NO. U R A I A N
a b
A JUMLAH (I+II+III+IV+V+VI+VII)
B PPN 10 %
C TOTAL
D DIBULATKAN
T O TAL
TERBILANG
Tiga Belas Milyar Sembilan Ratus Lima Puluh Enam Juta Dua Ratus Dua Puluh Delapan Ribu Rup
Panitia Peneliti Ko
No. Nama
1 Hj. Fironita ST, MT
2 Azrar Azis ST
3 Sukma AM
4 Marwan Yusuf, Sip
Erwin Syahril, ST, MM Erick Ady Novendra, ST, MT H. Satriya Madjid, ST, MSP
Nip .19720917 200312 1 011 Nip. 19821123 200901 1 004 Team Leader
E K A P I T U LA S I
CANA ANGGARAN BIAYA
JUMLAH HARGA
JUMLAH HARGA ADDENDUM
KONTRAK (Rp.) KONTRAK 01
(Rp.)
c d
7,592,958,477.98 7,748,861,116.38
216,094,026.69 268,718,369.50
386,900,452.64 400,995,883.53
1,099,331,202.66 1,496,347,602.26
1,271,977,837.25 1,195,825,666.74
137,468,387.18 74,813,750.00
1,982,750,000.00 1,501,917,996.00
12,687,480,384.41 12,687,480,384.41
1,268,748,038.44 1,268,748,038.44
13,956,228,422.85 13,956,228,422.85
13,956,228,000.00 13,956,228,000.00
13,956,228,000.00 13,956,228,000.00
VOLUME
VOLUME HARGA JUMLAH HARGA JUMLAH HARGA
ADD
NO. U R A I A N ANALISA KONTRAK SAT SATUAN KONTRAK AWAL ADD KONTRAK
KONTRAK
AWAL (Rp.) (Rp.) 01 (Rp.)
01
a b c d e f g h=dxg i=fxg
A PEKERJAAN LANTAI ANJUNGAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi ---- 1.00 Ls 1.00 80,000,000.00 80,000,000.00 80,000,000.00
2 Pembuatan Diresi Keet --- 1.00 Ls 1.00 16,000,000.00 16,000,000.00 16,000,000.00
3 Pasangan Bowplank SNI-1.6.4 644 M1 644.00 58,200.00 37,480,800.00 37,480,800.00
4 Papan Proyek ---- 1.00 Ls 1.00 300,000.00 300,000.00 300,000.00
133,780,800.00 133,780,800.00
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 53.23 M3 64.76 51,250.00 2,728,037.50 3,318,950.00
2 Galian Tanah Drainase SNI-2.6.1 354.45 M3 441.40 51,250.00 18,165,562.50 22,621,750.00
3 Urugan Kembali SNI-2.6.9a 17.74 M3 168.72 21,000.00 372,540.00 3,543,120.00
4 Urugan Tanah Timbunan Biasa SNI-2.6.15 1,170.15 M3 1,931.05 138,750.00 162,358,312.50 267,933,187.50
5 Urugan Pasir Bawah Lantai SNI-2.6.11 1,103.63 M3 1,750.61 152,500.00 168,303,575.00 266,968,025.00
351,928,027.50 564,385,032.50
III. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam Drainase SNI-4.6.10 1,575.34 M2 1,612.57 106,299.50 167,457,854.33 171,415,384.72
2 Pas. Plesteran Trasram 1:3 Tebal 15 mm SNI-5.6.3 1,339.04 M2 1,328.00 40,527.60 54,268,077.50 53,820,652.80
3 Pek. Pas. Batu Tanggul (mengganti tanggul yang rusak) SNI-3.6.6 M3 22.97 546,440.00 - 12,551,726.80
221,725,931.83 237,787,764.32
IV. PASANGAN BETON BERTULANG
1 Pek. Talud Beton SNI-7.6.42a 423.46 M3 423.48 4,174,200.00 1,767,606,732.00 1,767,690,216.00
2 Pek. Beton Penutup Drainase SNI-7.6.1 29.96 M3 - 776,350.00 23,259,446.00
Pek. Beton Penutup Drainase (BETON BERTULANG) 37.94 4,174,200.00 158,369,148.00
1,790,866,178.00 1,926,059,364.00
V. PEKERJAAN PIPA SALURAN
1 Pek. Pipa Saluran PVC 3" SNI-10.6.31 209.80 M" 160.00 118,575.00 24,877,035.00 18,972,000.00
24,877,035.00 18,972,000.00
VI. PEKERJAAN LANTAI
1 Pas. Lantai Keramik 60 x 60 Granit Kasar Stage SNI-13.6.45a 2,814.80 M2 2,576.88 348,533.00 981,050,688.40 898,127,717.04
2 Pas. Lantai Keramik 30 x 30 Anti Slip Tangga Pelataran SNI-13.6.49 432.00 M2 810.90 187,558.00 81,025,056.00 152,090,782.20
3 Pek.Lantai Kerja Beton SNI-7.6.1 1,199.38 M3 1,255.05 776,350.00 931,138,663.00 974,358,067.50
4 Pek. Lantai Anjungan Keramik 40 x 40 Anti slip SNI-13.6.48 9,311.38 M2 8,317.56 185,481.50 1,727,088,729.47 1,542,753,505.14
5 Pek.Beton Lantai Jogging Track SNI-7.6.1 109.26 M3 109.25 776,350.00 84,824,001.00 84,816,237.50
6 Pas. Lantai Keramik 40 x 40 Anti Slip (Motif Pola Lantai) SNI-13.6.48 1,320.00 M2 1,484.39 185,481.50 244,835,580.00 275,326,883.79
7 Pas. Lantai Keramik 30 x 30 Anti Slip (Motif Pola Lantai) SNI-13.6.49 2,595.91 M2 2,205.54 187,558.00 486,883,687.78 413,666,671.32
8 Pas. Koral Lantai - 3,947.66 M2 3,901.75 135,000.00 532,934,100.00 526,736,291.08
5,069,780,505.65 4,867,876,155.57
JUMLAH REAL COST 7,592,958,477.98 7,748,861,116.38
selisih 155,902,638.40
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d e f g h=dxg i=fxg
B PEKERJAAN SCULPTURE PERSAHABATAN
-
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 12.25 M3 26.81 51,250.00 627,812.50 1,374,012.50
2 Urugan Kembali SNI-2.6.9a 4.08 M3 8.94 21,000.00 85,680.00 187,740.00
3 Urugan Tanah Timbunan Biasa SNI-2.6.15 112.01 M3 47.12 138,750.00 15,541,387.50 6,537,900.00
4 Urugan Pasir Bawah Pondasi SNI-2.6.11 2.45 M3 2.34 152,500.00 373,625.00 356,850.00
5 Urugan Pasir Bawah Lantai SNI-2.6.11 5.28 M3 - 152,500.00 805,200.00 -
(Sudah terhitung di luasan anjungan)
17,433,705.00 8,456,502.50
III. PEKERJAAN PONDASI
1 Pas. Batu Kosong Bawah Pondasi SNI-3.6.14 4.90 M3 - 281,220.00 1,377,978.00 -
2 Pas. Pondasi Batu Kali / Bt.Gunung SNI-3.6.6 21.85 M3 - 546,440.00 11,939,714.00 -
3 Pek.Pondasi Poerplat SNI-7.6.42a - M3 13.86 4,174,200.00 - 57,854,412
4 Pek.Lantai Kerja Pondasi Poer SNI-7.6.1 - M3 1.10 776,350.00 - 853,985
5 Pek. Kolom dan Ring Balk Stand Gong Perdamaian SNI-7.6.42a - M3 2.03 4,174,200.00 - 8,473,626
13,317,692.00 67,182,023.00
IV. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Pondasi Batu Bata T= 1 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.3 105.20 M2 80.43 219,492.50 23,090,611.00 17,653,781.78
23,090,611.00 17,653,781.78
V. PEKERJAAN LANTAI
1 Pas. Lantai Granito 60x60 SNI-13.6.45a 27.15 M2 78.50 348,533.00 9,462,670.95 27,359,840.50
2 Pas. Lantai Granito Tangga 40x40 SNI-13.6.45b 78.53 M2 61.34 339,158.00 26,634,077.74 20,803,951.72
36,096,748.69 48,163,792.22
VI PEKERJAAN SCULPTURE DAN PRASASTI
1 Pembuatan Sculpture persahabatan Plat Alcupan --- 89.58 M2 90.40 1,350,000.00 120,933,000.00 122,040,000.00
2 Pembuatan Pilar Prasasti SNI-7.6.1 0.20 M3 0.20 776,350.00 155,270.00 155,270.00
3 Pembuatan Plakat Prasasti --- 1.00 Ls 1.00 1,167,000.00 1,167,000.00 1,167,000.00
122,255,270.00 123,362,270.00
VII. PEKERJAAN LAMPU SOROT
1 Lampu Sorot SpotLight + Instalasi 6.00 Bh 6.00 650,000.00 3,900,000.00 3,900,000.00
3,900,000.00 3,900,000.00
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d e f g h=dxg i=fxg
C PEKERJAAN PAGAR KELILING
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi ---- - Ls -
1 Pasangan Bowplank SNI-1.6.4 418 M1 418.00 58,200.00 24,327,600.00 24,327,600.00
2 Papan Proyek ---- - Ls -
24,327,600.00 24,327,600.00
IV. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.10 83.60 M2 222.88 106,299.50 8,886,638.20 23,692,245.16
2 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 6 SNI-4.6.13 167.2 M2 - 99,122.00 16,573,198.40 -
3 Plesteran 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 167.20 M2 780.93 43,502.40 7,273,601.28 33,972,329.23
4 Plesteran 1 Pc : 5 Ps, Dinding batu bata tebal 15 mm SNI-5.6.5 334.40 M2 - 37,358.40 12,492,648.96 -
45,226,086.84 57,664,574.39
V. PASANGAN BETON BERTULANG
1 Pek. Kolom beton bertulang SNI-7.6.40 20.58 M3 20.70 6,300,450.00 129,663,261.00 130,419,315.00
129,663,261.00 130,419,315.00
VI. PEKERJAAN PENGECATAN
1 Cat Dinding Tembok SNI-14.6.14 710.60 M2 780.93 41,468.00 29,467,160.80 32,383,605.24
29,467,160.80 32,383,605.24
VII. PEKERJAAN BESI / STAINLES
1 Railing Pagar Aluminium Dia. 2" SNI-11.6.31b 167.20 M2 165.07 946,270.00 158,216,344.00 156,200,788.90
GANTI STEINLESS STELL
158,216,344.00 156,200,788.90
JUMLAH REAL COST 386,900,452.64 400,995,883.53
SELISIH 14,095,430.89
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d e f g h=dxg i=fxg
D PEKERJAAN FONT MARK
I. PEKERJAAN PERSIAPAN
1 Pasangan Bowplank SNI-1.6.4 104 M1 104.00 58,200.00 6,052,800.00 6,052,800.00
6,052,800.00 6,052,800.00
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 259.85 M3 184.12 51,250.00 13,317,543.13 9,436,150.00
2 Urugan Kembali SNI-2.6.9a 86.62 M3 61.37 21,000.00 1,818,981.50 1,288,770.00
15,136,524.63 10,724,920.00
III. PEKERJAAN PONDASI
1 Pas. Pondasi Batu Kali / Bt.Gunung SNI-3.6.6 519.71 M3 503.21 546,440.00 283,989,785.96 274,974,072.40
2 Pek.Pondasi Poerplat 65.90 4,174,200.00 275,079,780.00
3 Pek.Lantai Kerja Pondasi Poer 2.64 776,350.00 2,049,564.00
283,989,785.96 552,103,416.40
IV. PEKERJAAN BESI / STAINLES
1 Pek.Rangka Huruf dan Pas.Plat Alcupan - 461.63 M2 485.34 1,350,000.00 623,200,500.00 655,209,000.00
623,200,500.00 655,209,000.00
V. PEKERJAAN PLESTERAN
1 Plesteran Pondasi 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 734.76 M2 372.08 43,502.40 31,963,866.93 16,186,372.99
2 Plesteran Dinding Kolam 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 394.11 M2 313.58 43,502.40 17,144,904.87 13,641,482.59
31,963,866.93 29,827,855.58
VI. PEKERJAAN KOLAM AIR MANCUR
1 Pek. Dinding Kolam Beton K225 SNI-7.6.35 32.41 M3 1,319,800.00 42,773,398.20
1 Pek. Dinding Kolam Beton K225 (beton bertulang) 25.72 4,174,200.00 107,360,424.00
2 Pek. Lantai Kolam Beton K225 SNI-7.6.35 13.16 M3 1,319,800.00 17,371,207.60
1 Pek. Lantai Kolam Beton K225 (beton bertulang) 15.58 4,174,200.00 65,034,036.00
60,144,605.80 172,394,460.00
VII. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Kolam SNI-14.6.14 394.11 M2 181.71 41,468.00 16,343,119.35 7,535,150.28
16,343,119.35 7,535,150.28
VIII. PEKERJAAN PERLENGKAPAN KOLAM
1 Pek.Pompa Air Mancur + Kelengkapan + Instalasi 1 1.00 Ls 1.00 40,000,000.00 40,000,000.00 40,000,000.00
2 Lampu Sorot SpotLight + Instalasi 30 30.00 Bh 30.00 750,000.00 22,500,000.00 22,500,000.00
62,500,000.00 62,500,000.00
JUMLAH REAL COST 1,099,331,202.66 1,496,347,602.26
SELISIH 397,016,399.60
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
VOLUME
HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME ADD
NO. U R A I A N ANALISA SAT SATUAN KONTRAK AWAL ADD KONTRAK
KONTRAK KONTRAK
(Rp.) (Rp.) 01 (Rp.)
01
a b c d e f g h=dxg i=fxg
F PEKERJAAN BANGKU TAMAN
I. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.10 77.28 M2 0.00 106,299.50 8,214,825.36 -
2 Plesteran 1 Pc : 5 Ps, Dinding batu bata tebal 15 mm SNI-5.6.5 154.56 M2 0.00 37,358.40 5,774,114.30 -
13,988,939.66 -
II. PASANGAN BETON BERTULANG
1 Pek. Plat Beton Bangku Taman SNI-7.6.42a 9.41 M3 0.00 4,174,200.00 39,270,873.60 -
39,270,873.60 -
III. PEKERJAAN PENGECATAN
1 Cat Dinding Tembok SNI-14.6.14 271.44 M2 0.00 41,468.00 11,256,073.92 -
11,256,073.92 -
IV. PEKERJAAN TAMAN
1 Pek.Taman Depan Font Mark Ls 60.37 M2 47.93 125,000.00 7,546,250.00 5,991,250.00
2 Pek.Taman Anjungan Ls 523.25 M2 550.58 125,000.00 65,406,250.00 68,822,500.00
72,952,500.00 74,813,750.00
JUMLAH REAL COST 137,468,387.18 74,813,750.00
SELISIH (62,654,637.18)
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
a b c d e f g h=dxg i=fxg
G PEKERJAAN PAYUNG HIAS,LAMPU TAMAN
I. PAYUNG HIAS
1 Payung Hias ( 6m x 6m ) + Instalasi --- 10.00 Bh 165,000,000.00 1,650,000,000.00 -
1 Payung Hias (6mx6m) Spesifikasi Produk Lain BH 10.00 103,950,000.00 1,039,500,000.00
2 LED SET 10.00 10,000,000.00 100,000,000.00
3 Galian pondasi 14.40 51,250.00 738,000.00
4 Urugan Kembali 4.80 21,000.00 100,800.00
5 Urugan Pasir 1.44 152,500.00 219,600.00
6 Lantai kerja 0.72 776,350.00 558,972.00
7 Beton pondasi M3 6.72 4,174,200.00 28,050,624.00
1,650,000,000.00 1,169,167,996.00
II. INSTALASI DAYA, LAMPU TAMAN DAN LAMPU SOROT
1 Lampu Taman Solar Cell --- 25.00 Bh 25.00 9,250,000.00 231,250,000.00 231,250,000.00
2 Lampu Sorot 500 watt + Kabel + Instalasi --- 8.00 Bh 8.00 7,500,000.00 60,000,000.00 60,000,000.00
3 Tiang Lampu Sorot Pipa Gip 5" Tinggi 9 m --- 2.00 Bh 2.00 7,500,000.00 15,000,000.00 15,000,000.00
4 Instalasi Daya 11.000 watt --- 1.00 Ls 1.00 16,500,000.00 16,500,000.00 16,500,000.00
5 Box Fuse (40 x 60 x 20 ) + MCB PANEL --- 1.00 Ls 1.00 10,000,000.00 10,000,000.00 10,000,000.00
332,750,000.00 332,750,000.00
JUMLAH REAL COST 1,982,750,000.00 1,501,917,996.00
SELISIH (480,832,004.00)
Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan
NO. U R A I A N MC-0
a b c
A PEKERJAAN LANTAI ANJUNGAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1
2 Pembuatan Diresi Keet 1
3 Pasangan Bowplank 644
4 Papan Proyek 1
KONTRAK SAT
1.00 Ls
1.00 Ls
644 M1
1.00 Ls
53.23 M3
354.45 M3
17.74 M3
1,170.15 M3
1,103.63 M3
1,575.34 M2
1,339.04 M2
423.46 M3
KG
KG/M3
M2
M2/M3
29.96 M3
KG
KG/M3
M2
M2/M3
209.80 M"
2,814.80 M2
432.00 M2
1,199.38 M2
9,311.38 M2
109.26 M3
1,320.00 M2
2,595.91 M2
3,947.66 M2
22.97 M3
NO. U R A I A N MC-0
a b c
B PEKERJAAN SCULPTURE PERSAHABATAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi -
2 Pengukuran Awal dan Pasangan Bowplank -
3 Papan Proyek -
V. PEKERJAAN LANTAI
1 Pas. Lantai Granito 60x60 78.5
= 0,25 * 3,14 * 10 * 10 78.50
KONTRAK
- Ls
- M1
- Ls
12.25 M3
4.08 M3
112.01 M3
2.45 M3
5.28 M3
4.90 M3
V.SCULPTURE PERSAHABATAN Page 27
KONTRAK
21.85 M3
- M3
- M3
KG
KG/M3
M2
M2/M3
- M3
105.20 M2
27.15 M2
78.53 M2
89.58 M2
0.20 M3
1.00 Ls
6.00 Bh
NO. U R A I A N MC-0
a b c
C PEKERJAAN PAGAR KELILING
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 0
1 Pasangan Bowplank 418
2 Papan Proyek 0
1 Pembersihan Akhir 0
KONTRAK
- Ls
418 M1
- Ls
- M3
- M3
- M3
- M3
- M3
- M3
- M3
- M3
- M3
83.60 M2
167.2 M2
167.20 M2
334.40 M2
20.58 M3
kg
kg/m3
M2
M2/M3
710.60 M2
167.20 M2
0.00 M3
- Ls
NO. U R A I A N MC-0
a b c
D PEKERJAAN FONT MARK
I. PEKERJAAN PERSIAPAN
1 Pasangan Bowplank 104
V. PEKERJAAN PLESTERAN
1 Plesteran Pondasi 1 Pc : 2 Ps Trasraam, tebal 15 mm 372.08
= (1,3+1,5+1,3)*(21,57+19,53+20,53) 252.68
= 1,10 * 105 115.50
= 1,5 * 1,3 * 2 3.90
BEKISTING
KONTRAK
104 M1
259.85 M3
86.62 M3
519.71 M3
M3
KG
KG/M3
M2
KG/M3
461.63 M2
734.76 M2
394.11 M2
32.41 M3
KG
KG/M3
M2
M2/M3
13.16 M3
KG
KG/M3
394.11 M2
1.00 Ls
30.00 Bh
a b c d
E PEKERJAAN SCULPTURE SANDEQ DAN KOLAM
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 0 - Ls
2 Pengukuran Awal dan Pasangan Bowplank 0 - M1
2 Papan Proyek 0 - Ls
V. PEKERJAAN LANTAI
1 Pas. Lantai Keramik 40x40 Kasar 68.562 58.12 M2
T.9 = AREA 208,59-150,47 58.12
= 0,2 * 52,21 OPTREDE 10.442
a b c d
F PEKERJAAN BANGKU TAMAN
I. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam 77.28 M2
PAS. DINDING BANGKU
= 1,1 * 0,4 * 2 * 4 * 18 63.36
PAS. DINDING TAMAN
= 2,3 * 1,2 * 2 * 18 99.36
= 2 * 1,2 * 2 * 18 86.4
a b c d
G PEKERJAAN PAYUNG HIAS,LAMPU TAMAN
I. PAYUNG HIAS
1 Payung Hias ( 6m x 6m ) + Instalasi 10 10.00 Bh
2 LED 10
3 Galian Pondasi
= 1,2 * 1,2* 1 * 10 14.4
4 Urugan kembali
= 1/3 * 14.4 4.8
5 Urugan pasir
= 1,2 * 1,2 * 0,1 * 10 1.44
6 lanati kerja
= 1,2 * 1,2 * 0,05 * 10 0.72