REVISION RECORD
REV 01 15/01/18 First revision of document approved internally and submitted to Newcross.
REPORT APPROVAL
Issue Checked by Approved by Date
1.0 B.Obe A.E 18/01/18
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
TABLE OF CONTENTS
3.1 CHECKLIST................................................................................................................................................10
3.3 OBSERVATION..........................................................................................................................................19
1.0 INTRODUCTION
The Newcross Production Limited Operation Safety Case shall include documentation of the
processes and activities carried out at the Ekulama-1, Ekulama-2 and Awoba Flowstations
stating all the studies carried out and the systems in place to ensure safety of personnel,
equipment and environment. Newcross Production Limited (NPEL) has engaged Petrorix to
support in developing an Operational Safety Case for the Ekulama and Awoba Flowstations.
A site visit was conducted on the 30th November – 13th December at Ekulama1 and 2
Flowstations as well as Awoba Flowstation. This document presents the Piping, Mechanical,
Process, Instrumentation, Electrical and Structural site visit report which relates to site
The following definitions, abbreviations and acronyms are used in this document
LP Low Pressure
HP High Pressure
NC Normally Closed
PTW Permit-To-Work
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
The objectives of the site visit are to carry out the following activities where operational
possible and accessible:
2.0 BACKGROUND
The flowstation is a single bank with vessels for a two-stage separation. The processed crude is
pumped with gas driven crude oil export reciprocating pumps into the trunkline, while the
separated gas is flared with horizontal flare unit located in a bunded area outside the
flowstation. Ekulama-1 field consists of 11 wells flowing into its flowstation. These wells are
located in swampy area with dredged slot to each well head for easy access during wellhead
activities. Ekulama-1 flowstation is currently producing 17,000bbls/d gross with an average
water cut of 38.85%. It is design to handle a maximum capacity of approximately 30.000bbls/d.
Accommodation for dedicated teams of technical personnel who visit the Ekulama-1
flowstation is provided at the nearest base station on Ekulama-2. Ekulama 1 is normally an
unmanned flowstation however daily visit by means of sea transportation is required to carry
out operational, maintenance activities and troubleshooting of equipment and instruments
failure. Although Ekulama 1 is described as unmanned, a flowstation attendant is on duty
24hours a day to keep vigilance and take bulk line meter readings on 2 hourly basis.
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
The flowstation is a double bank with vessels for two stage separations. The processed crude is
pumped with gas driven crude oil reciprocation export pumps into the trunkline, while the
separated gas is flared with two horizontal flare units located in a bunded area outside the
flowstation. The field consists of 12wells flowing into the flowstation. These wells are located
in swampy area with dredged slot to each wellhead for easy access during wellhead activities.
Ekulama-2 flowstation is currently producing 40,000bbls/d gross with an average water cut of
38.71%. It is designed to handle a maximum capacity of approximately 60,000bbls/d.
Ekulama-2 is a base station with full board accommodation unit provided for dedicated teams
of personnel who provide operation and maintenance activities, and troubleshooting of
equipment and instruments failure for Ekulama-1 and 2 flowstations. The accommodation unit
is located a walkable distance from Ekulama-2 flowstation. The flowstation is unmanned.
However, staff work 12hours rotating shift a day while on the field. They work 14days on
14days off basis.
The processed crude is pumped with motor driven crude oil centrifugal export pumps into the
trunkline, while the separated gas is flared with horizontal flare units located in a bunded area
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Awoba has a house-boat, a few walking distance from the facility, that provide full board
accommodation for dedicated teams of personnel who provide operation and maintenance
activities, and troubleshooting of equipment and instruments failure. The field is unmanned.
However, staff work 12hours rotating shift a day while on the field. They work 14days on
14days off basis.
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
3.1 Checklist
A site survey checklist (see tables below) was developed to ensure proper and adequate
implementation of the work scope. The checklist was strictly adhered to during the visit to each
respective flowstations.
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
A Manifold Area
B Process Vessel
Confirm the Operating and Design Pressure and
I Temperature of the process vessel OK
II Confirm the availability of OSDVs and their trip functions NOT OK Faulty Rupture Disc
III Confirm drain valves are in NC position NOT OK Faulty Rupture Disc
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
VII Confirm all Lines and Valve are properly tagged NOT OK Tag not seen
C EXPORT PUMP
Overhauling
I Confirm pump capacity NOT OK required
Could not access
II Confirm the availability of the pump data sheet NOT OK data
Confirm the availability of Low/High Level Suction trip
III function OK
Confirm the availability of Low/High Pressure Discharged
IV trip function OK
V Confirm the availability of PDI across strainer OK
VI Confirm the availability of recycle line OK
VII Confirm all Lines and Valve are properly tagged NOT OK Tag not seen
VIII Confirm all check valves are installed in the right direction OK
Confirm the availability of Low pressure suction trip
IX function OK
D Metering System
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
III Confirm all Lines and Valve are properly tagged NOT OK Tag not seen
E Flare Stack
Confirm the availability of past Technical Safety Studies
conducted (Flare Thermal Radiation Study) to ensure all Information not
I personnel working on the platform are in safe position NOT OK available
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
A Manifold Area
B Process Vessel
Confirm the Operating and Design Pressure and
I Temperature of the process vessel OK
II Confirm the availability of OSDVs and their trip functions NOT OK Faulty Rupture Disc
III Confirm drain valves are in NC position NOT OK Faulty Rupture Disc
Confirm all instrumentation tubing are properly arranged to
IV avoid Trip and Fall accident OK
VII Confirm all Lines and Valve are properly tagged NOT OK Tag not seen
C EXPORT PUMP
Overhauling
I Confirm pump capacity NOT OK required
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
Could not access
II Confirm the availability of the pump data sheet NOT OK data
Confirm the availability of Low/High Level Suction trip
III function OK
Confirm the availability of Low/High Pressure Discharged
IV trip function OK
V Confirm the availability of PDI across strainer OK
VII Confirm all Lines and Valve are properly tagged NOT OK Tag not seen
VIII Confirm all check valves are installed in the right direction OK
Confirm the availability of Low pressure suction trip
IX function OK
D Metering System
I Confirm all Meters are properly proved OK
II Confirm all check valves are installed in the right direction OK
III Confirm all Lines and Valve are properly tagged NOT OK Tag not seen
E Flare Stack
Confirm the availability of past Technical Safety Studies
conducted (Flare Thermal Radiation Study) to ensure all Information not
I personnel working on the platform are in safe position NOT OK available
D Pig Launcher and Pig Receiver
I Confirm the availability of Pig signaler OK
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
II Confirm set points of PSVs installed NOT OK Faulty Rupture Disc
No operation more
III Confirm the availability of the pigging operation NOT OK than a year
Confirm all piping are fully rated to handle the maximum
IV source of pressure OK
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
A Manifold Area
B Process Vessel
Confirm the Operating and Design Pressure and
I Temperature of the process vessel OK
II Confirm the availability of OSDVs and their trip functions OK
C EXPORT PUMP
I Confirm pump capacity OK
Could not access
II Confirm the availability of the pump data sheet NOT OK data
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
Confirm the availability of Low/High Level Suction trip
III function OK
Confirm the availability of Low/High Pressure Discharged
IV trip function OK
VII Confirm all Lines and Valve are properly tagged NOT OK Tag not seen
VIII Confirm all check valves are installed in the right direction OK
Confirm the availability of Low pressure suction trip
IX function OK
D Metering System
I Confirm all Meters are properly proved OK
III Confirm all Lines and Valve are properly tagged NOT OK Tag not seen
E Flare Stack
Confirm the availability of past Technical Safety Studies
conducted (Flare Thermal Radiation Study) to ensure all Information not
I personnel working on the platform are in safe position NOT OK available
D Pig Launcher and Pig Receiver
I Confirm the availability of Pig signaler OK
II Confirm set points of PSVs installed OK
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
STATUS
S/N DESCRIPTION REMARK
OK NOT OK
No operation more
III Confirm the availability of the pigging operation NOT OK than a year
Confirm all piping are fully rated to handle the maximum
IV source of pressure OK
From the above list, the following documents were made available; Standard operating
procedures, PTW, and Past incident reports
3.3 Observation
The facilities (Ekulama 1, Ekulama 2 and Awoba) were inspected and the following
observations were made:
1. Safety briefing was carried out at the briefing room on arrival to the facility.
2. Tool box meetings were effectively implemented prior to the commencement of all
daily activities.
3. Use of minimum required PPE was adhered to strictly prior to platforms visit.
4. Stop cards were placed at strategic points and issued to personnel to encourage
reporting of unsafe acts and unsafe conditions.
5. The job hazard analysis, fire drill and emergency drill were found to be progressing
appropriately.
1. The Platform Structures Damaged due to corrosion (Handrails, Man way Davit etc)
2. The Inlet manifold, valves, flanges and piping are severely corroded
3. Frequent breakdown of reciprocating pumps
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Recommendation:
Recommendations:
Recommendations:
Appendix I – Photograph
Location Ekulama-1
Corroded flanges on the manifold
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-1
Corroded flanges fitting
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-1
Damaged Structural Platform
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-1
Damaged Structural Platform
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-1
Damaged Structural Platform
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-1
Poor Condition of FlareHeader
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-1
Wrong connection of Spectacle blind
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-2
Corroded fittings
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-2
Corroded fittings
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-2
Corroded Hydrant Line
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Ekulama-2
Relief Valve in HP, LP, Test Separator depressurized to the atmosphere
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Awoba
Liquid-Carry-Over on the flare stack
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Awoba
Vessel due for test
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Awoba
Vessel due for test
NEPL
OPERATION
SAFETY CASE
Document Title: Ekulama-Awoba Site Survey Report Rev: 01
Location Awoba
Fire and Gas Detector faulty