Pada periode tertentu suatu sistem pembangkit mempunyai kapasitas tersedia sbb :

Pembangkit Kapasitas (MW) For State Probabillity


Generator A 250 0.025 1 -
Generator B 350 0.035 1 -
Generator C 450 0.045 1 -

Pada periode tersebut beban puncak yang dipikulnya adalah sebesar 700 MW
Berapakah LOLP sistem tersebut?

Kombinasi Capacity
Operasi On Out -
unit On Outage State Probabillity
= 2n combination age (MW)
n = jumlah unit
A,B,C - 0 0.975 0.965 0.955 =
-,B,C A 250 0.025 0.965 0.955 =
A,-,C B 350 0.975 0.035 0.955 =
A,B,- C 450 0.975 0.965 0.045 =
-,-,C A,B 600 0.025 0.035 0.955 =
-,B,- A,C 700 0.025 0.965 0.045 =
A,-,- B,C 800 0.975 0.035 0.045 =
-,-,- ABC 1050 0.025 0.035 0.045 =
JUMLAH =

Comulative outage table dengan cummulative outage probability


MW or More
Cummulative Probability
On-outage
0 0.101464375 + 0.898535625 = 1.000000000
250 0.078425000 + 0.023039375 = 0.101464375
350 0.045835625 + 0.032589375 = 0.078425000
450 0.003496250 + 0.042339375 = 0.045835625
600 0.002660625 + 0.000835625 = 0.003496250
700 0.001575 + 0.001085625 = 0.002660625
800 0.000039375 + 0.001535625 = 0.001575000
1050 = 0.000039375

Menghitung daya cadangan dan LOLP


Cadangan = Kapasitas Tersedia - Beban
= 1050 - 700
= 350 MW

Probability 350 MW atau lebin "on outage" dari tabel


cummulative probability adalah = 0.078425000
Jadi LOLP = 0.078425000 Dikali 365 hari
= 28.625125
= 29 hari/tahun
State Probabillity
0.025 0.975
0.035 0.965
0.045 0.955

ity

0.898535625
0.023039375
0.032589375
0.042339375
0.000835625
0.001085625
0.001535625
0.000039375
1.000000000