Anda di halaman 1dari 4

CTAPD-023 (2006/05)

PROJECTS DEPARTMENT - EAST


SUBSTATION PROJECTS DIVISON - EAST
REVIEW OF CONTRACTOR'S SUBMITTAL

Submittal No. AMC-NG/4400005863/E/038/REV.03 Date: 1/6/2017

PROJECT TITLE : Construction of AL-Awamia-2 115/13.8kV


CONTRACT No. : 4400005863/00 BI No. : JO No.: 1-1433103.01

To:Divison Manager, NG-Saudi Arabia From : (Contractor) AL MASHARIQ CO.


Mr. MUBARAK M.AL-OTAIBI,Division Manager, P. O. BOX 2540, DAMMAM 31461
Mr. Mohammad Al-Furiah,Project Engineer
Dammam, Saudi Arabia
ACCEPTANCE OF THE FOLLOWING SUBMITTAL IS HEREBY REQUESTED:
Check in the ✘ Drawings / ✘ Materials / Test Reports Others
Appropriate Box: Sketches Equipment
FILL-UP APPLICABLE INFORMATION BELOW:

LINE CT PARAMETERS FOR AL-AWAMIA-2 S/S & REMOTE END QATIF FOR REVIEW &
Description :
APPROVAL

Reference Specification : PTS - 13EN1104


Attachment : 1Sets + 1CD

COMPLYING WITH SCOPE OF WORK AND TECHNICAL SPECIFICATIONS? ✘ YES NO


IF"NO" INDICATE DEVIATIONS : (Provide justification and attach supporting documents)

(Contractor) NATIONAL GRID


Submitted by :Project Manager Received by : Project Engineer

Signature : Signature :
Name : Yousry Mohamed Sayed Name : Mr. Mohammad Al-Furiah
Date : 01/036/2017 Date :
FOR NATIONAL GRID - SA USE ONLY
PD-E/ /SPD-E HAVE RECEIVED THE ABOVE REMARKS :
SUBMITTAL AND FOUND IT: …………………………………………………………………….
ACCEPTABLE …………………………………………………………………….
ACCEPTABLE, AS NOTED …………………………………………………………………….
NOT ACCEPTABLE (RESUBMIT) …………………………………………………………………….
PROVIDE ADDITIONAL INFORMATION …………………………………………………………………….
SEE ATTACHED COMMENTS Please use extra sheets if needed.

Signature : Received by Signature :


Name : Mr. Raid M. Al Daalouj (AMCO) Name :
Transmission Spacialist Engineering , PD-E/SPD-E
Date : Date :

NOTE : Acceptance does not release the Contractor from his responsibilities in performing the work in strict