KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of design mix M20
with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates
@0.878cum and fine aggregtes @ 0.459cum, with superplastisiser @3lts confirming to IS9103-
1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick,
5 vibrated for all works in foundation plinth and ground floor level for roof slabs, staircase, lintles,
retaining walls, return walls, walls ( any thickness ) including attached plasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks,
anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of
machinery, curing, complete as per specifications. Specification No. KBS 4.1, 4.6
Plinth
Longwall 2x3 7.01 0.15 4.21
short wall 2x2 7.47 0.15 2.99
Partition wall 1x2 5.31 0.15 1.06
8.26 284.00 2346.00
Sqm
KSRB 4-1.7 : Providing and laying in position plain cement concrete of mix M10 ( 1:3:6)
with OPC cement @ 220kgs, with 20mm and down size graded granite metal coarse aggregates
@0.84cum and fine aggregtes @ 0.56cum machine mixed, machine mixed, concrete laid in layers
11 not exceeding 15 cms. thick, well compacted, in foundation, plinth and cills , cost of all materials,
labour, HOM of machinery, curing complete as per specifications. Specification No. KBS 4.1,
4.2(PWD SR 2015-16 page no 13 item no 4.7)
Plinth concrete
Longwall 3 7.01 0.45 0.15 1.42
short wall 2 7.47 0.45 0.15 1.01
Entrance steps 1 1.50 0.23 0.15 0.05
Partition wall 1 5.31 0.35 0.15 0.28
2.76 4766.00 13147.00
Cum
Filling available excavated earth (excluding rock) in sides of foundations upto plinth in layers not
exceeding 20cms. In depth compacting each deposited layers by ramiing after watering with lead
12 upto 50M and lift upto 1.50M including cost of all labour complete as per specifications. (P- 6, I-
2.10)
Filling
Alround Foundation Ewe-(CC bed+ssm) 5.50
Filling Up to plinth level LS 7.50
Hall 1 6.94 3.72 0.45 11.62
Kitchen 1 5.27 2.47 0.45 5.86
store 1 1.35 1.20 0.45 0.73
WC 1 1.35 0.95 0.45 0.58
31.78 120.00 3814.00
Cum
KSRB 5-11 : Providing and constructing load bearing wall with cement concretecavities blocks
( hollow blocks ) of proportion 1:5:3 blocks of size 40x20x20cms. ( lxbxh ) strength not less than
50 kg. per sqm with cement mortar 1:4 conforming to I.S. 2185 of 1967 having not less than
13 40mm. shell thickness with two or more large cavities and having solid material between
including cost of materials, labour charges, scaffolding, curing complete as per specifications.
KBS No.5.4
Lintel
Longwall 2x3 7.16 0.15 6.44
short wall 2x2 7.32 0.15 4.39
10.83
2 0.30 0.10 0.06
Net Qty 3.61 - 0.06 10.77 329.00 3543.00
Sqm
KSRB 4-6.10 :Providing and removing centering, shuttering, strutting, propping etc., for chajjas,
16 corbels etc., including edges including cost of all materials, labour complete as per specificaiton.
Specification No. KBS 4.6.2 (PWD SR 2015-16 page no 16 item no 4.37)
KSRB 4-6.3 : Providing and removing centering, shuttering, strutting, propping etc., and removal
of form work for flat surface such as suspended floors, roofs, landings, balconies and likes,
17 thickness above 200 mm including cost of all materials, labour complete as per specificaiton.
Specification No. KBS 4.6.2(PWD SR 2015-16 page no 16 item no 4.30)
Roof 1 8.08 7.78 62.86
Beam 1x2 3.94 0.30 2.36
Toilet soak pit slab 1 2.00 2.00 4.00
69.22 374.00 25888.00
Sqm
KSRB 4.9.2 : Providing T.M.T steel reinforcement for R.C.C work including straightening,
cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying
with binding wire and anchoring to the adjoining members wherever necessary complete as per
18 design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM
of machinery complete as per specifications. Specification No. KBS 4.6.3 (PWD SR 2015-16
page no 17 item no 4.46)
Chajjas
window 5 1.40 0.60 4.20
Ventilator 4 0.80 0.40 1.28
E.D 1 1.20 0.60 0.72
D2 2 0.90 0.60 1.08
7.28 414.00 3014.00
Sqm
KSRB 4.2.8 : Providing and laying in position reinforced cement concrete of mix M20 with OPC
cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum
and fine aggregtes @ 0.46cum, with superplastisiser@ 3lts confirming to IS9103-1999
Reaffirmed -2008 , machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated
for all works in foundation plinth and ground floor level for roof slabs, staircase, lintles, retaining
21 walls, return walls, walls ( any thickness ) including attached plasters, columns, piers, abutments,
pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor
blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery,
curing, complete as per specifications. Specification No. KBS 4.1, 4.6(PWD SR 2015-16 page no
14 item no 4.13)
KSRB- 11-3 Providing and fixing white vitreous china clay water closset indian type ( squired
pan) of size with footrest 100mm OR P trap (approved ) cutting and making good the wall and
23 floor whever required including cost of materials labour complete as [per specification
( PWDSR 77/12.3 )
Providing and laying in position to required level or slope 150mm internal diameter salt glazed
stone ware pipes grand A and jointing with stiff mixture of cement mortar in proportion of 1:1
24 testing of pipes and joints, including cost of materails labour charges complete as per
specifications(page no 67/11.1)
2 2.00 4.00
1 3.00 3.00
7.00 344.00 2408.00
Rmt
PART C : Finishing works
KSRB 9.4-3 : Providing Mathi / Nandi wood frames of doors, windows, clerestory windows,
ventilators and other frames, wrought, framed or assembled including making plaster groves
25 ( excluding cost of cement concrete and side clamps ), but including cost of materials, labour,
HOM of machineries complete as per specifications. Specification No. KBS 9.33 (PWD SR
2015-16 page no 51 item no 9.12)
Doors Frames
E.D 1 6.20 0.10 0.05 0.03
D1 2 5.80 0.10 0.05 0.06
0.09 79274.00 7055.00
Cum
KSRB 9.5-3 : Providing and fixing in position fully panelled Mathi/Nandi wood shutters for
doors, styles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and styles
26 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, HOM
of machineries complete as per specifications. ( excluding cost of fixtures) Specification No. KBS
9.34 (PWD SR 2015-16 page no 51 item no 9.16)
Door Shutters
E.D 1 1.00 2.00 2.00
D1 2 0.85 2.00 3.40
5.40 3816.00 20606.00
Sqm
Supply and fixing of door frame made of hollow extruded PVC Section (Nandi or Equivalent)
having dimension of 40x57mm with the wall thickness of 2mm+/-0.2mm duly reinforced with
27 seasoned wood plank at the hinges side. The door frame top 2corners shall be metric cut/ welded.
(PWD SR 2015-16 page no 58 item no 9.88)
Supply and fixing of door shutters made of rigid PVC extruded hollow section (Nandi or
equivalent) of 20mmx200mm with the wall thickness of 1.0mm+/-0.1mm equally divided into
4nos with tongue an groove locking arrangements. The shutter frame is made of 30mm x 79mm
with the wall thickness of 1.5mm+/-0.15mm section metric cut and joined at 4 corners with
28 125mmx225mm plastic brackets. The shutter shall be horizontally reinforced with 2nos of 8mm
PVC rods. Teak wood battons shall be reinforced inside the door shutter during the fabrication of
the door shutter at those points wherever the hardware is fixed on to the door shutter. (PWD SR
2015-16 page no 58 item no 9.87)
KSRB 7.8 : Providing and fixing in position in cement concrete 1:3:6 steel glazed windows and
ventilators side hung/top hung 2/3 openable 1/3 fixed as per approved drawings using Z angles of
25x33x3mm, weighing 1.419 kg/m both for outer and inner frames and central mullion section of
size 25x46x3mm, weighing 2.28kg/m all duly providing T section 19x19x3mm weighing 0.839
kg/m for glazing of windows, not more than 34 cms. c to c including providing and fixing 4mm.
thick reeded glass with teakwood beading of required size, all steel sections should confirm to I.S
7452:1990, 4nos. of holdfasts of approved size, section should be cut to length welded and
29 grinded electrically subdividing frames of unit shall be tenonned and revetted into the frames
electrically. All the steel surface shall be throughly cleaned free of rust and painted with one coat
of anti-corrosive paint and finishing two coats of ready mix paint of approved colour and make
including cost of materials, fixtures, labour charges and HOM of machinery complete as per
specifications.(PWD SR 2015-16 page no 32 item no 7.8)
KSRB15-3-13 : Providing 12mm thick cement plaster in single coat with cement mortar 1:3, to
ceiling including rounding off corners wherever required smooth rendering, : Providing and
30 removing scaffolding, including cost of materials, labour, curing complete as per specifications.
(PWD SR 2015-16 item no 113 page no 15.21)
Ceiling
Tecahing Hall 1 7.16 3.94 28.21
Beam 2 3.94 0.15 1.18
Kitchen 1 5.49 2.69 14.77
w.C 1 1.57 1.17 1.84
Store 1 1.57 1.42 2.23
48.23 173 8343.00
Sqm
KSRB15-3.7 : Providing 18mm thick cement plaster in single coat with cement mortar 1:3, to
brick masonry including rounding off corners wherever required smooth rendering, : Providing
31 and removing scaffolding, including cost of materials, labour, curing complete as per
specifications.(PWD SR 2015-16 page no 112 item no 15.15)
Internal plastering 12mm the
teaching Hall
2 7.16 3.05 43.68
2 3.94 3.05 24.03
Kitchen 2 5.49 3.05 33.49
2 2.69 3.05 16.41
washing 2 1.05 2.00 4.20
W.C 2 1.17 3.05 7.14
2 1.57 3.05 9.58
Store 2 1.57 3.05 9.58
2 1.42 3.05 8.66
156.76
Deduction D 1 1.06 2.10 2.23
D1 2 0.90 2.10 3.78
D2 2 0.75 2.10 3.15
W 5 1.20 1.00 6.00
V 4 0.60 0.45 1.08
16.24
Net Qty 156.76 - 16.24 140.53 216.00 30353.00
Sqm
KSRB15-3.5 : Providing 15mm thick cement plaster in single coat with cement mortar 1:4, to
brick masonry including rounding off corners wherever required smooth rendering, : Providing
32 and removing scaffolding, including cost of materials, labour, curing complete as per
specifications.(PWD SR 2015-16 item no 112 page no 15.13)
External Plastering Allround wall
Front and Back 2 7.62 3.05 46.48
Sides 2 7.32 3.05 44.65
Parapet allround 2 31.72 0.30 19.03
110.17
Deduction D 1 1.06 2.10 2.23
W 5 1.20 1.00 6.00
V 4 0.60 0.45 1.08
9.31
Net Qty 91.13 - 9.31 100.86 164.00 16541.00
Sqm
KSRB15-7 : Providing lime rendering for plastering to wall and ceiling, including cost of
33 materials, labour, curing complete as per specifications..(PWD SR 2015-16 item no 114 page no
15.33)
Qty same as Internal plastering 139.52
Qty same as ceilling plastering 48.23
187.75 24.00 4506.00
Sqm
Providing vitrified tiles 60 x 60cms of approved make, shade and size for flooring laid on a bed of
12mm thick cement mortar 1:3 mix, flush pointing with white cement using colour pigment,
34 including cost of materials, labour, curing complete as per specification..(PWD SR 2015-16 item
no 107 page no 14.45)
Teaching hall 1 7.16 3.94 28.21
Kitchen 1 5.49 2.69 14.77
Store 1 1.57 1.42 2.23
1 1.05 1.17 1.23
46.44
Deductions
Skirting 1 22.20 0.10 2.22
Teaching Hall 1 13.49 0.10 1.35
Kitchen 1 4.56 0.10 0.46
store 1 1.05 0.10 0.11
wash 4.13
Net Qty 46.44 - 4.13 42.31 1061 44891.00
Sqm
KSRB 14.14-5: Providing Ceramic tiles of approved make,shade and size for flooring, treads of
steps and landings laid on a bed of 12mm thick, cement mortar 1:3 mix, flush pointing with white
35 cement using colour pigment , including cost of materials, labour, curing, complete as per
specifications. Specification No. KBS size 15x15cms 6mm thick (PWD SR 2015-16 page no 106
item no 14.36.1)
WC 1 1.57 1.17 1.84
wash 1 1.17 1.05 1.23
3.07 863 2649.00
Sqm
KSRB 14-17.2 : Providing skirting, dado, rises of steps with colour glazed tiles on 10mm thick
cement plaster 1:3 and jointed with white cement slurry over rough plaster surface ( excluding
cost of rough plastered surface which should be measured and paid separately) using glazed tiles
36 of approved make and size including cost of materials, labour, complete as per specifications.
Specification No.KBS 14.16, 14.17(PWD SR 2015-16 page no 106 item no 14.41)
Providing and fixing to wall, ceiling and floor galvanised / mild steel tube nominal bore with
fittings (medium grade weight 1.27 kg/mtr) B class including cost of all materials, labour
46 charges, HOM of equipments and testing complete as per specifications. (2014-15 SR Page No.87,
Item No.13.2&13.3)
20mm dia 20.00 184.00 3680.00
25mm dia 12.00 266.00 3192.00
Mtrs
Providing and fixing in position brass bib cock of approved quality 20mm nominal bore including
47 cost of all materials, labour and HOM of equipments with all leads complete as per specifications
(PWD SR 2014-15 page no 96 item no 13.23)
Supplying and Fixing indoor type panel for single phase MONO BLOCK pump set they must be
with ISI mark capacitor and must have indicator lamps, Volta meter, ammeter, etc., complete with
48 proper terminal marking up to 0.50 HP including transportation errection on wooden board and
wiring with satisfactory test etc., as directed By Engineer in charge. Rate approved by S.E.PRE
Circle Mysore. Dated :12-12-2011.
Supplying and delivery of 0.50 HP-6Mtrs stage approved make with ISI mark MONO BLOCK
pump set having the declared duty conditions as detailed below and satisfying performance
characteristics for pump and motor as declared to the bureau of Indian standard the pump set with
ISI mark and approved make and duly conditions up to 0.50 HP only model declared head in 6
metres stage and discharge 50 LPM The pump set shall have guarantee period 15 months from the
49 date of acceptance by the consignee and 12 month from the date of installation which is earlier
including transportation errection and wiring with satisfactory test etc., complete as directed By
Engineer In charge. Rate approved by S.E.PRE Circle Mysore. Dated: 12-12-2011.
1.00
1.00 3700.00 3700.00
Nos
Providing and Installation at site of work PVC pipes including cost of pipes and special and
labour, including lowering into trenches, laying true to line, level and perfect leak proof linking at
joints including jointing of approved type with all labour and lift charges and with an initial lead
50 of 5Km including encasing the pipes around to a depth not less than 15 cm thick gravel or selected
earth available from the excavation and conveyance of materials from stores etc., complete.
(PRED mysore circle SR 2012-13 page no 2 item no(29/4.2)
A Concrete
1 Grade of concrete M-7.5 - PCC with OPC Cum 10.04
Materials
180 Cement Kgs 1807.20
0.85 Sand Cum 8.53
0.57 Jelly - 40 mm Cum 5.72
B STONE WORK
Materials
1.10 Size stone Cum 440.00
0.33 Sand Cum 1.65
C Brick work
Materials
6.5 Cement Kgs 313.47
0.013 Sand Cum 0.63
Materials
10 Cement Kgs 1405.25
0.02 Sand Cum 2.81
Materials
8 Cement Kgs 806.88
0.01 Sand Cum 1.01
Materials
0.0025 Lime Kgs 0.47
Materials
9.5 Cement Kgs 26.13
0.013 Sand Cum 0.04
1.1 Ceramic tiles sqm 3.03
Materials
9 Cement Kgs 380.79
0.028 Sand Cum 1.18
1.1 Vitrified tiles sqm 46.54
Materials
0.081 Distemper Ltr 15.21
0.15 Oil bound Kg 28.16
Materials
0.3 WPC kg 30.26
Materials
2.75 Cement Kgs 153.40
0.13 Sand Cum 7.25
Materials
9 Cement Kgs 21.60
0.13 Sand Cum 0.31
0.15 Enamel metal paint ltr 0.36
Materials
0.1 White lead paint ltr 1.95
ils
1,807.20 - - - - - -
- 8.53 - - - - -
- - 5.72 - - - -
410.12 - - - - - -
- 0.59 - - - - -
- - - 1.13 - - -
- - - - - - -
- - - - - 1,574.16 -
1,311.80 - - - - - -
- 5.62 - - - - -
- - - - - 675.36 -
562.80 - - - - - -
- 2.41 - - - - -
- - - - - 440.00 -
- 1.65 - - - - -
606.87 - - - - - -
- 1.54 - - - - -
- - - 2.32 - - -
13.84 - - - - - -
- 0.28 - - - - -
- - - - - - -
129.83 - - - - - -
- 28.13 - - - - -
- - - - - - -
2.45 - - - - - -
- 0.35 - - - - -
399.76 - - - - - -
- 0.57 - - - - -
- - - 0.86 - - -
- - - - - - -
174.72 - - - - - -
- 2.51 - - - - -
- - - - 3.77 - -
- - - - - - -
2,759.00 - - - - - -
- 3.97 - - - - -
- - - 5.95 - - -
- - - - - - -
- - - - - - 14.01
- - - - - - -
313.47 - - - - - -
- 0.63 - - - - -
1,405.25 - - - - - -
- 2.81 - - - - -
806.88 - - - - - -
- 1.01 - - - - -
- - - - - - -
26.13 - - - - - -
- 0.04 - - - - -
- - - - - - -
24.75 - - - - - -
- 0.36 - - - - -
- - - - - - -
380.79 - - - - - -
- 1.18 - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
153.40 - - - - - -
- 7.25 - - - - -
21.60 - - - - - -
- 0.31 - - - - -
- - - - - - -
- - - - - - -
#REF! #REF! #REF! #REF! #REF! #REF!
Sqm liters Cum Cum Sqm Sqm
Super
Centering Bricks Lime Ceramic tiles Vitrified tiles
Plasticisers
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- 3.84 - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - 52,472.39 - - -
- - - - - -
- - - - - -
- - 908.45 - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- 3.75 - - - -
- - - - - -
- - - - - -
- - - - - -
- 1.64 - - - -
- - - - - -
- - - - - -
- - - - - -
- 25.87 - - - -
- - - - - -
106.15 - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - 0.47 - -
- - - - - -
- - - - - -
- - - - 3.03 -
- - - - - -
- - - - - -
- - - - 3.03 -
- - - - - -
- - - - - -
- - - - - 46.54
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
#REF! #REF! #REF! #REF! #REF!
Ltr Kg Kg Ltr Ltr
Enamel metal White lead
Distemper Oil bound WPC
paint paint
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
15.21 - - - -
- 28.16 - - -
- - 30.26 - -
- - - 1.06 -
- - - - -
- - - - -
- - - - -
- - - - -
- - - 0.36 -
- - - - 1.95
PÁªÀÄUÁj ºÉ¸ÀgÀÄ : ºÁ¸À£À vÁ®ÆèPÀÄ PÀÄzÀÄgÀÄUÀÄAr UÁæªÀÄ
¥ÀAZÁAiÀÄw ¨ÉÆÃUÀgÀºÀ½î PÉÆ¥Àà®Ä UÁæªÀÄzÀ°è
CAUÀ£ÀªÁr PÀlÖqÀ ¤ªÀiÁðt PÁªÀÄUÁj
Materials cost Rate
Deductio
after
Sl.no Materials unit Qty Rate n 10% Amount
deductio
profit
1 40mm granite jelly Cum #REF! 800.00 80.00 n
720.00 #REF!
2 20mm granite jelly Cum #REF! 1080.00 108.00 972.00 #REF!
3 12mm granite jelly Cum #REF! 930.00 93.00 837.00 #REF!
4 Size stones Nos #REF! 11.00 1.10 9.90 #REF!
5 Boulders Cum 9.51 600.00 60.00 540.00 5135.40
6 Cement Bag #REF! 340.00 34.00 306.00 #REF!
7 sand Cum #REF! 1100.00 110.00 990.00 #REF!
8 Lime Cum #REF! 4000.00 400.00 3600.00 #REF!
9 Super Plasticisers Ltr #REF! 207.00 20.70 186.30 #REF!
Tonn
10 Steel #REF! ### 4450.00 40050.00 #REF!
e
11 Bricks Nos #REF! 6.00 0.60 5.40 #REF!
12 Distemper Ltr #REF! 68.00 6.80 61.20 #REF!
13 Oil bound Kg #REF! 66.00 6.60 59.40 #REF!
14 Waterproof Cement Paint Kg #REF! 75.00 7.50 67.50 #REF!
15 Enamel paint Ltr #REF! 250.00 25.00 225.00 #REF!
16 White lead paint Ltr #REF! 110.00 11.00 99.00 #REF!
17 Vetrified Tiles Sqm #REF! 544.00 54.40 489.60 #REF!
18 Ceramic Tiles Sqm #REF! 435.00 43.50 391.50 #REF!
19 Centering Sqm #REF! 120.00 12.00 108.00 #REF!
20 Water Closet No's 2.00 687.00 68.70 618.30 1236.60
21 Insepection chamber No's 2.00 504.00 50.40 453.60 907.20
22 stone ware pipes grand A Rmt 7.00 60.00 6.00 54.00 378.00
23 Wood Door Frame Cum 0.09 ### 5800.00 52200.00 4645.80
24 Wood Door Shutter Cum 0.16 ### 5800.00 52200.00 8456.40
25 Pvc Door Frame Rmt 11.40 230.00 23.00 207.00 2359.80
26 Pvc Door Shutter Sqm 3.15 1950.00 195.00 1755.00 5528.25
27 steel glazed windows No's 7.08 2996.00 299.60 2696.40 21212.00
28 Cuddapah slab Sqm 3.42 286.00 28.60 257.40 979.00
29 Name Board L/s 1500.00 1500.00
#REF!
Abstract
Material cost Rs #REF!
Provision for Internal Electricity 36000.00
Provision for water supply #REF!
Add for shapping of tools #REF!
Misscelleneous 2327.00
A #REF!
Labour cost Rs #REF!
Man days ###