Anda di halaman 1dari 53

01/26/2018

NSM 115 kV LINE DATA & COMMON SETTINGS


by: Tom Ernst
42 Line

Line Data

MVA(base) = 100 kV(base) = 115


Ohm(base) = kV(base)^2/MVA(base) = 132.25
Line CT Ratio (:1) = CTR = 120
Line PT Ratio (:1) = PTR = 1000 Sync PT Ratio (:1) = PTR = 600

Line =
R1 (pu) = 0.0941 X1 (pu) = 0.2968 ASPEN one-liner data
R0 (pu) = 0.3306 X0 (pu) = 0.7848
Line Length (miles) = LL = 52.3

R1(pri-ohms) = R1(pu)*Ohm(base) = 12.445


X1(pri-ohms) = X1(pu)*Ohm(base) = 39.252
Z1MAG(pri-ohms) = 41.177
Z1MAG(sec-ohms) = Z1MAG(pri-ohms)*(CTR/PTR) = 4.941
Z1 Line Angle = Z1ANG = 72.409
Line Length (miles) = 52.300

R0(pri-ohms) = R0(pu)*Ohm(base) = 43.722


X0(pri-ohms) = X0(pu)*Ohm(base) = 103.790
Z0MAG(sec-ohms) = Z0MAG (pri-ohms)*(CTR/PTR) = 13.515
Z0 Line Angle = Z0ANG = 67.157

Page 1 of 53
01/26/2018
NSM 115 kV LINE DATA & COMMON SETTINGS
by: Tom Ernst
42 Line

Zone 2 (pilot) Impedance Calculation


calculate impedance to farthest remote zone that remote line breaker trips
for (typically the low-side of bus connected distribution transformer)
during a remote line breaker failure condition.

Line =
56L @ Colbyville open
57L @ Colbyville open
2TM @ Colbyville open
For 3LG fault at Colbyville 13.8 kV (based on Aspen one-liner study):
V1 at NSM 115 kV bus = 58746 Volts @ -5.3 degrees
NSM 115 kV contribution (I1) = 526 Amps @ -51.2 degrees
Z1 App = V1/I1 = 111.68 Ohms @ 45.9 degrees
= 77.72 +j 80.20

Page 2 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

Line Data
N Shore Mining 115 kV - Colbyville 115 kV (act Z)
R1(pri-ohms) = R1(pu)*Ohm(base) = 12.445
X1(pri-ohms) = X1(pu)*Ohm(base) = 39.252
Z1MAG(sec-ohms) = Z1MAG(pri-ohms)*(CTR/PTR) = 4.941
Z1 Line Angle = Z1ANG = 72.409

R0(pri-ohms) = R0(pu)*Ohm(base) = 43.722


X0(pri-ohms) = X0(pu)*Ohm(base) = 103.790
Z0MAG(sec-ohms) = Z0MAG (pri-ohms)*(CTR/PTR) = 13.515
Z0 Line Angle = Z0ANG = 67.157

Line Length (miles) = LL = 52.300 miles

Line Terminal Settings

Station Identifier = SID = NS Mining 42L 21P


Relay Identifier = RID = NS Mining 42L 21P

Distance Elements - General

Enable zones of distance (select the number of zones for each type of element):
Mho Phase (N, 1 - 5) = E21P = 4
Mho Ground (N, 1 - 5) = E21MG = 4
Quad Ground (N, 1 - 5) = E21XG = N

Distance zones & overcurrent direction:


Note: F/R setting not applicable for zones not enabled above.
Distance Zone 1/Overcurrent Level 1 Direction (F,R) = F
Distance Zone 2/Overcurrent Level 2 Direction (F,R) = F
Distance Zone 3/Overcurrent Level 3 Direction (F,R) = R
Distance Zone 4/Overcurrent Level 4 Direction (F,R) = F
Distance Zone 5/Overcurrent Level 5 Direction (F,R) = NA

Page 3 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

MHO Phase Distance Elements

Note: Reach settings applicable only for zones enabled above.

Zone 1 Reach = 85% NSM - Colbyville (act Z)


Zone 1 Reach (sec-ohms) = Z1P = 4.20

Zone 2 Reach = 110% NSM 115 kV - Colbyville 13.8 kV W/42L @ NSM failed (app Z)
Zone 2 Reach (sec-ohms) = Z2P = 14.74
This element is used in pilot scheme only, Z4 provides time backup.

Zone 3 Reach = 150% of NSM Z2 overreach (42.31 ohms pri)


Zone 3 Reach (sec-ohms) = Z3P = 7.62

Zone 4 Reach = 125% NSM 115 kV - Colbyville 115 kV (act Z)


Zone 4 Reach (sec-ohms) = Z4P = 6.18
Note: Check to be sure that Z4 does not over-reach next shortest Z1.

Zone 5 Reach = Not Used


Zone 5 Reach (sec-ohms) = Z5P = NA

MHO Phase Distance Overcurrent Supervision Elements:


These are factory set at 0.1*Inom = 0.5 amps secondary

MHO and Quadrilateral Ground Distance Elements

Note: Reach settings applicable only for zones enabled above.

Zero-Sequence compensation factors:


Note: Use positive-sequence impedences for ground distance settings. Relay will use
the following zero-sequence compensation factor.

k01 = k0 = (Z0-Z1)/(3*Z1) Z0-Z1 = 8.60611 @ angle: 64.1437


k0 = 0.580558 @ angle: -8.2651

Z1Comp Factor Magnitude = k01M = AUTO AUTO, 0.00 - 10


Z1Comp Factor Angle = k01A = -8.265
Forward Zones Comp Factor Magnitude = k0M = 0.581
Forward Zones comp Factor Angle = k0A = -8.265
Reverse Zones Comp Factor Magnitude = k0MR = 0.581
Reverse Zones comp Factor Angle = k0AR = -8.265

Page 4 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

MHO Elements:
Zone 1 Reach = 85% NSM - Colbyville (act Z)
Desired Zone 1 MHO Grd Reach (zero seq sec-ohms) =
Zone 1 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K01 + 1) = Z1MG = 4.20

Zone 2 Reach = 110% NSM 115 kV - Colbyville 13.8 kV W/42L @ NSM failed (app Z)
Desired Zone 2 MHO Grd Reach (zero seq sec-ohms) =
Zone 2 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K0 + 1) = Z2MG = 14.74
Note: Check to be sure that Z2 does not over-reach next shortest Z1.

Zone 3 Reach = 150% of NSM Z2 overreach (42.31 ohms pri)


Desired Zone 3 MHO Grd Reach (zero seq sec-ohms) =
Zone 3 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K0 + 1) = Z3MG = 7.62

Zone 4 Reach = 125% NSM 115 kV - Colbyville 115 kV (act Z)


Desired Zone 4 MHO Grd Reach (zero seq sec-ohms) =
Zone 4 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K0 + 1) = Z4MG = 6.18

Zone 5 Reach = Not Used


Desired Zone 5 MHO Grd Reach (zero seq sec-ohms) =
Zone 5 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K0 + 1) = Z5MG =

Quadrilateral Elements:
Zone 1 Reach = Not Used
Zone 1 QUAD Reactive Grd Reach (sec-ohms) = XG1 = --
Zone 1 QUAD Resistive Grd Reach (sec-ohms) = RG1 = --

Zone 2 Reach = Not Used


Zone 2 QUAD Reactive Grd Reach (sec-ohms) = XG2 = --
Zone 2 QUAD Resistive Grd Reach (sec-ohms) = RG2 = --
Note: Check to be sure that Z2 does not over-reach next shortest Z1.

Zone 3 Reach = Not Used


Zone 3 QUAD Reactive Grd Reach (sec-ohms) = XG3 = --
Zone 3 QUAD Resistive Grd Reach (sec-ohms) = RG3 = --

Zone 4 Reach = Not Used


Zone 4 QUAD Reactive Grd Reach (sec-ohms) = XG4 = --
Zone 4 QUAD Resistive Grd Reach (sec-ohms) = RG4 = --

Zone 5 Reach = Not Used


Zone 5 QUAD Reactive Grd Reach (sec-ohms) = XG5 = --
Zone 5 QUAD Resistive Grd Reach (sec-ohms) = RG5 = --

MHO and Quad Ground Distance Overcurrent Supervision Elements:


These are factory set at 0.1*Inom = 0.5 amps secondary

Page 5 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

Zone Time Delay

Note: Timer settings applicable only if associated measurement elements are enabled above.
Zone 1 Phase Time Delay (cycles) = Z1PD = 0
Zone 2 Phase Time Delay (cycles) = Z2PD = 0
Zone 3 Phase Time Delay (cycles) = Z3PD = 0
Zone 4 Phase Time Delay (cycles) = Z4PD = 24
Zone 5 Phase Time Delay (cycles) = Z5GD =
Zone 1 Ground Time Delay (cycles) = Z1GD = 0
Zone 2 Ground Time Delay (cycles) = Z2GD = 0
Zone 3 Ground Time Delay (cycles) = Z3GD = 0
Zone 4 Ground Time Delay (cycles) = Z4GD = 24
Zone 5 Ground Time Delay (cycles) = Z5GD =

Out-of-Step Blocking and Tripping Elements

Enable OOS = EOOS = Y

Enable OOS Blocking - Zone 1 = OOSB1 = N


Enable OOS Blocking - Zone 2 = OOSB2 = N
Enable OOS Blocking - Zone 3 = OOSB3 = N
Enable OOS Blocking - Zone 4 = OOSB4 = N
Enable OOS Blocking - Zone 5 = OOSB5 =

OOS Block Time Delay (cycles) = OSBD = 5


Latch Out-of-Step Blocking = OSBLTCH = N
Enable OOS Tripping = EOOST = I N,I,O
OOS Trip Time Delay (TDPU) (cycles) = OSTD = 3.000

Note: OOST reach settings applicable only if EOOST is enabled above.


Zone 6 Reach = Per Tac Harbor Stability Study
Zone 6 Reactive Reach - Top (sec-ohms) = X1T6 = 15.00
Zone 6 Reactive Reach - Bottom (sec-ohms) = X1B6 = -15.00
Zone 6 Resistive Reach - Right (sec-ohms) = R1R6 = 6.40
Zone 6 Resistive Reach - Left (sec-ohms) = R1L6 = -6.40

Zone 7 Reach = Per Tac Harbor Stability Study


Zone 7 Reactive Reach - Top (sec-ohms) = X1T7 = 17.30
Zone 7 Reactive Reach - Bottom (sec-ohms) = X1B7 = -17.30
Zone 7 Resistive Reach - Right (sec-ohms) = R1R7 = 8.70
Zone 7 Resistive Reach - Left (sec-ohms) = R1L7 = -8.70

Pos Seq Overcurrent Supervision (sec-amps) = 50ABCP = 4.2


Neg Seq Overcurrent Supervision (sec-amps) = 50QUBP = OFF
Neg Seq Block Delay (cycles) = UBD = 0.5
OSS Angle Unblock Rate = UBOSBF = 4

Page 6 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

Load Encroachment Elements

Maximum Line Load Capability (MVA) = 150 (Tac Harb Gen RB Limit)
Maximum Line Load Power Factor = 0.75 41.4 deg
Minimum Load Impedance at 1.0 pu Voltage (sec-ohms) = 10.58
Minimum Load Impedance at 0.9 pu Voltage (sec-ohms) = 8.57 (constant MVA load)
Zone 2 Reach at Max Line Load PF (sec-ohms) = 12.64
Note: Use the zone with the longest reach for encroachment test.

Enable Load Encroachment = ELOAD = Y


Note: Load encroachment settings applicable only if enabled above.

Load Impedance:
Forward (sec-ohms) = 80% of minimum load impedance @ 0.9 pu voltage
ZLF = 6.86
Reverse (sec-ohms) = 80% of minimum load impedance @ 0.9 pu voltage
ZLR = 6.86
Load Angle - Positive Forward = PLAF = 41.4
Load Angle - Negative Forward = NLAF = -15.0
Load Angle - Positive Reverse = PLAR = 165.0 (180 - 15)
Load Angle - Negative Reverse = NLAR = 221.5 (180 + 41.5)

Directional Elements

Directional Control, E32 = AUTO Y, AUTO


Ground Directional Element Priority, ORDER = QV Q,V,I, Combined
Zero-sequence voltage current enable, E32IV = 1

Time Overcurrent Elements

Operating Quantity Element 1 = 51S1O = 3I0L


Select: IAn, IBn, ICn, IMAXn, I1L, 3I2L, 3I0L
51S1 Overcurrent Pick-up (sec amps) (Same as existing setting) = 51S1P = 1.50
51S1 Time Overcurrent Curve Family = 51S1C = U1
51S1 Time Overcurrent Time Dial = 51S1TD = 2.500
51S1 Time Overcurrent Reset Delay = 51S1RS = N
51S1 Time Overcurrent Torque Control = 51S1TC = 32GF

Operating Quantity Element 1 = 51S2O = N


Select: IAn, IBn, ICn, IMAXn, I1L, 3I2L, 3I0L
51S2 Overcurrent Pick-up (sec amps) = 51S2P = --
51S2 Time Overcurrent Curve Family = 51S2C = --
51S2 Time Overcurrent Time Dial = 51S2TD = --
51S2 Time Overcurrent Reset Delay = 51S2RS = --
51S2 Time Overcurrent Torque Control = 51S2TC = --

Page 7 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

Page 8 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

Operating Quantity Element 1 = 51S3O = N


Select: IAn, IBn, ICn, IMAXn, I1L, 3I2L, 3I0L
51S3 Overcurrent Pick-up (sec amps) = 51S3P = --
51S3 Time Overcurrent Curve Family = 51S3C = --
51S3 Time Overcurrent Time Dial = 51S3TD = --
51S3 Time Overcurrent Reset Delay = 51S3RS = --
51S3 Time Overcurrent Torque Control =51S3TC = --

Instantaneous Overcurrent Elements (Phase, Negative Seq, Residual)

Number of Enabled Phase Inst/Def-Time Overcurrent Elements = E50P = 1


Note: Phase inst O/C settings applicable only if enabled above.

Phase Inst Overcurrent Element Pick-ups (sec amps):


Level 1 Ph O/C PU = 50P1P = 200% of 42 line contribution to a Colbyville 115 kV 3LG bus fault
50P1P (amps sec) = 18.80

Level 2 Ph O/C PU = 50P2P = SOTFT not used here


50P2P (amps sec) =

Level 3 Ph O/C PU = 50P3P =


50P3P (amps sec) =

Level 4 Ph O/C PU = 50P4P =


50P4P (amps sec) =

Level 1 O/C Time Delay (cycles) = 67P1D = 0


Level 2 O/C Time Delay (cycles) = 67P2D =
Level 3 O/C Time Delay (cycles) = 67P3D =
Level 4 O/C Time Delay (cycles) = 67P4D =
Level 1 Torque Control = 67P1TC =
Level 2 Torque Control = 67P2TC =
Level 3 Torque Control = 67P3TC =
Level 4 Torque Control = 67P4TC =

Number of Enabled Neg. Seq. Inst Overcurrent Elements = E50Q = N


Note: Neg. Seq. inst O/C settings applicable only if enabled above.

Neg Seq Inst Overcurrent Element Pick-ups (sec amps, 3I2):


Level 1 NS O/C PU = 50Q1P = --
50Q1P (amps sec, 3I2) = --

Level 2 NS O/C PU = 50Q2P = --


50Q2P (amps sec, 3I2) = --

Level 3 NS O/C PU = 50Q3P = --


50Q3P (amps sec, 3I2) = --

Page 9 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

Level 4 NS O/C PU = 50Q4P = --


50Q4P (amps sec, 3I2) = --

Level 1 O/C Time Delay (cycles) = 67Q1D =


Level 2 O/C Time Delay (cycles) = 67Q2D =
Level 3 O/C Time Delay (cycles) = 67Q3D =
Level 4 O/C Time Delay (cycles) = 67Q4D =
Level 1 Torque Control = 67Q1TC =
Level 2 Torque Control = 67Q2TC =
Level 3 Torque Control = 67Q3TC =
Level 4 Torque Control = 67Q4TC =

Number of Enabled Residual Inst Overcurrent Elements = E50G = 3


Note: Residual inst O/C settings applicable only if enabled above.

Residual Inst Overcurrent Element Pick-ups (sec amps, 3I0):


Level 1 Res O/C PU = 50G1P = 150% of 42 line contribution to a Colbyville 115 kV 1LG bus
fault
50G1P (amps sec, 3I0) = 15.40

Level 2 Res O/C PU = 50G2P = Used in Blocking Logic, Set at standard value to Coord w/50G3P
50G2P (amps sec, 3I0) = 1.00

Level 3 Res O/C PU = 50G3P = Used in Blocking Logic, Set at standard value to Coord w/50G2P
50G3P (amps sec, 3I0) = 0.50

Level 4 Res O/C PU = 50G4P = SOTFT not used here


50G4P (amps sec, 3I0) =

Level 1 O/C Time Delay (cycles) = 67G1D = 0


Level 2 O/C Time Delay (cycles) = 67G2D = 0
Level 3 O/C Time Delay (cycles) = 67G3D = 0
Level 4 O/C Time Delay (cycles) = 67G4D =
Level 1 Torque Control = 67G1TC = 1
Level 2 Torque Control = 67G2TC = 1
Level 3 Torque Control = 67G3TC = 1
Level 4 Torque Control = 67G4TC =

Page 10 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

Communications-Assisted Trip Schemes (POTT, DCUB, DCB)

Note: Only one scheme can be enabled at a time.

Communications-Assisted Tripping Logic = ECOMM = DCB


N, DCB, POTT, DCUB1, DCUB2

Note: POTT settings applicable only if enabled above.


Zone 3 Reverse Block Time Delay (cycles) = Z3RBD = transient block
Echo Block Time Delay (cycles) = EBLKD =
Echo Time Delay Pick-up Time Delay (cycles) = ETDPU =
Echo Duration Time Delay (cycles) = EDURD =
Enable Weak Infeed trip = EWFC =
Weak Infeed Phase Undervoltage PU = 27PW1 =
Weak Infeed Undervoltage PU = 27PPW =
Weak Infeed Zero-Sequence Overvoltage PU = 59NW =
General Permissive Trip Received = PT1 =

Note: DCUB settings applicable only if enabled above.


Guard Present Security Time Delay (cycles) = GARD1D =
DCUB Disabling Time Delay (cycles) = UBDURD =
DCUB Duration Time Delay (cycles) = UBEND =
General Permissive Trip Received = PT1 =
Channel 2 Permissive Trip Received = PT2 =
Channel 1 Loss-of-Guard = LOG1 =
Channel 2 Loss-of-Guard = LOG2 =

Note: DCB settings applicable only if enabled above.


Zone 3 Reverse Pickup Delay (cycles) = Z3XPU = 1
Zone 3 Reverse Drop-out Time Delay (cycles) = Z3XD = 3
Block Trip Receive Extension Time Delay (cycles) = BTXD = 1
Zone 2 Distance Short Delay Time Delay (cycles) = 21SD = 1
Level 2 O/C Short Delay Time Delay (cycles) = 67SD = 1
Block Trip Received = BT = IN107 OR NOT IN106

Breaker 1 Failure Logic

Phase Fault PU = 50FP1 = Same as phase fault detectors


50FP1 (amps sec) = 0.50

Breaker Failure Time Delay - BK1 (cycles) = BFPU1 = 12


Retrip Time Delay - BK1 (cycles) = RTPU1 = 3
Three-Pole BF Initiate - BK1 = BFI3P1 = 3PT OR IN103
A-Phase BF Initiate - BK1 = BFIA1 = 0
B-Phase BF Initiate - BK1 = BFIB1 = 0
C-Phase BF Initiate - BK1 = BFIC1 = 0
BF Initiate Drop-out Delay - BK1 (cycles) = BFIDO1 = 0

Page 11 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

BF Initiate Seal-in Delay - BK1 (cycles) = BFISP1 = 0

No Current/Residual Current Logic - BK1 (Y,N) = ENCBF1 = Y

Residual Fault PU = 50RP1 = Same as residual/ground fault detectors


50RP1 (amps sec, 3IO) = 0.50

No Current Breaker Failure Time Delay - BK1 (cycles) = NPU1 = 12


No Current BF Initiate - BK1 = BFIN1 = 0

Load Current BF Logic - BK1 (Y,N) = ELCBF1 = N

Flash Over BF Logic - BK1 (Y,N) = EFOBF1 = N

BF Trip - BK1 = BFTR1 = FBF1 OR NBF1


BF Unlatch Trip - BK1 = BFULTR1 = NOT(3PT OR IN103)

Synchronism Check Element Reference

Synch Reference Voltage = SYNCP = VBY


25VL = 50% of VBY nominal (66 V)
Voltage Window Low Threshold (volts sec) = 25VL = 33.0
25VH = 110% of VBY nominal (66 V)
Voltage Window High Threshold (volts sec) = 25VH = 73.0

Breaker 1 Synchronism Check

Synch Source 1 = SYNCS1 = VBZ


Synch Source 1 Ratio Factor (0.10 - 3) = KS1M = 0.6 66.3/110.7
Synch Source Angle Shift (0 - 330 deg in 30 deg incre) = KS1A = 0.0
Max Slip Freg - BK1 (OFF, 0.005 - 0.5 Hz) = 25SFBK1 = OFF
Max Angle Difference 1 - BK1 (3.0 - 80 degrees) = ANG1BK1 = 40.0
Max Angle Difference 2 - BK1 (3.0 - 80 degrees) = ANG2BK1 = 40.0
Breaker 1 Close Time (1.00-30 cycles) = TCLSBK1 =
Block Synch Check - BK1 = BSYNBK1 = 0

Page 12 of 53
NSM 115 kV Substation 01/26/2018
SEL-421-1 SETTINGS
42 Line by Tom Ernst

Breaker 1 Recloser

Number of 3-pole Recolsers = N3PSHOT = 1


3-Pole Reclose Enable - Bk1 = E3PR1 = 1
Bkr Close Fail Delay (1 - 99,999, OFF) = BKCFD = 300
Unlatch closing - Bk1 = ULCL1 = 52AA1
Recloser drive-to-lockout = 79DTL = PCT01Q AND NOT 52AA1
Block reclaim timer = 79BRCT = 0
Manual close reclaim time (1 - 99,999 cycles) = 3PMRCD = 900
BK1 reclose supervision delay (OFF, 1 - 99,999) = BK1CLSD = OFF
3-pole open interval 1 delay (1 - 99,999 cycles) = 3POID1 = 300
3-pole open interval 2 delay (1 - 99,999 cycles) = 3POID2 =
3-pole open interval 3 delay (1 - 99,999 cycles) = 3POID3 =
3-pole open interval 4 delay (1 - 99,999 cycles) = 3POID4 =
3-pole fast ARC = 3PFARC = 0
3-pole fast open int delay (1 - 99,999 cycles) = 3PFOID = 60
3-pole reclaim time delay (1 - 99,999 cycles) = 3PRCD = 900
3-pole reclose initiation = 3PRI = (RMB1A OR 3PT AND NOT SOTFT) AND IN202
Skip recloser shot = 79SKP = 0
3-pole Bk1 reclose supv = 3P1CLS = PCT05Q OR ASV004 OR ASV005
Recloser Voltage Elements:
Reclosing voltage check = EVCK = Y
Dead line voltage = 27LP = 33
Live line voltage = 59LP = 58
Bk1 dead busbar voltage = 27BK1P = 33
Bk1 live busbar voltage = 59BK1P = 58

Page 13 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst

General Settings

Station Identifier = SID = NS Mining 42L 21S


Relay Identifier = RID = NS Mining 42L 21S

Phase CT ratio = CTR = 120


Polarizing CT ratio = CTRP = 160 (no currrent polarizing available)
Phase PT Ratio = PTR = 1000

Application = APP = 311A


Advanced settings enabled = EADVS = Y

Line Data and Fault Locating


Colbyville 115 kV - N Shore Mining 115 kV (act Z)
R1(pri-ohms) = 12.445
X1(pri-ohms) = 39.252
Z1MAG(sec-ohms) = Z1MAG(pri-ohms)*(CTR/PTR) = 4.941
Z1 Line Angle = Z1ANG = 72.4

R0(pri-ohms) = 43.722
X0(pri-ohms) = 103.790
Z0MAG(sec-ohms) = Z0MAG (pri-ohms)*(CTR/PTR) = 13.515
Z0 Line Angle = Z0ANG = 67.2

Line Length (miles) = LL = 52.30

Enable fault locator = EFLOC = Y

Phase Distance Elements

Enable Mho Phase distance elements (N, 1,2,1C,2C) = E21P = 2


CCVT transient detection enable = ECCVT = N

Note: Reach settings applicable only for zones enabled above.

Zone 1 Reach = 85% NSM 115 kV - Colbyville 115 kV (act Z)


Zone 1 Reach (sec-ohms) = Z1P = 4.20

Zone 2 Reach = 125% NSM 115 kV - Colbyville 115 kV (act Z)


Zone 2 Reach (sec-ohms) = Z2P = 6.18
Note: Check to be sure that Z2 does not over-reach next shortest Z1.

MHO Phase Distance Overcurrent Supervision Elements:


Phase-phase overcurrent fault detector Zone 1 = 50PP1 = 1
Phase-phase overcurrent fault detector Zone 2 = 50PP2 = 1

Page 14 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst

Ground Distance Elements

Enable Mho Ground distance elements (N, 1,2) = E21MG = 2

Note: Reach settings applicable only for zones enabled above.

MHO Elements:
Zone 1 Reach = 85% NSM 115 kV - Colbyville 115 kV (act Z)
Desired Zone 1 MHO Grd Reach (zero seq sec-ohms) = 11.49
Zone 1 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K01 + 1) = Z1MG = 4.19

Zone 2 Reach = 125% NSM 115 kV - Colbyville 115 kV (act Z)


Desired Zone 2 MHO Grd Reach (zero seq sec-ohms) =
Zone 2 MHO Grd Reach (Pos seq sec-ohms) = Z0/(3K0 + 1) = Z2MG = 6.18
Note: Check to be sure that Z2 does not over-reach next shortest Z1.

MHO and Quad Ground Distance Overcurrent Supervision Elements:


Phase current fault detector Zone 1 = 50L1 = 1
Phase current fault detector Zone 2 = 50L2 = 1
Residual current fault detector Zone 1 = 50GZ1 = 0.5
Residual current fault detector Zone 2 = 50GZ2 = 0.5

Zero-Sequence compensation factors:


Note: Use positive-sequence impedences for ground distance settings. Relay will use
the following zero-sequence compensation factor.

k01 = k0 = (Z0-Z1)/(3*Z1) Z0-Z1 = 8.60611 @ angle: 64.1437


k0 = 0.580558 @ angle: -8.2651

Z1Comp Factor Magnitude = k0M1 = 0.5806 0.00 - 10


Z1Comp Factor Angle = k0A1 = -8.2651
Forward Zones Comp Factor Magnitude = k0M = 0.5806
Forward Zones comp Factor Angle = k0A = -8.2651

Mho Phase Distance Element Time Delays


Note: Timer settings applicable only if associated measurement elements are enabled above.
Zone 1 Phase Time Delay (cycles) = Z1PD = OFF
Zone 2 Phase Time Delay (cycles) = Z2PD = 24

Mho Ground Distance Element Time Delays


Note: Timer settings applicable only if associated measurement elements are enabled above.
Zone 1 Ground Time Delay (cycles) = Z1GD = OFF
Zone 2 Ground Time Delay (cycles) = Z2GD = 24

Common Distance/Ground Distance Element Time Delays


Note: Timer settings applicable only if associated measurement elements are enabled above.
Zone 1 Common Time Delay (cycles) = Z1D = OFF
Zone 2 Common Time Delay (cycles) = Z2D = OFF

Page 15 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst

Phase Instantaneous Overcurrent Elements

Enabled Phase Overcurrent Element = E50P = Y

Phase Inst Overcurrent Element Pick-ups (sec amps):


Level 1 Ph O/C PU = 50P1P = 200% of 42 line contribution to a Colbyville 115 kV 3LG bus fault
50P1P (amps sec) = 18.80

Level 1 O/C Time Delay (cycles) = 67P1D = 0

Residual Instantaneous Overcurrent Elements

Enabled Residual Inst Overcurrent Elements = E50G = Y


Note: Residual inst O/C settings applicable only if enabled above.

Residual Inst Overcurrent Element Pick-ups (sec amps, 3I0):


Level 1 Res O/C PU = 50G1P = 150% of 42 line contribution to a Colbyville 115 kV 1LG bus
fault
50G1P (amps sec, 3I0) = 15.40

Level 1 O/C Time Delay (cycles) = 67G1D = 0

Phase Time Overcurrent Elements

Enable Phase Time Overcurrent Element = E51P = N

Phase Time Overcurrent Pick-up (sec amps) = 51PP =


Phase Time Overcurrent Curve Family = 51PC =
Phase Time Overcurrent Time Dial = 51PTD =
Phase Time Overcurrent Reset Delay = 51PRS =

Residual Ground Time Overcurrent Elements

Enable Residual Time Overcurrent Element = E51G = Y

Residual Time Overcurrent Pick-up (sec amps) = 51GP = 1.50


Residual Time Overcurrent Curve Family = 51GC = U1
Residual Time Overcurrent Time Dial = 51GTD = 2.500
Residual Time Overcurrent Reset Delay = 51GRS = N

Page 16 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst

Load Encroachment Elements

Maximum Line Load Capability (MVA) = 150 (based on Tac Harb gen RB)
Maximum Line Load Power Factor = 0.75 41.4 deg
Minimum Load Impedance at 1.0 pu Voltage (sec-ohms) = 10.58
Minimum Load Impedance at 0.9 pu Voltage (sec-ohms) = 8.57 (constant MVA load)
Zone 2 Reach at Max Line Load PF (sec-ohms) = 5.29

Enable Load Encroachment = ELOAD = N


Note: Load encroachment settings applicable only if enabled above.

Load Impedance:
Forward (sec-ohms) =
ZLF =
Reverse (sec-ohms) =
ZLR =
Load Angle - Positive Forward = PLAF =
Load Angle - Negative Forward = NLAF =
Load Angle - Positive Reverse = PLAR = (180 - 15)
Load Angle - Negative Reverse = NLAR = (180 + 41.5)

Directional Elements

Enable Directional Control = E32 = AUTO Y, AUTO


Enable Loss of Potential = ELOP = Y Y, Y1, N
Ground Directional Element Priority, ORDER = QV Q,V,I, Combined

Switch Onto Fault

Enable Switch Onto Fault Elements = ESOTF = N Y, N

Close Enable Time Delay = CLOEND =


52A Enable Time Delay = 52AEND =
SOTF Duration = SOTFD =

Demand Metering

Enable Demand Metering Method = EDEM = THM THM, ROL

Time Constant = DMTC = 15.0


Phase Pick-up = PDEMP = OFF
Residual/Ground Pick-up = GDEMP = OFF
Negative Sequence Pick-up = QDEMP = OFF

Page 17 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst

Other Settings

Minimum Trip Duration Time = TDUR = 9.00


Close Fail Time Delay = CFD = 60.00
Three Pole Open Time Delay = 3POD = 0.50
Open Pole Option = OPO = 52A
Three Pole Open Undervoltage = 27PO =
Load Detection Phase Pick-up = 50LD = 0.25

SELogic Control Equation Variable Timers

SELogic Latch Bits Enables = ELAT = 1 N, 1-16


SELogic Display Points Enables = EDP = N N, 1-16

Enable SELogic Control Variable Timers = ESV = 7 N, 1-16

SV1 Timer Pick-up = SV1PU = 30.00 0.00-999,999.00 cy


SV1 Timer Drop-out = SV1DO = 0.00 0.00-999,999.00 cy
SV2 Timer Pick-up = SV2PU = 0.00 0.00-999,999.00 cy
SV2 Timer Drop-out = SV2DO = 0.00 0.00-999,999.00 cy
SV3 Timer Pick-up = SV3PU = 0.00 0.00-999,999.00 cy
SV3 Timer Drop-out = SV3DO = 120.00 0.00-999,999.00 cy
SV4 Timer Pick-up = SV4PU = 30.00 0.00-999,999.00 cy
SV4 Timer Drop-out = SV4DO = 75.00 0.00-999,999.00 cy
SV5 Timer Pick-up = SV5PU = 0.00 0.00-999,999.00 cy
SV5 Timer Drop-out = SV5DO = 0.00 0.00-999,999.00 cy
SV6 Timer Pick-up = SV6PU = 60.00 0.00-999,999.00 cy
SV6 Timer Drop-out = SV6DO = 0.00 0.00-999,999.00 cy
SV7 Timer Pick-up = SV7PU = 0.00 0.00-999,999.00 cy
SV7 Timer Drop-out = SV7DO = 0.00 0.00-999,999.00 cy
SV8 Timer Pick-up = SV8PU = 0.00 0.00-999,999.00 cy
SV8 Timer Drop-out = SV8DO = 0.00 0.00-999,999.00 cy
SV9 Timer Pick-up = SV9PU = 0.00 0.00-999,999.00 cy
SV9 Timer Drop-out = SV9DO = 0.00 0.00-999,999.00 cy
SV10 Timer Pick-up = SV10PU = 0.00 0.00-999,999.00 cy
SV10 Timer Drop-out = SV10DO = 0.00 0.00-999,999.00 cy
SV11 Timer Pick-up = SV11PU = 0.00 0.00-999,999.00 cy
SV11 Timer Drop-out = SV11DO = 0.00 0.00-999,999.00 cy
SV12 Timer Pick-up = SV12PU = 0.00 0.00-999,999.00 cy
SV12 Timer Drop-out = SV12DO = 0.00 0.00-999,999.00 cy
SV13 Timer Pick-up = SV13PU = 0.00 0.00-999,999.00 cy
SV13 Timer Drop-out = SV13DO = 0.00 0.00-999,999.00 cy
SV14 Timer Pick-up = SV14PU = 0.00 0.00-999,999.00 cy
SV14 Timer Drop-out = SV14DO = 0.00 0.00-999,999.00 cy
SV15 Timer Pick-up = SV15PU = 0.00 0.00-999,999.00 cy
SV15 Timer Drop-out = SV15DO = 0.00 0.00-999,999.00 cy
SV16 Timer Pick-up = SV16PU = 0.00 0.00-999,999.00 cy
SV16 Timer Drop-out = SV16DO = 0.00 0.00-999,999.00 cy

Page 18 of 53
NSM 115 kV Substation 01/26/2018
SEL-311A Settings
42 Line by Tom Ernst

Page 19 of 53
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

Calculate the apparent impedance from NSM 115 kV to Colbyville 13.8 kV


====================================================================================================================
1. 3LG Bus fault on: with 56L, 57L and 2TM open at Colbyville
COLBYVIL 14.4 kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
4739.8@ -82.8 0.0@ 0.0 0.0@ 0.0 4739.8@ -82.8 4739.8@ 157.2 4739.
THEVENIN IMPEDANCE (OHM)
0.21991+j1.74019 0.21991+j1.74019 0.05039+j0.93727

SHORT CIRCUIT MVA= 118.2 X/R RATIO= 7.91322 R0/X1= 0.02896 X0/X1= 0.5386
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 2 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 58.746@ -5.3 0.000@ 0.0 0.000@ 0.0 58.746@ -5.3 58.746@-125.3
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 525.8@ -51.2 0.0@ 0.0 0.0@ 0.0 525.8@ -51.2 525.8@-171.2
0 NSM/SBP B2 115. S 431.7@ 129.4 0.0@ 0.0 0.0@ 0.0 431.7@ 129.4 431.7@ 9.4
0 SBP 3A 13.8 1T 94.3@ 125.7 0.0@ 0.0 0.0@ 0.0 94.3@ 125.7 94.3@ 5.7
--------------------------------------------------------------------------------------------------------------------

Calculate 50P1
====================================================================================================================
1. 3LG Bus fault on:
COLBYVL/1388 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
13267.3@ -68.6 0.0@ 0.0 0.0@ 0.0 13267.3@ -68.6 13267.3@ 171.4 13267.
THEVENIN IMPEDANCE (OHM)
1.82415+j4.66013 1.85839+j4.67645 19.2121+j25.3607

SHORT CIRCUIT MVA= 2642.7 X/R RATIO= 2.55468 R0/X1= 4.12265 X0/X1= 5.44207
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 46.536@ -3.7 0.000@ 0.0 0.000@ 0.0 46.536@ -3.7 46.536@-123.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 1130.4@ -76.1 0.0@ 0.0 0.0@ 0.0 1130.4@ -76.1 1130.4@ 163.9
0 NSM/SBP B2 115. S 932.9@ 104.8 0.0@ 0.0 0.0@ 0.0 932.9@ 104.8 932.9@ -15.2
0 SBP 3A 13.8 1T 198.2@ 99.6 0.0@ 0.0 0.0@ 0.0 198.2@ 99.6 198.2@ -20.4
--------------------------------------------------------------------------------------------------------------------

Calculate 50G1
====================================================================================================================
2. 1LG Bus fault on:
COLBYVL/1388 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1597.2@ -56.6 1597.2@ -56.6 1597.2@ -56.6 4791.6@ -56.6 0.0@ 0.0 0.

Page 20
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

THEVENIN IMPEDANCE (OHM)


1.82415+j4.66013 1.85839+j4.67645 19.2121+j25.3607

SHORT CIRCUIT MVA= 954.4 X/R RATIO= 1.51552 R0/X1= 4.12265 X0/X1= 5.44207
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 64.126@ -0.8 2.443@-159.8 4.928@-165.7 57.127@ -2.9 68.006@-121.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 136.1@ -64.0 136.8@ -64.3 409.7@ -72.8 680.7@ -69.4 276.0@ -76.9
0 NSM/SBP B2 115. S 112.3@ 116.9 112.9@ 116.6 262.7@ 107.5 486.3@ 111.8 153.0@ 100.9
0 SBP 3A 13.8 1T 23.9@ 111.7 24.0@ 111.4 147.0@ 106.7 194.7@ 107.9 123.2@ 105.8
--------------------------------------------------------------------------------------------------------------------
====================================================================================================================
3. 1LG Bus fault on:
COLBYVL/1388 115. kV
with outage(s):
COLBYVL/1388 115. kV - MUTL_56 115. kV 1 L
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1080.4@ -65.4 1080.4@ -65.4 1080.4@ -65.4 3241.1@ -65.4 0.0@ 0.0 0.
THEVENIN IMPEDANCE (OHM)
2.82193+j9.71618 2.8492+j9.72927 19.8778+j36.4475

SHORT CIRCUIT MVA= 645.6 X/R RATIO= 2.18769 R0/X1= 2.04584 X0/X1= 3.75122
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 63.205@ -0.9 3.358@-162.8 4.349@-166.0 55.852@ -3.1 66.966@-120.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 185.6@ -68.0 185.9@ -68.1 361.6@ -73.1 732.4@ -70.5 177.6@ -78.3
0 NSM/SBP B2 115. S 152.7@ 112.8 153.0@ 112.7 231.9@ 107.2 537.0@ 110.3 81.3@ 96.9
0 SBP 3A 13.8 1T 32.9@ 108.5 33.0@ 108.4 129.7@ 106.3 195.6@ 107.0 96.9@ 105.7
--------------------------------------------------------------------------------------------------------------------
====================================================================================================================
4. 1LG Bus fault on:
COLBYVL/1388 115. kV
with outage(s):
COLBYVL/1388 115. kV - CLBYVIL 57L 115. kV L
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1085.8@ -65.7 1085.8@ -65.7 1085.8@ -65.7 3257.5@ -65.7 0.0@ 0.0 0.
THEVENIN IMPEDANCE (OHM)
2.53811+j9.35007 2.56604+j9.36313 20.0399+j37.0237

SHORT CIRCUIT MVA= 648.9 X/R RATIO= 2.21671 R0/X1= 2.14329 X0/X1= 3.95973
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 63.339@ -0.9 3.230@-162.1 4.433@-166.1 56.038@ -3.1 67.088@-120.9

Page 21
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

BRANCH CURRENT (A) TO >


10420 SILVER-B-H-T 115. 1L 178.6@ -67.2 179.0@ -67.4 368.5@ -73.2 725.2@ -70.3 191.9@ -78.6
0 NSM/SBP B2 115. S 147.0@ 113.5 147.3@ 113.4 236.3@ 107.1 529.9@ 110.6 91.8@ 97.0
0 SBP 3A 13.8 1T 31.7@ 109.2 31.7@ 109.1 132.2@ 106.2 195.5@ 107.2 100.6@ 105.4
--------------------------------------------------------------------------------------------------------------------

Set 50G1 = 150% of 3I0, where I0 = larger of the 3 cases above


50G1 = 1.5 * 3 * 410 = 1845

Test Data:

====================================================================================================================
Test 1. 3LG Interm. fault 85.19%(50.00%) on:
SILVER-B-H-T 115. kV - WALD-UPA-SUB 115. kV 1 L
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
4279.8@ -75.3 0.0@ 0.0 0.0@ 0.0 4279.8@ -75.3 4279.8@ 164.7 4279.
THEVENIN IMPEDANCE (OHM)
3.93579+j15.0058 3.95052+j15.0131 16.426+j36.1676

SHORT CIRCUIT MVA= 852.5 X/R RATIO= 3.8126 R0/X1= 1.09464 X0/X1= 2.41025
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 0 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 35.701@ -8.0 0.000@ 0.0 0.000@ 0.0 35.701@ -8.0 35.701@-128.0
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 1728.1@ -76.6 0.0@ 0.0 0.0@ 0.0 1728.1@ -76.6 1728.1@ 163.4
0 NSM/SBP B2 115. S 1419.9@ 104.1 0.0@ 0.0 0.0@ 0.0 1419.9@ 104.1 1419.9@ -15.9
0 SBP 3A 13.8 1T 308.8@ 100.2 0.0@ 0.0 0.0@ 0.0 308.8@ 100.2 308.8@ -19.8
--------------------------------------------------------------------------------------------------------------------

====================================================================================================================
Test 2. 3LG Bus fault on:
COLBYVL/1388 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
13267.3@ -68.6 0.0@ 0.0 0.0@ 0.0 13267.3@ -68.6 13267.3@ 171.4 13267.
THEVENIN IMPEDANCE (OHM)
1.82415+j4.66013 1.85839+j4.67645 19.2121+j25.3607

SHORT CIRCUIT MVA= 2642.7 X/R RATIO= 2.55468 R0/X1= 4.12265 X0/X1= 5.44207
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 46.536@ -3.7 0.000@ 0.0 0.000@ 0.0 46.536@ -3.7 46.536@-123.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 1130.4@ -76.1 0.0@ 0.0 0.0@ 0.0 1130.4@ -76.1 1130.4@ 163.9
0 NSM/SBP B2 115. S 932.9@ 104.8 0.0@ 0.0 0.0@ 0.0 932.9@ 104.8 932.9@ -15.2
0 SBP 3A 13.8 1T 198.2@ 99.6 0.0@ 0.0 0.0@ 0.0 198.2@ 99.6 198.2@ -20.4
--------------------------------------------------------------------------------------------------------------------

Page 22
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

====================================================================================================================
Test 3. 3LG Bus fault on:
NSM/SBP B1 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
5037.1@ -81.8 0.0@ 0.0 0.0@ 0.0 5037.1@ -81.8 5037.1@ 158.2 5037.
THEVENIN IMPEDANCE (OHM)
1.87205+j13.0477 1.87485+j13.0505 0.91696+j11.1849

SHORT CIRCUIT MVA= 1003.3 X/R RATIO= 6.96974 R0/X1= 0.07028 X0/X1= 0.85723
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 0 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 0.000@ 0.0 0.000@ 0.0 0.000@ 0.0 0.000@ 0.0 0.000@ 0.0
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 1426.7@ 108.2 0.0@ 0.0 0.0@ 0.0 1426.7@ 108.2 1426.7@ -11.8
0 NSM/SBP B2 115. S 2989.7@ 94.9 0.0@ 0.0 0.0@ 0.0 2989.7@ 94.9 2989.7@ -25.1
0 SBP 3A 13.8 1T 652.2@ 91.1 0.0@ 0.0 0.0@ 0.0 652.2@ 91.1 652.2@ -28.9

CURRENT TO FAULT (A) > 5037.1@ -81.8 0.0@ 0.0 0.0@ 0.0 5037.1@ -81.8 5037.1@ 158.2
THEVENIN IMPEDANCE (OHM) > 13.1813@ 81.8 13.1813@ 81.8 11.2224@ 85.3
--------------------------------------------------------------------------------------------------------------------

====================================================================================================================
Test 4. 1LG Interm. fault 85.19%(50.00%) on:
SILVER-B-H-T 115. kV - WALD-UPA-SUB 115. kV 1 L
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
941.6@ -69.8 941.6@ -69.8 941.6@ -69.8 2824.9@ -69.8 0.0@ 0.0 0.
THEVENIN IMPEDANCE (OHM)
3.93579+j15.0058 3.95052+j15.0131 16.426+j36.1676

SHORT CIRCUIT MVA= 562.7 X/R RATIO= 2.72232 R0/X1= 1.09464 X0/X1= 2.41025
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 0 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 59.726@ -1.7 6.921@-165.5 6.774@-166.8 46.673@ -6.2 66.184@-120.0
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 380.2@ -71.1 380.5@ -71.2 563.3@ -74.0 1323.6@ -72.3 184.6@ -79.7
0 NSM/SBP B2 115. S 312.4@ 109.6 312.6@ 109.5 361.2@ 106.3 985.9@ 108.4 52.4@ 86.9
0 SBP 3A 13.8 1T 67.9@ 105.7 68.0@ 105.6 202.1@ 105.5 338.0@ 105.6 134.1@ 105.4
--------------------------------------------------------------------------------------------------------------------

====================================================================================================================
Test 5. 1LG Bus fault on:
COLBYVL/1388 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1597.2@ -56.6 1597.2@ -56.6 1597.2@ -56.6 4791.6@ -56.6 0.0@ 0.0 0.

Page 23
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

THEVENIN IMPEDANCE (OHM)


1.82415+j4.66013 1.85839+j4.67645 19.2121+j25.3607

SHORT CIRCUIT MVA= 954.4 X/R RATIO= 1.51552 R0/X1= 4.12265 X0/X1= 5.44207
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 1 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 64.126@ -0.8 2.443@-159.8 4.928@-165.7 57.127@ -2.9 68.006@-121.7
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 136.1@ -64.0 136.8@ -64.3 409.7@ -72.8 680.7@ -69.4 276.0@ -76.9
0 NSM/SBP B2 115. S 112.3@ 116.9 112.9@ 116.6 262.7@ 107.5 486.3@ 111.8 153.0@ 100.9
0 SBP 3A 13.8 1T 23.9@ 111.7 24.0@ 111.4 147.0@ 106.7 194.7@ 107.9 123.2@ 105.8
--------------------------------------------------------------------------------------------------------------------

====================================================================================================================
Test 6. 1LG Bus fault on:
NSM/SBP B1 115. kV
FAULT CURRENT (A @ DEG)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE C P
1767.1@ -82.9 1767.1@ -82.9 1767.1@ -82.9 5301.2@ -82.9 0.0@ 0.0 0.
THEVENIN IMPEDANCE (OHM)
1.87205+j13.0477 1.87485+j13.0505 0.91696+j11.1849

SHORT CIRCUIT MVA= 1055.9 X/R RATIO= 7.99404 R0/X1= 0.07028 X0/X1= 0.85723
--------------------------------------------------------------------------------------------------------------------
BUS 14661 NSM/SBP B1 115.KV AREA 3 ZONE 1 TIER 0 (PREFAULT V=1.000@ 0.0 PU)
+ SEQ - SEQ 0 SEQ A PHASE B PHASE
VOLTAGE (KV, L-G) > 43.109@ 0.6 23.298@ 179.0 19.831@-177.6 0.000@ 0.0 65.861@-116.8
BRANCH CURRENT (A) TO >
10420 SILVER-B-H-T 115. 1L 500.5@ 107.2 500.3@ 107.2 129.7@ 120.7 1127.4@ 108.7 375.7@ -77.4
0 NSM/SBP B2 115. S 1048.8@ 93.9 1049.1@ 93.9 1057.5@ 95.6 3155.0@ 94.5 33.5@ 169.7
0 SBP 3A 13.8 1T 228.8@ 90.1 228.9@ 90.1 591.5@ 94.8 1048.3@ 92.7 363.9@ 97.8

CURRENT TO FAULT (A) > 1767.1@ -82.9 1767.1@ -82.9 1767.1@ -82.9 5301.2@ -82.9 0.0@ 0.0
THEVENIN IMPEDANCE (OHM) > 13.1813@ 81.8 13.1813@ 81.8 11.2224@ 85.3
--------------------------------------------------------------------------------------------------------------------

Page 24
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

=====================================

B PHASE C PHASE
739.8@ 157.2 4739.8@ 37.2

X0/X1= 0.5386
-------------------------------------

B PHASE C PHASE
5.3 58.746@-125.3 58.746@ 114.7

1.2 525.8@-171.2 525.8@ 68.8


9.4 431.7@ 9.4 431.7@-110.6
5.7 94.3@ 5.7 94.3@-114.3
-------------------------------------

=====================================

B PHASE C PHASE
267.3@ 171.4 13267.3@ 51.4

X0/X1= 5.44207
-------------------------------------

B PHASE C PHASE
3.7 46.536@-123.7 46.536@ 116.3

6.1 1130.4@ 163.9 1130.4@ 43.9


4.8 932.9@ -15.2 932.9@-135.2
9.6 198.2@ -20.4 198.2@-140.4
-------------------------------------

=====================================

B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0

Page 25
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

X0/X1= 5.44207
-------------------------------------

B PHASE C PHASE
2.9 68.006@-121.7 67.371@ 122.0

9.4 276.0@ -76.9 275.1@ -77.2


1.8 153.0@ 100.9 152.3@ 100.5
7.9 123.2@ 105.8 123.0@ 105.7
-------------------------------------
=====================================

B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0

X0/X1= 3.75122
-------------------------------------

B PHASE C PHASE
3.1 66.966@-120.7 66.867@ 120.8

0.5 177.6@ -78.3 177.1@ -78.6


0.3 81.3@ 96.9 80.9@ 96.5
7.0 96.9@ 105.7 96.7@ 105.6
-------------------------------------
=====================================

B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0

X0/X1= 3.95973
-------------------------------------

B PHASE C PHASE
3.1 67.088@-120.9 66.967@ 120.9

Page 26
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

0.3 191.9@ -78.6 191.3@ -78.8


0.6 91.8@ 97.0 91.3@ 96.6
7.2 100.6@ 105.4 100.5@ 105.3
-------------------------------------

=====================================

B PHASE C PHASE
279.8@ 164.7 4279.8@ 44.7

X0/X1= 2.41025
-------------------------------------

B PHASE C PHASE
8.0 35.701@-128.0 35.701@ 112.0

6.6 1728.1@ 163.4 1728.1@ 43.4


4.1 1419.9@ -15.9 1419.9@-135.9
0.2 308.8@ -19.8 308.8@-139.8
-------------------------------------

=====================================

B PHASE C PHASE
267.3@ 171.4 13267.3@ 51.4

X0/X1= 5.44207
-------------------------------------

B PHASE C PHASE
3.7 46.536@-123.7 46.536@ 116.3

6.1 1130.4@ 163.9 1130.4@ 43.9


4.8 932.9@ -15.2 932.9@-135.2
9.6 198.2@ -20.4 198.2@-140.4
-------------------------------------

Page 27
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

=====================================

B PHASE C PHASE
037.1@ 158.2 5037.1@ 38.2

X0/X1= 0.85723
-------------------------------------

B PHASE C PHASE
0.0 0.000@ 0.0 0.000@ 0.0

8.2 1426.7@ -11.8 1426.7@-131.8


4.9 2989.7@ -25.1 2989.7@-145.1
1.1 652.2@ -28.9 652.2@-148.9

1.8 5037.1@ 158.2 5037.1@ 38.2

-------------------------------------

=====================================

B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0

X0/X1= 2.41025
-------------------------------------

B PHASE C PHASE
6.2 66.184@-120.0 66.515@ 119.8

2.3 184.6@ -79.7 184.1@ -79.9


8.4 52.4@ 86.9 52.1@ 86.4
5.6 134.1@ 105.4 134.1@ 105.4
-------------------------------------

=====================================

B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0

Page 28
NSM 115 kV Substation 01/26/2018
Fault Calcs
42 Line by Tom Ernst

X0/X1= 5.44207
-------------------------------------

B PHASE C PHASE
2.9 68.006@-121.7 67.371@ 122.0

9.4 276.0@ -76.9 275.1@ -77.2


1.8 153.0@ 100.9 152.3@ 100.5
7.9 123.2@ 105.8 123.0@ 105.7
-------------------------------------

=====================================

B PHASE C PHASE
0.0@ 0.0 0.0@ 0.0

X0/X1= 0.85723
-------------------------------------

B PHASE C PHASE
0.0 65.861@-116.8 63.605@ 117.9

8.7 375.7@ -77.4 375.2@ -77.5


4.5 33.5@ 169.7 33.0@ 170.0
2.7 363.9@ 97.8 363.9@ 97.7

2.9 0.0@ 0.0 0.0@ 0.0

-------------------------------------

Page 29
NSM 115 kV Substation 42L Test Faults 01/26/2018
by Tom Ernst
Fault Testing with mpAutoTest
Location / Line : 42 Line Tac Harbor

Directions ENGINEERING: Directions TECHNICIANS:


ENTER VALUES IN GREEN CELLS ONLY After data has been entered in this sheet …
FILE … SAVE AS … LINE NAME, SUBSTATION NAME Click on the "Arrays" sheet & SAVE AS:
EMAIL to Technician File Name = Import.txt

SK... V...
Format = Text(OS/2 or MS-DOS)(*.txt)
Place it in the Procomm\Aspect Directory

To be used with mpAutoTest "System Checkout - VID" or "System Checkout - Fault Control Panel"

PT & CT RATIO = / 1
PT Ratio: 1000 Voltage Current
CT Ratio: 120 0 0 ● Volts
● NORMAL (NO SKEW)

● Kilo Volts
SKEW ANGLES 1 2

Test 1 1) 42L 3Ph Flt mid line


Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 35.7 -8 1728 -77
B 35.7 -128 1728 163
C 35.7 112 1728 43

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 35.7 -8 14.4 -110
B 35.7 -128 14.4 130
C 35.7 112 14.4 18

Page 30
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 2 2) Colbyville 3Ph Bus Fault by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 46.5 -4 1130 -76
B 46.5 -124 1130 164
C 46.5 116 1130 44

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 46.5 -4 9.4 -76
B 46.5 -124 9.4 164
C 46.5 116 9.4 44

Test 3 3) NSM 3Ph Bus Fault (Reverse)


Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 0 0 1427 108
B 0 -120 1427 -12
C 0 120 1427 -132

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 11.9 108
B 0.0 -120 11.9 -12
C 0.0 120 11.9 -132

Page 31
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 4 4) 42L A-Grd Mid-Line Fault by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 47 -6 1324 -72
B 66 -120 185 -80
C 67 120 184 -80

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 47.0 -6 11.0 -72
B 66.0 -120 1.5 -80
C 67.0 120 1.5 -80

Test 5 5) Colbyville A-GND Bus Fault


Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 57 -3 681 -69
B 67 -122 276 -77
C 68 122 275 -77

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 57.0 -3 5.7 -69
B 67.0 -122 2.3 -77
C 68.0 122 2.3 -77

Page 32
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 6 6) NSM A-GND Bus Fault (Reverse) by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 0 0 1127 109
B 66 -117 376 -77
C 64 118 322 -78

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 9.4 109
B 66.0 -117 3.1 -77
C 64.0 118 2.7 -78

Test 7
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 72 -29 219 -101
B 2.6 180 2400 143
C 2.8 103 2400 5

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 72.0 -29 1.8 -101
B 2.6 180 20.0 143
C 2.8 103 20.0 5

Page 33
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 8 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 0 -32 49 -120
B 0 -154 49 120
C 0 94 49 0

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 -32 0.4 -120
B 0.0 -154 0.4 120
C 0.0 94 0.4 0

Test 9
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 0 180 2236 70
B 68 -154 200 93
C 70 94 212 92

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 180 18.6 70
B 68.0 -154 1.7 93
C 70.0 94 1.8 92

Page 34
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 10 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A 1.3 -30 3000 -110
B 1.3 -150 3000 130
C 1.3 90 3000 10

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 1.3 -30 25.0 -110
B 1.3 -150 25.0 130
C 1.3 90 25.0 10

Test 11
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Page 35
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 12 12 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Test 13 13
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Page 36
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 14 14 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Test 15 15
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Page 37
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 16 16 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Test 17 17
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Page 38
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 18 18 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Test 19 19
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Page 39
NSM 115 kV Substation 42L Test Faults 01/26/2018
Test 20 20 by Tom Ernst
Primary Test Values
Phase Pri. Voltage Pri. Current
Mag Angle Mag Angle
A
B
C

Secondary Test Values


Phase Sec. Voltage Sec. Current
Mag Angle Mag Angle
A 0.0 0 0.0 0
B 0.0 0 0.0 0
C 0.0 0 0.0 0

Page 40
NSM 115 kV Substation 42L Test Faults 01/26/2018
by Tom Ernst

Page 41
NSM 115 kV Substation 42L Test Faults 01/26/2018
by Tom Ernst

Page 42
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst

35.7
35.7 128 Line Tac Harbor
35.7
-8.0
-128.0
112.0
14.4
14.4
14.4
-110.0
130.0
18.0
46.5
46.5
46.5
-4.0
-124.0
116.0
9.4
9.4
9.4
-76.0
164.0
44.0
0.0
0.0
0.0
0.0
-120.0
120.0
11.9
11.9
11.9
108.0
-12.0
-132.0
47.0
66.0
67.0
-6.0
-120.0
120.0
11.0
1.5
1.5
-72.0
-80.0
-80.0
57.0
67.0

Page 43
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst

68.0
-3.0
-122.0
122.0
5.7
2.3
2.3
-69.0
-77.0
-77.0
0.0
66.0
64.0
0.0
-117.0
118.0
9.4
3.1
2.7
109.0
-77.0
-78.0
72.0
2.6
2.8
-29.0
180.0
103.0
1.8
20.0
20.0
-101.0
143.0
5.0
0.0
0.0
0.0
-32.0
-154.0
94.0
0.4
0.4
0.4
-120.0
120.0
0.0
0.0
68.0
70.0
180.0

Page 44
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst

-154.0
94.0
18.6
1.7
1.8
70.0
93.0
92.0
1.3
1.3
1.3
-30.0
-150.0
90.0
25.0
25.0
25.0
-110.0
130.0
10.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Page 45
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Page 46
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1) 42L 3Ph Flt mid line
2) Colbyville 3Ph Bus Fault
3) NSM 3Ph Bus Fault (Reverse)
4) 42L A-Grd Mid-Line Fault
5) Colbyville A-GND Bus Fault
6) NSM A-GND Bus Fault (Reverse)
0.0
0.0
0.0
0.0

Page 47
01/26/2018
NSM 115 kV Substation 42L Arrays
by Tom Ernst

0.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
1000
120

Page 48
01/26/2018
NSM 115 kV Substation 42L 21P OOS Characteristic
by Tom Ernst

Over-All X-R Characteristic of 21P (including load encroachment)

X
17.3
ZONE 7
15.0
ZONE 6

ZONE 2

ZONE 4

ZONE 1

-6.4 6.4

R
-8.7 8.7

ZONE 3

-15.0

-17.3

Page 49
01/26/2018
NSM 115 kV Substation 42L 21P OOS Characteristic
by Tom Ernst

Test Data for the Out-of Step Characteristic

Using Law if Sines:

inner blinder: Zin pu*sin(43.2) = 6.35*sin(106.8); Zin pu= 6.35*sin(106.8)/sin(43.2) = 8.88 ohm
@ -30 deg]

outer blinder: Zout pu*sin(43.2) = 8.73*sin(106.8); Zout pu= 8.73*sin(106.8)/sin(43.2) =12.21 o


4.9A @ -30 deg]

ramp rate = dZ/dT = (12.21 –Page


8.88)/0.05
50
= 66.6 ohms/sec

= dA/dT = (4.9 – 6.8)/0.05 = -38 A/sec [@ constant V = 60 volts]


Using Law if Sines:

inner blinder: Zin pu*sin(43.2) = 6.35*sin(106.8); Zin pu= 6.35*sin(106.8)/sin(43.2) = 8.88 ohm
@ -30 deg]
NSM 115 kV Substation 42L 21P OOS Characteristic
01/26/2018
by Tom Ernst
outer blinder: Zout pu*sin(43.2) = 8.73*sin(106.8); Zout pu= 8.73*sin(106.8)/sin(43.2) =12.21 o
4.9A @ -30 deg]

ramp rate = dZ/dT = (12.21 – 8.88)/0.05 = 66.6 ohms/sec

= dA/dT = (4.9 – 6.8)/0.05 = -38 A/sec [@ constant V = 60 volts]

Page 51
01/26/2018
NSM 115 kV Substation 42L 21P OOS Characteristic
by Tom Ernst

8)/sin(43.2) = 8.88 ohms [60V, 6.8A

6.8)/sin(43.2) =12.21 ohms [60V,

Page 52
8)/sin(43.2) = 8.88 ohms [60V, 6.8A
01/26/2018
NSM 115 kV Substation 42L 21P OOS Characteristic