KEY PLAN
not to scale
L
Ke
Kota Tawang
Bha
A
ru
U
MENTUAN
T
(TAWANG)
C
Beris Kubur Besar
PERUPOK
TANJUNG PAUH Bachok
H
JAJAHAN KOTA BHARU
I
N
Tanjung Pauh
A
BEKELAM
Ke Ko
4549
ta Bh
aru
S
Jelawat
Pauh Lima MELAWI
E
L
Ke
Ko
A
ta
Gunong
Bh
aru
T
A
GUNONG
N
MAHLIGAI
16965
TELONG
16966
Ke
Pa
sir
Ke
Pu
To
te
kB
h
Ke
ali
Go
/B
ng
esu
Ku
Ke
t
lim
Go
SITE
Ke
Ku
lim
Pa
LOCATION
h
16969
16967
16970
Individual septic tank to install to
manufacturer's detail & specs.
MUI FATT MF2 (PE)
7057 16968
soak away pit CADANGAN MEMBINA DAN MENYIAPKAN
(sewerage) 1 BUAH BANGLO 1 TINGKAT
DI ATAS LOT 16971,
MUKIM TELONG,
17956 DAERAH TELONG,
JAJAHAN BACHOK,
KELANTAN
N
KEY PLAN
16971 Kandiez Sunrise
Beach Resort LOCATION PLAN LOCATION PLAN
SITE PLAN
0 100m 200m
L
Training
A
Centre
U
T
D140
C
H
SCALE : 1/16" = 1'-0"
I
N
LEMBAGA
Ja
ARKITEK
A
la
n
MALAYSIA
LOT 16971
M
e
la
w
Villa Desa
i -
Se
S
m
KG. TEKO AIR MERAH
E
ra
k
L
TOTAL DEVELOPMENT POPULATION EQUIVALENT: 5 P.E. Penanda KM
MUKIM TELONG
A
D140
- Melawi 13km
- Tok Bali 4km
T
SCHEDULE OF SEWERAGE LEVELS - LOT 16971 Kedai hardware
A
Serba Mokniko Enterprise
DAERAH TELONG
(bumbung & cat kuning) 189
N
Ja
3388
la
JAJAHAN BACHOK 4549
n
Pe
Kandang ternakan terbiar 7057 17956
Rumah batu 1 tingkat
rs
is
Rumah batu 1 tingkat Tiang elektrik - TAM / A / 18
ira
NEGERI KELANTAN Rumah kayu 1 tingkat 7058
n
Kedai batu 1 tingkat
Pa
Akademi
nt
Memandu
SITE
ai
NO. PA : 205807
KIST
LOCATION
SYIT PIAWAI : L6-D 189
D140
AREA, LIGHT & VENT SCHEDULE DOOR & WINDOW SCHEDULE
LIGHTING VENTILATION TPL SD1 CW4
NO ROOM REMARKS
OPEN CLOSED REQ. PROV. REQ. PROV.
A B D E 1
2
PORCH + PATIO
LIVING + DINE.
206.0
-
-
276.0
20.6
27.6
OPEN
72.5
20.6
27.6
OPEN
52.0
3 FAMILY - 168.0 16.8 68.0 16.8 12.0 SHARE W/LIVING
4 MASTER - 163.0 16.3 28.0 16.3 22.0
5 BATH 1 - 35.0 2.0 6.0 2.0 6.0
300gal. HDPE domestic water FFL : 101.000
storage tank in roof space 6 BEDROOM 2 - 110.0 11.0 28.0 11.0 22.0 Timber frame deco. Aluminium frame glazed sliding door Aluminium frame casement window with
timber panel door w/ with top hung above to manufacturer's top hung above and fixed glass panels
7 BATH 2 - 50.0 2.0 6.0 2.0 6.0 fixed glass panel above specifications and details below to manuf.'s specs. & details
Y 8 BEDROOM 3 - 100.0 10.0 28.0 10.0 22.0 TP1 PVC CW2 CW3 TH2
Timber frame deco. Metal frame PVC Alum. fr. casement Alum. frame casement window Aluminium frame
timber panel door door to manuf.'s window w/top hung to manuf.'s specs & details top hung window
specifications above + fixed below
X X
A B D E 2 1
NUR NABILA SYAFIKA BINTI MOHD FAIROZ
I/C: 951231 - 03 - 5942
ROOF PLAN pitch (refer to roof plan for details) TH2 TP1 PVC PVC TP1 PVC
SCALE: 1/8" = 1'-0" Unplastered brick
2. Double sided aluminium foil insulation sheet feature wall
3. Proprietary lightweight metal truss system CW2
A B D E 1 2
A B D E
TPL
PATIO
tiles
FFL : 100.500
LEMBAGA
MASTER ARKITEK
tiles LIVING
tiles
FFL : 101.000
FFL : 101.000
MALAYSIA
1 CW2 CW4
BATH 3
cem. board
BATH 2
cem. board
BEDROOM 3 BEDROOM 4
plaster ceiling plaster ceiling
KITCHEN
plaster ceiling
BEDROOM 2
plaster ceiling BATH 1
Access manhole to
water storage tank
NUR NABILA SYAFIKA BINTI MOHD FAIROZ
DINING FAMILY I/C: 951231 - 03 - 5942
plaster ceiling plaster ceiling
BATH 2
BATH 1 LOT 158 KG. PAUH BADANG
cem. board TUBE WELL WATER SUPPLY
JALAN PCB
PORCH
15350 KOTA BHARU
plaster ceiling KELANTAN
PATIO BATH 3
plaster ceiling
MASTER KITCHEN
plaster ceiling LIVING
plaster ceiling
V.
LE
FL.
ND.
OU
GR
ELECTRICAL LAYOUT
REFLECTED CEILING PLAN
WATER SUPPLY PLUMBING LAYOUT
SANITARY PLUMBING DIAGRAMMATIC LAYOUT
LEMBAGA
ARKITEK
MALAYSIA
DESIGN SPECIFICATION & DIMENSION OF MF2 - PE
DESIGN CRITERIA
MODEL MF2-PE
NUMBER OF TANK 2
3 2
OVERFLOW RATE (M /M .d) 1.293
3 1.800
MAX. AVG. FLOW RATE (M /d)
VENTILATION PIPE
NOTES :
TYPICAL PLAN OF INSPECTION CHAMBER INSPECTION CHAMBER SHALL BE PROVIDED AFTER SEPTIC TANK
FOR MAINTANANCE PURPOSES, WHERE APPLICABLE. THIS
1000(MAX)
225
(X)
300
(Y)
800
400
1910(H)
1610(B)
1) P.E. SEPTIC TANK IS SOLD WITH ACCESSORY WHICH IS THE SEPTIC TANK COVER SEWERAGE WORKS DETAILS & DETAILS OF
WHERE IT IS USED TO COVER THE TOP OF SEPTIC TANK DURING INSTALLATION 300 MIN.
PROPOSED INDIVIDUAL SEPTIC TANK
300
WORK IS DONE (AIR TIGHT COVER)
(REFER APPENDIX J -MALAYSIAN SEWERAGE INDUSTRY GUIDELINE BEDDING & HAUNCHING (inside building) - MUI FATT INDUSTRIES SDN. BHD.: MUI FATT MF2-PE
3rd EDITION VOLUME 5 )
2) FOR MANHOLE COVER WHICH IS EXPOSED AT GROUND LEVEL AS MENTIONED (BY OTHER'S),
THE PARTY RESPONSIBLE SUCH AS (DEVELOPER , CONTRACTOR & OWNER)
FOR THE TANK INSTALLATION WORK SHOULD USE A COVER MADE OF CAST IRON
AS REQUIRED UNDER SPAN REGULATION. THIS IS TO AVOID ANY ACCIDENTS OCCUR.
3) ANY SUBSTANCE OR OBJECT THAT HAS A LOAD IS PROHIBITED TO BE PLACED VCP CONNECTION DETAILS
ON THE GROUND LEVEL. VEHICLES ARE ALSO PROHIBITED CROSSING THE SEPTIC TANK
AREA ALTHOUGH HIGHLY RESILIENT MANHOLE COVERS IS USED AS MENTIONED ABOVE. SECTION Y-Y - BY OTHER'S
BEDDING & HAUNCHING (outside building)
LEMBAGA
ARKITEK
INSTALLATION MANUAL FOR 'MF' P.E. BIO FILTER MALAYSIA
0 MI
10 N.
N 10
MI 0
MUI FATT