Variations of the loads acting on slopes, and variations In the case of a natural slope, not altered by either
of shear strengths with time, result in changes in the fill placement or excavation, there is no end-of-
factors of safety of slopes. As a consequence, it is often construction condition. The critical condition for a nat-
necessary to perform stability analyses corresponding ural slope corresponds to whatever combination of
to several different conditions, reflecting different seepage and external loading results in the lowest fac-
stages in the life of a slope.
dM tor of safety. The higher the phreatic surface within the
When an embankment is constructed on a clay foun- slope and the more severe the external loading condi-
dation, the embankment load causes the pore pressures tion, the lower is the factor of safety.
in the foundation clay to increase. Over a period of In the case of an embankment dam, several different
time the excess pore pressures will dissipate, and even- factors affect stability. Positive pore pressures may de-
tually, the pore pressures will return to values governed velop during construction of clay embankments, par-
by the groundwater conditions. As the excess pore ticularly if the material is compacted on the wet side
pressures dissipate, the effective stresses in the foun- of optimum. The same is true of clay cores in zoned
hte
dation clay increase, the strength of the clay will in- embankments. Over time, when water is impounded
and seepage develops through the embankment, the
crease, and the factor of safety of the embankment will
pore pressures may increase or decrease as they come
also increase. Figure 4.1 illustrates these relationships.
to equilibrium with steady seepage conditions. Reser-
If, as shown, the embankment height stays constant voir levels may vary with time during operation of the
and there is no external loading, the most critical con- dam. A rapid drop in reservoir level may create a crit-
rig
dition occurs at the end of construction. In this case, ical loading condition on the upstream slope. A rise
therefore, it is only necessary to analyze the end-of- from normal pool level to maximum pool level may
construction condition. result in a new state of seepage through the embank-
When a slope in clay is created by excavation, the ment and a more severe loading condition on the
pore pressures in the clay decrease in response to re- downstream slope.
py
moval of the excavated material. Over time, the neg- Earthquakes subject slopes to cyclic variations in
ative excess pore pressures dissipate and the pore load over a period of seconds or minutes that can cause
pressures eventually return to values governed by the instability or permanent deformations of the slope, de-
groundwater conditions. As the pore pressures in- pending on the severity of the shaking and its effect
Co
crease, the effective stresses in the clay around the ex- on the strength of the soil. As noted in Chapter 10,
cavation decrease, and the factor of safety of the slope loose sands may liquefy and lose almost all shearing
decreases with time. Figure 4.2 shows these relation- resistance as a result of cyclic loading. Other, more
ships. If the depth of excavation is constant and there resistant soils may deform during shaking but remain
are no external loads, the factor of safety continually stable.
decreases, and its minimum value is reached when the
pore pressures reach equilibrium with the groundwater END-OF-CONSTRUCTION STABILITY
seepage condition. In this case, therefore, the long-
term condition is more critical than the end-of- Slope stability during and at the end of construction is
construction condition. analyzed using either drained or undrained strengths,
31
l
A=0 Time
ria
Due to groundwater level
u
φu = 0 method applicable here
Time
0
A=0
F
factor Factor of safety (c',φ ' method)
of
ate
A=1
safety
Time
ru Average pore pressure ratio around slip surface Pore pressure redistribution Pore pressure equilibrium
Average Rapid construction
u
ru = γ z
Time
0 Figure 4.2 Variation with time of pore pressure and factor
dM of safety during and after excavation of a slope in clay. (After
φu = 0 method applicable here
Bishop and Bjerrum, 1960.)
Factor
of Factor of safety against foundation failure ( c', φ' method)
safety
Time
Pore pressure dissipation
clusion of construction. As discussed later, if an em-
Pore pressure equilibrium
Rapid construction
bankment is constructed in stages, and significant
consolidation occurs between stages, each construction
hte
Figure 4.1 Variations with time of shear stress, pore pres- stage should be analyzed.
sure, and factor of safety for an embankment on saturated
clay. (After Bishop and Bjerrum, 1960.)
LONG-TERM STABILITY
depending on the permeability of the soil. Many fine- Over time after construction the soil in slopes may
rig
grained soils are sufficiently impermeable that little either swell (with increase in water content) or con-
drainage occurs during construction. This is particu- solidate (with decrease in water content). Long-term
larly true for clays. For these fine-grained soils, un- stability analyses are performed to reflect the condi-
drained shear strengths are used, and the shear strength tions after these changes have occurred. Shear
is characterized using total stresses. For soils that drain strengths are expressed in terms of effective stresses
py
freely, drained strengths are used; shear strengths are and the pore water pressures are estimated from the
expressed in terms of effective stresses, and pore water most adverse groundwater and seepage conditions an-
pressures are defined based on either water table in- ticipated during the life of the slope. Seepage analyses
formation or an appropriate seepage analysis. Un- can be performed using either graphical techniques
Co
drained strengths for some soils and drained strengths (flow nets) or numerical analyses (finite element, finite
for others can be used in the same analysis. difference), depending on the complexity of the cross
For many embankment slopes the most critical con- section.
dition is the end of construction. In some cases, how-
ever, there may be intermediate conditions during
construction that might be more critical and should RAPID (SUDDEN) DRAWDOWN
therefore be analyzed. In some fill placement opera-
tions, including some waste fills, the fill may be placed Rapid or sudden drawdown is caused by a lowering of
with a slope geometry such that the stability conditions the water level adjacent to a slope, at a rate so fast that
during construction are more adverse than at the con- the soil does not have sufficient time to drain signifi-
l
be lower if drawdown occurs some time after construc-
ria
tion than if it occurs immediately after construction.
Rapid drawdown is discussed in Chapter 9. Recapitulation
ate
EARTHQUAKE
permeability of the soil.
Earthquakes affect the stability of slopes in two ways, • Long-term stability analyses, which reflect con-
as discussed in Chapter 10: (1) The acceleration pro- ditions after swelling and consolidation are com-
duced by the seismic ground motion during an earth- plete, are analyzed using drained strengths and
quake subjects the soil to cyclically varying forces, and pore water pressures corresponding to steady
seepage conditions.
dM
(2) the cyclic strains induced by the earthquake loads
may cause reduction in the shear strength of the soil. • Sudden drawdown removes the stabilizing effect
If the strength of the soil is reduced less than 15% of external water pressures and subjects the slope
by cyclic loading, pseudostatic analyses of the earth- to increased shear stress. Either drained or un-
quake loading can be used. In pseudostatic analyses, drained strengths are used, depending on the per-
the effect of the earthquake is represented crudely by meability of the soil.
applying a static horizontal force to the potential slid- • Earthquakes subject slopes to cyclically varying
hte
ing mass. This type of analysis, which is discussed in stresses and may cause reduction in the shear
Chapter 10, provides a semi-empirical means of deter- strength of the soil as a result of cyclic loading.
mining whether deformations due to an earthquake will Shear strengths measured in cyclic loading tests
be acceptably small. are appropriate for analyses of stability during
If the strength of the soil is reduced more than 15% earthquakes.
as a result of cyclic loading, dynamic analysis are • Stability analyses for staged construction of em-
rig
needed to estimate the deformations that would result bankments require consolidation analyses to esti-
from earthquakes. Some engineers perform this type of mate the increase in effective stresses that results
analysis for all slopes, even if the strength reduction from partial consolidation of the foundation.
due to earthquake loading is less than 15%. These
py
loads may be short term, such as passage of a heavy compared to the weight of the soil in the slope. For
vehicle, or permanent, such as construction of a build- example, a typical one-story building will exert loads
ing. Depending on whether the load is temporary or of about the same magnitude as an additional 1 ft of
permanent, and whether the soil drains quickly or soil. If it is unclear whether a surcharge load will have
slowly, undrained or drained strengths may be appro- a significant affect on stability, the condition should be
priate. If the surcharge loading occurs shortly after analyzed.
construction, the undrained strengths would be the
same as those used for end-of-construction stability. Partial Submergence and Intermediate Water Levels
However, if the load is imposed some time after con- For the upstream slopes of dams and other slopes
struction, and the soil has had time to drain (consoli- where the level of an adjacent body of water has an
date or expand), the undrained strengths may be influence on stability, the lowest water level usually
l
different and would be estimated using the same pro- produces the most adverse conditions. In the case of
ria
cedures as those used to estimate undrained strengths slopes that contain zones of materials with different
for rapid drawdown. strength characteristics, the factor of safety of the up-
In many cases slopes will have a sufficiently high stream slope may be lower with a water level at some
factor of safety that the effect of small surcharge loads elevation between the top and the toe of the slope. The
ate
is insignificant. Often, the loads imposed by even most critical water level for these conditions must be
heavy vehicles and multistory buildings are negligible determined by repeated trials.
dM
hte
rig