TANAH
B PEKERJAAN BETON DAN LANTAI 1
C PEKERJAAN BETON DAN LANTAI 2
D PEKERJAAN BETON, LANTAI 3 DAN ATAP
IV MEKANIKAL ELEKTRIKAL
LANTAI 1
A PEKERJAAN LISTRIK ARUS KUAT
B PEKERJAAN PLUMBING
C PEKERJAAN TATA UDARA
LANTAI 2
D PEKERJAAN LISTRIK ARUS KUAT
E PEKERJAAN PLUMBING
JUMLAH
KEMAJUAN RENCANA MINGGUAN
KEMAJUAN KOMULATIF RENCANA
KEMAJUAN PELAKSANAAN MINGGUAN
KEMAJUAN KOMULATIF PELAKSANAAN
DEVIASI N(+/-)
Mengetahui
Pejabat Pembuat Komitmen (PPK)
959,778,753.54 9.69
528,700,541.90 5.40
144,966,711.17 1.45
230,759,018.32 2.30
68,386,917.18 0.69
129,565,027.50 1.30
108,587,500.00 1.10
279,192,761.79 2.82
156,863,343.77 1.58
46,508,876.44 0.47
80,295,434.73 0.80
17,804,946.45 0.18
40,489,110.38 0.40
36,687,000.00 0.37
14,012,919.35 0.14
2,715,054.40 0.03
405,911,000.00 4.10
130,711,380.00 1.32
1,129,573,000.00 11.40
92,190,000.00 0.93
15,495,030.92 0.15
9,908,000,509.65 100.00
0.07 0.19 0.34 0.54 0.96 0.72 1.15
0.07 0.26 0.61 1.15 2.11 2.83 3.99
0.12 0.33 5.24 1.32 2.20 1.77 1.86
0.12 0.45 5.69 7.01 9.21 10.98 12.85
0.05 0.19 5.08 5.86 7.10 8.15 8.86
KEMAJUAN PEKERJAAN
PENGADAAN PENINGKATAN SARANA DAN PRASARANA RUMAH SAKIT/RUMAH SAKIT JIWA/RUMAH SAKIT PARU-PARU/ RUMAH SAKI
PEMBANGUNAN GEDUNG PERAWATAN VIP
PEMBANGUNAN GEDUNG PERAWATAN VIP RSUD KABUPATEN INDRAMAYU
TAHUN 2016
### ###
5.4
4.28 3.04 2.65 3.38 3.01 3.58
1.55 1.94 1.09 2.77 16.41 19.46 22.11 25.49 28.50 32.08
5.53 7.48 9.36 12.13
4.14 2.68
16.99 19.67
11.45 12.19
Di Periksa Oleh :
Konsultan Pengawas
……………………………………..
……………………………………..
Pengawas Lapangan
AKIT PARU-PARU/ RUMAH SAKIT MATA
###
4.44 8.05 13.03 11.40 15.28 13.63 1.15
36.52 44.57 57.60 69.00 84.28 97.90 99.06 0.77 0.19
99.83 100
Dibuat Oleh :
Kontraktor Pelaksana
PT. RAFFAEL KNP WIJAYA
RUSLANI
Direktur Utama