Anda di halaman 1dari 3

Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )

Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

TURBINE NO # 2

1. Line thru Lube


Oil Tank. Ok.

2. Manual
Operation and
Maintenance
Equipment Had
been Done.

#1).
DESCRIPTION TARGET
1. 1. Closed
Cover

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

1. Pre Alignment Turbine


Turbine # 1. perfected.

2. Last Drawing 2. Tightening


Approval. Bolts.

3. Certificate 3. Installed
Had been Pipe Line
done. from TG 1
Thru Lube
4. Calibration Tank,
Equipments Condenser
and Tools. 1 and
Had been Master
done. Steam
Valves.
5. Manual
Instruction 4. Installed AC
from Aciter and
Fabricator. Pipe Lines.
Had been
done. 5. Flushing
Pipe Lines.
6. SOP.
6. Air Test
7. Safety Manual Line.
Procedure.
7. Water Test
8. Final Line.
Inspected
Before 8. Test Welded
assembled In Pipe
and enclosed Lines.
upper casing.
9. Individual
Test.

10.Manual
Operation
Had been
done.

11.Operator
Experience
and
Excellent..

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

Name : Marsaid.Arsyad / KSO - Mechanical Engineering.

Mechanical Weekly Report

Anda mungkin juga menyukai