No Jenis Pekerjaan PERKIRAAN UPAH

Volume Satuan
1 2 3 4
REKAPITULASI TOTAL

No Jenis Pekerjaan
1 2
A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH
C PEKERJAAN SUB STRUKTUR
D PEKERJAAN STRUKTUR
E PEKERJAAN ARSITEKTUR
F PEKERJAAN MEKANIKAL
G PEKERJAAN ELEKTRIKAL
REAL COST TOTAL
PERKIRAAN UPAH
Harga Satuan( Rp ) Jumlah ( Rp )
5 6
TAL

Jumlah Harga
3
1,603,100.00
10,929,228.50
28,105,771.32
83,261,001.30
103,364,309.50
2,340,000.00
20,864,823.75
250,468,234.37
REKAPITULASI TOTAL
PROGRAM PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TERPADU
LOKASI KOMPLEX PERKANTORAN ARFAI
TAHUN 2014

NO. URAIAN PEKERJAAN SUB TOTAL

I PEKERJAAN SITEPLAN
(a ) PEKERJAAN TALUD Rp 311,522,495.94
II PEMBANGUNAN KANTOR
(a ) PEKERJAAN ARSITEKTUR Rp 696,215,324.54
PEKERJAAN MEKANIKAL Rp 5,332,929.96
PEKERJAAN ELEKTRIKAL Rp 50,555,265.00
REAL COST Rp 1,063,626,015.44
PPN 10 % Rp 106,362,601.54
TOTAL COST Rp 1,169,988,616.99
DIBULATKAN Rp 1,169,900,000.00

TERBILANG :
DELAPAN BELAS MILYAR TUJUH RATUS ENAM BELAS JUTA EMPAT RATUS RIBU RUPIAH

Mengetahui / Menyetujui
PEJABAT PELAKSANA :
TEKNIS KEGIATAN DISUSUN OLEH,
(PPTK) KONSULTAN PERENCANAAN
PT. SOLID KONSULTAN

AGUS RIANTO , SE LUKITA ADI , ST


NIP. 19620817 199703 1 004 DIREKTUR
Mengetahui / Menyetujui :
KEPALA BPMP2T PROVINSI PAPUA BARAT
KUASA PENGGUNA ANGGARAN

drs . DECKY RUMBIAK , MM


NIP : 1960531 200111 1 011
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No
Jenis Pekerjaan

1 2
A PEKERJAAN PEMBENTUKAN LAHAN
1 Galian Tanah (Utk Pembentukan Halaman)
2 Menimbun Tanah Kembali Sejauh Rata2 15 m
3 Membuang Tanah Ke Jurang Belakang Lokasi Rata2 10-50 m

B PEKERJAAN TALUD
B.1 PEKERJAAN TALUD HALAMAN BELAKANG
1 Talud A
a. Galian pondasi Talud kedalaman 2.5m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Footplat uk (1,2 X 1,2 x 0.3) 9 buah
1. Cor Beton K 250
2. Pembesian
3. Bekisting Pondasi Plat
d. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
e. Cor Balok & Sloof Beton 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
f. Plesteran Mata sapi 1 PC : 4 PSR
g. Urugan Pasir Bawah Pondasi tebal 5cm
h. Pasang Pipa PVC 1.5" untuk buangan air

2 Talud B
a. Galian pondasi Talud kedalaman 2m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
No
Jenis Pekerjaan

1 2
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

3 Talud C
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm

4 Talud D
a. Galian pondasi Talud kedalaman 1.5m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5 cm

5 Talud E
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

6 Talud F
No
Jenis Pekerjaan

1 2
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm

7 Talud G
a. Galian pondasi Talud kedalaman Rata2 0.5 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm

8 Talud H
a. Galian pondasi Talud kedalaman Rata2 1 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm

9 Talud I
a. Galian pondasi Talud kedalaman Rata2 1 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm
e. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
f. Cor sloof 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
No
Jenis Pekerjaan

1 2
B.2 PEKERJAAN TALUD BATAS KANAN HALAMAN DEPAN
1 Talud Batas Kanan Halaman
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
e. Cor Balok & Sloof Beton 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
f. Plesteran Mata sapi 1 PC : 4 PSR
g. Urugan Pasir Bawah Pondasi tebal 5cm
h. Pasang Pipa PVC 1.5" untuk buangan air

B.3 PEKERJAAN TALUD BATAS DEPAN


1 Talud Batas Kanan Halaman
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
f. Plesteran Mata sapi 1 PC : 4 PSR
g. Urugan Pasir Bawah Pondasi tebal 5cm
h. Pasang Pipa PVC 1.5" untuk buangan air

C PEKERJAAN PAGAR
C.1 PAGAR DEPAN
1 Kolom ( 15 buah )
a. Cor Kolom uk 20/62 tinggi 1,5 m
1. Cor Beton K 175
2. Pembesian 6d12, d6 - 200
3. Bekisting kolom
b. Pas.Dinding batu tela 1 pc : 4 Psr
c. Plesteran tebal 15 mm 1 pc : 4 Psr
d. Plesteran tebal 40 mm 1 pc : 4 Psr
e. Pas. Batu alam motif serut
No
Jenis Pekerjaan

1 2
f. Pas.Motif papua (cat + bahan + upah ) uk ( 0.2 x 1.2 ) x 2 buah
g. Pengecatan

2 Sloof
a. Cor Sloof uk15/20 panjang 44.8 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting sloof

3 Pekerjaan Dinding Nama


a. Cor Kolom uk 20/20 tinggi 1,5 m 3 buah
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting kolom
b. CorBalok uk15/20 panjang 6.7 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting balok
c. Pas.Dinding batu tela 1 pc : 4 Psr
d. Plesteran tebal 15 mm 1 pc : 4 Psr
e. Plesteran tebal 40 mm 1 pc : 4 Psr ( untuk bis beton tebal 10 l
f. Pas. Dinding Batu Alam Motif serut
g. Pasang Huruf Stainless steel Untuk Nama Badan Penanaman

4 Pagar teralis Besi hollow


a. Rangka Horisontal ( besi Hollow 40 x 40 mm)
b. Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
c. Rangka Vertikal tinggi 0.73m ( besi Hollow 40 x 20 mm) 170 bh
d. End Plat uk 5 x 5 cm tebal 3mm ( 108 buah )
e. Pengelasan Sambungan besi teralis
f. Pengecatan Besi teralis dengan cat besi 1 lapis

5 Pintu Gerbang
a. Rangka ( besi Hollow 40 x 40 mm)
b. Rangka Vertikal tinggi 1.07m ( besi Hollow 40 x 20 mm) 12 bua
c. Rangka Vertikal tinggi 0.73m ( besi Hollow 40 x 20 mm) 84 bh
d. Plat uk 0.6 X 9.5 M tebal 3mm
e. Pengelasan Sambungan besi teralis
f. Pengecatan Besi teralis dengan cat besi 1 lapis
No
Jenis Pekerjaan

1 2
g. Rel Pagar besi siku 5 panjang 2 x(19)
h. Tiang Penyangga Pintu

C.2 PAGAR SAMPING KANAN


1 Kolom ( 22 buah )
a. Cor Kolom uk 20/20 tinggi 1,5 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting kolom
b. Pas.Dinding batu tela 1 pc : 4 Psr
c. Plesteran tebal 15 mm 1 pc : 4 Psr
e. Plesteran Camprot 1 pc : 2 Psr
f. Pengecatan

2 Sloof
a. Cor Sloof uk15/20 panjang 44.8 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting sloof

3 Pagar BRC
a. BRC ukuran 120 x 240 cm
b. Biaya Pemasangan Pagar BRC

C.3 PAGAR SAMPING KIRI


1 Pondasi Pagar
a. Galian Tanah Pondasi
b. Urugan Tanah Kembali
c. Pas. Batu Kosong ( anstamping )
d. Pasangan Batu Kali 1 Pc : 4 Psr

2 Kolom ( 38 buah )
a. Cor Kolom uk 20/20 tinggi 1,5 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting kolom
b. Pas.Dinding batu tela 1 pc : 4 Psr
No
Jenis Pekerjaan

1 2
c. Plesteran tebal 15 mm 1 pc : 4 Psr
e. Plesteran Camprot 1 pc : 2 Psr
f. Pengecatan

3 Sloof
a. Cor Sloof uk15/20 panjang 93 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting sloof

4 Pagar BRC
a. BRC ukuran 120 x 240 cm
b. Biaya Pemasangan Pagar BRC

C.4 PAGAR BELAKANG


1 Kolom ( 6 buah )
a. Cor Kolom uk 20/20 tinggi 1,5 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting kolom
b. Pas.Dinding batu tela 1 pc : 4 Psr
c. Plesteran tebal 15 mm 1 pc : 4 Psr
e. Plesteran Camprot 1 pc : 2 Psr
f. Pengecatan

2 Sloof
a. Cor Sloof uk15/20 panjang 44.8 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting sloof

3 Pagar BRC
a. BRC ukuran 120 x 240 cm
b. Biaya Pemasangan Pagar BRC

4 Pagar teralis Besi hollow 43 M


No
Jenis Pekerjaan

1 2
a. Rangka Horisontal ( besi Hollow 40 x 40 mm)
b. Rangka Horisontal ( besi Hollow 20 x 40 mm)
c. Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
d. Rangka Vertikal tinggi 0.7m ( besi Hollow 40 x 20 mm) 170 bh
e. Pengelasan Sambungan besi teralis
f. Pengecatan Besi teralis dengan cat besi 1 lapis

C.5 PAGAR DI TALUD G


1 Pagar teralis Besi hollow 45 M '
a. Rangka Horisontal ( besi Hollow 40 x 40 mm)
b. Rangka Horisontal ( besi Hollow 20 x 40 mm)
c. Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
d. Rangka Vertikal tinggi 0.7m ( besi Hollow 40 x 20 mm) 170 bh
e. Pengelasan Sambungan besi teralis
f. Pengecatan Besi teralis dengan cat besi 1 lapis

D PEKERJAAN DRAINASI
1 Pekerjaan Pembuatan Saluran
a. Galian Tanah
b. Urugan Pasir
c. Pas Dinding batu Kali 1 Pc : 4 Psr tebal 15cm
d. Plesteran 1 pc : 3 psr
e. Cor Lantai Saluran 1pc : 3psr : 5krl
f. Penutup Ram besi siku 5/5
g. Penutup Besi d 16
h. Pengelasan Sambungan Ram penutup saluran

2 Pekerjaan Pembuatan Bak Kontrol 2 bh uk. ( 2 X 2 )m


a. Galian Tanah
b. Kolom 12x12 cm
1 Beton Praktis K 175
2 Begesting
3 Pembesian 4Ø12, Ø8-150
c. Sloof + Balok 12x12 cm
No
Jenis Pekerjaan

1 2
1 Beton Praktis K 175
2 Begesting
3 Pembesian 4Ø12, Ø8-150
d. Pas batu tela 1 pc : 4 Psr
e. Plester 1 : 3
f. Urugan Pasir Tebal 10 cm ( untuk bak kontrol bagian depan )
g. Urugan Sirtu Tebal 15 cm ( untuk bak kontrol bagian depan )
h. Cor lantai 1 Pc : 3 Psr : 5 Kr tebal 15 cm ( utk bak kontrol bagian b
i. Ijuk
j. Pemasangan 3 Jalur Pipa 6'' untuk Pembuangan Air ke jurang

E PEKERJAAN PEMBUATAN CANSTIN BETON


1 Urugan Pasir
2 Cor Beton 1pc : 3psr : 5krl
3 Pengecatan

F PEKERJAAN LAIN-LAIN
1 Pekerjaan Pembuatan Blok beton siar Rumput
a. Urugan Batu Karang tebal 15 cm
b. Urugan Pasir tebal 5cm
c. Blok beton K 250 uk 60 x 60 cm (1,78 buah / m2 ) tebal 10 cm
d. Urugan Tanah humus siar rumput lebar 20 cm tebal 10 cm
f. Tanam Rumput Gajah mini

2 Pekerjaan Tiang Bendera


a. Urugan Pasir Bawah Pondasi tebal 10 cm
b. Pengecoran Pondasi Tiang uk ( 0.8 x 0.8 x 0.8 ) k 175
No
Jenis Pekerjaan

1 2
c. Pengecoran Lantai Tiang Bendera tebal 20 cm 1 Pc : 3 Psr : 5 kr
d. Tiang Bendera + kelengkapan ( angker , Baut ,dll)

3 Cor Beton K 250 tebal 10 cm untuk Ram , ( Jalan Masuk & Jalan Turun
4 Pembuatan Garasi Parkir
a. Urugan Batu Karang tebal 15 cm
b. Urugan Pasir tebal 5cm
c. Cor Beton Tumbuk 1 : 3 : 5 tebal 10 cm
d. Pasang Rangka Atap Besi Hollow + Tiang Penyangga
e. Pasang Atap Spandek

G PEKERJAAN LANDSCAPE
1 Urugan Tanah humus Tebal 50 cm
2 Penanaman Pohon Pinang
3 Penanam Rumput Gajah mini (2 stek/ m2 ) luas zona tanam 301 m2
4 Penanam Bunga dan Tanaman Hias keliling Kantor

H ELEKTRIKAL
H.1 PEKERJAAN INTALASI PENERANGAN SITE
1 Pasang Lampu Taman 60 watt
2 Pasang Lampu Taman 23 watt
3 Pasang Lampu Sorot 250 watt
4 Pasang Lampu SL 18 watt
5 Pasang Panel untul Penerangan Halaman
6 Instalasi Penerangan
7 Instalasi Kotak kontak
8 Saklar Ganda
9 Saklar Tunggal
10 Stop Kontak 500 kva

H.2 PENGADAAN LISTRIK


1 Biaya Penyambungan Listrik PLN
2 Pengadaan Gardu Listrik
3 Pengadaan Genset 50 KVA type silent ( Buatan Jepang , Eropa atau Am
No
Jenis Pekerjaan

1 2

No

A PEKERJAAN PEMBENTUKAN LAHAN


B PEKERJAAN TALUD
C PEKERJAAN PAGAR
D PEKERJAAN DRAINASI
E PEKERJAAN PEMBUATAN CANSTIN BETON
F PEKERJAAN LAIN-LAIN
G PEKERJAAN LANDSCAPE
H ELEKTRIKAL
ENGENERING ESTIMATE PE

PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR


PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TERPADU
PEKERJAAN SITEPLAN
KOMPLEX PERKANTORAN ARFAI
2014

Jenis Pekerjaan

2
EKERJAAN PEMBENTUKAN LAHAN
alian Tanah (Utk Pembentukan Halaman)
enimbun Tanah Kembali Sejauh Rata2 15 m
embuang Tanah Ke Jurang Belakang Lokasi Rata2 10-50 m
Sub Total A (PEKERJAAN PEMBENTUK
EKERJAAN TALUD
EKERJAAN TALUD HALAMAN BELAKANG

Galian pondasi Talud kedalaman 2.5m


Pasangan Batu Kali 1 Pc : 4Psr
Cor Footplat uk (1,2 X 1,2 x 0.3) 9 buah

3. Bekisting Pondasi Plat

Cor Balok & Sloof Beton 20/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air

Galian pondasi Talud kedalaman 2m


Pasangan Batu Kali 1 Pc : 4Psr
Jenis Pekerjaan

Cor Balok & Sloof Beton 20/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi Tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air

Pasangan Batu Kali 1 Pc : 4Psr


Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5cm

Galian pondasi Talud kedalaman 1.5m


Pasangan Batu Kali 1 Pc : 4Psr
Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5 cm

Pasangan Batu Kali 1 Pc : 4Psr

Cor Balok & Sloof Beton 20/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi Tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air
Jenis Pekerjaan

Pasangan Batu Kali 1 Pc : 4Psr


Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5cm

Galian pondasi Talud kedalaman Rata2 0.5 m


Pasangan Batu Kali 1 Pc : 4Psr

Cor Balok & Sloof Beton 25/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi Tebal 5cm

Galian pondasi Talud kedalaman Rata2 1 m


Pasangan Batu Kali 1 Pc : 4Psr
Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5cm

Galian pondasi Talud kedalaman Rata2 1 m


Pasangan Batu Kali 1 Pc : 4Psr
Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5cm
Jenis Pekerjaan

2
EKERJAAN TALUD BATAS KANAN HALAMAN DEPAN
alud Batas Kanan Halaman

Pasangan Batu Kali 1 Pc : 4Psr

Cor Balok & Sloof Beton 20/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air

EKERJAAN TALUD BATAS DEPAN


alud Batas Kanan Halaman

Pasangan Batu Kali 1 Pc : 4Psr

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air

Sub Total A (PEKERJAAN TAL


EKERJAAN PAGAR

Cor Kolom uk 20/62 tinggi 1,5 m

2. Pembesian 6d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran tebal 40 mm 1 pc : 4 Psr
Pas. Batu alam motif serut
Jenis Pekerjaan

2
Pas.Motif papua (cat + bahan + upah ) uk ( 0.2 x 1.2 ) x 2 buah

Cor Sloof uk15/20 panjang 44.8 m

2. Pembesian 4d12, d6 - 200

ekerjaan Dinding Nama


Cor Kolom uk 20/20 tinggi 1,5 m 3 buah

2. Pembesian 4d12, d6 - 200

CorBalok uk15/20 panjang 6.7 m

2. Pembesian 4d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran tebal 40 mm 1 pc : 4 Psr ( untuk bis beton tebal 10 lebar 10 cm)
Pas. Dinding Batu Alam Motif serut
Pasang Huruf Stainless steel Untuk Nama Badan Penanaman Modal ( uk 17 x 20 cm )

Rangka Horisontal ( besi Hollow 40 x 40 mm)


Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
Rangka Vertikal tinggi 0.73m ( besi Hollow 40 x 20 mm) 170 bh
End Plat uk 5 x 5 cm tebal 3mm ( 108 buah )
Pengelasan Sambungan besi teralis
Pengecatan Besi teralis dengan cat besi 1 lapis

Rangka ( besi Hollow 40 x 40 mm)


Rangka Vertikal tinggi 1.07m ( besi Hollow 40 x 20 mm) 12 buah
Rangka Vertikal tinggi 0.73m ( besi Hollow 40 x 20 mm) 84 bh
Plat uk 0.6 X 9.5 M tebal 3mm
Pengelasan Sambungan besi teralis
Pengecatan Besi teralis dengan cat besi 1 lapis
Jenis Pekerjaan

2
Rel Pagar besi siku 5 panjang 2 x(19)
Tiang Penyangga Pintu

Cor Kolom uk 20/20 tinggi 1,5 m

2. Pembesian 4d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran Camprot 1 pc : 2 Psr

Cor Sloof uk15/20 panjang 44.8 m

2. Pembesian 4d12, d6 - 200

BRC ukuran 120 x 240 cm


Biaya Pemasangan Pagar BRC

Urugan Tanah Kembali


Pas. Batu Kosong ( anstamping )
Pasangan Batu Kali 1 Pc : 4 Psr

Cor Kolom uk 20/20 tinggi 1,5 m

2. Pembesian 4d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Jenis Pekerjaan

2
Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran Camprot 1 pc : 2 Psr

Cor Sloof uk15/20 panjang 93 m

2. Pembesian 4d12, d6 - 200

BRC ukuran 120 x 240 cm


Biaya Pemasangan Pagar BRC

Cor Kolom uk 20/20 tinggi 1,5 m

2. Pembesian 4d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran Camprot 1 pc : 2 Psr

Cor Sloof uk15/20 panjang 44.8 m

2. Pembesian 4d12, d6 - 200

BRC ukuran 120 x 240 cm


Biaya Pemasangan Pagar BRC

agar teralis Besi hollow 43 M


Jenis Pekerjaan

2
Rangka Horisontal ( besi Hollow 40 x 40 mm)
Rangka Horisontal ( besi Hollow 20 x 40 mm)
Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
Rangka Vertikal tinggi 0.7m ( besi Hollow 40 x 20 mm) 170 bh
Pengelasan Sambungan besi teralis
Pengecatan Besi teralis dengan cat besi 1 lapis

agar teralis Besi hollow 45 M '


Rangka Horisontal ( besi Hollow 40 x 40 mm)
Rangka Horisontal ( besi Hollow 20 x 40 mm)
Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
Rangka Vertikal tinggi 0.7m ( besi Hollow 40 x 20 mm) 170 bh
Pengelasan Sambungan besi teralis
Pengecatan Besi teralis dengan cat besi 1 lapis

Sub Total C (PEKERJAAN PA


EKERJAAN DRAINASI
ekerjaan Pembuatan Saluran

c. Pas Dinding batu Kali 1 Pc : 4 Psr tebal 15cm

e. Cor Lantai Saluran 1pc : 3psr : 5krl


. Penutup Ram besi siku 5/5

h. Pengelasan Sambungan Ram penutup saluran

ekerjaan Pembuatan Bak Kontrol 2 bh uk. ( 2 X 2 )m

1 Beton Praktis K 175


2 Begesting
3 Pembesian 4Ø12, Ø8-150
c. Sloof + Balok 12x12 cm
Jenis Pekerjaan

2
1 Beton Praktis K 175
2 Begesting
3 Pembesian 4Ø12, Ø8-150
d. Pas batu tela 1 pc : 4 Psr

. Urugan Pasir Tebal 10 cm ( untuk bak kontrol bagian depan )


. Urugan Sirtu Tebal 15 cm ( untuk bak kontrol bagian depan )
. Cor lantai 1 Pc : 3 Psr : 5 Kr tebal 15 cm ( utk bak kontrol bagian belakang )

. Pemasangan 3 Jalur Pipa 6'' untuk Pembuangan Air ke jurang

Sub Total D (PEKERJAAN DRA


EKERJAAN PEMBUATAN CANSTIN BETON

Sub Total E (PEKERJAAN PEMBUATA


EKERJAAN LAIN-LAIN
ekerjaan Pembuatan Blok beton siar Rumput
a. Urugan Batu Karang tebal 15 cm
b. Urugan Pasir tebal 5cm
c. Blok beton K 250 uk 60 x 60 cm (1,78 buah / m2 ) tebal 10 cm
d. Urugan Tanah humus siar rumput lebar 20 cm tebal 10 cm
f. Tanam Rumput Gajah mini

a. Urugan Pasir Bawah Pondasi tebal 10 cm


b. Pengecoran Pondasi Tiang uk ( 0.8 x 0.8 x 0.8 ) k 175
Jenis Pekerjaan

2
c. Pengecoran Lantai Tiang Bendera tebal 20 cm 1 Pc : 3 Psr : 5 kr
d. Tiang Bendera + kelengkapan ( angker , Baut ,dll)

or Beton K 250 tebal 10 cm untuk Ram , ( Jalan Masuk & Jalan Turun dari hal depan Ke Hal. Belakang )

a. Urugan Batu Karang tebal 15 cm


b. Urugan Pasir tebal 5cm
c. Cor Beton Tumbuk 1 : 3 : 5 tebal 10 cm
d. Pasang Rangka Atap Besi Hollow + Tiang Penyangga

Sub Total F (PEKERJAAN LAIN


EKERJAAN LANDSCAPE
rugan Tanah humus Tebal 50 cm

enanam Rumput Gajah mini (2 stek/ m2 ) luas zona tanam 301 m2


enanam Bunga dan Tanaman Hias keliling Kantor
Sub Total G (PEKERJAAN LAND

EKERJAAN INTALASI PENERANGAN SITE


asang Lampu Taman 60 watt
asang Lampu Taman 23 watt
asang Lampu Sorot 250 watt
asang Lampu SL 18 watt
asang Panel untul Penerangan Halaman

aya Penyambungan Listrik PLN

engadaan Genset 50 KVA type silent ( Buatan Jepang , Eropa atau Amerika )
Jenis Pekerjaan

2
REKAPITULAS

Jenis Pekerjaan

EKERJAAN PEMBENTUKAN LAHAN

EKERJAAN DRAINASI
EKERJAAN PEMBUATAN CANSTIN BETON
EKERJAAN LAIN-LAIN
EKERJAAN LANDSCAPE
ENGENERING ESTIMATE PEKERJAAN SITE PLAN

NAMAN MODAL DAN PERIZINAN TERPADU

Keterangan
Volume
3

Excavator 11,240.27
Buldozer 2,664.56
Buldozer (tanah timbun sebagai Pengaman Talud) 8,575.71
Sub Total A (PEKERJAAN PEMBENTUKAN LAHAN )

Alat Berat 162.38


Lihat Gbr Detail 718.43

Lihat Gbr Detail 3.89


Lihat Gbr Detail 259.52
Lihat Gbr Detail 12.96

Lihat Gbr Detail 1.53


Lihat Gbr Detail 2,801.26
Lihat Gbr Detail 56.10

Lihat Gbr Detail 6.14


Lihat Gbr Detail 1,775.69
Lihat Gbr Detail 30.70
Lihat Gbr Detail 343.21
3.25
100.00

Alat Berat 210.33


Lihat Gbr Detail 870.84
Keterangan
Volume
3
Lihat Gbr Detail 15.01
Lihat Gbr Detail 2,498.66
Lihat Gbr Detail 50.04

Lihat Gbr Detail 6.94


Lihat Gbr Detail 2,006.33
Lihat Gbr Detail 34.69
Lihat Gbr Detail 401.80
5.26
127.50

Alat Berat 13.68


Lihat Gbr Detail 28.69
Lihat Gbr Detail 25.00
Lihat Gbr Detail 0.30

Alat Berat 3.82


Lihat Gbr Detail 15.26
Lihat Gbr Detail 38.91
0.38

Alat Berat 38.40


Lihat Gbr Detail 176.00

Lihat Gbr Detail 4.23


Lihat Gbr Detail 444.62
Lihat Gbr Detail 14.10

Lihat Gbr Detail 1.60


Lihat Gbr Detail 286.08
Lihat Gbr Detail 8.00
Lihat Gbr Detail 49.20
0.96
21.00
Keterangan
Volume
3
Alat Berat 13.00
Lihat Gbr Detail 26.75
Lihat Gbr Detail 27.00
0.38

Alat Berat 35.34


Lihat Gbr Detail 196.20

Lihat Gbr Detail 5.00


Lihat Gbr Detail 715.20
Lihat Gbr Detail 20.00

Lihat Gbr Detail 8.03


Lihat Gbr Detail 1,147.90
Lihat Gbr Detail 32.10
Lihat Gbr Detail 214.00
3.21

Alat Berat 19.85


Lihat Gbr Detail 38.28
Lihat Gbr Detail 32.30
0.95

Alat Berat 66.53


Lihat Gbr Detail 220.50
Lihat Gbr Detail 32.30
0.95

Lihat Gbr Detail 6.54


Lihat Gbr Detail 936.11
Lihat Gbr Detail 26.18

Lihat Gbr Detail 6.07


Lihat Gbr Detail 1,084.87
Lihat Gbr Detail 30.34

PEKERJAAN TALUD HA
Keterangan
Volume
3

Alat Berat 114.94


Lihat Gbr Detail 404.44

Lihat Gbr Detail 3.15


Lihat Gbr Detail 1,453.06
Lihat Gbr Detail 29.10

Lihat Gbr Detail 3.85


Lihat Gbr Detail 1,113.42
Lihat Gbr Detail 19.25
Lihat Gbr Detail 233.87
4.44
125.40
PEKERJAAN TALUD BATAS KANA

Alat Berat 61.31


Lihat Gbr Detail 174.79

Lihat Gbr Detail 3.15


Lihat Gbr Detail 524.30
Lihat Gbr Detail 10.50
Lihat Gbr Detail 139.30
3.61
30.00
PEKERJAAN TA
Sub Total A (PEKERJAAN TALUD )

Lihat Gbr Detail 0.19


Lihat Gbr Detail 11.49
Lihat Gbr Detail 0.62
0.90
0.31
3.29
0.64
Keterangan
Volume
3
0.48
3.60
ju
Jum

Lihat Gbr Detail 1.34


Lihat Gbr Detail 198.91
Lihat Gbr Detail 4.48

Lihat Gbr Detail 0.18


Lihat Gbr Detail 26.46
Lihat Gbr Detail 0.90

Lihat Gbr Detail 0.20


Lihat Gbr Detail 29.75
Lihat Gbr Detail 3.69
6.84
18.43
1.44
8.64
73.00

Lihat Gbr Detail 82.74


Lihat Gbr Detail 12.00
Lihat Gbr Detail 124.10
Lihat Gbr Detail 6.36
Lihat Gbr Detail 6,096.00
Lihat Gbr Detail 29.57

Lihat Gbr Detail 49.97


Lihat Gbr Detail 6.42
Lihat Gbr Detail 61.32
Lihat Gbr Detail 134.24
Lihat Gbr Detail 2,964.00
Lihat Gbr Detail 27.52
Keterangan
Volume
3
Lihat Gbr Detail 38.00
Lihat Gbr Detail 1.00

PEKERJ

Lihat Gbr Detail 0.06


Lihat Gbr Detail 6.90
Lihat Gbr Detail 0.30
0.90
1.80
0.60
2.40
ju
Jum

Lihat Gbr Detail 1.29


Lihat Gbr Detail 190.25
Lihat Gbr Detail 4.29

Lihat Gbr Detail 18.00


Lihat Gbr Detail 51.84

PEKERJ

Lihat Gbr Detail 44.64


Lihat Gbr Detail 14.88
Lihat Gbr Detail 9.77
Lihat Gbr Detail 25.11
ju

Lihat Gbr Detail 0.06


Lihat Gbr Detail 6.90
Lihat Gbr Detail 0.30
0.90
Keterangan
Volume
3
1.80
0.60
2.40
ju
Jum

Lihat Gbr Detail 2.79


Lihat Gbr Detail 412.92
Lihat Gbr Detail 9.30

Lihat Gbr Detail 38.00


Lihat Gbr Detail 109.44

PEKERJAAN PA

Lihat Gbr Detail 0.06


Lihat Gbr Detail 6.90
Lihat Gbr Detail 0.30
0.90
1.80
0.60
2.40
ju
Ju

Lihat Gbr Detail 0.41


Lihat Gbr Detail 59.94
Lihat Gbr Detail 1.35

Lihat Gbr Detail 6.00


Lihat Gbr Detail 17.28
Keterangan
Volume
3
Lihat Gbr Detail 1.00
Lihat Gbr Detail 2.00
Lihat Gbr Detail 2.00
Lihat Gbr Detail 4.90
Lihat Gbr Detail 336.00
Lihat Gbr Detail 0.99

PEKERJ

Lihat Gbr Detail 1.00


Lihat Gbr Detail 2.00
Lihat Gbr Detail 2.00
Lihat Gbr Detail 4.90
Lihat Gbr Detail 336.00
Lihat Gbr Detail 0.99

PEKERJAAN
Sub Total C (PEKERJAAN PAGAR )

0.49
0.49
Lihat Gbr Detail 0.03
Lihat Gbr Detail 0.14
1.20
Lihat Gbr Detail 0.06
Lihat Gbr Detail 2.00
Lihat Gbr Detail 6.31
Lihat Gbr Detail 20.00

13.60

0.21
3.46
65.12
Keterangan
Volume
3
0.46
7.68
144.70
26.88
26.88
0.40
0.60
0.60
1.00
50.00

Sub Total D (PEKERJAAN DRAINASI )

Lihat Gbr Detail 0.02


Lihat Gbr Detail 0.14
Lihat Gbr Detail 0.20

Sub Total E (PEKERJAAN PEMBUATAN CANSTIN )

Lihat Gbr Detail 0.15


Lihat Gbr Detail 0.05
Lihat Gbr Detail 0.06
Lihat Gbr Detail 0.04
Lihat Gbr Detail 1.00
JUMLAH PEMBUATAN BLOK BETON SIA

Lihat Gbr Detail 0.10


Lihat Gbr Detail 0.51
Keterangan
Volume
3
Lihat Gbr Detail 0.15
Lihat Gbr Detail 1.00

depan Ke Hal. Belakang ) 15.56

Lihat Gbr Detail 21.56


Lihat Gbr Detail 7.19
Lihat Gbr Detail 14.38
Lihat Gbr Detail 175.00
Lihat Gbr Detail 175.00
JUMLAH PEMBUATA
Sub Total F (PEKERJAAN LAIN-LAIN )

150.50
Lihat Gbr Detail 71.00
1,204.00
1.00
Sub Total G (PEKERJAAN LANDSCAPE )

kontrol pada pos jaga 19.00


kontrol pada pos jaga 27.00
kontrol pada pos jaga 2.00
kontrol pada pos jaga 4.00
kontrol pada pos jaga 1.00
52.00
1.00
kontrol pada pos jaga 4.00
kontrol pada pos jaga 1.00
kontrol pada pos jaga 57.00
PEKERJAAN INSTALASI PE

1.00
1.00
1.00
PEN
Keterangan
Volume
3
REKAPITULASI TOTAL

Jenis Pekerjaan

2
LAN

TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

M3 0.00
M3 0.00
M3 0.00
0.00

m3 0.00
m3 0.00

m3 0.00
kg 0.00
m2 0.00

m3 0.00
kg 0.00
m2 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m3 0.00
m' 0.00
Total Talud A 0.00

m3 0.00
m3 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m3 0.00
kg 0.00
m2 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m3 0.00
m' 0.00
Total Talud B 0.00

m3 0.00
m3 0.00
m2 0.00
m3 0.00
Total Talud C 0.00

m3 0.00
m3 0.00
m2 0.00
m3 0.00
Total Talud D 0.00

m3 0.00
m3 0.00

m3 0.00
kg 0.00
m2 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m3 0.00
m' 0.00
Total Talud E 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m3 0.00
m3 0.00
m2 0.00
m3 0.00
Total Talud F 0.00

m3 0.00
m3 0.00

m3 0.00
kg 0.00
m2 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m3 0.00
Total Talud G 0.00

m3 0.00
m3 0.00
m2 0.00
m3 0.00
Total Talud H 0.00

m3 0.00
m3 0.00
m2 0.00
m3 0.00

m3 0.00
kg 0.00
m2 0.00

m3 0.00
kg 0.00
m2 0.00
Total Talud I 0.00
PEKERJAAN TALUD HALAMAN BELAKANG 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

m3 14,890.20 1,711,460.98
m3 665,453.25 269,135,912.43

m3 342,918.50 1,080,193.28
kg 2,819.23 4,096,503.08
m2 188,042.25 5,472,029.48

m3 342,918.50 1,320,236.23
kg 2,819.23 3,138,981.50
m2 148,154.50 2,851,974.13
m2 85,473.75 19,989,745.91
m3 49,335.00 218,800.73
m' 19,989.30 2,506,658.22
PEKERJAAN TALUD BATAS KANAN HALAMAN DEPAN 311,522,495.94

m3 0.00
m3 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m3 0.00
m' 0.00
PEKERJAAN TALUD BATAS DEPAN 0.00
311,522,495.94

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m2 0.00
m2 0.00
jumlah 1 buah kolom 0.00
Jumlah 15 buah kolom 0.00

m3 0.00
kg 0.00
m2 0.00
jumlah 0.00

m3 0.00
kg 0.00
m2 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
bh 0.00
jumlah 0.00

m' 0.00
m' 0.00
m' 0.00
kg 0.00
cm 0.00
m2 0.00
jumlah 0.00

m' 0.00
m' 0.00
m' 0.00
kg 0.00
cm 0.00
m2 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m' 0.00
ls 0.00
jumlah 0.00
PEKERJAAN PAGAR DEPAN 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
jumlah 1 buah kolom 0.00
Jumlah 22 buah kolom 0.00

m3 0.00
kg 0.00
m2 0.00
jumlah 0.00

lbr 0.00
m2 0.00
jumlah 0.00
PEKERJAAN PAGAR DEPAN 0.00

m3 0.00
m3 0.00
m3 0.00
m3 0.00
jumlah 1 buah kolom 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m2 0.00
m2 0.00
m2 0.00
jumlah 1 buah kolom 0.00
Jumlah 38 buah kolom 0.00

m3 0.00
kg 0.00
m2 0.00
jumlah 0.00

lbr 0.00
m2 0.00
jumlah 0.00
PEKERJAAN PAGAR SAMPING KIRI 0.00

m3 0.00
kg 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
m2 0.00
jumlah 1 buah kolom 0.00
Jumlah 6 buah kolom 0.00

m3 0.00
kg 0.00
m2 0.00
jumlah 0.00

lbr 0.00
m2 0.00
jumlah 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m' 0.00
m' 0.00
m' 0.00
m' 0.00
cm 0.00
m2 0.00
jumlah ( 1 m ' ) 0.00
jumlah ( 43 m ' ) 0.00
PEKERJAAN PAGAR DEPAN 0.00

m' 0.00
m' 0.00
m' 0.00
m' 0.00
cm 0.00
m2 0.00
jumlah ( 1 m ' ) 0.00
jumlah ( 45 m ' ) 0.00
PEKERJAAN PAGAR DI TALUD G 0.00
0.00

m3 0.00
m3 0.00
m3 0.00
m3 0.00
M2 0.00
m3 0.00
M' 0.00
kg 0.00
cm 0.00
JUMLAH SALURAN 1 M' 0.00
JUMLAH SALURAN 515 M' 0.00

m3 0.00

m3 0.00
M2 0.00
kg 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m3 0.00
M2 0.00
kg 0.00
m2 0.00
m2 0.00
m3 0.00
m3 0.00
m3 0.00
ls 0.00
m' 0.00
JUMLAH BAK KONTROL 0.00
0.00

m3 0.00
m3 0.00
M2 0.00
JUMLAH CANSTIN 1 M' 0.00
JUMLAH SALURAN 504 M' 0.00
0.00

m3 0.00
m3 0.00
m3 0.00
m3 0.00
stek 0.00
JUMLAH PEMBUATAN BLOK BETON SIAR RUMPUT 1 M2 0.00
JUMLAH 1508 M2 0.00

m3 0.00
m3 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m3 0.00
ls 0.00
JUMLAH PEK. TIANG BENDERA 0.00
m3 0.00

m3 0.00
m3 0.00
m3 0.00
m2 0.00
m2 0.00
JUMLAH PEMBUATAN GARASI PARKIR 0.00
0.00

m3 0.00
bh 0.00
stek 0.00
ls 0.00
0.00

bh 0.00
bh 0.00
bh 0.00
bh 0.00
bh 0.00
ttk 0.00
ttk 0.00
bh 0.00
bh 0.00
bh 0.00
PEKERJAAN INSTALASI PENERANGAN SITE 0.00

Ls 0.00
LS 0.00
unit 0.00
PENGADAAN LISTRIK 0.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

Jumlah Harga
( Rp )
3

0.00
311,522,495.94
0.00
0.00
0.00
0.00
0.00
0.00

REAL COST Rp 311,522,495.94


ENGINERING ESTIMATE GEDUNG K

PROGRAM : PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR


KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERI
PEKERJAAN : PEMBANGUNAN KANTOR
LOKASI : KOMPLEX PERKANTORAN ARFAI
TAHUN ANGGARAN : 2014

No Jenis Pekerjaan

1 2

A PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bowplank
Sub Total A
B PEKERJAAN TANAH
1 Galian Pondasi Menerus
2 Galian Pondasi Footplat
3 Urugan Tanah Kembali
4 Urugan Peninggian Peil Lantai
5 Urugan Pasir bawah Pondasi Footplat
6 Urugan Pasir bawah pondasi menerus
7 Urugan Pasir bawah lantai
Sub Total B
C PEKERJAAN SUB STRUKTUR
1 Pondasi
a. Pondasi Footplat F1 (uk. 2x2) 24 buah
1. Cor Beton K 300
2. Pembesian
3. Bekisting
4. Lantai Kerja
b. Pondasi Footplat F2 (uk. 1.5x1.5) 16 buah
1. Cor Beton K 300
2. Pembesian
3. Bekisting
4. Lantai Kerja
c. Pondasi Footplat F3 (uk 1.2 x 1.2) 8 buah
1. Cor Beton K 300
2. Pembesian
3. Bekisting
4. Lantai Kerja
c. Pasang Aanstamping
No Jenis Pekerjaan

1 2
d. Pasang Pondasi batu kali 1 pc : 4 psr
2 Kolom
a. Kolom K1 (uk 50 x50)cm16 buah
1. Cor Beton K 300 (pengecoran setinggi pondasi menerus)
2. Pembesian (Pengerjaan Sampai pondasi Menerus over stek 1m)
3. Bekisting
b. Kolom K2 (uk 40 x 40)cm 24 buah
1. Cor Beton K 300 (pengecoran setinggi pondasi menerus)
2. Pembesian (Pengerjaan Sampai pondasi Menerus over stek 1m)
3. Bekisting
3 SLOOF (uk 25/40)cm
1. Cor Beton K 300
2. Pembesian
3. Bekisting
4. Lantai Kerja (lebar 25cm tebal 5cm)
Sub Total C

D PEKERJAAN STRUKTUR
I. LANTAI 1 ( elev -0.10 - +4.00 )
1 Kolom
a. Kolom 50x50 cm (K1)
1. Cor Beton K 300
2. Bekisting
3. Pembesian 16D 16 ,d10-100

b. Kolom 40x40 cm (K2)


1. Cor Beton K 300
2. Bekisting
3. Pembesian 12D 16 ,d10-100

c. Kolom 12x12 cm (Kp)


1 Beton Praktis
2 Begesting
3 Pembesian 4Ø12, Ø8-150

2 Balok Lantai II
a. Balok 40/70 Cm (B1)
- Beton K300
- Begesting
- Pembesian 11D16, 4D12, Ø10-100~150
No Jenis Pekerjaan

1 2
b. Balok 30/60 Cm (B2)
- Beton K300
- Begesting Balok
- Pembesian 10D16, 4D12, Ø10-100~150

c. Balok 25/40 Cm (B4)


- Beton K300
- Begesting Balok
- Pembesian 7D16, Ø8-100~150

d. Balok 15/20 Cm (B5)


- Beton K300
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

e. Balok 12/20 Cm ( Penopang Parapet, panjang kolom ke kolom ) Elv +2.95


- Beton Praktis
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

3 Beton Plat
a. Plat Lantai T 12 Cm (PL)
- Beton K300
- Begesting Plat
- Pembesian Tumpuan Ø10-150, 2 lapis (75% luas)
- Pembesian Lapangan Ø10-150 1 lapis (25% luas)

b. Plat Atap Enterance T 10 Cm (PA)


- Beton K300
- Begesting Plat
- Pembesian Tumpuan Ø10-150, 2 lapis (75% luas)
- Pembesian Lapangan Ø10-150 1 lapis (25% luas)

c. Plat Dak Parapet T 10 Cm ( atas jendela ) elv + 2.85


- Beton Praktis
- Begesting Plat
- Pembesian Ø10-150, Ø8-100 ,

4 Beton Tangga ( plat tangga disambung ke sloof )


a .Pekerjaan Beton Plat Bordes uk ( 3 x 1,4 )m
- Beton K250
- Begesting
No Jenis Pekerjaan

1 2
- Pembesian D16-150 , Ø8-100
b. Pekerjaan Balok Bantu 20/30 (4 buah X panjang 3 m)
- Beton K250
- Begesting
- Pembesian 4d16 , 2d12 begel Ø8-150
c. Pekerjaan Kolom Bantu 20/20 setinggi bordes (4 buah X 2.96 m)
- Beton K250
- Begesting
- Pembesian 4d16 , 2d12 begel Ø8-150
d. Pekerjaan Beton Plat Tangga tebal 15 cm
- Beton K250
- Begesting
- Pembesian Ø16-150, Ø8-120
e. Pekerjaan Beton Anak Tangga
- Beton K250
- Begesting Tangga
- Pembesian Ø8-200, Ø8-200
II. LANTAI 2 ( elv +4.00 - keatas )
1 Beton Kolom Lantai II
a. Kolom 50x50 cm (K1)
- Beton K300
- Begesting
- Pembesian 18-D16, Ø10-100~150

b. Kolom 40x40 cm (K2)


- Beton K300
- Begesting
- Pembesian 18-D16, Ø10-100~150

c. Kolom 12x12 cm (Kp)


- Beton Praktis
- Begesting
- Pembesian 4-d12, Ø8-150

2 Balok
a. Balok 30/60 Cm (B2)
- Beton K300
- Begesting Balok
- Pembesian 10D16, 4D12, Ø10-100~150

b. Ring Balk Balok 25/50 Cm (B3)


- Beton K300
No Jenis Pekerjaan

1 2
- Begesting
- Pembesian 9D16,4d12 Ø10-100~150

c. Ring Balok 25/40 Cm (B4)


- Beton K300
- Begesting Balok 3x Pakai
- Pembesian 6Ø12, Ø8-100-150

d. Balok 12/20 Cm
- Beton Praktis
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

e. Balok 12/20 Cm ( Penopang Parapet, panjang kolom ke kolom ) Elv +6.95


- Beton Praktis
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

f. Balok 12/20 Cm ( Penopang Parapet, panjang kolom ke kolom ) di portal 1 -2 & 5 - 6 (Elv +8
- Beton Praktis
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

3 Beton Plat Atap

a. Plat Atap T 10 Cm di portal 1 - 2 & 5 - 6 ( elv +9.00 )


- Beton K300
- Begesting Plat
- Pembesian Lapangan Ø10-150 1 lapis

b. Plat Dak T 10 Cm ( atas jendela ) di portal 2- 5 ( elv + 8.00 )


- Beton K 300
- Begesting Plat
- Pembesian Ø10-150, Ø8-100 ,

c. Plat Dak T 10 Cm ( atas motif ukiran ) di portal 2- 5 ( elv + 8.30 )


- Beton K 300
- Begesting Plat
- Pembesian Ø10-150, Ø8-100 ,

d. Plat Dak Parapet T 10 Cm ( atas jendela ) elv + 6.85


- Beton Praktis
No Jenis Pekerjaan

1 2
- Begesting Plat
- Pembesian Ø10-150, Ø8-100 ,
SUB TOTAL D

E. PEKERJAAN ARSITEKTUR

LANTAI 1
A PEKERJAAN PASANGAN DAN PLESTERAN LT. 1
1 Pas. Dinding 1/2 Bata 1 Pc : 4 Ps
2 Pas. Dinding 1/2 Bata 1 Pc : 3 Ps
3 Pas. Dinding Rabat Batu kali 1Pc : 4 Psr
4 Pas. Dinding Partisi Double Gypsum Board + Rangka
5 Pekerjaan Plesteran 1Pc : 2 Ps untuk kolom
6 Pekerjaan Plesteran 1Pc : 3 Ps
7 Pekerjaan Plesteran 1 Pc : 4 Ps
8 Cor Lantai Beton Tumbuk Tbl 7 Cm
9 Cor Beton K 250 untuk alas dinding sirip ukiran uk (0.8 x 2)m tebal 30cm
10 Plesteran 1 Pc : 3Psr tebal 5cm (utk ddg motif ) 3x plesteran biasa
11 Acian
12 Floor Lt Rabat 1Pc : 2 Ps

Sub Total A PEKERJAAN PASAN

B PEKERJAAN KERAMIK LT. 1


1 Pasang lantai keramik 60x60 cm
2 Keramik 60x60 cm tekstur
3 Keramik Plint 60x10 cm
4 Keramik KM Tile 20x20 cm Tekstur
5 Keramik Dinding KM Tile 20x25 cm
6 Keramik Tangga Tile 30x30 cm texture kasar (anti slip)
7 Keramik Plint Tangga Tile15x30 cm( keramik 30x30 dibagi 2)
8 Keramik Plint Kayu uk 10 cm ( di dinding Partisi )
9 Pasangan Batu Alam ( dinding rabat + dinding ukiran )
Sub Total B

C. PEKERJAAN PINTU DAN JENDELA LT. 1


Pekerjaan Kusen Pintu
1 P1
2 P2
3 P3
No Jenis Pekerjaan

1 2
4 P4
Pekerjaan Kusen Jendela
1 Jendela J1
2 Jendela J2
3 Jendela J3
4 Jendela J5
5 Jendela J6
6 Ventilasi BV.1
7 Ventilasi BV.2
Sub Total C PEKERJAA

D. PEKERJAAN PLAFOND LT. 1


1 Penutup Plafond GRC 60 x 120 cm + rangka alluminium
2 List Gypsum
Sub Total D

E PEKERJAAN SANITAIR LT. 1


1 Kloset Duduk+Acc
2 Jet Washer
3 Kran Dinding
4 Wastafel + Kran & Accesoris
5 Cermin Wastafel uk. ± ( 1.5 x 0.8 )
6 kitchensink
Sub Total E

F. PEKERJAAN PENGECATAN LT.1


1 Pengecatan Dinding & Kolom
2 Pengecatan dinding Partisi
3 Pengecatan Plafon
Sub Total F PEK

LANTAI 2.
A. PEKERJAAN PASANGAN DAN PLESTERAN LT. 2
1 Pas. Dinding Bata Ringan 1 Pc : 3 Ps
2 Pas. Dinding Bata Ringan 1 Pc : 4 Ps
3 Pekerjaan Plesteran 1 Pc : 3 Ps
4 Pekerjaan Plesteran 1 Pc : 4 Ps
5 Acian
6 Pas. Dinding Partisi Double Gypsum Board + Rangka
Sub Total A PEKERJAAN PASAN
No Jenis Pekerjaan

1 2

B. PEKERJAAN KERAMIK LT. 2


1 Pasang lantai keramik 60x60 cm
2 Keramik Plint 60x10 cm
3 Keramik KM Tile 20x20 cm Tekstur
4 Keramik Dinding KM Tile 20x25 cm
5 Keramik Plint Kayu uk 10 cm ( di dinding Partisi )
Sub Total B

C. PEKERJAAN KUSEN LT. 2


Pekerjaan Pintu
1 Pintu P2
3 Pintu P3
4 Pintu P4

Pekerjaan Jendela
1 Jendela (J2)
2 Jendela (J3)
3 Jendela (J4)
4 Jendela (J5)
5 Jendela (J7)
9 Ventilasi ( BV.1 )
6 Ventilasi ( BV. 2 )
7 Ventilasi ( BV. 3 )
8 Ventilasi ( BV. 4 )
Sub Total

D. PEKERJAAN PLAFOND LT. 2


1 Penutup Plafond GRC 60 x 120 cm + rangka alluminium
2 List Gypsum
Sub Total D

E. PEKERJAAN KAP / ATAP LT. 2


1 Kuda-kuda baja ringan tebal 0.8 mm + reng
2 Pasang Atap Spandeck
3 Talang Allumunium
4 Listplank Allumunium composite panel 4 mm( exs. China) + Rangka
5 Pas.Dinding Allumunium Composit Panel + Rangka metal furing
6 Penutup Plafond GRC 60 x 120 cm + rangka alluminium
Sub Total E P
No Jenis Pekerjaan

1 2

F. PEKERJAAN SANITAIR LT. 2


1 Kloset Duduk+Acc
2 Jet Washer
3 Kran Air Stainless
4 Wastafel
5 Cermin Wastafel
Sub Total F

G. PEKERJAAN PENGECATAN LT. 2


1 Pengecatan Dinding & Kolom
2 Pengecatan dinding Partisi
3 Pengecatan Plafon
4 Water Proof Plat Dak
5 Water Proofing ( lt km,wc )
Sub Total G PEK
SUB TOTAL E

F PEKERJAAN MEKANIKAL

A PEKERJAAN INSTALASI AIR KOTOR, BEKAS


LANTAI 1
1 Instalasi Pipa Air Hujan PVC 4"
2 Instalasi Pipa Air Kotor PVC 4"
3 Instalasi Pipa Air Kotor PVC 3"
4 Septictank uk (1.2 x 1.7 ) + Peresapan dia 60 cm
5 Floor Drain

LANTAI 2
1 Instalasi Pipa Air Hujan PVC 4"
2 Instalasi Pipa Air Kotor PVC 4"
3 Instalasi Pipa Air Kotor PVC 3"
4 Floor Drain Stainless
5 Roof Drain
Sub Total A PEKERJAAN INSTALASI A

B PEKERJAAN INSTALASI AIR BERSIH


LANTAI 1
1 Instalasi Pipa Air Bersih PVC 1" ( Pipa Vertikal ke Lt 2 )
2 Instalasi Pipa Air Bersih PVC 3/4"
No Jenis Pekerjaan

1 2
LANTAI 2
3 Pipa PVC dia. 3/4 ''
Sub Total B PEKERJAAN INSTA
SUB TOTAL F

G PEKERJAAN ELEKTRIKAL
A PEKERJAAN INSTALASI PENERANGAN DAN KOTAK KONTAK
LANTAI 1
1 Pemasangan Panel Utama
2 Instalasi Penerangan
3 Instalasi Kotak kontak 500 VA
4 Lampu Dinding 18 Watt
5 Downlight 18 Watt + Armature
6 Downlight 14 Watt + Armature
7 Stop Kontak 500 VA
8 Saklar Ganda
9 Saklar Tunggal

LANTAI 2
1 Pemasangan Panel Distribusi Lantai 2
2 Instalasi Penerangan
3 Instalasi Kotak kontak Biasa
4 Downlight PLCE 23 Watt
5 Downlight PLCE 14 Watt
6 Stop Kontak Biasa
7 Saklar Ganda
8 Saklar Tunggal
PEKERJAAN INSTALASI PENERANGAN DA

B PEKERJAAN INSTALASI AC / TATA UDARA


LANTAI 1
1 Sub Panel AC
2 AC Split Type 1 PK + Instalasi
3 AC Split Type 1/2 PK + Instalasi
4 AC Stand Type 5 PK
5 Cable tray ( rak kabel )

LANTAI 2
1 Sub Panel AC
No Jenis Pekerjaan

1 2
2 AC Split Type 1 PK + Instalasi
3 AC Split Type 1/2 PK + Instalasi
4 Cable tray ( rak kabel )
PEKERJAAN INSTALAS

C PEKERJAAN INSTALASI CEILLING SPEAKER


LANTAI 1
1 Box Sound System ( amplifier )
2 Ceilling Speaker 3 Watt
3 Volume Kontrol

LANTAI 2
1 Box Sound System
2 Ceilling Speaker 3 Watt
3 Volume Kontrol
PEKERJAAN INSTALASI CE

D PEKERJAAN INSTALASI TITIK OUTLET TELP & DATA KONTAK


LANTAI 1
1 PABX
2 Instalasi Telephone + kabel
3 Outlet Telephone

LANTAI 2
1 PABX
2 Instalasi Telephone + kabel
3 Outlet Telephone
PEKERJAAN INSTALASI TITIK OUTLET TEL

E PEKERJAAN INSTALASI SMOKE DETECTOR & FIRE ALARM


LANTAI 1
1 Fire Alarm Terminal Box FATB uk 30 x 20 x 20 cm + Pasang
2 Instalasi Smoke detector
3 Smoke Detector
4 Alarm & Lampu Indikator

LANTAI 2
1 Fire Alarm Terminal Box FATB uk 30 x 20 x 20 cm
2 Instalasi Smoke detector
3 Smoke Detector
No Jenis Pekerjaan

1 2
4 Lampu Indikator & Lampu Indikator
PEKERJAAN INSTALASI SMOKE DETECT
F PEKERJAAN INSTALASI PENANGKAL PETIR

1 Penangkal Petir Type UFO Radius Proteksi 100 Meter


2 Kawat BC 50 mm lengkap dengan Support, Klem dll + Grounding
3 Tiang Penyanggah + Saluran Kabel Pipa GIP Dia 2,5"
Lengkap dgn kawat tarikan
PEKERJAAN IN
G SISTEM PEMADAM KEBAKARAN

1 Fire Extinguisher 1 Tabung + Pabel BOX dari kaca


SIST
SUB TOTAL G

H PEKERJAAN LAIN-LAIN
1 Pekerjaan Railling Tangga
2 Allumunium composite panel 4 mm + Rangka
3 Pekerjaan Ukiran Motif Papua Type 1 (1.95 x 8 m')
4 Pekerjaan Ukiran Motif Papua Type 2 (1.95 x 4 m')
5 Pekerjaan Ukiran Motif Papua Type 3 (0.45 x 3 m')
6 Pot Bunga
* Dinding Batu tela 1 pc : 4 Psr
* Plesteran 1 pc : 4 Psr
* Pas. Batu Alam
7 Pekerjaan Pembersihan
Sub Total H

REKAPITULASI TOTAL

No Jenis Pekerjaan

1 2
A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH
C PEKERJAAN SUB STRUKTUR
D PEKERJAAN STRUKTUR
E PEKERJAAN ARSITEKTUR
No Jenis Pekerjaan

1 2
F PEKERJAAN MEKANIKAL
G PEKERJAAN ELEKTRIKAL
H PEKERJAAN LAIN-LAIN
REAL COST TOTAL
G ESTIMATE GEDUNG KANTOR

N PRASARANA APARATUR
DAN PENANAMAN MODAL DAN PERIZINAN TERPADU

TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

114.00 M' -
ub Total A -

367.92 m3 -
382.87 m3 -
345.33 m3 -
525.30 m3 -
8.80 m3 -
15.15 m3 -
30.90 m3 -
b Total B -

28.80 m3 -
4,269.03 kg -
57.60 m2 -
11.62 m2 -

10.80 m3 -
1,683.65 kg -
28.80 m2 -
4.62 m2 -

3.46 m3 -
546.05 kg -
11.52 m2 -
1.57 m2 -
70.08 m3 -
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
265.72 m3 -

13.20 m3 -
2,963.62 kg -
105.60 m2 -

8.45 m3 -
2,184.96 kg -
84.48 m2 -

39.10 m3 -
6,858.14 kg -
312.80 m2 -
1.24 m2 -
b Total C -

27.00 M3 -
216.00 M2 -
3,625.87 Kg -

17.28 M3 -
172.80 M2 -
2,971.73 Kg -

2.54 M3 -
42.31 M2 -
797.23 Kg -

10.64 M3 -
68.40 M2 -
1,176.61 Kg -
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

63.36 M3 -
528.00 M2 -
9,615.47 Kg -

13.10 M3 -
137.55 M2 -
1,873.93 Kg -

0.29 M3 -
5.23 M2 -
52.72 Kg -

1.20 M3 -
26.00 M2 -
265.75 Kg -

70.92 M3 -
591.00 M2 -
7,328.40 Kg -
1,221.40 Kg -

12.80 M3 -
128.00 M2 -
1,587.20 Kg -
264.53 Kg -

2.62 M3 -
26.19 M2 -
232.06 Kg -

1.26 M3 -
8.40 M2 -
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
242.48 Kg -

0.72 M3 -
9.60 M2 -
145.25 Kg -

0.72 M3 -
9.60 M2 -
145.25 Kg -

3.62 M3 -
24.12 M2 -
348.13 Kg -

1.69 M3 -
11.25 M2 -
275.44 Kg -

28.00 M3 -
224.00 M2 -
3,961.28 Kg -

12.80 M3 -
128.00 M2 -
2,201.28 Kg -

2.85 M3 -
47.57 M2 -
896.26 Kg -

6.84 M3 -
57.00 M2 -
1,038.03 Kg -

28.50 M3 -
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
285.00 M2 -
5,867.96 Kg -

10.80 M3 -
113.40 M2 -
1,544.92 Kg -

0.61 M3 -
13.26 M2 -
135.53 Kg -

1.20 M3 -
26.00 M2 -
265.75 Kg -

kolom ) di portal 1 -2 & 5 - 6 (Elv +8.00)


0.29 M3 -
6.24 M2 -
63.78 Kg -

11.04 M3 -
110.40 M2 -
912.64 Kg -

1.92 M3 -
19.15 M2 -
173.93 Kg -

1.14 M3 -
11.45 M2 -
102.48 Kg -

2.62 M3 -
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
26.19 M2 -
232.06 Kg -
B TOTAL D -

321.32 M2 -
180.92 M2 -
28.51 m3 Rp 665,453.25 18,973,403.06
131.03 M2 -
345.60 M2 Rp 85,473.75 29,539,728.00
236.24 M2 Rp 85,473.75 20,192,318.70
642.64 M2 Rp 85,473.75 54,928,850.70
47.61 M3 -
1.92 M3 Rp 342,918.50 658,403.52
29.95 M2 Rp 256,421.25 7,680,329.28
1,224.48 M2 Rp 56,982.50 69,773,931.60
51.20 M2 -

Sub Total A PEKERJAAN PASANGAN DAN PLESTERAN LT. 1 201,746,964.86

618.00 M2 -
32.16 M2 -
170.50 M' -
30.00 M2 -
125.60 M2 -
33.09 M2 -
81.00 m' -
96.20 m' -
49.81 M2 -
Sub Total B PEKERJAAN KERAMIK LT. 1 -

2.00 Unit Rp 814,099.61 1,628,199.21


5.00 Unit Rp 4,360,165.88 21,800,829.38
8.00 Unit Rp 2,891,669.22 23,133,353.78
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
5.00 Unit Rp 2,580,776.93 12,903,884.67

12.00 Unit Rp 2,089,926.30 25,079,115.64


2.00 Unit Rp 617,158.03 1,234,316.06
6.00 Unit Rp 685,736.69 4,114,420.15
1.00 Unit Rp 875,096.12 875,096.12
2.00 Unit Rp 874,076.59 1,748,153.18
3.00 Unit Rp 203,548.16 610,644.48
6.00 Unit Rp 388,154.84 2,328,929.06
Sub Total C PEKERJAAN PINTU DAN JENDELA LT. 1 95,456,941.72

686.28 M2 Rp 101,918.75 69,944,799.75


433.80 M' Rp 24,046.50 10,431,371.70
Sub Total D PEKERJAAN PLAFOND LT. 1 80,376,171.45

5.00 Unit -
5.00 Bh -
6.00 Bh -
4.00 Unit -
2.00 Unit -
1.00 Unit -
Sub Total E PEKERJAAN SANITAIR LT. 1 -

1,224.48 M2 -
262.05 M2 -
729.00 M2 -
Sub Total F PEKERJAAN PENGECATAN LT.1 -

165.29 M2 -
425.57 M2 Rp 147,775.00 62,888,606.75
330.58 M2 Rp 85,473.75 28,255,912.28
851.14 M2 Rp 85,473.75 72,750,127.58
1,181.72 M2 Rp 56,982.50 67,337,359.90
533.60 M2 -
Sub Total A PEKERJAAN PASANGAN DAN PLESTERAN LT. 2 231,232,006.50
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

618.00 M2 -
118.00 M' -
27.00 M2 -
111.60 M2 -
314.00 m' -
Sub Total B PEKERJAAN KERAMIK LT. 2 -

3.00 Unit Rp 4,360,165.88 13,080,497.63


16.00 Unit Rp 2,891,669.22 46,266,707.56
4.00 Unit Rp 2,580,776.93 10,323,107.74

2.00 Unit Rp 617,158.03 1,234,316.06


6.00 Unit Rp 685,736.69 4,114,420.15
2.00 Unit Rp 995,236.29 1,990,472.58
1.00 Unit Rp 875,096.12 875,096.12
4.00 Unit Rp 1,060,116.33 4,240,465.33
3.00 Unit Rp 203,548.16 610,644.48
6.00 Unit Rp 388,154.84 2,328,929.06
4.00 Unit Rp 244,610.64 978,442.54
2.00 Unit Rp 263,257.89 526,515.77
Sub Total C PEKERJAAN KUSEN LT. 2 86,569,615.01

618.00 M2 -
647.50 M' -
Sub Total D PEKERJAAN PLAFOND LT. 2 -

791.80 M2 -
791.80 M2 -
84.00 m' -
200.60 M2 -
211.90 M2 -
168.00 M2 Rp - -
Sub Total E PEKERJAAN KAP / ATAP LT. 2 -
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

4.00 Unit -
4.00 Bh -
4.00 Bh -
4.00 Unit -
2.00 Unit -
Sub Total F PEKERJAAN SANITAIR LT. 2 -

1,181.72 M2 -
1,067.20 M2 -
618.00 M2 -
272.50 M2 -
27.00 M2 Rp 30,875.00 833,625.00
Sub Total G PEKERJAAN PENGECATAN LT. 2 833,625.00
B TOTAL E 696,215,324.54

62.00 m' Rp 19,989.30 1,239,336.60


24.00 m' Rp 19,989.30 479,743.20
22.20 m' Rp 19,989.30 443,762.46
2.00 Bh -
7.00 Bh Rp 26,105.00 182,735.00

44.00 m' Rp 19,989.30 879,529.20


8.00 m' Rp 19,989.30 159,914.40
15.00 m' Rp 19,989.30 299,839.50
5.00 Bh Rp 26,105.00 130,525.00
8.00 Unit Rp 26,105.00 208,840.00
otal A PEKERJAAN INSTALASI AIR KOTOR, BEKAS LT. 1 & 2 3,684,860.36

6.00 m' Rp 19,989.30 119,935.80


18.00 m' Rp 19,989.30 359,807.40
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

12.00 m' Rp 19,989.30 239,871.60


Sub Total B PEKERJAAN INSTALASI AIR BERSIH LT. 1 & 2 719,614.80
B TOTAL F 5,332,929.96

1.00 bh -
110.00 Ttk Rp 223,617.50 24,597,925.00
73.00 Ttk Rp 355,580.00 25,957,340.00
2.00 bh -
105.00 bh -
5.00 bh -
38.00 bh -
30.00 bh -
5.00 bh -

1.00 bh -
96.00 -
125.00 -
92.00 bh -
4.00 bh -
71.00 bh -
44.00 bh -
10.00 bh -
AN INSTALASI PENERANGAN DAN KOTAK KONTAK LT. 1 & 2 50,555,265.00

1.00 bh -
7.00 bh -
3.00 bh -
6.00 bh -
18.50 m' -

1.00 bh -
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
13.00 bh -
13.00 bh -
29.00 M' Rp - -
PEKERJAAN INSTALASI AC / TATA UDARA LT. 1 & 2 -

1.00 bh -
26.00 bh -
7.00 bh -

1.00 bh -
28.00 bh -
23.00 bh -
PEKERJAAN INSTALASI CEILLING SPEAKER LT. 1 & 2 -

1.00 bh -
10.00 ttk -
10.00 unit -

1.00 bh -
21.00 ttk -
21.00 unit -
AN INSTALASI TITIK OUTLET TELP & DATA KONTAK LT. 1 & 2 -

1.00 bh -
26.00 bh -
26.00 bh -
1.00 Set -

1.00 bh -
28.00 bh -
28.00 bh -
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
1.00 Set -
AAN INSTALASI SMOKE DETECTOR & FIRE ALARM LT. 1 & 2 -

1.00 set -
40.00 m' -
16.00 m' -
1.00 Set -
PEKERJAAN INSTALASI PENANGKAL PETIR -

2.00 TTK -
SISTEM PEMADAM KEBAKARAN -
B TOTAL G 50,555,265.00

19.00 M2 -
870.08 M2 -
62.40 M2 -
15.60 M2 -
10.80 M2 -

41.92 M2 -
20.20 M2 -
41.92 M2 -
1.00 Ls -
b Total H -

REKAPITULASI TOTAL

s Pekerjaan Jumlah Harga


( Rp )
2 3
-
-
-
-
696,215,324.54
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
5,332,929.96
50,555,265.00
-
ST TOTAL 752,103,519.50
REKAPITULASI TOTAL
PROGRAM PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TERPADU
LOKASI KOMPLEX PERKANTORAN ARFAI
TAHUN 2014

NO. URAIAN PEKERJAAN SUB TOTAL

I PEKERJAAN PENDAHULUAN Rp 241,482,247.80


II PEKERJAAN SITEPLAN Rp 3,481,736,212.38
III PEMBANGUNAN KANTOR Rp 4,215,182,133.19
IV PEMBANGUNAN GUDANG Rp 235,504,602.67
V PEMBANGUNAN RUMAH PENJAGA Rp 169,170,823.30
VI PEMBANGUNAN POS JAGA Rp 35,179,789.13
VII PEMBANGUNAN RUMAH GENSET Rp 40,968,282.22
VIII PEMBANGUNAN GROUND TANK DAN MENARA AIR Rp 56,217,493.02
REAL COST Rp 8,475,441,583.71
PPN 10 % Rp 847,544,158.37
TOTAL COST Rp 9,322,985,742.08
DIBULATKAN Rp 9,322,900,000.00

TERBILANG :
DELAPAN BELAS MILYAR TUJUH RATUS ENAM BELAS JUTA EMPAT RATUS RIBU RUPIAH

Mengetahui / Menyetujui
PEJABAT PELAKSANA :
TEKNIS KEGIATAN DISUSUN OLEH,
(PPTK) KONSULTAN PERENCANAAN
PT. SOLID KONSULTAN

AGUS RIANTO , SE LUKITA ADI , ST


NIP. 19620817 199703 1 004 DIREKTUR
Mengetahui / Menyetujui :
KEPALA BPMP2T PROVINSI PAPUA BARAT
KUASA PENGGUNA ANGGARAN

drs . DECKY RUMBIAK , MM


NIP : 1960531 200111 1 011
ENGENERING ESTIMATE P

PROGRAM : PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR


KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PE
PEKERJAAN : PEKERJAAN PENDAHULUAN
LOKASI : KOMPLEX PERKANTORAN ARFAI
TAHUN ANGGARAN : 2014

No
Jenis Pekerjaan

1 2

A PEKERJAAN PENDAHULUAN
1 Pengukuran Rinci Lokasi Pekerjaan
2 Pembuatan Gbr Shop Drawing & As build Drawing
3 Dokumentasi Proyek & Laporan
Sub Total A
B PEKERJAAN PERSIAPAN
1 Pembuatan Direksi keet, Los kerja,Barak Pekerja dan Gudang (15x5)m2
2 Papan nama Proyek uk. 1,2m x 1,8m
3 Mobilisasi dan Demobilisasi Alat Berat
4 Pembersihan Lahan (Semak Belukar)
Sub Total B

REKAP
No Jenis Pekerjaan

1 2
A PEKERJAAN PENDAHULUAN
B PEKERJAAN PERSIAPAN
ENGENERING ESTIMATE PEKERJAAN PENDAHULUAN

ANA DAN PRASARANA APARATUR


OR BADAN PENANAMAN MODAL DAN PERIZINAN TERPADU

TOTAL
Keterangan
Volume Satuan
3 4

1.000 Ls
1.000 Ls
1.000 Ls
Sub Total A

75.00 m2
2.16 M2
2.00 unit
manual 5,000.00 m2
Sub Total B

REKAPITULASI
Jenis Pekerjaan

REAL COST
ENDAHULUAN

TOTAL

Harga Satuan Jumlah Harga( Rp )


5 6

6,000,000.00 6,000,000.00
6,400,000.00 6,400,000.00
5,000,000.00 5,000,000.00
17,400,000.00

632,500.00 47,437,500.00
9,142.50 19,747.80
15,000,000.00 30,000,000.00
29,325.00 146,625,000.00
224,082,247.80

Jumlah Harga
( Rp )
3
17,400,000.00
224,082,247.80
REAL COST Rp 241,482,247.80
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No
Jenis Pekerjaan

1 2
A PEKERJAAN PEMBENTUKAN LAHAN
1 Galian Tanah (Utk Pembentukan Halaman)
2 Menimbun Tanah Kembali Sejauh Rata2 15 m
3 Membuang Tanah Ke Jurang Belakang Lokasi Rata2 10-50 m

B PEKERJAAN TALUD
B.1 PEKERJAAN TALUD HALAMAN BELAKANG
1 Talud A
a. Galian pondasi Talud kedalaman 2.5m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Footplat uk (1,2 X 1,2 x 0.3) 9 buah
1. Cor Beton K 250
2. Pembesian
3. Bekisting Pondasi Plat
d. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
e. Cor Balok & Sloof Beton 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
f. Plesteran Mata sapi 1 PC : 4 PSR
g. Urugan Pasir Bawah Pondasi tebal 5cm
h. Pasang Pipa PVC 1.5" untuk buangan air

2 Talud B
a. Galian pondasi Talud kedalaman 2m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
No
Jenis Pekerjaan

1 2
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

3 Talud C
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm

4 Talud D
a. Galian pondasi Talud kedalaman 1.5m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5 cm

5 Talud E
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

6 Talud F
No
Jenis Pekerjaan

1 2
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm

7 Talud G
a. Galian pondasi Talud kedalaman Rata2 0.5 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm

8 Talud H
a. Galian pondasi Talud kedalaman Rata2 1 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm

9 Talud I
a. Galian pondasi Talud kedalaman Rata2 1 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm
e. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
f. Cor sloof 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
No
Jenis Pekerjaan

1 2
B.2 PEKERJAAN TALUD BATAS KANAN HALAMAN DEPAN
1 Talud Batas Kanan Halaman
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
e. Cor Balok & Sloof Beton 20/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
f. Plesteran Mata sapi 1 PC : 4 PSR
g. Urugan Pasir Bawah Pondasi tebal 5cm
h. Pasang Pipa PVC 1.5" untuk buangan air

B.3 PEKERJAAN TALUD BATAS DEPAN


1 Talud Batas Kanan Halaman
a. Galian pondasi Talud
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
f. Plesteran Mata sapi 1 PC : 4 PSR
g. Urugan Pasir Bawah Pondasi tebal 5cm
h. Pasang Pipa PVC 1.5" untuk buangan air

C PEKERJAAN PAGAR
C.1 PAGAR DEPAN
1 Kolom ( 15 buah )
a. Cor Kolom uk 20/62 tinggi 1,5 m
1. Cor Beton K 175
2. Pembesian 6d12, d6 - 200
3. Bekisting kolom
b. Pas.Dinding batu tela 1 pc : 4 Psr
c. Plesteran tebal 15 mm 1 pc : 4 Psr
d. Plesteran tebal 40 mm 1 pc : 4 Psr
e. Pas. Batu alam motif serut
No
Jenis Pekerjaan

1 2
f. Pas.Motif papua (cat + bahan + upah ) uk ( 0.2 x 1.2 ) x 2 buah
g. Pengecatan

2 Sloof
a. Cor Sloof uk15/20 panjang 44.8 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting sloof

3 Pekerjaan Dinding Nama


a. Cor Kolom uk 20/20 tinggi 1,5 m 3 buah
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting kolom
b. CorBalok uk15/20 panjang 6.7 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting balok
c. Pas.Dinding batu tela 1 pc : 4 Psr
d. Plesteran tebal 15 mm 1 pc : 4 Psr
e. Plesteran tebal 40 mm 1 pc : 4 Psr ( untuk bis beton tebal 10 l
f. Pas. Dinding Batu Alam Motif serut
g. Pasang Huruf Stainless steel Untuk Nama Badan Penanaman

4 Pagar teralis Besi hollow


a. Rangka Horisontal ( besi Hollow 40 x 40 mm)
b. Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
c. Rangka Vertikal tinggi 0.73m ( besi Hollow 40 x 20 mm) 170 bh
d. End Plat uk 5 x 5 cm tebal 3mm ( 108 buah )
e. Pengelasan Sambungan besi teralis
f. Pengecatan Besi teralis dengan cat besi 1 lapis

5 Pintu Gerbang
a. Rangka ( besi Hollow 40 x 40 mm)
b. Rangka Vertikal tinggi 1.07m ( besi Hollow 40 x 20 mm) 12 bua
c. Rangka Vertikal tinggi 0.73m ( besi Hollow 40 x 20 mm) 84 bh
d. Plat uk 0.6 X 9.5 M tebal 3mm
e. Pengelasan Sambungan besi teralis
f. Pengecatan Besi teralis dengan cat besi 1 lapis
No
Jenis Pekerjaan

1 2
g. Rel Pagar besi siku 5 panjang 2 x(19)
h. Tiang Penyangga Pintu

C.2 PAGAR SAMPING KANAN


1 Kolom ( 22 buah )
a. Cor Kolom uk 20/20 tinggi 1,5 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting kolom
b. Pas.Dinding batu tela 1 pc : 4 Psr
c. Plesteran tebal 15 mm 1 pc : 4 Psr
e. Plesteran Camprot 1 pc : 2 Psr
f. Pengecatan

2 Sloof
a. Cor Sloof uk15/20 panjang 44.8 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting sloof

3 Pagar BRC
a. BRC ukuran 120 x 240 cm
b. Biaya Pemasangan Pagar BRC

C.3 PAGAR SAMPING KIRI


1 Pondasi Pagar
a. Galian Tanah Pondasi
b. Urugan Tanah Kembali
c. Pas. Batu Kosong ( anstamping )
d. Pasangan Batu Kali 1 Pc : 4 Psr

2 Kolom ( 38 buah )
a. Cor Kolom uk 20/20 tinggi 1,5 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting kolom
b. Pas.Dinding batu tela 1 pc : 4 Psr
No
Jenis Pekerjaan

1 2
c. Plesteran tebal 15 mm 1 pc : 4 Psr
e. Plesteran Camprot 1 pc : 2 Psr
f. Pengecatan

3 Sloof
a. Cor Sloof uk15/20 panjang 93 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting sloof

4 Pagar BRC
a. BRC ukuran 120 x 240 cm
b. Biaya Pemasangan Pagar BRC

C.4 PAGAR BELAKANG


1 Kolom ( 6 buah )
a. Cor Kolom uk 20/20 tinggi 1,5 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting kolom
b. Pas.Dinding batu tela 1 pc : 4 Psr
c. Plesteran tebal 15 mm 1 pc : 4 Psr
e. Plesteran Camprot 1 pc : 2 Psr
f. Pengecatan

2 Sloof
a. Cor Sloof uk15/20 panjang 44.8 m
1. Cor Beton K 175
2. Pembesian 4d12, d6 - 200
3. Bekisting sloof

3 Pagar BRC
a. BRC ukuran 120 x 240 cm
b. Biaya Pemasangan Pagar BRC

4 Pagar teralis Besi hollow 43 M


No
Jenis Pekerjaan

1 2
a. Rangka Horisontal ( besi Hollow 40 x 40 mm)
b. Rangka Horisontal ( besi Hollow 20 x 40 mm)
c. Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
d. Rangka Vertikal tinggi 0.7m ( besi Hollow 40 x 20 mm) 170 bh
e. Pengelasan Sambungan besi teralis
f. Pengecatan Besi teralis dengan cat besi 1 lapis

C.5 PAGAR DI TALUD G


1 Pagar teralis Besi hollow 45 M '
a. Rangka Horisontal ( besi Hollow 40 x 40 mm)
b. Rangka Horisontal ( besi Hollow 20 x 40 mm)
c. Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
d. Rangka Vertikal tinggi 0.7m ( besi Hollow 40 x 20 mm) 170 bh
e. Pengelasan Sambungan besi teralis
f. Pengecatan Besi teralis dengan cat besi 1 lapis

D PEKERJAAN DRAINASI
1 Pekerjaan Pembuatan Saluran
a. Galian Tanah
b. Urugan Pasir
c. Pas Dinding batu Kali 1 Pc : 4 Psr tebal 15cm
d. Plesteran 1 pc : 3 psr
e. Cor Lantai Saluran 1pc : 3psr : 5krl
f. Penutup Ram besi siku 5/5
g. Penutup Besi d 16
h. Pengelasan Sambungan Ram penutup saluran

2 Pekerjaan Pembuatan Bak Kontrol 2 bh uk. ( 2 X 2 )m


a. Galian Tanah
b. Kolom 12x12 cm
1 Beton Praktis K 175
2 Begesting
3 Pembesian 4Ø12, Ø8-150
c. Sloof + Balok 12x12 cm
No
Jenis Pekerjaan

1 2
1 Beton Praktis K 175
2 Begesting
3 Pembesian 4Ø12, Ø8-150
d. Pas batu tela 1 pc : 4 Psr
e. Plester 1 : 3
f. Urugan Pasir Tebal 10 cm ( untuk bak kontrol bagian depan )
g. Urugan Sirtu Tebal 15 cm ( untuk bak kontrol bagian depan )
h. Cor lantai 1 Pc : 3 Psr : 5 Kr tebal 15 cm ( utk bak kontrol bagian b
i. Ijuk
j. Pemasangan 3 Jalur Pipa 6'' untuk Pembuangan Air ke jurang

E PEKERJAAN PEMBUATAN CANSTIN BETON


1 Urugan Pasir
2 Cor Beton 1pc : 3psr : 5krl
3 Pengecatan

F PEKERJAAN LAIN-LAIN
1 Pekerjaan Pembuatan Blok beton siar Rumput
a. Urugan Batu Karang tebal 15 cm
b. Urugan Pasir tebal 5cm
c. Blok beton K 250 uk 60 x 60 cm (1,78 buah / m2 ) tebal 10 cm
d. Urugan Tanah humus siar rumput lebar 20 cm tebal 10 cm
f. Tanam Rumput Gajah mini

2 Pekerjaan Tiang Bendera


a. Urugan Pasir Bawah Pondasi tebal 10 cm
b. Pengecoran Pondasi Tiang uk ( 0.8 x 0.8 x 0.8 ) k 175
No
Jenis Pekerjaan

1 2
c. Pengecoran Lantai Tiang Bendera tebal 20 cm 1 Pc : 3 Psr : 5 kr
d. Tiang Bendera + kelengkapan ( angker , Baut ,dll)

3 Cor Beton K 250 tebal 10 cm untuk Ram , ( Jalan Masuk & Jalan Turun
4 Pembuatan Garasi Parkir
a. Urugan Batu Karang tebal 15 cm
b. Urugan Pasir tebal 5cm
c. Cor Beton Tumbuk 1 : 3 : 5 tebal 10 cm
d. Pasang Rangka Atap Besi Hollow + Tiang Penyangga
e. Pasang Atap Spandek

G PEKERJAAN LANDSCAPE
1 Urugan Tanah humus Tebal 50 cm
2 Penanaman Pohon Pinang
3 Penanam Rumput Gajah mini (2 stek/ m2 ) luas zona tanam 301 m2
4 Penanam Bunga dan Tanaman Hias keliling Kantor

H ELEKTRIKAL
H.1 PEKERJAAN INTALASI PENERANGAN SITE
1 Pasang Lampu Taman 60 watt
2 Pasang Lampu Taman 23 watt
3 Pasang Lampu Sorot 250 watt
4 Pasang Lampu SL 18 watt
5 Pasang Panel untul Penerangan Halaman
6 Instalasi Penerangan
7 Instalasi Kotak kontak
8 Saklar Ganda
9 Saklar Tunggal
10 Stop Kontak 500 kva

H.2 PENGADAAN LISTRIK


1 Biaya Penyambungan Listrik PLN
2 Pengadaan Gardu Listrik
3 Pengadaan Genset 50 KVA type silent ( Buatan Jepang , Eropa atau Am
No
Jenis Pekerjaan

1 2

No

A PEKERJAAN PEMBENTUKAN LAHAN


B PEKERJAAN TALUD
C PEKERJAAN PAGAR
D PEKERJAAN DRAINASI
E PEKERJAAN PEMBUATAN CANSTIN BETON
F PEKERJAAN LAIN-LAIN
G PEKERJAAN LANDSCAPE
H ELEKTRIKAL
ENGENERING ESTIMATE PE

PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR


PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TERPADU
PEKERJAAN SITEPLAN
KOMPLEX PERKANTORAN ARFAI
2014

Jenis Pekerjaan

2
EKERJAAN PEMBENTUKAN LAHAN
alian Tanah (Utk Pembentukan Halaman)
enimbun Tanah Kembali Sejauh Rata2 15 m
embuang Tanah Ke Jurang Belakang Lokasi Rata2 10-50 m
Sub Total A (PEKERJAAN PEMBENTUK
EKERJAAN TALUD
EKERJAAN TALUD HALAMAN BELAKANG

Galian pondasi Talud kedalaman 2.5m


Pasangan Batu Kali 1 Pc : 4Psr
Cor Footplat uk (1,2 X 1,2 x 0.3) 9 buah

3. Bekisting Pondasi Plat

Cor Balok & Sloof Beton 20/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air

Galian pondasi Talud kedalaman 2m


Pasangan Batu Kali 1 Pc : 4Psr
Jenis Pekerjaan

Cor Balok & Sloof Beton 20/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi Tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air

Pasangan Batu Kali 1 Pc : 4Psr


Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5cm

Galian pondasi Talud kedalaman 1.5m


Pasangan Batu Kali 1 Pc : 4Psr
Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5 cm

Pasangan Batu Kali 1 Pc : 4Psr

Cor Balok & Sloof Beton 20/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi Tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air
Jenis Pekerjaan

Pasangan Batu Kali 1 Pc : 4Psr


Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5cm

Galian pondasi Talud kedalaman Rata2 0.5 m


Pasangan Batu Kali 1 Pc : 4Psr

Cor Balok & Sloof Beton 25/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi Tebal 5cm

Galian pondasi Talud kedalaman Rata2 1 m


Pasangan Batu Kali 1 Pc : 4Psr
Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5cm

Galian pondasi Talud kedalaman Rata2 1 m


Pasangan Batu Kali 1 Pc : 4Psr
Plesteran Mata sapi 1 PC : 4 PSR
Urugan Pasir Bawah Pondasi Tebal 5cm
Jenis Pekerjaan

2
EKERJAAN TALUD BATAS KANAN HALAMAN DEPAN
alud Batas Kanan Halaman

Pasangan Batu Kali 1 Pc : 4Psr

Cor Balok & Sloof Beton 20/25

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air

EKERJAAN TALUD BATAS DEPAN


alud Batas Kanan Halaman

Pasangan Batu Kali 1 Pc : 4Psr

Plesteran Mata sapi 1 PC : 4 PSR


Urugan Pasir Bawah Pondasi tebal 5cm
Pasang Pipa PVC 1.5" untuk buangan air

Sub Total A (PEKERJAAN TAL


EKERJAAN PAGAR

Cor Kolom uk 20/62 tinggi 1,5 m

2. Pembesian 6d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran tebal 40 mm 1 pc : 4 Psr
Pas. Batu alam motif serut
Jenis Pekerjaan

2
Pas.Motif papua (cat + bahan + upah ) uk ( 0.2 x 1.2 ) x 2 buah

Cor Sloof uk15/20 panjang 44.8 m

2. Pembesian 4d12, d6 - 200

ekerjaan Dinding Nama


Cor Kolom uk 20/20 tinggi 1,5 m 3 buah

2. Pembesian 4d12, d6 - 200

CorBalok uk15/20 panjang 6.7 m

2. Pembesian 4d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran tebal 40 mm 1 pc : 4 Psr ( untuk bis beton tebal 10 lebar 10 cm)
Pas. Dinding Batu Alam Motif serut
Pasang Huruf Stainless steel Untuk Nama Badan Penanaman Modal ( uk 17 x 20 cm )

Rangka Horisontal ( besi Hollow 40 x 40 mm)


Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
Rangka Vertikal tinggi 0.73m ( besi Hollow 40 x 20 mm) 170 bh
End Plat uk 5 x 5 cm tebal 3mm ( 108 buah )
Pengelasan Sambungan besi teralis
Pengecatan Besi teralis dengan cat besi 1 lapis

Rangka ( besi Hollow 40 x 40 mm)


Rangka Vertikal tinggi 1.07m ( besi Hollow 40 x 20 mm) 12 buah
Rangka Vertikal tinggi 0.73m ( besi Hollow 40 x 20 mm) 84 bh
Plat uk 0.6 X 9.5 M tebal 3mm
Pengelasan Sambungan besi teralis
Pengecatan Besi teralis dengan cat besi 1 lapis
Jenis Pekerjaan

2
Rel Pagar besi siku 5 panjang 2 x(19)
Tiang Penyangga Pintu

Cor Kolom uk 20/20 tinggi 1,5 m

2. Pembesian 4d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran Camprot 1 pc : 2 Psr

Cor Sloof uk15/20 panjang 44.8 m

2. Pembesian 4d12, d6 - 200

BRC ukuran 120 x 240 cm


Biaya Pemasangan Pagar BRC

Urugan Tanah Kembali


Pas. Batu Kosong ( anstamping )
Pasangan Batu Kali 1 Pc : 4 Psr

Cor Kolom uk 20/20 tinggi 1,5 m

2. Pembesian 4d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Jenis Pekerjaan

2
Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran Camprot 1 pc : 2 Psr

Cor Sloof uk15/20 panjang 93 m

2. Pembesian 4d12, d6 - 200

BRC ukuran 120 x 240 cm


Biaya Pemasangan Pagar BRC

Cor Kolom uk 20/20 tinggi 1,5 m

2. Pembesian 4d12, d6 - 200

Pas.Dinding batu tela 1 pc : 4 Psr


Plesteran tebal 15 mm 1 pc : 4 Psr
Plesteran Camprot 1 pc : 2 Psr

Cor Sloof uk15/20 panjang 44.8 m

2. Pembesian 4d12, d6 - 200

BRC ukuran 120 x 240 cm


Biaya Pemasangan Pagar BRC

agar teralis Besi hollow 43 M


Jenis Pekerjaan

2
Rangka Horisontal ( besi Hollow 40 x 40 mm)
Rangka Horisontal ( besi Hollow 20 x 40 mm)
Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
Rangka Vertikal tinggi 0.7m ( besi Hollow 40 x 20 mm) 170 bh
Pengelasan Sambungan besi teralis
Pengecatan Besi teralis dengan cat besi 1 lapis

agar teralis Besi hollow 45 M '


Rangka Horisontal ( besi Hollow 40 x 40 mm)
Rangka Horisontal ( besi Hollow 20 x 40 mm)
Rangka Vertikal tinggi 1m ( besi Hollow 40 x 20 mm) 12 buah
Rangka Vertikal tinggi 0.7m ( besi Hollow 40 x 20 mm) 170 bh
Pengelasan Sambungan besi teralis
Pengecatan Besi teralis dengan cat besi 1 lapis

Sub Total C (PEKERJAAN PA


EKERJAAN DRAINASI
ekerjaan Pembuatan Saluran

c. Pas Dinding batu Kali 1 Pc : 4 Psr tebal 15cm

e. Cor Lantai Saluran 1pc : 3psr : 5krl


. Penutup Ram besi siku 5/5

h. Pengelasan Sambungan Ram penutup saluran

ekerjaan Pembuatan Bak Kontrol 2 bh uk. ( 2 X 2 )m

1 Beton Praktis K 175


2 Begesting
3 Pembesian 4Ø12, Ø8-150
c. Sloof + Balok 12x12 cm
Jenis Pekerjaan

2
1 Beton Praktis K 175
2 Begesting
3 Pembesian 4Ø12, Ø8-150
d. Pas batu tela 1 pc : 4 Psr

. Urugan Pasir Tebal 10 cm ( untuk bak kontrol bagian depan )


. Urugan Sirtu Tebal 15 cm ( untuk bak kontrol bagian depan )
. Cor lantai 1 Pc : 3 Psr : 5 Kr tebal 15 cm ( utk bak kontrol bagian belakang )

. Pemasangan 3 Jalur Pipa 6'' untuk Pembuangan Air ke jurang

Sub Total D (PEKERJAAN DRA


EKERJAAN PEMBUATAN CANSTIN BETON

Sub Total E (PEKERJAAN PEMBUATA


EKERJAAN LAIN-LAIN
ekerjaan Pembuatan Blok beton siar Rumput
a. Urugan Batu Karang tebal 15 cm
b. Urugan Pasir tebal 5cm
c. Blok beton K 250 uk 60 x 60 cm (1,78 buah / m2 ) tebal 10 cm
d. Urugan Tanah humus siar rumput lebar 20 cm tebal 10 cm
f. Tanam Rumput Gajah mini

a. Urugan Pasir Bawah Pondasi tebal 10 cm


b. Pengecoran Pondasi Tiang uk ( 0.8 x 0.8 x 0.8 ) k 175
Jenis Pekerjaan

2
c. Pengecoran Lantai Tiang Bendera tebal 20 cm 1 Pc : 3 Psr : 5 kr
d. Tiang Bendera + kelengkapan ( angker , Baut ,dll)

or Beton K 250 tebal 10 cm untuk Ram , ( Jalan Masuk & Jalan Turun dari hal depan Ke Hal. Belakang )

a. Urugan Batu Karang tebal 15 cm


b. Urugan Pasir tebal 5cm
c. Cor Beton Tumbuk 1 : 3 : 5 tebal 10 cm
d. Pasang Rangka Atap Besi Hollow + Tiang Penyangga

Sub Total F (PEKERJAAN LAIN


EKERJAAN LANDSCAPE
rugan Tanah humus Tebal 50 cm

enanam Rumput Gajah mini (2 stek/ m2 ) luas zona tanam 301 m2


enanam Bunga dan Tanaman Hias keliling Kantor
Sub Total G (PEKERJAAN LAND

EKERJAAN INTALASI PENERANGAN SITE


asang Lampu Taman 60 watt
asang Lampu Taman 23 watt
asang Lampu Sorot 250 watt
asang Lampu SL 18 watt
asang Panel untul Penerangan Halaman

aya Penyambungan Listrik PLN

engadaan Genset 50 KVA type silent ( Buatan Jepang , Eropa atau Amerika )
Jenis Pekerjaan

2
REKAPITULAS

Jenis Pekerjaan

EKERJAAN PEMBENTUKAN LAHAN

EKERJAAN DRAINASI
EKERJAAN PEMBUATAN CANSTIN BETON
EKERJAAN LAIN-LAIN
EKERJAAN LANDSCAPE
ENGENERING ESTIMATE PEKERJAAN SITE PLAN

NAMAN MODAL DAN PERIZINAN TERPADU

Keterangan
Volume
3

Excavator 11,240.27
Buldozer 2,664.56
Buldozer (tanah timbun sebagai Pengaman Talud) 8,575.71
Sub Total A (PEKERJAAN PEMBENTUKAN LAHAN )

Alat Berat 162.38


Lihat Gbr Detail 718.43

Lihat Gbr Detail 3.89


Lihat Gbr Detail 259.52
Lihat Gbr Detail 12.96

Lihat Gbr Detail 1.53


Lihat Gbr Detail 2,801.26
Lihat Gbr Detail 56.10

Lihat Gbr Detail 6.14


Lihat Gbr Detail 1,775.69
Lihat Gbr Detail 30.70
Lihat Gbr Detail 343.21
3.25
100.00

Alat Berat 210.33


Lihat Gbr Detail 870.84
Keterangan
Volume
3
Lihat Gbr Detail 15.01
Lihat Gbr Detail 2,498.66
Lihat Gbr Detail 50.04

Lihat Gbr Detail 6.94


Lihat Gbr Detail 2,006.33
Lihat Gbr Detail 34.69
Lihat Gbr Detail 401.80
5.26
127.50

Alat Berat 13.68


Lihat Gbr Detail 28.69
Lihat Gbr Detail 25.00
Lihat Gbr Detail 0.30

Alat Berat 3.82


Lihat Gbr Detail 15.26
Lihat Gbr Detail 38.91
0.38

Alat Berat 38.40


Lihat Gbr Detail 176.00

Lihat Gbr Detail 4.23


Lihat Gbr Detail 444.62
Lihat Gbr Detail 14.10

Lihat Gbr Detail 1.60


Lihat Gbr Detail 286.08
Lihat Gbr Detail 8.00
Lihat Gbr Detail 49.20
0.96
21.00
Keterangan
Volume
3
Alat Berat 13.00
Lihat Gbr Detail 26.75
Lihat Gbr Detail 27.00
0.38

Alat Berat 35.34


Lihat Gbr Detail 196.20

Lihat Gbr Detail 5.00


Lihat Gbr Detail 715.20
Lihat Gbr Detail 20.00

Lihat Gbr Detail 8.03


Lihat Gbr Detail 1,147.90
Lihat Gbr Detail 32.10
Lihat Gbr Detail 214.00
3.21

Alat Berat 19.85


Lihat Gbr Detail 38.28
Lihat Gbr Detail 32.30
0.95

Alat Berat 66.53


Lihat Gbr Detail 220.50
Lihat Gbr Detail 32.30
0.95

Lihat Gbr Detail 6.54


Lihat Gbr Detail 936.11
Lihat Gbr Detail 26.18

Lihat Gbr Detail 6.07


Lihat Gbr Detail 1,084.87
Lihat Gbr Detail 30.34

PEKERJAAN TALUD HA
Keterangan
Volume
3

Alat Berat 114.94


Lihat Gbr Detail 404.44

Lihat Gbr Detail 3.15


Lihat Gbr Detail 1,453.06
Lihat Gbr Detail 29.10

Lihat Gbr Detail 3.85


Lihat Gbr Detail 1,113.42
Lihat Gbr Detail 19.25
Lihat Gbr Detail 233.87
4.44
125.40
PEKERJAAN TALUD BATAS KANA

Alat Berat 61.31


Lihat Gbr Detail 174.79

Lihat Gbr Detail 3.15


Lihat Gbr Detail 524.30
Lihat Gbr Detail 10.50
Lihat Gbr Detail 139.30
3.61
30.00
PEKERJAAN TA
Sub Total A (PEKERJAAN TALUD )

Lihat Gbr Detail 0.19


Lihat Gbr Detail 11.49
Lihat Gbr Detail 0.62
0.90
0.31
3.29
0.64
Keterangan
Volume
3
0.48
3.60
ju
Jum

Lihat Gbr Detail 1.34


Lihat Gbr Detail 198.91
Lihat Gbr Detail 4.48

Lihat Gbr Detail 0.18


Lihat Gbr Detail 26.46
Lihat Gbr Detail 0.90

Lihat Gbr Detail 0.20


Lihat Gbr Detail 29.75
Lihat Gbr Detail 3.69
6.84
18.43
1.44
8.64
73.00

Lihat Gbr Detail 82.74


Lihat Gbr Detail 12.00
Lihat Gbr Detail 124.10
Lihat Gbr Detail 6.36
Lihat Gbr Detail 6,096.00
Lihat Gbr Detail 29.57

Lihat Gbr Detail 49.97


Lihat Gbr Detail 6.42
Lihat Gbr Detail 61.32
Lihat Gbr Detail 134.24
Lihat Gbr Detail 2,964.00
Lihat Gbr Detail 27.52
Keterangan
Volume
3
Lihat Gbr Detail 38.00
Lihat Gbr Detail 1.00

PEKERJ

Lihat Gbr Detail 0.06


Lihat Gbr Detail 6.90
Lihat Gbr Detail 0.30
0.90
1.80
0.60
2.40
ju
Jum

Lihat Gbr Detail 1.29


Lihat Gbr Detail 190.25
Lihat Gbr Detail 4.29

Lihat Gbr Detail 18.00


Lihat Gbr Detail 51.84

PEKERJ

Lihat Gbr Detail 44.64


Lihat Gbr Detail 14.88
Lihat Gbr Detail 9.77
Lihat Gbr Detail 25.11
ju

Lihat Gbr Detail 0.06


Lihat Gbr Detail 6.90
Lihat Gbr Detail 0.30
0.90
Keterangan
Volume
3
1.80
0.60
2.40
ju
Jum

Lihat Gbr Detail 2.79


Lihat Gbr Detail 412.92
Lihat Gbr Detail 9.30

Lihat Gbr Detail 38.00


Lihat Gbr Detail 109.44

PEKERJAAN PA

Lihat Gbr Detail 0.06


Lihat Gbr Detail 6.90
Lihat Gbr Detail 0.30
0.90
1.80
0.60
2.40
ju
Ju

Lihat Gbr Detail 0.41


Lihat Gbr Detail 59.94
Lihat Gbr Detail 1.35

Lihat Gbr Detail 6.00


Lihat Gbr Detail 17.28
Keterangan
Volume
3
Lihat Gbr Detail 1.00
Lihat Gbr Detail 2.00
Lihat Gbr Detail 2.00
Lihat Gbr Detail 4.90
Lihat Gbr Detail 336.00
Lihat Gbr Detail 0.99

PEKERJ

Lihat Gbr Detail 1.00


Lihat Gbr Detail 2.00
Lihat Gbr Detail 2.00
Lihat Gbr Detail 4.90
Lihat Gbr Detail 336.00
Lihat Gbr Detail 0.99

PEKERJAAN
Sub Total C (PEKERJAAN PAGAR )

0.49
0.49
Lihat Gbr Detail 0.03
Lihat Gbr Detail 0.14
1.20
Lihat Gbr Detail 0.06
Lihat Gbr Detail 2.00
Lihat Gbr Detail 6.31
Lihat Gbr Detail 20.00

13.60

0.21
3.46
65.12
Keterangan
Volume
3
0.46
7.68
144.70
26.88
26.88
0.40
0.60
0.60
1.00
50.00

Sub Total D (PEKERJAAN DRAINASI )

Lihat Gbr Detail 0.02


Lihat Gbr Detail 0.14
Lihat Gbr Detail 0.20

Sub Total E (PEKERJAAN PEMBUATAN CANSTIN )

Lihat Gbr Detail 0.15


Lihat Gbr Detail 0.05
Lihat Gbr Detail 0.06
Lihat Gbr Detail 0.04
Lihat Gbr Detail 1.00
JUMLAH PEMBUATAN BLOK BETON SIA

Lihat Gbr Detail 0.10


Lihat Gbr Detail 0.51
Keterangan
Volume
3
Lihat Gbr Detail 0.15
Lihat Gbr Detail 1.00

depan Ke Hal. Belakang ) 15.56

Lihat Gbr Detail 21.56


Lihat Gbr Detail 7.19
Lihat Gbr Detail 14.38
Lihat Gbr Detail 175.00
Lihat Gbr Detail 175.00
JUMLAH PEMBUATA
Sub Total F (PEKERJAAN LAIN-LAIN )

150.50
Lihat Gbr Detail 71.00
1,204.00
1.00
Sub Total G (PEKERJAAN LANDSCAPE )

kontrol pada pos jaga 19.00


kontrol pada pos jaga 27.00
kontrol pada pos jaga 2.00
kontrol pada pos jaga 4.00
kontrol pada pos jaga 1.00
52.00
1.00
kontrol pada pos jaga 4.00
kontrol pada pos jaga 1.00
kontrol pada pos jaga 57.00
PEKERJAAN INSTALASI PE

1.00
1.00
1.00
PEN
Keterangan
Volume
3
REKAPITULASI TOTAL

Jenis Pekerjaan

2
LAN

TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

M3 14,890.20 167,369,868.35
M3 19,946.05 53,147,449.12
M3 19,946.05 171,051,547.31
391,568,864.78

m3 14,890.20 2,417,796.23
m3 665,453.25 478,080,247.49

m3 342,918.50 1,333,267.13
kg 2,819.23 731,656.55
m2 147,878.50 1,916,505.36

m3 342,918.50 524,665.31
kg 2,819.23 7,897,382.22
m2 188,042.25 10,549,170.23

m3 342,918.50 2,105,519.59
kg 2,819.23 5,006,064.00
m2 148,154.50 4,548,343.15
m2 85,473.75 29,335,856.01
m3 49,335.00 160,215.41
m' 0.00 0.00
Total Talud A 544,606,688.67

m3 14,890.20 3,131,855.77
m3 665,453.25 579,503,308.23
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m3 342,918.50 5,147,892.52
kg 2,819.23 7,044,296.02
m2 188,042.25 9,409,634.19

m3 342,918.50 2,378,997.09
kg 2,819.23 5,656,281.60
m2 148,154.50 5,139,109.22
m2 85,473.75 34,343,352.75
m3 49,335.00 259,415.76
m' 0.00 0.00
Total Talud B 652,014,143.15

m3 14,890.20 203,697.94
m3 665,453.25 19,093,184.65
m2 85,473.75 2,136,843.75
m3 49,335.00 14,800.50
Total Talud C 21,448,526.84

m3 14,890.20 56,806.11
m3 665,453.25 10,154,816.60
m2 85,473.75 3,326,040.03
m3 49,335.00 18,821.30
Total Talud D 13,556,484.04

m3 14,890.20 571,783.68
m3 665,453.25 117,119,772.00

m3 342,918.50 1,450,545.26
kg 2,819.23 1,253,483.82
m2 188,042.25 2,651,395.73

m3 342,918.50 548,669.60
kg 2,819.23 806,523.89
m2 148,154.50 1,185,236.00
m2 85,473.75 4,205,308.50
m3 49,335.00 47,361.60
m' 0.00 0.00
Total Talud E 129,840,080.07
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m3 14,890.20 193,572.60
m3 665,453.25 17,800,874.44
m2 85,473.75 2,307,791.25
m3 49,335.00 18,500.63
Total Talud F 20,320,738.91

m3 14,890.20 526,264.34
m3 665,453.25 130,561,927.65

m3 342,918.50 1,714,592.50
kg 2,819.23 2,016,309.72
m2 188,042.25 3,760,845.00

m3 342,918.50 2,751,920.96
kg 2,819.23 3,236,177.10
m2 148,154.50 4,755,759.45
m2 85,473.75 18,291,382.50
m3 49,335.00 158,513.36
Total Talud G 167,773,692.58

m3 14,890.20 295,496.02
m3 665,453.25 25,473,550.41
m2 85,473.75 2,760,802.13
m3 49,335.00 46,621.58
Total Talud H 28,576,470.13

m3 14,890.20 990,570.56
m3 665,453.25 146,732,774.35
m2 85,473.75 2,760,802.13
m3 49,335.00 46,621.58

m3 342,918.50 2,244,187.26
kg 2,819.23 2,639,097.38
m2 188,042.25 4,922,476.00

m3 342,918.50 2,080,658.00
kg 2,819.23 3,058,489.81
m2 148,154.50 4,494,637.14
Total Talud I 169,970,314.20
PEKERJAAN TALUD HALAMAN BELAKANG 1,748,107,138.58
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

m3 14,890.20 1,711,460.98
m3 665,453.25 269,135,912.43

m3 342,918.50 1,080,193.28
kg 2,819.23 4,096,503.08
m2 188,042.25 5,472,029.48

m3 342,918.50 1,320,236.23
kg 2,819.23 3,138,981.50
m2 148,154.50 2,851,974.13
m2 85,473.75 19,989,745.91
m3 49,335.00 218,800.73
m' 19,989.30 2,506,658.22
PEKERJAAN TALUD BATAS KANAN HALAMAN DEPAN 311,522,495.94

m3 14,890.20 912,918.16
m3 665,453.25 116,314,573.57

m3 342,918.50 1,080,193.28
kg 2,819.23 1,478,119.67
m2 188,042.25 1,974,443.63
m2 85,473.75 11,906,493.38
m3 49,335.00 178,099.35
m' 19,989.30 599,679.00
PEKERJAAN TALUD BATAS DEPAN 134,444,520.02
2,194,074,154.55

m3 342,918.50 63,782.84
kg 2,819.23 32,392.90
m2 188,042.25 115,645.98
m2 73,887.50 66,498.75
m2 85,473.75 26,496.86
m2 229,034.00 753,521.86
m2 199,438.75 127,640.80
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m2 0.00 0.00
m2 59,588.40 214,518.24
jumlah 1 buah kolom 1,400,498.23
Jumlah 15 buah kolom 21,007,473.49

m3 342,918.50 460,882.46
kg 2,819.23 560,777.68
m2 148,154.50 663,732.16
jumlah 1,685,392.31

m3 342,918.50 61,725.33
kg 2,819.23 74,596.69
m2 188,042.25 169,238.03

m3 342,918.50 68,926.62
kg 2,819.23 83,866.31
m2 188,042.25 692,935.69
m2 73,887.50 505,612.16
m2 85,473.75 1,575,452.16
m2 229,034.00 329,808.96
m2 199,438.75 1,723,150.80
bh 0.00 0.00
jumlah 5,285,312.75

m' 0.00 0.00


m' 0.00 0.00
m' 0.00 0.00
kg 0.00 0.00
cm 1,384.03 8,437,016.40
m2 17,974.50 531,513.15
jumlah 8,968,529.55

m' 0.00 0.00


m' 0.00 0.00
m' 0.00 0.00
kg 0.00 0.00
cm 1,384.03 4,102,250.10
m2 17,974.50 494,730.14
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m' 0.00 0.00
ls 1,000,000.00 1,000,000.00
jumlah 5,596,980.24
PEKERJAAN PAGAR DEPAN 42,543,688.33

m3 342,918.50 20,575.11
kg 2,819.23 19,452.65
m2 188,042.25 56,412.68
m2 73,887.50 66,498.75
m2 85,473.75 153,852.75
m2 73,887.50 44,332.50
m2 59,588.40 143,012.16
jumlah 1 buah kolom 504,136.60
Jumlah 22 buah kolom 11,091,005.15

m3 342,918.50 440,821.73
kg 2,819.23 536,368.83
m2 24,527.25 105,099.27
jumlah 1,082,289.83

lbr 0.00 0.00


m2 43,452.75 2,252,590.56
jumlah 2,252,590.56
PEKERJAAN PAGAR DEPAN 14,425,885.54

m3 123,337.50 5,505,786.00
m3 35,052.00 521,573.76
m3 332,120.00 3,243,151.80
m3 665,453.25 16,709,531.11
jumlah 1 buah kolom 25,980,042.67

m3 342,918.50 20,575.11
kg 2,819.23 19,452.65
m2 188,042.25 56,412.68
m2 73,887.50 66,498.75
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m2 85,473.75 153,852.75
m2 73,887.50 44,332.50
m2 59,588.40 143,012.16
jumlah 1 buah kolom 504,136.60
Jumlah 38 buah kolom 19,157,190.71

m3 342,918.50 956,742.62
kg 2,819.23 1,164,114.39
m2 298,190.00 2,773,167.00
jumlah 4,894,024.00

lbr 0.00 0.00


m2 43,452.75 4,755,468.96
jumlah 4,755,468.96
PEKERJAAN PAGAR SAMPING KIRI 54,786,726.33

m3 342,918.50 20,575.11
kg 2,819.23 19,452.65
m2 188,042.25 56,412.68
m2 73,887.50 66,498.75
m2 85,473.75 153,852.75
m2 73,887.50 44,332.50
m2 59,588.40 143,012.16
jumlah 1 buah kolom 504,136.60
Jumlah 6 buah kolom 3,024,819.59

m3 342,918.50 138,881.99
kg 2,819.23 168,984.35
m2 0.00 0.00
jumlah 307,866.34

lbr 0.00 0.00


m2 43,452.75 750,863.52
jumlah 750,863.52
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m' 0.00 0.00
m' 0.00 0.00
m' 0.00 0.00
m' 0.00 0.00
cm 1,384.03 465,032.40
m2 59,588.40 58,873.34
jumlah ( 1 m ' ) 523,905.74
jumlah ( 43 m ' ) 22,527,946.79
PEKERJAAN PAGAR DEPAN 26,611,496.23

m' 0.00 0.00


m' 0.00 0.00
m' 0.00 0.00
m' 0.00 0.00
cm 1,384.03 465,032.40
m2 59,588.40 58,873.34
jumlah ( 1 m ' ) 523,905.74
jumlah ( 45 m ' ) 22,527,946.79
PEKERJAAN PAGAR DI TALUD G 22,527,946.79
160,895,743.22

m3 16,087.50 7,882.88
m3 123,337.50 60,435.38
m3 49,335.00 1,430.72
m3 665,453.25 90,501.64
M2 85,473.75 102,568.50
m3 249,205.00 14,703.10
M' 0.00 0.00
kg 0.00 0.00
cm 1,384.03 27,680.50
JUMLAH SALURAN 1 M' 305,202.70
JUMLAH SALURAN 515 M' 157,179,391.53

m3 123,337.50 1,677,390.00

m3 342,918.50 71,107.58
M2 188,042.25 649,874.02
kg 2,819.23 183,578.91
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m3 342,918.50 158,016.84
M2 148,154.50 1,137,826.56
kg 2,819.23 407,953.13
m2 73,887.50 1,986,096.00
m2 85,473.75 2,297,534.40
m3 49,335.00 19,734.00
m3 49,335.00 29,601.00
m3 249,205.00 149,523.00
ls 25,000.00 25,000.00
m' 19,989.30 999,465.00
JUMLAH BAK KONTROL 9,792,700.45
166,972,091.98

m3 49,335.00 740.03
m3 249,205.00 34,888.70
M2 14,858.00 2,971.60
JUMLAH CANSTIN 1 M' 38,600.33
JUMLAH SALURAN 504 M' 19,454,563.80
19,454,563.80

m3 49,335.00 7,400.25
m3 49,335.00 2,466.75
m3 342,918.50 21,946.78
m3 49,335.00 1,776.06
stek 0.00 0.00
JUMLAH PEMBUATAN BLOK BETON SIAR RUMPUT 1 M2 33,589.84
JUMLAH 1508 M2 50,653,484.75

m3 49,335.00 4,933.50
m3 342,918.50 175,574.27
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m3 249,205.00 37,380.75
ls 2,500,000.00 2,500,000.00
JUMLAH PEK. TIANG BENDERA 2,717,888.52
m3 342,918.50 5,335,811.86

m3 49,335.00 1,063,785.94
m3 49,335.00 354,595.31
m3 249,205.00 3,582,321.88
m2 600,000.00 105,000,000.00
m2 21,487.75 3,760,356.25
JUMLAH PEMBUATAN GARASI PARKIR 113,761,059.38
172,468,244.51

m3 40,500.00 6,095,250.00
bh 0.00 0.00
stek 0.00 0.00
ls 5,000,000.00 5,000,000.00
11,095,250.00

bh 438,293.75 8,327,581.25
bh 409,543.75 11,057,681.25
bh 380,793.75 761,587.50
bh 237,043.75 948,175.00
bh 321,137.50 321,137.50
ttk 223,617.50 11,628,110.00
ttk 355,580.00 355,580.00
bh 79,925.00 319,700.00
bh 74,175.00 74,175.00
bh 86,537.50 4,932,637.50
PEKERJAAN INSTALASI PENERANGAN SITE 38,726,365.00

Ls 100,000,000.00 100,000,000.00
LS 50,000,000.00 50,000,000.00
unit 225,000,000.00 225,000,000.00
PENGADAAN LISTRIK 375,000,000.00
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

Jumlah Harga
( Rp )
3

391,568,864.78
2,194,074,154.55
160,895,743.22
157,179,391.53
19,454,563.80
172,468,244.51
11,095,250.00
375,000,000.00

REAL COST Rp 3,481,736,212.38


TABEL KONVESI BESI BETON

BJ Besi Panjang/
Ø konversi luas (Пr2) m2 (PMI Kg/m Harga/ujung ujung
1970)

6 0.003 0.00002826 7850 0.22 Rp 40,000.00 11


8 0.004 0.00005024 7850 0.39 Rp 50,000.00 11
10 0.005 0.00007850 7850 0.62 Rp 80,000.00 11
12 0.006 0.00011304 7850 0.89 Rp 165,000.00 11
16 0.008 0.00020096 7850 1.58 Rp 190,000.00 11
19 0.0095 0.00028339 7850 2.22 Rp 390,000.00 11

Harga per kg besi setelah ditambah faktor


Kg/ujun
Harga/m Harga/Kg
g

Rp 3,636.36 2.44 Rp 9,324.01 DIPAKAI


Rp 4,545.45 4.34 Rp 11,655.01 DIPAKAI
Rp 7,272.73 6.78 Rp 11,730.21 DIPAKAI
Rp 15,000.00 9.76 Rp 16,853.93 DIPAKAI
Rp 17,272.73 17.35 Rp 10,949.18 DIPAKAI
Rp 35,454.55 24.47 Rp 17,727.27 DIPAKAI
RATA-RATA KESELURUHAN Rp 13,039.94
besi setelah ditambah faktor fluktuasi harga 5% Rp 13,691.93
ENGINERING ESTIMATE RUMAH TINGG

PEKERJAAN : PEMBANGUNAN RUMAH 2 LT Bpk. SIREGAR


LOKASI : PERUM IRMAN JAYA - MANOKWARI
TAHUN ANGGARAN : 2017

No Jenis Pekerjaan

1 2

A PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bowplank
Sub Total A
B PEKERJAAN TANAH
1 Galian Pondasi Menerus
2 Galian Pondasi Footplat
3 Urugan Tanah Kembali
4 Urugan Peninggian Peil Lantai
5 Urugan Pasir bawah Pondasi Footplat
6 Urugan Pasir bawah pondasi menerus
7 Urugan Pasir bawah lantai
Sub Total B
C PEKERJAAN SUB STRUKTUR
1 Pondasi
a. Pondasi Footplat F1 (uk. 2x2) 24 buah
1. Cor Beton K 300
2. Pembesian
3. Bekisting
4. Lantai Kerja
b. Pondasi Footplat F2 (uk. 1.5x1.5) 16 buah
1. Cor Beton K 300
2. Pembesian
3. Bekisting
4. Lantai Kerja
c. Pondasi Footplat F3 (uk 1.2 x 1.2) 8 buah
1. Cor Beton K 300
2. Pembesian
3. Bekisting
4. Lantai Kerja
c. Pasang Aanstamping
d. Pasang Pondasi batu kali 1 pc : 4 psr
2 Kolom
No Jenis Pekerjaan

1 2
a. Kolom K1 (uk 50 x50)cm16 buah
1. Cor Beton K 300 (pengecoran setinggi pondasi menerus)
2. Pembesian (Pengerjaan Sampai pondasi Menerus over stek 1m)
3. Bekisting
b. Kolom K2 (uk 40 x 40)cm 24 buah
1. Cor Beton K 300 (pengecoran setinggi pondasi menerus)
2. Pembesian (Pengerjaan Sampai pondasi Menerus over stek 1m)
3. Bekisting
3 SLOOF (uk 25/40)cm
1. Cor Beton K 300
2. Pembesian
3. Bekisting
4. Lantai Kerja (lebar 25cm tebal 5cm)
Sub Total C

D PEKERJAAN STRUKTUR
I. LANTAI 1 ( elev -0.10 - +4.00 )
1 Kolom
a. Kolom 50x50 cm (K1)
1. Cor Beton K 300
2. Bekisting
3. Pembesian 16D 16 ,d10-100

b. Kolom 40x40 cm (K2)


1. Cor Beton K 300
2. Bekisting
3. Pembesian 12D 16 ,d10-100

c. Kolom 12x12 cm (Kp)


1 Beton Praktis
2 Begesting
3 Pembesian 4Ø12, Ø8-150

2 Balok Lantai II
a. Balok 40/70 Cm (B1)
- Beton K300
- Begesting
- Pembesian 11D16, 4D12, Ø10-100~150

b. Balok 30/60 Cm (B2)


- Beton K300
No Jenis Pekerjaan

1 2
- Begesting Balok
- Pembesian 10D16, 4D12, Ø10-100~150

c. Balok 25/40 Cm (B4)


- Beton K300
- Begesting Balok
- Pembesian 7D16, Ø8-100~150

d. Balok 15/20 Cm (B5)


- Beton K300
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

e. Balok 12/20 Cm ( Penopang Parapet, panjang kolom ke kolom ) Elv +2.95


- Beton Praktis
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

3 Beton Plat
a. Plat Lantai T 12 Cm (PL)
- Beton K300
- Begesting Plat
- Pembesian Tumpuan Ø10-150, 2 lapis (75% luas)
- Pembesian Lapangan Ø10-150 1 lapis (25% luas)

b. Plat Atap Enterance T 10 Cm (PA)


- Beton K300
- Begesting Plat
- Pembesian Tumpuan Ø10-150, 2 lapis (75% luas)
- Pembesian Lapangan Ø10-150 1 lapis (25% luas)

c. Plat Dak Parapet T 10 Cm ( atas jendela ) elv + 2.85


- Beton Praktis
- Begesting Plat
- Pembesian Ø10-150, Ø8-100 ,

4 Beton Tangga ( plat tangga disambung ke sloof )


a .Pekerjaan Beton Plat Bordes uk ( 3 x 1,4 )m
- Beton K250
- Begesting
- Pembesian D16-150 , Ø8-100
b. Pekerjaan Balok Bantu 20/30 (4 buah X panjang 3 m)
No Jenis Pekerjaan

1 2
- Beton K250
- Begesting
- Pembesian 4d16 , 2d12 begel Ø8-150
c. Pekerjaan Kolom Bantu 20/20 setinggi bordes (4 buah X 2.96 m)
- Beton K250
- Begesting
- Pembesian 4d16 , 2d12 begel Ø8-150
d. Pekerjaan Beton Plat Tangga tebal 15 cm
- Beton K250
- Begesting
- Pembesian Ø16-150, Ø8-120
e. Pekerjaan Beton Anak Tangga
- Beton K250
- Begesting Tangga
- Pembesian Ø8-200, Ø8-200
II. LANTAI 2 ( elv +4.00 - keatas )
1 Beton Kolom Lantai II
a. Kolom 50x50 cm (K1)
- Beton K300
- Begesting
- Pembesian 18-D16, Ø10-100~150

b. Kolom 40x40 cm (K2)


- Beton K300
- Begesting
- Pembesian 18-D16, Ø10-100~150

c. Kolom 12x12 cm (Kp)


- Beton Praktis
- Begesting
- Pembesian 4-d12, Ø8-150

2 Balok
a. Balok 30/60 Cm (B2)
- Beton K300
- Begesting Balok
- Pembesian 10D16, 4D12, Ø10-100~150

b. Ring Balk Balok 25/50 Cm (B3)


- Beton K300
- Begesting
- Pembesian 9D16,4d12 Ø10-100~150
No Jenis Pekerjaan

1 2

c. Ring Balok 25/40 Cm (B4)


- Beton K300
- Begesting Balok 3x Pakai
- Pembesian 6Ø12, Ø8-100-150

d. Balok 12/20 Cm
- Beton Praktis
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

e. Balok 12/20 Cm ( Penopang Parapet, panjang kolom ke kolom ) Elv +6.95


- Beton Praktis
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

f. Balok 12/20 Cm ( Penopang Parapet, panjang kolom ke kolom ) di portal 1 -2 & 5 - 6 (Elv +8
- Beton Praktis
- Begesting Balok
- Pembesian 8Ø12, Ø8-100-150

3 Beton Plat Atap

a. Plat Atap T 10 Cm di portal 1 - 2 & 5 - 6 ( elv +9.00 )


- Beton K300
- Begesting Plat
- Pembesian Lapangan Ø10-150 1 lapis

b. Plat Dak T 10 Cm ( atas jendela ) di portal 2- 5 ( elv + 8.00 )


- Beton K 300
- Begesting Plat
- Pembesian Ø10-150, Ø8-100 ,

c. Plat Dak T 10 Cm ( atas motif ukiran ) di portal 2- 5 ( elv + 8.30 )


- Beton K 300
- Begesting Plat
- Pembesian Ø10-150, Ø8-100 ,

d. Plat Dak Parapet T 10 Cm ( atas jendela ) elv + 6.85


- Beton Praktis
- Begesting Plat
- Pembesian Ø10-150, Ø8-100 ,
No Jenis Pekerjaan

1 2
SUB TOTAL D

E. PEKERJAAN ARSITEKTUR

LANTAI 1
A PEKERJAAN PASANGAN DAN PLESTERAN LT. 1
1 Pas. Dinding 1/2 Bata 1 Pc : 4 Ps
2 Pas. Dinding 1/2 Bata 1 Pc : 3 Ps
3 Pas. Dinding Rabat Batu kali 1Pc : 4 Psr
4 Pas. Dinding Partisi Double Gypsum Board + Rangka
5 Pekerjaan Plesteran 1Pc : 2 Ps untuk kolom
6 Pekerjaan Plesteran 1Pc : 3 Ps
7 Pekerjaan Plesteran 1 Pc : 4 Ps
8 Cor Lantai Beton Tumbuk Tbl 7 Cm
9 Cor Beton K 250 untuk alas dinding sirip ukiran uk (0.8 x 2)m tebal 30cm
10 Plesteran 1 Pc : 3Psr tebal 5cm (utk ddg motif ) 3x plesteran biasa
11 Acian
12 Floor Lt Rabat 1Pc : 2 Ps

Sub Total A PEKERJAAN PASAN

B PEKERJAAN KERAMIK LT. 1


1 Pasang lantai keramik 60x60 cm
2 Keramik 60x60 cm tekstur
3 Keramik Plint 60x10 cm
4 Keramik KM Tile 20x20 cm Tekstur
5 Keramik Dinding KM Tile 20x25 cm
6 Keramik Tangga Tile 30x30 cm texture kasar (anti slip)
7 Keramik Plint Tangga Tile15x30 cm( keramik 30x30 dibagi 2)
8 Keramik Plint Kayu uk 10 cm ( di dinding Partisi )
9 Pasangan Batu Alam ( dinding rabat + dinding ukiran )
Sub Total B

C. PEKERJAAN PINTU DAN JENDELA LT. 1


Pekerjaan Kusen Pintu
1 P1
2 P2
3 P3
4 P4
Pekerjaan Kusen Jendela
No Jenis Pekerjaan

1 2
1 Jendela J1
2 Jendela J2
3 Jendela J3
4 Jendela J5
5 Jendela J6
6 Ventilasi BV.1
7 Ventilasi BV.2
Sub Total C PEKERJAA

D. PEKERJAAN PLAFOND LT. 1


1 Penutup Plafond GRC 60 x 120 cm + rangka alluminium
2 List Gypsum
Sub Total D

E PEKERJAAN SANITAIR LT. 1


1 Kloset Duduk+Acc
2 Jet Washer
3 Kran Dinding
4 Wastafel + Kran & Accesoris
5 Cermin Wastafel uk. ± ( 1.5 x 0.8 )
6 kitchensink
Sub Total E

F. PEKERJAAN PENGECATAN LT.1


1 Pengecatan Dinding & Kolom
2 Pengecatan dinding Partisi
3 Pengecatan Plafon
Sub Total F PEK

LANTAI 2.
A. PEKERJAAN PASANGAN DAN PLESTERAN LT. 2
1 Pas. Dinding Bata Ringan 1 Pc : 3 Ps
2 Pas. Dinding Bata Ringan 1 Pc : 4 Ps
3 Pekerjaan Plesteran 1 Pc : 3 Ps
4 Pekerjaan Plesteran 1 Pc : 4 Ps
5 Acian
6 Pas. Dinding Partisi Double Gypsum Board + Rangka
Sub Total A PEKERJAAN PASAN

B. PEKERJAAN KERAMIK LT. 2


No Jenis Pekerjaan

1 2
1 Pasang lantai keramik 60x60 cm
2 Keramik Plint 60x10 cm
3 Keramik KM Tile 20x20 cm Tekstur
4 Keramik Dinding KM Tile 20x25 cm
5 Keramik Plint Kayu uk 10 cm ( di dinding Partisi )
Sub Total B

C. PEKERJAAN KUSEN LT. 2


Pekerjaan Pintu
1 Pintu P2
3 Pintu P3
4 Pintu P4

Pekerjaan Jendela
1 Jendela (J2)
2 Jendela (J3)
3 Jendela (J4)
4 Jendela (J5)
5 Jendela (J7)
9 Ventilasi ( BV.1 )
6 Ventilasi ( BV. 2 )
7 Ventilasi ( BV. 3 )
8 Ventilasi ( BV. 4 )
Sub Total

D. PEKERJAAN PLAFOND LT. 2


1 Penutup Plafond GRC 60 x 120 cm + rangka alluminium
2 List Gypsum
Sub Total D

E. PEKERJAAN KAP / ATAP LT. 2


1 Kuda-kuda baja ringan tebal 0.8 mm + reng
2 Pasang Atap Spandeck
3 Talang Allumunium
4 Listplank Allumunium composite panel 4 mm( exs. China) + Rangka
5 Pas.Dinding Allumunium Composit Panel + Rangka metal furing
6 Penutup Plafond GRC 60 x 120 cm + rangka alluminium
Sub Total E P

F. PEKERJAAN SANITAIR LT. 2


No Jenis Pekerjaan

1 2
1 Kloset Duduk+Acc
2 Jet Washer
3 Kran Air Stainless
4 Wastafel
5 Cermin Wastafel
Sub Total F

G. PEKERJAAN PENGECATAN LT. 2


1 Pengecatan Dinding & Kolom
2 Pengecatan dinding Partisi
3 Pengecatan Plafon
4 Water Proof Plat Dak
5 Water Proofing ( lt km,wc )
Sub Total G PEK
SUB TOTAL E

F PEKERJAAN MEKANIKAL

A PEKERJAAN INSTALASI AIR KOTOR, BEKAS


LANTAI 1
1 Instalasi Pipa Air Hujan PVC 4"
2 Instalasi Pipa Air Kotor PVC 4"
3 Instalasi Pipa Air Kotor PVC 3"
4 Septictank uk (1.2 x 1.7 ) + Peresapan dia 60 cm
5 Floor Drain

LANTAI 2
1 Instalasi Pipa Air Hujan PVC 4"
2 Instalasi Pipa Air Kotor PVC 4"
3 Instalasi Pipa Air Kotor PVC 3"
4 Floor Drain Stainless
5 Roof Drain
Sub Total A PEKERJAAN INSTALASI A

B PEKERJAAN INSTALASI AIR BERSIH


LANTAI 1
1 Instalasi Pipa Air Bersih PVC 1" ( Pipa Vertikal ke Lt 2 )
2 Instalasi Pipa Air Bersih PVC 3/4"
LANTAI 2
3 Pipa PVC dia. 3/4 ''
No Jenis Pekerjaan

1 2
Sub Total B PEKERJAAN INSTA
SUB TOTAL F

G PEKERJAAN ELEKTRIKAL
A PEKERJAAN INSTALASI PENERANGAN DAN KOTAK KONTAK
LANTAI 1
1 Pemasangan Panel Utama
2 Instalasi Penerangan
3 Instalasi Kotak kontak 500 VA
4 Lampu Dinding 18 Watt
5 Downlight 18 Watt + Armature
6 Downlight 14 Watt + Armature
7 Stop Kontak 500 VA
8 Saklar Ganda
9 Saklar Tunggal

LANTAI 2
1 Pemasangan Panel Distribusi Lantai 2
2 Instalasi Penerangan
3 Instalasi Kotak kontak Biasa
4 Downlight PLCE 23 Watt
5 Downlight PLCE 14 Watt
6 Stop Kontak Biasa
7 Saklar Ganda
8 Saklar Tunggal
PEKERJAAN INSTALASI PENERANGAN DA

B PEKERJAAN INSTALASI AC / TATA UDARA


LANTAI 1
1 Sub Panel AC
2 AC Split Type 1 PK + Instalasi
3 AC Split Type 1/2 PK + Instalasi
4 AC Stand Type 5 PK
5 Cable tray ( rak kabel )

LANTAI 2
1 Sub Panel AC
2 AC Split Type 1 PK + Instalasi
3 AC Split Type 1/2 PK + Instalasi
No Jenis Pekerjaan

1 2
4 Cable tray ( rak kabel )
PEKERJAAN INSTALAS

C PEKERJAAN INSTALASI CEILLING SPEAKER


LANTAI 1
1 Box Sound System ( amplifier )
2 Ceilling Speaker 3 Watt
3 Volume Kontrol

LANTAI 2
1 Box Sound System
2 Ceilling Speaker 3 Watt
3 Volume Kontrol
PEKERJAAN INSTALASI CE

D PEKERJAAN INSTALASI TITIK OUTLET TELP & DATA KONTAK


LANTAI 1
1 PABX
2 Instalasi Telephone + kabel
3 Outlet Telephone

LANTAI 2
1 PABX
2 Instalasi Telephone + kabel
3 Outlet Telephone
PEKERJAAN INSTALASI TITIK OUTLET TEL

E PEKERJAAN INSTALASI SMOKE DETECTOR & FIRE ALARM


LANTAI 1
1 Fire Alarm Terminal Box FATB uk 30 x 20 x 20 cm + Pasang
2 Instalasi Smoke detector
3 Smoke Detector
4 Alarm & Lampu Indikator

LANTAI 2
1 Fire Alarm Terminal Box FATB uk 30 x 20 x 20 cm
2 Instalasi Smoke detector
3 Smoke Detector
4 Lampu Indikator & Lampu Indikator
PEKERJAAN INSTALASI SMOKE DETECT
No Jenis Pekerjaan

1 2
F PEKERJAAN INSTALASI PENANGKAL PETIR

1 Penangkal Petir Type UFO Radius Proteksi 100 Meter


2 Kawat BC 50 mm lengkap dengan Support, Klem dll + Grounding
3 Tiang Penyanggah + Saluran Kabel Pipa GIP Dia 2,5"
Lengkap dgn kawat tarikan
PEKERJAAN IN
G SISTEM PEMADAM KEBAKARAN

1 Fire Extinguisher 1 Tabung + Pabel BOX dari kaca


SIST
SUB TOTAL G

H PEKERJAAN LAIN-LAIN
1 Pekerjaan Railling Tangga
2 Allumunium composite panel 4 mm + Rangka
3 Pekerjaan Ukiran Motif Papua Type 1 (1.95 x 8 m')
4 Pekerjaan Ukiran Motif Papua Type 2 (1.95 x 4 m')
5 Pekerjaan Ukiran Motif Papua Type 3 (0.45 x 3 m')
6 Pot Bunga
* Dinding Batu tela 1 pc : 4 Psr
* Plesteran 1 pc : 4 Psr
* Pas. Batu Alam
7 Pekerjaan Pembersihan
Sub Total H

REKAPITULASI TOTAL

No Jenis Pekerjaan

1 2
A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH
C PEKERJAAN SUB STRUKTUR
D PEKERJAAN STRUKTUR
E PEKERJAAN ARSITEKTUR
F PEKERJAAN MEKANIKAL
G PEKERJAAN ELEKTRIKAL
No Jenis Pekerjaan

1 2
H PEKERJAAN LAIN-LAIN
REAL COST TOTAL
STIMATE RUMAH TINGGAL 2 LANTAI

TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

114.00 M' 40,077.50 4,568,835.00


ub Total A 4,568,835.00

367.92 m3 14,890.20 5,478,402.38


382.87 m3 14,890.20 5,701,040.65
345.33 m3 35,052.00 12,104,577.26
525.30 m3 49,335.00 25,915,675.50
8.80 m3 49,335.00 433,950.66
15.15 m3 49,335.00 747,425.25
30.90 m3 49,335.00 1,524,451.50
b Total B 51,905,523.21

28.80 m3 436,108.75 12,559,932.00


4,269.03 kg 2,819.23 12,035,366.25
57.60 m2 147,878.50 8,517,801.60
11.62 m2 249,205.00 2,894,765.28

10.80 m3 436,108.75 4,709,974.50


1,683.65 kg 2,819.23 4,746,582.53
28.80 m2 147,878.50 4,258,900.80
4.62 m2 249,205.00 1,152,323.92

3.46 m3 436,108.75 1,507,191.84


546.05 kg 2,819.23 1,539,432.17
11.52 m2 147,878.50 1,703,560.32
1.57 m2 0.00 -
70.08 m3 332,120.00 23,274,969.60
265.72 m3 665,453.25 176,824,237.59
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

13.20 m3 436,108.75 5,756,635.50


2,963.62 kg 2,819.23 8,355,100.32
105.60 m2 188,042.25 19,857,261.60

8.45 m3 436,108.75 3,684,246.72


2,184.96 kg 2,819.23 6,159,893.86
84.48 m2 0.00 -

39.10 m3 436,108.75 17,051,852.13


6,858.14 kg 2,819.23 19,334,639.74
312.80 m2 148,154.50 46,342,727.60
1.24 m2 249,205.00 308,391.19
b Total C 382,575,787.05

27.00 M3 Rp 436,108.75 11,774,936.25


216.00 M2 Rp 188,042.25 40,617,126.00
3,625.87 Kg Rp 2,819.23 10,222,148.99

17.28 M3 Rp 436,108.75 7,535,959.20


172.80 M2 Rp 188,042.25 32,493,700.80
2,971.73 Kg Rp 2,819.23 8,377,969.87

2.54 M3 Rp 342,918.50 870,574.05


42.31 M2 Rp 188,042.25 7,956,443.68
797.23 Kg Rp 2,819.23 2,247,566.80

10.64 M3 Rp 436,108.75 4,640,197.10


68.40 M2 Rp 188,042.25 12,862,089.90
1,176.61 Kg Rp 2,819.23 3,317,118.93

63.36 M3 Rp 436,108.75 27,631,850.40


TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
528.00 M2 Rp 188,042.25 99,286,308.00
9,615.47 Kg Rp 2,819.23 27,108,164.01

13.10 M3 Rp 436,108.75 5,713,024.63


137.55 M2 Rp 188,042.25 25,865,211.49
1,873.93 Kg Rp 2,819.23 5,283,026.92

0.29 M3 Rp 436,108.75 124,290.99


5.23 M2 Rp 188,042.25 982,520.76
52.72 Kg Rp 2,819.23 148,616.86

1.20 M3 Rp 342,918.50 411,502.20


26.00 M2 Rp 188,042.25 4,889,098.50
265.75 Kg Rp 2,819.23 749,209.04

70.92 M3 Rp 436,108.75 30,928,832.55


591.00 M2 Rp 188,042.25 111,132,969.75
7,328.40 Kg Rp 2,819.23 20,660,408.49
1,221.40 Kg Rp 2,819.23 3,443,401.42

12.80 M3 Rp 436,108.75 5,582,192.00


128.00 M2 Rp 188,042.25 24,069,408.00
1,587.20 Kg Rp 2,819.23 4,474,673.92
264.53 Kg Rp 2,819.23 745,778.99

2.62 M3 Rp 342,918.50 898,172.14


26.19 M2 Rp 188,042.25 4,925,202.61
232.06 Kg Rp 2,819.23 654,232.51

1.26 M3 Rp 342,918.50 432,077.31


8.40 M2 Rp 188,042.25 1,579,554.90
242.48 Kg Rp 19,013.53 4,610,399.54
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
0.72 M3 Rp 342,918.50 246,901.32
9.60 M2 Rp 188,042.25 1,805,205.60
145.25 Kg Rp 2,819.23 409,486.79

0.72 M3 Rp 342,918.50 246,901.32


9.60 M2 Rp 188,042.25 1,805,205.60
145.25 Kg Rp 2,819.23 409,486.79

3.62 M3 Rp 342,918.50 1,240,679.13


24.12 M2 Rp 188,042.25 4,535,579.07
348.13 Kg Rp 2,819.23 981,462.44

1.69 M3 Rp 342,918.50 578,674.97


11.25 M2 Rp 188,042.25 2,115,475.31
275.44 Kg Rp 2,819.23 776,520.29

28.00 M3 Rp 436,108.75 12,211,045.00


224.00 M2 Rp 188,042.25 42,121,464.00
3,961.28 Kg Rp 2,819.23 11,167,739.61

12.80 M3 Rp 436,108.75 5,582,192.00


128.00 M2 Rp 188,042.25 24,069,408.00
2,201.28 Kg Rp 2,819.23 6,205,903.61

2.85 M3 Rp 342,918.50 978,716.83


47.57 M2 Rp 188,042.25 8,944,793.75
896.26 Kg Rp 2,819.23 2,526,759.73

6.84 M3 Rp 436,108.75 2,982,983.85


57.00 M2 Rp 188,042.25 10,718,408.25
1,038.03 Kg Rp 2,819.23 2,926,449.52

28.50 M3 Rp 436,108.75 12,429,099.38


285.00 M2 Rp 188,042.25 53,592,041.25
5,867.96 Kg Rp 2,819.23 16,543,099.53
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

10.80 M3 Rp 436,108.75 4,709,974.50


113.40 M2 Rp 188,042.25 21,323,991.15
1,544.92 Kg Rp 2,819.23 4,355,472.58

0.61 M3 Rp 342,918.50 209,866.12


13.26 M2 Rp 188,042.25 2,493,440.24
135.53 Kg Rp 2,819.23 382,096.61

1.20 M3 Rp 342,918.50 411,502.20


26.00 M2 Rp 188,042.25 4,889,098.50
265.75 Kg Rp 2,819.23 749,209.04

kolom ) di portal 1 -2 & 5 - 6 (Elv +8.00)


0.29 M3 Rp 342,918.50 98,760.53
6.24 M2 Rp 188,042.25 1,173,383.64
63.78 Kg Rp 2,819.23 179,810.17

11.04 M3 Rp 436,108.75 4,814,640.60


110.40 M2 Rp 188,042.25 20,759,864.40
912.64 Kg Rp 2,819.23 2,572,937.50

1.92 M3 Rp 436,108.75 835,235.48


19.15 M2 Rp 188,042.25 3,601,385.17
173.93 Kg Rp 2,819.23 490,336.15

1.14 M3 Rp 436,108.75 499,257.30


11.45 M2 Rp 188,042.25 2,152,707.68
102.48 Kg Rp 2,819.23 288,916.43

2.62 M3 Rp 342,918.50 898,172.14


26.19 M2 Rp 188,042.25 4,925,202.61
232.06 Kg Rp 2,819.23 654,232.51
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
B TOTAL D 866,867,135.68

321.32 M2 Rp 73,887.50 23,741,531.50


180.92 M2 Rp 73,887.50 13,367,726.50
28.51 m3 Rp 665,453.25 18,973,403.06
131.03 M2 Rp 431,940.00 56,594,938.50
345.60 M2 Rp 85,473.75 29,539,728.00
236.24 M2 Rp 85,473.75 20,192,318.70
642.64 M2 Rp 85,473.75 54,928,850.70
47.61 M3 Rp 249,205.00 11,864,949.10
1.92 M3 Rp 342,918.50 658,403.52
29.95 M2 Rp 256,421.25 7,680,329.28
1,224.48 M2 Rp 56,982.50 69,773,931.60
51.20 M2 Rp 232,443.75 11,901,120.00

Sub Total A PEKERJAAN PASANGAN DAN PLESTERAN LT. 1 319,217,230.46

618.00 M2 Rp 68,379.00 42,258,222.00


32.16 M2 Rp 68,379.00 2,199,068.64
170.50 M' Rp 36,207.75 6,173,421.38
30.00 M2 Rp 199,438.75 5,983,162.50
125.60 M2 Rp 256,421.25 32,206,509.00
33.09 M2 Rp 199,438.75 6,599,428.24
81.00 m' Rp 36,207.75 2,932,827.75
96.20 m' Rp 48,093.00 4,626,546.60
49.81 M2 Rp 199,438.75 9,933,645.26
Sub Total B PEKERJAAN KERAMIK LT. 1 112,912,831.36

2.00 Unit Rp 814,099.61 1,628,199.21


5.00 Unit Rp 4,360,165.88 21,800,829.38
8.00 Unit Rp 2,891,669.22 23,133,353.78
5.00 Unit Rp 2,580,776.93 12,903,884.67
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
12.00 Unit Rp 2,089,926.30 25,079,115.64
2.00 Unit Rp 617,158.03 1,234,316.06
6.00 Unit Rp 685,736.69 4,114,420.15
1.00 Unit Rp 875,096.12 875,096.12
2.00 Unit Rp 874,076.59 1,748,153.18
3.00 Unit Rp 203,548.16 610,644.48
6.00 Unit Rp 388,154.84 2,328,929.06
Sub Total C PEKERJAAN PINTU DAN JENDELA LT. 1 95,456,941.72

686.28 M2 Rp 101,918.75 69,944,799.75


433.80 M' Rp 24,046.50 10,431,371.70
Sub Total D PEKERJAAN PLAFOND LT. 1 80,376,171.45

5.00 Unit Rp 786,904.75 3,934,523.75


5.00 Bh Rp - -
6.00 Bh Rp 26,105.00 156,630.00
4.00 Unit Rp 551,137.50 2,204,550.00
2.00 Unit Rp - -
1.00 Unit Rp 74,589.00 74,589.00
Sub Total E PEKERJAAN SANITAIR LT. 1 6,370,292.75

1,224.48 M2 Rp 59,588.40 72,964,804.03


262.05 M2 Rp 14,858.00 3,893,538.90
729.00 M2 Rp 36,420.50 26,550,544.50
Sub Total F PEKERJAAN PENGECATAN LT.1 103,408,887.43

165.29 M2 Rp 147,775.00 24,425,729.75


425.57 M2 Rp 147,775.00 62,888,606.75
330.58 M2 Rp 85,473.75 28,255,912.28
851.14 M2 Rp 85,473.75 72,750,127.58
1,181.72 M2 Rp 56,982.50 67,337,359.90
533.60 M2 Rp 431,940.00 230,483,184.00
Sub Total A PEKERJAAN PASANGAN DAN PLESTERAN LT. 2 486,140,920.25
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
618.00 M2 Rp 68,379.00 42,258,222.00
118.00 M' Rp 36,207.75 4,272,514.50
27.00 M2 Rp 199,438.75 5,384,846.25
111.60 M2 Rp 256,421.25 28,616,611.50
314.00 m' Rp 48,093.00 15,101,202.00
Sub Total B PEKERJAAN KERAMIK LT. 2 95,633,396.25

3.00 Unit Rp 4,360,165.88 13,080,497.63


16.00 Unit Rp 2,891,669.22 46,266,707.56
4.00 Unit Rp 2,580,776.93 10,323,107.74

2.00 Unit Rp 617,158.03 1,234,316.06


6.00 Unit Rp 685,736.69 4,114,420.15
2.00 Unit Rp 995,236.29 1,990,472.58
1.00 Unit Rp 875,096.12 875,096.12
4.00 Unit Rp 1,060,116.33 4,240,465.33
3.00 Unit Rp 203,548.16 610,644.48
6.00 Unit Rp 388,154.84 2,328,929.06
4.00 Unit Rp 244,610.64 978,442.54
2.00 Unit Rp 263,257.89 526,515.77
Sub Total C PEKERJAAN KUSEN LT. 2 86,569,615.01

618.00 M2 Rp 101,918.75 62,985,787.50


647.50 M' Rp 24,046.50 15,570,108.75
Sub Total D PEKERJAAN PLAFOND LT. 2 78,555,896.25

791.80 M2 Rp 140,472.50 111,226,125.50


791.80 M2 Rp 21,487.75 17,014,000.45
84.00 m' Rp - -
200.60 M2 Rp 43,757.50 8,777,754.50
211.90 M2 Rp 431,940.00 91,528,086.00
168.00 M2 Rp 101,918.75 17,122,350.00
Sub Total E PEKERJAAN KAP / ATAP LT. 2 245,668,316.45
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
4.00 Unit Rp 786,904.75 3,147,619.00
4.00 Bh Rp - -
4.00 Bh Rp 26,105.00 104,420.00
4.00 Unit Rp 551,137.50 2,204,550.00
2.00 Unit Rp - -
Sub Total F PEKERJAAN SANITAIR LT. 2 5,456,589.00

1,181.72 M2 Rp 59,588.40 70,416,804.05


1,067.20 M2 Rp 14,858.00 15,856,457.60
618.00 M2 Rp 14,858.00 9,182,244.00
272.50 M2 Rp 61,750.00 16,826,875.00
27.00 M2 Rp 30,875.00 833,625.00
Sub Total G PEKERJAAN PENGECATAN LT. 2 113,116,005.65
B TOTAL E 1,828,883,094.03

62.00 m' Rp 19,989.30 1,239,336.60


24.00 m' Rp 19,989.30 479,743.20
22.20 m' Rp 19,989.30 443,762.46
2.00 Bh Rp 2,277,294.07 4,554,588.15
7.00 Bh Rp 26,105.00 182,735.00

44.00 m' Rp 19,989.30 879,529.20


8.00 m' Rp 19,989.30 159,914.40
15.00 m' Rp 19,989.30 299,839.50
5.00 Bh Rp 26,105.00 130,525.00
8.00 Unit Rp 26,105.00 208,840.00
otal A PEKERJAAN INSTALASI AIR KOTOR, BEKAS LT. 1 & 2 8,239,448.51

6.00 m' Rp 19,989.30 119,935.80


18.00 m' Rp 19,989.30 359,807.40

12.00 m' Rp 19,989.30 239,871.60


TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
Sub Total B PEKERJAAN INSTALASI AIR BERSIH LT. 1 & 2 719,614.80
B TOTAL F 9,887,518.11

1.00 bh Rp 1,413,637.50 1,413,637.50


110.00 Ttk Rp 223,617.50 24,597,925.00
73.00 Ttk Rp 355,580.00 25,957,340.00
2.00 bh Rp 323,293.75 646,587.50
105.00 bh Rp 237,043.75 24,889,593.75
5.00 bh Rp 214,043.75 1,070,218.75
38.00 bh Rp 86,537.50 3,288,425.00
30.00 bh Rp 79,925.00 2,397,750.00
5.00 bh Rp 74,175.00 370,875.00

1.00 bh Rp 321,137.50 321,137.50


96.00 Rp 223,617.50 21,467,280.00
125.00 Rp 355,580.00 44,447,500.00
92.00 bh Rp 242,793.75 22,337,025.00
4.00 bh Rp 214,043.75 856,175.00
71.00 bh Rp 86,537.50 6,144,162.50
44.00 bh Rp 79,925.00 3,516,700.00
10.00 bh Rp 74,175.00 741,750.00
AN INSTALASI PENERANGAN DAN KOTAK KONTAK LT. 1 & 2 184,464,082.50

1.00 bh Rp 321,137.50 321,137.50


7.00 bh Rp 5,266,950.00 36,868,650.00
3.00 bh Rp 3,766,950.00 11,300,850.00
6.00 bh Rp 25,000,000.00 150,000,000.00
18.50 m' Rp 50,000.00 925,000.00

1.00 bh Rp 321,137.50 321,137.50


13.00 bh Rp 5,266,950.00 68,470,350.00
13.00 bh Rp 3,766,950.00 48,970,350.00
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
29.00 bh Rp 50,000.00 1,450,000.00
PEKERJAAN INSTALASI AC / TATA UDARA LT. 1 & 2 318,627,475.00

1.00 bh Rp 1,500,000.00 1,500,000.00


26.00 bh Rp 719,555.00 18,708,430.00
7.00 bh Rp 150,000.00 1,050,000.00

1.00 bh Rp 1,500,000.00 1,500,000.00


28.00 bh Rp 719,555.00 20,147,540.00
23.00 bh Rp 150,000.00 3,450,000.00
PEKERJAAN INSTALASI CEILLING SPEAKER LT. 1 & 2 46,355,970.00

1.00 bh Rp 7,500,000.00 7,500,000.00


10.00 ttk Rp 100,000.00 1,000,000.00
10.00 unit Rp 500,000.00 5,000,000.00

1.00 bh Rp 7,500,000.00 7,500,000.00


21.00 ttk Rp 100,000.00 2,100,000.00
21.00 unit Rp 500,000.00 10,500,000.00
AN INSTALASI TITIK OUTLET TELP & DATA KONTAK LT. 1 & 2 33,600,000.00

1.00 bh Rp 500,000.00 500,000.00


26.00 bh Rp 171,867.50 4,468,555.00
26.00 bh Rp 306,043.75 7,957,137.50
1.00 Set Rp 1,000,000.00 1,000,000.00

1.00 bh Rp 500,000.00 500,000.00


28.00 bh Rp 171,867.50 4,812,290.00
28.00 bh Rp 306,043.75 8,569,225.00
1.00 Set Rp 1,000,000.00 1,000,000.00
AAN INSTALASI SMOKE DETECTOR & FIRE ALARM LT. 1 & 2 28,807,207.50
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

1.00 set Rp 50,000,000.00 50,000,000.00


40.00 m' Rp 50,000.00 2,000,000.00
16.00 m' Rp - -
1.00 Set Rp 1,500,000.00 1,500,000.00
PEKERJAAN INSTALASI PENANGKAL PETIR 53,500,000.00

2.00 TTK Rp 1,500,000.00 3,000,000.00


SISTEM PEMADAM KEBAKARAN 3,000,000.00
B TOTAL G 668,354,735.00

19.00 M2 Rp 164,881.25 3,132,743.75


870.08 M2 Rp 431,940.00 375,822,355.20
62.40 M2 Rp - -
15.60 M2 Rp - -
10.80 M2 Rp - -

41.92 M2 Rp 73,887.50 3,097,364.00


20.20 M2 Rp 85,473.75 1,726,569.75
41.92 M2 Rp 199,438.75 8,360,472.40
1.00 Ls Rp 10,000,000.00 10,000,000.00
b Total H 402,139,505.10

REKAPITULASI TOTAL

s Pekerjaan Jumlah Harga


( Rp )
2 3
4,568,835.00
51,905,523.21
382,575,787.05
866,867,135.68
1,828,883,094.03
9,887,518.11
668,354,735.00
TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6
402,139,505.10
ST TOTAL 4,215,182,133.19
ENGENERING ESTIMATE GUDANG

SATUAN KERJA : BADAN PENANAMAN MODAL DAN PELAYANAN PERIJINAN TERPADU (BPMP2T)
PEKERJAAN : PEMBANGUNAN GUDANG
TAHUN ANGGARAN : 2014
PROVINSI : PAPUA BARAT

No Jenis Pekerjaan VOLUME

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemesangan Bouwplank 64.500

II PEKERJAAN TANAH, PASIR DAN PASANGAN


1 Galian Tanah Pondasi Menerus 16.00
2 Urugan Tanah Kembali 5.33
3 Urugan Tanah Peninggian Lantai 58.50
4 Urugan Pasir Bawah Pondasi 0.32
5 Urugan Pasir Bawah Lantai 17.55
6 Pasang Pondasi Batu Kosong 4.80
7 Pasang Pondasi Batu Kali Camp. 1 : 4 12.60
8 Pasangan Dinding Batu Tela Camp. 1 : 4 158.00
9 Plesteran dinding Camp. 1:4 265.70
10 Acian 265.70

III PEKERJAAN BETON


1 a. Pondasi Footplat 12 buah
- Beton K 250 2.30
- Begesting 15.36
- Pembesian 6D12, Ø8-150 346.07
b. Kolom Pedestal 12 buah
- Beton K 250 1.13
- Begesting Kolom 18.00
- Pembesian 6D12, Ø8-150 554.85
2 Sloof
Sloof 20x30cm (S1)
- Beton K 250 2.40
- Begesting Sloof 24.00
- Pembesian 6D12, Ø8-150 477.72
3 Kolom 25x25cm (K1)
- Beton K 250 3.19
- Begesting Kolom 51.00
- Pembesian 6D12, Ø8-150 1,572.07
4 Ring Balk 15/20
- Beton K 250 2.04
- Begesting Balok 21.08
- Pembesian 6D12, Ø8-150 464.57

IV PEKERJAAN KAYU DAN PASANGAN PINTU


1 Pek. Pasang kuda-kuda Kayu Besi 5/10 1.7
2 Pasang Balok Gording Kayu Matoa 5/10 0.98
3 Pek. Kusen Pintu , Jendela dan ventilasi 0.23
4 Pek. Jendela Jalusi ky besi 5.022
5 Pintu Harmonika 2.00
6 Pasang Listplank Papan Kayu 2/25 51.00

V PEKERJAAN ATAP DAN PLAFOND


1 Pek. Pasang Atap Spandek 147.00
2 Pasang Rangka Plafond Kayu Klass II 147.00
3 Pasang Plafond GRC 147.00

VI PEKERJAAN LANTAI DAN KERAMIK


1 Cor Lantai Beton k.125 t=7cm 8.19
2 Pas. Lantai Keramik 30/30 (Dalam ruang dan teras) 117.00

VIII PEKERJAAN PENGECATAN


1 Cat Dinding Tembok Exterior 265.70
2 Cat Plafond 147.00
3 Cat Kusen Pintu ,Jendela dan Ventilasi dengan cat Warna Kayu 4.51
4 Cat Listplank Kayu Besi dengan Cat Warna Kayu 17.85

IX PEKERJAAN INSTALASI LISTRIK


1 Instalasi Penerangan 10.00
2 Instalasi Kotak kontak Biasa 6.00
3 Pasang Stop Kontak 4.00
4 Saklar Ganda 2.00
5 SL 18 Watt 10.00
6 Box Limits 1.00

X PEKERJAAN AKHIR
1 Pembersihan dan Perapihan 1.00

REKAPITULASI
No Jenis Pekerjaan
1 2

I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH, PASIR DAN PASANGAN
III PEKERJAAN BETON
IV PEKERJAAN KAYU DAN PASANGAN PINTU
V PEKERJAAN ATAP DAN PLAFOND
VI PEKERJAAN LANTAI DAN KERAMIK
VIII PEKERJAAN PENGECATAN
IX PEKERJAAN INSTALASI LISTRIK
X PEKERJAAN AKHIR
REAL COST TOTAL
MATE GUDANG

AN PERIJINAN TERPADU (BPMP2T)

SAT. HARGA SATUAN JUMLAH

M' 40,077.50 Rp 2,584,998.75


JUMLAH I Rp 2,584,998.75

M3 123,337.50 Rp 1,973,400.00
M3 35,052.00 Rp 186,944.00
M3 49,335.00 Rp 2,886,097.50
M3 49,335.00 Rp 15,787.20
M3 49,335.00 Rp 865,829.25
M3 332,120.00 Rp 1,594,176.00
M3 665,453.25 Rp 8,384,710.95
m2 73,887.50 Rp 11,674,225.00
M2 85,473.75 Rp 22,710,375.38
56,982.50 Rp 15,140,250.25
JUMLAH II Rp 65,431,795.53

m3 Rp 342,918.50 Rp 790,084.22
m2 Rp 147,878.50 Rp 2,271,413.76
kg Rp 2,819.23 Rp 975,652.13

m3 Rp 342,918.50 Rp 385,783.31
m2 Rp 188,042.25 Rp 3,384,760.50
kg Rp 2,819.23 Rp 1,564,242.93

m3 Rp 342,918.50 Rp 823,004.40
m2 Rp 148,154.50 Rp 3,555,708.00
kg Rp 2,819.23 Rp 1,346,812.35

m3 Rp 342,918.50 Rp 1,093,052.72
m2 Rp 188,042.25 Rp 9,590,154.75
kg Rp 2,819.23 Rp 4,432,021.64

m3 Rp 342,918.50 Rp 699,553.74
m2 Rp 188,042.25 Rp 3,963,930.63
kg Rp 2,819.23 Rp 1,309,718.20
JUMLAH III. Rp 36,185,893.28

M3 Rp 3,456,900.00 Rp 5,876,730.00
M3 Rp 2,074,140.00 Rp 2,032,657.20
M3 Rp 6,084,075.00 Rp 1,371,983.25
M2 Rp 864,225.00 Rp 4,340,137.95
Unit Rp 13,050,000.00 Rp 26,100,000.00
M' Rp 63,250.00 Rp 3,225,750.00
JUMLAH IV Rp 42,947,258.40

M2 Rp 21,487.75 Rp 3,158,699.25
M2 Rp 103,327.50 Rp 15,189,142.50
M2 Rp 101,918.75 Rp 14,982,056.25
JUMLAH V Rp 33,329,898.00

M3 Rp 249,205.00 Rp 2,040,988.95
M2 Rp 199,438.75 Rp 23,334,333.75
JUMLAH VI Rp 25,375,322.70

M2 Rp 59,588.40 Rp 15,832,637.88
M2 36,420.50 Rp 5,353,813.50
M2 14,904.00 Rp 67,218.23
M2 14,904.00 Rp 266,036.40
JUMLAH VIII Rp 21,519,706.01

Titik 223,617.50 Rp 2,236,175.00


Titik 355,580.00 Rp 2,133,480.00
Titik 86,537.50 Rp 346,150.00
Titik 79,925.00 Rp 159,850.00
Titik 93,293.75 Rp 932,937.50
Titik 321,137.50 Rp 321,137.50
JUMLAH IX Rp 6,129,730.00

Ls 2,000,000.00 Rp 2,000,000.00
JUMLAH X Rp 2,000,000.00

ULASI
Jumlah Harga
3

2,584,998.75
65,431,795.53
36,185,893.28
42,947,258.40
33,329,898.00
25,375,322.70
21,519,706.01
6,129,730.00
2,000,000.00
235,504,602.67
ENGENERING ESTIMATE RUMAH PENJAGA
SATUAN KERJA : BADAN PENANAMAN MODAL DAN PELAYANAN PERIJINAN TERPADU (BPMP2T)
PEKERJAAN : PEMBANGUNAN RUMAH JAGA
TAHUN ANGGARAN : 2015
PROVINSI : PAPUA BARAT

No Jenis Pekerjaan VOLUME SAT.

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemesangan Bouwplank 32.000 M'

II PEKERJAAN TANAH, PASIR DAN PASANGAN


1 Galian Tanah Pondasi 24.36 M3
2 Urugan Tanah Kembali 8.12 M3
3 Urugan Tanah Peninggian Lantai 21.25 M3
4 Urugan Pasir Bawah Pondasi 3.40 M3
5 Urugan Pasir Bawah Lantai 6.38 M3
6 Pasang Pondasi Batu Kosong 4.59 M3
7 Pasang Pondasi Batu Kali Camp. 1 : 4 18.71 M3
8 Pasangan Dinding Batu Tela Camp. 1 : 4 147.84 m2
9 Plesteran dinding Camp. 1:4 295.68 M2
10 Acian 295.68 M2

III PEKERJAAN BETON


1 Pek. Cor Sloof Beton 15/20 Beton K.175
- Beton Praktis 1.40 M3
- Begesting Sloof 4.68 M2
- Pembesian 4D12, Ø8-150 319.39 Kg
2 Pek. Cor Kolom Beton 15/20 Beton K. 175
- Beton Praktis 0.21 M3
- Begesting Kolom 1.05 M2
- Pembesian 4D12, Ø8-150 47.82 Kg
3 Pek. Cor Kolom Praktis 12/12 Beton K. 175
- Beton Praktis 0.71 M3
- Begesting Kolom 5.88 M2
- Pembesian 4Ø12, Ø8-100 283.66 Kg
4 Pek. Cor Ring Balok Beton 12/15 Beton K175
- Beton Praktis 1.12 M3
- Begesting Kolom 3.27 M2
- Pembesian 4Ø12, Ø8-100 319.39 Kg
5 Pek. Cor Plat Beton Teras Tbl 10 Cm Beton K. 250
- Beton K 250 0.41 M3
- Begesting Plat 2.06 M2
- Pembesian Ø10-100, Ø8-100 46.51 Kg

IV PEKERJAAN KAYU DAN KACA


1 Pek. Pasang kuda-kuda Kayu Besi 5/10 1.15 M3
2 Pasang Balok Gording Kayu Matoa 5/10 0.64 M3
3 Pek. Kusen Pintu , Jendela dan ventilasi 0.65 M3
4 Pek. Jendela Panil kaca Bening 5 mm 3.88 M2
5 Pek. Pasang kaca Bening 5 mm 3.88 M2
6 Pek. Pintu Panil 8.00 M2
7 Pasang Listplank Papan Kayu 2/25 51.00 M'

V PEKERJAAN ATAP DAN PLAFOND


1 Pek. Pasang Atap Spandek 95.00 M2
2 Pek. Pasang Bubungan Nok Seng Plat BJLS 0.30 8.00 M'
3 Pasang Rangka Plafond kayu matoa 95.00 M2
4 Pasang Plafond GRC 95.00 M2

VI PEKERJAAN LANTAI DAN KERAMIK


1 Cor Lantai Beton k.125 t=7cm 3.27 M3
2 Pas. Lantai Keramik 30/30 (Dalam ruang dan teras) 43.94 M2
3 Pas. Keramik Anti Slip 20/20 (KM/WC) 2.81 M2
4 Pas. Dinding Keramik 20/25 (KM/WC) 4.90 M2

VII PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pasang Ensel H- 4" Untuk Pintu 5.00 Bh
2 Pasang Ensel H- 3" Untuk Jendela 6.00 Bh
3 Kunci Pintu Tanam 2 Slaag 5.00 Bh
4 Pasang Hak Angin 6.00 Bh
5 Pasang Grendel Jendela 6.00 Bh

VIII PEKERJAAN PENGECATAN


1 Cat Dinding Tembok 295.68 M2
2 Cat Plafond 95.00 M2
3 Cat Kusen Pintu ,Jendela dan Ventilasi dengan cat Warna Kayu 12.96 M2
4 Cat Listplank Kayu Besi dengan Cat Warna Kayu 17.85 M2
5 Cat Jendela Panil Kaca 3.88 M2
6 Cat Daun Pintu 16.80 M2

IX PEKERJAAN INSTALASI LISTRIK


1 Instalasi Penerangan 7.00 Titik
2 Instalasi Kotak kontak Biasa 4.00 Titik
3 Pasang Stop Kontak 4.00 Titik
4 Saklar Tunggal 3.00 Titik
5 Saklar Ganda 2.00 Titik
6 Lampu SL 18 Watt 7.00 Titik
7 Box Limits 1.00 Titik

X PEKERJAAN SANITAIR
1 Septictank + Peresapan 1.00 Unit
2 Pasang Kitchensink 1.00 Bh
2 Pasang Kloset Jongkok 1.00 Bh
3 Pasang Pipa Air Bersih PVC dia 3/4 " 15.00 M'
4 Pasang Pipa Air Kotor PVC dia 4" 4.00 M'
5 Pasang Pipa Air Kotor PVC dia 3 " 4.00 M'
6 Pasang Floor Drain 1.00 Bh
7 Pasang Kran Air 3/4" 2.00 Bh
8 Pembersihan Akhir 1.00 Ls
REKAPITULASI
No Jenis Pekerjaan

1 2
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH, PASIR DAN PASANGAN
III PEKERJAAN BETON
IV PEKERJAAN KAYU DAN KACA
V PEKERJAAN ATAP DAN PLAFOND
VI PEKERJAAN LANTAI DAN KERAMIK
VII PEKERJAAN PENGGANTUNG DAN PENGUNCI
VIII PEKERJAAN PENGECATAN
IX PEKERJAAN INSTALASI LISTRIK
X PEKERJAAN SANITAIR
REAL COST TOTAL
MAH PENJAGA
RIJINAN TERPADU (BPMP2T)
JLH KOLOM 20/20
PANJANG SLOOF 15/20
panjang ring balk 12/15

HARGA SATUAN JUMLAH

Rp 40,077.50 Rp 1,282,480.00
JUMLAH I Rp 1,282,480.00
###
Rp 123,337.50 Rp 3,004,501.50
Rp 35,052.00 Rp 284,622.24
Rp 49,335.00 Rp 1,048,368.75
Rp 49,335.00 Rp 167,739.00
Rp 49,335.00 Rp 314,510.63
Rp 332,120.00 Rp 1,525,676.25
Rp 665,453.25 Rp 12,447,303.04
Rp 73,887.50 Rp 10,923,528.00
Rp 85,473.75 Rp 25,272,878.40
Rp 56,982.50 Rp 16,848,585.60
JUMLAH II Rp 71,837,713.41

###
Rp 342,918.50 Rp 480,943.20
Rp 148,154.50 Rp 692,622.29
Rp 2,819.23 Rp 900,431.26

Rp 342,918.50 Rp 72,012.89
Rp 188,042.25 Rp 197,444.36
Rp 2,819.23 Rp 134,823.93
###
Rp 342,918.50 Rp 241,963.29
Rp 188,042.25 Rp 1,105,688.43
Rp 2,819.23 Rp 799,713.02

Rp 342,918.50 Rp 384,754.56
Rp 188,042.25 Rp 615,368.26
Rp 2,819.23 Rp 900,431.26
###
Rp 342,918.50 Rp 141,453.88
Rp 188,042.25 Rp 387,837.14
Rp 2,819.23 Rp 131,117.49
JUMLAH III. Rp 7,186,605.27
###
Rp 3,456,900.00 Rp 3,982,348.80
Rp 2,074,140.00 Rp 1,327,449.60
Rp 6,084,075.00 Rp 3,942,480.60
Rp 691,380.00 Rp 2,682,554.40
Rp 37,294.50 Rp 144,702.66
Rp 864,225.00 Rp 6,909,478.88
Rp 63,250.00 Rp 3,225,750.00
JUMLAH IV Rp 22,214,764.94

Rp 21,487.75 Rp 2,041,336.25
Rp 21,487.75 Rp 171,902.00
Rp 103,327.50 Rp 9,816,112.50
Rp 101,918.75 Rp 9,682,281.25
JUMLAH V Rp 21,711,632.00

Rp 249,205.00 Rp 815,523.36
Rp 199,438.75 Rp 8,763,338.68
Rp 199,438.75 Rp 560,921.48
Rp 256,421.25 Rp 1,256,464.13
JUMLAH VI Rp 11,396,247.65

Rp 37,294.50 Rp 186,472.50
Rp 24,863.00 Rp 149,178.00
Rp 108,905.00 Rp 544,525.00
Rp 37,294.50 Rp 223,767.00
Rp 37,294.50 Rp 223,767.00
JUMLAH VII Rp 1,327,709.50

Rp 59,588.40 Rp 17,619,098.11
Rp 36,420.50 Rp 3,459,947.50
Rp 14,904.00 Rp 193,155.84
Rp 14,904.00 Rp 266,036.40
Rp 14,904.00 Rp 57,827.52
Rp 14,904.00 Rp 250,387.20
JUMLAH VIII Rp 21,846,452.57

Rp 223,617.50 Rp 1,565,322.50
Rp 355,580.00 Rp 1,422,320.00
Rp 86,537.50 Rp 346,150.00
Rp 74,175.00 Rp 222,525.00
Rp 79,925.00 Rp 159,850.00
Rp 93,293.75 Rp 653,056.25
Rp 321,137.50 Rp 321,137.50
JUMLAH IX Rp 4,690,361.25

Rp 2,277,294.07 Rp 2,277,294.07
Rp 74,589.00 Rp 74,589.00
Rp 786,904.75 Rp 786,904.75
Rp 19,989.30 Rp 299,839.50
Rp 19,989.30 Rp 79,957.20
Rp 19,989.30 Rp 79,957.20
Rp 26,105.00 Rp 26,105.00
Rp 26,105.00 Rp 52,210.00
Rp 2,000,000.00 Rp 2,000,000.00
JUMLAH X Rp 5,676,856.72
Jumlah Harga

3
1,282,480.00
71,837,713.41
7,186,605.27
22,214,764.94
21,711,632.00
11,396,247.65
1,327,709.50
21,846,452.57
4,690,361.25
5,676,856.72
169,170,823.30
ENGENERING ESTIMATE

KEGIATAN Err:509
PEKERJAAN PEMBANGUNAN RUMAH GENSET
LOKASI KOMPLEX PERKANTORAN GUBERNUR ARFAI
TAHUN ANGGARAN 2014

No Jenis Pekerjaan Volume Satuan

1 2 3 4

A PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bowplank 16.000 Ls
Sub Total A
B PEKERJAAN TANAH
1 Galian pondasi, saluran & galian perataan peil 14.322 m3
2 Urugan Tanah Kembali 1.080 m3
3 Urugan Pasir Bawah Pondasi dan Lantai 2.025 m3
Sub Total B
C PEKERJAAN PONDASI
1 Pasang Aanstamping batu kali 1.228 m3
2 Pasangan batu kali 1 pc : 4psr 12.144 m3
Sub Total C
D PEKERJAAN PASANGAN / BETON
1 Cor sloof 20/30
- Beton Praktis 0.72 m3
- Begesting Sloof 3.60 m2
- Pembesian 6D12, Ø8-150 80.40 kg
2 Cor kolom 12/12
- Beton Praktis 0.05 m3
- Begesting kolom 0.78 m2
- Pembesian 4D12, Ø8-150 57.72 kg
3 Cor ringbalk 12/20
- Beton Praktis 0.22 m3
- Begesting balok 1.56 m2
- Pembesian 6D12, Ø8-150 80.40 kg
4 Pasangan batu tela 1 pc : 4 psr 32.350 m2
5 Plesteran 1 pc : 4 psr 64.700 m2
6 Cor lantai beton 1 pc : 3 psr : 5 krl tebal 20 cm 3.200 m3
Sub Total D
E PEKERJAAN ATAP DAN PLAFON
1 Kuda-kuda kayu besi (5/10 cm) 0.390 m3
2 Gording kayu Matoa (5/10 cm) 0.378 m3
3 Atap Spandek 26.097 m2
4 Nok Galvalum 11.000 m'
5 Papan listplank kayu besi 16.000 m2
6 Rangka Plafond Kayu Matoa 5/10 17.760 m2
7 Plafond GRC 17.760 m2
8 List Plafond Gibsum 14.600 m'
Sub Total E
F PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Kusen Pintu, Jendela dan Ventilasi kayu besi 6/12 cm 0.120 m3
2 Pintu panil kayu besi 2.520 m2
3 Jalusi Kayu Besi 2.330 m2
Sub Total F
G PEKERJAAN PENGECATAN
1 Cat kayu mengkilat (bidang permukaan kayu) 8.120 m2
2 Cat plafond 17.760 m2
3 Cat dinding tembok 64.700 m2
Sub Total G
H PEKERJAAN INSTALASI LISTRIK
1 Titik instalasi lampu + armateure 3.000 titik
2 Titik stop kontak 1.000 titik
3 Lampu SL 18 Watt 3.000 titik
4 Stop Kontak 1.000 titik
5 Saklar Ganda 1.000 titik
6 Saklar Tunggal 1.000 titik
Sub Total H
I PEKERJAAN ALAT GANTUNG DAN PENGUNCI
1 Kunci tanam 2 slaag 1.000 set
2 Engsel pintu ring nylon 3.000 set
Sub Total I

REKAPITULASI

No Jenis Pekerjaan

1 2
A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN PASANGAN / BETON
E PEKERJAAN ATAP DAN PLAFON
F PEKERJAAN KUSEN, PINTU DAN JENDELA
G PEKERJAAN PENGECATAN
H PEKERJAAN INSTALASI LISTRIK
I PEKERJAAN ALAT GANTUNG DAN PENGUNCI
REAL COST RUMAH GENSET
STIMATE

RFAI

Harga Satuan Jumlah Harga


( Rp ) ( Rp )
5 6

40,077.50 641,240.00
641,240.00

123,337.50 1,766,439.68
35,052.00 37,856.16
49,335.00 99,903.38
1,904,199.21

332,120.00 407,884.88
665,453.25 8,081,264.27
8,489,149.14

342,918.50 246,901.32
148,154.50 533,356.20
2,819.23 226,665.69

342,918.50 16,048.59
188,042.25 146,672.96
2,819.23 162,725.67

342,918.50 74,070.40
188,042.25 293,345.91
2,819.23 226,665.69
73,887.50 2,390,260.63
85,473.75 5,530,151.63
249,205.00 797,456.00
10,644,320.66

3,456,900.00 1,348,191.00
2,074,140.00 782,987.85
21,487.75 560,765.76
21,487.75 236,365.25
63,250.00 1,012,000.00
103,327.50 1,835,096.40
101,918.75 1,810,077.00
24,046.50 351,078.90
7,936,562.16

6,084,075.00 730,089.00
864,225.00 2,177,847.00
864,225.00 2,013,644.25
4,921,580.25

14,904.00 121,020.48
36,420.50 646,828.08
59,588.40 3,855,369.48
4,623,218.04

223,617.50 670,852.50
355,580.00 355,580.00
93,293.75 279,881.25
86,537.50 86,537.50
79,925.00 79,925.00
74,175.00 74,175.00
1,546,951.25

149,178.00 149,178.00
37,294.50 111,883.50
261,061.50

SI

Jumlah Harga
( Rp )
3
641,240.00
1,904,199.21
8,489,149.14
10,644,320.66
7,936,562.16
4,921,580.25
4,623,218.04
1,546,951.25
261,061.50
40,968,282.22
ENGENERING ESTIMATE MENARA AIR DAN GRO

KEGIATAN : Err:509
PEKERJAAN : PEMBANGUNAN MENARA AIR DAN GROUND TANK
LOKASI : KOMPLEX PERKANTORAN GUBERNUR ARFAI
TAHUN ANGGARAN : 2014

No Jenis Pekerjaan

1 2

PEKERJAAN GROUND TANK + Menara Air

1 Pengukuran dan Pemasangan Bowplank


2 Galian
3 Urugan Pasir Tebal 7 cm
4 Cor lantai kerja 1 pc : 3 psr : 5 krl 5 cm
5 Cor Plat lantai tebal 25 cm
- Beton k 250
- Pembesian Ø10-150
6 Cor kolom
- Beton k 250
- Begesting kolom
- Pembesian 4D12, Ø8-150
7 Cor dinding beton 1 pc : 2 psr : 3 krl
- Beton k 250
- Begesting
- Pembesian Ø10-150
8 Cor Plat beton tebal15 cm
- Beton k 250
- Begesting Plat
- Pembesian Ø8-150
9 Penutup Rumah Pompa ( plat baja tebal 3 mm ) + kelengkapan
10 Rangka Menara + Cat ( besi siku 10 & 7 )
11 Tangki air Stainlesstell 2000 L
12 Pompa 400 watt
REAL COST
TIMATE MENARA AIR DAN GROUND TANK

Volume Satuan Harga Satuan Jumlah Harga


( Rp ) ( Rp )
3 4 5 6

16.000 M' 40,077.50 641,240.00


22.500 m3 123,337.50 2,775,093.75
0.630 m3 49,335.00 31,081.05
0.450 m3 249,205.00 112,142.25

2.25 m3 342,918.50 771,566.63


148.80 kg 2,819.23 419,500.68

1.92 m3 342,918.50 658,403.52


4.80 m2 188,042.25 902,602.80
158.88 kg 2,819.23 447,918.47

7.50 m3 342,918.50 2,571,888.75


7.50 m2 147,878.50 1,109,088.75
496.00 kg 2,819.23 1,398,335.60

1.35 m3 342,918.50 462,939.98


4.50 m2 188,042.25 846,190.13
148.80 kg 2,819.23 419,500.68
1.000 ls 150,000.00 150,000.00
1.000 ls 25,000,000.00 25,000,000.00
1.000 ls 7,500,000.00 7,500,000.00
2.000 unit 5,000,000.00 10,000,000.00
REAL COST 56,217,493.02
ANALISA HARGA SATUAN

PROGRAM : PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR


KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN
LOKASI : KOMPLEX PERKANTORAN ARFAI
TAHUN ANGGARAN : 2014

NO. URAIAN PEKERJAAN

1 2

1 1 M' Pengukuran dan Pemasangan Bowplank


Kayu 5/10 m3 0.012
Paku Biasa 2" - 5" kg 0.020
Kayu Papan 2/20 m3 0.007
Tukang Kayu Oh 0.100
Pekerja Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.005

Overhe

2 1 M2 Papan Nama PEKERJAAN( BALITBANG PU 2012 )


Pekerja m3 0.05
Mandor kg 0.005

Papan Kayu Matoa tebal 2cm m3 0.022


Paku biasa 4cm - 7 cm Oh 0.250
Cat kayu Oh 1.000

Overhe
Total (1 m2 Papan
3 1 M2 Pembuatan Direksi Keet
Dolken Kayu dia 8-10/400 btg 1.250
Semen Portland Zak 0.360
NO. URAIAN PEKERJAAN

1 2
Pasir Beton m3 0.030
Koral Beton m3 0.050
Kayu m3 0.186
Paku biasa kg 0.300
Seng gelombang bjls 30 lbr 1.500
tripleks 3mm lbr 1.350
Tukang Kayu Oh 2.000
Pekerja Oh 1.000
Kepala Tukang Oh 0.200
Mandor Oh 0.050

Overhe

4 1 M2 Pembersihan lapangan
Pekerja Oh 0.100
Mandor Oh 0.050

Overhe

5 1m3 Galian Tanah Biasa Menggunakan EXcavator ( BALITBANG PU 2012 )


Tenaga
Pekerja oh 0.0298
Mandor oh 0.0075
Peralatan
Excavator oh 0.0075

Overhe

6 1 M3 Galian Tanah Biasa sedalam 1 meter ( SNI 2008 )


Pekerja Oh 0.750
Mandor Oh 0.025

Overhe

7 1m3 Menggusur dan Membuang Tanah Disekitar Lokasi Menggunakan Buldozer ( BALITBANG PU
NO. URAIAN PEKERJAAN

1 2
Peralatan
Buldozer oh 0.014502

Overhe

8 1 M3 Urugan kembali
Pekerja Oh 0.192
Mandor Oh 0.019

Overhe

9 1 M3 Pembuangan Tanah Sejauh 15 m ( SNI 2008 )


Pekerja Oh 0.330
Mandor Oh 0.010

Overhe

10 1 M3 Urugan Karang (SNI 2008 )


Urugan Batu Karang m3 1.200
Pekerja Oh 0.300
Mandor Oh 0.010

Overhe

11 1 M3 Urugan Sirtu (SNI 2008 )


Urugan Sirtu m3 1.200
Pekerja Oh 0.300
Mandor Oh 0.010

Overhe

12 1 M3 Urugan Tanah Humus (SNI 2008 )


Tanah Humus m3 1.200
Pekerja Oh 0.300
Mandor Oh 0.010
NO. URAIAN PEKERJAAN

1 2

Overhe

13 1 M3 Urugan pasir (SNI 2008 )


Pasir urug m3 1.200
Pekerja Oh 0.300
Mandor Oh 0.010

Overhe

14 1 M3 Biaya Kerja Urugan Tanah(SNI 2008 )


Pasir urug m3 1.200
Pekerja Oh 0.300
Mandor Oh 0.010

Overhe

15 1 M3 Pasang pondasi batu kali ( 1 Pc : 4 Ps ) (Balitbang Pu 2012 )


Batu Kali m3 1.200
Semen portland kg 163.000
Pasir pasang m3 0.520

Tukang batu Oh 0.900


Pekerja Oh 2.703
Kepala Tukang Oh 0.090
Mandor Oh 0.135

Overhe

16 1 M3 Pasang pondasi batu kosong anstamping (Balitbang Pu 2012 )


Batu Kali m3 1.200
Pasir urug m3 0.120

Pekerja Oh 1.400
NO. URAIAN PEKERJAAN

1 2
Tukang batu Oh 0.400
Kepala Tukang Oh 0.040
Mandor Oh 0.080

Overhe

17 1 M2 finishing siar pasangan batu kali adukan 1 PC : 2 Ps (mata sapi) ( sni 2008 )
Semen portland kg 6.34
Pasir pasang m3 0.012
Pekerja Oh 0.300
Tukang batu Oh 0.150
kepala tukang Oh 0.015
Mandor Oh 0.015

Overhe

18 10 cm Pengelasan Besi (sni 2008)


kawat Las Listrik kg 0.4
Solar ltr 0.3
Minyak Pelumas ltr 0.04
Pekerja Oh 0.04
Tukang besi Oh 0.02
Kepala tukang Oh 0.002
Mandor Oh 0.002
sewa alat jam 0.17

Overhe

19 1 kg Pembesian dengan besi polos atau besi ulir (sni 2008)


Besi beton (polos/ulir) kg 1.05
Kawat beton kg 0.015
Pekerja Oh 0.007
Tukang besi Oh 0.007
Kepala tukang Oh 0.0007
NO. URAIAN PEKERJAAN

1 2
Mandor Oh 0.0004

Overhe

20 1 m2 Pasang begisting untuk pondasi (sni 2008)


Kayu Kelas III m3 0.040
Paku biasa 2" - 5" kg 0.300
Minyak begisting lt 0.100
Pekerja Oh 0.520
Tukang kayu Oh 0.260
Kepala tukang Oh 0.0260
Mandor Oh 0.025

Overhe

21 1 m2 Pasang begisting untuk sloof (sni 2008)


Kayu Kelas III m3 0.045
Paku biasa 2" - 5" kg 0.300
Minyak begisting lt 0.100
Pekerja Oh 0.520
Tukang kayu Oh 0.260
Kepala tukang Oh 0.0260
Mandor Oh 0.026

Overhe

22 1 m2 Pasang begisting untuk kolom (sni 2008)


Kayu kelas III m3 0.040
Paku biasa 2" - 5" kg 0.400
Minyak begisting lt 0.200
Balok kayu kelas II m3 0.015
Dolken kayu galam dia 8-10/4m btg 2.000
Pekerja Oh 0.660
Tukang kayu Oh 0.330
Kepala tukang Oh 0.0330
NO. URAIAN PEKERJAAN

1 2
Mandor Oh 0.033

Overhe

23 1 m2 Pasang begisting untuk balok (sni 2008)


Kayu kelas III m3 0.040
Paku biasa 2" - 5" kg 0.400
Minyak begisting lt 0.200
Balok kayu kelas II m3 0.018
plywood tebal 9 mm lbr 0.350
Dolken kayu galam dia 8-10/4m btg 2.000
Pekerja Oh 0.660
Tukang kayu Oh 0.330
Kepala tukang Oh 0.0330
Mandor Oh 0.033

Overhe

24 1 m2 Pasang begisting untuk plat lantai (sni 2008)


Kayu kelas III m3 0.040
Paku biasa 2" - 5" kg 0.400
Minyak begisting lt 0.200
Balok kayu kelas II m3 0.015
plywood tebal 9 mm lbr 0.350
Dolken kayu galam dia 8-10/4m btg 6.000
Pekerja Oh 0.660
Tukang kayu Oh 0.330
Kepala tukang Oh 0.0330
Mandor Oh 0.033

Overhe

25 1 m2 Pasang begisting untuk tangga (sni 2008)


Kayu kelas III m3 0.030
Paku biasa 2" - 5" kg 0.400
NO. URAIAN PEKERJAAN

1 2
Minyak begisting lt 0.150
Balok kayu kelas II m3 0.015
plywood tebal 9 mm lbr 0.350
Dolken kayu galam dia 8-10/4m btg 2.000
Pekerja Oh 0.660
Tukang kayu Oh 0.330
Kepala tukang Oh 0.0330
Mandor Oh 0.033

Overhe

26 1 m3 Pasang Kuda2 Kayu Besi (sni 2008)


Balok Kayu Besi m3 1.100
Paku biasa 2" - 5" kg 5.600
Besi Strip kg 15.000
Pekerja Oh 4.000
Tukang kayu Oh 12.000
Kepala tukang Oh 1.2000
Mandor Oh 0.2

Overhe

27 1 m3 Pasang Gording Kayu Matoa (sni 2008)


Balok Kayu Matoa m3 1.100
Paku biasa 2" - 5" kg 3.000
Besi Strip kg 15.000
Pekerja Oh 2.400
Tukang kayu Oh 7.200
Kepala tukang Oh 0.7200
Mandor Oh 0.12

Overhe

28 1 m' Pasang Listplank Kayu Besi (sni 2008)


Papan Kayu Besi m3 0.011
NO. URAIAN PEKERJAAN

1 2
Paku biasa 2" - 5" kg 0.050
Pekerja Oh 0.100
Tukang kayu Oh 0.200
Kepala tukang Oh 0.0200
Mandor Oh 0.005

Overhe

29 1 m2 Pasang Rangka Plafon Kayu Matoa (sni 2008)


Kayu Matoa m3 0.0163
Paku biasa 2" - 5" kg 0.250
Pekerja Oh 0.200
Tukang kayu Oh 0.300
Kepala tukang Oh 0.0300
Mandor Oh 0.01

Overhe

30 1 M3 membuat lantai kerja beton tumbuk , 1 Pc : 3 Ps : 5 Kr ( sni 2008 )


Semen portland Kg 230.000
Pasir beton kg 893.0000
Koral beton kg 1,027.0000
air Ltr 200.000
Pekerja Oh 1.2000
Tukang batu Oh 0.2000
Kepala Tukang Oh 0.0200
Mandor Oh 0.0600

Overhe

31 1 m3 beton dengan mutu K 250 (sni 2008 )


Semen PC Kg 384.000
Pasir beton kg 692.000
Koral beton/ batu pecah diameter 2-3cm kg 1039.000
air Ltr 215.000
NO. URAIAN PEKERJAAN

1 2
Pekerja Oh 1.6500
Tukang batu Oh 0.2750
Kepala tukang Oh 0.0280
Mandor Oh 0.0830

Overhe

32 1 m3 beton dengan mutu K 300 ( sni 2008 )


Semen PC Kg 439.000
Pasir beton kg 670.000
Koral beton/ batu pecah diameter 2-3cm kg 1006.000
air Ltr 215.000
Pekerja Oh 2.1000
Tukang batu Oh 0.3500
Kepala tukang Oh 0.0350
Mandor Oh 0.1050

Overhe

33 1 m3 beton dengan mutu K 175 untuk beton praktis ( sni 2008 )


Semen PC Kg 326.000
Pasir beton kg 760.0000
Koral beton/ batu pecah diameter 2-3cm kg 1,029.0000
air Ltr 215.0000
Pekerja Oh 1.6500
Tukang batu Oh 0.2750
Kepala tukang Oh 0.0280
Mandor Oh 0.0830

Overhe

34 1 M2 Pasang Batu Tela 1Pc : 4Psr tebal 1/2 bata ( konversi dari pas. 1/2 batu tela di sni 2008 )
Batu Tela 7x14x28 ( konversi dari batu tela 5 x 11 x 22 ) BH 21.000
Semen PC 50 Kg kg 11.500
Pasir pasang M3 0.0430
NO. URAIAN PEKERJAAN

1 2
Tukang Batu HO 0.100
Kepala Tukang HO 0.010
Pekerja HO 0.300
Mandor HO 0.015

Overhe

35 1 M2 Pasang Batu Tela 1Pc :3Psr tebal 1/2 bata ( konversi dari pas. 1/2 batu tela di sni 2008 )
Batu Tela 7x14x28 ( konversi dari batu tela 5 x 11 x 22 ) BH 21.000
Semen PC 50 Kg kg 14.370
Pasir pasang M3 0.0400
Tukang Batu HO 0.100
Kepala Tukang HO 0.010
Pekerja HO 0.300
Mandor HO 0.015

Overhe

36 1 M2 Pasang Batu Tela hebel 1Pc : 4Psr ( konversi dari pas 1 batu tela di sni 2008 )
Batu Tela 10x20x50 (hebel) ( konversi dari batu tela 5 x 11 x 22 ) BH 11.000
Semen PC 50 Kg kg 26.550
Pasir pasang M3 0.0930
Tukang Batu HO 0.200
Kepala Tukang HO 0.020
Pekerja HO 0.600
Mandor HO 0.030

Overhe

37 1 M2 Pasang Batu Tela hebel 1Pc : 3Psr ( konversi dari pas 1 batu tela di sni 2008 )
Batu Tela 10x20x50 (hebel) ( konversi dari batu tela 5 x 11 x 22 ) BH 11.000
Semen PC 50 Kg kg 32.950
Pasir pasang M3 0.0910
Tukang Batu HO 0.200
Kepala Tukang HO 0.020
NO. URAIAN PEKERJAAN

1 2
Pekerja HO 0.600
Mandor HO 0.030

Overhe

38 1 M2 Plesteran Beton 1 Pc : 2 Ps , tebal 15 mm (sni 2008 )


Semen portland KG 10.224
Pasir pasang m3 0.02
Pekerja Oh 0.300
Tukang batu Oh 0.150
kepala tukang Oh 0.015
Mandor Oh 0.015

Overhe

39 1 M2 Plesteran 1 Pc : 3 Ps , tebal 15 mm (sni 2008 )


Semen portland KG 7.776
Pasir pasang m3 0.019
Pekerja Oh 0.300
Tukang batu Oh 0.150
kepala tukang Oh 0.015
Mandor Oh 0.015

Overhe

40 1 M2 Plesteran 1 Pc : 4 Ps , tebal 15 mm (sni 2008 )


Semen portland KG 6.24
Pasir pasang m3 0.024
Pekerja Oh 0.300
Tukang batu Oh 0.150
kepala tukang Oh 0.015
Mandor Oh 0.015

Overhe
NO. URAIAN PEKERJAAN

1 2

41 1 M2 Plesteran 1 Pc : 4 Ps , tebal 40 mm (conversi koefisien plesteran 20mm sni 2008 dikali 2 )


Semen portland KG 16.64
Pasir pasang m3 0.064
Pekerja Oh 0.800
Tukang batu Oh 0.400
kepala tukang Oh 0.040
Mandor Oh 0.044

Overhe

42 1 M2 Plesteran Ciprat / Kamprot 1 Pc : 2 Ps , (sni 2008 )


Semen portland KG 4.32
Pasir pasang m3 0.006
Pekerja Oh 0.300
Tukang batu Oh 0.100
kepala tukang Oh 0.010
Mandor Oh 0.015

Overhe

43 1 M2 Acian Dinding ( SNI 2008 )


Semen portland KG 3.2500
Pekerja HO 0.2000
Tukang batu HO 0.1000
kepala tukang HO 0.0100
Mandor HO 0.0100

Overhe

44 1 M2 Floor Lantai, 1 Pc : 2 Ps
Semen portland Kg 0.1600
Pasir Pasang m3 0.0110
Tukang Oh 0.7500
Kepala Tukang Oh 0.0750
NO. URAIAN PEKERJAAN

1 2
Pekerja Oh 0.2000
Mandor Oh 0.1000

Overhe

45 1 m2 Pasang batu alam motif serut bergaris


Batu Alam M2 1.1000
PC Kg 11.7500
Pasir pasang M3 0.0350
Pekerja Kg 0.700
Tukang batu Oh 0.350
Kepala Tukang Oh 0.035
Mandor Oh 0.035

Overhe

46 1 m2 Pasang lantai Granite keramik 60x60 cm


Ubin keramik GRANIT 60X60 m2 1.000
Semen portland Kg 9.600
Pasir pasang M3 0.045
Semen warna Kg 1.500
Pekerja Oh 0.240
Tukang batu Oh 0.120
Kepala tukang Oh 0.012
Mandor Oh 0.012

Overhe

47 1 m2 Pasang lantai Granite keramik 60x60 cm textur kasar


Ubin keramik GRANIT 60X60 texture kasar M2 1.000
Semen portland Kg 9.600
Pasir pasang M3 0.045
Semen warna Kg 1.500
Pekerja Oh 0.240
Tukang batu Oh 0.120
NO. URAIAN PEKERJAAN

1 2
Kepala tukang Oh 0.012
Mandor Oh 0.012

Overhe

48 1 m' Plint Kayu uk 10cm


Papan Ky Besi m3 0.003
Paku Skrup Kg 0.050
Pekerja Oh 0.120
Tukang batu Oh 0.120
Kepala tukang Oh 0.012
Mandor Oh 0.006

Overhe

49 1 m" Pasang Plint keramik 10x60 cm


Ubin keramik GRANIT 60X60 texture kasar bh 1.700
Semen portland Kg 1.140
Pasir pasang M3 0.003
Semen warna Kg 0.100
Pekerja Oh 0.090
Tukang batu Oh 0.090
Kepala tukang Oh 0.009
Mandor Oh 0.005

Overhe

50 1 m' Pasang Plint tangga keramik 15x30 cm


Ubin keramik 15X30 texture kasar ( keramik 30x 30 di bagi 2 ) bh 3.350
Semen portland Kg 1.710
Pasir pasang M3 0.0045
Semen warna Kg 0.150
Pekerja Oh 0.090
Tukang batu Oh 0.090
Kepala tukang Oh 0.009
NO. URAIAN PEKERJAAN

1 2
Mandor Oh 0.005

Overhe

51 1 m2 Pasang lantai km/wc keramik 30x30 cm textur kasar


Ubin keramik 20x20 M2 1.000
Semen portland Kg 10.000
Pasir pasang M3 0.045
Semen warna Kg 1.500
Pekerja Oh 0.700
Tukang batu Oh 0.350
Kepala tukang Oh 0.035
Mandor Oh 0.035

Overhe

52 1 m2 Pasang lantai km/wc keramik 20x20 cm textur kasar


Ubin keramik 20x20 M2 1.000
Semen portland Kg 10.400
Pasir pasang M3 0.045
Semen warna Kg 1.620
Pekerja Oh 0.700
Tukang batu Oh 0.350
Kepala tukang Oh 0.035
Mandor Oh 0.035

Overhe

53 1 m2 Pasang Dinding km/wc keramik 20x25 cm


Ubin keramik 20x20 M2 1.000
Semen portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
Pekerja Oh 0.900
Tukang batu Oh 0.450
NO. URAIAN PEKERJAAN

1 2
Kepala tukang Oh 0.045
Mandor Oh 0.045

Overhe

54 1m2 Plafond GRC 60 x 120 cm + rangka alluminium


Profil Alluminium Hollow M1 3.600
Kawat seng polos Kg 0.150
Ramset/dina bolt Bh 1.000
GRC uk (1200 x 2400 x5) mm Lbr 0.381
Pekerja oh 0.150
Tukang oh 0.250
Kepala tukang oh 0.025
Mandor oh 0.075

Overhe

55 1m2 Plafond GRC di Rangka Kayu


Ramset/dina bolt Bh 1.000
GRC uk (1200 x 2400 x5) mm Lbr 0.381
Pekerja oh 0.150
Tukang oh 0.250
Kepala tukang oh 0.025
Mandor oh 0.075

Overhe

56 1m2 Pasang Dinding Partisi dobel Gybsum


rangka metal stud (MS 100) uk.100x34mm M1 2.000
rangka U runner (U 100) uk.100x30 mm M 1
0.750
Paku Pivet Bh 8.000
Plester Sambungan Gybsum M1 8.000
GRC uk (1200 x 2400 x12) mm lbr 0.770
Tepung gibsum kg 0.800
skrup gibsum bh 20.000
NO. URAIAN PEKERJAAN

1 2
Pekerja oh 0.490
Tukang oh 1.500
Kepala tukang oh 0.150
Mandor oh 0.030

Overhe

57 1m2 Pasang Dinding Allumunium Composit Panel


rangka metal stud (MS 100) uk.100x34mm M1 2.000
rangka U runner (U 100) uk.100x30 mm M1 0.750
Paku Pivet Bh 8.000
Allumunium Composit Panel m2 1.000
skrup bh 20.000
Pekerja oh 0.490
Tukang oh 1.500
Kepala tukang oh 0.150
Mandor oh 0.030

Overhe

58 1m2 Pasang Rangka Atap Baja Ringan


C-75 , 0.8 m' 1.490
C-75 , 0.6 m' 2.232
Baut ( screw driver ) bh 28.000
Dynabolt bh 1.600
Reng 0.43 m' 3.600
Pekerja oh 0.200
Tukang oh 0.450
Kepala tukang oh 0.010
Mandor oh 0.050

Overhe

59 1 M2 Railling Tangga
Rangka Besi Hollow m' 3.460
NO. URAIAN PEKERJAAN

1 2
Perlengkapan paket 1.000
Pekerja Oh 0.025
Tukang Oh 0.500
Mandor Oh 0.003

Overhe

60 1 M2 Pemasangan Pagar BRC


Pekerja Oh 0.3750
Tukang Oh 0.1250
Kepala Tukang Oh 0.0120
Mandor Oh 0.0190

Overhe

61 1 M' Pasang List plank Alucobond lebar 40 cm


Alucobond m2 0.450
skrup bh 8.000
besi strip m' 1.600
Pekerja Oh 0.090
Tukang Oh 0.060
kepala tukang Oh 0.020
Mandor Oh 0.045

Overhe

62 1 M2 Pasang atap spandek 0,35mm


Spandek Galvalum Zincalum 0,35 mm m2 1.1000
Screw Ctex 12-14x50 bh 6.0000
Screw Ctex 10x16-16 bh 2.0000
Pekerja Oh 0.0150
Tukang Oh 0.0750
kepala tukang Oh 0.0080
Mandor Oh 0.0060
NO. URAIAN PEKERJAAN

1 2
Overhe

63 1 M' Pasang Nok Zincalum 0,35 mm


Seng plat BJLS 0.3mm m' 1.0000
Screw Ctex 10x16-16 bh 6.0000
Pekerja Oh 0.0150
Tukang kayu Oh 0.0750
kepala tukang Oh 0.0080
Mandor Oh 0.0060

Overhe

64 1m' List Plafon Gybsum


List plafon gybsum M1 1.050
Tepung Gybsum Kg 0.150
Pekerja oh 0.060
Tukang oh 0.060
Kepala tukang oh 0.006
Mandor oh 0.003

Overhe

65 Memasang 1buah kloset duduk


Kloset duduk Bh 1.0000
Perlengkapan 0.6% harga closed
Pekerja Oh 3.3000
Tukang batu Oh 1.1000
Kepala tukang Oh 0.0110
Mandor Oh 0.1600

Overhe

66 Memasang 1buah kloset jongkok


Kloset Jongkok Bh 1.0000
Perlengkapan 0.6% harga closed
NO. URAIAN PEKERJAAN

1 2
Pekerja Oh 3.3000
Tukang batu Oh 1.1000
Kepala tukang Oh 0.0110
Mandor Oh 0.1600

Overhe

67 Memasang 1 buah wastafel


Wastafel + kran & accesoris Bh 1.0000
Semen kg 6.0000
Pasir pasang M3 0.0100
Pekerja Oh 1.2000
Tukang batu Oh 1.4500
Kepala tukang Oh 0.1500
Mandor Oh 0.1000

Overhe

68 Memasang 1 bh bak cuci / Kitchensink


Kitchensink + water drain & assesoris Bh 1.0000
Pekerja Oh 0.0300
Tukang Oh 0.3000
Kepala tukang Oh 0.0300
Mandor Oh 0.0015

Overhe

69 Memasang 1 bh Kran diameter 3/4" atau 1/2"


Kran air Bh 1.0000
Seal tipe Bh 0.0250
Pekerja Oh 0.0100
Tukang batu Oh 0.1000
Kepala tukang Oh 0.0100
Mandor Oh 0.0050
NO. URAIAN PEKERJAAN

1 2
Overhe

70 Memasang 1 bh Floor drain


Floor drain Bh 1.0000
Pekerja Oh 0.0100
Tukang batu Oh 0.1000
Kepala tukang Oh 0.0100
Mandor Oh 0.0050

Overhe

71 Memasang 1 bh Roof drain


Floor drain Bh 1.0000
Pekerja Oh 0.0100
Tukang batu Oh 0.1000
Kepala tukang Oh 0.0100
Mandor Oh 0.0050

Overhe

72 1 m1 Pasang pipa PVC tipe AW dia 3/4"


Pipa PVC m' 1.2000
Perlengkapan 35% harga pipa 35.00%
Pekerja Oh 0.036
Tukang Oh 0.060
Kepala tukang Oh 0.006
Mandor Oh 0.0018

Overhe

73 1 m1 Pasang pipa PVC tipe AW dia 1"


Pipa PVC m' 1.2000
Perlengkapan 35% harga pipa 35.00%
Pekerja Oh 0.036
Tukang Oh 0.060
NO. URAIAN PEKERJAAN

1 2
Kepala tukang Oh 0.006
Mandor Oh 0.0018

Overhe

74 1 m1 Pasang pipa PVC tipe AW dia 1,5"


Pipa PVC m' 1.2000
Perlengkapan 35% harga pipa 35.00%
Pekerja Oh 0.036
Tukang Oh 0.060
Kepala tukang Oh 0.006
Mandor Oh 0.0018

Overhe

75 1 m1 Pasang pipa PVC tipe AW dia 3"


Pipa PVC m' 1.2000
Perlengkapan 35% harga pipa 35.00%
Pekerja Oh 0.036
Tukang Oh 0.060
Kepala tukang Oh 0.006
Mandor Oh 0.0018

Overhe

76 1 m1 Pasang pipa PVC tipe AW dia 4"


Pipa PVC m' 1.2000
Perlengkapan 35% harga pipa 35.00%
Pekerja Oh 0.036
Tukang Oh 0.060
Kepala tukang Oh 0.006
Mandor Oh 0.0018

Overhe
NO. URAIAN PEKERJAAN

1 2
77 1 m1 Pasang pipa PVC tipe AW dia 6"
Pipa PVC m' 1.2000
Perlengkapan 35% harga pipa 35.00%
Pekerja Oh 0.036
Tukang Oh 0.060
Kepala tukang Oh 0.006
Mandor Oh 0.0018

Overhe

78 Septictank 1.2 x 1.7 cm dalam 140 cm + Peresapan


Peresapan
Galian Tanah M3 1.5386
Buis Beton dia. 60cm bh 2
Urugan pasir m3 0.1413

Septictank
Bouwplank M' 7.0000
Galian Tanah M3 2.8560
Urugan Pasir M3 0.1020
Beton Lantai Kerja 1:3:5 M3 0.1500
Cor Beton K 175 Untuk keseluruhan Plat,Dinding & Alas M3 1.3596
besi tulangan kg 57.5308
bekisting plat m2 2.0400
bekisting dinding m2 4.8300
Pipa PVC 1,5" M' 0.5000
Pipa PVC 4" M' 1.5000

79 1 M2 Mendempul atau menggosok kayu


Dempul jadi Kg 0.0800
Minyak Cat Kg 0.0200
Mandor Oh 0.0025
Pekerja Oh 0.0400
Kepala tukang Oh 0.0040
Tukang cat Oh 0.0400
NO. URAIAN PEKERJAAN

1 2

Overhe

80 1 M2 Pengecatan tembok baru(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Cat Dinding Kg 0.2600
Cat Dasar Putih Kg 0.1000
Cat Plamur Kg 0.1000
Kertas Amplas Lbr 0.0500
Tukang Cat Oh 0.1200
Kepala Tukang Oh 0.0120
Pekerja Oh 0.1880
Mandor Oh 0.0094

Overhe

81 1 M2 Pengecatan tembok lama( 1 lapis cat dasar, 2 lapis cat penutup)


Cat Dasar Putih Kg 0.1200
Cat Penutup Kg 0.1800
Tukang Cat Oh 0.0420
Kepala Tukang Oh 0.0040
Pekerja Oh 0.028
Mandor Oh 0.0030

Overhe

82 1 M2 Pengecatan Plafon
Cat 3 lapis Kg 0.5500
Tukang Cat Oh 0.1000
Kepala Tukang Oh 0.0100
Pekerja Oh 0.080
Mandor Oh 0.0030

Overhe

83 1 M2 Water Proofing Dak


NO. URAIAN PEKERJAAN

1 2
Watter Profing m2 1.0000
Self Aditive membran m2 1.0000
Tukang Cat Oh 0.2500
Kepala Tukang Oh 0.0500
Mandor Oh 0.0250

84 1 M2 Water Proofing coating


Aditive m2 1.0000
Tukang Cat Oh 0.1250
Kepala Tukang Oh 0.0250
Mandor Oh 0.0125

85 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup.
Cat Meni Kg 0.2000
Plamir Kg 0.1500
Cat Dasar Kg 0.1700
Cat Penutup 2 kali Kg 0.2600
Pekerja Oh 0.0700
Tukang cat Oh 0.0090
Kepala tukang Oh 0.0060
Mandor Oh 0.0025

Overhe

86 1 M2 Pengecatan permukaan baja lapis seng (Galbani) secara manual


sistem 1 lapis cat mutakhir dengan tebal 200 um
Cat Kg 0.3000
Pekerja Oh 0.0060
Tukang cat Oh 0.0600
Kepala tukang Oh 0.0120
Mandor Oh 0.0060

Overhe
UAN

AMAN MODAL DAN PERIZINAN TERPADU

HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4

0.00 0.00
0.00 0.00
0.00 0.00
180,000.00 18,000.00
135,000.00 13,500.00
215,000.00 2,150.00
240,000.00 1,200.00
Sub total 34,850.00
Overhead & Profit (15,0%) 5,227.50
jumlah 40,077.50

135,000.00 6,750.00
240,000.00 1,200.00

0.00 0.00
0.00 0.00
0.00 0.00
Sub total 7,950.00
Overhead & Profit (15,0%) 1,192.50
Total (1 m2 Papan Nama Pekerjaan ) 9,142.50

0.00 0.00
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
180,000.00 360,000.00
135,000.00 135,000.00
215,000.00 43,000.00
240,000.00 12,000.00
Sub total 550,000.00
Overhead & Profit (15,0%) 82,500.00
jumlah 632,500.00

135,000.00 13,500.00
240,000.00 12,000.00
Sub total 25,500.00
Overhead & Profit (15,0%) 3,825.00
jumlah 29,325.00

135,000.00 4,023.00
240,000.00 1,800.00

950,000.00 7,125.00
Sub total 12,948.00
Overhead & Profit (15,0%) 1,942.20
JUMLAH 14,890.20

135,000.00 101,250.00
240,000.00 6,000.00
Sub total 107,250.00
Overhead & Profit (15,0%) 16,087.50
Total Harga 123,337.50
r ( BALITBANG PU 2012 )
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4

1,196,000.00 17,344.39
Sub total 17,344.39
Overhead & Profit (15,0%) 2,601.66
JUMLAH 19,946.05

135,000.00 25,920.00
240,000.00 4,560.00
Sub total 30,480.00
Overhead & Profit (15,0%) 4,572.00
jumlah 35,052.00

135,000.00 44,550.00
240,000.00 2,400.00
Sub total 46,950.00
Overhead & Profit (15,0%) 7,042.50
jumlah 53,992.50

0.00 0.00
135,000.00 40,500.00
240,000.00 2,400.00
Sub total 42,900.00
Overhead & Profit (15,0%) 6,435.00
jumlah 49,335.00

0.00 0.00
135,000.00 40,500.00
240,000.00 2,400.00
Sub total 42,900.00
Overhead & Profit (15,0%) 6,435.00
jumlah 49,335.00

0.00 0.00
135,000.00 40,500.00
240,000.00 2,400.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
Sub total 42,900.00
Overhead & Profit (15,0%) 6,435.00
jumlah 49,335.00

0.00 0.00
135,000.00 40,500.00
240,000.00 2,400.00
Sub total 42,900.00
Overhead & Profit (15,0%) 6,435.00
jumlah 49,335.00

0.00
135,000.00 40,500.00
240,000.00 2,400.00
Sub total 42,900.00
Overhead & Profit (15,0%) 6,435.00
jumlah 49,335.00

0.00 0.00
0.00 0.00
0.00 0.00

180,000.00 162,000.00
135,000.00 364,905.00
215,000.00 19,350.00
240,000.00 32,400.00
Sub total 578,655.00
Overhead & Profit (15,0%) 86,798.25
jumlah 665,453.25

0.00 0.00
0.00 0.00

135,000.00 189,000.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
180,000.00 72,000.00
215,000.00 8,600.00
240,000.00 19,200.00
Sub total 288,800.00
Overhead & Profit (15,0%) 43,320.00
jumlah 332,120.00

0.00 0.00
0.00 0.00
135,000.00 40,500.00
180,000.00 27,000.00
215,000.00 3,225.00
240,000.00 3,600.00
Sub total 74,325.00
Overhead & Profit (15,0%) 11,148.75
jumlah 85,473.75

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 5,400.00
180,000.00 3,600.00
215,000.00 430.00
240,000.00 480.00
12,500.00 2,125.00
Sub total 12,035.00
Overhead & Profit (15,0%) 1,805.25
jumlah per 10 cm 13,840.25
jumlah per 1 cm 1,384.03

0.00 0.00
0.00 0.00
135,000.00 945.00
180,000.00 1,260.00
215,000.00 150.50
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
240,000.00 96.00
Sub total 2,451.50
Overhead & Profit (15,0%) 367.73
jumlah 2,819.23

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 70,200.00
180,000.00 46,800.00
215,000.00 5,590.00
240,000.00 6,000.00
Sub total 128,590.00
Overhead & Profit (15,0%) 19,288.50
jumlah 147,878.50

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 70,200.00
180,000.00 46,800.00
215,000.00 5,590.00
240,000.00 6,240.00
Sub total 128,830.00
Overhead & Profit (15,0%) 19,324.50
jumlah 148,154.50

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 89,100.00
180,000.00 59,400.00
215,000.00 7,095.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
240,000.00 7,920.00
Sub total 163,515.00
Overhead & Profit (15,0%) 24,527.25
jumlah 188,042.25

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 89,100.00
180,000.00 59,400.00
215,000.00 7,095.00
240,000.00 7,920.00
Sub total 163,515.00
Overhead & Profit (15,0%) 24,527.25
Total Harga 188,042.25

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 89,100.00
180,000.00 59,400.00
215,000.00 7,095.00
240,000.00 7,920.00
Sub total 163,515.00
Overhead & Profit (15,0%) 24,527.25
Total Harga 188,042.25

0.00 0.00
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 89,100.00
180,000.00 59,400.00
215,000.00 7,095.00
240,000.00 7,920.00
Sub total 163,515.00
Overhead & Profit (15,0%) 24,527.25
Total Harga 188,042.25

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 540,000.00
180,000.00 2,160,000.00
215,000.00 258,000.00
240,000.00 48,000.00
Sub total 3,006,000.00
Overhead & Profit (15,0%) 450,900.00
Total Harga 3,456,900.00

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 324,000.00
180,000.00 1,296,000.00
215,000.00 154,800.00
240,000.00 28,800.00
Sub total 1,803,600.00
Overhead & Profit (15,0%) 270,540.00
Total Harga 2,074,140.00

0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
0.00 0.00
135,000.00 13,500.00
180,000.00 36,000.00
215,000.00 4,300.00
240,000.00 1,200.00
Sub total 55,000.00
Overhead & Profit (15,0%) 8,250.00
Total Harga 63,250.00

0.00 0.00
0.00 0.00
135,000.00 27,000.00
180,000.00 54,000.00
215,000.00 6,450.00
240,000.00 2,400.00
Sub total 89,850.00
Overhead & Profit (15,0%) 13,477.50
Total Harga 103,327.50

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 162,000.00
180,000.00 36,000.00
215,000.00 4,300.00
240,000.00 14,400.00
Sub total 216,700.00
Overhead & Profit (15,0%) 32,505.00
jumlah 249,205.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
135,000.00 222,750.00
180,000.00 49,500.00
215,000.00 6,020.00
240,000.00 19,920.00
Sub total 298,190.00
Overhead & Profit (15,0%) 44,728.50
jumlah 342,918.50

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 283,500.00
180,000.00 63,000.00
215,000.00 7,525.00
240,000.00 25,200.00
Sub total 379,225.00
Overhead & Profit (15,0%) 56,883.75
jumlah 436,108.75

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 222,750.00
180,000.00 49,500.00
215,000.00 6,020.00
240,000.00 19,920.00
Sub total 298,190.00
Overhead & Profit (15,0%) 44,728.50
jumlah 342,918.50
la di sni 2008 )
0.00 0.00
0.00 0.00
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
180,000.00 18,000.00
215,000.00 2,150.00
135,000.00 40,500.00
240,000.00 3,600.00
Sub total 64,250.00
Overhead & Profit (15,0%) 9,637.50
Total Harga 73,887.50
a di sni 2008 )
0.00 0.00
0.00 0.00
0.00 0.00
180,000.00 18,000.00
215,000.00 2,150.00
135,000.00 40,500.00
240,000.00 3,600.00
Sub total 64,250.00
Overhead & Profit (15,0%) 9,637.50
Total Harga 73,887.50

0.00 0.00
0.00 0.00
0.00 0.00
180,000.00 36,000.00
215,000.00 4,300.00
135,000.00 81,000.00
240,000.00 7,200.00
Sub total 128,500.00
Overhead & Profit (15,0%) 19,275.00
Total Harga 147,775.00

0.00 0.00
0.00 0.00
0.00 0.00
180,000.00 36,000.00
215,000.00 4,300.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
135,000.00 81,000.00
240,000.00 7,200.00
Sub total 128,500.00
Overhead & Profit (15,0%) 19,275.00
Total Harga 147,775.00

0.00 0.00
0.00 0.00
135,000.00 40,500.00
180,000.00 27,000.00
215,000.00 3,225.00
240,000.00 3,600.00
Sub total 74,325.00
Overhead & Profit (15,0%) 11,148.75
Total Harga 85,473.75

0.00 0.00
0.00 0.00
135,000.00 40,500.00
180,000.00 27,000.00
215,000.00 3,225.00
240,000.00 3,600.00
Sub total 74,325.00
Overhead & Profit (15,0%) 11,148.75
Total Harga 85,473.75

0.00 0.00
0.00 0.00
135,000.00 40,500.00
180,000.00 27,000.00
215,000.00 3,225.00
240,000.00 3,600.00
Sub total 74,325.00
Overhead & Profit (15,0%) 11,148.75
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
Total Harga 85,473.75
ni 2008 dikali 2 )
0.00 0.00
0.00 0.00
135,000.00 108,000.00
180,000.00 72,000.00
215,000.00 8,600.00
240,000.00 10,560.00
jumlah 199,160.00
Overhead & Profit (15,0%) 29,874.00
Total Harga 229,034.00

0.00 0.00
0.00 0.00
135,000.00 40,500.00
180,000.00 18,000.00
215,000.00 2,150.00
240,000.00 3,600.00
jumlah 64,250.00
Overhead & Profit (15,0%) 9,637.50
Total Harga 73,887.50

0.00 0.00
135,000.00 27,000.00
180,000.00 18,000.00
215,000.00 2,150.00
240,000.00 2,400.00
Sub total 49,550.00
Overhead & Profit (15,0%) 7,432.50
Total Harga 56,982.50

0.00 0.00
0.00 0.00
180,000.00 135,000.00
215,000.00 16,125.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
135,000.00 27,000.00
240,000.00 24,000.00
Sub total 202,125.00
Overhead & Profit (15,0%) 30,318.75
jumlah 232,443.75

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 94,500.00
180,000.00 63,000.00
215,000.00 7,525.00
240,000.00 8,400.00
Sub total 173,425.00
Overhead & Profit (15,0%) 26,013.75
jumlah 199,438.75

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 32,400.00
180,000.00 21,600.00
215,000.00 2,580.00
240,000.00 2,880.00
Sub total 59,460.00
Overhead & Profit (15,0%) 8,919.00
jumlah 68,379.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 32,400.00
180,000.00 21,600.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
215,000.00 2,580.00
240,000.00 2,880.00
Sub total 59,460.00
Overhead & Profit (15,0%) 8,919.00
jumlah 68,379.00

0.00 0.00
0.00 0.00
135,000.00 16,200.00
180,000.00 21,600.00
215,000.00 2,580.00
240,000.00 1,440.00
Sub total 41,820.00
Overhead & Profit (15,0%) 6,273.00
jumlah 48,093.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 12,150.00
180,000.00 16,200.00
215,000.00 1,935.00
240,000.00 1,200.00
Sub total 31,485.00
Overhead & Profit (15,0%) 4,722.75
jumlah 36,207.75

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 12,150.00
180,000.00 16,200.00
215,000.00 1,935.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
240,000.00 1,200.00
Sub total 31,485.00
Overhead & Profit (15,0%) 4,722.75
jumlah 36,207.75

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 94,500.00
180,000.00 63,000.00
215,000.00 7,525.00
240,000.00 8,400.00
Sub total 173,425.00
Overhead & Profit (15,0%) 26,013.75
jumlah 199,438.75

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 94,500.00
180,000.00 63,000.00
215,000.00 7,525.00
240,000.00 8,400.00
Sub total 173,425.00
Overhead & Profit (15,0%) 26,013.75
jumlah 199,438.75

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 121,500.00
180,000.00 81,000.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
215,000.00 9,675.00
240,000.00 10,800.00
Sub total 222,975.00
Overhead & Profit (15,0%) 33,446.25
jumlah 256,421.25

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 20,250.00
180,000.00 45,000.00
215,000.00 5,375.00
240,000.00 18,000.00
Sub total 88,625.00
Overhead & Profit (15,0%) 13,293.75
jumlah 101,918.75

0.00 0.00
0.00 0.00
135,000.00 20,250.00
180,000.00 45,000.00
215,000.00 5,375.00
240,000.00 18,000.00
Sub total 88,625.00
Overhead & Profit (15,0%) 13,293.75
jumlah 101,918.75

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
135,000.00 66,150.00
180,000.00 270,000.00
215,000.00 32,250.00
240,000.00 7,200.00
Sub total 375,600.00
Overhead & Profit (15,0%) 56,340.00
jumlah 431,940.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 66,150.00
180,000.00 270,000.00
215,000.00 32,250.00
240,000.00 7,200.00
Sub total 375,600.00
Overhead & Profit (15,0%) 56,340.00
jumlah 431,940.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 27,000.00
180,000.00 81,000.00
215,000.00 2,150.00
240,000.00 12,000.00
Sub total 122,150.00
Overhead & Profit (15,0%) 18,322.50
jumlah 140,472.50

0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
50,000.00 50,000.00
135,000.00 3,375.00
180,000.00 90,000.00
0.00 0.00
Sub total 143,375.00
Overhead & Profit (15,0%) 21,506.25
jumlah 164,881.25

50,000.00 18,750.00
135,000.00 16,875.00
180,000.00 2,160.00
0.00 0.00
Sub total 37,785.00
Overhead & Profit (15,0%) 5,667.75
jumlah 43,452.75

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 12,150.00
180,000.00 10,800.00
215,000.00 4,300.00
240,000.00 10,800.00
Sub total 38,050.00
Overhead & Profit (15,0%) 5,707.50
jumlah 43,757.50

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 2,025.00
180,000.00 13,500.00
215,000.00 1,720.00
240,000.00 1,440.00
Sub total 18,685.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
Overhead & Profit (15,0%) 2,802.75
jumlah 21,487.75

0.00 0.00
0.00 0.00
135,000.00 2,025.00
180,000.00 13,500.00
215,000.00 1,720.00
240,000.00 1,440.00
Sub total 18,685.00
Overhead & Profit (15,0%) 2,802.75
jumlah 21,487.75

0.00 0.00
0.00 0.00
135,000.00 8,100.00
180,000.00 10,800.00
215,000.00 1,290.00
240,000.00 720.00
Sub total 20,910.00
Overhead & Profit (15,0%) 3,136.50
jumlah 24,046.50

0.00 0.00
0.00
135,000.00 445,500.00
180,000.00 198,000.00
215,000.00 2,365.00
240,000.00 38,400.00
Sub total 684,265.00
Overhead & Profit (15,0%) 102,639.75
jumlah 786,904.75

0.00 0.00
0.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
135,000.00 445,500.00
180,000.00 198,000.00
215,000.00 2,365.00
240,000.00 38,400.00
Sub total 684,265.00
Overhead & Profit (15,0%) 102,639.75
jumlah 786,904.75

0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 162,000.00
180,000.00 261,000.00
215,000.00 32,250.00
240,000.00 24,000.00
Sub total 479,250.00
Overhead & Profit (15,0%) 71,887.50
jumlah 551,137.50

0.00 0.00
135,000.00 4,050.00
180,000.00 54,000.00
215,000.00 6,450.00
240,000.00 360.00
Sub total 64,860.00
Overhead & Profit (15,0%) 9,729.00
jumlah 74,589.00

0.00 0.00
0.00 0.00
135,000.00 1,350.00
180,000.00 18,000.00
215,000.00 2,150.00
240,000.00 1,200.00
Sub total 22,700.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
Overhead & Profit (15,0%) 3,405.00
jumlah 26,105.00

0.00 0.00
135,000.00 1,350.00
180,000.00 18,000.00
215,000.00 2,150.00
240,000.00 1,200.00
Sub total 22,700.00
Overhead & Profit (15,0%) 3,405.00
jumlah 26,105.00

0.00 0.00
135,000.00 1,350.00
180,000.00 18,000.00
215,000.00 2,150.00
240,000.00 1,200.00
Sub total 22,700.00
Overhead & Profit (15,0%) 3,405.00
jumlah 26,105.00

0.00 0.00
0.00 0.00
135,000.00 4,860.00
180,000.00 10,800.00
215,000.00 1,290.00
240,000.00 432.00
Sub total 17,382.00
Overhead & Profit (15,0%) 2,607.30
jumlah 19,989.30

0.00 0.00
0.00 0.00
135,000.00 4,860.00
180,000.00 10,800.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
215,000.00 1,290.00
240,000.00 432.00
Sub total 17,382.00
Overhead & Profit (15,0%) 2,607.30
jumlah 19,989.30

0.00 0.00
0.00 0.00
135,000.00 4,860.00
180,000.00 10,800.00
215,000.00 1,290.00
240,000.00 432.00
Sub total 17,382.00
Overhead & Profit (15,0%) 2,607.30
jumlah 19,989.30

0.00 0.00
0.00 0.00
135,000.00 4,860.00
180,000.00 10,800.00
215,000.00 1,290.00
240,000.00 432.00
Sub total 17,382.00
Overhead & Profit (15,0%) 2,607.30
jumlah 19,989.30

0.00 0.00
0.00 0.00
135,000.00 4,860.00
180,000.00 10,800.00
215,000.00 1,290.00
240,000.00 432.00
Sub total 17,382.00
Overhead & Profit (15,0%) 2,607.30
jumlah 19,989.30
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4

0.00 0.00
0.00 0.00
135,000.00 4,860.00
180,000.00 10,800.00
215,000.00 1,290.00
240,000.00 432.00
Sub total 17,382.00
Overhead & Profit (15,0%) 2,607.30
jumlah 19,989.30

123,337.50 189,767.08
0.00 0.00
49,335.00 6,971.04

40,077.50 280,542.50
0.00 0.00
49,335.00 5,032.17
249,205.00 37,380.75
342,918.50 466,231.99
2,819.23 162,192.17
188,042.25 383,606.19
148,154.50 715,586.24
0.00 0.00
19,989.30 29,983.95
jumlah 2,277,294.07

0.00 0.00
0.00 0.00
240,000.00 600.00
135,000.00 5,400.00
215,000.00 860.00
180,000.00 7,200.00
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
Sub total 14,060.00
Overhead & Profit (15,0%) 2,109.00
jumlah 16,169.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
180,000.00 21,600.00
215,000.00 2,580.00
135,000.00 25,380.00
240,000.00 2,256.00
Sub total 51,816.00
Overhead & Profit (15,0%) 7,772.40
jumlah 59,588.40

0.00 0.00
0.00 0.00
180,000.00 7,560.00
215,000.00 860.00
135,000.00 3,780.00
240,000.00 720.00
Sub total 12,920.00
Overhead & Profit (15,0%) 1,938.00
jumlah 14,858.00

0.00 0.00
180,000.00 18,000.00
215,000.00 2,150.00
135,000.00 10,800.00
240,000.00 720.00
Sub total 31,670.00
Overhead & Profit (15,0%) 4,750.50
jumlah 36,420.50
HARGA JUMLAH
SATUAN HARGA
(RUPIAH) (RUPIAH)
3 4
0.00 0.00
0.00 0.00
180,000.00 45,000.00
215,000.00 10,750.00
240,000.00 6,000.00
Sub total 61,750.00

0.00 0.00
180,000.00 22,500.00
215,000.00 5,375.00
240,000.00 3,000.00
Sub total 30,875.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
135,000.00 9,450.00
180,000.00 1,620.00
215,000.00 1,290.00
240,000.00 600.00
Sub total 12,960.00
Overhead & Profit (15,0%) 1,944.00
jumlah 14,904.00

0.00 0.00
135,000.00 810.00
180,000.00 10,800.00
215,000.00 2,580.00
240,000.00 1,440.00
Sub total 15,630.00
Overhead & Profit (15,0%) 2,344.50
jumlah 17,974.50
ANALISA PINTU DAN JENDELA

HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3

1 1 m3 pasang kusen kayu besi


Kayu besi balok m3 1.10 0.00
Paku biasa 2" - 5" kg 1.25 0.00
Lem kayu Kg 1.00 30,000.00
Pekerja Oh 7.00 135,000.00
Tukang kayu Oh 21.00 180,000.00
Kepala tukang Oh 2.10 215,000.00
Mandor Oh 0.35 240,000.00
Subtotal
profit + overhead 15%
jumlah
2 1 m2 pasang pintu panel kayu besi
Papan Kayu Besi m3 0.04 0.00
Lem kayu Kg 0.50 0.00
Pekerja Oh 1.00 135,000.00
Tukang kayu Oh 3.00 180,000.00
Kepala tukang Oh 0.30 215,000.00
Mandor Oh 0.05 240,000.00
Subtotal
profit + overhead 15%
jumlah
3 1 m2 pasang pintu/jendela bingkai kayu besi
Papan Kayu Besi m3 0.02 0.00
Lem kayu Kg 0.30 0.00
Pekerja Oh 0.80 135,000.00
Tukang kayu Oh 2.40 180,000.00
Kepala tukang Oh 0.24 215,000.00
Mandor Oh 0.04 240,000.00
Subtotal
profit + overhead 15%
jumlah
4 1 M' Pasang Kusen Stainless untuk pintu Utama
Profil kusen Stainlesstell m' 1.10 0.00
Skrup fixer 3,5' buah 2.00 0.00
Sealant tube 0.06 0.00
Pekerja terlatih OH 0.04 135,000.00
Tukang OH 0.04 180,000.00
Kepala Tukang OH 0.00 215,000.00
Mandor OH 0.00 240,000.00
HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3
Subtotal
profit + overhead 15%
jumlah
5 1 M' Pasang Kusen Alumunium
Profil kusen aluminium m' 1.10 0.00
Skrup fixer 3,5' buah 2.00 0.00
Sealant tube 0.06 0.00
Pekerja terlatih OH 0.04 135,000.00
Tukang alumunium OH 0.04 180,000.00
Kepala Tukang OH 0.00 215,000.00
Mandor OH 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
6 1 M' Pasang Rangka jendela bingkai Alumunium
Profil kusen aluminium m' 1.10 0.00
Skrup fixer 3,5' buah 2.00 0.00
Sealant tube 0.06 0.00
Pekerja terlatih OH 0.04 135,000.00
Tukang alumunium OH 0.04 180,000.00
Kepala Tukang OH 0.00 215,000.00
Mandor OH 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
7 1 M2 Pasang Rangka jendela panel kaca
Papan Kayu Besi m3 0.024 0.00
Lem Kayu kg 0.30 0.00
Pekerja OH 0.80 135,000.00
Tukang alumunium OH 2.40 180,000.00
Kepala Tukang OH 0.24 215,000.00
Mandor OH 0.04 240,000.00
Subtotal
profit + overhead 15%
jumlah
8 1 M2 Pasang Jendela Jalusi Ky besi
Papan Kayu Besi m3 0.064 0.00
Lem Kayu kg 0.50 0.00
Pekerja OH 1.00 135,000.00
Tukang alumunium OH 3.00 180,000.00
Kepala Tukang OH 0.30 215,000.00
Mandor OH 0.05 240,000.00
HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3
Subtotal
profit + overhead 15%
jumlah
9 1 m2 pasang kaca rayben, tebal 12 mm
Kaca rayben 9 mm m2 1.10 0.00
Sealant tube 0.27 0.00
Pekerja Oh 0.015 135,000.00
Tukang kayu Oh 0.15 180,000.00
Kepala tukang Oh 0.015 215,000.00
Mandor Oh 0.00075 240,000.00
Subtotal
profit + overhead 15%
jumlah
10 1 m2 pasang kaca rayben, tebal 5 mm
Kaca rayben 5 mm m2 1.10 0.00
Sealant tube 0.27 0.00
Pekerja Oh 0.015 135,000.00
Tukang kayu Oh 0.15 180,000.00
Kepala tukang Oh 0.015 215,000.00
Mandor Oh 0.00075 240,000.00
Subtotal
profit + overhead 15%
jumlah
11 1 m2 pasang kaca bening, tebal 5 mm
Kaca bening 5 mm m2 1.10 0.00
Sealant tube 0.27 0.00
Pekerja Oh 0.015 135,000.00
Tukang kayu Oh 0.15 180,000.00
Kepala tukang Oh 0.015 215,000.00
Mandor Oh 0.00075 240,000.00
Subtotal
profit + overhead 15%
jumlah
12 1 buah pasang kunci 2 slaagh
Kunci tanam 2 slaagh Bh 1.00 0.00
Pekerja OH 0.06 135,000.00
Tukang kayu Oh 0.60 180,000.00
Kepala tukang Oh 0.06 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3
13 1 buah pasang kunci biasa
Kunci biasa Bh 1.00 0.00
Pekerja Oh 0.01 135,000.00
Tukang kayu Oh 0.50 180,000.00
kepala tukang Oh 0.01 215,000.00
Mandor OH 0.01 240,000.00
Subtotal
profit + overhead 15%
jumlah
14 1 buah pasang engsel pintu stainlesstell
Engsel pintu Bh 1.00 0.00
Pekerja Oh 0.02 135,000.00
Tukang kayu Oh 0.15 180,000.00
Kepala tukang Oh 0.02 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
15 1 buah pasang engsel pintu
Engsel pintu Bh 1.00 0.00
Pekerja Oh 0.02 135,000.00
Tukang kayu Oh 0.15 180,000.00
Kepala tukang Oh 0.02 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
16 1 buah pasang engsel jendela kupu - kupu
Engsel jendela Bh 1.00 0.00
Pekerja Oh 0.01 135,000.00
Tukang kayu Oh 0.10 180,000.00
Kepala tukang Oh 0.01 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
17 1 buah pasang engsel jendela alumunium
Engsel jendela Bh 1.00 0.00
Pekerja terlatih Oh 0.01 135,000.00
Tukang alumunium Oh 0.10 180,000.00
Kepala tukang Oh 0.01 215,000.00
Mandor Oh 0.00 240,000.00
HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3
Subtotal
profit + overhead 15%
jumlah
18 1 buah pasang kait angin
Kait angin Bh 1.00 0.00
Pekerja Oh 0.02 135,000.00
Tukang kayu Oh 0.15 180,000.00
Kepala tukang Oh 0.02 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
19 1 buah pasang grendel
Grendel Bh 1.00 0.00
Pekerja Oh 0.02 135,000.00
Tukang kayu Oh 0.15 180,000.00
Kepala tukang Oh 0.02 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
20 1 buah pasang door closer
Door closer Bh 1.00 0.00
Pekerja Oh 0.02 135,000.00
Tukang kayu Oh 0.17 180,000.00
Kepala tukang Oh 0.02 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
21 1 buah pasang pegangan pintu / door holder Stainlesstell
Door holder stainless Bh 1.00 0.00
Pekerja Oh 0.05 135,000.00
Tukang kayu Oh 0.50 180,000.00
Kepala tukang Oh 0.05 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
22 1 buah pasang pegangan pintu / door holder biasa
Door holder Bh 1.00 0.00
Pekerja Oh 0.05 135,000.00
HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3
Tukang kayu Oh 0.50 180,000.00
Kepala tukang Oh 0.05 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
23 1 buah pasang pegangan jendela
Peganagan Jendela Bh 1.00 0.00
Pekerja Oh 0.05 135,000.00
Tukang kayu Oh 0.50 180,000.00
Kepala tukang Oh 0.05 215,000.00
Mandor Oh 0.00 240,000.00
Subtotal
profit + overhead 15%
jumlah
24 P1
Kusen Stainleessteel m' 6.20 17,219.53
Pintu Kaca Rayben 12mm m2 4.10 37,294.50
Pasang Kunci Stainlees bh 2.00 37,294.50
Pasang Engsel Pintu Kaca Stainless bh 4.00 37,294.50
Pasang Door Holder Stainless bh 2.00 124,315.00
Pasang Door Closer bh 2.00 41,017.05
jumlah
25 P2
Kusen kayu besi m3 0.07 6,084,075.00
Pintu Panel Kayu Besi m2 3.08 864,225.00
Pasang Kaca Rayben 5mm m2 0.42 37,294.50
Pasang Jendela Bingkai Kayu besi m2 0.40 691,380.00
Pasang Kunci Tanam 2 slag bh 1.00 149,178.00
Pasang Engsel Pintu bh 6.00 37,294.50
Pasang Engsel Jendela bh 2.00 24,863.00
Pasang Hak Angin bh 1.00 37,294.50
Grendel jendela bh 1.00 37,294.50
Pasang Pegangan Jendela bh 1.00 124,315.00
Pasang Pegangan Pintu bh 1.00 124,315.00
Pengamplasan kusen, pintu & jendela m2 8.32 16,169.00
Pengecatan kusen Pintu & jendela dgn cat minyak m2 8.32 14,904.00
jumlah
26 P3
Kusen kayu besi m3 0.05 6,084,075.00
Pintu Panel Kayu Besi m2 1.68 864,225.00
Pasang Kaca Rayben 5mm m2 0.26 37,294.50
HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3
Pasang Jendela Bingkai Kayu besi m2 0.44 691,380.00
Pasang Kunci Tanam 1 slag bh 1.00 149,178.00
Pasang Engsel Pintu bh 3.00 37,294.50
Pasang Engsel Jendela bh 2.00 24,863.00
Pasang Hak Angin bh 1.00 37,294.50
Grendel jendela bh 1.00 37,294.50
Pasang Pegangan Jendela bh 1.00 124,315.00
Pasang Pegangan Pintu bh 1.00 124,315.00
Pengamplasan kusen, pintu & jendela m2 5.48 16,169.00
Pengecatan kusen Pintu & jendela dgn cat minyak m2 5.48 14,904.00
jumlah
27 P4
Kusen kayu besi m3 0.05 6,084,075.00
Pintu Panel Kayu Besi m2 1.47 864,225.00
Pasang Kaca Rayben 5mm m2 0.24 37,294.50
Pasang Jendela Bingkai Kayu besi m2 0.35 691,380.00
Pasang Kunci Tanam 1 slag bh 1.00 108,905.00
Pasang Engsel Pintu bh 3.00 37,294.50
Pasang Engsel Jendela bh 2.00 24,863.00
Pasang Hak Angin bh 1.00 37,294.50
Grendel jendela bh 1.00 37,294.50
Pasang Pegangan Jendela bh 1.00 124,315.00
Pasang Pegangan Pintu bh 1.00 124,315.00
Pengamplasan kusen, pintu & jendela m2 4.92 16,169.00
Pengecatan kusen Pintu & jendela dgn cat minyak m2 4.92 14,904.00
jumlah
28 J1
Pasang Kusen Alumunium m' 44.16 17,219.53
Pasang Rangka Allumunium Jendela Bingkai Kaca m' 15.96 17,219.53
Pasang Kaca rayben 5mm m2 8.28 37,294.50
Pasang Grendel bh 6.00 37,294.50
Pasang Engsel Jendela bh 12.00 24,863.00
Pasang Kait Angin bh 6.00 37,294.50
jumlah
29 J2
Pasang Kusen Alumunium m' 12.25 17,219.53
Pasang Rangka Allumunium Jendela Bingkai Kaca m' 5.08 17,219.53
Pasang Kaca rayben 5mm m2 1.88 37,294.50
Pasang Grendel bh 2.00 37,294.50
Pasang Engsel Jendela bh 4.00 24,863.00
Pasang Kait Angin bh 2.00 37,294.50
jumlah
HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3
30 J3
Pasang Kusen Alumunium m' 13.65 17,219.53
Pasang Rangka Allumunium Jendela Bingkai Kaca m' 5.80 17,219.53
Pasang Kaca rayben 5mm m2 2.74 37,294.50
Pasang Grendel bh 2.00 37,294.50
Pasang Engsel Jendela bh 4.00 24,863.00
Pasang Kait Angin bh 2.00 37,294.50
jumlah
31 J4
Pasang Kusen Alumunium m' 19.00 17,219.53
Pasang Rangka Allumunium Jendela Bingkai Kaca m' 8.64 17,219.53
Pasang Kaca rayben 5mm m2 3.92 37,294.50
Pasang Grendel bh 3.00 37,294.50
Pasang Engsel Jendela bh 6.00 24,863.00
Pasang Kait Angin bh 3.00 37,294.50
jumlah
32 J5
Pasang Kusen Alumunium m' 9.30 17,219.53
Pasang Rangka Allumunium Jendela Bingkai Kaca m' 10.00 17,219.53
Pasang Kaca rayben 5mm m2 1.22 37,294.50
Pasang Grendel bh 4.00 37,294.50
Pasang Engsel Jendela bh 8.00 24,863.00
Pasang Kait Angin bh 4.00 37,294.50
jumlah
33 J6
Pasang Kusen Alumunium m' 35.60 17,219.53
Pasang Kaca rayben 5mm m2 7.00 37,294.50
jumlah
34 J7
Pasang Kusen Alumunium m' 22.96 17,219.53
Pasang Rangka Allumunium Jendela Bingkai Kaca m' 7.98 17,219.53
Pasang Kaca rayben 5mm m2 4.14 37,294.50
Pasang Grendel bh 3.00 37,294.50
Pasang Engsel Jendela bh 6.00 24,863.00
Pasang Kait Angin bh 3.00 37,294.50
jumlah
35 BV1
Pasang Kusen Alumunium m' 2.10 17,219.53
Pasang Rangka Allumunium Jendela Bingkai Kaca m' 1.70 17,219.53
Pasang Kaca rayben 5mm m2 0.37 37,294.50
Pasang Grendel bh 1.00 37,294.50
Pasang Engsel Jendela bh 2.00 24,863.00
HARGA
URAIAN PEKERJAAN
NO. SATUAN
1 2 3
Pasang Kait Angin bh 1.00 37,294.50
jumlah
36 BV2
Pasang Kusen Alumunium m' 3.10 17,219.53
Pasang Rangka Allumunium Jendela Bingkai Kaca m' 3.40 17,219.53
Pasang Kaca rayben 5mm m2 0.74 37,294.50
Pasang Grendel bh 2.00 37,294.50
Pasang Engsel Jendela bh 4.00 24,863.00
Pasang Kait Angin bh 2.00 37,294.50
jumlah
37 BV3
Pasang Kusen Alumunium m' 11.00 17,219.53
Pasang Kaca rayben 5mm m2 1.48 37,294.50
jumlah
38 BV4
Pasang Kusen Alumunium m' 11.00 17,219.53
Pasang Kaca rayben 5mm m2 1.98 37,294.50
jumlah
JUMLAH
HARGA
4

0.00
0.00
30,000.00
945,000.00
3,780,000.00
451,500.00
84,000.00
5,290,500.00
793,575.00
6,084,075.00

0.00
0.00
135,000.00
540,000.00
64,500.00
12,000.00
751,500.00
112,725.00
864,225.00

0.00
0.00
108,000.00
432,000.00
51,600.00
9,600.00
601,200.00
90,180.00
691,380.00

0.00
0.00
0.00
5,805.00
7,740.00
924.50
504.00
JUMLAH
HARGA
4
14,973.50
2,246.03
17,219.53

0.00
0.00
0.00
5,805.00
7,740.00
924.50
504.00
14,973.50
2,246.03
17,219.53

0.00
0.00
0.00
5,805.00
7,740.00
924.50
504.00
14,973.50
2,246.03
17,219.53

0.00
0.00
108,000.00
432,000.00
51,600.00
9,600.00
601,200.00
90,180.00
691,380.00

0.00
0.00
135,000.00
540,000.00
64,500.00
12,000.00
JUMLAH
HARGA
4
751,500.00
112,725.00
864,225.00

0.00
0.00
2,025.00
27,000.00
3,225.00
180.00
32,430.00
4,864.50
37,294.50

0.00
0.00
2,025.00
27,000.00
3,225.00
180.00
32,430.00
4,864.50
37,294.50

0.00
0.00
2,025.00
27,000.00
3,225.00
180.00
32,430.00
4,864.50
37,294.50

0.00
8,100.00
108,000.00
12,900.00
720.00
129,720.00
19,458.00
149,178.00
JUMLAH
HARGA
4

0.00
1,350.00
90,000.00
2,150.00
1,200.00
94,700.00
14,205.00
108,905.00

0.00
2,025.00
27,000.00
3,225.00
180.00
32,430.00
4,864.50
37,294.50

0.00
2,025.00
27,000.00
3,225.00
180.00
32,430.00
4,864.50
37,294.50

0.00
1,350.00
18,000.00
2,150.00
120.00
21,620.00
3,243.00
24,863.00

0.00
1,350.00
18,000.00
2,150.00
120.00
JUMLAH
HARGA
4
21,620.00
3,243.00
24,863.00

0.00
2,025.00
27,000.00
3,225.00
180.00
32,430.00
4,864.50
37,294.50

0.00
2,025.00
27,000.00
3,225.00
180.00
32,430.00
4,864.50
37,294.50

0.00
2,227.50
29,700.00
3,547.50
192.00
35,667.00
5,350.05
41,017.05

0.00
6,750.00
90,000.00
10,750.00
600.00
108,100.00
16,215.00
124,315.00

0.00
6,750.00
JUMLAH
HARGA
4
90,000.00
10,750.00
600.00
108,100.00
16,215.00
124,315.00

0.00
6,750.00
90,000.00
10,750.00
600.00
108,100.00
16,215.00
124,315.00

106,761.06
152,907.45
74,589.00
149,178.00
248,630.00
82,034.10
814,099.61

401,694.97
2,661,813.00
15,663.69
276,552.00
149,178.00
223,767.00
49,726.00
37,294.50
37,294.50
124,315.00
124,315.00
134,539.02
124,013.20
4,360,165.88

321,531.20
1,451,898.00
9,696.57
JUMLAH
HARGA
4
304,207.20
149,178.00
111,883.50
49,726.00
37,294.50
37,294.50
124,315.00
124,315.00
88,631.99
81,697.77
2,891,669.22

312,770.13
1,270,410.75
8,950.68
241,983.00
108,905.00
111,883.50
49,726.00
37,294.50
37,294.50
124,315.00
124,315.00
79,577.35
73,351.53
2,580,776.93

760,414.22
274,823.62
308,798.46
223,767.00
298,356.00
223,767.00
2,089,926.30

210,939.18
87,475.19
70,113.66
74,589.00
99,452.00
74,589.00
617,158.03
JUMLAH
HARGA
4

235,046.52
99,873.25
102,186.93
74,589.00
99,452.00
74,589.00
685,736.69

327,170.98
148,776.70
146,343.62
111,883.50
149,178.00
111,883.50
995,236.29

160,141.58
172,195.25
45,499.29
149,178.00
198,904.00
149,178.00
875,096.12

613,015.09
261,061.50
874,076.59

395,360.29
137,411.81
154,399.23
111,883.50
149,178.00
111,883.50
1,060,116.33

36,161.00
29,273.19
13,798.97
37,294.50
49,726.00
JUMLAH
HARGA
4
37,294.50
203,548.16

53,380.53
58,546.39
27,597.93
74,589.00
99,452.00
74,589.00
388,154.84

189,414.78
55,195.86
244,610.64

189,414.78
73,843.11
263,257.89
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKA
NO URAIAN PEKERJAAN INDEKS

A B C
1 1 Bh Pasang Panel Box Utama
Panel box utama 1.000
Pipa Listrik 12.000
Klem Pipa 5/8" 12.000
T Doos 2.000
Pekerja 0.750
Instalatur/Tukang Listrik 0.375
Mandor 0.375

2 1 Bh Pasang Panel Distribusi


Panel box Distribusi 1.000
Pipa Listrik 12.000
Klem Pipa 5/8" 12.000
T Doos 2.000
Pekerja 0.750
Instalatur/Tukang Listrik 0.375
Mandor 0.375

3 1 Titik Instalasi Penerangan


Kabel NYA 1 x 2,5 mm 14.000
Pipa Elektrik Ø 5/8" 6.000
Tee Doss 1.000
Klem Pipa 5/8" 5.000
Isolatif 0.100
Pekerja 0.300
Instalatur/Tukang Listrik 0.150
Mandor 0.075

4 1 Titik Instalasi Stop Kontak 500 VA


Kabel NYA 2 x 2,5 mm 14.000
NO URAIAN PEKERJAAN INDEKS

A B C
Pipa Elektrik Ø 5/8" 6.000
Tee Doss 1.000
Klem Pipa 5/8" 5.000
Isolatif 0.100
Pekerja 0.300
Instalatur/Tukang Listrik 0.150
Mandor 0.150

5 1 Bh Pasang Saklar Tunggal


Saklar Tunggal 1.000
Isolatif 0.250
Pekerja 0.100
Instalatur/Tukang Listrik 0.050
Mandor 0.050

6 1 Bh Pasang Saklar Ganda


Saklar Ganda 1.000
Isolatif 0.250
Pekerja 0.100
Instalatur/Tukang Listrik 0.050
Mandor 0.050

7 1 Bh Pasang Stop Kontak


Stop Kontak 1.000
Isolatif 0.250
Pekerja 0.050
Instalatur/Tukang Listrik 0.100
Mandor 0.050

8 1 Bh Pasang Lampu SL 18 Watt


NO URAIAN PEKERJAAN INDEKS

A B C
Lampu SL 18 Watt 1.000
Fitting 1.000
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038

9 1 Bh Pasang Lampu DownLight SL 23 Watt + Armature


Lampu Downlight SL 23 Watt + Armature 1.000
Fitting 1.000
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038

10 1 Bh Pasang Lampu DownLight SL 18 Watt + Armature


Lampu Downlight SL 18 Watt + Armature 1.000
Fitting 1.000
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038

11 1 Bh Pasang Lampu DownLight SL 14 Watt + Armature


Lampu Downlight SL 14 Watt + Armature 1.000
Fitting 1.000
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038

12 1 Bh Pasang Lampu Dinding SL 18 Watt + Armature


Lampu Dinding SL 18 Watt + Armature 1.000
Fitting 1.000
NO URAIAN PEKERJAAN INDEKS

A B C
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038

13 1 Bh Pasang Lampu Taman 60 Watt + Armature


Lampu Taman SL 60 Watt + Armature 1.000
Fitting 1.000
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038

14 1 Bh Pasang Lampu Taman 23 Watt + Armature


Lampu Taman SL 23 Watt + Armature 1.000
Fitting 1.000
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038

15 1 Bh Pasang Lampu Sorot 250 Watt + Armature


Lampu Sorot 250 Watt + Armature 1.000
Fitting 1.000
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038

16 1 Titik Instalasi AC 1 PK
AC 1 PK 1.000
Kabel NYA 2 x 2,5 mm 14.000
Pipa Pembuangan PVC 1/2 '' 6.000
Tee Doss 1.000
NO URAIAN PEKERJAAN INDEKS

A B C
Isolatif 0.100
Pekerja 0.300
Instalatur/Tukang Listrik 0.150
Mandor 0.075

17 1 Titik Instalasi AC 1/2 PK


AC 1 PK 1.000
Kabel NYA 2 x 2,5 mm 14.000
Pipa Pembuangan PVC 1/2 '' 6.000
Tee Doss 1.000
Isolatif 0.100
Pekerja 0.300
Instalatur/Tukang Listrik 0.150
Mandor 0.075

18 1 Titik Instalasi Sound System + Ceilling Speaker 3 watt


Ceilling Speaker 3 watt 1.000
Kabel Sound System 14.000
Isolatif 0.100
Pekerja 0.300
Instalatur/Tukang Listrik 0.150
Mandor 0.150

19 1 Titik Instalasi Fire Alarm


Kabel NYA 1 x 2,5 mm 8.000
Pipa Elektrik Ø 5/8" 6.000
Tee Doss 1.000
Klem Pipa 5/8" 5.000
Isolatif 0.100
Pekerja 0.300
Instalatur/Tukang Listrik 0.150
Mandor 0.075
NO URAIAN PEKERJAAN INDEKS

A B C

20 1 Bh Pasang Smoke Detektor


Smoke Detector 1.000
Pekerja 0.075
Instalatur/Tukang Listrik 0.038
Mandor 0.038
RJAAN ELEKTRIKAL
HARGA JUMLAH HARGA
SAT
( RP ) ( RP )

D E F

bh Rp 1,000,000.00 Rp 1,000,000.00
m¹ Rp 5,000.00 Rp 60,000.00
bh Rp 500.00 Rp 6,000.00
bh Rp 1,000.00 Rp 2,000.00
ho Rp 95,000.00 Rp 71,250.00
ho Rp 110,000.00 Rp 41,250.00
ho Rp 130,000.00 Rp 48,750.00
subtotal Rp 1,229,250.00
Profit + Overhead ( 15%) Rp 184,387.50
JUMLAH Rp 1,413,637.50

bh Rp 50,000.00 Rp 50,000.00
m¹ Rp 5,000.00 Rp 60,000.00
bh Rp 500.00 Rp 6,000.00
bh Rp 1,000.00 Rp 2,000.00
ho Rp 95,000.00 Rp 71,250.00
ho Rp 110,000.00 Rp 41,250.00
ho Rp 130,000.00 Rp 48,750.00
subtotal Rp 279,250.00
Profit + Overhead ( 15%) Rp 41,887.50
JUMLAH Rp 321,137.50

m¹ Rp 7,500.00 Rp 105,000.00
m¹ Rp 5,000.00 Rp 30,000.00
bh Rp 1,000.00 Rp 1,000.00
bh Rp 500.00 Rp 2,500.00
bh Rp 12,000.00 Rp 1,200.00
ho Rp 95,000.00 Rp 28,500.00
ho Rp 110,000.00 Rp 16,500.00
ho Rp 130,000.00 Rp 9,750.00
subtotal Rp 194,450.00
Profit + Overhead ( 15%) Rp 29,167.50
JUMLAH Rp 223,617.50

m¹ Rp 15,000.00 Rp 210,000.00
HARGA JUMLAH HARGA
SAT
( RP ) ( RP )

D E F
m¹ Rp 5,000.00 Rp 30,000.00
bh Rp 1,000.00 Rp 1,000.00
bh Rp 500.00 Rp 2,500.00
bh Rp 12,000.00 Rp 1,200.00
ho Rp 95,000.00 Rp 28,500.00
ho Rp 110,000.00 Rp 16,500.00
ho Rp 130,000.00 Rp 19,500.00
subtotal Rp 309,200.00
Profit + Overhead ( 15%) Rp 46,380.00
JUMLAH Rp 355,580.00

bh Rp 40,000.00 Rp 40,000.00
bh Rp 12,000.00 Rp 3,000.00
ho Rp 95,000.00 Rp 9,500.00
ho Rp 110,000.00 Rp 5,500.00
ho Rp 130,000.00 Rp 6,500.00
subtotal Rp 64,500.00
Profit + Overhead ( 15%) Rp 9,675.00
JUMLAH Rp 74,175.00

bh Rp 45,000.00 Rp 45,000.00
bh Rp 12,000.00 Rp 3,000.00
ho Rp 95,000.00 Rp 9,500.00
ho Rp 110,000.00 Rp 5,500.00
ho Rp 130,000.00 Rp 6,500.00
subtotal Rp 69,500.00
Profit + Overhead ( 15%) Rp 10,425.00
JUMLAH Rp 79,925.00

bh Rp 50,000.00 Rp 50,000.00
bh Rp 12,000.00 Rp 3,000.00
ho Rp 95,000.00 Rp 4,750.00
ho Rp 110,000.00 Rp 11,000.00
ho Rp 130,000.00 Rp 6,500.00
subtotal Rp 75,250.00
Profit + Overhead ( 15%) Rp 11,287.50
JUMLAH Rp 86,537.50
HARGA JUMLAH HARGA
SAT
( RP ) ( RP )

D E F
bh Rp 50,000.00 Rp 50,000.00
bh Rp 15,000.00 Rp 15,000.00
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 81,125.00
Profit + Overhead ( 15%) Rp 12,168.75
JUMLAH Rp 93,293.75

bh Rp 180,000.00 Rp 180,000.00
bh Rp 15,000.00 Rp 15,000.00
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 211,125.00
Profit + Overhead ( 15%) Rp 31,668.75
JUMLAH Rp 242,793.75

bh Rp 175,000.00 Rp 175,000.00
bh Rp 15,000.00 Rp 15,000.00
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 206,125.00
Profit + Overhead ( 15%) Rp 30,918.75
JUMLAH Rp 237,043.75

bh Rp 155,000.00 Rp 155,000.00
bh Rp 15,000.00 Rp 15,000.00
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 186,125.00
Profit + Overhead ( 15%) Rp 27,918.75
JUMLAH Rp 214,043.75

bh Rp 250,000.00 Rp 250,000.00
bh Rp 15,000.00 Rp 15,000.00
HARGA JUMLAH HARGA
SAT
( RP ) ( RP )

D E F
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 281,125.00
Profit + Overhead ( 15%) Rp 42,168.75
JUMLAH Rp 323,293.75

bh Rp 350,000.00 Rp 350,000.00
bh Rp 15,000.00 Rp 15,000.00
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 381,125.00
Profit + Overhead ( 15%) Rp 57,168.75
JUMLAH Rp 438,293.75

bh Rp 325,000.00 Rp 325,000.00
bh Rp 15,000.00 Rp 15,000.00
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 356,125.00
Profit + Overhead ( 15%) Rp 53,418.75
JUMLAH Rp 409,543.75

bh Rp 300,000.00 Rp 300,000.00
bh Rp 15,000.00 Rp 15,000.00
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 331,125.00
Profit + Overhead ( 15%) Rp 49,668.75
JUMLAH Rp 380,793.75

UNIT Rp 5,000,000.00 Rp 5,000,000.00


m¹ Rp 15,000.00 Rp 210,000.00
m¹ Rp - Rp -
bh Rp 1,000.00 Rp 1,000.00
HARGA JUMLAH HARGA
SAT
( RP ) ( RP )

D E F
bh Rp 12,000.00 Rp 1,200.00
ho Rp 95,000.00 Rp 28,500.00
ho Rp 110,000.00 Rp 16,500.00
ho Rp 130,000.00 Rp 9,750.00
TOTAL Rp 5,266,950.00
Profit + Overhead ( 15%) Rp 790,042.50
JUMLAH Rp 6,056,992.50

UNIT Rp 3,500,000.00 Rp 3,500,000.00


m¹ Rp 15,000.00 Rp 210,000.00
m¹ Rp - Rp -
bh Rp 1,000.00 Rp 1,000.00
bh Rp 12,000.00 Rp 1,200.00
ho Rp 95,000.00 Rp 28,500.00
ho Rp 110,000.00 Rp 16,500.00
ho Rp 130,000.00 Rp 9,750.00
TOTAL Rp 3,766,950.00
Profit + Overhead ( 15%) Rp 565,042.50
JUMLAH Rp 4,331,992.50

unit Rp 350,000.00 Rp 350,000.00


m¹ Rp 15,000.00 Rp 210,000.00
bh Rp 12,000.00 Rp 1,200.00
ho Rp 95,000.00 Rp 28,500.00
ho Rp 110,000.00 Rp 16,500.00
ho Rp 130,000.00 Rp 19,500.00
total Rp 625,700.00
Profit + Overhead ( 15%) Rp 93,855.00
JUMLAH Rp 719,555.00

m¹ Rp 7,500.00 Rp 60,000.00
m¹ Rp 5,000.00 Rp 30,000.00
bh Rp 1,000.00 Rp 1,000.00
bh Rp 500.00 Rp 2,500.00
bh Rp 12,000.00 Rp 1,200.00
ho Rp 95,000.00 Rp 28,500.00
ho Rp 110,000.00 Rp 16,500.00
ho Rp 130,000.00 Rp 9,750.00
HARGA JUMLAH HARGA
SAT
( RP ) ( RP )

D E F
subtotal Rp 149,450.00
Profit + Overhead ( 15%) Rp 22,417.50
JUMLAH Rp 171,867.50

bh Rp 250,000.00 Rp 250,000.00
ho Rp 95,000.00 Rp 7,125.00
ho Rp 110,000.00 Rp 4,125.00
ho Rp 130,000.00 Rp 4,875.00
subtotal Rp 266,125.00
Profit + Overhead ( 15%) Rp 39,918.75
JUMLAH Rp 306,043.75
DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN ELEKRIKA

PEKERJAAN : Err:509

LOKASI : PERUM IRMAN JAYA - MANOKWARI

TAHUN : 2014

NO URAIAN SAT

A B C

I HARGA BAHAN

1 AC Stand Tipe , 5 PK Bh

2 AC Split Tipe , 1 PK Bh

3 AC Split Tipe,1/2 PK Bh

4 Lampu SL 18 Watt Bh

5 Lampu Dinding 18 Watt + Armature Bh

6 Lampu Downlight 4'' 23 Watt + armature Bh

7 Lampu Downlight 4'' 18 Watt + armature Bh

8 Lampu Downlight 4'' 14 Watt + armature Bh

9 Lampu Indikator + Alarm Set

10 Lampu Taman 60 Watt + armature Bh

11 Lampu Taman 23 Watt + armature Bh

12 Lampu Sorot 250 Watt Bh

13 Kabel NYM 2x2,5 mm (Eterna) M¹

14 Kabel NYM 3x2,5 mm (Eterna) M¹

15 Kabel NYM 2x4 mm (Eterna) M¹

16 Kabel NYA 1 x 2.5 mm M¹

17 Kabel Rak ( Cable tray ) M¹


NO URAIAN SAT

A B C

18 Kabel Sound Sistem M¹

19 Kawat BC 50 mm lengkap dengan Support, Klem dll M¹

20 Vitting Bh

21 Saklar Tunggal Philip/ Panasonic Bh

22 Saklar Ganda Philip/ Panasonic Bh

23 Stop Kontak Philip/ Panasonic Bh

24 Speaker Ceiiling 3 watt Bh

25 Volume Kontrol Bh

26 Box Sound System ( amplifier ) Bh

27 Klam Pipa 5/8" Bh

28 Isolatif bh

29 Panel BOX Utama Bh

30 Panel BOX Distribusi biasa Bh

31 Panel BOX AC Bh

32 Pipa Elektrik Ø 5/8" M¹

33 Tee Doss/ In Doss Bh

34 Penangkal Petir Type UFO Radius Proteksi 100 Meter M¹

35 PABX minimal 120 channel M¹

36 Instalasi Telepon + kabel ttk

37 Outlet Telepon unit

38 Smoke Detector bh

39 Fire Alarm Terminal Box + Pasang M¹

40 Fire Extinguisher 1 Tabung + Pabel BOX dari kaca M¹


NO URAIAN SAT

A B C

II TENAGA KERJA

1 Mandor Oh

2 Kepala Tukang Oh

3 Tukang Oh

4 Pekerja Oh

5 Instalatur Elektrik Oh
PAH PEKERJAAN ELEKRIKAL

HARGA
KETERANGAN
(RP)
D E

Rp 25,000,000.00

Rp 5,000,000.00

Rp 3,500,000.00

Rp 50,000.00

Rp 250,000.00

Rp 180,000.00

Rp 175,000.00

Rp 155,000.00

Rp 1,000,000.00

Rp 350,000.00

Rp 325,000.00

Rp 300,000.00

Rp 15,000.00

Rp 22,500.00

Rp 25,000.00

Rp 7,500.00

Rp 50,000.00
HARGA
KETERANGAN
(RP)
D E

Rp 15,000.00

Rp 50,000.00

Rp 15,000.00

Rp 40,000.00

Rp 45,000.00

Rp 50,000.00

Rp 350,000.00

Rp 150,000.00

Rp 1,500,000.00

Rp 500.00

Rp 12,000.00

Rp 1,000,000.00

Rp 50,000.00

Rp 1,000,000.00

Rp 5,000.00

Rp 1,000.00

Rp 50,000,000.00

Rp 7,500,000.00

Rp 100,000.00

Rp 500,000.00

Rp 250,000.00

Rp 500,000.00

Rp 1,500,000.00
HARGA
KETERANGAN
(RP)
D E

Rp 130,000.00

Rp 120,000.00

Rp 110,000.00

Rp 95,000.00

Rp 110,000.00
PROGRAM PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TE
LOKASI KOMPLEX PERKANTORAN ARFAI
TAHUN ANGGARAN 2014

DAFTAR HARGA SATUAN BAHAN

NO. URAIAN SAT

1 2 3

I. BAHAN
1 Air Ltr
2 Allumunium Profil Baja Ringan C 75 . 1 mm (Baja Ringan) m'
3 Allumunium Profil C 75 . 0.75mm (Baja Ringan) m'
4 Allumunium Profil 0.43 (Baja Ringan) untuk reng m'
5 Allumunium Profil Metal stud (MS 100) uk 100 x 34 mm m'
6 Allumunium Profil Hollow m'
7 Allumunium Profil Kusen uk. 4'' (coklat) m'
8 Allumunium Profil Jendela Bingkai 3' m'
9 Allumunium Profil U runner (U 100) uk 100 x 30 mm m'
10 Alluco Composit Panel m2
11 Amplas LBR
12 Batu Kali M3
13 Batu Karang timbunan M3
14 Batu Tela 8x14x28 BH
15 Batu Tela Ringan (Hebel) uk.10x20x50 cm BH
16 Batu pecah diameter 2-3cm M3
17 Batu Pecah diameter 2-3cm ( berat jenis 1350kg/m3 ) Kg
18 Batu kerikil kasar m3
19 Besi KG
20 Besi Hollow 40 x 40 mm m'
21 Besi Hollow 20 x 40 mm m'
22 Besi Siku 5 m'
23 Besi Strip lebar 4cm m'
24 Buis beton dia 60cm BH
25 Cat Besi KG
26 Cat Dasar Dinding KG
27 Cat Dinding KG
28 Cat Kayu KG
29 Cat Meni Kayu KG
NO. URAIAN SAT

1 2 3
30 Cat Plamir Kayu KG
31 Cat Plamir Dinding KG
32 Cermin Washtafel uk (1.5 x 0.8 ) m bh
33 Dempul Kayu kg
34 Door Holder ( Pegangan Pintu ) stainlesstell Pintu Utama bh
35 Door Holder ( Pegangan Pintu ) Biasa bh
36 Door Closer ( Alat Tutup Pintu Kaca Otomatis ) bh
37 Engsel Pintu stainlessteel untuk pintu kaca bh
38 Engsel Pintu KG
39 Engsel Jendela KG
40 Floor Drain Stainless bh
41 Gibsum uk (1200 x 2400 x12) mm lbr
42 GRC uk (1200 x 2400 x5) mm lbr
43 Gybsum List plafon m'
44 Gybsum Tepung kg
45 Huruf Stainless stell uk 17 x 20 cm bh
46 Jet Washer TOTO THX 20 NPIV bh
47 KaCa Rayben 12 mm m2
48 KaCa Rayben 5 mm m2
49 KaCa Polos 5 mm m2
50 KaCa Profil m'
51 Kait Angin untuk penahan jendela bh
52 Kunci jendela / Grendel bh
53 Kalkarium Kg
54 Kayu Kelas 1 (Kayu Besi) M3
55 Kayu Kelas 2 (Kayu Matoa) M3
56 Kayu Putih (bekisting) M3
57 Kayu/Dolken Kayu Dia. 8 - 10 Panjang 4 meter BTG
58 Kawat Ikat Beton KG
59 Kawat Las KG
60 Kawat Seng KG
61 Keramik Batu Alam M2
62 Keramik 60 x 60 (granit ) M2
63 Keramik 60 x 60 ( texture kasar ) M2
64 Keramik 10 x 60 bh
65 Keramik 20 x 20 ( texture kasar ) M2
66 Keramik 20 x 25 M2
67 Keramik 30x30 (texture kasar) M2
68 Keramik plint 15x30 (texture kasar) bh
69 Kitchensink bh
70 Klosed Duduk Lengkap Dengan Penampungan Air ( Merek Lotto ) bh
71 Klosed Jongkok bh
NO. URAIAN SAT

1 2 3
72 Kunci Tanam 2 slaag bh
73 Kunci Tanam Biasa utk pintu km/wc bh
74 Kunci Stainlees steel untuk pintu kaca + Engsel + Kelengkapan set
75 Kran Stainlesstell dia 1/2 ' atau 3/4 '' bh
76 Kusen stainless stell untuk pintu utama m'
77 Lem Kayu kg
78 Minyak Bekisting ltr
79 Minyak Cat Kayu ltr
80 Minyak Pelumas ltr
81 Nok Plat seng bjls 0.3mm m'
82 Pagar BRC uk 120 cm x 240 cm , d 8 lbr
83 Pas. Dinding Partisi double Gypsum + Rangka Metalfuring M2
84 Pasir Pasang M3
85 Pasir Cor M3
86 Pasir Cor ( berat jenis 1400kg/m3 ) kg
87 Pasir Urug M3
88 Papan Kayu Putih 2 x 20 x 400 M3
89 Papan Kayu Besi 3 x 20 x 400 M3
90 Papan Kayu Matoa 3 x 30 x 400 M3
91 Papan Kayu Jati 3 x 30 x 400 M3
92 Paku Campuran KG
93 Paku Seng KG
94 Pegangan Jendela bh
95 Pekerjaan Pembuatan Motif Papua + Bahan m2
96 Pipa PVC tepi AW diameter 1 1/2" M'
97 Pipa PVC tipe AW diameter 1/2" M'
98 Pipa PVC tipe AW diameter 3/4" M'
99 Pipa PVC tipe AW diameter 1" M'
100 Pipa PVC tipe AW diameter 3" M'
101 Pipa PVC tipe AW diameter 4" M'
102 Pipa PVC tipe AW diameter 6" M'
103 Pipa Gip Dia 2' M'
104 Pipa Gip Dia 2,5' M'
105 Plester sambungan gibsum M'
106 Plywood 9mm lbr
107 Pohon Pinang bh
108 Roof Drain bh
109 Rumput Gajah mini per stek ( 1 stek uk 15m x 15 cm ) stek
110 Semen PC 50 Kg ZAK
111 Semen Warna Kg
112 Seng Gelombang BJLS 0.3 lbr
113 Seng Allumunium utk Talang 1m' = 0.9 lbr m'
NO. URAIAN SAT

1 2 3
114 Sealant tube
115 Seal tipe ( isolasi pipa ) bh
116 Sirtu m3
117 Skrup fixer 3,5' bh
118 Skrup ( Gibsum ) bh
119 Skrup ( Paku 5cm ) kg
120 Skrup ( Paku Pivet ) bh
121 Skrup ( Ramset Dyna Bolt ) bh
122 Screw Ctex 12-14x50 bh
123 Screw Ctex 10x16-16 bh
124 Spandek Galvalum Zincalum 0,35 mm m2
125 solar ltr
126 Tanah Humus m3
127 Triplex 3mm ltr
128 washtafel + Kran & Accesoris bh
129 watter proofing cat m2
130 watter proofing ( aditive membran ) m2

II. UPAH
1 Pekerja Hari
2 Tukang Hari
3 Kepala tukang Hari
4 Mandor Hari

III. ALAT
1 Sewa Alat untuk Pengelasan ( Mesin Las + Genset ) JAM
2 Excavator JAM
3 Buldozer JAM
MAN MODAL DAN PERIZINAN TERPADU

HAN

HARGA
SATUAN
(Rp)
4
HARGA
SATUAN
(Rp)
4
HARGA
SATUAN
(Rp)
4
HARGA
SATUAN
(Rp)
4

135,000.00
180,000.00
215,000.00
240,000.00

12,500.00
950,000.00
1,196,000.00
PROGRAM PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TE
LOKASI KOMPLEX PERKANTORAN ARFAI
TAHUN ANGGARAN 2014

DAFTAR HARGA SATUAN BAHAN

NO. URAIAN SAT

1 2 3

I. BAHAN
1 Air Ltr
2 Allumunium Profil Baja Ringan C 75 . 1 mm (Baja Ringan) m'
3 Allumunium Profil C 75 . 0.75mm (Baja Ringan) m'
4 Allumunium Profil 0.43 (Baja Ringan) untuk reng m'
5 Allumunium Profil Metal stud (MS 100) uk 100 x 34 mm m'
6 Allumunium Profil Hollow m'
7 Allumunium Profil Kusen uk. 4'' (coklat) m'
8 Allumunium Profil Jendela Bingkai 3' m'
9 Allumunium Profil U runner (U 100) uk 100 x 30 mm m'
10 Alluco Composit Panel m2
11 Amplas LBR
12 Batu Kali M3
13 Batu Karang timbunan M3
14 Batu Tela 8x14x28 BH
15 Batu Tela Ringan (Hebel) uk.10x20x50 cm BH
16 Batu pecah diameter 2-3cm M3
17 Batu Pecah diameter 2-3cm ( berat jenis 1350kg/m3 ) Kg
18 Batu kerikil kasar m3
19 Besi KG
20 Besi Hollow 40 x 40 mm m'
21 Besi Hollow 20 x 40 mm m'
22 Besi Siku 5 m'
23 Besi Strip lebar 4cm m'
24 Buis beton dia 60cm BH
25 Cat Besi KG
26 Cat Dasar Dinding KG
27 Cat Dinding KG
28 Cat Kayu KG
29 Cat Meni Kayu KG
NO. URAIAN SAT

1 2 3
30 Cat Plamir Kayu KG
31 Cat Plamir Dinding KG
32 Cermin Washtafel uk (1.5 x 0.8 ) m bh
33 Dempul Kayu kg
34 Door Holder ( Pegangan Pintu ) stainlesstell Pintu Utama bh
35 Door Holder ( Pegangan Pintu ) Biasa bh
36 Door Closer ( Alat Tutup Pintu Kaca Otomatis ) bh
37 Engsel Pintu stainlessteel untuk pintu kaca bh
38 Engsel Pintu KG
39 Engsel Jendela KG
40 Floor Drain Stainless bh
41 Gibsum uk (1200 x 2400 x12) mm lbr
42 GRC uk (1200 x 2400 x5) mm lbr
43 Gybsum List plafon m'
44 Gybsum Tepung kg
45 Huruf Stainless stell uk 17 x 20 cm bh
46 Jet Washer TOTO THX 20 NPIV bh
47 KaCa Rayben 12 mm m2
48 KaCa Rayben 5 mm m2
49 KaCa Polos 5 mm m2
50 KaCa Profil m'
51 Kait Angin untuk penahan jendela bh
52 Kunci jendela / Grendel bh
53 Kalkarium Kg
54 Kayu Kelas 1 (Kayu Besi) M3
55 Kayu Kelas 2 (Kayu Matoa) M3
56 Kayu Putih (bekisting) M3
57 Kayu/Dolken Kayu Dia. 8 - 10 Panjang 4 meter BTG
58 Kawat Ikat Beton KG
59 Kawat Las KG
60 Kawat Seng KG
61 Keramik Batu Alam M2
62 Keramik 60 x 60 (granit ) M2
63 Keramik 60 x 60 ( texture kasar ) M2
64 Keramik 10 x 60 bh
65 Keramik 20 x 20 ( texture kasar ) M2
66 Keramik 20 x 25 M2
67 Keramik 30x30 (texture kasar) M2
68 Keramik plint 15x30 (texture kasar) bh
69 Kitchensink bh
70 Klosed Duduk Lengkap Dengan Penampungan Air ( Merek Lotto ) bh
71 Klosed Jongkok bh
NO. URAIAN SAT

1 2 3
72 Kunci Tanam 2 slaag bh
73 Kunci Tanam Biasa utk pintu km/wc bh
74 Kunci Stainlees steel untuk pintu kaca + Engsel + Kelengkapan set
75 Kran Stainlesstell dia 1/2 ' atau 3/4 '' bh
76 Kusen stainless stell untuk pintu utama m'
77 Lem Kayu kg
78 Minyak Bekisting ltr
79 Minyak Cat Kayu ltr
80 Minyak Pelumas ltr
81 Nok Plat seng bjls 0.3mm m'
82 Pagar BRC uk 120 cm x 240 cm , d 8 lbr
83 Pas. Dinding Partisi double Gypsum + Rangka Metalfuring M2
84 Pasir Pasang M3
85 Pasir Cor M3
86 Pasir Cor ( berat jenis 1400kg/m3 ) kg
87 Pasir Urug M3
88 Papan Kayu Putih 2 x 20 x 400 M3
89 Papan Kayu Besi 3 x 20 x 400 M3
90 Papan Kayu Matoa 3 x 30 x 400 M3
91 Papan Kayu Jati 3 x 30 x 400 M3
92 Paku Campuran KG
93 Paku Seng KG
94 Pegangan Jendela bh
95 Pekerjaan Pembuatan Motif Papua + Bahan m2
96 Pipa PVC tepi AW diameter 1 1/2" M'
97 Pipa PVC tipe AW diameter 1/2" M'
98 Pipa PVC tipe AW diameter 3/4" M'
99 Pipa PVC tipe AW diameter 1" M'
100 Pipa PVC tipe AW diameter 3" M'
101 Pipa PVC tipe AW diameter 4" M'
102 Pipa PVC tipe AW diameter 6" M'
103 Pipa Gip Dia 2' M'
104 Pipa Gip Dia 2,5' M'
105 Plester sambungan gibsum M'
106 Plywood 9mm lbr
107 Pohon Pinang bh
108 Roof Drain bh
109 Rumput Gajah mini per stek ( 1 stek uk 15m x 15 cm ) stek
110 Semen PC 50 Kg ZAK
111 Semen Warna Kg
112 Seng Gelombang BJLS 0.3 lbr
113 Seng Allumunium utk Talang 1m' = 0.9 lbr m'
NO. URAIAN SAT

1 2 3
114 Sealant tube
115 Seal tipe ( isolasi pipa ) bh
116 Sirtu m3
117 Skrup fixer 3,5' bh
118 Skrup ( Gibsum ) bh
119 Skrup ( Paku 5cm ) kg
120 Skrup ( Paku Pivet ) bh
121 Skrup ( Ramset Dyna Bolt ) bh
122 Screw Ctex 12-14x50 bh
123 Screw Ctex 10x16-16 bh
124 Spandek Galvalum Zincalum 0,35 mm m2
125 solar ltr
126 Tanah Humus m3
127 Triplex 3mm ltr
128 washtafel + Kran & Accesoris bh
129 watter proofing cat m2
130 watter proofing ( aditive membran ) m2

II. UPAH
1 Pekerja Hari
2 Tukang Hari
3 Kepala tukang Hari
4 Mandor Hari

III. ALAT
1 Sewa Alat untuk Pengelasan ( Mesin Las + Genset ) JAM
2 Excavator JAM
3 Buldozer JAM
MAN MODAL DAN PERIZINAN TERPADU

HAN

HARGA
SATUAN
(Rp)
4

60.00
50,000.00
37,500.00
20,000.00
40,000.00
20,000.00
150,000.00
120,000.00
35,000.00
307,465.28
5,000.00
297,000.00
180,000.00
2,500.00
20,000.00
585,000.00
433.33
307,000.00
14,000.00
15,000.00
11,250.00
20,000.00
10,000.00
140,000.00
45,000.00
22,500.00
37,500.00
46,500.00
40,000.00
HARGA
SATUAN
(Rp)
4
45,000.00
30,000.00
750,000.00
40,000.00
175,000.00
125,000.00
300,000.00
125,000.00
45,000.00
30,000.00
50,000.00
125,000.00
80,000.00
15,000.00
8,000.00
50,000.00
95,000.00
750,000.00
150,000.00
130,000.00
10,000.00
20,000.00
30,000.00
22,000.00
4,300,000.00
2,300,000.00
1,900,000.00
12,000.00
22,000.00
40,000.00
25,000.00
200,000.00
300,000.00
300,000.00
15,000.00
80,000.00
80,000.00
75,000.00
4,050.00
250,000.00
3,000,000.00
400,000.00
HARGA
SATUAN
(Rp)
4
300,000.00
125,000.00
400,000.00
50,000.00
125,000.00
30,000.00
25,000.00
30,000.00
30,000.00
25,000.00
850,000.00
450,000.00
290,000.00
295,000.00
210.71
283,000.00
2,200,000.00
4,700,000.00
2,700,000.00
3,636,000.00
22,770.00
22,000.00
20,000.00
700,000.00
14,250.00
6,500.00
7,750.00
9,750.00
41,250.00
61,500.00
92,250.00
75,000.00
90,000.00
250.00
95,000.00
1,500,000.00
50,000.00
25,000.00
100,000.00
4,042.50
70,000.00
105,000.00
HARGA
SATUAN
(Rp)
4
40,000.00
15,000.00
250,000.00
1,500.00
200.00
45,000.00
1,000.00
5,000.00
2,000.00
1,500.00
50,000.00
13,000.00
100,000.00
60,000.00
500,000.00
30,000.00
40,000.00

95,000.00
110,000.00
120,000.00
130,000.00

12,500.00
950,000.00
1,196,000.00
OWNER ESTIMATE PEKERJAAN SITE PLAN TAHAP I

PROGRAM : PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR


KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TERPADU
PEKERJAAN : PEKERJAAN SITEPLAN
LOKASI : KOMPLEX PERKANTORAN ARFAI
TAHUN ANGGARAN : 2014

No TOTAL
Jenis Pekerjaan Keterangan
Volume
1 2 3
A PEKERJAAN PEMBENTUKAN LAHAN
1 Galian Tanah (Utk Pembentukan Halaman) Excavator 8,221.40
2 Menimbun Tanah Kembali Sejauh Rata2 15 m Buldozer 3,931.90
3 Membuang Tanah Ke Jurang Belakang Lokasi Rata2 10-50 m Buldozer (tanah timbun sebagai Pengaman Talud) 4,289.50
Sub Total A
B PEKERJAAN TALUD
1 Talud A
a. Galian pondasi Talud kedalaman 2.5m Alat Berat 206.25
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 903.23
c. Cor Footplat uk (1,2 X 1,2 x 0.3) 10 buah
1. Cor Beton K 250 Lihat Gbr Detail 4.32
2. Pembesian Lihat Gbr Detail 288.36
3. Bekisting Pondasi Plat Lihat Gbr Detail 14.40
d. Cor Kolom uk 30/30
1. Cor Beton K 250 Lihat Gbr Detail 20.52
2. Pembesian Lihat Gbr Detail 2,157.07
3. Bekisting kolom Lihat Gbr Detail 68.41
e. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250 Lihat Gbr Detail 14.44
No TOTAL
Jenis Pekerjaan Keterangan
Volume
1 2 3
2. Pembesian Lihat Gbr Detail 2,065.14
3. Bekisting sloof Lihat Gbr Detail 57.75
f. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 590.21
g. Urugan Pasir Bawah Pondasi tebal 5cm 4.13
h. Pasang Pipa PVC 1.5" untuk buangan air 158.81

2 Talud B
a. Galian pondasi Talud kedalaman 2m Alat Berat 36.00
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 80.18
c. Cor Kolom uk 30/30
1. Cor Beton K 250 Lihat Gbr Detail 2.38
2. Pembesian Lihat Gbr Detail 249.93
3. Bekisting kolom Lihat Gbr Detail 7.93
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250 Lihat Gbr Detail 2.25
2. Pembesian Lihat Gbr Detail 321.84
3. Bekisting sloof Lihat Gbr Detail 9.00
e. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 95.11
f. Urugan Pasir Bawah Pondasi Tebal 5cm 0.90
g. Pasang Pipa PVC 1.5" untuk buangan air 21.60

3 Talud C
a. Galian pondasi Talud kedalaman 2m Alat Berat 18.00
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 59.25
c. Cor Kolom uk 30/30
1. Cor Beton K 250 Lihat Gbr Detail 1.05
2. Pembesian Lihat Gbr Detail 110.11
3. Bekisting kolom Lihat Gbr Detail 3.49
No TOTAL
Jenis Pekerjaan Keterangan
Volume
1 2 3
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250 Lihat Gbr Detail 0.94
2. Pembesian Lihat Gbr Detail 134.10
3. Bekisting sloof Lihat Gbr Detail 3.75
e. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 34.92
f. Urugan Pasir Bawah Pondasi Tebal 5cm 0.30
g. Pasang Pipa PVC 1.5" untuk buangan air 21.60

4 Talud D
a. Galian pondasi Talud kedalaman 1.5m Alat Berat 20.25
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 65.28
c. Cor Kolom uk 30/30
1. Cor Beton K 250 Lihat Gbr Detail 0.90
2. Pembesian Lihat Gbr Detail 94.60
3. Bekisting kolom Lihat Gbr Detail 3.00
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250 Lihat Gbr Detail 1.13
2. Pembesian Lihat Gbr Detail 160.92
3. Bekisting sloof Lihat Gbr Detail 4.50
e. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 45.00
f. Urugan Pasir Bawah Pondasi Tebal 5 cm 0.68
g. Pasang Pipa PVC 1.5" untuk buangan air 4.50

5 Talud E
a. Galian pondasi Talud kedalaman 1m Alat Berat 18.00
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 32.16
c. Cor Kolom uk 30/30
1. Cor Beton K 250 Lihat Gbr Detail 1.24
No TOTAL
Jenis Pekerjaan Keterangan
Volume
1 2 3
2. Pembesian Lihat Gbr Detail 130.17
3. Bekisting kolom Lihat Gbr Detail 4.13
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250 Lihat Gbr Detail 1.13
2. Pembesian Lihat Gbr Detail 160.92
3. Bekisting sloof Lihat Gbr Detail 4.50
e. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 41.28
f. Urugan Pasir Bawah Pondasi Tebal 5cm 0.90
g. Pasang Pipa PVC 1.5" untuk buangan air 9.75

6 Talud F
a. Galian pondasi Talud kedalaman 1m Alat Berat 7.44
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 27.02
c. Cor Kolom uk 30/30
1. Cor Beton K 250 Lihat Gbr Detail 0.48
2. Pembesian Lihat Gbr Detail 50.04
3. Bekisting kolom Lihat Gbr Detail 1.59
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250 Lihat Gbr Detail 0.56
2. Pembesian Lihat Gbr Detail 80.46
3. Bekisting sloof Lihat Gbr Detail 2.25
e. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 15.87
f. Urugan Pasir Bawah Pondasi Tebal 5cm 0.37
g. Pasang Pipa PVC 1.5" untuk buangan air 6.50

7 Talud G
a. Galian pondasi Talud kedalaman 1m Alat Berat 8.21
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 16.70
No TOTAL
Jenis Pekerjaan Keterangan
Volume
1 2 3
c. Cor Kolom uk 30/30
1. Cor Beton K 250 Lihat Gbr Detail 0.66
2. Pembesian Lihat Gbr Detail 69.81
3. Bekisting kolom Lihat Gbr Detail 2.21
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250 Lihat Gbr Detail 0.52
2. Pembesian Lihat Gbr Detail 74.15
3. Bekisting sloof Lihat Gbr Detail 3.11
e. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 15.30
f. Urugan Pasir Bawah Pondasi Tebal 5cm 0.90
g. Pasang Pipa PVC 1.5" untuk buangan air 0.41

8 Talud H
a. Galian pondasi Talud kedalaman 1,5m Alat Berat 5.43
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 10.24
c. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 17.50
d. Urugan Pasir Bawah Pondasi Tebal 5cm 0.18
e. Pasang Pipa PVC 1.5" untuk buangan air 3.00

9 Talud I
a. Galian pondasi Talud kedalaman Rata2 3 m Alat Berat 23.40
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 16.28
c. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 31.20
d. Urugan Pasir Bawah Pondasi Tebal 5cm 0.33
No TOTAL
Jenis Pekerjaan Keterangan
Volume
1 2 3
e. Pasang Pipa PVC 1.5" untuk buangan air 7.50

10 Talud J
a. Galian pondasi Talud kedalaman Rata2 1.2 m Alat Berat 7.50
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 28.51
c. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 21.00
d. Urugan Pasir Bawah Pondasi Tebal 5cm 0.30
e. Pasang Pipa PVC 1.5" untuk buangan air 7.50

11 Talud K
a. Galian pondasi Talud kedalaman Rata2 1.2 m Alat Berat 4.20
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 11.25
c. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 7.02
d. Urugan Pasir Bawah Pondasi Tebal 5cm 0.15
e. Pasang Pipa PVC 1.5" untuk buangan air 2.50

12 Talud L
a. Galian pondasi Talud kedalaman Rata2 1 m Alat Berat 1.58
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 4.12
c. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 0.85
d. Urugan Pasir Bawah Pondasi Tebal 5cm 0.08

13 Talud M
a. Galian pondasi Talud kedalaman Rata2 1 m Alat Berat 1.28
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 3.38
c. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 4.35
d. Urugan Pasir Bawah Pondasi Tebal 5cm 0.08
No TOTAL
Jenis Pekerjaan Keterangan
Volume
1 2 3

14 Talud R
a. Galian pondasi Talud kedalaman Rata2 0.5 m Alat Berat 35.34
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 196.20
c. Cor Kolom uk 25/25
1. Cor Beton K 250 Lihat Gbr Detail 5.00
2. Pembesian Lihat Gbr Detail 715.20
3. Bekisting kolom Lihat Gbr Detail 20.00
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250 Lihat Gbr Detail 8.03
2. Pembesian Lihat Gbr Detail 1,147.90
3. Bekisting sloof Lihat Gbr Detail 32.10
e. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 214.00
f. Urugan Pasir Bawah Pondasi Tebal 5cm 3.21

15 Talud T
a. Galian pondasi Talud kedalaman Rata2 1 m Alat Berat 15.12
b. Pasangan Batu Kali 1 Pc : 4Psr Lihat Gbr Detail 27.19
c. Plesteran Mata sapi 1 PC : 4 PSR Lihat Gbr Detail 22.02
d. Urugan Pasir Bawah Pondasi Tebal 5cm 0.72

Sub Total B

REKAPITULASI TOTAL

No Jenis Pekerjaan
No TOTAL
Jenis Pekerjaan Keterangan
Volume
1 2 3
1 2

A PEKERJAAN PEMBENTUKAN LAHAN


B PEKERJAAN TALUD
REAL COST
ATE PEKERJAAN SITE PLAN TAHAP I

TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

M3 14,890.20 122,418,290.28
M3 19,946.05 78,425,877.14
M3 19,946.05 85,558,584.91
ub Total A 286,402,752.33

m3 14,890.20 3,071,103.75
m3 665,453.25 601,057,339.00

m3 342,918.50 1,481,407.92
kg 2,819.23 812,951.72
m2 147,878.50 2,129,450.40

m3 342,918.50 7,037,304.87
kg 2,819.23 6,081,263.42
m2 188,042.25 12,863,218.15

m3 342,918.50 4,950,885.84
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
kg 2,819.23 5,822,094.32
m2 148,154.50 8,555,922.38
m2 85,473.75 50,447,034.62
m3 49,335.00 203,506.88
m' 0.00 0.00
Total Talud A 704,513,483.26

m3 14,890.20 536,047.20
m3 665,453.25 53,356,041.59

m3 342,918.50 815,391.61
kg 2,819.23 704,617.93
m2 188,042.25 1,490,422.87

m3 342,918.50 771,566.63
kg 2,819.23 907,339.37
m2 148,154.50 1,333,390.50
m2 85,473.75 8,129,579.31
m3 49,335.00 44,401.50
m' 0.00 0.00
Total Talud B 68,088,798.50

m3 14,890.20 268,023.60
m3 665,453.25 39,428,105.06

m3 342,918.50 359,241.42
kg 2,819.23 310,437.27
m2 188,042.25 656,643.54
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

m3 342,918.50 321,486.09
kg 2,819.23 378,058.07
m2 148,154.50 555,579.38
m2 85,473.75 2,984,743.35
m3 49,335.00 14,800.50
m' 0.00 0.00
Total Talud C 45,277,118.28

m3 14,890.20 301,526.55
m3 665,453.25 43,440,788.16

m3 342,918.50 308,626.65
kg 2,819.23 266,698.69
m2 188,042.25 564,126.75

m3 342,918.50 385,783.31
kg 2,819.23 453,669.69
m2 148,154.50 666,695.25
m2 85,473.75 3,846,318.75
m3 49,335.00 33,301.13
m' 0.00 0.00
Total Talud D 50,267,534.92

m3 14,890.20 268,023.60
m3 665,453.25 21,400,976.52

m3 342,918.50 424,670.27
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
kg 2,819.23 366,977.39
m2 188,042.25 776,238.41

m3 342,918.50 385,783.31
kg 2,819.23 453,669.69
m2 148,154.50 666,695.25
m2 85,473.75 3,528,356.40
m3 49,335.00 44,401.50
m' 0.00 0.00
Total Talud E 28,315,792.34

m3 14,890.20 110,783.09
m3 665,453.25 17,980,546.82

m3 342,918.50 163,263.50
kg 2,819.23 141,083.60
m2 188,042.25 298,423.05

m3 342,918.50 192,891.66
kg 2,819.23 226,834.84
m2 148,154.50 333,347.63
m2 85,473.75 1,356,468.41
m3 49,335.00 18,352.62
m' 0.00 0.00
Total Talud F 20,821,995.21

m3 14,890.20 122,270.22
m3 665,453.25 11,113,069.28
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6

m3 342,918.50 227,766.47
kg 2,819.23 196,823.63
m2 188,042.25 416,325.54

m3 342,918.50 177,768.95
kg 2,819.23 209,050.99
m2 148,154.50 460,819.76
m2 85,473.75 1,308,019.16
m3 49,335.00 44,401.50
m' 0.00 0.00
Total Talud G 14,276,315.49

m3 14,890.20 80,779.34
m3 665,453.25 6,814,241.28
m2 85,473.75 1,495,790.63
m3 49,335.00 8,633.63
m' 0.00 0.00
Total Talud H 8,399,444.87

m3 14,890.20 348,430.68
m3 665,453.25 10,833,578.91
m2 85,473.75 2,666,781.00
m3 49,335.00 16,033.88
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
m' 0.00 0.00
Total Talud I 13,864,824.47

m3 14,890.20 111,676.50
m3 665,453.25 18,972,072.16
m2 85,473.75 1,794,948.75
m3 49,335.00 14,800.50
m' 0.00 0.00
Total Talud J 20,893,497.91

m3 14,890.20 62,538.84
m3 665,453.25 7,486,349.06
m2 85,473.75 600,025.73
m3 49,335.00 7,400.25
m' 0.00 0.00
Total Talud K 8,156,313.88

m3 14,890.20 23,452.07
m3 665,453.25 2,741,667.39
m2 85,473.75 72,652.69
m3 49,335.00 3,700.13
Total Talud L 2,841,472.27

m3 14,890.20 18,985.01
m3 665,453.25 2,249,231.99
m2 85,473.75 371,810.81
m3 49,335.00 3,700.13
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
Total Talud M 2,643,727.93

m3 14,890.20 526,264.34
m3 665,453.25 130,561,927.65

m3 342,918.50 1,714,592.50
kg 2,819.23 2,016,309.72
m2 188,042.25 3,760,845.00

m3 342,918.50 2,751,920.96
kg 2,819.23 3,236,177.10
m2 148,154.50 4,755,759.45
m2 85,473.75 18,291,382.50
m3 49,335.00 158,513.36
Total Talud R 167,773,692.58

m3 14,890.20
m3 665,453.25
m2 85,473.75
m3 49,335.00
Total Talud R
ub Total B 1,156,134,011.89

REKAPITULASI TOTAL

is Pekerjaan Jumlah Harga


( Rp )
TOTAL

Satuan Harga Satuan Jumlah Harga( Rp )


4 5 6
2 3

286,402,752.33
1,156,134,011.89
REAL COST Rp 1,442,536,764.22
ENGENERING ESTIMATE P

PROGRAM : PROGRAM PENINGKATAN SARANA DA


KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BA
PEKERJAAN : PEKERJAAN SITEPLAN
LOKASI : KOMPLEX PERKANTORAN ARFAI
TAHUN ANGGARAN : 2014

No
Jenis Pekerjaan

1 2
A PEKERJAAN PEMBENTUKAN LAHAN
1 Galian Tanah (Utk Pembentukan Halaman)
2 Menimbun Tanah Kembali Sejauh Rata2 15 m
3 Membuang Tanah Ke Jurang Belakang Lokasi Rata2 10-50 m
Sub Total A
B PEKERJAAN TALUD
1 Talud A
a. Galian pondasi Talud kedalaman 2.5m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Footplat uk (1,2 X 1,2 x 0.3) 10 buah
1. Cor Beton K 250
2. Pembesian
3. Bekisting Pondasi Plat
d. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
e. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
f. Plesteran Mata sapi 1 PC : 4 PSR
g. Urugan Pasir Bawah Pondasi tebal 5cm
h. Pasang Pipa PVC 1.5" untuk buangan air

2 Talud B
a. Galian pondasi Talud kedalaman 2m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
No
Jenis Pekerjaan

1 2
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

3 Talud C
a. Galian pondasi Talud kedalaman 2m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

4 Talud D
a. Galian pondasi Talud kedalaman 1.5m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5 cm
g. Pasang Pipa PVC 1.5" untuk buangan air
No
Jenis Pekerjaan

1 2

5 Talud E
a. Galian pondasi Talud kedalaman 1m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

6 Talud F
a. Galian pondasi Talud kedalaman 1m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

7 Talud G
a. Galian pondasi Talud kedalaman 1m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 30/30
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
No
Jenis Pekerjaan

1 2
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm
g. Pasang Pipa PVC 1.5" untuk buangan air

8 Talud H
a. Galian pondasi Talud kedalaman 1,5m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm
e. Pasang Pipa PVC 1.5" untuk buangan air

9 Talud I
a. Galian pondasi Talud kedalaman Rata2 3 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm
e. Pasang Pipa PVC 1.5" untuk buangan air

10 Talud J
a. Galian pondasi Talud kedalaman Rata2 1.2 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm
e. Pasang Pipa PVC 1.5" untuk buangan air

11 Talud K
a. Galian pondasi Talud kedalaman Rata2 1.2 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm
e. Pasang Pipa PVC 1.5" untuk buangan air

12 Talud L
a. Galian pondasi Talud kedalaman Rata2 1 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm
No
Jenis Pekerjaan

1 2

13 Talud M
a. Galian pondasi Talud kedalaman Rata2 1 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Plesteran Mata sapi 1 PC : 4 PSR
d. Urugan Pasir Bawah Pondasi Tebal 5cm

14 Talud R
a. Galian pondasi Talud kedalaman Rata2 0.5 m
b. Pasangan Batu Kali 1 Pc : 4Psr
c. Cor Kolom uk 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting kolom
d. Cor Balok & Sloof Beton 25/25
1. Cor Beton K 250
2. Pembesian
3. Bekisting sloof
e. Plesteran Mata sapi 1 PC : 4 PSR
f. Urugan Pasir Bawah Pondasi Tebal 5cm

Sub Total B

REKAP

No Jenis Pekerja

1 2

A PEKERJAAN PEMBENTUKAN LAHAN


B PEKERJAAN TALUD
ENERING ESTIMATE PEKERJAAN SITE PLAN TAHAP I

RAM PENINGKATAN SARANA DAN PRASARANA APARATUR


NGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TERPADU
JAAN SITEPLAN
EX PERKANTORAN ARFAI

TOTAL
Keterangan
Volume Satuan
3 4

Excavator 8,221.40 M3
Buldozer 3,931.90 M3
Buldozer (tanah timbun sebagai Pengaman Talud) 4,289.50 M3
Sub Total A

Alat Berat 206.25 m3


Lihat Gbr Detail 903.23 m3

Lihat Gbr Detail 4.32 m3


Lihat Gbr Detail 288.36 kg
Lihat Gbr Detail 14.40 m2

Lihat Gbr Detail 20.52 m3


Lihat Gbr Detail 2,157.07 kg
Lihat Gbr Detail 68.41 m2

Lihat Gbr Detail 14.44 m3


Lihat Gbr Detail 2,065.14 kg
Lihat Gbr Detail 57.75 m2
Lihat Gbr Detail 590.21 m2
4.13 m3
158.81 m'

Alat Berat 36.00 m3


Lihat Gbr Detail 80.18 m3
TOTAL
Keterangan
Volume Satuan
3 4
Lihat Gbr Detail 2.38 m3
Lihat Gbr Detail 249.93 kg
Lihat Gbr Detail 7.93 m2

Lihat Gbr Detail 2.25 m3


Lihat Gbr Detail 321.84 kg
Lihat Gbr Detail 9.00 m2
Lihat Gbr Detail 95.11 m2
0.90 m3
21.60 m'

Alat Berat 18.00 m3


Lihat Gbr Detail 59.25 m3

Lihat Gbr Detail 1.05 m3


Lihat Gbr Detail 110.11 kg
Lihat Gbr Detail 3.49 m2

Lihat Gbr Detail 0.94 m3


Lihat Gbr Detail 134.10 kg
Lihat Gbr Detail 3.75 m2
Lihat Gbr Detail 34.92 m2
0.30 m3
21.60 m'

Alat Berat 20.25 m3


Lihat Gbr Detail 65.28 m3

Lihat Gbr Detail 0.90 m3


Lihat Gbr Detail 94.60 kg
Lihat Gbr Detail 3.00 m2

Lihat Gbr Detail 1.13 m3


Lihat Gbr Detail 160.92 kg
Lihat Gbr Detail 4.50 m2
Lihat Gbr Detail 45.00 m2
0.68 m3
4.50 m'
TOTAL
Keterangan
Volume Satuan
3 4

Alat Berat 18.00 m3


Lihat Gbr Detail 32.16 m3

Lihat Gbr Detail 1.24 m3


Lihat Gbr Detail 130.17 kg
Lihat Gbr Detail 4.13 m2

Lihat Gbr Detail 1.13 m3


Lihat Gbr Detail 160.92 kg
Lihat Gbr Detail 4.50 m2
Lihat Gbr Detail 41.28 m2
0.90 m3
9.75 m'

Alat Berat 7.44 m3


Lihat Gbr Detail 27.02 m3

Lihat Gbr Detail 0.48 m3


Lihat Gbr Detail 50.04 kg
Lihat Gbr Detail 1.59 m2

Lihat Gbr Detail 0.56 m3


Lihat Gbr Detail 80.46 kg
Lihat Gbr Detail 2.25 m2
Lihat Gbr Detail 15.87 m2
0.37 m3
6.50 m'

Alat Berat 8.21 m3


Lihat Gbr Detail 16.70 m3

Lihat Gbr Detail 0.66 m3


Lihat Gbr Detail 69.81 kg
Lihat Gbr Detail 2.21 m2

Lihat Gbr Detail 0.52 m3


TOTAL
Keterangan
Volume Satuan
3 4
Lihat Gbr Detail 74.15 kg
Lihat Gbr Detail 3.11 m2
Lihat Gbr Detail 15.30 m2
0.90 m3
0.41 m'

Alat Berat 5.43 m3


Lihat Gbr Detail 10.24 m3
Lihat Gbr Detail 17.50 m2
0.18 m3
3.00 m'

Alat Berat 23.40 m3


Lihat Gbr Detail 16.28 m3
Lihat Gbr Detail 31.20 m2
0.33 m3
7.50 m'

Alat Berat 7.50 m3


Lihat Gbr Detail 28.51 m3
Lihat Gbr Detail 21.00 m2
0.30 m3
7.50 m'

Alat Berat 4.20 m3


Lihat Gbr Detail 11.25 m3
Lihat Gbr Detail 7.02 m2
0.15 m3
2.50 m'

Alat Berat 1.58 m3


Lihat Gbr Detail 4.12 m3
Lihat Gbr Detail 0.85 m2
0.08 m3
TOTAL
Keterangan
Volume Satuan
3 4

Alat Berat 1.28 m3


Lihat Gbr Detail 3.38 m3
Lihat Gbr Detail 4.35 m2
0.08 m3

Alat Berat 35.34 m3


Lihat Gbr Detail 196.20 m3

Lihat Gbr Detail 5.00 m3


Lihat Gbr Detail 715.20 kg
Lihat Gbr Detail 20.00 m2

Lihat Gbr Detail 8.03 m3


Lihat Gbr Detail 1,147.90 kg
Lihat Gbr Detail 32.10 m2
Lihat Gbr Detail 214.00 m2
3.21 m3

Sub Total B

REKAPITULASI TOTAL

Jenis Pekerjaan

REAL COST
HAP I

INAN TERPADU

TOTAL

Harga Satuan Jumlah Harga( Rp )


5 6

14,890.20 122,418,290.28
19,946.05 78,425,877.14
19,946.05 85,558,584.91
286,402,752.33

14,890.20 3,071,103.75
665,453.25 601,057,339.00

342,918.50 1,481,407.92
2,819.23 812,951.72
147,878.50 2,129,450.40

342,918.50 7,037,304.87
2,819.23 6,081,263.42
188,042.25 12,863,218.15

342,918.50 4,950,885.84
2,819.23 5,822,094.32
148,154.50 8,555,922.38
85,473.75 50,447,034.62
49,335.00 203,506.88
0.00 0.00
Total Talud A 704,513,483.26

14,890.20 536,047.20
665,453.25 53,356,041.59
TOTAL

Harga Satuan Jumlah Harga( Rp )


5 6
342,918.50 815,391.61
2,819.23 704,617.93
188,042.25 1,490,422.87

342,918.50 771,566.63
2,819.23 907,339.37
148,154.50 1,333,390.50
85,473.75 8,129,579.31
49,335.00 44,401.50
0.00 0.00
Total Talud B 68,088,798.50

14,890.20 268,023.60
665,453.25 39,428,105.06

342,918.50 359,241.42
2,819.23 310,437.27
188,042.25 656,643.54

342,918.50 321,486.09
2,819.23 378,058.07
148,154.50 555,579.38
85,473.75 2,984,743.35
49,335.00 14,800.50
0.00 0.00
Total Talud C 45,277,118.28

14,890.20 301,526.55
665,453.25 43,440,788.16

342,918.50 308,626.65
2,819.23 266,698.69
188,042.25 564,126.75

342,918.50 385,783.31
2,819.23 453,669.69
148,154.50 666,695.25
85,473.75 3,846,318.75
49,335.00 33,301.13
0.00 0.00
TOTAL

Harga Satuan Jumlah Harga( Rp )


5 6
Total Talud D 50,267,534.92

14,890.20 268,023.60
665,453.25 21,400,976.52

342,918.50 424,670.27
2,819.23 366,977.39
188,042.25 776,238.41

342,918.50 385,783.31
2,819.23 453,669.69
148,154.50 666,695.25
85,473.75 3,528,356.40
49,335.00 44,401.50
0.00 0.00
Total Talud E 28,315,792.34

14,890.20 110,783.09
665,453.25 17,980,546.82

342,918.50 163,263.50
2,819.23 141,083.60
188,042.25 298,423.05

342,918.50 192,891.66
2,819.23 226,834.84
148,154.50 333,347.63
85,473.75 1,356,468.41
49,335.00 18,352.62
0.00 0.00
Total Talud F 20,821,995.21

14,890.20 122,270.22
665,453.25 11,113,069.28

342,918.50 227,766.47
2,819.23 196,823.63
188,042.25 416,325.54

342,918.50 177,768.95
TOTAL

Harga Satuan Jumlah Harga( Rp )


5 6
2,819.23 209,050.99
148,154.50 460,819.76
85,473.75 1,308,019.16
49,335.00 44,401.50
0.00 0.00
Total Talud G 14,276,315.49

14,890.20 80,779.34
665,453.25 6,814,241.28
85,473.75 1,495,790.63
49,335.00 8,633.63
0.00 0.00
Total Talud H 8,399,444.87

14,890.20 348,430.68
665,453.25 10,833,578.91
85,473.75 2,666,781.00
49,335.00 16,033.88
0.00 0.00
Total Talud I 13,864,824.47

14,890.20 111,676.50
665,453.25 18,972,072.16
85,473.75 1,794,948.75
49,335.00 14,800.50
0.00 0.00
Total Talud J 20,893,497.91

14,890.20 62,538.84
665,453.25 7,486,349.06
85,473.75 600,025.73
49,335.00 7,400.25
0.00 0.00
Total Talud K 8,156,313.88

14,890.20 23,452.07
665,453.25 2,741,667.39
85,473.75 72,652.69
49,335.00 3,700.13
TOTAL

Harga Satuan Jumlah Harga( Rp )


5 6
Total Talud L 2,841,472.27

14,890.20 18,985.01
665,453.25 2,249,231.99
85,473.75 371,810.81
49,335.00 3,700.13
Total Talud M 2,643,727.93

14,890.20 526,264.34
665,453.25 130,561,927.65

342,918.50 1,714,592.50
2,819.23 2,016,309.72
188,042.25 3,760,845.00

342,918.50 2,751,920.96
2,819.23 3,236,177.10
148,154.50 4,755,759.45
85,473.75 18,291,382.50
49,335.00 158,513.36
Total Talud R 167,773,692.58
1,156,134,011.89

Jumlah Harga
( Rp )
3

286,402,752.33
1,156,134,011.89
EAL COST Rp 1,442,536,764.22
ENGENERING ESTIMATE GEDUNG KAN

PROGRAM : PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR


KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZ
PEKERJAAN : PEMBANGUNAN KANTOR
LOKASI : KOMPLEX PERKANTORAN ARFAI
TAHUN ANGGARAN : 2014

No Jenis Pekerjaan

1 2

A PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bowplank
Sub Total A
B PEKERJAAN TANAH
1 Galian Pondasi Menerus
2 Galian Pondasi Footplat
3 Urugan Tanah Kembali
4 Urugan Pasir bawah Pondasi Footplat
Sub Total B
C PEKERJAAN SUB STRUKTUR
1 Pondasi
a. Pondasi Footplat F1
1. Cor Beton K 325
2. Pembesian
3. Bekisting
4. Lantai Kerja
b. Pondasi Footplat F2 (Dikerjakan 12 buah dari total 16 buah)
1. Cor Beton K 325
2. Pembesian
3. Bekisting
4. Lantai Kerja
c. Pasang Aanstamping
d. Pasang Pondasi batu kali 1 pc : 4 psr
2 Kolom
a. Kolom K1
1. Cor Beton K 325 (pengecoran setinggi pondasi menerus)
2. Pembesian (Pengerjaan Sampai pondasi Menerus over stek 1m)
3. Bekisting
b. Kolom K2
1. Cor Beton K 325 (pengecoran setinggi pondasi menerus)
2. Pembesian (Pengerjaan Sampai pondasi Menerus over stek 1m)
3. Bekisting
Sub Total D

REKAPITULASI TAHAP I

No Jenis Pekerjaan

1 2
A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH
C PEKERJAAN SUB STRUKTUR
REA
ESTIMATE GEDUNG KANTOR TAHAP I

N PRASARANA APARATUR
DAN PENANAMAN MODAL DAN PERIZINAN TERPADU

TOTAL
Volume Satuan Harga Satuan( Rp ) Jumlah ( Rp )
3 4 5 6

114.00 M' 40,077.50 4,568,835.00


Total A 4,568,835.00

318.15 m3 14,890.20 4,737,317.13


186.02 m3 14,890.20 2,769,845.22
276.89 m3 35,052.00 9,705,478.18
5.06 m3 49,335.00 249,635.10
Total B 17,462,275.63

18.90 m3 436,108.75 8,242,455.38


1,644.72 kg 2,819.23 4,636,835.74
50.40 m2 147,878.50 7,453,076.40
8.09 m2 249,205.00 2,016,566.86

5.18 m3 436,108.75 2,260,787.76


461.38 kg 2,819.23 1,300,722.75
17.28 m2 147,878.50 2,555,340.48
2.03 m2 0.00 0.00
60.6 m3 332,120.00 20,126,472.00
226.8 m3 1,394,444.00 316,259,899.20

15.40 m3 436,108.75 6,716,074.75


3,457.55 kg 2,819.23 9,747,617.04
123.20 m2 188,042.25 23,166,805.20

5.63 m3 436,108.75 2,456,164.48


1,001.60 kg 2,819.23 2,823,735.76
56.32 m2 0.00 0.00
Total D 409,762,553.80

REKAPITULASI TAHAP I

Pekerjaan Jumlah Harga


( Rp )
2 3
4,568,835.00
17,462,275.63
409,762,553.80
REAL COST KANTOR TAHAP I 431,793,664.43
REKAPITULASI ENGENERING ESTIMATE TAHAP I
PROGRAM PROGRAM PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN PEMBANGUNAN GEDUNG KANTOR BADAN PENANAMAN MODAL DAN PERIZINAN TERPADU
PEKERJAAN PEMBANGUNAN TAHAP I
LOKASI KOMPLEX PERKANTORAN ARFAI
TAHUN 2014

NO. URAIAN PEKERJAAN SUB TOTAL

I PEKERJAAN PENDAHULUAN Rp 241,482,247.80


II PEKERJAAN SITEPLAN Rp 1,442,536,764.22
III PEMBANGUNAN KANTOR Rp 431,793,664.43
REAL COST Rp 2,115,812,676.45
PPN 10 % Rp 211,581,267.64
TOTAL COST Rp 2,327,393,944.09
DIBULATKAN Rp 2,327,300,000.00

TERBILANG :
EMPAT MILYAR LIMA BELAS JUTA RUPIAH

Mengetahui
PEJABAT / Menyetujui
PELAKSANA :
TEKNIS DISUSUN OLEH,
KEGIATAN (PPTK) KONSULTAN PERENCANAAN
PT. SOLID KONSULTAN

AGUS RIANTO , SE LUKITA ADI , ST


NIP. 19620817 199703 1 004 DIREKTUR