Anda di halaman 1dari 59

R E K A P I T U LA S I

RENCANA ANGGARAN BIAYA

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU No. Kontrak :
KABUPATEN : MAMUJU Tgl. Kontrak :
PROPINSI : SULAWESI BARAT No. SPMK :
TAHUN : 2015 Tgl. SPMK :

NO. U R A I A N

a b

I. PEKERJAAN LANTAI ANJUNGAN


II. PEKERJAAN SCULPTURE PERSAHABATAN

III. PEKERJAAN PAGAR KELILING

IV. PEKERJAAN FONT MARK

V. PEKERJAAN SCULPTURE SANDEQ DAN KOLAM

VI. PEKERJAAN BANGKU TAMAN

VII. PEKERJAAN PAYUNG HIAS,LAMPU TAMAN

A JUMLAH (I+II+III+IV+V+VI+VII)
B PPN 10 %
C TOTAL
D DIBULATKAN

T O TAL

TERBILANG
Tiga Belas Milyar Sembilan Ratus Lima Puluh Enam Juta Dua Ratus Dua Puluh Delapan Ribu Rup

Panitia Peneliti Ko

No. Nama
1 Hj. Fironita ST, MT
2 Azrar Azis ST
3 Sukma AM
4 Marwan Yusuf, Sip

Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi


PT. Anugrah Cipta Dimensi

Erwin Syahril, ST, MM Erick Ady Novendra, ST, MT H. Satriya Madjid, ST, MSP
Nip .19720917 200312 1 011 Nip. 19821123 200901 1 004 Team Leader
E K A P I T U LA S I
CANA ANGGARAN BIAYA

AN ANJUNGAN PANTAI MANAKARRA


663/001/SPK-FISIK/DPU/I/2015
30 Januari 2015
663/001/SPMK-FISIK/DPU/II/2015
18 Februari 2015

JUMLAH HARGA
JUMLAH HARGA ADDENDUM
KONTRAK (Rp.) KONTRAK 01
(Rp.)
c d

7,592,958,477.98 7,748,861,116.38
216,094,026.69 268,718,369.50

386,900,452.64 400,995,883.53

1,099,331,202.66 1,496,347,602.26

1,271,977,837.25 1,195,825,666.74

137,468,387.18 74,813,750.00

1,982,750,000.00 1,501,917,996.00

12,687,480,384.41 12,687,480,384.41
1,268,748,038.44 1,268,748,038.44
13,956,228,422.85 13,956,228,422.85
13,956,228,000.00 13,956,228,000.00

13,956,228,000.00 13,956,228,000.00

h Enam Juta Dua Ratus Dua Puluh Delapan Ribu Rupiah

Panitia Peneliti Kontrak

Jabatan Tanda Tangan


Ketua / Anggota
Sekretaris / Anggota
Anggota
Anggota

Konsultan Supervisi Kontraktor Pelaksana


PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera

H. Satriya Madjid, ST, MSP FAJRI


Team Leader Kepala Proyek
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU No. Kontrak 663/001/SPK-FISIK/DPU/I/2015
KABUPATEN : MAMUJU Tgl. Kontrak 30 Januari 2015
PROPINSI : SULAWESI BARAT No. SPMK 663/001/SPMK-FISIK/DPU/II/2015
TAHUN : 2015 Tgl. SPMK 18 Februari 2015

VOLUME
VOLUME HARGA JUMLAH HARGA JUMLAH HARGA
ADD
NO. U R A I A N ANALISA KONTRAK SAT SATUAN KONTRAK AWAL ADD KONTRAK
KONTRAK
AWAL (Rp.) (Rp.) 01 (Rp.)
01
a b c d e f g h=dxg i=fxg
A PEKERJAAN LANTAI ANJUNGAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi ---- 1.00 Ls 1.00 80,000,000.00 80,000,000.00 80,000,000.00
2 Pembuatan Diresi Keet --- 1.00 Ls 1.00 16,000,000.00 16,000,000.00 16,000,000.00
3 Pasangan Bowplank SNI-1.6.4 644 M1 644.00 58,200.00 37,480,800.00 37,480,800.00
4 Papan Proyek ---- 1.00 Ls 1.00 300,000.00 300,000.00 300,000.00
133,780,800.00 133,780,800.00
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 53.23 M3 64.76 51,250.00 2,728,037.50 3,318,950.00
2 Galian Tanah Drainase SNI-2.6.1 354.45 M3 441.40 51,250.00 18,165,562.50 22,621,750.00
3 Urugan Kembali SNI-2.6.9a 17.74 M3 168.72 21,000.00 372,540.00 3,543,120.00
4 Urugan Tanah Timbunan Biasa SNI-2.6.15 1,170.15 M3 1,931.05 138,750.00 162,358,312.50 267,933,187.50
5 Urugan Pasir Bawah Lantai SNI-2.6.11 1,103.63 M3 1,750.61 152,500.00 168,303,575.00 266,968,025.00
351,928,027.50 564,385,032.50
III. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam Drainase SNI-4.6.10 1,575.34 M2 1,612.57 106,299.50 167,457,854.33 171,415,384.72
2 Pas. Plesteran Trasram 1:3 Tebal 15 mm SNI-5.6.3 1,339.04 M2 1,328.00 40,527.60 54,268,077.50 53,820,652.80
3 Pek. Pas. Batu Tanggul (mengganti tanggul yang rusak) SNI-3.6.6 M3 22.97 546,440.00 - 12,551,726.80
221,725,931.83 237,787,764.32
IV. PASANGAN BETON BERTULANG
1 Pek. Talud Beton SNI-7.6.42a 423.46 M3 423.48 4,174,200.00 1,767,606,732.00 1,767,690,216.00
2 Pek. Beton Penutup Drainase SNI-7.6.1 29.96 M3 - 776,350.00 23,259,446.00
Pek. Beton Penutup Drainase (BETON BERTULANG) 37.94 4,174,200.00 158,369,148.00
1,790,866,178.00 1,926,059,364.00
V. PEKERJAAN PIPA SALURAN
1 Pek. Pipa Saluran PVC 3" SNI-10.6.31 209.80 M" 160.00 118,575.00 24,877,035.00 18,972,000.00
24,877,035.00 18,972,000.00
VI. PEKERJAAN LANTAI
1 Pas. Lantai Keramik 60 x 60 Granit Kasar Stage SNI-13.6.45a 2,814.80 M2 2,576.88 348,533.00 981,050,688.40 898,127,717.04
2 Pas. Lantai Keramik 30 x 30 Anti Slip Tangga Pelataran SNI-13.6.49 432.00 M2 810.90 187,558.00 81,025,056.00 152,090,782.20
3 Pek.Lantai Kerja Beton SNI-7.6.1 1,199.38 M3 1,255.05 776,350.00 931,138,663.00 974,358,067.50
4 Pek. Lantai Anjungan Keramik 40 x 40 Anti slip SNI-13.6.48 9,311.38 M2 8,317.56 185,481.50 1,727,088,729.47 1,542,753,505.14
5 Pek.Beton Lantai Jogging Track SNI-7.6.1 109.26 M3 109.25 776,350.00 84,824,001.00 84,816,237.50
6 Pas. Lantai Keramik 40 x 40 Anti Slip (Motif Pola Lantai) SNI-13.6.48 1,320.00 M2 1,484.39 185,481.50 244,835,580.00 275,326,883.79
7 Pas. Lantai Keramik 30 x 30 Anti Slip (Motif Pola Lantai) SNI-13.6.49 2,595.91 M2 2,205.54 187,558.00 486,883,687.78 413,666,671.32
8 Pas. Koral Lantai - 3,947.66 M2 3,901.75 135,000.00 532,934,100.00 526,736,291.08
5,069,780,505.65 4,867,876,155.57
JUMLAH REAL COST 7,592,958,477.98 7,748,861,116.38
selisih 155,902,638.40

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan

1 Hj. Fironita ST, MT Ketua / Anggota


Erick Ady Novendra, ST, MT H. Satriya Madjid, ST. MSP FAJRI
Nip. 19821123 200901 1 004 Team Leader Kepala Proyek 2 Azrar Azis ST Sekretaris / Anggota
3 Sukma AM Anggota
4 Marwan Yusuf, Sip Anggota

Pejabat Pembuat Komitmen

Erwin Syahril, ST, MM


Nip .19720917 200312 1 011
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU No. Kontrak 663/001/SPK-FISIK/DPU/I/2015
KABUPATEN : MAMUJU Tgl. Kontrak 30 Januari 2015
PROPINSI : SULAWESI BARAT No. SPMK 663/001/SPMK-FISIK/DPU/II/2015
TAHUN : 2015 Tgl. SPMK 18 Februari 2015

VOLUME HARGA JUMLAH HARGA JUMLAH HARGA


VOLUME
NO. U R A I A N ANALISA SAT ADD SATUAN KONTRAK AWAL ADD KONTRAK 01
KONTRAK
KONTRAK 01 (Rp.) (Rp.) (Rp.)

a b c d e f g h=dxg i=fxg
B PEKERJAAN SCULPTURE PERSAHABATAN
-
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 12.25 M3 26.81 51,250.00 627,812.50 1,374,012.50
2 Urugan Kembali SNI-2.6.9a 4.08 M3 8.94 21,000.00 85,680.00 187,740.00
3 Urugan Tanah Timbunan Biasa SNI-2.6.15 112.01 M3 47.12 138,750.00 15,541,387.50 6,537,900.00
4 Urugan Pasir Bawah Pondasi SNI-2.6.11 2.45 M3 2.34 152,500.00 373,625.00 356,850.00
5 Urugan Pasir Bawah Lantai SNI-2.6.11 5.28 M3 - 152,500.00 805,200.00 -
(Sudah terhitung di luasan anjungan)

17,433,705.00 8,456,502.50
III. PEKERJAAN PONDASI
1 Pas. Batu Kosong Bawah Pondasi SNI-3.6.14 4.90 M3 - 281,220.00 1,377,978.00 -
2 Pas. Pondasi Batu Kali / Bt.Gunung SNI-3.6.6 21.85 M3 - 546,440.00 11,939,714.00 -
3 Pek.Pondasi Poerplat SNI-7.6.42a - M3 13.86 4,174,200.00 - 57,854,412
4 Pek.Lantai Kerja Pondasi Poer SNI-7.6.1 - M3 1.10 776,350.00 - 853,985
5 Pek. Kolom dan Ring Balk Stand Gong Perdamaian SNI-7.6.42a - M3 2.03 4,174,200.00 - 8,473,626

13,317,692.00 67,182,023.00
IV. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Pondasi Batu Bata T= 1 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.3 105.20 M2 80.43 219,492.50 23,090,611.00 17,653,781.78

23,090,611.00 17,653,781.78
V. PEKERJAAN LANTAI
1 Pas. Lantai Granito 60x60 SNI-13.6.45a 27.15 M2 78.50 348,533.00 9,462,670.95 27,359,840.50
2 Pas. Lantai Granito Tangga 40x40 SNI-13.6.45b 78.53 M2 61.34 339,158.00 26,634,077.74 20,803,951.72
36,096,748.69 48,163,792.22
VI PEKERJAAN SCULPTURE DAN PRASASTI
1 Pembuatan Sculpture persahabatan Plat Alcupan --- 89.58 M2 90.40 1,350,000.00 120,933,000.00 122,040,000.00
2 Pembuatan Pilar Prasasti SNI-7.6.1 0.20 M3 0.20 776,350.00 155,270.00 155,270.00
3 Pembuatan Plakat Prasasti --- 1.00 Ls 1.00 1,167,000.00 1,167,000.00 1,167,000.00
122,255,270.00 123,362,270.00
VII. PEKERJAAN LAMPU SOROT
1 Lampu Sorot SpotLight + Instalasi 6.00 Bh 6.00 650,000.00 3,900,000.00 3,900,000.00
3,900,000.00 3,900,000.00

JUMLAH REAL COST 216,094,026.69 268,718,369.50


SELISIH 52,624,343

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan

1 Hj. Fironita ST, MT Ketua / Anggota


Erick Ady Novendra, ST, MT H. Satriya Madjid, ST. MSP FAJRI
Nip. 19821123 200901 1 004 Team Leader Kepala Proyek 2 Azrar Azis ST Sekretaris / Anggota
3 Sukma AM Anggota
4 Marwan Yusuf, Sip Anggota

Pejabat Pembuat Komitmen

Erwin Syahril, ST, MM


Nip .19720917 200312 1 011
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU No. Kontrak 663/001/SPK-FISIK/DPU/I/2015
KABUPATEN : MAMUJU Tgl. Kontrak 30 Januari 2015
PROPINSI : SULAWESI BARAT No. SPMK 663/001/SPMK-FISIK/DPU/II/2015
TAHUN : 2015 Tgl. SPMK 18 Februari 2015

VOLUME HARGA JUMLAH HARGA JUMLAH HARGA


VOLUME
NO. U R A I A N ANALISA SAT ADD SATUAN KONTRAK AWAL ADD KONTRAK
KONTRAK
KONTRAK 01 (Rp.) (Rp.) 01 (Rp.)

a b c d e f g h=dxg i=fxg
C PEKERJAAN PAGAR KELILING
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi ---- - Ls -
1 Pasangan Bowplank SNI-1.6.4 418 M1 418.00 58,200.00 24,327,600.00 24,327,600.00
2 Papan Proyek ---- - Ls -
24,327,600.00 24,327,600.00
IV. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.10 83.60 M2 222.88 106,299.50 8,886,638.20 23,692,245.16
2 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 6 SNI-4.6.13 167.2 M2 - 99,122.00 16,573,198.40 -
3 Plesteran 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 167.20 M2 780.93 43,502.40 7,273,601.28 33,972,329.23
4 Plesteran 1 Pc : 5 Ps, Dinding batu bata tebal 15 mm SNI-5.6.5 334.40 M2 - 37,358.40 12,492,648.96 -
45,226,086.84 57,664,574.39
V. PASANGAN BETON BERTULANG
1 Pek. Kolom beton bertulang SNI-7.6.40 20.58 M3 20.70 6,300,450.00 129,663,261.00 130,419,315.00
129,663,261.00 130,419,315.00
VI. PEKERJAAN PENGECATAN
1 Cat Dinding Tembok SNI-14.6.14 710.60 M2 780.93 41,468.00 29,467,160.80 32,383,605.24
29,467,160.80 32,383,605.24
VII. PEKERJAAN BESI / STAINLES
1 Railing Pagar Aluminium Dia. 2" SNI-11.6.31b 167.20 M2 165.07 946,270.00 158,216,344.00 156,200,788.90
GANTI STEINLESS STELL
158,216,344.00 156,200,788.90
JUMLAH REAL COST 386,900,452.64 400,995,883.53
SELISIH 14,095,430.89

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan

1 Hj. Fironita ST, MT Ketua / Anggota


Erick Ady Novendra, ST, MT H. Satriya Madjid, ST. MSP FAJRI
Nip. 19821123 200901 1 004 Team Leader Kepala Proyek 2 Azrar Azis ST Sekretaris / Anggota
3 Sukma AM Anggota
4 Marwan Yusuf, Sip Anggota

Pejabat Pembuat Komitmen

Erwin Syahril, ST, MM


Nip .19720917 200312 1 011
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU No. Kontrak 663/001/SPK-FISIK/DPU/I/2015
KABUPATEN : MAMUJU Tgl. Kontrak 30 Januari 2015
PROPINSI : SULAWESI BARAT No. SPMK 663/001/SPMK-FISIK/DPU/II/2015
TAHUN : 2015 Tgl. SPMK 18 Februari 2015

VOLUME HARGA JUMLAH HARGA JUMLAH HARGA


VOLUME
NO. U R A I A N ANALISA SAT ADD SATUAN KONTRAK AWAL ADD KONTRAK 01
KONTRAK
KONTRAK 01 (Rp.) (Rp.) (Rp.)

a b c d e f g h=dxg i=fxg
D PEKERJAAN FONT MARK
I. PEKERJAAN PERSIAPAN
1 Pasangan Bowplank SNI-1.6.4 104 M1 104.00 58,200.00 6,052,800.00 6,052,800.00
6,052,800.00 6,052,800.00
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 259.85 M3 184.12 51,250.00 13,317,543.13 9,436,150.00
2 Urugan Kembali SNI-2.6.9a 86.62 M3 61.37 21,000.00 1,818,981.50 1,288,770.00
15,136,524.63 10,724,920.00
III. PEKERJAAN PONDASI
1 Pas. Pondasi Batu Kali / Bt.Gunung SNI-3.6.6 519.71 M3 503.21 546,440.00 283,989,785.96 274,974,072.40
2 Pek.Pondasi Poerplat 65.90 4,174,200.00 275,079,780.00
3 Pek.Lantai Kerja Pondasi Poer 2.64 776,350.00 2,049,564.00
283,989,785.96 552,103,416.40
IV. PEKERJAAN BESI / STAINLES
1 Pek.Rangka Huruf dan Pas.Plat Alcupan - 461.63 M2 485.34 1,350,000.00 623,200,500.00 655,209,000.00
623,200,500.00 655,209,000.00
V. PEKERJAAN PLESTERAN
1 Plesteran Pondasi 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 734.76 M2 372.08 43,502.40 31,963,866.93 16,186,372.99
2 Plesteran Dinding Kolam 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 394.11 M2 313.58 43,502.40 17,144,904.87 13,641,482.59
31,963,866.93 29,827,855.58
VI. PEKERJAAN KOLAM AIR MANCUR
1 Pek. Dinding Kolam Beton K225 SNI-7.6.35 32.41 M3 1,319,800.00 42,773,398.20
1 Pek. Dinding Kolam Beton K225 (beton bertulang) 25.72 4,174,200.00 107,360,424.00
2 Pek. Lantai Kolam Beton K225 SNI-7.6.35 13.16 M3 1,319,800.00 17,371,207.60
1 Pek. Lantai Kolam Beton K225 (beton bertulang) 15.58 4,174,200.00 65,034,036.00
60,144,605.80 172,394,460.00
VII. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Kolam SNI-14.6.14 394.11 M2 181.71 41,468.00 16,343,119.35 7,535,150.28
16,343,119.35 7,535,150.28
VIII. PEKERJAAN PERLENGKAPAN KOLAM
1 Pek.Pompa Air Mancur + Kelengkapan + Instalasi 1 1.00 Ls 1.00 40,000,000.00 40,000,000.00 40,000,000.00
2 Lampu Sorot SpotLight + Instalasi 30 30.00 Bh 30.00 750,000.00 22,500,000.00 22,500,000.00
62,500,000.00 62,500,000.00
JUMLAH REAL COST 1,099,331,202.66 1,496,347,602.26
SELISIH 397,016,399.60

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan

1 Hj. Fironita ST, MT Ketua / Anggota


Erick Ady Novendra, ST, MT H. Satriya Madjid, ST. MSP FAJRI
Nip. 19821123 200901 1 004 Team Leader Kepala Proyek 2 Azrar Azis ST Sekretaris / Anggota
3 Sukma AM Anggota
4 Marwan Yusuf, Sip Anggota

Pejabat Pembuat Komitmen

Erwin Syahril, ST, MM


Nip .19720917 200312 1 011
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU No. Kontrak 663/001/SPK-FISIK/DPU/I/2015
KABUPATEN : MAMUJU Tgl. Kontrak 30 Januari 2015
PROPINSI : SULAWESI BARAT No. SPMK 663/001/SPMK-FISIK/DPU/II/2015
TAHUN : 2015 Tgl. SPMK 18 Februari 2015

VOLUME JUMLAH HARGA


JUMLAH HARGA
VOLUME ADD HARGA SATUAN ADD KONTRAK
NO. U R A I A N ANALISA SAT KONTRAK AWAL
KONTRAK KONTRAK (Rp.) 01
(Rp.)
01 (Rp.)
a b c d e f g h=dxg I=Fxg
E PEKERJAAN SCULPTURE SANDEQ DAN KOLAM
II. PEKERJAAN TANAH
1 Galian Tanah SNI-2.6.1 75.24 M3 0.00 51,250.00 3,855,793.75 -
2 Urugan Kembali SNI-2.6.9a 25.08 M3 0.00 21,000.00 526,645.00 -
3 Urugan Tanah Timbunan Biasa SNI-2.6.15 5.81 M3 0.00 138,750.00 806,415.00 -
4 Urugan Pasir Bawah Lantai SNI-2.6.11 2.91 M3 0.00 152,500.00 443,165.00 -
5,632,018.75 -
III. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Pondasi Batu Bata T= 1 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.3 32.93 M2 0.00 219,492.50 7,227,888.03 -
2 Plesteran 1 Pc : 2 Ps Trasraam, tebal 15 mm SNI-5.6.2 262.94 M2 0.00 43,502.40 11,438,521.06 -
18,666,409.08 -
IV. PASANGAN BETON BERTULANG
1 Pek. Sloof beton bertulang 20/30 SNI-7.6.39 4.60 M3 6.39 5,049,800.00 23,224,939.16 32,268,222.00
2 Pek. Dinding Kolam Beton Bertulang SNI-7.6.40 63.51 M3 22.23 6,300,450.00 400,135,279.05 140,059,003.50
3 Pek. Pilar beton Sculpture Sandeq SNI-7.6.40 15.07 M3 0.00 6,300,450.00 94,960,382.40 -
4 Pek. Plat Beton Dudukan Sculpture Sandeq SNI-7.6.40 3.62 M3 4.94 6,300,450.00 22,795,028.10 31,124,223.00
5 Pek. Plat Lantai Kolam SNI-7.6.40 - M3 45.14 6,300,450.00 - 284,402,313.00
541,115,628.71 487,853,761.50
V. PEKERJAAN LANTAI
1 Pas. Lantai Keramik 40x40 Kasar SNI-13.6.48 58.12 M2 68.56 185,481.50 10,780,184.78 12,716,611.64
10,780,184.78 12,716,611.64
VI. PEKERJAAN PENGECATAN
1 Cat Kolam SNI-14.6.14 262.94 M2 250.20 41,468.00 10,903,595.92 10,375,293.60
10,903,595.92 10,375,293.60
VII. PEKERJAAN SCULPTURE
1 Pembuatan Sculpture Perahu Sandeq 1 1.00 Ls 1.00 635,000,000.00 635,000,000.00 635,000,000.00
635,000,000.00 635,000,000.00
VIII. PEKERJAAN LAMPU KOLAM
1 Lampu Kolam Inbow 1 8.00 Bh 8.00 1,235,000.00 9,880,000.00 9,880,000.00
9,880,000.00 9,880,000.00
IX. PEKERJAAN AIR MANCUR
1 Pek.Pompa Air Mancur + Kelengkapan + Instalasi 1 1.00 Ls 1.00 40,000,000.00 40,000,000.00 40,000,000.00
40,000,000.00 40,000,000.00

JUMLAH REAL COST 1,271,977,837.25 1,195,825,666.74


SELISIH (76,152,170.50)

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan

1 Hj. Fironita ST, MT Ketua / Anggota


Erick Ady Novendra, ST, MT H. Satriya Madjid, ST. MSP FAJRI
Nip. 19821123 200901 1 004 Team Leader Kepala Proyek 2 Azrar Azis ST Sekretaris / Anggota
3 Sukma AM Anggota
4 Marwan Yusuf, Sip Anggota

Pejabat Pembuat Komitmen

Erwin Syahril, ST, MM


Nip .19720917 200312 1 011
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU No. Kontrak 663/001/SPK-FISIK/DPU/I/2015
KABUPATEN : MAMUJU Tgl. Kontrak 30 Januari 2015
PROPINSI : SULAWESI BARAT No. SPMK 663/001/SPMK-FISIK/DPU/II/2015
TAHUN : 2015 Tgl. SPMK 18 Februari 2015

VOLUME
HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME ADD
NO. U R A I A N ANALISA SAT SATUAN KONTRAK AWAL ADD KONTRAK
KONTRAK KONTRAK
(Rp.) (Rp.) 01 (Rp.)
01

a b c d e f g h=dxg i=fxg
F PEKERJAAN BANGKU TAMAN
I. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam SNI-4.6.10 77.28 M2 0.00 106,299.50 8,214,825.36 -
2 Plesteran 1 Pc : 5 Ps, Dinding batu bata tebal 15 mm SNI-5.6.5 154.56 M2 0.00 37,358.40 5,774,114.30 -
13,988,939.66 -
II. PASANGAN BETON BERTULANG
1 Pek. Plat Beton Bangku Taman SNI-7.6.42a 9.41 M3 0.00 4,174,200.00 39,270,873.60 -
39,270,873.60 -
III. PEKERJAAN PENGECATAN
1 Cat Dinding Tembok SNI-14.6.14 271.44 M2 0.00 41,468.00 11,256,073.92 -
11,256,073.92 -
IV. PEKERJAAN TAMAN
1 Pek.Taman Depan Font Mark Ls 60.37 M2 47.93 125,000.00 7,546,250.00 5,991,250.00
2 Pek.Taman Anjungan Ls 523.25 M2 550.58 125,000.00 65,406,250.00 68,822,500.00
72,952,500.00 74,813,750.00
JUMLAH REAL COST 137,468,387.18 74,813,750.00
SELISIH (62,654,637.18)

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan

1 Hj. Fironita ST, MT Ketua / Anggota


Erick Ady Novendra, ST, MT H. Satriya Madjid, ST. MSP FAJRI
Nip. 19821123 200901 1 004 Team Leader Kepala Proyek 2 Azrar Azis ST Sekretaris / Anggota
3 Sukma AM Anggota
4 Marwan Yusuf, Sip Anggota
Pejabat Pembuat Komitmen

Erwin Syahril, ST, MM


Nip .19720917 200312 1 011
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU No. Kontrak 663/001/SPK-FISIK/DPU/I/2015
KABUPATEN : MAMUJU Tgl. Kontrak 30 Januari 2015
PROPINSI : SULAWESI BARAT No. SPMK 663/001/SPMK-FISIK/DPU/II/2015
TAHUN : 2015 Tgl. SPMK 18 Februari 2015

VOLUME JUMLAH HARGA JUMLAH HARGA


VOLUME HARGA SATUAN
NO. U R A I A N ANALISA SAT ADD KONTRAK AWAL ADD KONTRAK
KONTRAK (Rp.)
KONTRAK 01 (Rp.) 01 (Rp.)

a b c d e f g h=dxg i=fxg
G PEKERJAAN PAYUNG HIAS,LAMPU TAMAN
I. PAYUNG HIAS
1 Payung Hias ( 6m x 6m ) + Instalasi --- 10.00 Bh 165,000,000.00 1,650,000,000.00 -
1 Payung Hias (6mx6m) Spesifikasi Produk Lain BH 10.00 103,950,000.00 1,039,500,000.00
2 LED SET 10.00 10,000,000.00 100,000,000.00
3 Galian pondasi 14.40 51,250.00 738,000.00
4 Urugan Kembali 4.80 21,000.00 100,800.00
5 Urugan Pasir 1.44 152,500.00 219,600.00
6 Lantai kerja 0.72 776,350.00 558,972.00
7 Beton pondasi M3 6.72 4,174,200.00 28,050,624.00

1,650,000,000.00 1,169,167,996.00
II. INSTALASI DAYA, LAMPU TAMAN DAN LAMPU SOROT
1 Lampu Taman Solar Cell --- 25.00 Bh 25.00 9,250,000.00 231,250,000.00 231,250,000.00
2 Lampu Sorot 500 watt + Kabel + Instalasi --- 8.00 Bh 8.00 7,500,000.00 60,000,000.00 60,000,000.00
3 Tiang Lampu Sorot Pipa Gip 5" Tinggi 9 m --- 2.00 Bh 2.00 7,500,000.00 15,000,000.00 15,000,000.00
4 Instalasi Daya 11.000 watt --- 1.00 Ls 1.00 16,500,000.00 16,500,000.00 16,500,000.00
5 Box Fuse (40 x 60 x 20 ) + MCB PANEL --- 1.00 Ls 1.00 10,000,000.00 10,000,000.00 10,000,000.00
332,750,000.00 332,750,000.00
JUMLAH REAL COST 1,982,750,000.00 1,501,917,996.00
SELISIH (480,832,004.00)

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana Panitia Peneliti Kontrak
PT. Anugrah Cipta Dimensi PT. Karya Mandala Putera
No. Nama Jabatan Tanda Tangan

1 Hj. Fironita ST, MT Ketua / Anggota


Erick Ady Novendra, ST, MT H. Satriya Madjid, ST. MSP FAJRI
Nip. 19821123 200901 1 004 Team Leader Kepala Proyek 2 Azrar Azis ST Sekretaris / Anggota
3 Sukma AM Anggota
4 Marwan Yusuf, Sip Anggota
Pejabat Pembuat Komitmen

Erwin Syahril, ST, MM


Nip .19720917 200312 1 011
BACK UP MC-0
PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA
LOKASI : MAMUJU
KABUPATEN : MAMUJU
PROPINSI : SULAWESI BARAT
TAHUN : 2015

NO. U R A I A N MC-0

a b c
A PEKERJAAN LANTAI ANJUNGAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1
2 Pembuatan Diresi Keet 1
3 Pasangan Bowplank 644
4 Papan Proyek 1

II. PEKERJAAN TANAH


1 Galian Tanah 64.76
UTK KUKU BETON TANGGUL
= 399,78 * (0,3+0,78)*0,5*0,3 64.76

2 Galian Tanah Drainase 441.40


= (399,78 + 121,76 + 103,46+94,12)*0,65*0,7 327.20
= (50,38+52,41+62,35+65,22)*0,65*0,7 104.81
= (4,95+5,02+5,2+5,46)*0,65*0,7 9.39

3 Urugan Kembali 168.72


= (1/3)* (64,76+441,4) 168.72

4 Urugan Tanah Timbunan Biasa 1,931.05


= 2395 * 0,9 2,155.50
= 273 * 0,1 27.30
= 14,96 * 1,05 15.71
kurangi
= 3,6 * 0,9 * (21,57+19,53+20,55) (199.75)
= 150,47 * 0,45 (67.71)

5 Urugan Pasir Bawah Lantai 1,750.61


LUAS AREA 17506,1 X TEBAL 10 CM 1,750.61

V.LANTAI ANJUNGAN Page 12


NO. U R A I A N MC-0

III. PEKERJAAN DINDING DAN PAS. BATU


1 Pas. Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam Drainase 1,612.57
= 399,78 + 121,76 + 98,09+86,8 706.43
= 38,05+38,81+63,78+60,12 200.76
= 5,28+4,95+5,63+5,02+5,20+4,93+5,46+4,91 41.38
= 948,57 * 1,7 = 1612,57 M2 948.57
2 Pas. Plesteran Trasram 1:3 Tebal 15 mm 1,328.00
= 948,57 *1,4 1,328.00

IV. PASANGAN BETON BERTULANG


1 Pek. Talud Beton 423.48 423.48
= 1,02 * (420,65+409,7)*0,5 423.48

TULANGAN 28,874.0 28,874.0


D-12 = (0,8+2,4+0,95) * 415,18/0,15 * 0,887 KG/M' 10,203.9 68.2
= (0,05+2,38+0,28+0,05) * 415,8/0,15 * 0,887 KG/M' 6,786.2
= 415,8 * (2,4/0,15) * 2 * 0,887 KG/M' 11,802.1
= (0,05+0,32) * (399,78/5) * 3 * 0,887 KG/M' 81.9

BEKISTING 873.2 873.2


= (0,87+0,15) * 415,8 424.116 2.1
= 1,08 * 415,8 449.064

2 Pek. Beton Penutup Drainase 37.94 37.94


= PJG SALURAN 948,57 * 0,5 * 0,08 37.94

TULANGAN 3,700.69 3,700.69


D-10 = 3 POT * 948,57 * 0,616 KG/M' 1,752.96 98
= (0,05+0,4+0,05) * (948,57/0,15) * 0,616 KG/M' 1,947.73

BEKISTING 379.43 379


= 0,4 * 948,57 379.43 10

V. PEKERJAAN PIPA SALURAN


V.LANTAI ANJUNGAN Page 13
NO. U R A I A N MC-0

1 Pek. Pipa Saluran PVC 3" 160.00


= 10 BH * 2,5 AREAL PAYUNG TULIP 25.00
= 30 BH * 3 AREAL TANGGUL/JOGING 90.00
= 17,5 * 2 AREAL SANDEQ 35.00
=5*2 FONT WORK 10.00

VI. PEKERJAAN LANTAI


1 Pas. Lantai Keramik 60 x 60 Granito Kasar Stage 2576.88
= LUAS AREA 2925,08 2925.08
= 0,2 * 4 * 114 91.2
= 0,1 * 1 * 123 12.3
KURANGI
= LUAS AREA KOLAM SANDEQ 208,59 -208.59
= LUAS AREA FONT WORK 243,11 -243.11

V.LANTAI ANJUNGAN Page 14


NO. U R A I A N MC-0

2 Pas. Lantai Keramik 30 x 30 Anti Slip Tangga Pelataran 810.9


T8 = LUAS AREA 545,70 545.7
= 0,2 * 6 * 221 265.2

3 Pek.Lantai Kerja Beton 1,255.05


LUAS AREA 17506,1 X TEBAL 0,08 CM 1,400.49
KRANGI JOGING 1092,5 X TEBAL 0,08 (87.40)
KURANGI TAMAN 1 =307,63 * 0,08 (24.61)
KURANGI TAMAN 2 = 242,95 * 0,08 (19.44)
KURANGI TANGGA STAGE = 1,2*121,76 *0,08 (11.69)
KURANGI TANGGA PER = 0,8*36*0,08 (2.30)
KURANGI POT TAMAN 2,3*2,3*0,08 * 18
PELAKSANAAN 7,5 CM ..PROMO
4 Pek. Lantai Anjungan Keramik 40 x 40 Anti slip 8317.56
T.2 = GRANADA BROWN 1949,04 1949.04
T.6 = ALTECO CHOCO 1670,4 BIS TENGAH 1670.4
= ALTECO CHOCO 100,86 BIS TENGAH 100.86
= ALTECO CHOCO 104,13 BIS TENGAH 104.13
T.9 = TAVERNO TERRACOTA 113,36 MOTIF TGH 113.36
= TAVERNO TERRACOTA 4284,55 MOTIF TGH 4284.55
= 2,3 * 2,3 * 18 95.22

5 Pek.Beton Lantai Jogging Track 109.25


LUAS AREA 1092,5 * 0,1 109.25

6 Pas. Lantai Keramik 40 x 40 Anti Slip (Motif Pola Lantai) 1484.39


T.6 = ALTECA CHOCO 946,56 MOTIF TENGAH 946.56
T.6 = ALTECO CHOCO 537,83 BIS 537.83

7 Pas. Lantai Keramik 30 x 30 Anti Slip (Motif Pola Lantai) 2,205.54


T.3 = ALASKA GREEN 600-(5,29*6) 568.26
T.4 = ALASKA BEIGE 800-(5,29*8) 757.68
T.5 = ALASKA TERRACOTA 400-(5,29*4) 378.84
T.8 =ATTILA TERRACOTA 500,76 500.76

V.LANTAI ANJUNGAN Page 15


NO. U R A I A N MC-0

8 Pas. Koral Lantai 3901.7503043


= AREAL ANJUNGAN 3144,93 3144.93
=AREAL JOGING 1092,5 756.8203043

9 Perbaikan pondasi tanggul 22.97

V.LANTAI ANJUNGAN Page 16


BACK UP MC-0

KONTRAK SAT

1.00 Ls
1.00 Ls
644 M1
1.00 Ls

53.23 M3

354.45 M3

17.74 M3

1,170.15 M3

1,103.63 M3

V.LANTAI ANJUNGAN Page 17


KONTRAK SAT

1,575.34 M2

1,339.04 M2

423.46 M3

KG
KG/M3

M2
M2/M3

29.96 M3

KG
KG/M3

M2
M2/M3

V.LANTAI ANJUNGAN Page 18


KONTRAK SAT

209.80 M"

2,814.80 M2

V.LANTAI ANJUNGAN Page 19


KONTRAK SAT

432.00 M2

1,199.38 M2

9,311.38 M2

109.26 M3

1,320.00 M2

2,595.91 M2

V.LANTAI ANJUNGAN Page 20


KONTRAK SAT

3,947.66 M2

22.97 M3

V.LANTAI ANJUNGAN Page 21


BACK UP MC-0

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU
KABUPATEN : MAMUJU
PROPINSI : SULAWESI BARAT
TAHUN : 2015

NO. U R A I A N MC-0

a b c
B PEKERJAAN SCULPTURE PERSAHABATAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi -
2 Pengukuran Awal dan Pasangan Bowplank -
3 Papan Proyek -

II. PEKERJAAN TANAH


1 Galian Tanah 26.81
= (0,3) *31,42 * 0,2 1.89
= (0,3) * 33,93* 0,2 2.04
= (0,3) * 36,44 *0,2 2.19
= 2 * 1,5 * 1,15 * 6 20.70

2 Urugan Kembali 8.94


= (1/3) * 29,51 8.94

3 Urugan Tanah Timbunan Biasa 47.124


= 78,54 * 0,6 47.124

4 Urugan Pasir Bawah Pondasi 2.34


= 2 * 1,5 * 1,3 * 0,1 * 6 2.34

5 Urugan Pasir Bawah Lantai 0


SDH TERHITUNG DI LUASAN ANJUNGAN 0

III. PEKERJAAN PONDASI


1 Pas. Batu Kosong Bawah Pondasi
V.SCULPTURE PERSAHABATAN Page 22
NO. U R A I A N MC-0

= 2 * 1,5 * 0,2 * 6 3.6

V.SCULPTURE PERSAHABATAN Page 23


NO. U R A I A N MC-0

2 Pas. Pondasi Batu Kali / Bt.Gunung


= 2 * 0,5 * 1,5 * 6 9
= 1,5 * 1,4 * 1 * 6 12.6

3 Pek.Pondasi Poerplat 13.86 13.86


= 1,5 * 2 * 0,5 * 6 9.00
= 0,5 * 1 * 1,3 * 6 3.90
= 1,2 * 0,8 * 0,5 * 2 0.96

4 Pek.Tiang dan Rink Balk Stand Gong Perdamaian 2.03 2.03


= 0,4 * 0,4 * 5,4 * 2 1.728
= (4,6-0,4-0,4) * 0,4 * 0,2 0.304

TULANGAN 1,603.07 1,603.07


D-16 = (0,05+1,4+0,05)* 2/0,2 * 1,577 KG/M' * 6 BH 189.24 115.66
= (0,05+0,4+1,4+0,4+0,05) * 2/0,2 * 1,577 KG/M' * 6 BH 290.168
= (0,05+1,9+0,05) * 1,5/0,2 * 1,577 KG/M' * 6 BH 189.24
= (0,05+0,4+1,9+0,4+0,05) * 1,5/0,2 * 1,577 KG/M' * 6 BH 264.936
= (0,2+1,7+0,05) * 1/0,2 * 2 * 1,577 KG/M' * 6 BH 184.509
= (0,2+1,7+0,05) * 0,5/0,2 * 2 * 1,577 KG/M' * 6 BH 92.2545
= (0,05+ 0,9+0,05)* 1,3/0,2 * 1,577 KG/M' * 6 BH 34.593
V.SCULPTURE PERSAHABATAN Page 24
NO. U R A I A N MC-0

= (0,05+0,4+0,9+0,4+0,05) * 1,3/0,2 * 1,577 KG/M' * 6 BH 62.2674


D-16 = (0,05+1,1+0,05) * (0,8/0,2) * 1,577 kg/m' * 2 bh 15.1392
= (0,05+0,4+1,1+0,4+0,05) * (0,8/0,2) * 1,577 kg/m' * 2 bh 25.232
= (0,05+0,7+0,05)* (1,2/0,2) * 1,577 kg/m' * 2 bh 15.1392
= (0,05+0,4+0,7+0,4+0,05) * (1,2/0,2) * 1,577 kg/m' * 2 bh 30.2784
D-16 = 8 pot * (0,2+5,3) * 1,577 kg/m' * 2 bh 138.776
= 6 pot * (0,2+4,5+0,2) * 1,577 kg/m' 46.3638
D-10 = (0,05+0,15+0,35+0,15+0,35+0,05) * (4,6/0,125) * 0,616 24.93568

BEKISTING 66.28 66.28


= (2+1,5+2+1,5) * 0,5 * 6 21 4.78
= (1+0,5+1+0,5) * 1,3 * 6 23.4
= (0,4+0,4+0,4+0,4) * 5,4 * 2 17.28
= (0,4+0,2+0,4) * 4,6 4.6

4 Pek.Lantai Kerja Pondasi Poer 1.104 1.104


= 1,6 * 2,1 * 0,05 * 6 BH 1.008
= 1,2 * 0,8 * 0,05 * 2 bh 0.096

V.SCULPTURE PERSAHABATAN Page 25


NO. U R A I A N MC-0

IV. PEKERJAAN DINDING DAN PAS. BATU


1 Pas. Pondasi Batu Bata T= 1 bata, 1 Pc : 3 Ps Trasraam 80.428
= (0,75+0,3) *31,42 32.991
= (0,40+0,3) * 33,93 23.751
= (0,35+0,3) * 36,44 23.686

V. PEKERJAAN LANTAI
1 Pas. Lantai Granito 60x60 78.5
= 0,25 * 3,14 * 10 * 10 78.50

2 Pas. Lantai Granito Tangga 40x40 61.34


= (0,25 * 3,14 * 11,6 * 11,6)- 78,5 27.13
= 0,2 * 31,42 6.284
= 0,2 * 33,93 6.786
= 0,2 * 105,68 21.136

VI PEKERJAAN SCULPTURE DAN PRASASTI


1 Pembuatan Sculpture persahabatan Plat Alcupan 90.402
= (0,4+1,82+1,65+3,56)*0,5 * 6 22.29
= (1,42+1,42+3,67)*0,5 * 6 19.53
= 1,82 * 0,4 * 2 * 6 8.736
= 1,42 * 0,4 * 2 * 6 6.816
= 1,5*3,67*0,5 * 2 * 6 33.03

2 Pembuatan Pilar Prasasti 0.20


= (1+0,7)*0,5*0,4*0,6 0.20

3 Pembuatan Plakat Prasasti 1


= 0,5 * 0,6

VII. PEKERJAAN LAMPU SOROT


1 Lampu Sorot SpotLight + Instalasi 6

V.SCULPTURE PERSAHABATAN Page 26


BACK UP MC-0

KONTRAK

- Ls
- M1
- Ls

12.25 M3

4.08 M3

112.01 M3

2.45 M3

5.28 M3

4.90 M3
V.SCULPTURE PERSAHABATAN Page 27
KONTRAK

V.SCULPTURE PERSAHABATAN Page 28


KONTRAK

21.85 M3

- M3

- M3

KG
KG/M3

V.SCULPTURE PERSAHABATAN Page 29


KONTRAK

M2
M2/M3

- M3

V.SCULPTURE PERSAHABATAN Page 30


KONTRAK

105.20 M2

27.15 M2

78.53 M2

89.58 M2

0.20 M3

1.00 Ls

6.00 Bh

V.SCULPTURE PERSAHABATAN Page 31


BACK UP MC-0

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU
KABUPATEN : MAMUJU
PROPINSI : SULAWESI BARAT
TAHUN : 2015

NO. U R A I A N MC-0

a b c
C PEKERJAAN PAGAR KELILING
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 0
1 Pasangan Bowplank 418
2 Papan Proyek 0

II. PEKERJAAN TANAH


1 Galian Tanah 0
2 Urugan Kembali 0
3 Urugan Tanah Pilihan 0
3 Urugan Pasir Bawah Pondasi 0
4 Urugan Pasir Bawah Lantai 0

III. PEKERJAAN PONDASI


1 Pas. Batu Kosong Bawah Pondasi 0
2 Pas. Pondasi Batu Kali / Bt.Gunung 0
3 Pek.Pondasi Poerplat 0
3 Pek.Lantai Kerja Pondasi Poer 0

IV. PEKERJAAN DINDING DAN PAS. BATU


1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam 222.88
= (412,67 -(206 TITIK KOLOM *0,2)) * 0,6 222.88

2 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 6 -


TDK ADA

3 Plesteran 1 Pc : 2 Ps Trasraam, tebal 15 mm 780.93


= PAS BATA * 2 445.76

V.RAB PAGAR Page 32


NO. U R A I A N MC-0

= (412,67-(206 TITI KOLOM*0,2) * 0,15 55.7205


= TIANG KOLOM
= AREA 0,5 * 2 * 207 TITIK 207.00
= (1,1+0,3+0,67+0,58)*0,2*207 TITIK 109.71
KURANGI PERTEMUNAN PASANGAN BT
= 207 TITIK * 2 * 0,15 * 0,6 -37.26

4 Plesteran 1 Pc : 5 Ps, Dinding batu bata tebal 15 mm 0


TDK ADA

V. PASANGAN BETON BERTULANG


1 Pek. Kolom beton bertulang 20.70 20.70
= 207 TITIK * AREA 0,5 * TEBAL 0,2 20.70

TULANGAN 2,078.68 2,078.68


D-12 = 4 POT * (0,1+1,3) * 207 * 0,887 KG/M' 1,028.21 100.42
D-8 = (0,05+0,15+0,25+0,15+0,25+0,05)* 207 * 0,394 KG/M' * 2 146.8044
= (0,05+0,15+0,3+0,15+0,3+0,05) * 207 * 0,394 KG/M' * 2 163.116
= (0,05+0,15+0,4+0,15+0,4+0,05) * 207 * 0,394 KG/M' * 2 195.7392
= (0,05+0,15+0,5+0,15+0,5+0,05) * 207 * 0,394 KG/M' * 2 228.3624
= (0,05+0,15+0,05) * 4 * 207 * 0,394 kg/m' 81.558
= (0,05+0,67+0,67+0,05) * 2* 207 titik * 0,394 kg/m' 234.88704

BEKISTING 207 207.00


= 0,5 * 2 * 207 TITIK 207 10.00

VI. PEKERJAAN PENGECATAN


1 Cat Dinding Tembok 780.93
LUASAN PLESTERAN 780.93

VII. PEKERJAAN BESI / STAINLES


1 Railing Pagar Aluminium Dia. 2" 165.068
PAKAI STEINLESS 2 "
= 412,67 * 0,4 165.068

VIII. PEKERJAAN HALAMAN


1 Pek. Beton Rabat 0

IX. PEKERJAAN LAIN - LAIN


V.RAB PAGAR Page 33
NO. U R A I A N MC-0

1 Pembersihan Akhir 0

V.RAB PAGAR Page 34


BACK UP MC-0

KONTRAK

- Ls
418 M1
- Ls

- M3
- M3
- M3
- M3
- M3

- M3
- M3
- M3
- M3

83.60 M2

167.2 M2

167.20 M2

V.RAB PAGAR Page 35


KONTRAK

334.40 M2

20.58 M3

kg
kg/m3

M2
M2/M3

710.60 M2

167.20 M2

0.00 M3

V.RAB PAGAR Page 36


KONTRAK

- Ls

V.RAB PAGAR Page 37


BACK UP MC-0

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU
KABUPATEN : MAMUJU
PROPINSI : SULAWESI BARAT
TAHUN : 2015

NO. U R A I A N MC-0

a b c
D PEKERJAAN FONT MARK
I. PEKERJAAN PERSIAPAN
1 Pasangan Bowplank 104

II. PEKERJAAN TANAH


1 Galian Tanah 184.12
= 3,8 * 0,3 * (21,57+19,53+20,53) 70.26
= 0,6 * 0,3 * 105 18.90
= 2,1*0,3* 115 72.45
= 0,7*0,3 *13,65 * 2 5.73
= 0,7 * 0,3 * 16,12 3.39
= 0,7 * 0,3 * 9,55 * 2 4.01
= 0,7 * 0,3 * 44,67 9.38

2 Urugan Kembali 61.37


= 1/3 * 184,12 61.37

III. PEKERJAAN PONDASI


1 Pas. Pondasi Batu Kali / Bt.Gunung 503.21
Pondasi Font Work
= 1,9*0,5*(21,57+19,53+20,55) 58.57
= 1,50*1,30*(21,57+19,53+20,55) 120.22
KURANGI BETON = - 65.9025 (65.90)
Pondasi tangga
= 115 * 0,3 * 1,35 46.58
= 115 * 0,55 * 1,15 72.74
= 115 * 0,55 * 0,95 60.09
= 115 * 0,55 * 0,75 47.44

V.RAB FONT MARK Page 38


NO. U R A I A N MC-0

= 121 * 0,3 * 0,55 19.97


= 105 * (0,3+0,6)*0,5*0,85 63.79
= 105 * 0,6* 0,5 31.50
= (0,3+0,7)*0,5*0,9*13,65*2 12.29
= (0,3+0,7)*0,5*0,9*16,12 7.25
= (0,3+0,7)*0,5*0,9*9,55*2 8.60
= (0,3+0,7)*0,5*0,9*44,67 20.10

V.RAB FONT MARK Page 39


NO. U R A I A N MC-0

2 Pek.Pondasi Poerplat 65.9025 65.90


= 61 * 0,5 * 1,9 * 0 0
P = 2,5 * 0,9 * 1,1 2.475
A = 2,5 * 0,9 * 1,16 * 2 * 6 HURUF 31.32
T = 2,5 * 0,9 * 1,1 2.475
I = 2,5 * 0,9 * 1,1 2.475
M = 2,5 * 0,9 * 0,91 * 3 6.1425
N = 2,5 * 0,9 * 1,05 * 2 * 2 HURUF 4.725
K = 2,5 * 0,9 * 1,1 2.475
= 2,5 * 0,9 * 1,38 3.105
R = 2,5 * 0,9 * 1,12 * 2 HURUF 5.04
= 2,5 * 0,9 * 1,26 * 2 HURUF 5.67

TULANGAN 6,279.25 6,279.25


D-16 = (0,05+63+0,05) * 1,9/0,15 * 1,577 KG/M' *0 - 95.28
= (0,05+0,4+63+0,4+0,05) * 1,9/0,15 * 1,577 KG/M' *0 -
= (0,05+1,8+0,05) * (63/0,15) * 1,577 KG/M' *0 -
= (0,05+0,4+1,8+0,05) * (63/0,15) *1,577 KG/M' *0 -
P = (0,2+1,9) * (0,9/0,2) * 2,5 * 1,577 KG/M' 49.68
= (0,2+1,9) * (1,1/0,2) * 2,5 * 1,577 KG/M' 60.71
A = (0,2+1,9) * (0,9/0,2) * 2,5 * 2 * 6 * 1,577 KG/M' 596.11
= (0,2+1,9) * (1,16/0,2) * 2,5 *2 * 6 * 1,577 KG/M' 768.31
T = (0,2+1,9) * (0,9/0,2) * 2,5 * 1,577 KG/M' 49.68
= (0,2+1,9) * (1,1/0,2) * 2,5 * 1,577 KG/M' 60.71
I = (0,2+1,9) * (0,9/0,2) * 2,5 * 1,577 KG/M' 49.68
= (0,2+1,9) * (1,1/0,2) * 2,5 * 1,577 KG/M' 60.71
M = (0,2+1,9) * (0,9/0,2) * 2,5 * 3 * 1,577 KG/M' 149.03
= (0,2+1,9) * (0,9/0,2) * 2,5 * 3* 1,577 KG/M' 149.03
N = (0,2+1,9) * (0,9/0,2) * 2,5 * 2 * 2 * 1,577 KG/M' 198.70
= (0,2+1,9) * (1,05/0,2) * 2,5 * 2 * 2 *1,577 KG/M' 231.82
K = (0,2+1,9) * (0,9/0,2) * 2,5 * 1,577 KG/M' 49.68
= (0,2+1,9) * (1,1/0,2) * 2,5 *1,577 KG/M' 60.71
= (0,2+1,9) * (0,9/0,2) * 2,5 * 1,577 KG/M' 49.68
= (0,2+1,9) * (1,38/0,2) * 2,5 *1,577 KG/M' 76.17
R = (0,2+1,9) * (0,9/0,2) * 2,5 * 2* 1,577 KG/M' 99.35
= (0,2+1,9) * (1,12/0,2) * 2,5 * 2 *1,577 KG/M' 123.64
= (0,2+1,9) * (0,9/0,2) * 2,5 * 2* 1,577 KG/M' 99.35
= (0,2+1,9) * (1,26/0,2) * 2,5 * 2 *1,577 KG/M' 139.09
P = 2,5/0,2 * (0,05+0,9+ 1,1+0,9+0,05) * 0,616 78.85
V.RAB FONT MARK Page 40
NO. U R A I A N MC-0

= 2,5/0,2 * (0,05+ 1,1+0,05) * 0,616 31.54


A = 2,5/0,2 * (0,05+0,9+1,16+0,9+0,05) * 2 * 6 HURUF * 0,616 965.12
= 2,5/0,2 * (0,05+1,16+0,05) * 2 * 6 HURUF * 0,616 397.40
T = 2,5/0,2 * (0,05+0,9 +1,1+0,9+0,05) * 0,616 78.85
= 2,5/0,2 * (0,05 +1,1+0,05) * 0,616 31.54
I = 2,5/0,2 * (0,05+0,9 +1,1+0,9+0,05) * 0,616 78.85
= 2,5/0,2 * (0,05 +1,1+0,05) * 0,616 31.54
M = 2,5/0,2 * (0,05+0,9+0,91+0,9+0,05) * 3 * 0,616 221.57
= 2,5/0,2 * (0,5+0,91+0,05) * 3 * 0,616 115.12
N = 2,5/0,2 * (0,05+0,9+1,05+0,9+0,05) * 2 * 2 HURUF * 0,616 310.14
= 2,5/0,2 * (0,05+1,05+0,05) * 2 * 2 HURUF * 0,616 120.90
K = 2,5/0,2 * (0,05+0,9+1,1+0,9+0,05) * 0,616 78.85
= 2,5/0,2 * (0,05+1,1+0,05) * 0,616 31.54
= 2,5/0,2 * (0,05+0,9 +1,38+0,9+0,05) * 0,616 86.21
= 2,5/0,2 * (0,05 +1,38+0,05) * 0,616 38.90
R = 2,5/0,2 * (0,05+0,9+1,12+0,9+0,05) * 2 HURUF * 0,616 158.75
= 2,5/0,2 * (0,05+1,12+0,05) * 2 HURUF * 0,616 64.13
= 2,5/0,2 * (0,05+0,9+1,26+0,9+0,05) * 2 HURUF * 0,616 166.11
= 2,5/0,2 * (0,05+1,26+0,05) * 2 HURUF * 0,616 71.49

BEKISTING 282.95 282.95


= (63+63+1,9+1,9) * 0,5 *0 - 4.29
P = 2,5 * (0,9+ 1,1+0,9+1,1) 10.00
A = 2,5 * (0,9+1,16+0,9+1,16) * 2 * 6 HURUF 123.6
T = 2,5 * (0,9 +1,1+0,9+1,1) 10.00
I = 2,5 * (0,9 +1,1+0,9+1,1) 10.00
M = 2,5 * (0,9+0,91+0,9+0,91) * 3 27.15
N = 2,5 * (0,9+1,05+0,9+1,05) * 2 * 2 HURUF 39
K = 2,5 * (0,9+1,1+0,9+1,1) 10.00
= 2,5 * (0,9 +1,38+0,9+1,38) 11.4
R = 2,5 * (0,9+1,12+0,9+1,12) * 2 HURUF 20.2
= 2,5 * (0,9+1,26+0,9+1,26) * 2 HURUF 21.6

3 Pek.Lantai Kerja Pondasi Poer


= 61 * 1,9 * 0,05 5.795 2.64

V.RAB FONT MARK Page 41


NO. U R A I A N MC-0

IV. PEKERJAAN BESI / STAINLES


1 Pek.Rangka Huruf dan Pas.Plat Alcupan 485.34
P = 3,6*1,11*2 7.992
= 0,73*0,85*2 bidang*2 sisi 2.482
=1,08*1,81*2 sisi 3.9096
= (3,6+3,05+1,81+1,93+1,33)*0,9 10.548
= (0,85+0,85+0,8) * 0,9 2.25
= 0,9 * 1,15 1.035 28.22

A = (1,21+3,92)*0,5 * 3,6 * 2 sisi* 6 huruf 110.808


= - (1,26+1,62)*0,5*0,59 * 2 sisi* 6 huruf -10.1952
= -(0,79*1,26*0,5) * 2 sisi* 6 huruf -5.9724
= 0,9 * (3,84+1,21+3,84+0,62+0,62+1,26+0,79+1,35+1,25) *6 huruf 79.812
= 0,9*1,14 * 2 bidang *6 huruf 12.312 186.76

V.RAB FONT MARK Page 42


NO. U R A I A N MC-0

N = 3,44 * 3,60 * 2 sisi*2 huruf 49.536


= -(1,35*1,98*0,5)*2 bidang*2 sisi *2 huruf -10.692
= 0,9*(3,6+1,04+2,41+1,98) * 2 huruf 16.218
= 0,9*(1,98+2,41+3,6+1,05) *2 huruf 16.236
= 0,9*(1,04+1,05) *2 huruf 3.762 75.06

T = ((1,11*2,71) + (3,38*0,89)) * 2 sisi 12.0326


= 0,9*(2,71+1,13+0,89+3,38) 7.299
= 0,9*(2,71+1,13+0,89) 4.257
= 0,9*1,1 0.99 24.5786

I = 3,6*1,11*2 sisi 7.992


= 3,6*0,9*2 sisi 6.48
= 1,11*0,9*2 sisi 1.998 16.47

M = 4,05 * 3,60 * 2 sisi 29.16


= -(0,7*2,74*0,5)*2 bidang*2 sisi (3.84)
= -(1,12*2,19*0,5)*2 sisi (2.45)
= 0,9*(3,6+1,46+2,26+2,26+1,46+3,6) 13.18
= 0,9*(2,74+2,83+2,83+2,74) 10.03
=0,9*(0,91+0,82+0,91) 2.38 48.45

K = 3,81*3,6 * 2 sisi 27.43


= -(1,17*1,36*0,5) * 2 sisi (1.59)
= -(0,83*0,6*0,5)*2 sisi (0.50)
= -(0,88+1,33)*0,5*0,88*2 sisi (1.94)
= -(3,6*1,31*0,5) * 2 sisi (4.72)
= 0,9*(3,6+1,11+1,36+1,79+1,48) 8.41
= 0,9*(1,89+2,63+1,66+0,83+0,88) 7.10
= 0,9*(1,11+1,37) 2.23 36.42

R = 3,52 * 3,6 * 2 sisi * 2 huruf 50.69


= -(1,17*1,46*0,5)*2 sisi* 2 huruf (3.42)
= -(0,73*1,01) * 2 sisi* 2 huruf (2.95)
= -(1,16*3,6*0,5) * 2 sisi* 2 huruf (8.35)
= 0,9*(3,6+3,23+1,2+1,97) * 2 huruf 18.00
= 0,9*(0,73+1,01+1,01) * 2 huruf 4.95
= 0,9*(1,46+1,97) * 2 huruf 6.17
= 0,9*(1,12+1,26) * 2 huruf 4.28 69.38
V.RAB FONT MARK Page 43
NO. U R A I A N MC-0

V. PEKERJAAN PLESTERAN
1 Plesteran Pondasi 1 Pc : 2 Ps Trasraam, tebal 15 mm 372.08
= (1,3+1,5+1,3)*(21,57+19,53+20,53) 252.68
= 1,10 * 105 115.50
= 1,5 * 1,3 * 2 3.90

2 Plesteran Dinding Kolam 1 Pc : 2 Ps Trasraam, tebal 15 mm 313.58


= 1,1 * (20,12+18,66+21,13) * 2 131.80
= 0,99 * (20,12+18,66+21,13) * 2 118.62
= 0,9 * (20,12+18,66+21,13) 53.92
= 2,1*1,1 * 2 * 2 9.24

VI. PEKERJAAN KOLAM AIR MANCUR


1 Pek. Dinding Kolam Beton K225 25.72
= (20,12+18,66+21,13) * 1,10 * 0,2 13.18
= (20,12+18,66+21,13) * 0,99 * 0,2 11.86
= 1,3 * 1,3 * 0,2 * 2 0.676

TULANGAN 2,398.13 2,398.13


D-12 = 59,91 * (1,10/0,15) * 2 * 0,887 KG/M' 1,169.08 93.25
= 1,1 * (59,91/0,15) * 2 * 0,887 KG/M' 1,169.08
= 1,3 * (1,3/0,15) * 2 * 0,887 KG/M' 29.98
= 1,3 * (1,3/0,15) * 2 * 0,887 KG/M' 29.98

BEKISTING 318.29 318.29


59,91 * 1,3 * 4 311.532 12.38
= 1,3 * 1,3 * 4 6.76

2 Pek. Lantai Kolam Beton K225 15.58


= (20,12+18,66+21,13) * 1,3 * 0,2 15.58

TULANGAN 1,382 1,381.64


D-12 = 59,91 * (1,3/0,1) * 0,887 KG/M' 691 88.70
= 1,3 * (59,91/0,1) * 0,887KG/M' 691

BEKISTING

V.RAB FONT MARK Page 44


NO. U R A I A N MC-0

VII. PEKERJAAN PENGECATAN


1 Pek. Cat Dinding Kolam 181.71
= (1,1+0,9+1)* (20,12+18,66+21,13) 179.73
= 0,9 * 1,1 * 2 1.98

VIII. PEKERJAAN PERLENGKAPAN KOLAM


1 Pek.Pompa Air Mancur + Kelengkapan + Instalasi 1
2 Lampu Sorot SpotLight + Instalasi 30

V.RAB FONT MARK Page 45


BACK UP MC-0

KONTRAK

104 M1

259.85 M3

86.62 M3

519.71 M3

V.RAB FONT MARK Page 46


KONTRAK

V.RAB FONT MARK Page 47


KONTRAK

M3

KG
KG/M3

V.RAB FONT MARK Page 48


KONTRAK

M2
KG/M3

V.RAB FONT MARK Page 49


KONTRAK

461.63 M2

V.RAB FONT MARK Page 50


KONTRAK

V.RAB FONT MARK Page 51


KONTRAK

734.76 M2

394.11 M2

32.41 M3

KG
KG/M3

M2
M2/M3

13.16 M3

KG
KG/M3

V.RAB FONT MARK Page 52


KONTRAK

394.11 M2

1.00 Ls
30.00 Bh

V.RAB FONT MARK Page 53


BACK UP MC-0

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU
KABUPATEN : MAMUJU
PROPINSI : SULAWESI BARAT
TAHUN : 2015

NO. U R A I A N MC-0 KONTRAK

a b c d
E PEKERJAAN SCULPTURE SANDEQ DAN KOLAM
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 0 - Ls
2 Pengukuran Awal dan Pasangan Bowplank 0 - M1
2 Papan Proyek 0 - Ls

II. PEKERJAAN TANAH


1 Galian Tanah 0 75.24 M3
MASUK D LANTAI 0
2 Urugan Kembali 0 25.08 M3
MASUK DI LANTAI 0
3 Urugan Tanah Timbunan Biasa 0 5.81 M3
MASUK DI LANTAI 0
4 Urugan Pasir Bawah Lantai 0 2.91 M3
MASUK DI LANTAI

III. PEKERJAAN DINDING DAN PAS. BATU


1 Pas. Pondasi Batu Bata T= 1 bata, 1 Pc : 3 Ps Trasraam 0 32.93 M2
TDK ADA 0
2 Plesteran 1 Pc : 2 Ps Trasraam, tebal 15 mm 0 262.94 M2
TDK ADA 0

IV. PASANGAN BETON BERTULANG


1 Pek. Sloof beton bertulang 20/30 6.3948 4.60 M3
= 0,2 * 0,3 * 16,12 0.9672
= 0,2 *0,3 * 13,65 * 2 1.638
= 0,2 *0,3*9,43*2 1.1316
= 0,2 * 0,3 * 44,3 2.658

V.RAB SCULPTURE DAN KOLAM Page 54


NO. U R A I A N MC-0 KONTRAK

2 Pek. Dinding Kolam Beton Bertulang 22.23 63.51 M3


= 44,3 * 0,3 * 1,4 DINDING LUAR 18.61
= 15,1 * 0,2 * 1,2 DINDING DALAM 3.62

3 Pek. Pilar beton Sculpture Sandeq 0 15.07 M3


TDK ADA

4 Pek. Plat Beton Dudukan Sandeq 4.94 3.62 M3


= AREA 24,71 * 0,2 .... PELAT DUDUKAN 4.94

5 Pek. Plat Lantai Kolam 45.14 - M3


= AREA 150,47 * 0,3 .... PELAT LANTAI 45.14

V. PEKERJAAN LANTAI
1 Pas. Lantai Keramik 40x40 Kasar 68.562 58.12 M2
T.9 = AREA 208,59-150,47 58.12
= 0,2 * 52,21 OPTREDE 10.442

VI. PEKERJAAN PENGECATAN


1 Cat Kolam 250.2 262.94 M2
= 44,3 * 1,4 62.02
= 44,3 * 1 44.3
= 15,1 * 1,2 18.12
= AREA 150,47-24,71 125.76

VII. PEKERJAAN SCULPTURE


1 Pembuatan Sculpture Perahu Sandeq 1 1.00 Ls

VIII. PEKERJAAN LAMPU KOLAM


1 Lampu Kolam Inbow 8 8.00 Bh

IX. PEKERJAAN AIR MANCUR


1 Pek.Pompa Air Mancur + Kelengkapan + Instalasi 1 1.00 Ls

V.RAB SCULPTURE DAN KOLAM Page 55


BACK UP MC-0

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU
KABUPATEN : MAMUJU
PROPINSI : SULAWESI BARAT
TAHUN : 2015

NO. U R A I A N MC-0 KONTRAK

a b c d
F PEKERJAAN BANGKU TAMAN
I. PEKERJAAN DINDING DAN PAS. BATU
1 Pas. Dinding Batu Bata T= 1/2 bata, 1 Pc : 3 Ps Trasraam 77.28 M2
PAS. DINDING BANGKU
= 1,1 * 0,4 * 2 * 4 * 18 63.36
PAS. DINDING TAMAN
= 2,3 * 1,2 * 2 * 18 99.36
= 2 * 1,2 * 2 * 18 86.4

2 Plesteran 1 Pc : 5 Ps, Dinding batu bata tebal 15 mm 154.56 M2


= (0,6+0,6+0,15+0,15)*0,4*2*4*18 86.40
= (2,3*4)*0,85 * 18 140.76
= (2*4)*0,7*18 100.8

II. PASANGAN BETON BERTULANG


1 Pek. Plat Beton Bangku Taman 9.41 M3
= 2,3 * 0,1 * 0,6 * 4 * 18 9.94

III. PEKERJAAN PENGECATAN


1 Cat Dinding Tembok 271.44 M2
= LUASAN DINDING BANGKU 86.40
= LUAS DINDING LUAR TAMAN 140.76

IV. PEKERJAAN TAMAN


1 Pek.Taman Depan Font Mark 47.928 60.37 M2
= (20,12+18,66+21,13) * 0,8 47.928

2 Pek.Taman Anjungan 550.58 523.25 M2

V.RAB BANGKU TAMAN Page 56


NO. U R A I A N MC-0 KONTRAK

area 307,63 307.63


area 242,95 242.95

V.RAB BANGKU TAMAN Page 57


BACK UP MC-0

PEKERJAAN : PENATAAN KAWASAN ANJUNGAN PANTAI MANAKARRA


LOKASI : MAMUJU
KABUPATEN : MAMUJU
PROPINSI : SULAWESI BARAT
TAHUN : 2015

NO. U R A I A N MC-0 KONTRAK

a b c d
G PEKERJAAN PAYUNG HIAS,LAMPU TAMAN
I. PAYUNG HIAS
1 Payung Hias ( 6m x 6m ) + Instalasi 10 10.00 Bh
2 LED 10

3 Galian Pondasi
= 1,2 * 1,2* 1 * 10 14.4

4 Urugan kembali
= 1/3 * 14.4 4.8

5 Urugan pasir
= 1,2 * 1,2 * 0,1 * 10 1.44

6 lanati kerja
= 1,2 * 1,2 * 0,05 * 10 0.72

7 pondasi beton 6.72


= (1,2*1,2*0,4) * 10 5.76
= (0,4*0,4*0,6) * 10 0.96

II. INSTALASI DAYA, LAMPU TAMAN DAN LAMPU SOROT


1 Lampu Taman Solar Cell 25 25.00 Bh
JARAK LAMPU '= 417/25 = 16,68 M
2 Lampu Sorot 500 watt + Kabel + Instalasi 8 8.00 Bh
3 Tiang Lampu Sorot Pipa Gip 5" Tinggi 9 m 2 2.00 Bh
4 Instalasi Daya 11.000 watt 1 1.00 Ls
5 Box Fuse (40 x 60 x 20 ) + MCB PANEL 1 1.00 Ls

V.RAB TULIP UMBRELLA Page 58


V.RAB TULIP UMBRELLA Page 59