Line Data
Line =
R1 (pu) = 0.0941 X1 (pu) = 0.2968 ASPEN one-liner data
R0 (pu) = 0.3306 X0 (pu) = 0.7848
Line Length (miles) = LL = 52.3
Page 1 of 53
01/26/2018
NSM 115 kV LINE DATA & COMMON SETTINGS
by: Tom Ernst
42 Line
Line =
56L @ Colbyville open
57L @ Colbyville open
2TM @ Colbyville open
For 3LG fault at Colbyville 13.8 kV (based on Aspen one-liner study):
V1 at NSM 115 kV bus = 58746 Volts @ -5.3 degrees
NSM 115 kV contribution (I1) = 526 Amps @ -51.2 degrees
Z1 App = V1/I1 = 111.68 Ohms @ 45.9 degrees
= 77.72 +j 80.20
Page 2 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Line Data
N Shore Mining 115 kV - Colbyville 115 kV (act Z)
R1(pri-ohms) = R1(pu)*Ohm(base) = 12.445
X1(pri-ohms) = X1(pu)*Ohm(base) = 39.252
Z1MAG(sec-ohms) = Z1MAG(pri-ohms)*(CTR/PTR) = 4.941
Z1 Line Angle = Z1ANG = 72.409
Enable zones of distance (select the number of zones for each type of element):
Mho Phase (N, 1 - 5) = E21P = 4
Mho Ground (N, 1 - 5) = E21MG = 4
Quad Ground (N, 1 - 5) = E21XG = N
Page 3 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Zone 2 Reach = 110% NSM 115 kV - Colbyville 13.8 kV W/42L @ NSM failed (app Z)
Zone 2 Reach (sec-ohms) = Z2P = 14.74
This element is used in pilot scheme only, Z4 provides time backup.
Page 4 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
MHO Elements:
Zone 1 Reach = 85% NSM - Colbyville (act Z)
Desired Zone 1 MHO Grd Reach (zero seq sec-ohms) =
Zone 1 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K01 + 1) = Z1MG = 4.20
Zone 2 Reach = 110% NSM 115 kV - Colbyville 13.8 kV W/42L @ NSM failed (app Z)
Desired Zone 2 MHO Grd Reach (zero seq sec-ohms) =
Zone 2 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K0 + 1) = Z2MG = 14.74
Note: Check to be sure that Z2 does not over-reach next shortest Z1.
Quadrilateral Elements:
Zone 1 Reach = Not Used
Zone 1 QUAD Reactive Grd Reach (sec-ohms) = XG1 = --
Zone 1 QUAD Resistive Grd Reach (sec-ohms) = RG1 = --
Page 5 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Note: Timer settings applicable only if associated measurement elements are enabled above.
Zone 1 Phase Time Delay (cycles) = Z1PD = 0
Zone 2 Phase Time Delay (cycles) = Z2PD = 0
Zone 3 Phase Time Delay (cycles) = Z3PD = 0
Zone 4 Phase Time Delay (cycles) = Z4PD = 24
Zone 5 Phase Time Delay (cycles) = Z5GD =
Zone 1 Ground Time Delay (cycles) = Z1GD = 0
Zone 2 Ground Time Delay (cycles) = Z2GD = 0
Zone 3 Ground Time Delay (cycles) = Z3GD = 0
Zone 4 Ground Time Delay (cycles) = Z4GD = 24
Zone 5 Ground Time Delay (cycles) = Z5GD =
Page 6 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Maximum Line Load Capability (MVA) = 150 (Tac Harb Gen RB Limit)
Maximum Line Load Power Factor = 0.75 41.4 deg
Minimum Load Impedance at 1.0 pu Voltage (sec-ohms) = 10.58
Minimum Load Impedance at 0.9 pu Voltage (sec-ohms) = 8.57 (constant MVA load)
Zone 2 Reach at Max Line Load PF (sec-ohms) = 12.64
Note: Use the zone with the longest reach for encroachment test.
Load Impedance:
Forward (sec-ohms) = 80% of minimum load impedance @ 0.9 pu voltage
ZLF = 6.86
Reverse (sec-ohms) = 80% of minimum load impedance @ 0.9 pu voltage
ZLR = 6.86
Load Angle - Positive Forward = PLAF = 41.4
Load Angle - Negative Forward = NLAF = -15.0
Load Angle - Positive Reverse = PLAR = 165.0 (180 - 15)
Load Angle - Negative Reverse = NLAR = 221.5 (180 + 41.5)
Directional Elements
Page 7 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Page 8 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Page 9 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Level 2 Res O/C PU = 50G2P = Used in Blocking Logic, Set at standard value to Coord w/50G3P
50G2P (amps sec, 3I0) = 1.00
Level 3 Res O/C PU = 50G3P = Used in Blocking Logic, Set at standard value to Coord w/50G2P
50G3P (amps sec, 3I0) = 0.50
Page 10 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Page 11 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Page 12 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst
Breaker 1 Recloser
Page 13 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst
General Settings
R0(pri-ohms) = 43.722
X0(pri-ohms) = 103.790
Z0MAG(sec-ohms) = Z0MAG (pri-ohms)*(CTR/PTR) = 13.515
Z0 Line Angle = Z0ANG = 67.2
Page 14 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst
MHO Elements:
Zone 1 Reach = 85% NSM 115 kV - Colbyville 115 kV (act Z)
Desired Zone 1 MHO Grd Reach (zero seq sec-ohms) = 11.49
Zone 1 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K01 + 1) = Z1MG = 4.19
Page 15 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst
Page 16 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst
Maximum Line Load Capability (MVA) = 150 (based on Tac Harb gen RB)
Maximum Line Load Power Factor = 0.75 41.4 deg
Minimum Load Impedance at 1.0 pu Voltage (sec-ohms) = 10.58
Minimum Load Impedance at 0.9 pu Voltage (sec-ohms) = 8.57 (constant MVA load)
Zone 2 Reach at Max Line Load PF (sec-ohms) = 5.29
Load Impedance:
Forward (sec-ohms) =
ZLF =
Reverse (sec-ohms) =
ZLR =
Load Angle - Positive Forward = PLAF =
Load Angle - Negative Forward = NLAF =
Load Angle - Positive Reverse = PLAR = (180 - 15)
Load Angle - Negative Reverse = NLAR = (180 + 41.5)
Directional Elements
Demand Metering
Page 17 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst
Other Settings
Page 18 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst
Page 19 of 53
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
SHORT CIRCUIT MVA= 118.2 X/R RATIO= 7.91322 R0/X1= 0.02896 X0/X1= 0.5386
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 2 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 58.746@ -5.3 0.000@ 0.0 0.000@ 0.0 58.746@ -5.3 58.746@-125.3
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 525.8@ -51.2 0.0@ 0.0 0.0@ 0.0 525.8@ -51.2 525.8@-171.2
0 NSM/SBP B2 115. S 431.7@ 129.4 0.0@ 0.0 0.0@ 0.0 431.7@ 129.4 431.7@ 9.4
0 SBP 3A 13.8 1T 94.3@ 125.7 0.0@ 0.0 0.0@ 0.0 94.3@ 125.7 94.3@ 5.7
--------------------------------------------------------------------------------------------------------------------
Calculate 50P1
====================================================================================================================
1. 3LG Bus fault on:
COLBYVL/1388 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
13267.3@ -68.6 0.0@ 0.0 0.0@ 0.0 13267.3@ -68.6 13267.3@ 171.4 13267.
THEVENIN IMPEDANCE (OHM)
1.82415+j4.66013 1.85839+j4.67645 19.2121+j25.3607
SHORT CIRCUIT MVA= 2642.7 X/R RATIO= 2.55468 R0/X1= 4.12265 X0/X1= 5.44207
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 46.536@ -3.7 0.000@ 0.0 0.000@ 0.0 46.536@ -3.7 46.536@-123.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 1130.4@ -76.1 0.0@ 0.0 0.0@ 0.0 1130.4@ -76.1 1130.4@ 163.9
0 NSM/SBP B2 115. S 932.9@ 104.8 0.0@ 0.0 0.0@ 0.0 932.9@ 104.8 932.9@ -15.2
0 SBP 3A 13.8 1T 198.2@ 99.6 0.0@ 0.0 0.0@ 0.0 198.2@ 99.6 198.2@ -20.4
--------------------------------------------------------------------------------------------------------------------
Calculate 50G1
====================================================================================================================
2. 1LG Bus fault on:
COLBYVL/1388 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1597.2@ -56.6 1597.2@ -56.6 1597.2@ -56.6 4791.6@ -56.6 0.0@ 0.0 0.
Page 20
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
SHORT CIRCUIT MVA= 954.4 X/R RATIO= 1.51552 R0/X1= 4.12265 X0/X1= 5.44207
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 64.126@ -0.8 2.443@-159.8 4.928@-165.7 57.127@ -2.9 68.006@-121.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 136.1@ -64.0 136.8@ -64.3 409.7@ -72.8 680.7@ -69.4 276.0@ -76.9
0 NSM/SBP B2 115. S 112.3@ 116.9 112.9@ 116.6 262.7@ 107.5 486.3@ 111.8 153.0@ 100.9
0 SBP 3A 13.8 1T 23.9@ 111.7 24.0@ 111.4 147.0@ 106.7 194.7@ 107.9 123.2@ 105.8
--------------------------------------------------------------------------------------------------------------------
====================================================================================================================
3. 1LG Bus fault on:
COLBYVL/1388 115. kV
with outage(s):
COLBYVL/1388 115. kV - MUTL_56 115. kV 1 L
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1080.4@ -65.4 1080.4@ -65.4 1080.4@ -65.4 3241.1@ -65.4 0.0@ 0.0 0.
THEVENIN IMPEDANCE (OHM)
2.82193+j9.71618 2.8492+j9.72927 19.8778+j36.4475
SHORT CIRCUIT MVA= 645.6 X/R RATIO= 2.18769 R0/X1= 2.04584 X0/X1= 3.75122
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 63.205@ -0.9 3.358@-162.8 4.349@-166.0 55.852@ -3.1 66.966@-120.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 185.6@ -68.0 185.9@ -68.1 361.6@ -73.1 732.4@ -70.5 177.6@ -78.3
0 NSM/SBP B2 115. S 152.7@ 112.8 153.0@ 112.7 231.9@ 107.2 537.0@ 110.3 81.3@ 96.9
0 SBP 3A 13.8 1T 32.9@ 108.5 33.0@ 108.4 129.7@ 106.3 195.6@ 107.0 96.9@ 105.7
--------------------------------------------------------------------------------------------------------------------
====================================================================================================================
4. 1LG Bus fault on:
COLBYVL/1388 115. kV
with outage(s):
COLBYVL/1388 115. kV - CLBYVIL 57L 115. kV L
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1085.8@ -65.7 1085.8@ -65.7 1085.8@ -65.7 3257.5@ -65.7 0.0@ 0.0 0.
THEVENIN IMPEDANCE (OHM)
2.53811+j9.35007 2.56604+j9.36313 20.0399+j37.0237
SHORT CIRCUIT MVA= 648.9 X/R RATIO= 2.21671 R0/X1= 2.14329 X0/X1= 3.95973
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 63.339@ -0.9 3.230@-162.1 4.433@-166.1 56.038@ -3.1 67.088@-120.9
Page 21
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
Test Data:
====================================================================================================================
Test 1. 3LG Interm. fault 85.19%(50.00%) on:
SILVER-B-H-T 115. kV - WALD-UPA-SUB 115. kV 1 L
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
4279.8@ -75.3 0.0@ 0.0 0.0@ 0.0 4279.8@ -75.3 4279.8@ 164.7 4279.
THEVENIN IMPEDANCE (OHM)
3.93579+j15.0058 3.95052+j15.0131 16.426+j36.1676
SHORT CIRCUIT MVA= 852.5 X/R RATIO= 3.8126 R0/X1= 1.09464 X0/X1= 2.41025
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 0 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 35.701@ -8.0 0.000@ 0.0 0.000@ 0.0 35.701@ -8.0 35.701@-128.0
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 1728.1@ -76.6 0.0@ 0.0 0.0@ 0.0 1728.1@ -76.6 1728.1@ 163.4
0 NSM/SBP B2 115. S 1419.9@ 104.1 0.0@ 0.0 0.0@ 0.0 1419.9@ 104.1 1419.9@ -15.9
0 SBP 3A 13.8 1T 308.8@ 100.2 0.0@ 0.0 0.0@ 0.0 308.8@ 100.2 308.8@ -19.8
--------------------------------------------------------------------------------------------------------------------
====================================================================================================================
Test 2. 3LG Bus fault on:
COLBYVL/1388 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
13267.3@ -68.6 0.0@ 0.0 0.0@ 0.0 13267.3@ -68.6 13267.3@ 171.4 13267.
THEVENIN IMPEDANCE (OHM)
1.82415+j4.66013 1.85839+j4.67645 19.2121+j25.3607
SHORT CIRCUIT MVA= 2642.7 X/R RATIO= 2.55468 R0/X1= 4.12265 X0/X1= 5.44207
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 46.536@ -3.7 0.000@ 0.0 0.000@ 0.0 46.536@ -3.7 46.536@-123.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 1130.4@ -76.1 0.0@ 0.0 0.0@ 0.0 1130.4@ -76.1 1130.4@ 163.9
0 NSM/SBP B2 115. S 932.9@ 104.8 0.0@ 0.0 0.0@ 0.0 932.9@ 104.8 932.9@ -15.2
0 SBP 3A 13.8 1T 198.2@ 99.6 0.0@ 0.0 0.0@ 0.0 198.2@ 99.6 198.2@ -20.4
--------------------------------------------------------------------------------------------------------------------
Page 22
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
====================================================================================================================
Test 3. 3LG Bus fault on:
NSM/SBP B1 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
5037.1@ -81.8 0.0@ 0.0 0.0@ 0.0 5037.1@ -81.8 5037.1@ 158.2 5037.
THEVENIN IMPEDANCE (OHM)
1.87205+j13.0477 1.87485+j13.0505 0.91696+j11.1849
SHORT CIRCUIT MVA= 1003.3 X/R RATIO= 6.96974 R0/X1= 0.07028 X0/X1= 0.85723
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 0 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 0.000@ 0.0 0.000@ 0.0 0.000@ 0.0 0.000@ 0.0 0.000@ 0.0
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 1426.7@ 108.2 0.0@ 0.0 0.0@ 0.0 1426.7@ 108.2 1426.7@ -11.8
0 NSM/SBP B2 115. S 2989.7@ 94.9 0.0@ 0.0 0.0@ 0.0 2989.7@ 94.9 2989.7@ -25.1
0 SBP 3A 13.8 1T 652.2@ 91.1 0.0@ 0.0 0.0@ 0.0 652.2@ 91.1 652.2@ -28.9
CURRENT TO FAULT (A) > 5037.1@ -81.8 0.0@ 0.0 0.0@ 0.0 5037.1@ -81.8 5037.1@ 158.2
THEVENIN IMPEDANCE (OHM) > 13.1813@ 81.8 13.1813@ 81.8 11.2224@ 85.3
--------------------------------------------------------------------------------------------------------------------
====================================================================================================================
Test 4. 1LG Interm. fault 85.19%(50.00%) on:
SILVER-B-H-T 115. kV - WALD-UPA-SUB 115. kV 1 L
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
941.6@ -69.8 941.6@ -69.8 941.6@ -69.8 2824.9@ -69.8 0.0@ 0.0 0.
THEVENIN IMPEDANCE (OHM)
3.93579+j15.0058 3.95052+j15.0131 16.426+j36.1676
SHORT CIRCUIT MVA= 562.7 X/R RATIO= 2.72232 R0/X1= 1.09464 X0/X1= 2.41025
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 0 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 59.726@ -1.7 6.921@-165.5 6.774@-166.8 46.673@ -6.2 66.184@-120.0
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 380.2@ -71.1 380.5@ -71.2 563.3@ -74.0 1323.6@ -72.3 184.6@ -79.7
0 NSM/SBP B2 115. S 312.4@ 109.6 312.6@ 109.5 361.2@ 106.3 985.9@ 108.4 52.4@ 86.9
0 SBP 3A 13.8 1T 67.9@ 105.7 68.0@ 105.6 202.1@ 105.5 338.0@ 105.6 134.1@ 105.4
--------------------------------------------------------------------------------------------------------------------
====================================================================================================================
Test 5. 1LG Bus fault on:
COLBYVL/1388 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1597.2@ -56.6 1597.2@ -56.6 1597.2@ -56.6 4791.6@ -56.6 0.0@ 0.0 0.
Page 23
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
SHORT CIRCUIT MVA= 954.4 X/R RATIO= 1.51552 R0/X1= 4.12265 X0/X1= 5.44207
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 64.126@ -0.8 2.443@-159.8 4.928@-165.7 57.127@ -2.9 68.006@-121.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 136.1@ -64.0 136.8@ -64.3 409.7@ -72.8 680.7@ -69.4 276.0@ -76.9
0 NSM/SBP B2 115. S 112.3@ 116.9 112.9@ 116.6 262.7@ 107.5 486.3@ 111.8 153.0@ 100.9
0 SBP 3A 13.8 1T 23.9@ 111.7 24.0@ 111.4 147.0@ 106.7 194.7@ 107.9 123.2@ 105.8
--------------------------------------------------------------------------------------------------------------------
====================================================================================================================
Test 6. 1LG Bus fault on:
NSM/SBP B1 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1767.1@ -82.9 1767.1@ -82.9 1767.1@ -82.9 5301.2@ -82.9 0.0@ 0.0 0.
THEVENIN IMPEDANCE (OHM)
1.87205+j13.0477 1.87485+j13.0505 0.91696+j11.1849
SHORT CIRCUIT MVA= 1055.9 X/R RATIO= 7.99404 R0/X1= 0.07028 X0/X1= 0.85723
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 0 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 43.109@ 0.6 23.298@ 179.0 19.831@-177.6 0.000@ 0.0 65.861@-116.8
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 500.5@ 107.2 500.3@ 107.2 129.7@ 120.7 1127.4@ 108.7 375.7@ -77.4
0 NSM/SBP B2 115. S 1048.8@ 93.9 1049.1@ 93.9 1057.5@ 95.6 3155.0@ 94.5 33.5@ 169.7
0 SBP 3A 13.8 1T 228.8@ 90.1 228.9@ 90.1 591.5@ 94.8 1048.3@ 92.7 363.9@ 97.8
CURRENT TO FAULT (A) > 1767.1@ -82.9 1767.1@ -82.9 1767.1@ -82.9 5301.2@ -82.9 0.0@ 0.0
THEVENIN IMPEDANCE (OHM) > 13.1813@ 81.8 13.1813@ 81.8 11.2224@ 85.3
--------------------------------------------------------------------------------------------------------------------
Page 24
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
=====================================
B PHASE C PHASE
739.8@ 157.2 4739.8@ 37.2
X0/X1= 0.5386
-------------------------------------
B PHASE C PHASE
5.3 58.746@-125.3 58.746@ 114.7
=====================================
B PHASE C PHASE
267.3@ 171.4 13267.3@ 51.4
X0/X1= 5.44207
-------------------------------------
B PHASE C PHASE
3.7 46.536@-123.7 46.536@ 116.3
=====================================
B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0
Page 25
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
X0/X1= 5.44207
-------------------------------------
B PHASE C PHASE
2.9 68.006@-121.7 67.371@ 122.0
B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0
X0/X1= 3.75122
-------------------------------------
B PHASE C PHASE
3.1 66.966@-120.7 66.867@ 120.8
B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0
X0/X1= 3.95973
-------------------------------------
B PHASE C PHASE
3.1 67.088@-120.9 66.967@ 120.9
Page 26
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
=====================================
B PHASE C PHASE
279.8@ 164.7 4279.8@ 44.7
X0/X1= 2.41025
-------------------------------------
B PHASE C PHASE
8.0 35.701@-128.0 35.701@ 112.0
=====================================
B PHASE C PHASE
267.3@ 171.4 13267.3@ 51.4
X0/X1= 5.44207
-------------------------------------
B PHASE C PHASE
3.7 46.536@-123.7 46.536@ 116.3
Page 27
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
=====================================
B PHASE C PHASE
037.1@ 158.2 5037.1@ 38.2
X0/X1= 0.85723
-------------------------------------
B PHASE C PHASE
0.0 0.000@ 0.0 0.000@ 0.0
-------------------------------------
=====================================
B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0
X0/X1= 2.41025
-------------------------------------
B PHASE C PHASE
6.2 66.184@-120.0 66.515@ 119.8
=====================================
B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0
Page 28
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst
X0/X1= 5.44207
-------------------------------------
B PHASE C PHASE
2.9 68.006@-121.7 67.371@ 122.0
=====================================
B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0
X0/X1= 0.85723
-------------------------------------
B PHASE C PHASE
0.0 65.861@-116.8 63.605@ 117.9
-------------------------------------
Page 29
NSM 115 kV Substation 42L Test Faults 01/26/2018
by Tom Ernst
Fault Testing with mpAutoTest
Location / Line : 42 Line Tac Harbor
SK... V...
Format = Text(OS/2 or MS-DOS)(*.txt)
Place it in the Procomm\Aspect Directory
To be used with mpAutoTest "System Checkout - VID" or "System Checkout - Fault Control Panel"
PT & CT RATIO = / 1
PT Ratio: 1000 Voltage Current
CT Ratio: 120 0 0 ● Volts
● NORMAL (NO SKEW)
● Kilo Volts
SKEW ANGLES 1 2
Page 30
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 2 2) Colbyville 3Ph Bus Fault by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 46.5 -4 1130 -76
B 46.5 -124 1130 164
C 46.5 116 1130 44
Page 31
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 4 4) 42L A-Grd Mid-Line Fault by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 47 -6 1324 -72
B 66 -120 185 -80
C 67 120 184 -80
Page 32
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 6 6) NSM A-GND Bus Fault (Reverse) by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 0 0 1127 109
B 66 -117 376 -77
C 64 118 322 -78
Test 7
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 72 -29 219 -101
B 2.6 180 2400 143
C 2.8 103 2400 5
Page 33
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 8 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 0 -32 49 -120
B 0 -154 49 120
C 0 94 49 0
Test 9
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 0 180 2236 70
B 68 -154 200 93
C 70 94 212 92
Page 34
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 10 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 1.3 -30 3000 -110
B 1.3 -150 3000 130
C 1.3 90 3000 10
Test 11
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Page 35
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 12 12 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Test 13 13
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Page 36
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 14 14 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Test 15 15
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Page 37
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 16 16 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Test 17 17
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Page 38
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 18 18 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Test 19 19
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Page 39
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 20 20 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C
Page 40
NSM 115 kV Substation 42L Test Faults 01/26/2018
by Tom Ernst
Page 41
NSM 115 kV Substation 42L Test Faults 01/26/2018
by Tom Ernst
Page 42
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst
35.7
35.7 128 Line Tac Harbor
35.7
-8.0
-128.0
112.0
14.4
14.4
14.4
-110.0
130.0
18.0
46.5
46.5
46.5
-4.0
-124.0
116.0
9.4
9.4
9.4
-76.0
164.0
44.0
0.0
0.0
0.0
0.0
-120.0
120.0
11.9
11.9
11.9
108.0
-12.0
-132.0
47.0
66.0
67.0
-6.0
-120.0
120.0
11.0
1.5
1.5
-72.0
-80.0
-80.0
57.0
67.0
Page 43
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst
68.0
-3.0
-122.0
122.0
5.7
2.3
2.3
-69.0
-77.0
-77.0
0.0
66.0
64.0
0.0
-117.0
118.0
9.4
3.1
2.7
109.0
-77.0
-78.0
72.0
2.6
2.8
-29.0
180.0
103.0
1.8
20.0
20.0
-101.0
143.0
5.0
0.0
0.0
0.0
-32.0
-154.0
94.0
0.4
0.4
0.4
-120.0
120.0
0.0
0.0
68.0
70.0
180.0
Page 44
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst
-154.0
94.0
18.6
1.7
1.8
70.0
93.0
92.0
1.3
1.3
1.3
-30.0
-150.0
90.0
25.0
25.0
25.0
-110.0
130.0
10.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Page 45
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Page 46
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1) 42L 3Ph Flt mid line
2) Colbyville 3Ph Bus Fault
3) NSM 3Ph Bus Fault (Reverse)
4) 42L A-Grd Mid-Line Fault
5) Colbyville A-GND Bus Fault
6) NSM A-GND Bus Fault (Reverse)
0.0
0.0
0.0
0.0
Page 47
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst
0.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
1000
120
Page 48
01/26/2018
NSM 115 kV Substation 42L 21P OOS Characteristic
by Tom Ernst
X
17.3
ZONE 7
15.0
ZONE 6
ZONE 2
ZONE 4
ZONE 1
-6.4 6.4
R
-8.7 8.7
ZONE 3
-15.0
-17.3
Page 49
01/26/2018
NSM 115 kV Substation 42L 21P OOS Characteristic
by Tom Ernst
inner blinder: Zin pu*sin(43.2) = 6.35*sin(106.8); Zin pu= 6.35*sin(106.8)/sin(43.2) = 8.88 ohm
@ -30 deg]
inner blinder: Zin pu*sin(43.2) = 6.35*sin(106.8); Zin pu= 6.35*sin(106.8)/sin(43.2) = 8.88 ohm
@ -30 deg]
NSM 115 kV Substation 42L 21P OOS Characteristic
01/26/2018
by Tom Ernst
outer blinder: Zout pu*sin(43.2) = 8.73*sin(106.8); Zout pu= 8.73*sin(106.8)/sin(43.2) =12.21 o
4.9A @ -30 deg]
Page 51
01/26/2018
NSM 115 kV Substation 42L 21P OOS Characteristic
by Tom Ernst
Page 52
8)/sin(43.2) = 8.88 ohms [60V, 6.8A
01/26/2018
NSM 115 kV Substation 42L 21P OOS Characteristic
by Tom Ernst
6.8)/sin(43.2) =12.21 ohms [60V,
Page 53