Anda di halaman 1dari 7

C# 1510 - SITE PROGRESS REPORT

Date: 30 October 2017

PANELS DOUBLE TEES / SS


REQ'D DEL. ERECTED GROUT
PLATE
SRL BLDG. BLDG. # ALIGN SCAFOLDING FIXING INSPECTION CORNER TG REQ'D DEL. DT/SS PLATE FIXING WELDING REMARKS
NAME DECORA DECORA DECORA WELDING EXTRA ERECTED (DT) (DT - P)
PANEL TIVE PANEL TIVE PANEL TIVE (PANEL) BOT VER
PANEL PANEL PANEL

1 SS-03 420 132 19 132 19 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 44 44 DONE DONE 90%

Plate closing & grouting on-going. Need welding area


2 PIB-01 320 133 28 133 28 DONE DONE DONE DONE DONE DONE DONE 70% DONE 95% 54 54 DONE DONE 90% paint to continue the work. HOLD by Client because not
priority as of now

3 PIB-03Y 331 69 23 69 23 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 30 30 DONE DONE 90%

Vertical joint grout & plate closing on going. Waiting for


4 PIB-03Z 332 69 23 69 23 DONE DONE DONE DONE DONE DONE DONE 50% DONE 98% 30 30 DONE DONE 90% NESMA on corner welding area paint to continue the
work

5 MDS-01 461 87 10 87 10 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 26 26 DONE DONE 90%

6 MDS-02 462 87 10 87 10 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 26 26 DONE DONE 90%

7 SS-14 431 108 19 108 19 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 35 35 DONE DONE 90%

8 SS-09 460 88 19 88 19 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 28 28 DONE DONE 90%

9 SS-10 463 76 19 76 19 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 22 22 DONE DONE 90%

10 PIB-06 360 135 22 135 22 DONE DONE DONE DONE DONE DONE DONE - DONE 50% 58 58 DONE DONE 80% need scaffolding for TG extra on-going

11 CCB 300 74 74 - 72 - 60% 10% 50% 40% 30% - - 160 160 DONE - - 2 Panels stock on site due to wrong anchor bolt in CIP

12 115KV GIS 400 177 177 - 160 - 50% 10% 50% 50% 50% 50% - 36 / 74 34 / 74 12 / DONE - - need scaffolding for alignment & grouting

13 SS-15 432 108 19 108 19 DONE DONE DONE DONE DONE DONE DONE - DONE 98% 35 35 DONE DONE DONE Plate closing on-going

14 PIB-02 335 69 23 69 23 DONE DONE DONE DONE DONE DONE DONE - DONE 80% 31 31 DONE - 80%

15 SS-06 435 88 19 88 15 DONE 11 DONE DONE DONE DONE DONE - DONE 20% 28 28 DONE - 80% need scafolding for batching

16 SS-04 433 108 19 108 - DONE - DONE DONE DONE DONE DONE - DONE G 35 35 DONE - 60%

17 SS-05 434 108 19 108 - DONE - DONE DONE DONE DONE DONE - DONE 35 35 34 - -

18 PIB-03 333 69 23 69 - DONE - DONE DONE DONE DONE DONE - DONE 30 30 DONE - 60%

19 PIB 03X 334 69 23 69 - DONE - DONE DONE 90% DONE DONE - DONE 30 30 DONE - 60%

20 LAB 200 63 - 63 - - - - - - - - - - 89 83 - - -

21 OME-01 220 50 - 50 - DONE - 50% - 25% - - - - 57 57 DONE - -

22 OME-05 231 50 - 50 - 49 - 30% - 10% - - - - 57 57 DONE - -

23 UT OME 260 56 - 55 - 53 - - - - - - - - 66 65 65 - -

24 OME 02 234 50 - 49 - 40 - - - - - - - - 57 55 55 - -

25 UT ESO 760 29 - 29 - - - - - - - - - - 30 28 - - -

26 MPR 600 24 - 22 - 5 - - - - - - - - 42 38 38 - -

27 OPS 734 12 - 12 - DONE - - - - - - - - 3 3 DONE - -

28 EDG 1 532 27 34 24 - 19 - - - - - - - - 10 9 - - -

29 EDG 2 534 27 34 6 - - - - - - - - - - 10 7 - - -

30 EDG 4 561 27 34 4 - - - - - - - - - - 10 4 - - -

31 EDG 5 562 27 34 - - - - - - - - - - - 10 4 - - -

32 EDG 8 520 27 34 15 - - - - - - - - - - 10 7 - - -
C# 1510 - SITE PROGRESS REPORT
Date: 16 NOVEMBER 2017

PANELS DOUBLE TEES / SS


REQ'D DEL. ERECTED GROUT
PLATE
SRL BLDG. BLDG. # ALIGN SCAFOLDING FIXING INSPECTION CORNER TG REQ'D DEL. DT/SS PLATE FIXING WELDING REMARKS
NAME DECORA DECORA DECORA WELDING EXTRA ERECTED (DT) (DT - P)
PANEL TIVE PANEL TIVE PANEL TIVE (PANEL) BOT VER
PANEL PANEL PANEL

1 SS-03 420 132 19 132 19 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 44 44 DONE DONE 90%

Plate closing & grouting on-going. Need welding area


2 PIB-01 320 133 28 133 28 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 54 54 DONE DONE 90% paint to continue the work. HOLD by Client because not
priority as of now

3 PIB-03Y 331 69 23 69 23 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 30 30 DONE DONE 90%

Vertical joint grout & plate closing on going. Waiting for


4 PIB-03Z 332 69 23 69 23 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 30 30 DONE DONE 90% NESMA on corner welding area paint to continue the
work

5 MDS-01 461 87 10 87 10 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 26 26 DONE DONE 90%

6 MDS-02 462 87 10 87 10 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 26 26 DONE DONE 90%

7 SS-14 431 108 19 108 19 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 35 35 DONE DONE 90%

8 SS-09 460 88 19 88 19 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 28 28 DONE DONE 90%

9 SS-10 463 76 19 76 19 DONE DONE DONE DONE DONE DONE DONE DONE DONE DONE 22 22 DONE DONE 90%

10 PIB-06 360 135 22 135 22 DONE DONE DONE DONE DONE DONE DONE - DONE 70% 58 58 DONE DONE 80% need scaffolding for TG extra on-going

11 CCB 300 74 74 - DONE - 75% 80% 80% 75% 50% - - 40% 160 160 DONE - -

12 115KV GIS 400 177 177 - DONE - 100% 0% 95% 95% 95% 95% - 36 / 74 36 / 74 DONE - - need scaffolding for alignment & grouting

13 SS-15 432 108 19 108 19 DONE DONE DONE DONE DONE DONE DONE 50% DONE DONE 35 35 DONE DONE DONE Plate closing on-going

14 PIB-02 335 69 23 69 23 DONE DONE DONE DONE DONE DONE DONE - DONE DONE 31 31 DONE DONE 80%

15 SS-06 435 88 19 88 15 DONE 11 DONE DONE DONE DONE DONE - DONE DONE 28 28 DONE DONE 80%

16 SS-04 433 108 19 108 - DONE 8 DONE DONE DONE DONE DONE - DONE 90% 35 35 DONE - 60%

17 SS-05 434 108 19 108 - DONE 10 DONE DONE DONE DONE DONE - DONE 35 35 DONE G -

18 PIB-03 333 69 23 69 - DONE - DONE DONE DONE DONE DONE - DONE 90% 30 30 DONE - 60%

19 PIB 03X 334 69 23 69 - DONE - DONE DONE DONE DONE DONE - DONE 50% 30 30 DONE DONE 60%

20 LAB 200 63 - 63 - - - - - - - - - - 89 84 14 - -

21 OME-01 220 50 - 50 - DONE - 50% - 70% - - - - 57 57 DONE - -

22 OME-05 231 50 - 50 - DONE - 30% - 10% - - - - 57 57 DONE - -

23 UT OME 260 56 - 55 - 55 - - - - - - - - 66 66 65 - -

24 OME 02 234 50 - 49 - DONE - - - - - - - - 57 56 56 - -

25 UT ESO 760 29 - 29 - - - - - - - - - - 30 28 - - -

26 MPR 600 24 - 20 - DONE - - - - - - - - 42 39 39 - -

27 OPS 734 12 - 12 - DONE - - - - - - - - 3 3 DONE - -

28 EDG 1 532 27 34 20 - DONE - - - - - - - - 10 9 - - -

29 EDG 2 534 27 34 17 - - - - - - - - 10 10 - - -

30 EDG 4 561 27 34 - - 16 - - - - - - - - 10 10 - - -

31 EDG 5 562 27 34 - - 14 - - - - - - - - 10 10 - - -

32 EDG 8 520 27 34 6 - 16 - - - - - - - - 10 10 - - -
C# 1510 - SITE PROGRESS REPORT
Date: 16 September 2017

BALANCE DELIVERY
BLDG. SCUPPER &
SRL NAME BLDG. # PANELS DECORATIVE DOUBLE TEE HCS SOLID SLAB SPLASHBLOCK

1 SS-03 420 - - - - - 18

2 MDS-01 461 - - - - - 14

3 MDS-02 462 - - - - - 14

4 SS-14 431 - - - - - 18

5 SS-09 460 - - - - - 14

6 SS-10 463 - - - - - 12

7 PIB-01 320 - - - - - 24

8 PIB-03Y 331 - - - - - 12

9 PIB-03Z 332 - - - - - 12

10 PIB-06 360 - - - - - 24

11 CCB 300 - - - - - 24

12 115KV GIS 400 134 - 25 - 3 38

13 SS-15 432 18

14 SS-06 435 19 14

15 SS-04 433 19 35 18

16 SS-05 434 1 19 22 18

17 PIB-02 335 12

18 PIB-03 333 23 12

19 PIB 03X 334 23 16 12

20 LAB 200 63 9 16

21 UT OME 260 49 15 16

22 OME 02 234 50 3 12

23 OME-05 231 16 2 12
C# 1510 - ERECTION ACCESSORIES MONITORING
Date: 10-May-17

QTY. REQ'D ACC 03 ACC 03A TOTAL DELIVERED BALANCE


SRL BLDG ACC 03 ACC 03A GALV. DRILL FAB GALV. DRILL FAB ACC 03 ACC 03A ACC 03 ACC 03A
1 420 712 1196 712 712
2 320 833 1662 200 1657 570 900 1570 1662 370 1662
3 331 400 895 895
4 332 400 895 35 100
5 461 490 658
6 431 428 958
7 462 490 658

NOTE:
1.) all fabricated accessories will be send outside for drilling.
2.) 1 - 2 days on drilling and will be send back to factory.
3.) minimum of 3 days in galvanization plant after sending from the factory.
4.) once received from the galvanization, it will be send to site immediately.
C# 1510 - BALANCE ACCESSORIES REQUIRED AT SITE

PANELS
SRL BLDG ACC 01 ACC 03 ACC 03A ACC 03B ACC 04 ACC 06A ACC 11 ACC 12
1 420 - - - - - - - -
2 320 - 263 - - - - - 168
3 331 - 400 295 - - - - 141
4 461 69 490 658 - 112 21 95 95
5 431 469 428 958 81 112 57 95 95
6 332 - 400 635 - 181 - - 141
7 462 360 490 658 - 112 21 95 95
8 460 382 426 703 90 117 24 95 95

TOTAL 1280 2897 3907 171 634 123 380 830

DOUBLE TEES
SRL BLDG ACC 05 ACC 05A ACC 05B ACC 07 ACC 08 ACC 09 ACC 10 ACC 13
1 420 - - 352 691 - 155 - -
2 320 - 370 - 827 416 96 208 168
3 331 - 204 - 448 232 56 - 72
4 461 120 260 1110 208 156
5 431 240 30 280 759 198 132 240
6 332 72 204 448 232 56 116 72
7 462 120 260 1110 208 156 104
8 460 240 224 598 156 104 240

TOTAL 792 1328 856 5991 1296 1029 664 792

Note:
1.) Qty. in red font means fabricated already.
2.) Approximately 1500 pcs (ACC-03) are outside for drilling.
3.) 80 pcs (ACC-03) are now in galvanization plant.
4.) 200 pcs (ACC-03) sending for galvanizing.

LEGEND:
ACC 01 - 100x150x12mm thick bent plate (galvanized)
ACC 03 - 170x190x8mm thick steel plate
ACC 03A - 170x190x6mm thick steel plate
ACC 03B - 170x190x12mm thick steel plate
ACC 04 - 120x90x10mm thick (L=175) steel bent plate
ACC 05 - 100x150x8mm thick bent plate (galvanized)
ACC 05A - 100x100x8mm thick (L=175) bent plate (galvanized)
ACC 05B - 100x150x8mm thick (L=150) bent plate (galvanized)
ACC 06A - 120x110x10mm thick (L=180) st'l bent plate
ACC 07 - 160x310x10mm thick steel plate (galvanized)
ACC 08 - 100x150x6mm thick (L=150) bent plate (galvanized)
ACC 09 - 600x200x16mm thick steel plate (galvanized)
ACC 10 - 110x110x10mm thick random fibre reinforced bearing pads
ACC 11 - 80x80x8mm thick washer plates
ACC 12 - Ø20mm threaded bar, L=140
ACC 13 - M16 threaded bar, L=240
C# 1510 - BALANCE ACCESSORIES REQUIRED AT SITE

PANELS
ACC 01 ACC 02 ACC 03 ACC 03A ACC 03B ACC 04 ACC 05 ACC 05A ACC 05B ACC 06A ACC 08 ACC 11 ACC 12
SRL BLDG
REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL.
1 420 587 712 1196 181 189 360 440 352 25 - 105 105
2 461 360 490 658 112 120 260 21 208 95 95
3 462 360 490 658 112 120 260 21 208 95 95
4 431 469 428 958 81 112 240 350 280 57 - 95 95
5 460 382 426 703 90 117 240 280 224 24 - 95 95
6 463 320 476 540 - 117 240 220 176 24 - 95 95
7 320 778 833 1662 386 160 370 416 168 168
8 331 412 400 895 181 72 204 232 141 141
9 360 795 698 1815 412 144 386 456 138 138
10 300 350 425 925
11 332 412 400 895 181 72 204 232 141 141
12 400
13 432
14 435
15 433
16 434
17 335
18 333
19 334
20 200

TOTAL 5225 0 425 0 5353 0 10905 0 352 0 1919 0 1768 0 2974 0 1032 0 172 0 1752 0 1168 0 1168 0

INDENTIFICATION:
DOUBLE TEES ACCESSORIES LOCATION REQUIREMENTS DAILY TARGET
ACC 07 ACC 09 ACC 10 ACC 13 ACC 01 Panel - Foundation for daily erection 200pcs/day
SRL BLDG
REQ'D BAL. REQ'D BAL. REQ'D BAL. REQ'D BAL. Panel - Panel Side
ACC 03 Alignment required completed building 100pcs/day
1 420 943 246 164 360 Elevation
2 461 1110 156 104
ACC 03A Panel - Panel for completed building to hand over alignment 200pcs/day
3 462 1110 156 104
4 431 759 198 132 240 ACC 03B Panel - Panel back to back panels completed bldgs. 20pcs/day
5 460 598 156 104 240 ACC 04 Panel - Panel required for corner connection 20pcs/day
6 463 460 120 80 240 ACC 05 Panel - Double Tee required to remove props
7 320 864 96 208 160 ACC 05A Panel - Double Tee required to remove props
8 331 448 56 116 72 ACC 05B Panel - Double Tee required to remove props
9 360 900 100 228 144 ACC 06A Panel / Panel / Corner for internal joints 25pcs/day
10 300 ACC 07 DT - DT to hand over slabs
11 332 448 56 116 72 ACC 08 Double Tee - Panel to remove props
12 400 ACC 09 DT - DT to hand over slabs
ACC 10 Double Tee for installation
TOTAL 7640 0 1340 0 1356 0 1528 0 ACC 13 Panel - Double Tee for connection
C# 1510 - ACCESSORIES DELIVERY MONITORING
UPDATING DELIVERY FOR BLDG. 420, 320, 331, 332, 461, 431, 462, 460

SRL ACCESSORIES REQUIRED DELIVERED BALANCE


1 ACC 01 5225 3707 1518
2 ACC 02 425 425
3 ACC 03 5353 2659 2694
4 ACC 03A 10905 4408 6497
5 ACC 03B 352 182 170
PANELS

6 ACC 04 1919 756 1163


7 ACC 05 1768 1024 744
8 ACC 05A 2974 512 2462
9 ACC 05B 1032 400 632
10 ACC 06A 172 25 147
11 ACC 08 1752 95 1657
12 ACC 11 1168 555 613
13 ACC 12 1168 473 695

TOTAL 34213 14796 19417

SRL ACCESSORIES REQUIRED DELIVERED BALANCE


DOUBLE TEE

11 ACC 07 7640 128 7512


13 ACC 09 1340 71 1269
14 ACC 10 1356 384 972
17 ACC 13 1528 360 1168

TOTAL 11864 943 10921

Anda mungkin juga menyukai