Anda di halaman 1dari 2

SUN OIL AND NATURAL GAS

(SUN PETROCHEMICALS PVT. LTD.)

Daily Morning Meeting MOM-Hazira Operations


Document No. SunPetro/SONG/Guj/Hazira/O&M/MM/2018/R/0 Time: 10:00 to 10:30 hrs Date : 17th Jan 2018
S.
Department Points Discussed Action/Status
No.
1 HAZ 09 well to be kept under observation.
2 Skim Tank draining issue resolved.
Operations 3 Visit to HAZ 02 conducted
4 PPT dosing tank leak Arrested
5 Schedule changeover of propane compressor done yesterday
Fire water line work ongoing, pipe shifting , manual excavation and pre fabrication
6
work at Aneri yard .
Emergency medical service agreement handed over to Dr. Girish Gangwal(Care
7
hospital ESSAR). Will reviewed, signed and handed over by tomorrow.
8 OHCP updates review ongoing.
HSE 9 Fire water sample given for SRB testing.
Manual excavation work for fire water line to continue today as well. Hot work
10
planned for tomorrow
11
12
13 Offshore points to be closed based on yesterday visit.
14 PM for final discharge pump planned today.
Maintenance
15 MSR being raised for electrical for new instrument air compressor.
16 All material ordered should be with proper specification to ensure proper processing
from commercial side.
17 DGMS annual report preparation ongoing as per CEA-2010.
18 Joint calibration with bias done for meter – 4004,4006 and gas chromatograph.
19 Honeywell representative visiting today for DCS feasibility study.
Instrument Cable shifted for Instrument air compressor to the laying location(MCC to
20
DCS)
21 Routine activities ongoing.
22 Instrument air compressor Civil TC to be floated today.
23 Pipe and fittings TC will be send by tomorrow.
24 Charcoal filter TC will be sent on priority.
ABB Turbocharger TC will be sent today as the confirmation on rate has been
25
received.
Others NO other quotation received other than GIMMCO for 3616. GIMMCO will be finalized
26
if no other quotation is received.
27 ISO training Vendor will be finalized today with justification.
28 Sewer AMC quotation received, TC planned for today.
29 For RO plant, finalization will be done after sample analysis.
30 Gardener coming today for discussion.

Anda mungkin juga menyukai