TERMINAL REP INFO FOR TANKER(ESPECIALLY BOW NOMINATED TANKER MOORING ARRANGEMENT) ARRANGE MOORING MASTER AND WEATHER REPORT
3 CARGO HEATING ABOVE 10⁰C
FSO MASTER PREPARED TO DETERMINED DRY CRUDE POUR POINT (BOILER START AT LEAST 4 DAYS BEFORE)
4 FSO MASTER PREPARED PROCEDURES AND JHA IN
OFFTAKE PROCEDURES AND JRA PLACE AT LEAST 2 DAYS BE FORE OFFTAKE
5 FSO MASTER PREPARED MOORING BOLLARD PULL TEST FOR
OPERATION AND LOADING HOSE CONNECTED SUPPORT VESSEL 2 DAYS BEFORE OFFTAKE CONNECT TO QRH VISUAL INSPECTION FOR EXPORT HOSE, MOORING HAWSER, OFFTAKE TOOLS 2 DAYS BEFORE OFFTAKE
6 PRE OFFTAKE MEETING FSO MASTER LEAD THE
MEETING WITH OFFTAKE TEAM IN 1 DAY BEFORE PROCEDURES AND JRA IN PLACE TO EXPLAIN 1 DAY BEFORE TANKS INSPECTION FOR WA TER CUT CHECK BY SKKMIGAS AND SURVEYOR FSO MASTER INFORM OFF- 7 OFFTAKE TAKE TEAM TO STAND BY OPERATION 1 HR BEFORE( WILL BE PICK UP BY SUPPORT VESSEL TO GETHER WITH TOOLS) AND ORGANIZED FSO PERSONNEL ON DUTY SKKMIGAS