DOC NO: 1809‐C0‐CR‐512‐R Attachment ‐1
PIPING SYSTEM ERECTION WORK Addendum ‐ 2
PLTU GORONTALO 2 X 25 MW Date : 08 Desember 2017
Price Schedule: DIRECT COST Prepared by : TIF
Checked by : ADP/RSY
Approved : DLM/MZR
pp /
Rev : 0
RE= Rekadaya, SC= Subcontractor 17 Januari 2018
CONSTRUCTION COST
RESPONSIBI
LITY QTY
NO DESCRIPTION UNIT LABOR COST EQUIPMENT/TOOLS COST CONSUMABLE COST REMARKS
UNIT PRICE TOTAL PRICE
UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
RE SC
(1) (2) (3)=(2)X(1) (4) (5)=(1)X(4) (6) (7)=(1)X(6) (8)=(2)+(4)+(6) (9)=(1)X(8)
1 MECHANICAL WORK
MECHANICAL WORK
1.1 Piping System for Spray Coal Yard & Silo Qty can be adjusted
1.1.1 Pipe Welding x dia. Inch 2858 Rp 825,000 Rp 2,357,850,000 Rp 150,000 Rp 428,700,000 Rp 80,000 Rp 228,640,000 Rp 1,055,000 Rp 3,015,190,000 based on actual
include:
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.2 Piping System for Make‐up Cooling Tower
1.2.1 Pipe Welding x dia. Inch 200 Rp 825,000 Rp 165,000,000 Rp 150,000 Rp 30,000,000 Rp 80,000 Rp 16,000,000 Rp 1,055,000 Rp 211,000,000 Qty can be adjusted
include: based on actual
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.3 Piping System for Waste Water
1.3.1 Pipe Welding x dia. Inch 1897 Rp 825,000 Rp 1,565,025,000 Rp 150,000 Rp 284,550,000 Rp 80,000 Rp 151,760,000 Rp 1,055,000 Rp 2,001,335,000 Qty can be adjusted
include: based on actual
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.4 Piping System for Oily Waste Water
1.4.1 Pipe Welding x dia. Inch 931 Rp 825,000 Rp 768,075,000 Rp 150,000 Rp 139,650,000 Rp 80,000 Rp 74,480,000 Rp 1,055,000 Rp 982,205,000 Qty can be adjusted
include: based on actual
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.5 Piping System for Demineralized Water
1.5.1 Pipe Welding x dia. Inch 570 Rp 1,125,000 Rp 641,250,000 Rp 150,000 Rp 85,500,000 Rp 80,000 Rp 45,600,000 Rp 1,355,000 Rp 772,350,000 Qty can be adjusted
include: based on actual
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.6 Piping system for Chemical Water
1 6 1 Pipe Welding
1.6.1 Pipe Welding x dia Inch
dia. Inch 3620 Rp
Rp 825 000 Rp
825,000 Rp 2,986,500,000
2 986 500 000 Rp
Rp 150 000 Rp
150,000 Rp 543 000 000 Rp
543,000,000 Rp 80 000 Rp
80,000 Rp 289 600 000 Rp
289,600,000 Rp 1 055 000 Rp
1,055,000 Rp 3 819 100 000 Qty
3,819,100,000 can be adjusted
Qty can be adjusted
include: based on actual
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.7 Piping system for Service water
1.7.1 Pipe Welding x dia. Inch 907 Rp 825,000 Rp 748,275,000 Rp 150,000 Rp 136,050,000 Rp 80,000 Rp 72,560,000 Rp 1,055,000 Rp 956,885,000 Qty can be adjusted
include: based on actual
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.8 Painting work x Lot 1 Rp 510,000,000 Rp 510,000,000 Rp 125,000,000 Rp 125,000,000 Rp 155,000,000 Rp 155,000,000 Rp 790,000,000 Rp 790,000,000
NOTE:
1. Material handling and transportation material from warehouse or laydown area to installation area shall be done by SC
2. Tools and Consumable material shall be supplied by SC
3. Price in Rupiah
4. Price exclude
a. Pickling/Chemical cleaning/ Flushing,etc d. Hydrotest
b. NDE/NDT e. Insulation
c. Civil works and Pipe support/Pipe rack/ Pipe bridge f. All Material
PIPING SYSTEM SYSTEM ERECTION WORK
PLTU GORONTALO 2 X 25 MW
Price Schedule: INDIRECT COST
RE= Rekadaya, SC= Subcontractor 17 Januari 2018
RESPONSIBILITY
NO DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE Remarks
RE SC
1 TEMPORARY FACILITIES
2 POWER & WATER SUPPLY
2.1 Power Resource for Construction x 1 lot Rp 150,000,000 Rp 150,000,000
2.2 Water for Construction x 1 lot Rp
p 25,000,000
, , Rp
p 25,000,000
, ,
2.3 Water Distribution x 1 lot Rp 25,000,000 Rp 25,000,000
Nilai Pekerjaan ( Rp )
No DESCRIPTION Unit Volume Total ( Rp )
Material Upah/jasa
# PIPE BRIDGE B9 :
1 CHS 216,3 X 8 ( Steel Pipe Dia.8" ) Kg 2019 Rp 49,465,500
2 H 150 X 75 X 5 Kg 278 Rp 6,811,000
3 L 75 X 6 Kg 250 Rp 6,125,000
4 H 200 X 100 X 5,5 Kg 50 Rp 1,225,000
5 L 60 X 4 Kg 175 Rp 4,287,500
6 L 60 X 5 Kg 170 Rp 4,165,000
7 C 100 X 50 X 5 Kg 170 Rp 4,165,000
8 CHS 165,2 X 6 ( Steel Pipe Dia.6" ) Kg 100 Rp 2,450,000
9 Connection Plate Kg 481.8 Rp 11,804,100
3693.8 Rp 90,498,100
11012018
TIME SCHEDULE
Owner : PT Rekadaya Elektrika
Project : Piping System Erection Work
Lokation : PLTU Gorontalo 2x25 MW
No. SPH : 971R2/SPH/RE‐KPME/XI/17
Prepare By : PT Kuwera Pandukarya Mega Engineering
Date : 17 Januari 2018
2 POWER & WATER SUPPLY
2.1 Power Resource for Construction Lot 1 1.0751% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672% 0.0672%
2.2 Water for Construction Lot 1 0.1792% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112%
2.3 Water Distribution Lot 1 0.1792% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112% 0.0112%
1.3 Piping System for Waste Water dia. Inch 1897 14.3437% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034% 1.1034%
1.3.1 Pipe Welding
include:
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.4 Piping System for Oily Waste Water dia. Inch 931 7.0395% 1.0056% 1.0056% 1.0056% 1.0056% 1.0056% 1.0056% 1.0056%
1.4.1 Pipe Welding
include:
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1 5 Piping
1.5 Piping System for Demineralized Water
System for Demineralized Water dia Inch
dia. Inch 570 5 5355%
5.5355% 0 9226%
0.9226% 0 9226%
0.9226% 0 9226%
0.9226% 0 9226%
0.9226% 0 9226%
0.9226% 0 9226%
0.9226%
1.5.1 Pipe Welding
include:
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.6 Piping system for Chemical Water dia. Inch 3620 27.3717% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107% 1.7107%
1.6.1 Pipe Welding
include:
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.7 Piping system for Service water dia. Inch 907 6.8580% 1.3716% 1.3716% 1.3716% 1.3716% 1.3716%
1.7.1 Pipe Welding
include:
‐ Installation of Piping Valves & Specialties
‐ Fitting
‐ Pipe Cutting
1.8 Painting work Lot 1 5.6620% 1.1324% 1.1324% 1.1324% 1.1324% 1.1324%
C. PIPE BRIDGE B9 :
1 CHS 216,3 X 8 ( Steel Pipe Dia.8" ) Kg 2019 0.3545% 0.1773% 0.1773%
2 H 150 X 75 X 5 Kg 278 0.0488% 0.0244% 0.0244%
3 L 75 X 6 Kg 250 0.0439% 0.0219% 0.0219%
4 H 200 X 100 X 5,5 Kg 50 0.0088% 0.0044% 0.0044%
5 L 60 X 4 Kg 175 0.0307% 0.0154% 0.0154%
6 L 60 X 5 Kg 170 0.0299% 0.0149% 0.0149%
7 C 100 X 50 X 5 Kg 170 0.0299% 0.0149% 0.0149%
8 CHS 165,2 X 6 ( Steel Pipe Dia.6" ) Kg 100 0.0176% 0.0088% 0.0088%
9 Connection Plate Kg 482 0.0846% 0.0423% 0.0423%
10.9319% 4.8590% 4.8345% 5.6380% 5.2599% 5.2599% 6.8725% 6.3093% 6.3093% 6.3093% 6.3093% 7.6809% 6.5485% 5.6259% 5.6259% 5.6259%
TOTAL 100%
10.9319% 15.7908% 20.6254% 26.2634% 31.5233% 36.7833% 43.6558% 49.9651% 56.2743% 62.5836% 68.8929% 76.5738% 83.1223% 88.7482% 94.3741% 100%