BOW-TIE Analysis for Pneumatic Testing Activity

THREATS BARRIERS PNEUMATIC TEST RECOVERY MEASURES CONSEQUENCES

Implementa
Substandard Equipment Monitoring and Whip check
tion of
condition of had been control process are applied To control Loss of containment
Safety
equipment for tested and conducted by for all hoses source of (Live LNG Line)
Checklist
pressure testing calibrated experienced connection ignition Resulting explosion
form prior
start activity operator

Only authorized
personal (with Reminder /
Uncontrolled access controlled ID) is notification No personal is
at testing area allowed to to all party allowed to
enter testing enter affected Personal hit by
area zone when equipment @
pressure is attachment
Top
above 3/4 or
Event 100% test
Pump pressure
Pressure exceeds Install relieve pressure
Consistent shutdown is (Pipe
the required test valve (tested
monitoring of available as
pressure / and calibrated) Rupture)
pressure double
Overpressure
protection

Pump
Implementation Operator Asphyxiation due to
Close unit are Good
Human Error (e.g. of PTW system will be Nitrogen build up
supervision by placed natural
lack of experience, including equipped ((Nie consequence
experienced in the ventilation
lack of (Toolbox Talk, with pipe rupture ka bro
operator open
concentration) Job Safety personal gas
air area
Analysis) detector )