PANJANG BABAT 78.60 59.40 = 138.

00 M'
LUAS RABAT 138.00 1.35 = 186.30 M2

JENIS PEKERJAAN L.A L.B T PANJANG

PONDASI BATU KALI A 0.3 0.85 2.1 59.4 =


PONDASI BATU KALI B 0.3 0.85 2.1 40.6 =
JUMLAH =

TIMBUNAN A 1.3 1.3 2.1 59.4


B 1.3 1.3 2.1 40.6
JUMLAH =

TIMBUNAN RABAT A 1 1 1.4605 138.00

JUMLAH =

COR RABAT A 1 1 0.1 186.30

JUMLAH =

COR LANTAI SALURAN A 0.3 0.3 0.1 49.70 =


COR LANTAI SALURAN B 0.3 0.5 0.1 26.00 =
JUMLAH =
-
VOL

71.7255 M3 100 0.3 0.8 2


49.0245 M3 0.3 0.8 2
120.75 M3 JUM

162.162 M3
110.838 M3
273 M3

201.55 M3 372.60

201.549 M3

18.63 M3

18.63 M3

1.49 M3
1.30 M3
2.79 M3
59.4 = 65.34 M3
40.6 = 44.66 M3
JUMLAH = 110 M3
ENGINEERS ESTIATE (EE)
PEKERJAAN : PEMBANGUNAN ASRAMA BKPLA KABUPATEN SARMI
LOKASI : KABUPATEN SARMI
TAHUN : 2017
HARGA JUMLAH HARGA
No URAIAN PEKERJAAN SAT KUANTITAS
SATUAN (Rp) TAHAP. I

HARGA JUMLAH HARGA


No URAIAN PEKERJAAN SAT VOLUME
SATUAN (Rp) TAHAP. I

A PEKERJAAN RABAT KELILING Rp720,110,382.49


I. PEKERJAAN PERSIAPAN Jumlah Rp 28,545,791.50
1 Pembersihan Lokasi Ls 1.00 Rp. 5,900,000.00 Rp 5,900,000.00
2 Pengukuran Bouplank M' 4.30 Rp. 133,905.00 Rp 575,791.50
3 Pambuatan Direksi Keet Ls 1.00 Rp 22,070,000.00 Rp 22,070,000.00
II PEKERJAAN TANAH Jumlah Rp181,496,623.13
1 Galian Tanah Pondasi M3 64.50 Rp. 158,250.00 Rp 10,207,125.00
2 Urugan Tanah Bekas Galian M3 21.50 Rp. 39,750.00 Rp 854,625.00
3 Urugan Karang Timbunan M3 201.55 Rp. 845,625.00 Rp 170,434,873.13
III PEKERJAAN PONDASI Jumlah Rp510,067,967.86
1 Pasang Cerucut Kayu M2 55.00 Rp. 1,329,746.43 Rp 73,136,053.57
2 Cor dasar pondasi M3 5.50 Rp. 3,255,990.00 Rp 17,907,945.00
3 Pasangan Pondasi Batu Kali/Gunung/Karang M3 120.75 Rp. 2,748,250.00 Rp 331,851,187.50
4 Cor dasar saluran M3 2.79 Rp. 3,255,990.00 Rp 9,087,468.09
5 Cor Rabat Keliling M3 18.63 Rp. 3,255,990.00 Rp 60,659,093.70
6 Plesteran 1 : 4 M2 45.00 Rp. 83,916.00 Rp 3,776,220.00
7 Acian Lantai Rabat Keliling Bangunan M2 200.00 Rp. 68,250.00 Rp 13,650,000.00

B PEKERJAAN PENAMBUNGAN AIR Rp238,710,309.54


1 Pasang Cerucut Kayu M2 22.04 Rp. 1,329,746.43 Rp 29,307,611.29
2 Pasangan Pondasi Batu Kali/Gunung/Karang M3 50.44 Rp. 2,748,250.00 Rp 138,610,737.00
3 Dinding Beton
Beton 1Pc : 2Ps : 3Kr M3 7.03 Rp. 2,411,650.00 Rp 16,947,870.38
Bekesting M2 67.32 Rp. 399,400.00 Rp 26,887,608.00
Pembesian Kg 554.70 Rp. 23,438.34 Rp 13,001,342.60
4 Balok 15 x 35
Beton 1Pc : 2Ps : 3Kr M3 0.12 Rp. 2,411,650.00 Rp 291,206.74
Bekesting M2 1.27 Rp. 399,400.00 Rp 505,241.00
Pembesian Kg 17.70 Rp. 23,438.34 Rp 414,877.42
5 Penutup Bak air (bahan Plat baja) Ls 1.00 Rp. 2,500,000.00 Rp 2,500,000.00
6 Plesteran 1 : 4 (Bagian Luar dan Dalam) M2 67.32 Rp. 83,916.00 Rp 5,649,225.12
7 Acian Dinding (Bagian Luar dan Dalam) M2 67.32 Rp. 68,250.00 Rp 4,594,590.00

C PEKERJAAN SEPTICTANK Rp 94,018,050.06


1 Pasang Cerucut Kayu M2 22.04 Rp. 1,329,746.43 Rp 29,307,611.29
3 Dinding Beton
Beton 1Pc : 2Ps : 3Kr M3 7.52 Rp. 2,411,650.00 Rp 18,138,019.65
Bekesting M2 69.92 Rp. 399,400.00 Rp 27,926,048.00
Pembesian Kg 554.70 Rp. 23,438.34 Rp 13,001,342.60
4 Balok 15 x 35
Beton 1Pc : 2Ps : 3Kr M3 0.12 Rp. 2,411,650.00 Rp 291,206.74
Bekesting M2 1.27 Rp. 399,400.00 Rp 505,241.00
Pembesian Kg 17.70 Rp. 23,438.34 Rp 414,877.42
5 Sap drain & Pipa pengudaraan Ls 1.00 Rp. 1,500,000.00 Rp 1,500,000.00
6 Plesteran 1 : 4 (Bagian Luar) M2 34.96 Rp. 83,916.00 Rp 2,933,703.36
D PEKERJAAN PENIMBUNAN HALAMAN PARKIR Rp310,578,465.69
1 Pasangan Pondasi Batu Kali/Gunung/Karang M3 8.06 Rp. 2,748,250.00 Rp 22,142,306.72
2 Cor dasar saluran M3 2.35 Rp. 3,255,990.00 Rp 7,635,296.55
3 Urugan Karang Timbunan M3 326.63 Rp. 845,625.00 Rp 276,202,265.63
4 Plesteran 1 : 4 M2 54.80 Rp. 83,916.00 Rp 4,598,596.80
REKAPITULASI

PEKERJAAN : PEMBANGUNAN ASRAMA BKPLA KABUPATEN SARMI


LOKASI : KABUPATEN SARMI
TAHUN : 2017

NO. URAIAN PEKERJAAN JUMLAH HARGA


A PEKERJAAN RABAT KELILING Rp. 720,110,382.49
B PEKERJAAN PENAMBUNGAN AIR Rp. 238,710,309.54
C PEKERJAAN SEPTICTANK Rp. 94,018,050.06
D PEKERJAAN PENIMBUNAN HALAMAN PARKIR Rp. 310,578,465.69
REAL COST = ( I + II ) ###
DIBULATKAN = (@INT A/10000)*1000 ###
PPN 10% 136,341,000.00
TOTAL (termasuk PPN+PPH) 1,499,751,000.00
TOTAL + PPN + PPH (dibulatkan) 1,499,751,000.00
Terbilang : Err:511

Sarmi, 2017
Dibuat oleh
KONSULTAN PERENCANA
CV. DETAIL KONSULTAN

DAYAN TASIRANDAN, ST
Direktur
ENGINEERS ESTIATE (EE)
PEKERJAAN : PEMBANGUNAN ASRAMA BKPLA KABUPATEN SARMI
LOKASI : KABUPATEN SARMI
TAHUN : 2017
HARGA JUMLAH HARGA
No URAIAN PEKERJAAN SAT KUANTITAS
SATUAN (Rp) TAHAP. I

HARGA JUMLAH HARGA


No URAIAN PEKERJAAN SAT VOLUME
SATUAN (Rp) TAHAP. I

A PEKERJAAN RABAT KELILING Rp754,524,972.53


I. PEKERJAAN PERSIAPAN Jumlah Rp 28,545,791.50
1 Pembersihan Lokasi Ls 1.00 Rp. 5,900,000.00 Rp 5,900,000.00
2 Pengukuran Bouplank M' 4.30 Rp. 133,905.00 Rp 575,791.50
3 Pambuatan Direksi Keet Ls 1.00 Rp 22,070,000.00 Rp 22,070,000.00
II PEKERJAAN TANAH Jumlah Rp181,496,623.13
1 Galian Tanah Pondasi M3 64.50 Rp. 158,250.00 Rp 10,207,125.00
2 Urugan Tanah Bekas Galian M3 21.50 Rp. 39,750.00 Rp 854,625.00
3 Urugan Karang Timbunan M3 201.55 Rp. 845,625.00 Rp 170,434,873.13
III PEKERJAAN PONDASI Jumlah Rp544,482,557.90
1 Pasang Cerucut Kayu M2 34.00 Rp. 1,329,746.43 Rp 45,211,378.57
2 Cor dasar pondasi M3 3.40 Rp. 3,255,990.00 Rp 11,070,366.00
3 Pasangan Pondasi Batu Kali/Gunung/Karang M3 120.75 Rp. 2,748,250.00 Rp 331,851,187.50
4 Cor dasar saluran M3 5.99 Rp. 3,255,990.00 Rp 19,493,612.13
5 Cor Rabat Keliling M3 18.63 Rp. 3,255,990.00 Rp 60,659,093.70
6 Plesteran 1 : 4 M2 45.00 Rp. 83,916.00 Rp 3,776,220.00
7 Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm M2 200.00 Rp. 362,103.50 Rp 72,420,700.00
B PEKERJAAN PENAMBUNGAN AIR Rp254,966,321.54
1 Pasang Cerucut Kayu M2 22.04 Rp. 1,329,746.43 Rp 29,307,611.29
2 Pasangan Pondasi Batu Kali/Gunung/Karang M3 50.44 Rp. 2,748,250.00 Rp 138,610,737.00
3 Dinding Beton
Beton 1Pc : 2Ps : 3Kr M3 7.03 Rp. 2,411,650.00 Rp 16,947,870.38
Bekesting M2 67.32 Rp. 399,400.00 Rp 26,887,608.00
Pembesian Kg 554.70 Rp. 23,438.34 Rp 13,001,342.60
4 Balok 15 x 35
Beton 1Pc : 2Ps : 3Kr M3 0.12 Rp. 2,411,650.00 Rp 291,206.74
Bekesting M2 1.27 Rp. 399,400.00 Rp 505,241.00
Pembesian Kg 17.70 Rp. 23,438.34 Rp 414,877.42
5 Penutup Bak air (bahan Plat baja) Ls 1.00 Rp. 2,500,000.00 Rp 2,500,000.00
6 Plesteran 1 : 4 (Bagian Luar dan Dalam) M2 67.32 Rp. 83,916.00 Rp 5,649,225.12
7 Acian Dinding (Bagian Luar dan Dalam) M2 67.32 Rp. 68,250.00 Rp 4,594,590.00
8 Keramik 40x40 (Lantai dan Dinding bak air) M2 32.00 Rp. 362,103.50 Rp 11,587,312.00
9 Pasang Pipa PVC Union Ø 3/4" + Accessories M' 60.00 Rp. 73,645.00 Rp 4,418,700.00
10 Stop Kran Ø 2" (Pengurasan air) Ls 1.00 Rp. 250,000.00 Rp 250,000.00
C PEKERJAAN SEPTICTANK Rp 94,018,050.06
1 Pasang Cerucut Kayu M2 22.04 Rp. 1,329,746.43 Rp 29,307,611.29
3 Dinding Beton
Beton 1Pc : 2Ps : 3Kr M3 7.52 Rp. 2,411,650.00 Rp 18,138,019.65
Bekesting M2 69.92 Rp. 399,400.00 Rp 27,926,048.00
Pembesian Kg 554.70 Rp. 23,438.34 Rp 13,001,342.60
4 Balok 15 x 35
Beton 1Pc : 2Ps : 3Kr M3 0.12 Rp. 2,411,650.00 Rp 291,206.74
Bekesting M2 1.27 Rp. 399,400.00 Rp 505,241.00
Pembesian Kg 17.70 Rp. 23,438.34 Rp 414,877.42
5 Sap drain & Pipa pengudaraan Ls 1.00 Rp. 1,500,000.00 Rp 1,500,000.00
6 Plesteran 1 : 4 (Bagian Luar) M2 34.96 Rp. 83,916.00 Rp 2,933,703.36
D PEKERJAAN PENIMBUNAN HALAMAN PARKIR Rp260,135,637.49
1 Pasangan Pondasi Batu Kali/Gunung/Karang M3 5.16 Rp. 2,748,250.00 Rp 14,192,134.77
2 Cor dasar saluran M3 2.35 Rp. 3,255,990.00 Rp 7,635,296.55
3 Urugan Karang Timbunan M3 276.38 Rp. 845,625.00 Rp 233,709,609.38
4 Plesteran 1 : 4 M2 54.80 Rp. 83,916.00 Rp 4,598,596.80
REKAPITULASI

PEKERJAAN : PEMBANGUNAN ASRAMA BKPLA KABUPATEN SARMI


LOKASI : KABUPATEN SARMI
TAHUN : 2017

NO. URAIAN PEKERJAAN JUMLAH HARGA


A PEKERJAAN RABAT KELILING Rp. 754,524,972.53
B PEKERJAAN PENAMBUNGAN AIR Rp. 254,966,321.54
C PEKERJAAN SEPTICTANK Rp. 94,018,050.06
D PEKERJAAN PENIMBUNAN HALAMAN PARKIR Rp. 260,135,637.49
REAL COST = ( I + II ) ###
DIBULATKAN = (@INT A/10000)*1000 ###
PPN 10% 136,364,000.00
TOTAL (termasuk PPN+PPH) 1,500,004,000.00
TOTAL + PPN + PPH (dibulatkan) 1,500,000,000.00
Terbilang : Err:511

Sarmi, 2017
Dibuat oleh
KONSULTAN PERENCANA
CV. DETAIL KONSULTAN

DAYAN TASIRANDAN, ST
Direktur
ENGINEERS ESTIATE (EE)
PEKERJAAN : PEMBANGUNAN ASRAMA BKPLA KABUPATEN SARMI
LOKASI : KABUPATEN SARMI
TAHUN : 2017
HARGA JUMLAH HARGA
No URAIAN PEKERJAAN SAT KUANTITAS
SATUAN (Rp) TAHAP. I

HARGA JUMLAH HARGA


No URAIAN PEKERJAAN SAT VOLUME
SATUAN (Rp) TAHAP. I

A PEKERJAAN RABAT KELILING Rp702,684,162.49


I. PEKERJAAN PERSIAPAN Jumlah Rp 28,545,791.50
1 Pembersihan Lokasi Ls 1.00 Rp. 5,900,000.00 Rp 5,900,000.00
2 Pengukuran Bouplank M' 4.30 Rp. 133,905.00 Rp 575,791.50
3 Pambuatan Direksi Keet Ls 1.00 Rp 22,070,000.00 Rp 22,070,000.00
II PEKERJAAN TANAH Jumlah Rp181,496,623.13
1 Galian Tanah Pondasi M3 64.50 Rp. 158,250.00 Rp 10,207,125.00
2 Urugan Tanah Bekas Galian M3 21.50 Rp. 39,750.00 Rp 854,625.00
3 Urugan Karang Timbunan M3 201.55 Rp. 845,625.00 Rp 170,434,873.13
III PEKERJAAN PONDASI Jumlah Rp492,641,747.86
1 Pasang Cerucut Kayu M2 55.00 Rp. 1,329,746.43 Rp 73,136,053.57
2 Cor dasar pondasi M3 5.50 Rp. 3,255,990.00 Rp 17,907,945.00
3 Pasangan Pondasi Batu Kali/Gunung/Karang M3 120.75 Rp. 2,748,250.00 Rp 331,851,187.50
4 Cor dasar saluran M3 2.79 Rp. 3,255,990.00 Rp 9,087,468.09
5 Cor Rabat Keliling M3 18.63 Rp. 3,255,990.00 Rp 60,659,093.70
6 Plesteran 1 : 4 M2 Rp. 83,916.00
B PEKERJAAN PENAMBUNGAN AIR Rp228,466,494.42
1 Pasang Cerucut Kayu M2 22.04 Rp. 1,329,746.43 Rp 29,307,611.29
2 Pasangan Pondasi Batu Kali/Gunung/Karang M3 50.44 Rp. 2,748,250.00 Rp 138,610,737.00
3 Dinding Beton
Beton 1Pc : 2Ps : 3Kr M3 7.03 Rp. 2,411,650.00 Rp 16,947,870.38
Bekesting M2 67.32 Rp. 399,400.00 Rp 26,887,608.00
Pembesian Kg 554.70 Rp. 23,438.34 Rp 13,001,342.60
4 Balok 15 x 35
Beton 1Pc : 2Ps : 3Kr M3 0.12 Rp. 2,411,650.00 Rp 291,206.74
Bekesting M2 1.27 Rp. 399,400.00 Rp 505,241.00
Pembesian Kg 17.70 Rp. 23,438.34 Rp 414,877.42
5 Penutup Bak air (bahan Plat baja) Ls 1.00 Rp. 2,500,000.00 Rp 2,500,000.00
6 Plesteran 1 : 4 M2 67.32 Rp. 2,500,000.00 Rp 168,300,000.00
C PEKERJAAN SEPTICTANK Rp 91,084,346.70
1 Pasang Cerucut Kayu M2 22.04 Rp. 1,329,746.43 Rp 29,307,611.29
3 Dinding Beton
Beton 1Pc : 2Ps : 3Kr M3 7.52 Rp. 2,411,650.00 Rp 18,138,019.65
Bekesting M2 69.92 Rp. 399,400.00 Rp 27,926,048.00
Pembesian Kg 554.70 Rp. 23,438.34 Rp 13,001,342.60
4 Balok 15 x 35
Beton 1Pc : 2Ps : 3Kr M3 0.12 Rp. 2,411,650.00 Rp 291,206.74
Bekesting M2 1.27 Rp. 399,400.00 Rp 505,241.00
Pembesian Kg 17.70 Rp. 23,438.34 Rp 414,877.42
5 Sap drain & Pipa pengudaraan Ls 1.00 Rp. 1,500,000.00 Rp 1,500,000.00
6 Plesteran 1 : 4 M2
D PEKERJAAN PENIMBUNAN HALAMAN PARKIR Rp341,414,577.49
1 Pasangan Pondasi Batu Kali/Gunung/Karang M3 17.09 Rp. 2,748,250.00 Rp 46,953,851.25
2 Cor dasar saluran M3 2.35 Rp. 3,255,990.00 Rp 7,635,296.55
3 Urugan Karang Timbunan M3 339.19 Rp. 845,625.00 Rp 286,825,429.69
4 Plesteran 1 : 4 M2
REKAPITULASI

PEKERJAAN : PEMBANGUNAN ASRAMA BKPLA KABUPATEN SARMI


LOKASI : KABUPATEN SARMI
TAHUN : 2017

NO. URAIAN PEKERJAAN JUMLAH HARGA


A PEKERJAAN RABAT KELILING Err:502
B PEKERJAAN PENAMBUNGAN AIR Err:502
C PEKERJAAN SEPTICTANK Err:502
D PEKERJAAN PENIMBUNAN HALAMAN PARKIR Err:502
REAL COST = ( I + II ) Err:502
DIBULATKAN = (@INT A/10000)*1000 Err:502
PPN 10% Err:502
TOTAL (termasuk PPN+PPH) Err:502
TOTAL + PPN + PPH (dibulatkan) Err:502
Terbilang : Err:511

Sarmi, 2017
Dibuat oleh
KONSULTAN PERENCANA
CV. DETAIL KONSULTAN

DAYAN TASIRANDAN, ST
Direktur
DAFTAR ANALISA BIAYA PEKERJAAN
LOKASI : KABUPATEN SARMI
TAHUN : 2017
No SAT URAIAN PEKERJAAN HARGA SATUAN (Rp) JUMLAH (Rp)

1 M' Pengukuran Bouplank Rp 133,905.00


0.007 M3 Papan Kayu Putih Rp. 3,115,000.00 Rp. 21,805.00
0.012 M3 Kayu Rp. 5,450,000.00 Rp. 65,400.00
0.020 Kg Paku Rp. 35,000.00 Rp. 700.00
0.100 h/o Pekerja Rp. 150,000.00 Rp. 15,000.00
0.010 h/o Kepala tukang Rp. 250,000.00 Rp. 2,500.00
0.100 h/o Mandor Rp. 275,000.00 Rp. 27,500.00
0.005 h/o Tukang Rp. 200,000.00 Rp. 1,000.00

2 M3 Galian Tanah Pondasi Rp 158,250.00


1.000 h/o Pekerja Rp. 150,000.00 Rp. 150,000.00
0.03 h/o Mandor Rp. 275,000.00 Rp. 8,250.00

3 M3 Urugan Tanah Bekas Galian Rp 39,750.00


0.243 h/o Pekerja Rp. 150,000.00 Rp. 36,450.00
0.012 h/o Mandor Rp. 275,000.00 Rp. 3,300.00
4 M3 Urugan Karang Timbunan Rp 845,625.00
1.200 M3 Karang Timbunan Rp. 500,000.00 Rp. 600,000.00
1.500 #N/A Pekerja Rp. 150,000.00 Rp. 225,000.00
0.075 #N/A Mandor Rp. 275,000.00 Rp. 20,625.00

5 M3 Pasangan Pondasi Batu Kali/Gunung/Karang Rp 2,748,250.00


1.200 M3 Batu Kali / Gunung Rp. 650,000.00 Rp. 780,000.00
0.485 M3 Pasir Beton Rp. 850,000.00 Rp. 412,250.00
202.000 Kg Semen PC Rp. 4,000.00 Rp. 808,000.00
0.850 h/o Tukang Rp. 200,000.00 Rp. 170,000.00
0.085 h/o Kepala Tukang Rp. 250,000.00 Rp. 21,250.00
3.400 h/o Pekerja Rp. 150,000.00 Rp. 510,000.00
0.170 h/o Mandor Rp. 275,000.00 Rp. 46,750.00

6 M3 Beton 1Pc : 2Ps : 3Kr Rp 2,411,650.00


0.577 M3 Kerikil Rp. 2,840,000.00 Rp. 1,638,680.00
0.490 M3 Pasir Beton Rp. 850,000.00 Rp. 416,500.00
7.680 Zak Semen PC Rp. 4,000.00 Rp. 30,720.00
0.250 O/H Tukang Rp. 200,000.00 Rp. 50,000.00
0.025 O/H Kepala Tukang Rp. 250,000.00 Rp. 6,250.00
1.650 O/H Pekerja Rp. 150,000.00 Rp. 247,500.00
0.080 O/H Mandor Rp. 275,000.00 Rp. 22,000.00

7 M2 Bekesting Rp 399,400.00
0.045 M3 Kayu Rp. 5,450,000.00 Rp. 245,250.00
0.300 Kg Paku Rp. 35,000.00 Rp. 10,500.00
0.260 O/H Tukang Rp. 200,000.00 Rp. 52,000.00
0.026 O/H Kepala Tukang Rp. 250,000.00 Rp. 6,500.00
0.520 O/H Pekerja Rp. 150,000.00 Rp. 78,000.00
0.026 O/H Mandor Rp. 275,000.00 Rp. 7,150.00
8 1 Kg Pembesian Rp 23,438.34
0.007 O/H Tukang Rp. 200,000.00 Rp. 1,400.00
0.001 O/H Kepala Tukang Rp. 250,000.00 Rp. 175.00
0.007 O/H Pekerja Rp. 150,000.00 Rp. 1,050.00
0.000 O/H Mandor Rp. 275,000.00 Rp. 82.50
1.050 Kg Besi Beton Rp. 19,132.23 Rp. 20,088.84
0.015 Kg Kawat baja/bendrat Rp. 42,800.00 Rp. 642.00

9 M2 Plesteran 1 : 4 Rp 83,916.00
0.104 Zak Semen PC Rp. 4,000.00 Rp. 416.00
0.020 M3 Pasir Beton Rp. 850,000.00 Rp. 17,000.00
0.150 O/H Tukang Rp. 200,000.00 Rp. 30,000.00
0.015 O/H Kepala Tukang Rp. 250,000.00 Rp. 3,750.00
0.200 O/H Pekerja Rp. 150,000.00 Rp. 30,000.00
0.010 O/H Mandor Rp. 275,000.00 Rp. 2,750.00
10 M3 BETON TAK BERTULANG 1pc : 2ps : 3kr Rp. 3,255,990.00
Cor dasar pondasi Rp. 3,255,990.00
Cor dasar saluran Rp. 3,255,990.00
Cor Rabat Keliling Rp. 3,255,990.00
0.870 M3 Kerikil Rp. 2,840,000.00 Rp. 2,470,800.00
0.520 M3 Pasir Beton Rp. 850,000.00 Rp. 442,000.00
4.360 Zak Semen PC Rp. 4,000.00 Rp. 17,440.00
0.250 Tukang Rp. 200,000.00 Rp. 50,000.00
0.025 Kepala tukang Rp. 250,000.00 Rp. 6,250.00
1.650 Pekerja Rp. 150,000.00 Rp. 247,500.00
0.080 Mandor Rp. 275,000.00 Rp. 22,000.00
11 M2 Pasang Cerucut Kayu 1,329,746.43
A BAHAN
1 2.500 Btg Balok Kayu 10/10 Rp. 218,000.00 Rp. 545,000.00
2 0.500 Btg Gelagar kayu 10/10 cm Rp 218,000.00 Rp. 109,000.00
3 1.250 Lbr Papan Kayu 3/20 cm Rp. 109,000.00 Rp. 136,250.00
3 0.055 Kg Paku Rp. 35,000.00 Rp. 1,925.00
B UPAH
1 0.200 O/H Pekerja Rp. 150,000.00 Rp. 30,000.00
2 0.200 O/H Tukang Rp. 200,000.00 Rp. 40,000.00
3 0.020 O/H Kepala Tukang Rp. 250,000.00 Rp. 5,000.00
4 0.010 O/H Mandor Rp. 275,000.00 Rp. 2,750.00
C ALAT
1 0.200 Jam Excavator Rp 2,142,857.14 Rp. 428,571.43
2 0.500 Ls Alat Bantu Rp 62,500.00 Rp. 31,250.00
12 M2 Acian Lantai Rabat Keliling Bangunan 68,250.00
3.250 KG Semen PC Rp. 4,000.00 Rp. 13,000.00
0.200 M3 Pekerja Rp. 150,000.00 Rp. 30,000.00
0.100 OH Tukang Rp. 200,000.00 Rp. 20,000.00
0.010 OH Kepala Tukang Rp. 250,000.00 Rp. 2,500.00
0.010 OH Mandor Rp. 275,000.00 Rp. 2,750.00
13 M2 Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm Rp. 362,103.50
6.6300 Buah Keramik 40 x 40 Rp. 35,700.00 Rp. 236,691.00
9.8000 KG Semen PC Rp. 4,000.00 Rp. 39,200.00
0.0215 M3 Pasir Beton Rp. 850,000.00 Rp. 18,275.00
0.2500 OH Pekerja Rp. 150,000.00 Rp. 37,500.00
0.1200 OH Tukang Rp. 200,000.00 Rp. 24,000.00
0.0120 OH Kepala Tukang Rp. 250,000.00 Rp. 3,000.00
0.0125 OH Mandor Rp. 275,000.00 Rp. 3,437.50
14 1 BH Kran air Dia. 3/4" atau 1/2" 62,250.00
1.2000 Buah Stop Kran 3/4" Rp. 32,500.00 Rp. 39,000.00
0.0250 Buah Seal Tape Rp. 30,000.00 Rp. 750.00
0.1000 OH Tukang Rp. 200,000.00 Rp. 20,000.00
0.0100 OH Kepala tukang Rp. 250,000.00 Rp. 2,500.00
15 1 M Memasang Pipa PVC Tipe AW Dia. 3/4" Rp. 73,645.00
1.2000 M Pipa PVC AW 3/4" Rp. 35,000.00 Rp. 42,000.00
1.0000 Set 35%Perlengkapan Rp. 12,250.00 Rp. 12,250.00
0.0360 OH Pekerja Rp. 150,000.00 Rp. 5,400.00
0.0600 OH Tukang Rp. 200,000.00 Rp. 12,000.00
0.0060 OH Kepala Tukang Rp. 250,000.00 Rp. 1,500.00
0.0018 OH Mandor Rp. 275,000.00 Rp. 495.00
DAFTAR HARGA SATUAN DASAR
PEKERJAAN : PEMBANGUNAN ASRAMA BKPLA KABUPATEN SARMI
LOKASI : KABUPATEN SARMI
TAHUN : 2017

HARGA
No. NAMA BAHAN SATUAN
(Rp)

1 Kayu M3 Rp. 5,450,000.00


Balok Kayu 10/10 Btg Rp. 218,000.00
Papan Kayu 3/20 cm Lbr Rp. 109,000.00
2 Papan Kayu Putih M3 Rp. 3,115,000.00
3 Pasir Urug M3 Rp. 490,000.00
4 Tanah Urug M3 Rp. 400,000.00
5 Karang Timbunan M3 Rp. 500,000.00
6 Pasir Beton M3 Rp. 850,000.00
3 Kerikil M3 2,840,000.00
7 Batu Kali / Gunung M3 Rp. 650,000.00
8 Semen PC Kg Rp. 4,000.00
9 Paku Kg Rp. 35,000.00
10 Besi Beton Kg 19,132.23
11 Kawat baja/bendrat Kg 42,800.00
12 Keramik 40 x 40 Bh Rp. 35,700.00
13 Pipa PVC AW 3/4" M' Rp. 35,000.00
14 Stop Kran 3/4" Bh Rp. 32,500.00
15 Seal Tape Bh Rp. 30,000.00
No. JENIS KEAHLIAN SATUAN UPAH
1 Tukang h/o Rp. 200,000.00
2 Kepala tukang h/o Rp. 250,000.00
3 Pekerja h/o Rp. 150,000.00
4 Mandor h/o Rp. 275,000.00
###
###
###
1 Timbunan karang =