Anda di halaman 1dari 4

Ke Kota Bharu

KEY PLAN
not to scale

L
Ke
Kota Tawang
Bha

A
ru

U
MENTUAN

T
(TAWANG)

C
Beris Kubur Besar
PERUPOK
TANJUNG PAUH Bachok

H
JAJAHAN KOTA BHARU

I
N
Tanjung Pauh

A
BEKELAM
Ke Ko

4549
ta Bh
aru

S
Jelawat
Pauh Lima MELAWI

E
L
Ke
Ko

A
ta

Gunong
Bh
aru

T
A
GUNONG

N
MAHLIGAI

16965
TELONG
16966
Ke
Pa
sir

Ke
Pu

To
te

kB
h

Ke

ali
Go

/B
ng

esu
Ku
Ke

t
lim
Go

JAJAHAN PASIR PUTEH


ng

SITE
Ke

Ku
lim
Pa

NUR NABILA SYAFIKA BINTI MOHD FAIROZ


sir
Pu

I/C: 951231 - 03 - 5942


te

LOCATION
h

LOT 158 KG. PAUH BADANG


JALAN PCB
15350 KOTA BHARU
KELANTAN

16969
16967

for future connection

16970
Individual septic tank to install to
manufacturer's detail & specs.
MUI FATT MF2 (PE)

7057 16968
soak away pit CADANGAN MEMBINA DAN MENYIAPKAN
(sewerage) 1 BUAH BANGLO 1 TINGKAT
DI ATAS LOT 16971,
MUKIM TELONG,
17956 DAERAH TELONG,
JAJAHAN BACHOK,
KELANTAN

N
KEY PLAN
16971 Kandiez Sunrise
Beach Resort LOCATION PLAN LOCATION PLAN
SITE PLAN
0 100m 200m

SEWERAGE DESIGN NOTES Aura

L
Training

A
Centre

U
T
D140

soak away pit


SITE PLAN
189
(storm water)

C
H
SCALE : 1/16" = 1'-0"

I
N
LEMBAGA

Ja
ARKITEK

A
la
n
MALAYSIA
LOT 16971

M
e
la
w
Villa Desa

i -
Se

S
m
KG. TEKO AIR MERAH

E
ra
k

L
TOTAL DEVELOPMENT POPULATION EQUIVALENT: 5 P.E. Penanda KM

MUKIM TELONG

A
D140
- Melawi 13km
- Tok Bali 4km

T
SCHEDULE OF SEWERAGE LEVELS - LOT 16971 Kedai hardware

A
Serba Mokniko Enterprise

DAERAH TELONG
(bumbung & cat kuning) 189

N
Ja
3388

la
JAJAHAN BACHOK 4549

n
Pe
Kandang ternakan terbiar 7057 17956
Rumah batu 1 tingkat

rs
is
Rumah batu 1 tingkat Tiang elektrik - TAM / A / 18

ira
NEGERI KELANTAN Rumah kayu 1 tingkat 7058

n
Kedai batu 1 tingkat

Pa
Akademi

nt
Memandu

SITE

ai
NO. PA : 205807
KIST

LOCATION
SYIT PIAWAI : L6-D 189
D140
AREA, LIGHT & VENT SCHEDULE DOOR & WINDOW SCHEDULE
LIGHTING VENTILATION TPL SD1 CW4

NO ROOM REMARKS
OPEN CLOSED REQ. PROV. REQ. PROV.

A B D E 1
2
PORCH + PATIO
LIVING + DINE.
206.0
-
-
276.0
20.6
27.6
OPEN
72.5
20.6
27.6
OPEN
52.0
3 FAMILY - 168.0 16.8 68.0 16.8 12.0 SHARE W/LIVING
4 MASTER - 163.0 16.3 28.0 16.3 22.0
5 BATH 1 - 35.0 2.0 6.0 2.0 6.0
300gal. HDPE domestic water FFL : 101.000

storage tank in roof space 6 BEDROOM 2 - 110.0 11.0 28.0 11.0 22.0 Timber frame deco. Aluminium frame glazed sliding door Aluminium frame casement window with
timber panel door w/ with top hung above to manufacturer's top hung above and fixed glass panels
7 BATH 2 - 50.0 2.0 6.0 2.0 6.0 fixed glass panel above specifications and details below to manuf.'s specs. & details

Y 8 BEDROOM 3 - 100.0 10.0 28.0 10.0 22.0 TP1 PVC CW2 CW3 TH2

9 BEDROOM 4 - 100.0 10.0 28.0 10.0 22.0


10 BATH 3 - 35.0 2.0 6.0 2.0 6.0
1 11 KITCHEN - 132.0 13.2 28.5 13.2 24.0

SUBTOTAL 206.0 1,169.0 Notes:


1. Minimum requirement for lighting & ventilation per room
1,375.0 is 10% of area [UBBL 1984, By-law 39(i)]
2. Minimum requirement for lighting & ventilation for each
127.74 FFL : 101.000

Timber frame deco. Metal frame PVC Alum. fr. casement Alum. frame casement window Aluminium frame
timber panel door door to manuf.'s window w/top hung to manuf.'s specs & details top hung window
specifications above + fixed below

X X
A B D E 2 1
NUR NABILA SYAFIKA BINTI MOHD FAIROZ
I/C: 951231 - 03 - 5942

LOT 158 KG. PAUH BADANG


JALAN PCB
15350 KOTA BHARU
KELANTAN
1
Concrete roof tiles
(refer roof construction
specification)
Y
FFL : 112.000

ROOF CONSTRUCTION. FFL : 111.000

ROOF PLAN pitch (refer to roof plan for details) TH2 TP1 PVC PVC TP1 PVC
SCALE: 1/8" = 1'-0" Unplastered brick
2. Double sided aluminium foil insulation sheet feature wall
3. Proprietary lightweight metal truss system CW2

designed, fabricated and installed strictly to Ceramic wall tiles


BATH 1 PVC DINING FAMILY PORCH BEDROOM 2 MASTER
to 7'-0" height
system manufacturer's design, details and
specifications FFL : 101.000
4. 10" x 3/4" thk. cement-fibre fascia board. FFL : 100.000
drain @ 1:200 fall

SECTION X-X RC foundation & structure


to engineer's detail
SECTION Y-Y
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"

A B D E 1 2
A B D E

soak away pit


Ceramic wall tiles
CADANGAN MEMBINA DAN MENYIAPKAN
to 7'-0" height 1 BUAH BANGLO 1 TINGKAT
Ceramic wall tiles
to 7'-0" height DI ATAS LOT 16971,
Y MUKIM TELONG,
DAERAH TELONG,
TH2 Tap for washing machine JAJAHAN BACHOK,
CW2 CW2 FFL : 112.000 KELANTAN
2 BATH 3
Ceramic wall tiles
to 5'-0" height
FFL : 111.000

PVC tiles CW3


BATH 2 FFL : 100.750 TL1
TH2 tiles
FFL : 100.750 TPL
Unplastered brick
BEDROOM 3 BEDROOM 4 CW2 CW4 SD1
feature wall
PVC
tiles
FFL : 101.000
tiles
FFL : 101.000 PVC IBS wall panel with FLOOR & ROOF PLANS, SECTIONS X-X & Y-Y
KITCHEN
suitable finish to FRONT, RIGHT, LEFT & REAR ELEVATIONS
TP1 tiles CW3 client's approval
BEDROOM 2
TP1 FFL : 100.875 AREA, LIGHTING & VENTILATION SCHEDULE
CW2 tiles
FFL : 101.000
FFL : 101.000
FFL : 100.000
DOOR & WINDOW SCHEDULE
TP1

IBS wall panel with


DINING
tiles
FAMILY
tiles suitable finish to FRONT ELEVATION RIGHT ELEVATION
BATH 1
FFL : 101.000 FFL : 101.000
Unplastered brick client's approval SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
TH2 tiles
FFL : 100.750
feature wall
X X 2 1 D C B A
PVC TP1
SD1
PORCH
tiles
FFL : 100.000

TPL
PATIO
tiles
FFL : 100.500

LEMBAGA
MASTER ARKITEK
tiles LIVING
tiles
FFL : 101.000
FFL : 101.000
MALAYSIA

1 CW2 CW4

Individual septic tank to install FFL : 112.000


to manufacturer's detail @ 1:200 fall to discharge
FFL : 111.000
& specifications to soak away pit (location
MUI FATT MF2 (PE) based on site condition)
CW2 TL1 CW2 CW2
R.c. coping to detail
TH2 TH2 TH2

FLOOR PLAN Y soak away pit IBS wall panel with


suitable finish to
SCALE: 1/8" = 1'-0" client's approval
FFL : 101.000
PFL : 100.000
FFL : 100.000
DRIVEWAY

for future connection


LEFT ELEVATION REAR ELEVATION
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
ELECTRICAL WORKS NOTE
A. ALL ELECTRICAL WORKS SHALL BE CARRIED OUT
BY TNB REGISTERED CONTRACTOR

B. ALL WIRING SHALL BE INSTALLED IN G.I. CONDUIT


(CLASS A) AND CONCEALED IN PLASTER WORK

C. ALL CONCEALED WORK SHALL BE INSPECTED AND


APPROVED BEFORE SEALING

D. IT IS THE RESPONSIBILITY OF THE CONTRACTOR


TO PREPARE AND SUBMIT SHOP-DRAWINGS TO
TNB IF REQUESTED TO DO SO. THE PREPARATION
AND CERTIFICATION COSTS OF THE DRAWINGS
SHALL BE BORNE BY THE CONTRACTOR

E. THE CONTRACTOR IS ALSO REQUIRED, ON BEHALF


OF THE OWNER, TO SUBMIT APPLICATION FORMS
AND RELEVANT DOCUMENTS TO TNB FOR
CONNECTION OF ELECTRICAL POWER SUPPLY

Power for washing machine

BATH 3
cem. board
BATH 2
cem. board

BEDROOM 3 BEDROOM 4
plaster ceiling plaster ceiling

KITCHEN
plaster ceiling

BEDROOM 2
plaster ceiling BATH 1
Access manhole to
water storage tank
NUR NABILA SYAFIKA BINTI MOHD FAIROZ
DINING FAMILY I/C: 951231 - 03 - 5942
plaster ceiling plaster ceiling
BATH 2
BATH 1 LOT 158 KG. PAUH BADANG
cem. board TUBE WELL WATER SUPPLY
JALAN PCB
PORCH
15350 KOTA BHARU
plaster ceiling KELANTAN
PATIO BATH 3
plaster ceiling

MASTER KITCHEN
plaster ceiling LIVING
plaster ceiling

V.
LE
FL.
ND.
OU
GR

ELECTRICAL LAYOUT REFLECTED CEILING PLAN WATER SUPPLY PLUMBING LAYOUT


SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" NOT TO SCALE

CADANGAN MEMBINA DAN MENYIAPKAN


1 BUAH BANGLO 1 TINGKAT
DI ATAS LOT 16971,
MUKIM TELONG,
DAERAH TELONG,
JAJAHAN BACHOK,
KELANTAN

ELECTRICAL LAYOUT
REFLECTED CEILING PLAN
WATER SUPPLY PLUMBING LAYOUT
SANITARY PLUMBING DIAGRAMMATIC LAYOUT

LEMBAGA
ARKITEK
MALAYSIA
DESIGN SPECIFICATION & DIMENSION OF MF2 - PE

DESIGN CRITERIA

MODEL MF2-PE

TYPE OF WASTE DOMESTIC


Y
POPULATION EQUIVALENT 8

NUMBER OF TANK 2

SEPARATION CHAMBER : VOL (L) 2618

BIOMEDIA CHAMBER : VOL (L) 132

TYPICAL DETAIL SECTION OF INSPECTION CHAMBER TANK DEPTH, H (MM) 1910

DETAIL 'A' LIQUID HEIGHT, B (MM) 1610

X DANGER DANGER TANK DIAMETER, A (MM) 1440


DETAIL OF VENTILATION PIPE INLET PIPE (MM) 100

OUTLET PIPE (MM) 100

RETENTION TIME (HRS) 34.67

3 2
OVERFLOW RATE (M /M .d) 1.293

3 1.800
MAX. AVG. FLOW RATE (M /d)

VENTILATION PIPE

SIRIM STANDARD CAN/CSA-B66-05

MATERIAL-SEPARATION CHAMBER PE 6 MM THK

MATERIAL-BIOMEDIA CHAMBER PE 3 MM THK


TYPICAL DETAIL SECTION OF INSPECTION CHAMBER
MATERIAL-BIOMEDIA / NOS. OF MEDIA PLASTIC / 80 NOS.
RECEIVING DRAIN
DETAIL 'C' IMPORTANT
THIS DRAWING IS VALID FOR CONSTRUCTION PURPOSES ONLY WHEN STAMPED
DETAIL OF BIO-MEDIA VERTICAL 'CONSTRUCTION DRAWING' BY MUI FATT INDUSTRIES SDN. BHD. ANY RELIANCE
OTHERWISE IS AT ONE'S OWN RISK & COST
NUR NABILA SYAFIKA BINTI MOHD FAIROZ
MF2-PE I/C: 951231 - 03 - 5942
DETAIL OF SPECIFICATION
THIS DRAWING IS ISSUE BY MUI FATT INDUSTRIES SDN. BHD. LOT 158 KG. PAUH BADANG
SUBJECT TO THE CONDITION THAT IS NOT COPIED, REPRODUCED JALAN PCB
OR DISTRIBUTED EITHER IN WHOLE OR IN PART, OR IN USED IN 15350 KOTA BHARU
KELANTAN
ANYWAY DETRIMENTAL TO MUI FATT INDUSTRIES SDN. BHD.

NOTES :

TYPICAL PLAN OF INSPECTION CHAMBER INSPECTION CHAMBER SHALL BE PROVIDED AFTER SEPTIC TANK
FOR MAINTANANCE PURPOSES, WHERE APPLICABLE. THIS

GROUND LEV. INSPECTION CHAMBER SHALL BE LOCATED AT LEAST 1M


GROUND LEV.
AWAY FROM THE BUILDING LINE.

1000(MAX)
225
(X)

300
(Y)
800

400
1910(H)
1610(B)

MFI 2011 2618L T 1000MM 1610MM


MF2-PE

STANDARD CLASS 'B' BEDDING


BACKFILL SAND
400

DETAIL 'B' CADANGAN MEMBINA DAN MENYIAPKAN


1 BUAH BANGLO 1 TINGKAT
DI ATAS LOT 16971,
STEEL ANCHOR HOOK AND CONCRETE
1440(D) 'SEPTIC TANK LABELING DETAILS' : MUKIM TELONG,
1640 DAERAH TELONG,
CONCRETE BASE DETAIL ISOMETRIC VIEW
SECTION X-X JAJAHAN BACHOK,
KELANTAN
MF2-PE
NOTICE :

1) P.E. SEPTIC TANK IS SOLD WITH ACCESSORY WHICH IS THE SEPTIC TANK COVER SEWERAGE WORKS DETAILS & DETAILS OF
WHERE IT IS USED TO COVER THE TOP OF SEPTIC TANK DURING INSTALLATION 300 MIN.
PROPOSED INDIVIDUAL SEPTIC TANK

300
WORK IS DONE (AIR TIGHT COVER)
(REFER APPENDIX J -MALAYSIAN SEWERAGE INDUSTRY GUIDELINE BEDDING & HAUNCHING (inside building) - MUI FATT INDUSTRIES SDN. BHD.: MUI FATT MF2-PE
3rd EDITION VOLUME 5 )

2) FOR MANHOLE COVER WHICH IS EXPOSED AT GROUND LEVEL AS MENTIONED (BY OTHER'S),
THE PARTY RESPONSIBLE SUCH AS (DEVELOPER , CONTRACTOR & OWNER)
FOR THE TANK INSTALLATION WORK SHOULD USE A COVER MADE OF CAST IRON
AS REQUIRED UNDER SPAN REGULATION. THIS IS TO AVOID ANY ACCIDENTS OCCUR.

3) ANY SUBSTANCE OR OBJECT THAT HAS A LOAD IS PROHIBITED TO BE PLACED VCP CONNECTION DETAILS
ON THE GROUND LEVEL. VEHICLES ARE ALSO PROHIBITED CROSSING THE SEPTIC TANK
AREA ALTHOUGH HIGHLY RESILIENT MANHOLE COVERS IS USED AS MENTIONED ABOVE. SECTION Y-Y - BY OTHER'S
BEDDING & HAUNCHING (outside building)
LEMBAGA
ARKITEK
INSTALLATION MANUAL FOR 'MF' P.E. BIO FILTER MALAYSIA

MUI FATT MUI FATT

MUI FATT MUI FATT MUI FATT

0 MI
10 N.
N 10
MI 0

MUI FATT

Anda mungkin juga menyukai