UNITED CEMENT PVT LTD

5-Apr-16
Daily production report from 1st SHAWAN 2072 (17th JULY 2015) Date
Miti:-23-12-72

R.hrs Production TPH MTD-


SECTION TODAY MTD YTD TODAY MTD YTD TODAY Max.
Lime stone crusher 5.9 59.4 189.536 983 7393.13 20848.54 166.61 124.46
Raw Mill 13.7 129.82 334.42 1051.63 10246.67 21199.68 76.76 78.93
Kiln 16.36 158.14 498.44 468.00 4971.03 10421.26 28.61 31.43
Coal Mill 6.78 103.82 304.5 61.96 930.37 2201.02 9.14 8.96
Cement mill-OPC 0 0 173.036 0 0.00 5454.92 0.00 0.00
Stoppage Hrs. Stoppage Reason
18.1 492.60 6142.86 Crusher started at 6:50,(7:30 to 8:45)(10:15 to 10:50)(12:03 to
Lime stone crusher (9:55 to 11:20)
14:45)(16:45 to200 BC3 mechanical
17:25),18:00 hoppermaintenance
empty. work,13:05
Raw Mill 10.3 422.18 6723.78 300 RVF1 ZSS fault & kiln stopped due to ring formation so hot
7.64 393.86 5237.29 Kiln gasesfeed cut @to11:35
needed to break
run was the ring formed, At 16:50 kiln
insufficient.
Kiln coal firing started again coal firing & main drive stop 18:45
Coal Mill 17.22 448.18 5711.01 Stop for fine coal bin sufficient level.
Cement Mill 24 552.00 6148.64 Planned stoppage
Packing Plant 24 547.50 3710.24 No requirement.
Daily receipt & consumption report
Receipt Consumption
Material description Op.stock TODAY MTD YTD TODAY MTD YTD Cl.Stock
Lime stone 36739.23 383.97 5859.22 5859.22 983 7393.13 20848.54 36140.20
Crushed lime stone 1349.54 983 7393.13 20848.54 1051.63 10160.65 20680.53 1280.91
Clay 0.00 0 0 0 0 0 0 0.00
Bauxite 0.00 0 0 0 0 10 10 0.00
Irone ore 0.00 0 0 0 0 20.05 20.05 0.00
Mill scale 0.00 0 0 0 0 49.97 49.97 0.00
Gypsum 205.87 0 0 295.43 0 0 344.102 205.87
Fly ash 0.00 0 0 0 0 0 0 0.00
Sand 266.46 0 0 0 0 0 0 266.46
Raw Coal 569.16 0 0 2019.62 61.96 930.37 2201.02 507.20
Fine coal. 58.71 881.53 0.00 102.94 964.45 2217.96
Calciner coal 65.67 607.24 1343.357
Kiln coal 37.27 357.21 1043.392
Raw Meal 3908.56 1021.00 9946.04 10832.44 748.8 7953.65 16674.09 4180.76
Clinker 7053.68 468.00 4971.03 10421.26 0 455.32 6452.43 7521.68

Packing Plant
Packer R.hrs Packer Production silo
Silo Opn.
Material Clos.stoc
Stock TODAY MTD YTD TODAY MTD YTD k
Cement OPC 475.42 0 4.5 191.46 0.00 36.00 5272.40 475.42
Cement PPC 0.00 0 0 0
Sales
Clinker
TODAY MTD YTD Total
0 455.32 1340.75 1340.75
Sales/Dispatch.
Self Consumption Dispatch-Sale OUT (Self+Out)Total Delivery
TODAY MTD YTD TODAY MTD YTD TODAY MTD
0 36 433.6 0 0.00 4825.35 0 84.85
DIESEL RECORDS
Today MTD YTD
Diese consp. Ltrs 11700 107819 118002
Unit Generated 45096 413054 451186
unit/Ltrs average 3.85 3.83 3.82
DG R/Hr. 59.9 534.9 591.9
5-Apr-16
Miti:-23-12-72

YTD-Max.
110.00
63.39
20.91
7.23
31.52

15 to 10:50)(12:03 to
tenance work,13:05
pty.
ring formation so hot
rmed, At 16:50 kiln
n drive stop 18:45

Moist. %

In silo
Out)Total Delivery
YTD
5258.95