c. Doors Exteriors...................................................
6. ROOFING...............................................................
GI Roof
B. MATERIAL SPECIFICATIONS
1. REINFORCED CONCRETE
a. Panels..................................................................
Ready Mix Concrete, 3000 psi in 28 days
b. Footings..............................................................
Ready Mix Concrete, 3000 psi in 28 days
c. Ground Slabs...........................................................
Ready Mix Concrete, 3000 psi in 28 days
d. Reinforcing Bars................................................ Structural Grade, fy= 33,000 psi
2. METAL DECKING
a. Roofing..................................................................
GI Roof
b. Fasteners..........................................................
Rivets and Washers
4. ROOFING ACCESORIES
5. WINDOWS..................................................................
Steel Casement Window
a. Main Door..............................................................
1.0m x 2.1m Narra Wood Door with door
stopper