Anda di halaman 1dari 1

TRAFFIC IMPACT ASSESMENT

EXISTING INFRASTRUCTURE & CONDITIONS

Existing Highway Existing Intersection Existing Traffic Conditions


Conditions Conditions
Pavement width Intersection Turning Movement Counts
Configuration (include (Diagram &/or Table) –
scaled plan) AADT
Pavement markings Vertical grades of local/ Turning Movement Count
intersecting road (Diagram &/or Table) – AM
Peak
Right-of-way width Intersection sight Turning Movement Count
distance (Diagram &/or Table) – PM
Peak
Vertical grades on Stopping sight distance Existing AADT on Highway
Highway
Horizontal alignment of Signal timings (if Historical Traffic Growth
Highway (i.e. curve existing) Rate on Highway
radius)
Design and/or posted Major developments 5-yr Traffic Growth Rate at
speed limit currently using Highway/ Intersection
intersection
Locations of speed limit 10-yr Traffic Growth Rate
changes at Highway/Intersection
Existing/proposed Annual Traffic Growth Rate
acceses in vicinity at Highway/ Intersection
Existing Illumination in Vehicle composition (%
vicinity vehicle type) on Highway/
Intersection
Traffic Control Type
(i.e.two-way or all-way
stop control,etc)
Traffic Operation
Signage (i.e. no left-
turns, no parking)
Sumber: Alberta Infrastructure Transportation, 2005

Anda mungkin juga menyukai