Anda di halaman 1dari 97

Urban Stormwater Management

User Manual
Version 3.3

SALES & SUPPORT OFFICE


13A, JALAN KENARI 2, BANDAR PUCHONG JAYA,
47100 PUCHONG, SELANGOR, MALAYSIA

DEVELOPMENT OFFICE
E-16-2, JALAN MULTIMEDIA 7/AG, CITY PARK,
I-CITY, 40000 SHAH ALAM, SELANGOR MALAYSIA

http://www.mes100.com

Phone +603-5885 1250

Fax +603-5885 1251

Copyright © 2009-2013 MES Innovation Sdn Bhd. All rights reserved.


Disclaimer

Before using MiTS-MSMA, kindly carefully read the License Agreement. The user or
licensee is required to check all calculations and drawings produced by MiTS-MSMA for
accuracy and suitability for purpose.

Both this physical document and the right to use it are owned exclusively by MES
Innovation. This document may not be reproduced in any form either in part or in whole
without the express written consent of MES Innovation. Use of this document by others
is licensed by MES Innovation under the terms of the MES Software License Agreement.
Content

Welcome

Design Manual Part 1: MSMA 2nd Edition

Chapter 1 Creating IDF


1.1 IDF

Chapter 2 Designing On-site Detention


2.1 OSD
2.1.1 Pond Requirement
2.1.2 Pond Sizing
2.1.3 Outlet Design
2.1.4 Result

2.2 OSD
2.2.1 Pre-development
2.2.2 Post-development
2.2.3 Pond Storage
2.2.4 Pond Sizing
2.2.5 Outlet Design
2.2.6 Result

Chapter 3 Designing Pond


3.1 Pond Design by Time-area Method
3.1.1 Pre-development
3.1.2 Post-development
3.1.3 Pond Sizing
3.1.4 Outlet Design
3.1.5 Result

3.2 Pond Design by Rational Method Hydrograph Method


3.2.1 Pre-development
3.2.2 Post-development
3.2.3 Pond Sizing
3.2.4 Outlet Design
3.2.5 Result
Chapter 4 Designing Rainwater Harvesting Pond
4.1 RWH (Simplified Method)
4.1.1 Rainfall Data
4.1.2 Water Demand
4.1.3 Harvested Rainfall
4.1.4 Tank Sizing
4.1.5 Result

4.2 RWH (Water Balance Method)


4.2.1 Rainfall Data
4.2.2 Harvested Rainfall
4.2.3 Water Demand
4.2.4 Tank Sizing
4.2.5 Result

Chapter 5 Designing Sediment Basin


5.1 Sediment Basin
5.1.1 Basin Requirement
5.1.2 Basin Sizing
5.1.3 Outlet Design
5.1.4 Result

Chapter 6 Result Export and Batch Export


6.1.1 Export
6.1.2 Batch Export
Design Manual Part 2 : MSMA 1st Edition

Chapter 1 Creating IDF


1.2 IDF

Chapter 2 Designing On-site Detention


2.1 OSD
2.1.1 Pre-development
2.1.2 Post-development
2.1.3 Pond Storage
2.1.4 Pond Sizing
2.1.5 Outlet Design
2.1.6 Result

Chapter 3 Designing Pond


3.1 Pond
3.1.1 Pre-development
3.1.2 Post-development
3.1.3 Pond Sizing
3.1.4 Outlet Design
3.1.5 Result

Chapter 4 Designing Rainwater Harvesting Pond


4.1 RWH
4.1.1 Rainfall Data
4.1.2 Harvested Rainfall
4.1.3 Water Demand
4.1.4 Tank Sizing
4.1.5 Result

Chapter 5 Designing Sediment Basin


5.1 Sediment Basin
5.1.1 Basin Requirement
5.1.2 Basin Sizing
5.1.3 Outlet Design
5.1.4 Result

Chapter 6 Result Export and Batch Export


6.1.1 Export
6.1.2 Batch Export
Welcome

MiTS-MSMA software enables you to design and create on-site detention and detention
pond for all types of development projects.

The software is written based on the Urban Stormwater Management Manual for
Malaysia (MSMA) standards and guidelines. The application of MSMA is simplified and
you can generate the result in designing pond by only few simple inputs. It is easy to use
and the software comes with drawing detailing export capability.

This user manualoutlines the main features of MiTS-MSMA that users would generally
use. Users will learn how to create IDF, OSD and detention pond for a development
project.

If you are holding a printed copy now, do check for a softcopy supplied with the software
CD which may have updates subsequent to the printing of this manual.
Design Manual

Design Manual can be select in Option tab, users can select type of design manual, either
MSMA 1st Edition or MSMA 2nd Edition.
Design Manual
Part 1:
MSMA 2nd Edition
Chapter 1 Creating IDF

With the button of IDF, the rainfall intensity and IDF curve for a location can be easily
generated.

1.1 IDF
In input tab, users have to input the duration. This duration can either input manually or
calculate using the calculators.
Users can select calculator for different equation by clicking the scroll down box.
Select ARI and location. click Next button.

Output shows the factors and coefficients that used in calculating the rainfall intensity.
Click Analyze button to show rainfall intensity and rainfall depth.

Click IDF Curve tab and Textual Report tab to show IDF graph and detail calculation
respectively.
Chapter 2 Designing On-site Detention

2.1 OSD – Simplified Method

Click OSD button to design an On-site detention pond.

Click Option button to select OSD Method as Simplified Method.


Select the type of the OSD by clicking the drop down list.

2.1.1 Pond Requirement

1) Select the location in the list.


2) Input Area(ha) , Impervious and Pervious area.
3) Select Terrain based on surface slope. Click on button for more information.
4) Input the “Impervious” and “Pervious” area for Pre-development.
5) Click on Calculate button to obtain PSD and SSR value.
2.1.2 Pond Sizing

Design pond volume by inputting data in Pond Sizing tab.

1) Select the type of the pond (rectangular ,circular or irregular).


2) Input length, width, and depth to calculate the volume. (Above ground with side
slope)
3) Click “Calculate” button to obtain the Depth of Water and Volume.

Note: Warning message willpop out if the designed volume is less than the required
storage.
2.1.3 Outlet Design

Design outlet by inputting data in Outlet Design tab.

Inlet Pipe
1) Input diameter and number of orifice

Primary Outlet
1) Input Height from bottom of Pond to bottom of orifice, H. Effective head, Ho will
be calculated.
2) Input diameter and number of orifice.

Secondary Outlet
1) Select Outlet Type (only for above ground OSD)
2) Input diameter and number of orifice (or weir dimensions, only for above ground
OSD)
2.1.4 Result

Click “Analyze” button to generate textual report, summary report, pond detailing, and
graph.

Click Textual Report, Detailing, or Appendix tabs to show the outcomes respectively.
2.2 OSD – Rational Method

Click OSD button to design an On-site detention pond.

Click Option button to select OSD Method as Rational Method.

Select the type of the OSD by clicking the drop down list.
2.2.1 Pre-development

Calculate pre-development discharge by inputting data in Pre tab


6) Input or select location. The location can be input by enter the location Longitude
and Latitude. Click “Use” button to use the proposed nearest raingauge location.
The Location also can be select by clicking on Raingauge Location drop list.
7) The fitting constants are generated automatically and it is editable. Click on
button to change the fitting constants to default value based on selected
location.
8) Input the length of flow path from catchment divide to outlet, slope of stream
flow path and catchment area to obtain tc and it is editable.
9) Input the “Impervious” and “Pervious” area for Pre-development.
10) Select ARI. Rainfall Intensity is generated automatically and it is editable.
11) Select land use or soil type by clicking button. Select the land use or soil type
in the popped out Runoff Coefficient Table by clicking the value in the table.

12) Click “Calculate” button to obtain pre-development discharge.


2.2.2 Post-development

Calculate post-development discharge by inputting data in Post tab.


1) Input overland flow length, slope of overland surface and manning coefficient
to obtain to.
2) Input drain flow length and average velocity to obtain td and tc.
3) Input “Impervious” and “Pervious” area for post development.
4) Select ARI. The fitting coefficient and rainfall intensity are generated
automatically and editable
5) Select land use or soil type by clicking button. Select the land use or soil type
in the popped out Runoff Coefficient Table by clicking the value in the table.

6) Click “Calculate” button to obtain post-development discharge.


2.2.3 Pond Storage

Determine required storage by inputting data in Pond Storage tab.

1) Input tcs to generate the SSR.


2) Click “Calculate” button to obtain the Required SSR. Make sure maximum SSR is
not fall at the last row as the value may not be the maximum value. Change the
number of row from Option>SSR>OSD>No. of range.
2.2.4 Pond Sizing

Design pond volume by inputting data in Pond Sizing tab.

4) Select the type of the pond (rectangular or circular).


5) Input length, width, anddepthto calculate the volume. (Above ground with side
slope)
6) Click “Calculate” button to obtainthe Depth of Water and Volume.

Note: Warning message willpop out if the designed volume is less than the required
storage.
2.2.5 Outlet Design

Design outlet by inputting data in Outlet Design tab.

Primary Outlet
3) Input Height from bottom of Pond to bottom of orifice, H. Effective head, Ho will
be calculated.
4) Input diameter and number of orifice.

Secondary Outlet
5) Select ARI.
6) Input the Broad-crested Weir Coefficient, CBCW.
7) Input the effective head and weir width.
2.2.6 Result

Click “Analyze” button to generate textual report, summary report, pond detailing, and
graph.

Click Textual Report, Summary Report, Detailing, or Graph tabs to show the
outcomes respectively.
Chapter 3 Designing Detention Pond

3.1 Pond Design by Time-area Method

Click Pond button to design a pond.


3.1.1 Pre-development

Calculate pre-development discharge by inputting data in Pre tab.

1) Input or select location. The location can be input by enter the location Longitude and
Latitude. Click “Use” button to use the proposed nearest raingauge location. The
Location also can be select by clicking on Raingauge Location drop list.
2) The fitting constants are generated automatically and it is editable. Click on
button to change the fitting constants to default value based on selected location.
3) Input length of flow path from catchment divide to outlet, slope of stream flow
path and catchment area to obtain tc and it is editable.
4) Select Minor and Major Design ARI. Rainfall intensity is generated automatically.
5) Select Region from the drop list.
6) Click “Calculate” button to obtain Minor and Major Storm discharge.
3.1.2 Post-development

Calculate post-development discharge by inputting data in Post tab.


1) Input overland sheet flow path length, slope of overland surface and manning
coefficient to obtain to.
2) Inputs drain flow length and average velocity to obtain td and tc.
3) Input total catchment and define the sub-catchments for pervious and impervious
area.
4) Click “Calculate” button to obtain post-development critical storm duration.

3.1.3 Pond Sizing

Determine required storage by inputting data in Pond Sizing tab. Select the type of the
pond (Rectangular or Irregular).

For Rectangular:

1) Input top length, top width, depth, side slope and invert level to calculate the
volume.
2) The graphical pond displayed can be rotated to different view.
3) Click “Calculate” button to obtain the volume and pond top area.
For Irregular:

1) Input pond depth and invert level.


2) Input the surface area for each interval of pond invert level.
3) Interval of pond invert level can be added or deleted by clicking “+” and “-” button.
4) Click “Calculate” button to obtain the volume and pond top area.
3.1.4 Outlet Design

Design the outlet by inputting data in Outlet Design tab.


1) Minor Design Storm Primary Outlet
a. Input orifice height between pond and orifice invert level, H.
b. Input orifice diameter, Do and number of orifice.
c. Click “Routing” to obtain “Maximum Water Level”.
d. Post-development storm outlet maximum discharge must be lower than pre-
development minor design storm peak flow.

2) Major Design Storm Primary Outlet


a. Major storm primary outlet design is optional. Untick the box to exclude major
design storm primary outlet.
b. Input orifice height between pond and orifice invert level, H. H for Major
Design must be higher than “Maximum Water Level of Minor Design – Pond
Invert Level”.
c. Input orifice diameter, Do and number of orifice.
d. Click “Routing” to obtain “Maximum Water Level”
e. Post-development major design storm outlet maximum discharge must be lower
than pre-development major design storm peak flow.

3) Secondary Outlet Arrangement


a. Input weir heightbetween pond and spillway invert level, H. H for Secondary
outlet must be higher than “Maximum Water Level of Major Design – Pond
Invert Level”.
b. Input weir width.
c. Select ARI.
d. Click “Routing” to obtain “Maximum Water Level”.

3.1.5 Result

Click “Analyze” button to generate textual report, summary report, graph, and water
level profile.
Water Level Simulation will be shown for every 5 minutes interval.

Click Textual Report, Summary Report,Graph, or Water Level Profile tabs to show
the outcomes respectively.
3.2 Pond Design by Rational Method Hydrograph Method

Click Pond button to design a pond.

At Option > Pond, change setting named ‘Method’ to Rational Method:

Then select appropriate settings for:


• Time Step
• Incremental Factor to tc
• No. of Trial
3.2.1 Pre-development

Calculate pre-development discharge by inputting data in Pre tab.

1) Input or select location. The location can be input by enter the location Longitude and
Latitude. Click “Use” button to use the proposed nearest raingauge location. The
Location also can be selected by clicking on Raingauge Location drop list.
2) The fitting constants are generated automatically and it is editable. Click on
button to change the fitting constants to default value based on selected location.
3) Input length of flow path from catchment divide to outlet, slope of stream flow
path and catchment area to obtain tc and it is editable.
4) Select Minor, Major and Secondary Outlet design storm ARI. Rainfall intensity is
generated automatically.
5) Select appropriate Land Use for impervious and pervious area. User can click on
button ‘+’ or ‘-’ and the right side of the table to add or delete number of row from
the table. Then key in area to each specified land use respectively.
6) Click “Calculate” button to obtain Minor, Major and Secondary Outlet design storm
peak flow.
7) Cell in light blue color indicates the value is editable. The edited cell’s frame will be
highlighted in red color.
3.2.2 Post-development

Calculate post-development discharge by inputting data in Post tab.

5) Input overland sheet flow path length, slope of overland surface and manning
coefficient to obtain to.
6) Inputs drain flow length and average velocity to obtain td and tc.
7) Select appropriate Land Use for impervious and pervious area. User can click on
button ‘+’ or ‘-’ and the right side of the table to add or delete number of row from
the table. Then key in area to each specified land use respectively.
8) Click “Calculate” button to obtain post-development preliminary critical storm
duration and respective peak flows for each storm event.
9) Cell in light blue color indicates the value is editable. The edited cell’s frame will
be highlighted in red color.

3.2.3 Pond Sizing

Determine required storage by inputting data in Pond Sizing tab. Select the type of the
pond (Rectangular or Irregular).

For Rectangular:

4) Input top length, top width, depth, side slope and invert level to calculate the
volume.
5) The graphical pond displayed can be rotated to different view.
6) Click “Calculate” button to obtain the volume and pond top area.
For Irregular:

1) Input pond depth and invert level.


2) Input the surface area for each interval of pond invert level.
3) Interval of pond invert level can be added or deleted by clicking “+” and “-” button.
4) Click “Calculate” button to obtain the volume and pond top area.
3.2.4 Outlet Design

Design the outlet by inputting data in Outlet Design tab.

4) Minor Design Storm Primary Outlet


a. Input orifice height between pond and orifice invert level, H.
b. Input orifice diameter, Do and number of orifice.
c. Click “Routing” to obtain “Maximum Water Level”.
d. Post-development storm outlet maximum discharge must be lower than pre-
development minor design storm peak flow.

5) Major Design Storm Primary Outlet


a. Major storm primary outlet design is optional. Untick the box to exclude major
design storm primary outlet.
b. Input orifice height between pond and orifice invert level, H. H for Major
Design must be higher than “Maximum Water Level of Minor Design – Pond
Invert Level”.
c. Input orifice diameter, Do and number of orifice.
d. Click “Routing” to obtain “Maximum Water Level”
e. Post-development major design storm outlet maximum discharge must be lower
than pre-development major design storm peak flow.
6) Secondary Outlet Arrangement
a. Input weir height between pond and spillway invert level, H. H for Secondary
outlet must be higher than “Maximum Water Level of Major Design – Pond
Invert Level”.
b. Input weir width.
c. Click “Routing” to obtain “Maximum Water Level”.

3.1.5 Result

Click “Analyze” button to generate textual report, summary report, graph, and water
level profile.

Water Level Simulation will be shown for every 5 minutes interval.


Click Textual Report, Summary Report, Graph, Appendix or Water Level Profile
tabs to view the results.
Chapter 4 Designing Rainwater Harvesting Pond

4.1 RWH (Simplified Method)

Click the RWH button to design rainwater harvesting tank.

4.1.1 Rainfall Data

Select a location from dropdown list; Locations and values can be added/edited via
options parameters RWH Hydrological Data
4.1.2 Water Demand

Determine the amount of annual rainwater and domestic water demand by inputting data
in Harvested Rainfall tab.

For annual rainwater demand:


1) Choose the Appliance (outdoor/indoor).
2) Select the Unit.
3) Input the Frequency of Use.
For domestic water demand:
4) Provide water demand per capita, followed by total capita
5) Annual rainwater demand and annual domestic water demand will be computed
automatically
4.1.3 Harvested Rainfall

Determine the amount of harvested rainfall by inputting data in Harvested Rainfall tab.

1) Input the plane area of rooftop catchment, and press “Enter” in keyboard.
2) Design results will be calculated automatically
4.1.4 Tank Sizing

Design tank volume by inputting data in Tank Sizing tab.

1) Select the type of the tank (rectangular or circular).


2) Input length, width, depth, and number of tank to calculate the storage.
3) Click “Calculate” button to obtain Tank Storage.
4.1.5 Result

Click “Analyze” button to generate textual report.


4.2 RWH (Water Balance Method)

To switch to Water Balance Method, go to options parameter RWH Method, and


change design method to water balance method

Click the Main, followed by RWH button to return to interface for rainwater harvesting
tank design
4.2.1 Rainfall Data

Determine the average yearly rainfall by inputting the average monthly rainfall from
January to December.
4.2.2 Harvested Rainfall

Determine the amount of harvested rainfall by inputting data in Harvested Rainfall tab.

1) Input the plane area of rooftop catchment, impervious pavement catchment, and/or
landscape catchment.
2) Input the runoff coefficient of rooftop catchment, impervious pavement catchment,
and/or landscape catchment.
3) Click on “Calculate” button to obtain the harvested rainfall from different types of
catchment areas and total yearly harvested rainfall.
4.2.3 Water Demand

Determine the amount of water demand by inputting data in Harvested Rainfall tab.

6) Choose the Appliance (outdoor/indoor).


7) Select the Unit.
8) Input the Frequency of Use.
9) Click on “Calculate” to obtain average water demand and required tank storage.
4.2.4 Tank Sizing

Design tank volume by inputting data in Tank Sizing tab.

4) Select the type of the tank (rectangular or circular).


5) Input length, width, depth, and number of tank to calculate the storage.
6) Click “Calculate” button to obtain Tank Storage.
4.2.5 Result

Click “Analyze” button to generate textual report, summary report, and graph.

Click Textual Report, Summary Report, or Graph tabs to show the outcomes
respectively.
Chapter 5 Designing Sediment Basin

5.1 Sediment Basin

Click on Sed Basin button to design a Sediment Basin.

Select the type of the Sediment Basin by clicking the drop down list.
5.1.1 Basin Requirement

Calculate basin requirement by inputting data in Basin Requirement tab.

1) Input the catchment area.


2) Input the overland sheet flow path length, slope, and manning coefficient to obtain
the overland flow time of concentration.
3) Click “Calculate” button to obtain the required area and volume.
5.1.2 Basin Sizing

Calculate overall dimension of setting and sediment storage zone by inputting data in
Basin Sizing tab.
1) Settling Zone
a. Input settling depth, y1 (parameter: min. 0.6m)
b. Input average width, w1
c. Input average length, L1 by referring to the range proposed.
d. Click “Calculate” to obtain average surface area, L1/y1 ratio and L1/w1 ratio.

2) Sediment Storage Zone


a. Select side slope (H):(V)
b. Input sediment storage depth, y2 based on the suggested minimum depth.
c. Click “Calculate” to obtain the overall dimension of settling and sediment
storage zone.

5.1.3 Outlet Design

1) Design the outlet by inputting data in Outlet Design tab.

2) Outlet Pipe
a. Input outlet riser diameter.
b. Input diameter of each orifice.
c. Input number of orifice based on the suggested orifice required.
d. Obtain outlet riser discharge capacity, Qriser.
5.1.4 Result

Click “Analyze” button to generate textual report, summary report, and detailing.

Click Textual Report, Summary Report, and Detailing tab to show the outcomes
respectively.
Chapter 6 Result Export and Batch Export

6.1.1 Export
The textual report can be exportedas Word format or PDF format by clicking “Export”
button.
The pond detailing can be exported as DWG or DXFformat by clicking “Export” button.
6.1.2 Batch Export

All results can be exported in one time by clicking “Batch Export” button.
Design Manual
Part 2:
MSMA 1st Edition
Chapter 1 Creating IDF

With the button of IDF, the rainfall intensity and IDF curve for a location can be easily
generated.

1.2 IDF
In input tab, users have to input the duration. This duration can either input manually or
calculate using the calculators.
Users can select calculator for different equation by clicking the scroll down box.
Select ARI and location, click Next button.

Output shows the factors and coefficients that used in calculating the rainfall intensity.

Click Analyze button to show rainfall intensity and rainfall depth.


Click IDF Curve tab and Textual Report tab to show IDF graph and detail calculation
respectively.
Chapter 2 Designing On-site Detention

2.1 OSD

Click OSD button to design an On-site detention pond.

Select the type of the OSD by clicking the drop down list.
2.1.1 Pre-development
Calculate pre-development discharge by inputting data in Pre tab
13) Input the length of flow path from catchment divide to outlet, slope of stream
flow path and catchment area to obtain tc and it is editable.
14) Input the “Impervious” and “Pervious” area for Pre-development.
15) Select land use or soil type by clicking button. Choose Urban or Rural. Select
the land use or soil type in the popped out Runoff Coefficient Chart by clicking
the box number.

16) Select ARI and location.2P24and FD are generated automatically. Both are editable
when tc less than 30 minutes.
17) Click “Calculate” button to obtain pre-development discharge. Type of land use,
fitting coefficients, runoff coefficient and intensity will be shown.
2.1.2 Post-development
Calculate post-development discharge by inputting data in Post tab.
7) Input overland flow length, slope of overland surface and manning coefficient
to obtain to.
8) Input drain flow length and average velocity to obtain tp.
9) Input “Impervious” and “Pervious” area for post development.
10) Select land use or type soil by clicking button. Choose Urban or Rural. Select
the land use or type soil in the popped out Runoff Coefficient Chart by clicking
the box number.

11) tc is calculated and editable.


12) Select ARI.
13) Click “Calculate” button to obtain post-development discharge. Type of land use,
fitting coefficients, runoff coefficient and intensity will be shown.
2.1.3 Pond Storage
Determine required storage by inputting data in Pond Storage tab.

3) Input tcs to generate the SSR.


4) Click “Calculate” button to obtain the Required SSR. Make sure maximum SSR is
not fall at the last row as the value may not be the maximum value. Change the
number of row from Option>SSR>OSD>No. of range.
2.1.4 Pond Sizing
Design pond volume by inputting data in Pond Sizing tab.

7) Select the type of the pond (rectangular or circular).


8) Input length, width, and depth to calculate the volume. (Above ground with side
slope)
9) Click “Calculate” button to obtain the Depth of Water and Volume.

Note: Warning message will pop out if the designed volume is less than the required
storage.
2.1.5 Outlet Design
Design outlet by inputting data in Outlet Design tab.

Primary Outlet
8) Input Height from bottom of Pond to bottom of orifice, H. Effective head, Ho will
be calculated.
9) Input diameter and number of orifice.

Secondary Outlet
10) Select ARI.
11) Input the Broad-crested Weir Coefficient, CBCW.
12) Input the effective head and weir width.
2.1.6 Result

Click “Analyze” button to generate textual report, summary report, pond detailing, and
graph.

Click Textual Report, Summary Report, Detailing, or Graph tabs to show the
outcomes respectively.
Chapter 3 Designing Detention Pond

3.1 Pond
Click Pond button to design a pond.

3.1.1 Pre-development
Calculate pre-development discharge by inputting data in Pre tab.
8) Input length of flow path from catchment divide to outlet, slope of stream flow
path and catchment area to obtain tc and it is editable.
9) Select location. 2P24 and FD are generated automatically. Both are editable when tc
less than 30 minutes.
10) Select Minor and Major Design ARI.
11) Click “Calculate” button to obtain Minor and Major Storm discharge.
3.1.2 Post-development
Calculate post-development discharge by inputting data in Post tab.
10) Input overland sheet flow path length, slope of overland surface and manning
coefficient to obtain to.
11) Input drain flow length and average velocity to obtain tp.
12) Input total catchment and define the sub-catchments for pervious and impervious
area.
13) Click “Calculate” button to obtain post-development critical storm duration.

3.1.3 Pond Sizing


Determine required storage by inputting data in Pond Sizing tab. Select the type of the
pond (Rectangular or Irregular).

For Rectangular:

5) Input top length, top width, depth, side slope and invert level to calculate the
volume.
6) The graphical pond displayed can be rotated to different view.
7) Click “Calculate” button to obtain the volume and pond top area.
For Irregular:

8) Input pond depth and invert level.


9) Input the surface area for each interval of pond invert level.
10) Interval of pond invert level can be added or deleted by clicking “+” and “-” button.
11) Click “Calculate” button to obtain the volume and pond top area.
3.1.4 Outlet Design
Design the outlet by inputting data in Outlet Design tab.
7) Minor Design Storm Primary Outlet
a. Input orifice height between pond and orifice invert level, H.
b. Input orifice diameter, Do and number of orifice.
c. Click “Routing” to obtain “Maximum Water Level”.
d. Post-development storm outlet maximum discharge must be lower than pre-
development minor design storm peak flow.

8) Major Design Storm Primary Outlet


a. Major storm primary outlet design is optional. Untick the box to exclude major
design storm primary outlet.
b. Input orifice height between pond and orifice invert level, H. H for Major
Design must be higher than “Maximum Water Level of Minor Design – Pond
Invert Level”.
c. Input orifice diameter, Do and number of orifice.
d. Click “Routing” to obtain “Maximum Water Level”
e. Post-development major design storm outlet maximum discharge must be lower
than pre-development major design storm peak flow.

9) Secondary Outlet Arrangement


a. Input weir height between pond and spillway invert level, H. H for Secondary
outlet must be higher than “Maximum Water Level of Major Design – Pond
Invert Level”.
b. Input weir width.
c. Select ARI.
d. Click “Routing” to obtain “Maximum Water Level”.

3.1.5 Result
Click “Analyze” button to generate textual report, summary report, graph, and water
level profile.
Water Level Simulation will be shown for every 5 minutes interval.

Click Textual Report, Summary Report, Graph, or Water Level Profile tabs to show
the outcomes respectively.
Chapter 4 Designing Rainwater Harvesting Pond

4.1 RWH
Click the RWH button to design rainwater harvesting tank.

4.1.1 Rainfall Data


Determine the average yearly rainfall by inputting the average monthly rainfall from
January to December.
4.1.2 Harvested Rainfall
Determine the amount of harvested rainfall by inputting data in Harvested Rainfall tab.
1) Input the plane area of rooftop catchment, impervious pavement catchment, and/or
landscape catchment.
2) Input the runoff coefficient of rooftop catchment, impervious pavement catchment,
and/or landscape catchment.
3) Click on “Calculate” button to obtain the harvested rainfall from different types of
catchment areas and total yearly harvested rainfall.

4.1.3 Water Demand


Determine the amount of water demand by inputting data in Harvested Rainfall tab.

10) Choose the Appliance (outdoor/indoor).


11) Select the Unit.
12) Input the Frequency of Use.
13) Click on “Calculate” to obtain average water demand and required tank storage.
4.1.4 Tank Sizing
Design tank volume by inputting data in Tank Sizing tab.

7) Select the type of the tank (rectangular or circular).


8) Input length, width, depth, and number of tank to calculate the storage.
9) Click “Calculate” button to obtain Tank Storage.
4.1.5 Result
Click “Analyze” button to generate textual report, summary report, and graph.

Click Textual Report, Summary Report, or Graph tabs to show the outcomes
respectively.
Chapter 5 Designing Sediment Basin

5.1 Sediment Basin

Click Sed Basin button to design a Sediment Basin.

Select the type of the Sediment Basin by clicking the drop down list.
5.1.1 Basin Requirement

Calculate basin requirement by inputting data in Basin Requirement tab.

4) Input the catchment area.


5) Input the overland sheet flow path length, slope, and manning coefficient to obtain
the overland flow time of concentration.
6) Choose the construction period of less than 2 years for 3 months ARI or more than 2
years for 6 months ARI.
7) Click “Calculate” button to obtain the required area and volume.
5.1.2 Basin Sizing

Calculate overall dimension of setting and sediment storage zone by inputting data in
Basin Sizing tab.
3) Settling Zone
a. Input settling depth, y1 (parameter: min. 0.6m)
b. Input average width, w1
c. Input average length, L1 by referring to the range proposed.
d. Click “Calculate” to obtain average surface area, L1/y1 ratio and L1/w1 ratio.

4) Sediment Storage Zone


a. Select side slope (H):(V)
b. Input sediment storage depth, y2 based on the suggested minimum depth.
c. Click “Calculate” to obtain the overall dimension of settling and sediment
storage zone.

5.1.3 Outlet Design

Design the outlet by inputting data in Outlet Design tab.


3) Outlet Pipe
a. Input outlet riser diameter.
b. Input diameter of each orifice.
c. Input number of orifice based on the suggested orifice required.
d. Obtain outlet riser discharge capacity, Qriser below.

5.1.4 Result

Click “Analyze” button to generate textual report, summary report, and detailing.

Click Textual Report, Summary Report, and Detailing tab to show the outcomes
respectively.
Chapter 6 Result Export and Batch Export

6.1.1 Export
The textual report can be exported as Word format or PDF format by clicking “Export”
button.
The pond detailing can be exported as DWG or DXFformat by clicking “Export” button.
6.1.2 Batch Export
All results can be exported in one time by clicking “Batch Export” button.