Name of work
Carriageway width
Classification of road
Design life
Terrain
Current year
Construction period 0
#N/A
#N/A
90 120 6.94
90 6.94 6.94 90
100
80 7.09
Percentile ---->
80 7.09 7.09 80
80
60
40
20
0
y = -50.09x2 + 636.8x - 1917.
0 CBR ---->
1 2 3 4 5 6 7
-20
Equation of the CBR graph is y = -50.09x2 + 636.8x - 1917.
ab -50.09 -50.09
c -+636.8
1917. -+636.8
1917.
CBR values for 90 80
6.938 7.090
5.775 5.623
6.94 7.09
Percentile
CBR 90
6.94 80
7.09 89.877
79.983
CBR = 7.09
poisons ratio to be used in iitpave design for all the layers 0.35
Assumed Layer thickness
BC = 40 bituminous layer thick
120
DBM = 80
WMM = 250 granular layer thickness: h
450
GSB = 200
570
Allowable Strain
εt = #N/A Horizontal tensile strain at the bottom of bituminous layers
εv = #N/A Vertical compressive strain at the top of Sub grade
Vertical compressive strain at the top of Sub grade #N/A 354 micro Strain
#N/A
No. of layers 3
E values (MPa) 1700.00 240.00 76.83
Mu values 0.350.350.35
thicknesses (mm) 120.00 450.00
single wheel load (N) 20500.00
tyre pressure (MPa) 0.56
Dual Wheel
Z R SigmaZ SigmaT SigmaR TaoRZ DispZ epZ epT epR
120.00 0.00-0.1882E 0.5423E 0.4254E0.1963E-01 0.4302E0.3099E-03 0.2702E-03 0.1773E-03
120.00L 0.00-0.1882E0.1047E-01-0.2698E-01-0.1963E-01 0.4302E0.7296E-03 0.2702E-03 0.1773E-03
120.00 155.00-0.1434E 0.4017E 0.3949E-01-0.9000E-01 0.4364E0.1752E-03 0.2577E-03-0.2997E-04
120.00L 155.00-0.1434E0.9580E-02-0.6072E-01-0.9000E-01 0.4364E0.4948E-03 0.2577E-03-0.2997E-04
570.00 0.00-0.2404E-01 0.3471E-01 0.2958E-01-0.4122E-02 0.2843E0.1939E-03 0.1365E-03 0.1077E-03
570.00L 0.00-0.2402E-01 0.2302E-02 0.6168E-03-0.4114E-02 0.2843E0.3260E-03 0.1366E-03 0.1070E-03
570.00 155.00-0.2586E-01 0.3739E-01 0.3367E-01-0.5416E-02 0.2926E0.2114E-03 0.1444E-03 0.1235E-03
570.00L 155.00-0.2586E-01 0.2475E-02 0.1338E-02-0.5654E-02 0.2926E0.3540E-03 0.1439E-03 0.1240E-03