Anda di halaman 1dari 1

SAP® OS/DB MIGRATION SERVICES

COMPLETE SUPPORT:
SAP® OS/DB Migration Services MIGRATION SUPPORT

• Project Management
WFT is committed to ensuring that after a migration, • Coordination with SAP support
your SAP System continues to be a stable product with • Hardware/OS/database selection
high availability and security and sufficient • Technical support
performance for everyday business. Therefore, an  Change Management
indispensible requirement for the OS/DB migration is  System Tuning
that you secure the services of a certified NetWeaver  Execution of migration activities
consultant who has obtained the specialist • Bolt-on system migration
qualification for the performance of database and • Backup strategy and implementation
operating system migrations. WFT have certified and • Disaster recovery on new platform
experienced consultant dedicated for OS/DB • Post-migration support
migrations.

Migration Planning and Preparation


Non-Production System Migration
The Preparation phase in the migration process is to
After the “proof of concept” test system is migrated
take detail action on all aspects of migration
and the technical functionality of the system has been
planning. We can provide you with resource planning,
proven, all systems in the landscape will be migrated.
budgeting, project plan and time frame to ensure
Throughout the process of migrating additional systems
successful completion. We assess that all of the
the processes are refined to streamline and ensure
necessary technical prerequisites including Hardware,
success during the cutover of the production system.
Operating system, Database and SAP software. We
Before we proceed to the Go-Live phase, we make sure
assist you to co-ordinate with SAP support and
we provide complete documentation on process and
contract team to receive software and support for the
procedure for the migration and we receive full
migration project.
customer approval.
“Proof of Concept” (PoC) System Migration

This phase starts with migration of the “proof of Final Migration and Go-Live
concept” test system. The PoC migration process
involves performing a test migration of the production In this phase the migration of the production database
environment to the target platform and applying all and all dynamic data of SAP Production systems,
fixes required to prepare for migration of the other interfaces and add-on systems are carried out. All
systems in the landscape. It is during this phase of the changes and fixes are applied based on previous
project that the key business processes and interfaces migration cycles. The functional team checks the
are tested to ensure operability and that the system to ensure it is operating correctly. Once
functionality works correctly. If there are fixes agreement that the system is operational the system is
required due to OS/database platform changes, they released to users.
are implemented and tested during this phase of the
project. Post Go-Live Support
If there are other non-SAP components like Job WFT team will assist customer with post-go live tuning.
Scheduling, EDI, Tax software (Vertax/Taxware/BSI), After going live with target production system, we
Output Management, Faxing and Monitoring/Capacity schedule post go-live migration check with SAP support
tools requiring migration as well, these need to be and assist with implementing recommendations from
carefully researched and planned for during the SAP support.
migration. WFT have deep understanding of SAP bolt-
on systems and their migration along with SAP OS/DB
migrations.

Wharfedale Technologies Inc. 2850 Brunswick Pike Lawrenceville NJ 08648 www.wftus.com


 609-882-8826 x125  732-549-5400  ajacobs@wftus.com

Anda mungkin juga menyukai