Anda di halaman 1dari 15

PERIODE 11

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


519 36/40 SUDIRMAN CBD PROJECT SURAT KEPUTUSAN GUBERNUR
520 35-36/38 SUDIRMAN CBD PROJECT SURAT KEPUTUSAN GUBERNUR
521 35-36/38 SUDIRMAN CBD PROJECT SURAT KEPUTUSAN GUBERNUR
522 36-36/35 SUDIRMAN CBD PROJECT SURAT KEPUTUSAN GUBERNUR
523 SUDIRMAN CBD PROJECT USULAN PERUBAHAN TRASE KALI CIRAGIL (PR 01 - PR2 )
524 D/9516-54/96 KAWASAN NIAGA TERPADU SUDIRMAN (KNTS) LONGITUDINAL SECTION
525 310/SH/002 SUDIRMAN CBD PROJECT AS BUILD DRAWING BORED PILES FOR SHORING AT BOUNDARY SCBD AND BAPINDO AREA
526 12/INV / 1995 1 SUDIRMAN CBD PROJECT PETA INVENTARISASI
527 12/INV / 1995 2 SUDIRMAN CBD PROJECT PETA INVENTARISASI
528 12/INV / 1995 3 SUDIRMAN CBD PROJECT PETA INVENTARISASI
529 310/204/GE/001 SUDIRMAN CBD PROJECT RENCANA UNDERPASS
530 A3 - 12 PASAR PESANGGRAHAN DENAH TOILET, KUSEN PINTU DAN JENDELA
531 A4 - 12 PASAR PESANGGRAHAN KUSEN PINTU DAN JENDELA
532 ME3 - 12 PASAR PESANGGRAHAN PENANGKAL PETIR DAN LETAKAN TALANG TEGAK
533 A2 - 12 PASAR PESANGGRAHAN DENAH, TAMPAK DAN POTONGAN
534 ME2 - 12 PASAR PESANGGRAHAN ISOMETRIS AIR BERSIH, AIR KOTOR DAN AIR BEKAS
535 ME4 - 12 PASAR PESANGGRAHAN WIRING DIAGRAM
536 ME4 - 12 PASAR PESANGGRAHAN WIRING DIAGRAM
537 ME1 - 12 PASAR PESANGGRAHAN INSTALASI AIR BERSIH, AIR KOTOR DAN AIR BEKAS ( SETELAH PERUBAHAN )
538 A1 - 12 PASAR PESANGGRAHAN RENCANA PERUBAHAN LOS TERBUKA, LOS DAGING DAN KANTOR PASAR
539 ME5 - 12 PASAR PESANGGRAHAN RENCANA INSTALASI LISTRIK ( SETELAH PERUBAHAN )
540 ME6 - 12 PASAR PESANGGRAHAN INSTALASI TATA SUARA DAN PERLETAKAN TABUNG PEMADAM
441 468 466 493

442 469 467 494

443 470 495

444 471

445 472

446 473

447 474

448 475

449 476

450 477

451 478

452 479

453 480

454 481

455 482

456 483

457 484

458 485

459 486

460 487

461 488

462 489

463 490

464 491

465 492
PERIODE 1

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


1 310/202/ST/0001 /1 CONTROL ROOM SCBD FOUNDATION PLAN & DETAIL PILECAP TYPE 1 & 2
2 310/202/ST/0002 /1 CONTROL ROOM SCBD PLAN SECTION PILECAP TYPE 3
3 310/202/ST/0003 /1 CONTROL ROOM SCBD PLAN SECTION PILECAP TYPE 4
4 310/202/ST/0004 /1 CONTROL ROOM SCBD BASEMENT & COLOUMN PLAN
5 310/202/ST/0004A /1 CONTROL ROOM SCBD PLAN SECTION RESERVOIR (STRUCTURAL)
6 310/202/AD/0017 CONTROL ROOM SCBD CANOPY DETAILS
7 310/202/AD/0018 CONTROL ROOM SCBD FLOOR PLAN 1ST FLOOR
8 310/202/AD/0019 CONTROL ROOM SCBD FLOOR PLAN 2ND FLOOR
9 310/202/AD/0020 CONTROL ROOM SCBD FLOOR PLAN 3RD FLOOR
10 310/202/AD/0021 CONTROL ROOM SCBD ELEVATION & SECTION DETAILS WINDOW
11 310/202/AD/0022 CONTROL ROOM SCBD ELEVATION OF WINDOW
12 310/202/AD/0023 CONTROL ROOM SCBD ELEVATION & SECTION DETAILS WINDOW
13 310/202/AD/0024 CONTROL ROOM SCBD ELEVATION & SECTION DETAILS WINDOW
14 310/202/AD/0025 CONTROL ROOM SCBD ELEVATION OF DOOR & DETAILS SECTION
15 310/202/AD/0026 CONTROL ROOM SCBD ELEVATION & SECTION DETAILS OF DOOR
16 310/202/AD/0027 CONTROL ROOM SCBD ELEVATION OF DOOR & SECTION DETAILS DOOR GENSET ROOM
17 310/202/AD/0028 CONTROL ROOM SCBD ELEVATION OF WINDOW & DOOR
18 310/202/AD/0029 CONTROL ROOM SCBD PLAN, SECTION & ELEVATION SECURITY POST
19 310/257/CI/0006 AB SCBD PROJECT EASTWAY UNDERPASS SUMP PIT DETAILS 1/2 STA 0+715.712
20 310/257/CI/0007 AB SCBD PROJECT EASTWAY UNDERPASS SUMP PIT DETAILS 2/2 STA 0+715.712
21 310/257/ST/0005A AB SCBD PROJECT EASTWAY UNDERPASS STRUCTURAL DETAILS
TYPE A1 STA 0+867.261 TO STA 0+873.561
22 310/257/ST/0011 AB SCBD PROJECT EASTWAY TUNNEL UNDERPASS STRUCTURAL
DETAILS TYPE VA STA 0+775 TO 0+785
23 310/257/ST/0005 AB SCBD PROJECT EASTWAY TUNNEL UNDERPASS STRUCTURAL DETAILS TYPE A1
24 310/257/ST/0006 SCBD PROJECT EASTWAY TUNNEL UNDERPASS STRUCTURAL DETAILS TYPE A2
25 310/257/ST/0007 AB SCBD PROJECT EASTWAY TUNNEL UNDERPASS STRUCTURAL DETAILS TYPE U1
26 310/257/ST/0008 AB SCBD PROJECT EASTWAY TUNNEL UNDERPASS STRUCTURAL DETAILS TYPE U2
27 310/257/ST/0009 AB SCBD PROJECT EASTWAY TUNNEL UNDERPASS STRUCTURAL DETAILS TYPE U3
28 310/257/ST/0005 AB 1 SCBD PROJECT WESTWAY TUNNEL STRUCTURAL DETAILS TYPE A2
29 310/257/ST/0005A AB SCBD PROJECT WESTWAY TUNNEL STRUCTURAL DETAILS TYPE A1
30 310/257/ST/0010 AB 1 SCBD PROJECT WESTWAY TUNNEL STRUCTURAL DETAILS TYPE VA
STA 0+893.612 TO STA 0+895.000
31 310/257/ST/0010A1 AB SCBD PROJECT WESTWAY TUNNEL STRUCTURAL DETAILS TYPE A….
STA 0+911.130 TO STA 0+917.430
32 310/257/ST/0006 AB 1 SCBD PROJECT WESTWAY TUNNEL STRUCTURAL DETAILS TYPE VA
STA 0+994.930 TO STA 1+009.930
STA 1+114.930 TO STA 1+129.930
33 310/257/ST/0007 AB 1 SCBD PROJECT WESTWAY TUNNEL STRUCTURAL DETAILS TYPE U1
STA 0+863.612 TO STA 0+893.612
STA 1+231. 248 TO STA 2+261.248
34 310/257/ST/0008 AB 1 SCBD PROJECT WESTWAY TUNNEL STRUCTURAL DETAILS TYPE U2
STA 0+833.612 TO STA 0+863.612
STA 1+261. 248 TO STA 1+276.248
35 310/257/ST/0009 AB 1 SCBD PROJECT WESTWAY TUNNEL STRUCTURAL DETAILS TYPE U3
STA 0+803.324 TO STA 0+833.612
STA 1+276. 248 TO STA 1+291.248
36 ST/310/202/ST/0005 /I CONTROL ROOM SCBD COLOUMN SCHEDULE & SCHEMATIC
37 ST/310/202/ST/0006 /I CONTROL ROOM SCBD 1ST FLOOR PLAN
38 ST/310/202/ST/0007 /I CONTROL ROOM SCBD BEAM SCHEDULE 1ST FLOOR
39 ST/310/202/ST/0008 /I CONTROL ROOM SCBD DENAH PENULANGAN PELAT LT 2
40 ST/310/202/ST/0009 /I CONTROL ROOM SCBD DENAH PENULANGAN PELAT LT 3
41 ST/310/202/ST/0010 /I CONTROL ROOM SCBD DENAH PENULANGAN PELAT ATAP
42 ST/310/202/ST/0011 /I CONTROL ROOM SCBD DETAIL POTONGAN LISTPLANK LT 2
43 ST/310/202/ST/0012 /I CONTROL ROOM SCBD DETAIL & POTONGAN LISTPLANK LT ATAP
44 ST/310/202/ST/0013 /I CONTROL ROOM SCBD DETAIL POTONGAN PELAT DAN STEEL DECKING
45 ST/310/202/ST/0014 /I CONTROL ROOM SCBD DENAH&POTONGAN PENULANGAN TANGGA LT BASEMENT&LT TYPICAL
46 ST/310/202/ST/0015 /I CONTROL ROOM SCBD CANOPY DETAILS
47 ST/310/202/ST/0016 /I CONTROL ROOM SCBD DENAH&POTONGAN PENULANGAN PELAT TUTUP TANGGA&POS JAGA
48 ST/310/202/ST/0017 /I CONTROL ROOM SCBD DENAH/POTONGAN SEPTICTANK & SUMUR PERESAPAN
No. No. Gambar Tertera Rev Nama Proyek Judul Gambar
49 ST/310/202/ST/0020 /I CONTROL ROOM SCBD PLAN&SECTION TELECOMMUNICATION CABLE MANHOLE
50 ST/310/202/ST/0021 /I CONTROL ROOM SCBD PLAN&SECTION TELECOMMUNICATION CABLE MANHOLE
51 ST/310/202/ST/0022 /I CONTROL ROOM SCBD PLAN&SECTION POWER CABLE MANHOLE
52 ST/310/202/ST/0023 /I CONTROL ROOM SCBD PLAN&SECTION POWER MANHOLE
53 ST/310/202/ST/0024 /I CONTROL ROOM SCBD PLAN&SECTION MANHOLE LOT 24 CONNECTION
54 ST/310/202/ST/0026 /I CONTROL ROOM SCBD PLAN&SECTION SERVICE DUCT BRANCH TO LOT 24 (STRUCTURAL)
55 ST/310/202/ST/0027 /I CONTROL ROOM SCBD PLAN&SECTION SERVICE AIR VENTILATION HOLE NO.1 (STRUCTURAL)
PERIODE 2
No. No. Gambar Tertera Rev Nama Proyek Judul Gambar
56 ST/310/202/ST/0029 /I CONTROL ROOM SCBD PLAN&SECTION DETAILS STORMWATER CATCHBASIN NO.22&23
AND CABLE TRENCH
57 ST/310/202/ST/0031 /I CONTROL ROOM SCBD PLAN&SECTION POWER MANHOLE (ARCHITECTURAL)
58 ST/310/202/ST/0032 /I CONTROL ROOM SCBD PLAN&SECTION AIR VENTILATION HOLE NO.1 (ARCHITECTURAL)
59 310/202/GE/0001 CONTROL ROOM SCBD PUMP ROOM LAYOUT PIPE
60 310/202/GE/0002 CONTROL ROOM SCBD PUMP ROOM PROFILE OF OVERFLOW & DISTRIBUTION PIPE
(CONTROL ROOM)
61 310/202/GE/0003 CONTROL ROOM SCBD PUMP ROOM PROFILE OF SUBROTO & SUDIRMAN CONNECTION PIPES
62 310/350/GE/0002 /AB SCBD PROJECT GENERAL LAYOUT OF CATCH BASIN
63 310/350/CI/0018 /AB SCBD PROJECT STORM WATER CATCHBASIN DETAILS 1/2
64 310/274/CI/0004 /AB SCBD PROJECT ON-SITE ROAD (STAGE I) PAVEMENT DETAILS
65 310/202/GE/0005 /AB SCBD PROJECT STORM WATER DIMENSION OF MANHOLE AND CATCHBASIN
66 310/615/CI/0005/AB 1 SCBD PROJECT SERVICE DUCT PLAN & PROFILE STA 0+533.90 - 0+320.925
67 310/615/CI/0006/AB SCBD PROJECT SERVICE DUCT & CABLE DUCT PLAN & PROFILE
68 310/350/CI/0010/AB SCBD PROJECT STORM WATER PLAN DETAIL NORTHWAY STA 0+869.221 -
STA 0+680.000 SOUTHWAY STA 0+620.000 - STA 0+680.000
69 310/350/CI/0007/AB SCBD PROJECT STORM WATER PLAN & PROFILE STA 0+640 - STA 0+786.000
NORTHWAY STA 0+841 - STA 0+891.342 NORTHWAY
70 310/350/CI/0001/AB SCBD PROJECT STORM WATER PLAN & PROFILE OF N/S LINK
71 310/204/GE/002 SCBD PROJECT GENERAL LAY OUT SCBD
72 310/204/CI/001 SCBD PROJECT HORIZONTAL ALIGNMENT R-IN & R-OUT TUNNEL
73 310/204/CI/002 SCBD PROJECT R-OUT VERTICAL ALIGNMENT
74 310/204/CI/003 SCBD PROJECT R-IN VERTICAL ALIGNMENT
75 310/204/ST/001 SCBD PROJECT R-OUT HORIZONTAL COORDINATION TABLE
76 310/204/ST/004 SCBD PROJECT R-IN HORIZONTAL COORDINATION TABLE
77 310/257/ST/0001/AB SCBD PROJECT EASTWAY TUNNEL UNDERPASS STRUCTURE LAYOUT
STA 0+566.412 - STA 0+981.405
78 310/286/CI/0001/AB SCBD PROJECT CAR PARKING CONNECTION TUNNEL LOT1 TO LOT2 PLAN AND PROFILE
79 310/350/CI/0025/AB SCBD PROJECT STORM WATER PLAN & PROFILE OF NORTHWAY
80 310/350/CI/0017/AB 1 SCBD PROJECT STORM WATER PIPE JOINT
81 310/350/CI/0019/AB 1 SCBD PROJECT STORM WATER CATCH BASIN DETAILS (2/2)
82 310/350/CI/0021/AB 1 SCBD PROJECT STORM WATER OUTLET PIPE PROTECTION
83 310/350/CI/0014/AB 1 SCBD PROJECT STORM WATER MANHOLE DETAIL
84 310/350/CI/0014/AB SCBD PROJECT STORM WATER MANHOLE DETAIL
85 310/350/CI/0017/AB SCBD PROJECT STORM WATER PIPE JOINT
86 310/350/CI/0021/AB SCBD PROJECT STORM WATER OUTLET PIPE PROTECTION
87 310/350/CI/0023/AB SCBD PROJECT STORM WATER PROFILE OF SUB DRAINAGE
88 310/350/CI/0008A/AB SCBD PROJECT STORM WATER MANHOLE MH.69 MH.70 MH.71
MH.E.1 DAN MH.E.2 PLAN AND SECTION
89 310/257/ST/0003/AB SCBD PROJECT EASTWAY TUNNEL UNDERPASS STRUCTURE PROFILE
STA 0+566.412 - STA 0+981.405
90 310/257/ST/0003/AB SCBD PROJECT WESTWAY TUNNEL STRUCTURE PROFILE STA 0+803.324 - STA 1+291.248
91 310/289/CI/0002/AB SCBD PROJECT LOT 6 TO LOT 22 CAR PARKING LINK PLAN PROFILE & SECTION SOUTHERN
92 310/289/CI/0003/AB 1 SCBD PROJECT LOT 5 TO LOT 6 CAR PARKING & PEDESTRIAN LINK PLAN & PROFILE
93 310/321/ST/0004-B/AB SCBD PROJECT EQUIPMENT DROP STRUCTURE ( EC - 1 ) STA 0+003.573 CIRAGIL CULVERT
DETAIL OF TRASH SCREEN ( 2/4)
94 310/321/ST/0004-C/AB SCBD PROJECT EQUIPMENT DROP STRUCTURE ( EC - 1 ) STA 0+003.573 CIRAGIL
DETAIL OF CONCRETE COVER ( 3/4)
95 310/321/ST/0004-D/AB SCBD PROJECT EQUIPMENT DROP STA 0+003.573 CIRAGIL ( EC - 1 ) STRUCTURE
DETAIL OF TRASH SCREEN ( 4/4)
96 310/321/ST/0005-A/AB SCBD PROJECT EQUIPMENT DROP STRUCTURE STA 0+535.500 CIRAGIL (EC-2)
STRUCTURAL DETAILS ( 1/2)
97 310/321/CI/0004/AB SCBD PROJECT CULVERT TYPICAL SECTION ARRANGEMENT & JOINT
98 310/257/ST/0004/AB SCBD PROJECT WEST WAY TUNNEL UNDERPASS STRUCTURAL PROFILE
STA 0+895.000 - STA 0+949.930
99 310/257/ST/0002/AB SCBD PROJECT WEST WAY TUNNEL UNDERPASS STRUCTURE LAYOUT
STA 0+895.000 - STA 0+949.930
100 310/308/ST/0002/AB 2 SCBD PROJECT BOX CULVERT LONGITUDINAL SECTION CROSS SECTION & DETAILS
101 310/289/CI/0008/AB SCBD PROJECT LOT 6 TO LOT 9 CAR PARKING LINK STA 0+575.000 (NORTHWAY) PLAN & SECTION
102 310/289/CI/0009/AB SCBD PROJECT LOT 8 TO LOT 10 CAR PARKING LINK STA 0+400 NORTHWAY PLAN - SECTION
No. No. Gambar Tertera Rev Nama Proyek Judul Gambar
103 310/289/CI/0007/AB 1 SCBD PROJECT LOT 22 TO LOT 23 CAR PARKING LINK STA 1+024.000 EASTWAY
PLAN PROFILE & SECTION
104 310/289/CI/0006/AB SCBD PROJECT LOT 6 TO LOT 7 CAR PARKING LINK STA 1+020.595 WESTWAY PLAN, SECTION
105 310/289/CI/0005/AB SCBD PROJECT LOT 7 TO LOT 10 CAR PARKING LINK STA 0+440.000 NORTHWAY PLAN - SECTION
106 310/282/CI/0001-A/AB SCBD PROJECT NORTHERN PEDESTRIAN UNDERPASS PLAN & PROFILE CONNECT TO LOT 1,2, & 3
107 310/282/CI/0002-A/AB SCBD PROJECT PEDESTRIAN LINK NORTHERN PEDESTRIAN UNDERPASS ( OPEN SECTION )
PLAN SECTION & DETAIL
108 310/321/GE/0002/AB-1 SCBD PROJECT ALIGNMENT PLAN OF RIVER DIVERSION CULVERT
109 310/321/CI/0001/AB SCBD PROJECT PLAN &PROFILE OF CIRAGIL RIVER DIVERSION CULVERT
STA 0+174.250 TO STA 0+325.000
110 310/321/GE/0002/AB SCBD PROJECT ALIGNMENT PLAN OF RIVER DIVERSION CULVERT
PERIODE 3

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


111 COVER AS BUILT DRAWINGS ON SIDE ROAD
112 310/287/ST/0004/AB SUDIRMAN CBD PROJECT LOT 5 - LOT 24 CAR PARKING LINK TEMPORARY STRUCTURE
113 310/286/ST/0001-A/AB SUDIRMAN CBD PROJECT CAR PARKING CONECTION TUNNEL LOT 1 TO LOT 2 STRUCTURAL DETAILS 2/2
114 310/241/CI/0007-A/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SOUTHWAY (3) STA 0+800 TO STA 0+850
115 310/241/CI/0007/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SOUTHWAY (3) STA 0+900 TO STA 0+950
116 310/241/CI/0008-A/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SOUTHWAY (5) STA 1+000 TO STA 1+050
117 310/241/CI/0008/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SOUTHWAY (6) STA 1+100 TO STA 1+150
118 310/245/CI/0004/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF NORTHWAY (1) STA 0+700 TO STA 0+750
119 310/245/CI/0005/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF NORTHWAY (2) STA 0+800 TO STA 0+836.972
120 310/245/CI/0006/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF NORTHWAY (3) STA 0+850 TO STA 0+891.842
121 310/245/CI/0008/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF NORTHWAY (5) STA 1+000 TO STA 1+040
122 310/030/CI/0011/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF EASTWAY CH 716.980 TO CH 829.005
123 310/030/CI/0012/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF EASTWAY (2) STA 0+891405 TO 1+000
124 310/241/CI/0006/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SOUTHWAY (2) STA 0+700 TO STA 0+750
125 310/241/CI/0006-A/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SOUTHWAY (1) STA 0+620 TO STA 0+650
126 310/244/CI/0007/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SUDIRMAN - MAIN ENTRANCE L-IN (3)
127 310/244/CI/0006/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SUDIRMAN - MAIN ENTRANCE L-IN (2)
128 310/244/CI/0005/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) CROSS SECTION OF SUDIRMAN - MAIN ENTRANCE L-IN (1)
129 310/244/CI/0004-A/AB SUDIRMAN CBD PROJECT ON SIDE ROAD (STAGE I) PROFILE OF EASTWAY
130 310/321/ST/0004A-1/AB SUDIRMAN CBD PROJECT EQUIPMENT DROP STRUCTURE (EC-3) STA 1+056858 CIRAGIL 1/2 PLAN & SECTION
131 310/321/ST/0005-B/AB SUDIRMAN CBD PROJECT EQUIPMENT DROP STRUCTURE (EC-2) STA 1+0535500 (CIRAGIL CULVERT) DETAIL OF CONCRETE COVER (2/2)
132 310/322/CI/0002/AB SUDIRMAN CBD PROJECT INLET OF BANGKENG DIVERSION CULVERT PLAN & SECTION
133 310/322/ST/0007/AB SUDIRMAN CBD PROJECT OPENING BANGKENG CULVERT FOR TEMPORARY OUTLET STA 0+570.00
134 310/321/ST/0001-A/AB SUDIRMAN CBD PROJECT STRUCTURAL DETAILS CULVERT TYPE-A (TRANSITION) STA 0+457.148 - STA 0+468.548 CIRAGIL 1/2
135 310/287/CI/0001/AB SUDIRMAN CBD PROJECT LOT 5 - LOT 24 CAR PARKING LINK - PLAN PROFILE & SECTION
136 310/288/CI/0001/AB SUDIRMAN CBD PROJECT LOT 2 TO LOT 3 CAR PARKING LINK PLAN PROFILE & SECTION
137 310/321/CI/0005/AB SUDIRMAN CBD PROJECT INLET OF CIRAGIL DIVERSION CULVERT ( TRASH SCREEN )
138 COVER AS BUILT DRAWINGS RIVER DIVERSION CULVERT
139 310/321/ST/0004-A/AB SUDIRMAN CBD PROJECT EQUIPMENT DROP STRUCTURE (EC-1) STA 0+003.573 CIRAGIL CULVERT PLAN AND SECTION (1/4)
140 310/245/CI/0007/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) CROSS SECTION OF NORTHWAY (4) STA 0+900 TO 0+978.061
141 310/321/CI/0003/AB SUDIRMAN CBD PROJECT PLAN AND PROFILE OF BANGKENG DIVERSION CULVERT STA 0+000 TO STA 0+360.000
142 310/322/CI/0001/AB SUDIRMAN CBD PROJECT PLAN & PROFILE BANGKENG RIVER DIVERSION CULVERT STA 0+360.000 - STA 0+712.800
143 310/308/ST/0001/AB SUDIRMAN RIVER DIVERSIO LAY OUT PLAN BOX CULVERT
144 ST/31/202/ST/0025/I CONTROL ROOM PLAN AND SECTION SERVICE DUCT
145 310/226/CI/0003/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PLAN & PROFILE OF SENOPATI TO SUDIRMAN (1) (SENOPATI LINK I - NORTHWAY)
146 310/226/CI/0002/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PLAN & PROFILE OF SENOPATI (2) (SOUTHWAY - SENOPATI LINK I )
147 310/244/CI/0004/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PROFILE OF S-N LINK AND SUDIRMAN MAIN ENTRANCE R-OUT
148 310/274/CI/0003/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PAVEMENT LAYOUT 2/2
149 DAFTAR GAMBAR SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) LIST OF DRAWINGS
150 310/288/ST/0001/AB SUDIRMAN CBD PROJECT LOT 2 TO LOT 3 CAR PARKING LINK STRUCTURAL DETAIL (1/3)
151 310/287/ST/0002/AB SUDIRMAN CBD PROJECT LOT 5 - LOT 24 CAR PARKING LINK STRUCTURAL DETAIL (1/2)
152 310/287/ST/0003/AB SUDIRMAN CBD PROJECT LOT 5 - LOT 24 CAR PARKING LINK STRUCTURAL DETAIL (2/2)
153 310/286/ST/0001/AB SUDIRMAN CBD PROJECT CAR PARKING CONECTION TUNNEL LOT 1 TO LOT 2 STRUCTURAL DETAILS 1/2
154 310/211/CI/0005/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PROFILE OF SUDIRMAN MAIN ENTRANCE L-IN AND N-S LINK
155 310/241/CI/0003/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PLAN & PROFILE OF SUDIRMAN - TO SENOPATI (1) (SOUTHWAY-SENOPATI LINK 1)
156 310/245/CI/0002/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PLAN & PROFILE OF SENOPATI TO SUDIRMAN (2) NORTHWAY SUDIRMAN MAIN ENTRANCE (L-OUT)
157 310/274/CI/0002-A/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PAVEMENT LAYOUT & ELEVATION
158 310/274/CI/0002/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) PAVEMENT LAYOUT & ELEVATION 1/2
159 310/200/GE/0002-2/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) ALIGNMENT PLAN 2/2
160 310/200/GE/0002-1/AB SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE I) ALIGNMENT PLAN 1/2
161 310/221/ST/0005A-1/AB SUDIRMAN CBD PROJECT EQUIPMENT DROP STRUCTURE STA 1+056.858 (CIRAGIL) EC-3 STUCTURAL DETAILS (2/2)
162 310/321/ST/0001/AB SUDIRMAN CBD PROJECT PLAN AND PROFILE OF CIRAGIL DIVERSION CULVERT (1/2) STA 0+000 TO STA 0+174.250, STA 0+425.000 TO STA 0+600
163 310/321/ST/0001-B/AB SUDIRMAN CBD PROJECT STRUCTURAL DETAILS CULVERT TYPE-A (TRANSITION) STA 0+457.148 TO STA 0+468.548 CIRAGIL 2/2
164 310/321/ST/0003/AB SUDIRMAN CBD PROJECT STRUCTURAL DETAILS CIRAGIL INLET
165 310/321/ST/0003/AB SUDIRMAN CBD PROJECT STRUCTURAL DETAILS CULVERT TYPE A
PERIODE 4

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


166 310/204/ME/011 SUDIRMAN CBD PROJECT INTEGRATED MONITORING PANEL & CCTV CONTROL PANEL
167 310/204/PB/002 SUDIRMAN CBD PROJECT REFUGWAY 2 TO R-IN UNDERPASS (DETAILS)
168 310/204/PB/003 SUDIRMAN CBD PROJECT REFUGE WAY TO R-OUT UNDER PASS (PLAN AND DETAILS)
169 310/204/ME/007 SUDIRMAN CBD PROJECT SAFETY CONTROL FACILITIES (1/2)
170 310/204/DR/009 SUDIRMAN CBD PROJECT PEDESTRIAN HANDRAIL AND BARRIER RAILING DETAILS
171 310/204/ME/001 SUDIRMAN CBD PROJECT CABLE LAYOUT
172 310/204/DR/005 SUDIRMAN CBD PROJECT PAVEMENT DETAILS
173 310/204/DR/006 SUDIRMAN CBD PROJECT CURB STONE AND CONCRETE BARRIER
174 310/204/DR/008 SUDIRMAN CBD PROJECT PEDESTRIAN HANDRAIL AND BARRIER RAILING LAYOUT
175 310/204/DR/001 SUDIRMAN CBD PROJECT DRAINAGE LAYOUT
176 310/204/GE/008 SUDIRMAN CBD PROJECT PROFILE I-I OF EXISTING & FINAL ROAD
177 310/204/GE/009 SUDIRMAN CBD PROJECT PROFILE II-II OF EXISTING & FINAL ROAD
178 310/204/GE/010 SUDIRMAN CBD PROJECT PROFILE III-III OF EXISTING & FINAL ROAD
179 310/204/ST/002 SUDIRMAN CBD PROJECT R-OUT VERTICAL COORDINATION TABLE
180 310/204/GE/004 SUDIRMAN CBD PROJECT REALIGNMENT OF ROAD MEDIAN
181 310/204/GE/005 SUDIRMAN CBD PROJECT LAYOUT OF EXISTING UTILITY
182 COVER SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS PROJECT INFRASTRUCTURE PACKAGE 310-204
183 COVER SUDIRMAN CBD PROJECT LIST OF SUDIRMAN UNDERPASS
184 310/204/GE/002-A KAWASAN NIAGA TERPADU EXISTING ELEVATION OF JL. JEND SUDIRMAN
185 310/204/GE/003 SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS LAYOUT
186 310/615/CI/0008/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT TELECOMMUNICATION CABLE DUCT STANDARD SECTION
187 310/615/CI/0009/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT POWER CABLE DUCT STANDARD SECTION
188 310/615/ST/0013/AB SUDIRMAN CBD PROJECT SERVICE DUCT AIR VENTILATION STA 0+825.000 STRUCTURAL DETAIL
189 310/282/ST/0001/AB SUDIRMAN CBD PROJECT NORTHERN PEDESTRIAN UNDERPASS CONNECT TO LOT 1,2&3 STRUCTURAL DETAILS
190 310/282/ST/0002-A/AB SUDIRMAN CBD PROJECT NORTHERN PEDESTRIAN UNDERPASS (OPEN SECTION) STRUCTURAL DETAILS
191 310/289/CI/0001/AB SUDIRMAN CBD PROJECT CAR PARKING LINK PLAN PROFILE & SECTION
192 310/289/ST/0001-A/AB SUDIRMAN CBD PROJECT LOT.6-LOT.22 NORTHERN CAR LINK TEMPORARY STRUCTURE
193 310/288/ST/0002-A/AB SUDIRMAN CBD PROJECT LOT.2-LOT.3 CAR PARKING LINK STRUCTURAL DETAILS 3/3
194 310/204/ST/003 SUDIRMAN CBD PROJECT R-IN HORIZONTAL COORDINATION TABLE
195 310/204/PB/001 SUDIRMAN CBD PROJECT REFUGE WAY-2 TO R-IN UNDERPASS (PLAN AND SECTION)
196 310/204/DR/003 SUDIRMAN CBD PROJECT SUMP DETAILS (1/2)
197 310/204/DR/007 SUDIRMAN CBD PROJECT DRAINAGE DETAILS (2/2)
198 310/204/DR/004 SUDIRMAN CBD PROJECT SUMP DETAILS (2/2)
199 310/204/PB/004 SUDIRMAN CBD PROJECT PEDESTRIAN BRIDGE (PLAN SECTION AND VIEW)
200 310/204/PB/005 SUDIRMAN CBD PROJECT PEDESTRIAN BRODGE (DETAILS)
201 310/212/ST/0001/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE LAYOUT (1/2) R-OUT TUNNEL STA 0+100.000 TO STA 0+291.609
202 310/212/ST/0002/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE PROFILE (2/2) R-OUT TUNNEL STA 0+100.000 TO STA 0+291.609
203 310/204/ME/010 DANAYASA PROJECT CONTROL SYSTEM OF TUNNEL FACILITY
204 310/204/ME/009 SUDIRMAN CBD PROJECT VENTILATION LAYOUT
205 310/204/ME/008 SUDIRMAN CBD PROJECT SAFETY CONTROL FACILITIES (2/2)
206 310/204/ME/002 SUDIRMAN CBD PROJECT DETAIL LIGHTING TUNNEL & CABLE
207 310/204/ME/003 SUDIRMAN CBD PROJECT WIRING SCHEDULE FOR LIGHTING
208 310/204/ME/004 DANAYASA CBD PROJECTS ILLUMINATION ARRANGEMENT & QUANTITY LAYOUT
209 310/204/ME/005 SUDIRMAN CBD PROJECT LIGHTING (1/2) TYPE 1
210 310/204/ME/006 SUDIRMAN CBD PROJECT LIGHTING (2/2) TYPE 1
211 310/204/DR/002 SUDIRMAN CBD PROJECT DRAINAGE DETAIL (1/2)
212 310/204/GE/006 SUDIRMAN CBD PROJECT TEST PITTING RESULTION JL. JEND SUDIRMAN (1/2)
213 310/204/GE/007 DANAYASA CITY PROJECT TEST PITTING RESULTION JL. JEND SUDIRMAN (2/2)
214 310/615/CI/0006/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT PLAN & PROFILE
215 310/289/ST/0001/AB SUDIRMAN CBD PROJECT LOT.6 - LOT.22 NORTHERN CAR PARKING LINK STRUCTURAL DETAILS
216 310/289/ST/0002.A/AB SUDIRMAN CBD PROJECT LOT.6 - LOT.22 SOUTHERN CAR PARKING LINK STRUCTURAL DETAILS 2/2
217 310/289/ST/0002/AB SUDIRMAN CBD PROJECT LOT.6 - LOT.22 (SOUTHERN) CAR PARKING LINK - STRUCTURAL DETAIL 1/2
218 310/289/ST/0005/AB SUDIRMAN CBD PROJECT LOT.5-LOT.6 CAR PARKING LINK TEMPORARY STRUCTURE COVER
219 310/289/ST/0004/AB SUDIRMAN CBD PROJECT LOT.5-LOT.6 CAR PARKING & PEDESTRIAN LINK STRUCTURAL DETAILS
220 310/288/ST/0002/AB SUDIRMAN CBD PROJECT LOT.2 - LOT.3 CAR PARKING LINK STRUCTURAL DETAIL (2/3)
PERIODE 5

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


221 COVER AS BUILT DRAWINGS PACKAGE : 310.607 SOUTHWAY CULVERT
222 310/307/ST/0009 SOUTHWAY SUDIRMAN CENTR MANHOLE DETAILS OF RIVER DIVERSION CULVERT (STA 0+420000)
223 COVER LIST OF AS BUILT DRAWINGSSOUTHWAY 310.307
224 310/257/ST SUDIRMAN CBD PROJECT SUMP PIT DETAILS 1/2 STA 1+083.130
225 COVER SCBD STAGE II INFRASTRU WEST WAY TUNNEL UNDERPASS
226 - SUDIRMAN CBD PROJECT WESTWAY TUNNEL UNDERPASS LIST OF DRAWINGS
227 310/257/GE SUDIRMAN CBD PROJECT WEST WAY / EAST WAY ALIGNMENT PLAN
228 310/212/CI SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS REFUGE WAY DETAILS
229 COVER SCBD STAGE II INFRASTRU RIVER DIVERSION CULVERT
230 - SUDIRMAN CBD PROJECT RIVER DIVERSION CULVERT LIST OF DRAWINGS
231 310/212/CI SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS REFUGE WAY DETAILS MH RI.1 & MH RI.2
232 310/212/CI SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS SUMP PIT DETAILS 1/2 STA 0+302.800 R-IN
233 310/212/ST SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN STRUCTURE PROFILE
234 310/212/ST SUDIRMAN CBD PROJECT TEMPORARY STRUCTURE SHEET PILES STA 0+293.000 R-IN
235 310/212/ST SUDIRMAN CBD PROJECT TEMPORARY STRUCTURE R-IN STA 0+300.000
236 310/212/ST SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN STRUCTURE LAY OUT
237 - SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN TUNNEL LIST OF DRAWINGS
238 COVER SCBD STAGE I INFRASTRUC EAST WAY TUNNEL UNDERPASS
239 - SUDIRMAN CBD PROJECT EAST WAY TUNNEL UNDERPASS LIST O F DRAWINGS
240 310/257/GE/0002/AB SUDIRMAN CBD PROJECT EASTWAY WESTWAY UNDERPASS ALIGNMEN PLAN
241 310/257/ST/0010/AB SUDIRMAN CBD PROJECT EASTWAY WESTWAY UNDERPASS ALIGNMEN PLAN
242 COVER SCBD STAGE I INFRASTRUC SUDIRMAN UNDERPASS R-IN TUNNEL
243 ST/310/307/ST/0030/I CONTROL ROOM SUDIRMAN C PLAN & SECTION DETAILS STORMWATER MANHOLE NO.24, CATCHBASIN NO.12
244 310/257/ST/0002/AB/I SUDIRMAN CBD PROJECT WEST WAY TUNNEL STRUCTURE LAYOUT STA 0+803.324 - STA 1+291.248
245 310/296/76/0005/AB SUDIRMAN CBD PROJECT ON-SITE ROAD (STAGE1) WIRING SCHEDULE AND ONE LINE DIAGRAM IN STEP 1
246 310/297/ME/0007/AB/2 SUDIRMAN CBD PROJECT ONE-SITE ROAD (STAGE1) WIRING SCHEDULE
247 310/297/ME/0007/AB/2 SUDIRMAN CBD PROJECT SCHEMATIC DIAGRAM ONE LINE FOR DP1, DP11,DP15,DP20, & DP30
248 310/322/ST/0006/AB/2 SUDIRMAN CBD PROJECT OPENING BANGKENG CULVERT FOR EQUIPMENT ACCESS ROAD STA 0+691.45
249 - SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-OUT TUNNEL LIST OF DRAWINGS
250 310/307/ST/0002 SOUTHWAY SUDIRMAN CENTR CULVERT DETAILS
251 310/212/ST/0011/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE VA R-OUT TUNNEL STA 0+239.109 TO STA 0+249.109
252 310/212/ST/0013A/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE U1 R-OUT TUNNEL STA 0+170.000 TO STA 0+185.000
253 310/212/ST/0013B/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE U1 R-OUT TUNNEL STA 0+156.000 TO STA 0+170.000
254 310/212/ST/0014/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE U2 R-OUT TUNNEL STA 0+151.228 TO STA 0+156.000
255 310/212/ST/0016A/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS R-OUT TYPE RETAINING WALL (Rightside) STA 0+100.000 TO STA 0+151.228 RT
256 310/212/ST/0016B/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS R-OUT TYPE RETAINING WALL (LEFTside) STA 0+100.000 TO STA 0+151.228 RT
257 310/321/ST/0001/AB SUDIRMAN CBD PROJECT TIPYCAL STRUCTURAL DETAILS CULVERT TYPE A
258 310/322/ST/0005/AB/2 SUDIRMAN CBD PROJECT EQUIPMANT DROP STRUCTURE STA 0+665.809 (BANGKENG CULVERT) (STRUCTURE DETAILS)
259 310/322/ST/0005/AB/1 SUDIRMAN CBD PROJECT EQUIPMANT DROP STRUCTURE STA 0+665.809 (BANGKENG CULVERT) PLAN, SECTION & DETAILS
260 310/321/CI/0004/AB/2 SUDIRMAN CBD PROJECT CULVERT TYPICAL SECTION ARRANGEMENT &JOINT
261 310/321/ST/0002/AB/1 SUDIRMAN CBD PROJECT STRUCTURAL DETAILS CULVERT TYPE B
262 310/212/ST/0006/AB/1 SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN TUNNEL STRUCTURAL DETAILS TYPE U2 STA 0+552.100 TO STA 0+578.750
263 310/212/ST/0007/AB/1 SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN TUNNEL STRUCTURAL DETAILS TYPE U3 STA 0+578.750 TO STA 0+620.000
264 310/212/CI/0013/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS SUMP PIT DETAILS 2/2 STA 0+302.800
265 310/212/CI/0014/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS REFUGE WAY PLAN & SECTIONS
266 310/212/CI/0015/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS REFUGE WAY STRUCTURAL DETAILS
267 310/212/ST/0005/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN STRUCTURAL DETAILS TYPE A1
268 310/212/ST/0006/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN STRUCTURAL DETAILS TYPE A2
269 310/212/ST/0008/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN STRUCTURAL DETAILS TYPE B2 CH 300.000 TO CH 310.457
270 310/212/ST/0011/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN STRUCTURAL DETAILS TYPE VA
271 310/212/GE/0002/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS ALIGNMENT PLAN WITHIN SCBD
272 310/257/ST/0004/AB SUDIRMAN CBD PROJECT WEST WAY TUNNEL STRUCTURAL DETAILS TYPE A1
273 310/257/ST/0012/AB SUDIRMAN CBD PROJECT WEST WAY TUNNEL SUMP PIT DETAILS 2/2 STA 1+083.130
274 310/297/ME/0002/AB/2 SUDIRMAN CBD PROJECT ON-SITE ROAD ROAD LIGHTING PLAN (STAGE II)
275 310/296/EL/0002/AB SUDIRMAN CBD PROJECT ON-SITE ROAD (STAGE1) ROAD LIGHTING PLAN 2/2
PERIODE 6

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


276 310/615/EL/0001A/AB SUDIRMAN CBD PROJECT SERVICE DUCT LIGHTING DETAIL CH.369.80 -- CH.533.90
277 310/615/CI/0014/AB/1 SUDIRMAN CBD PROJECT POWER CABLE MANHOLE TYPE-A PLAN & SECTION
278 310/350/CI/0018/AB SUDIRMAN CBD PROJECT STORMWATER CATCHBASIN DETAILS 1/2
279 310/615/CI/0015/AB/1 SUDIRMAN CBD PROJECT POWER CABLE MANHOLE TYPE-B PLAN & SECTION
280 310/615/CI/0013/AB SUDIRMAN CBD PROJECT MANHOLE TELCOM TYPE A PLAN AND SECTION
281 310/615/ST/0002/AB/1 SUDIRMAN CBD PROJECT CABLE DUCT STANDARD SECTION STRUCTURAL DETAILS
282 310/615/CI/0022-A/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH CONNECTION NO.19 STA 0+531.800 (EASTWAY) PLAN AND SECTION
283 310/615/ST/0013/AB SUDIRMAN CBD PROJECT SERVICE DUCT AIR VENTILATION HOLE NO.4 STA 0+449.000 (EASTWAY) PLAN, SECTION & DETAILS
284 310/615/CI/0022-B/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH CONNECTION NO.20 STA 0+484.000 (EASTWAY) PLAN AND SECTION
285 310/615/CI/0022/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH CONNECTION NO.22 STA 0+369.800 (EASTWAY) PLAN AND SECTION
286 310/410/CI/0005/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NET WORK SENOPATI LINK 1 PLAN AND PROFILE STAGE 1 STA 0+064 N.N LINK TO STA 1+206 SOUTHWAY
287 COVER SUDIRMAN CENTRAL BUSINES
SERVICE DUCT AND CABLE DUCT
288 - SUDIRMAN CBD PROJECT SERVICE DUCT AND CABLE DUCT LIST OF DRAWINGS
289 310/410/CI/0001/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK N-S LINK, PLAN & PROFILE
290 ST/310/307/ST/0004 SUDIRMAN CBD PROJECT PLAN REINFORCEMENT BARS OF CONFUELENCE PORTION
291 310/410/CI/0020/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK LOT CONNECTION OF WESTWAY CROSS SECTION
292 310/615/ST/0007/AB SUDIRMAN CBD PROJECT POWER CABLE DUCT TYPE A STRUCTURAL DETAILS
293 310/410/CI/0019/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK LOT CONNECTION OF WESTWAY CROSS SECTION
294 310/615/ST/0008/AB SUDIRMAN CBD PROJECT POWER CABLE MANHOLE TYPE-B STRUCTURAL DETAILS
295 - SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK OF WESTWAY STA 0+756.500 EASTWAY STA 1+038.500 N-S LINK STA 0+100.00
296 310/615/ST/0009/AB SUDIRMAN CBD PROJECT POWER CABLE MANHOLE TYPE-C PLAN, SECTION & STRUCTURAL DETAILS
297 310/410/CI/0008/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORKE ASTWAY (2) AND ACCESS ROAD PLAN AND PROFILE STAGE. I 2/2
298 310/615/ST/0007-A/AB SUDIRMAN CBD PROJECT MANHOLE TELCOM TYPE A STRUCTURAL DETAILS
299 310/410/CI/0017/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK LOT CONNECTION OF R-IN CROSS SECTION
300 310/615/ST/0011/AB SUDIRMAN CBD PROJECT TELECOMMUNICATION CABLE MANHOLE TYPE B STRUCTURAL DETAILS
301 310/615/ST/0012/AB SUDIRMAN CBD PROJECT TELCOM CABEL MANHOLE TYPE-C STRUCTURAL DETAILS
302 310/410/CI/0018/AB/1 SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK LOT CONNECTION OF EASTWAY CROSS SECTION
303 310/615/CI/0007/AB SUDIRMAN CBD PROJECT SERVICE DUCT STANDARD SECTIONS
304 310/615/ST/0003-A/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH CONNECTION NO.19 STA 0+531.800 (EASTWAY) STRUCTURAL DETAILS
305 310/615/CI/0009/AB SUDIRMAN CBD PROJECT POWER CABLE DUCT STANDARD SECTION
306 310/615/CI/0008/AB SUDIRMAN CBD PROJECT TELECOMUNICATION CABLE DUCT STANDARD SECTION
307 310/615/ST/0003-B/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH CONNECTION NO.20 STA 0+484.000 (EASTWAY) STRUCTURAL DETAILS
308 310/615/ST/0003/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH CONNECTION NO.22 STA 0+369.800 (EASTWAY) STRUCTURAL DETAILS
309 COVER SUDIRMAN CENTRAL BUSINES
SUDIRMAN UNDERPASS R-IN TUNNEL
310 COVER SUDIRMAN CENTRAL BUSINESTORM WATER DRAINAGE
311 310/615/ST/0001/AB/1 SUDIRMAN CBD PROJECT SERVICE DUCT STANDARD SECTIONS & STRUCTURAL-DETAILS FOR TYPE B AND TYPE C
312 310/271/CI/0002/AB SUDIRMAN CBD PROJECT ON-SITE ROAD (STAGE 1) DRAINAGE LAYOUT 2
313 310/415/CI/0001/AB SUDIRMAN CBD PROJECT WATER SUPPLY CONNECTION PIPE SUDIRMAN CONNECTION PLAN AND PROFILE
314 COVER SUDIRMAN CENTRAL BUSINEWATER DISTRIBUTION PIPE NETWORK
315 - SUDIRMAN CBD PROJECT WATER DISTRIBUTION PIPE NETWORK (STAGE 1) LIST OF DRAWINGS
316 310/321/CI/0002/AB SUDIRMAN CBD PROJECT PLAN AND PROFILE OF CIRAGIL DIVERSION CULVERT (2/2) STA 0+600.000 TO ST 1+143.656
317 310/410/CI/0003/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK SUDIRMAN MAIN ENTRANCE PLAN AND PROFILE STAGE 1
318 310/410/CI/0002/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK SOUTHWAY PLAN AND PROFILE 2/2 STAGE 1
319 310/410/CI/0014/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK VALVE CHAMBER DETAILS
320 310/615/CI/0025/AB/1 SUDIRMAN CBD PROJECT CROSS SECTION TELECOM CABLE DUCT OF WESTWAY STA 1+147.000 & STA 0+969.500
321 310/615/EL/0001/AB SUDIRMAN CBD PROJECT SERVICE DUCT CABLE DUCT LAY OUT OF FIRE ALARM CH.533.90 -- CH.369.80
322 310/410/ST/0002/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK REINFORCEMENT BAR ARRANGEMENT (2)
323 310/350/CI/0016/AB SUDIRMAN CBD PROJECT STORMWATER INLET AND LATERALS
324 310/615/CI/0019/AB SUDIRMAN CBD PROJECT TELECOMMUNICATION CABLE - MANHOLE TYPE B
325 310/615/CI/0020/AB SUDIRMAN CBD PROJECT TELECOMMUNICATION CABLE - MANHOLE TYPE C
326 310/350/GE/0002/AB SUDIRMAN CBD PROJECT GENERAL LAY OUT OF STORM WATER DRAINAGE SYSTEM
327 310/350/GE/0003/AB SUDIRMAN CBD PROJECT LAYOUT OF CATCH BASIN (STAGE1)
328 310/615/ST/016/AB SUDIRMAN CBD PROJECT SERVICE DUCT AIR VENTILATION HOLE NO.2 CH.45.00 (Sub station)
329 310/212/ST/0003/AB SUDIRMAN CBD PROJECT TEMPORARY STRUCTURE STONE MASONRY STA 0+293.109 R - 0UT
330 310/212/ST/0004/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN STRUCTURE LAYOUT
PERIODE 7

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


331 310/212/ST/0009B/AB SUDIRMAN CBD PROJECT R-OUT TUNNEL CEILING GRC PLAN, SECTION & DETAIL STA 0+261.609 TO STA 0+291.609
332 310/212/ST/0009A/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS DETAIL OF TOPPING (FRAME)R-OUT TUNNEL STA 0+261.609 - 0+291.609
333 310/212/ST/0006B/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE A2 R-OUT TUNNEL STA 0+215.000 TO STA 0+227054
334 310/212ST/0008A1/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILSTYPE A2 R-OUT TUNNEL STA 0+261.609 TO STA 0+276.609
335 310/212/ST/0008A2/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE B2 R-OUT TUNNEL STA 0+276.609 TO STA 0+291.609
336 310/212/ST/0005/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE A1 R-OUT TUNNEL STA 0+185.000 TO STA 0+215.000
337 310/212/ST/0006A/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE A2 R-OUT TUNNEL STA 0+227.054 TO STA 0+239.109 STA 0+249.109 TO STA 0261.609
338 310/212/ST/0013/AB SUDIRMAN CBD PROJECT TEMPORARY STRUCTURE STONE MASONRY STA 0+29.109 R-OUT
339 310/212/ST/0010/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE PROFILE (2/2)R-OUT TUNNEL STA 0+100.000 TO STA 0+291.609
340 310/212/ST/0002/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE LAYOUT (1/2) R-OUT TUNNEL STA 0+100.000 TO STA 0+261.609
341 COVER SUDIRMAN CENTRAL BUSINESERVICE DUCT & CABLE DUCT
342 - SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT LIST OF DRAWING
343 310/615/CI/00007/AB SUDIRMAN CBD PROJECT SERVICE DUCT STANDARD SECTION
344 310/350/CI/0002/AB SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE
345 310/350/CI/0006/AB SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE STA 0+668 NORTHWAY STA 0+058 - 0+099 R-OUT STA 0+950 - 1.040 L OUT
346 310/350/CI/0009/AB SUDIRMAN CBD PROJECT STORM WATER PLAIN DETAILS SUDIRMAN MAIN ENTRANCE LEFT IN, SUDIRMAN MAIN ENTRANCE LEFT OUT
347 - SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN LIST OF DRAWINGS
348 310/212/ST/0001/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE LAYOUT R-IN STA 0+410.000 TO 0+620.000
349 310/212/GE/0002/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS ALIGNMENT PLAN
350 310/212/ST/0003/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE PROFILE R-IN STA 0+410.000 TO STA 0+620.000
351 310/212/ST/0004/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN TUNNEL STRUCTURAL DETAILS TYPE A1 STA 0+410.000 TO STA 0+520.000
352 310/212/ST/0005/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN TUNNEL STRUCTURAL DETAILS TYPE U1 STA 0+510.000 TO STA 0+552.100
353 - SUDIRMAN CBD PROJECT RIVER DIVERSION CULVERT LIST OF DRAWINGS
354 310/212/ST/0008-A/AB SUDIRMAN CBD PROJECT OUTLET OF CIRAGIL CULVERT (2/4) TYPE A STA 0+000
355 310/321/CI/0008/AB SUDIRMAN CBD PROJECT OUTLET OF CIRAGIL CULVERT (1/4) TYPE A STA 0+000 PLAN AND SECTION
356 310/321/ST/0008-B/AB SUDIRMAN CBD PROJECT OUTLET OF CIRAGIL CULVERT (3/4) TYPE A STA 0+000
357 310/321/ST/0008-C/AB SUDIRMAN CBD PROJECT OUTLET OF CIRAGIL CULVERT (4/4) TYPE A STA 0+000
358 310/321/CI/0010/AB SUDIRMAN CBD PROJECT MANHOLE DETAILS OF RIVER-DIVERSION CULVERT
359 310/321/CI/0010/AB SUDIRMAN CBD PROJECT MANHOLE W/ STEP IRONS DETAILS AND TABLE
360 310/350/CI/0022/AB SUDIRMAN CBD PROJECT TABLE OF CONNECTION TYPE WITH RIVER DIVERSION CULVERT
361 310/307/CI/0001 SUDIRMAN CBD PROJECT PLAN AND COVER OF CULVERT
362 310/296/EL/0006/AB SUDIRMAN CBD PROJECT LIGHTING POLE & PANEL FOUNDATION
363 D/TUN/S/0001 SUDIRMAN CBD PROJECT HORIZONTAL ALIGNMENT PLAN
364 310/321/ST/0002/AB SUDIRMAN CBD PROJECT STRUCTURAL DETAILS CULVERT TYPE B
365 310/615/CI/0010/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT SE INTERSECTION PLAN AND SECTIONS
366 310/615/0012/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT TELECOMMUNICATION CABLE MANHOLE TYPE-C STRUCTURAL DETAILS
367 310/615/CI/0020/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT TELECOMMUNICATION CABLE MANHOLE TYPE-C
368 310/615/CI/0024/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT DRAINAGE PIT DETAILS STA 0+855.150
369 310/615/ST/0001/AB SUDIRMAN CBD PROJECT SERVICE DUCT-STANDARD SECTIONS STRUCTURAL DETAILS
370 310/615/ST/0002/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT CABLE DUCT STANDARD SECTION STRUCTURAL DETAILS
371 310/615/ST/0003/AB SUDIRMAN CBD PROJECT N.E INTERSECTION STA 0+99.00 STRUCTURAL DETAILS
372 310/615/ST/0003-1/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO.18 STA 0+797 STRUCTURAL DETAILS 1/2
373 310/615/ST/0003-2/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO.18 STA 0+797 STRUCTURAL DETAILS 2/2
374 310/615/ST/0004-1/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT SE INTERSECTION STRUCTURAL DETAILS 1/2
375 310/615/ST/0004-2/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT SE INTERSECTION STRUCTURAL DETAILS 2/2
376 310/615/ST/0006/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT DRAINAGE PIT STA 0+855.150 STRUCTURAL DETAILS
377 310/615/ST/0008/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT POWER CABLE MAINHOLE TYPE-B STRUCTURAL DETAILS (TYPICAL)
378 310/615/ST/0009/AB SUDIRMAN CBD PROJECT POWER CABLE MAINHOLE TYPE C PLAN, SECTION & STRUCTURAL DETAILS
379 310/615/ST/0014/AB SUDIRMAN CBD PROJECT SERVICE DUCT CABLE NO.17 STA 0+814.400 STRUCTURAL DETAILS
380 310/615/ST/0014-A/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO.19P STA 0+726 (EASTWAY) STRUCTURAL DETAILS
381 310/615/CI/0013/AB SUDIRMAN CBD PROJECT CROSS SECTION POWER CABLE DUCT OF EASTWAY STA 1+117 & STA 0+484.00
382 310/615/GE/0004-A/AB SUDIRMAN CBD PROJECT POWER CABLE DUCT CROSS SECTION STA 0+620 (R-IN) STA 0+865.500 (SOUTHWAY)
383 310/615/GE/0005-A/AB SUDIRMAN CBD PROJECT CROSS SECTION OF TELECOM.CABLE DUCT STA 0+862.000 SOUTHWAY STA 0+827.500 SOUTHWAY STA0+817.000 NORTHWAY
384 310/615/ci/0002/AB SUDIRMAN CBD PROJECT CABLE DUCT PLAN & PROFILE (2/3) STA 0+917.500~1+010 (L-OUT) STA 0+20~0+800 (SOUTHWAY)
385 310/307/ST/OOO3 SUDIRMAN CBD PROJECT PLAN AND SECTION DETAILS CONFLUENCE PORTION
PERIODE 7

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


331 310/212/ST/0009B/AB SUDIRMAN CBD PROJECT R-OUT TUNNEL CEILING GRC PLAN, SECTION & DETAIL STA 0+261.609 TO STA 0+291.609
332 310/212/ST/0009A/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS DETAIL OF TOPPING (FRAME)R-OUT TUNNEL STA 0+261.609 - 0+291.609
333 310/212/ST/0006B/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE A2 R-OUT TUNNEL STA 0+215.000 TO STA 0+227054
334 310/212ST/0008A1/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILSTYPE A2 R-OUT TUNNEL STA 0+261.609 TO STA 0+276.609
335 310/212/ST/0008A2/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE B2 R-OUT TUNNEL STA 0+276.609 TO STA 0+291.609
336 310/212/ST/0005/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE A1 R-OUT TUNNEL STA 0+185.000 TO STA 0+215.000
337 310/212/ST/0006A/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURAL DETAILS TYPE A2 R-OUT TUNNEL STA 0+227.054 TO STA 0+239.109 STA 0+249.109 TO STA 0261.609
338 310/212/ST/0013/AB SUDIRMAN CBD PROJECT TEMPORARY STRUCTURE STONE MASONRY STA 0+29.109 R-OUT
339 310/212/ST/0010/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE PROFILE (2/2)R-OUT TUNNEL STA 0+100.000 TO STA 0+291.609
340 310/212/ST/0002/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE LAYOUT (1/2) R-OUT TUNNEL STA 0+100.000 TO STA 0+261.609
341 COVER SUDIRMAN CENTRAL BUSINESERVICE DUCT & CABLE DUCT
342 - SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT LIST OF DRAWING
343 310/615/CI/00007/AB SUDIRMAN CBD PROJECT SERVICE DUCT STANDARD SECTION
344 310/350/CI/0002/AB SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE
345 310/350/CI/0006/AB SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE STA 0+668 NORTHWAY STA 0+058 - 0+099 R-OUT STA 0+950 - 1.040 L OUT
346 310/350/CI/0009/AB SUDIRMAN CBD PROJECT STORM WATER PLAIN DETAILS SUDIRMAN MAIN ENTRANCE LEFT IN, SUDIRMAN MAIN ENTRANCE LEFT OUT
347 - SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN LIST OF DRAWINGS
348 310/212/ST/0001/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE LAYOUT R-IN STA 0+410.000 TO 0+620.000
349 310/212/GE/0002/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS ALIGNMENT PLAN
350 310/212/ST/0003/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE PROFILE R-IN STA 0+410.000 TO STA 0+620.000
351 310/212/ST/0004/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN TUNNEL STRUCTURAL DETAILS TYPE A1 STA 0+410.000 TO STA 0+520.000
352 310/212/ST/0005/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS R-IN TUNNEL STRUCTURAL DETAILS TYPE U1 STA 0+510.000 TO STA 0+552.100
353 - SUDIRMAN CBD PROJECT RIVER DIVERSION CULVERT LIST OF DRAWINGS
354 310/212/ST/0008-A/AB SUDIRMAN CBD PROJECT OUTLET OF CIRAGIL CULVERT (2/4) TYPE A STA 0+000
355 310/321/CI/0008/AB SUDIRMAN CBD PROJECT OUTLET OF CIRAGIL CULVERT (1/4) TYPE A STA 0+000 PLAN AND SECTION
356 310/321/ST/0008-B/AB SUDIRMAN CBD PROJECT OUTLET OF CIRAGIL CULVERT (3/4) TYPE A STA 0+000
357 310/321/ST/0008-C/AB SUDIRMAN CBD PROJECT OUTLET OF CIRAGIL CULVERT (4/4) TYPE A STA 0+000
358 310/321/CI/0010/AB SUDIRMAN CBD PROJECT MANHOLE DETAILS OF RIVER-DIVERSION CULVERT
359 310/321/CI/0010/AB SUDIRMAN CBD PROJECT MANHOLE W/ STEP IRONS DETAILS AND TABLE
360 310/350/CI/0022/AB SUDIRMAN CBD PROJECT TABLE OF CONNECTION TYPE WITH RIVER DIVERSION CULVERT
361 310/307/CI/0001 SUDIRMAN CBD PROJECT PLAN AND COVER OF CULVERT
362 310/296/EL/0006/AB SUDIRMAN CBD PROJECT LIGHTING POLE & PANEL FOUNDATION
363 D/TUN/S/0001 SUDIRMAN CBD PROJECT HORIZONTAL ALIGNMENT PLAN
364 310/321/ST/0002/AB SUDIRMAN CBD PROJECT STRUCTURAL DETAILS CULVERT TYPE B
365 310/615/CI/0010/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT SE INTERSECTION PLAN AND SECTIONS
366 310/615/0012/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT TELECOMMUNICATION CABLE MANHOLE TYPE-C STRUCTURAL DETAILS
367 310/615/CI/0020/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT TELECOMMUNICATION CABLE MANHOLE TYPE-C
368 310/615/CI/0024/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT DRAINAGE PIT DETAILS STA 0+855.150
369 310/615/ST/0001/AB SUDIRMAN CBD PROJECT SERVICE DUCT-STANDARD SECTIONS STRUCTURAL DETAILS
370 310/615/ST/0002/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT CABLE DUCT STANDARD SECTION STRUCTURAL DETAILS
371 310/615/ST/0003/AB SUDIRMAN CBD PROJECT N.E INTERSECTION STA 0+99.00 STRUCTURAL DETAILS
372 310/615/ST/0003-1/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO.18 STA 0+797 STRUCTURAL DETAILS 1/2
373 310/615/ST/0003-2/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO.18 STA 0+797 STRUCTURAL DETAILS 2/2
374 310/615/ST/0004-1/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT SE INTERSECTION STRUCTURAL DETAILS 1/2
375 310/615/ST/0004-2/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT SE INTERSECTION STRUCTURAL DETAILS 2/2
376 310/615/ST/0006/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT DRAINAGE PIT STA 0+855.150 STRUCTURAL DETAILS
377 310/615/ST/0008/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT POWER CABLE MAINHOLE TYPE-B STRUCTURAL DETAILS (TYPICAL)
378 310/615/ST/0009/AB SUDIRMAN CBD PROJECT POWER CABLE MAINHOLE TYPE C PLAN, SECTION & STRUCTURAL DETAILS
379 310/615/ST/0014/AB SUDIRMAN CBD PROJECT SERVICE DUCT CABLE NO.17 STA 0+814.400 STRUCTURAL DETAILS
380 310/615/ST/0014-A/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO.19P STA 0+726 (EASTWAY) STRUCTURAL DETAILS
381 310/615/CI/0013/AB SUDIRMAN CBD PROJECT CROSS SECTION POWER CABLE DUCT OF EASTWAY STA 1+117 & STA 0+484.00
382 310/615/GE/0004-A/AB SUDIRMAN CBD PROJECT POWER CABLE DUCT CROSS SECTION STA 0+620 (R-IN) STA 0+865.500 (SOUTHWAY)
383 310/615/GE/0005-A/AB SUDIRMAN CBD PROJECT CROSS SECTION OF TELECOM.CABLE DUCT STA 0+862.000 SOUTHWAY STA 0+827.500 SOUTHWAY STA0+817.000 NORTHWAY
384 310/615/ci/0002/AB SUDIRMAN CBD PROJECT CABLE DUCT PLAN & PROFILE (2/3) STA 0+917.500~1+010 (L-OUT) STA 0+20~0+800 (SOUTHWAY)
385 310/307/ST/OOO3 SUDIRMAN CBD PROJECT PLAN AND SECTION DETAILS CONFLUENCE PORTION
PERIODE 8

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


386 310/615/CI/0001/AB SUDIRMAN CBD PROJECT CABLE DUCT PLAN & PROFILE (1/3) STA 0+656,500 ~ 0+817 (NORTHWAY)
387 310/615/GE/0002/AB SUDIRMAN CBD PROJECT TELECOMMNICATION CABLE DUCT OF N-S LINK PLAN AND PROFILE STA 0+32 ~ STA 0+297
388 310/615/CI/0002-A/AB SUDIRMAN CBD PROJECT CROSS SECTION TELCOM CABLE DUCT NORTHWAY STA 0+336,50 N-S LINK STA 0+091.50
389 310/615/ST/0015/AB SUDIRMAN CBD PROJECT POWER CABLE MANHOLE TYPE B
390 310/615/EL/0001/AB SUDIRMAN CBD PROJECT SERVICE DUCT LIGHTING DETAILS
391 310/615/EL/0001-A/AB SUDIRMAN CBD PROJECT SERVICE DUCT CABLE DUCT LAYOUT OF FIRE ALARM
392 310/615/CI/0002/AB 1 SUDIRMAN CBD PROJECT CROSS SECTION TELECOM CABLE DUCT OF WESTWAY STA 0+894.306 & STA 0+732.250
393 310/615/GE/0005-B/AB SUDIRMAN CBD PROJECT CROSS SECTION TELECOM CABLE DUCT STA 1+110.000 SOUTH WAY STA 0+732.500 NORTH WAY
394 310/615/CI/0026/AB SUDIRMAN CBD PROJECT CROSS SECTION POWER CABLE DUCT OF NORTHWAY STA 0+340.00 N-S LINK STA 0+84.500 N-S LINK STA 0+145.000
395 310/615/GE/0004-B/AB SUDIRMAN CBD PROJECT CROSS SECTION OF POWER CABLE DUCT STA 1+097.500 (SOUTHWAY) STA 0+247 (NORTHWAY)
396 310/615/GE/0005-C/AB SUDIRMAN CBD PROJECT CABLE DUCT CROSS SECTION STA 0+239.500 (NORTHAWAY) T.CABLE MH NO.12
397 310/615/GE/0004/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT ARRANGEMENT OF POWER CABLE
398 310/615/GE/0026/AB 1 SUDIRMAN CBD PROJECT TELECOMMUNICATION C.DUCT PLAN AND PROFILE OF NORTH WAY CH 336.5 ~ CH 645.5
399 310/615/CI/0003/AB SUDIRMAN CBD PROJECT CABLE DUCT PLAN & PLAN PROFILE (3/3) STA 0+800 - 1 + 159.296 ( SOUTHWA ) STA 0+239.500 - 0+247 (NORTHWAY)
400 310/615/GE/0005/AB SUDIRMAN CBD PROJECT ARRANGEMENT OF TELECOMUNICATION CABLES
401 310/615/GE/0005/AB 1 SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT ARRANGEMENT OF TELECOMMUNICATION CABLE DUCT
402 310/410/CI/0013/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK PIPE CONNECTION TO FIRE HYDRANT
403 310/410/CI/0021/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORKS CONNECTION TO LOT OF NORTHWAY CROSS SECTION
404 310/410/CI/0011-B/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK LOT CONNECTION PIPE STA 1+101.000 SOUTH & STA 0+250.000 NORTH
405 310/410/CI/0012-A/AB SUDIRMAN CBD PROJECT WATER SUPPLY PLAN AND PROFILE OF NORTHWAY STA 0+281.131 TO STA 0+617
406 310/615/CI/017/AB 1 SUDIRMAN CBD PROJECT WATER SUPPLY OF NORTHWAY STA 0+281.131 TO STA 0+617
407 310/615/ST/017/AB SUDIRMAN CBD PROJECT SERVICE DUCT AIR VENTILATION HOLE NO.1 CH 4.60 (S S LINK)
408 310/350/CI/0011/AB SUDIRMAN CBD PROJECT STORM WATER PLAN DETAILS SOUTHWAY STA 0+680-STA 1+015.121 EASTWAY STA 0+691.699 - STA 0+900
409 310/307/ST/0007 SOUTHWAY SUDIRMAN CENTR
PEDESTRIAN LINK, CARLINK POSITION TO B.A.G AND DETAILS LOT 25-LOT 5 (PEDESTRIAN LINK) LOT 25-LOT 24 (CAR LINK)
410 310/307/ST/0005 SOUTHWAY SUDIRMAN CENTR
STRUCTURAL DETAIL
411 310/307/ST/0006 SOUTHWAY SUDIRMAN CENTR
PLAN, SECTION & DIAGRAM REINFORCEMENT CARLINK (LOT 25 <---> LOT 24)
412 310/307/ST/0008 SOUTHWAY SUDIRMAN CENTR
CARLINK DETAILS (LOT 25 TO LOT 24)
413 COVER SUDIRMAN CBD PROJECT ###
414 - SUDIRMAN CBD PROJECT WEST WAY TUNNEL - UNDERPASS LIST OF DRAWING
415 COVER SUDIRMAN CBD PROJECT ###
416 - SUDIRMAN CBD PROJECT STORM WATER DRAINAGE LIST OF DRAWING
417 - SUDIRMAN CBD PROJECT STORM WATER DRAINAGE LIST OF DRAWING
418 310/350/CI/0024/AB SUDIRMAN CBD PROJECT STROM WATER PLAN & PROFILE OF DRAINAGE FOR LOT 11
419 310/350/CI/0027/AB 1 SUDIRMAN CBD PROJECT STROM WATER PLAN AND PROFILE OF EASTWAY STA 0+0551.80 TO STA 0+675
420 310/350/CI/0001/AB SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE STA 0+000 - 0+051 N.S LINK STA 0+620 - 0+722 SOUTHWAY
421 310/350/CI/0022/AB SUDIRMAN CBD PROJECT STORM WAR=TER TABLE OF CONNECTION TYPE WITH RIVER DIVERSION CULVERT
422 310/350/GE/0005/AB SUDIRMAN CBD PROJECT STORM WATER DIMENSION OF MANHOLE & CATCH BASIN
423 310/350/CI/0020/AB SUDIRMAN CBD PROJECT STORM WATER OUTLET PIPE AND ROAD CROSSING
424 310/350/CI/0012/AB SUDIRMAN CBD PROJECT STORM WATER PLAN DETAILS SOUTHWAY STA 0+680.00-STA 0+800 EASTWAY STA 0+773.121 - STA 1+000
425 310/615/GE/0004/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT ARRANGEMENT OF POWER CABLE
426 310/350/CI/0013/AB SUDIRMAN CBD PROJECT STORM WATER PLAN DETAILS SOUTHWAY STA 1+015.121-STA 1+337.209 NORTHWAY STA 0+0.000 - STA 0+281.131
427 310/350/CI/0016/AB SUDIRMAN CBD PROJECT STORM WATER INLET AND LATERALS
428 310/615/CI/0022-C/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO 17 STA 0+814.400 PLAN AND SECTIONS
429 310/615/CI/0022-B/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO 19 STA 0+726 (EASTWAY) PLAN AND SECTIONS
430 310/615/CI/0022/AB SUDIRMAN CBD PROJECT SERVICE DUCT BRANCH NO 18 STA 0+797 EASTWAY PLAN AND SECTION
431 310/615/CI/0011/AB SUDIRMAN CBD PROJECT SERVICE DUCT & CABLE DUCT N E INTERSECTION STA 0+699 PLAN AND SECTIONS
432 310/271/CI/0001/AB SUDIRMAN CBD PROJECT ON-SITE ROAD ( STAGE 1 ) DRAINAGE LAYOUT 1
433 310/350/CI/0008/AB SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE EASTWAY
434 310/410/CI/0004/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK. NORTHWAY PLAN AND PROFILE STAGE 1
435 310/410/CI/0007/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK EASTWAY PLAN AND PROFILE STAGE 1 1/2
436 310/410/CI/0001/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK SOUTHWAY PLAN AND PROFILE 1/2 STAGE 1
437 310/350/CI/0026/AB SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE OF NORTHWAY
438 310/350/CI/0020/AB SUDIRMAN CBD PROJECT STORM WATER OUTLET PIPE AND ROAD CROSSING
439 310/410/CI/0016/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK EASTWAY, CHANDRA LINK PLAN & PROFILE STA 0+990 TO STA 1+210
440 310/212/ST/0005/AB SUDIRMAN CBD PROJECT SUDIRMAN UNDERPAS R-IN STRUCTURE PROFILE
PERIODE 9

No. No. Gambar Tertera Rev Nama Proyek Judul Gambar


441 310/400/GE/0002/AB SUDIRMAN CBD PROJECT WATER SUPPLY GENERAL LAY OUT STAGE I
442 310/410/CI/0006/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK OF EAST PLAN & PROFILE STA0+339 TO STA 0+565
443 310/400/GE/0001/AB SUDIRMAN CBD PROJECT WATER SUPPLY GENERAL LAY OUT
444 310/350/CI/0029/AB 1 SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE OF WESTWAY
445 310/350/CI/0028/AB 1 SUDIRMAN CBD PROJECT STORM WATER PLAN AND PROFILE OF EASTWAY
446 310/350/CI/0019/AB SUDIRMAN CBD PROJECT STORM WATER CATCHBASIN DETAILS (2/2)
447 310/615/GE/0025/AB SUDIRMAN CBD PROJECT CABLE DUCT (STAGE II) OF WESTWAY PLAN AND PROFILE CH 1147 - CH 732.250
448 310/410/CI/0011-A/AB SUDIRMAN CBD PROJECT WATER SUPPLY DISTRIBUTION PIPE NETWORK LOT CONN PIPE D200 STA 0+801, BRANCH PIPE D 250 TO WESTWAY STA 0+893 SOUTHWAY
449 310/410/CI/0015/AB 1 SUDIRMAN CBD PROJECT WATER SUPPLY PLAN AND PROFILE OF WESTWAY
450 310/350/GE/0001/AB 1 SUDIRMAN CBD PROJECT GENERAL LAYOUT OF STORM WATER DRAINAGE SYSTEM
451 COVER SUDIRMAN CBD PROJECT STAGE II INFRASTRUCTURE ON SITE ROAD
452 LIST OF DRAWING SUDIRMAN CBD PROJECT STAGE II INFRASTRUCTURE ON SITE ROAD
453 310/200/GE/0002/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) ALIGNMENT PLAN
454 2002-08 PLT SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II PAVEMENT LAYOUT 2/4
455 310/271/CI/0003/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) DRAINAGE LAYOUT EASTWAY
456 2000-08PLT SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II PAVEMENT LAYOUT 3/4
457 2000-07 PLT SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II PAVEMENT LAYOUT 4/4
458 310/211/CI/0004/AB SUDIRMAN CBD PROJECT PLAN OF SUDIRMAN MAIN ENTERANCE - L - IN STA 0+180.000 - STA 0+ 409.819 N-S ;INK STA 0+060.00 - STA 0+285.329
459 310/274/CI/0005/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) PAVEMENT LAY OUT & ELEVATION
460 2000-36PLT 2000-37PLT SUDIRMAN CBD PROJECT ON SITE ROAD PROFILE OF : - EAST WAY CH. 300 - CH. 70673 - WEST WAY CH.1077.75 - CH.1621.66
461 310/211/CI/0005-A/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) PROFILE OF : - L-IN STA 0+180.000 TO STA 0+409.819, - N-S LINK 0 + 060.000 TO STA 0+285.329, - R-IN STA 0+410.000 TO STA 0+620.0
462 310/030/CI/0015-A/AB SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II CROSS SECTION OF NORTH WAY CH. 550.00 TO CH 640.00
463 310/030/CI/0015/AB SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II CROSS SECTION OF NORTH WAY CH. 281.131 TO CH 500.00
464 310/030/CI/0011/AB SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II CROSS SECTION OF EAST WAY CH 550.00 - CH 650.00
465 310/030/CI/0013/AB SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II CROSS SECTION OF EAST WAY CH. 1000-CH 1125
466 310/030/CI/0014/AB SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II CROSS SECTION OF WEST WAY CH 868.612 TO CH 893.612
467 310/030/CI/0014A/AB SUDIRMAN CBD PROJECT ON SITE ROAD STAGE II CROSS SECTION OF WEST WAY CH 750.00 - CH 850.00
468 310/030/CI/0014-B/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) CROSS SECTION OF WEST WAY CH 625.00 - CH 700.00
469 310/244/CI/0007B/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) CROSS SECTION OF L-IN STA 0+275.000 TO STA 0+300.000
470 310/244/CI/0007C/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) CROSS SECTION OF L-N STA 0+325.000 TO STA 0+350.000
471 310/244/CI/0007D/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) CROSS SECTION OF L-IN STA 0+400.000 TO STA 0+409.819
472 310/244/CI/0007/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) CROSS SECTION OF L-IN STA 0+200.000 TO STA 0+250.000
473 310/030/CI/0010/AB 1 SUDIRMAN CBD PROJECT ON SITE ROAD (STAGE II ) CROSS SECTION OF EASTWAY CH 350.00 - CH 500.00
474 310/274/CI/0004/AB SUDIRMAN CBD PROJECT ON SITE ROAD ( STAGE II ) PAVEMENT DETAIL
475 310/296/EL/0005/AB SUDIRMAN CBD PROJECT LIGHTING POLE & PANEL - FOUNDATION
476 310/297/ME/0001/AB SUDIRMAN CBD PROJECT LAY OUT OF DP CABLE AT CONTROL BUILDING TO DP 11, DP 15, DP 20 & 30
477 310/289/ST/0008/AB 1 SUDIRMAN CBD PROJECT LOT 6 - LOT 9 CAR PARKING LINK STA 0+575.000 (NORTHWAY) STRUCTURAL DETAILS 1/3
478 310/289/ST/0008-A/AB SUDIRMAN CBD PROJECT LOT 6 - LOT 9 CAR PARKING LINK STA 0+575 NORTHWAY STRUCTURAL DETAILS 2/3
479 310/298/ST/0008-B/AB SUDIRMAN CBD PROJECT LOT 6 - LOT 9 CAR PARKING LINK STA 0+575.000 (NORTHWAY) STRUCTURAL DETAILS 3/3
480 310/289/CI/0002/AB SUDIRMAN CBD PROJECT TEMPORARY STRUCTURE FOR CAR PARKING LINK ( FOR ALL TYPES )
481 310/289/ST/0009/AB SUDIRMAN CBD PROJECT LOT 8 LOT 10 CAR PARKING LINK STA 0+400.000 (NORTHWAY) STRUCTURAL DETAILS 1/3
482 310/289/ST/0009-A/AB SUDIRMAN CBD PROJECT LOT 8 LOT 10 CAR PARKING LINK STA 0+400.000 (NORTHWAY) STRUCTURAL DETAILS 2/3
483 310/289/ST/0009-B/AB SUDIRMAN CBD PROJECT LOT 8 LOT 10 CAR PARKING LINK STA 0+400.000 (NORTHWAY) STRUCTURAL DETAILS 3/3
484 310/289/ST/0007/AB 1 SUDIRMAN CBD PROJECT LOT 22 - LOT 23 CAR PARKING LINK STA 1+024.000 (EASTWAY) STRUCTURAL DETAILS 1/3
485 310/289/ST/0007-A/AB SUDIRMAN CBD PROJECT LOT 22 - LOT 23 CAR PARKING LINK STA 1+024.000 (EASTWAY) STRUCTURAL DETAILS 2/3
486 310/289/ST/0007-B/AB SUDIRMAN CBD PROJECT LOT 22 - LOT 23 CAR PARKING LINK STA 1+024.000 (EASTWAY) STRUCTURAL DETAILS 3/3
487 310/289/ST/0006/AB 1 SUDIRMAN CBD PROJECT LOT 6 - LOT 7 CAR PARKING LINK STA 1+020.595 (WESTWAY) STRUCTURAL DETAILS
488 310/289/ST/0005/AB SUDIRMAN CBD PROJECT LOT 7 - LOT 10 CAR PARKING LINK STA 0+440.000 (NORTHWAY) STRUCTURAL DETAILS
489 310/289/ST/0005-A/AB SUDIRMAN CBD PROJECT LOT 7 - LOT 10 CAR PARKING LINK STA 0+440.000 (NORTHWAY) STRUCTURAL DETAILS 2/3
490 310/615/CI/0015-A/AB 1 SUDIRMAN CBD PROJECT CROSS SECTION POWER CABLE DUCT OF WESTWAY STA 0+780.250 & STA 0+960.500
491 310/615/CI/0015/AB 1 SUDIRMAN CBD PROJECT CROSS SECTION POWER CABLE DUCT OF WESTWAY STA 1+308 & STA 1+130.50
492 310/289/ST/0005-B/AB SUDIRMAN CBD PROJECT LOT 7 - LOT 10 CAR PARKING LINK STA 0+440.000 (NORTHWAY) STRUCTURAL DETAILS 3/3
493 310/271/CI/0001/AB SUDIRMAN CBD PROJECT ON SITE ROAD DRAINAGE LAYOUT OF L-IN & NS-LINK
494 310/271/CI/0002/AB SUDIRMAN CBD PROJECT ON SITE ROAD DRAINAGE LAYOUT OF NORTHWAY
495 310/212/ST/0008/AB TEMPORARY STRUCTURE SHEET PILES STA 0+293.000 R-IN
PERIODE 10
No. No. Gambar Tertera Rev Nama Proyek Judul Gambar
496 36-37 LAMPIRAN SURAT KEPUTUSAN GUBERNUR
497 NORMALISASI KALI KRUKUT PAKET 310.311
498 310/296/EL/0003/AB SUDIRMAN CBD PROJECT ON-SITE ROAD (STAGE I) ROAD LIGHTING PLAN 1/2
499 310/212/ST/0009/AB SUDIRMAN CBD PROJECT TEMPORARY STRUCTURE R-IN STA 0+300.00
500 310/212/ST/0007/AB 1 SUDIRMAN CBD PROJECT SUDIRMAN UNDERPASS STRUCTURE LAYOUT R-IN STA 0+410.000-0+620.000
501 310/615/C1/0007/AB SUDIRMAN CBD PROJECT SERVICE DUCT STANDARD SECTION
502 AD/310/202/AD/0001 CONTROL ROOM SUDIRMAN C LOCATION AND SITE PLAN
503 AD/310/202/AD/0002 CONTROL ROOM SUDIRMAN C BASEMENT, 1ST, 2ND, 3RD FLOOR PLAN
504 AD/310/202/AD/0005 CONTROL ROOM SUDIRMAN C SECTION STAIRS 1 AND 2
505 310/SH/001 SCBD SUDIRMAN SHORING SUDIRMAN BORED PILES (AS BUILD DRAWING)
506 310/308/ST/0004/AB 2 SUDIRMAN RIVER DIVERSIO M/S, MESSER BASE
507 310/271/C1/0005/AB SUDIRMAN CBD PROJECT ON-SITE ROAD DRAINAGE LAYOUT OF EASTWAY, NORTHWAY & WESTWAY
508 310/245/C1/0002/AB SUDIRMAN CBD PROJECT ON-SITE ROAD PROFILE OF : - EASTWAY CH. 1000 - CH. 1210, -WESTWAY CH. 945.43 - CH. 625, NORTHWAY CH. 250 - CH. 700
509 310/308/ST/0005/AB 2 SUDIRMAN CBD PROJECT BOX CULVERT STRUCTURAL DETAIL FOR REINFORCEMENT
510 310/308/ST/0006/AB 2 SUDIRMAN CBD PROJECT REINF. FOR JOINT WALL & EXISTING BORED PILE, PERIPHERAL HOLE FOR MANHOLE 1&2
511 310/308/ST/0007/AB 2 SUDIRMAN CBD PROJECT EXTENSION BOX CULVERT PLAN, SECTION & STRUCTURAL DETAIL FOR REINFORCEMENT
512 2000-09.PLT SUDIRMAN CBD PROJECT ON-SITE ROAD STAGE II PAVEMENT LAYOUT 1/4
513 310/271/C1/0004/AB SUDIRMAN CBD PROJECT ON-SITE ROAD DRAINAGE LAYOUT OF EASTWAY & WESTWAY
514 310/212/ST/0006/AB 1 SUDIRMAN CBD PROJECT STRUCTURE SUDIRMAN UNDERPASS STA 0+410.000 TO STA 0+620.000
515 310/308/ST/AB 2 SUDIRMAN CBD PROJECT EXTENSION BOX CULVERT STRUCTURAL DETAIL FOR REINF. ( SECTION&PLAN)
516 310/308/ST/0009/AB 2 SUDIRMAN CBD PROJECT EXTENTION BOX CULVERT MANHOLE FOR BOX CULVERT
517 310/308/ST/0010/AB 2 SUDIRMAN CBD PROJECT EXTENTION BOX CULVERT BAR BENDING DIMENSION & Q'TY
518 310/308/ST/0003/AB 2 SUDIRMAN CBD PROJECT TEMPORARY STRUCTURE PLAN SECTION

PERIODE 11
No. No. Gambar Tertera Rev Nama Proyek Judul Gambar
519 36/40 SUDIRMAN CBD PROJECT SURAT KEPUTUSAN GUBERNUR
520 35-36/38 SUDIRMAN CBD PROJECT SURAT KEPUTUSAN GUBERNUR
521 35-36/38 SUDIRMAN CBD PROJECT SURAT KEPUTUSAN GUBERNUR
522 36-36/35 SUDIRMAN CBD PROJECT SURAT KEPUTUSAN GUBERNUR
523 SUDIRMAN CBD PROJECT USULAN PERUBAHAN TRASE KALI CIRAGIL (PR 01 - PR2 )
524 D/9516-54/96 KAWASAN NIAGA TERPADU SLONGITUDINAL SECTION
525 310/SH/002 SUDIRMAN CBD PROJECT AS BUILD DRAWING BORED PILES FOR SHORING AT BOUNDARY SCBD AND BAPINDO AREA
526 12/INV / 1995 1 SUDIRMAN CBD PROJECT PETA INVENTARISASI
527 12/INV / 1995 2 SUDIRMAN CBD PROJECT PETA INVENTARISASI
528 12/INV / 1995 3 SUDIRMAN CBD PROJECT PETA INVENTARISASI
529 310/204/GE/001 SUDIRMAN CBD PROJECT RENCANA UNDERPASS
530 A3 - 12 PASAR PESANGGRAHAN DENAH TOILET, KUSEN PINTU DAN JENDELA
531 A4 - 12 PASAR PESANGGRAHAN KUSEN PINTU DAN JENDELA
532 ME3 - 12 PASAR PESANGGRAHAN PENANGKAL PETIR DAN LETAKAN TALANG TEGAK
533 A2 - 12 PASAR PESANGGRAHAN DENAH, TAMPAK DAN POTONGAN
534 ME2 - 12 PASAR PESANGGRAHAN ISOMETRIS AIR BERSIH, AIR KOTOR DAN AIR BEKAS
535 ME4 - 12 PASAR PESANGGRAHAN WIRING DIAGRAM
536 ME4 - 12 PASAR PESANGGRAHAN WIRING DIAGRAM
537 ME1 - 12 PASAR PESANGGRAHAN INSTALASI AIR BERSIH, AIR KOTOR DAN AIR BEKAS ( SETELAH PERUBAHAN )
538 A1 - 12 PASAR PESANGGRAHAN RENCANA PERUBAHAN LOS TERBUKA, LOS DAGING DAN KANTOR PASAR
539 ME5 - 12 PASAR PESANGGRAHAN RENCANA INSTALASI LISTRIK ( SETELAH PERUBAHAN )
540 ME6 - 12 PASAR PESANGGRAHAN INSTALASI TATA SUARA DAN PERLETAKAN TABUNG PEMADAM

Anda mungkin juga menyukai