1200 mm
B. Hasil Analisa Mu
Lebar pondasi (B) = 1100 mm
Tebal pondasi (d) = 0.3 mm 300 mm
Tulangan = dia16 - 250
Jumlah tul.per lebar pondasi = 5 bh
d=0.3
C. Analisa
Data penyelidikan tanah
gelam
g (Wet density)
3
= 1700 t/m f10-6m
f (angle of internal friction)
o
= 45
2
c (cohesion) = 0 kg/cm
t (timbunan tanah merah) = 0 cm B=1100
Analisa Terzaghi
qult = 1,3.c.Nc.+q.Nq+0,4.g.B.Ng
gelam
f10-6m
Tabel Tersaghi untuk nilai :f,Nc,Nq,Ng
f = 0 5
Nc = 5.7 7.3
Nq = 1 1.6
B=1100
Ng = 0 0.5
b
Page 1 of 2
1. One way action
diambil lebar pondasi (B)
= 1100 mm
2
qu= Pu/B^2 = 0.270661157 N/mm
Vu < Vc
qu*B(0.5*B-0.5*b-d)0.6*1/6(sqrt(f'c))*B*d
=
Tebal pondasi (d) 390.7598194 mm
diambil tebal pondasi (d)
= 400 mm
2 2
qu= Pu/B^2<s'lentur = 0.271 N/mm < 22.440 N/mm Ok!
Page 2 of 2