CB&I

LNG Plant Project

Environmental and Utility Datasheet

Document No: 157883-000-PE-DS-0001

Revision D2

Peru LNG S.R.L. Contract: CB&I Contract: 157883


Focus ID Number: 946
Total pages: 5

UNCONTROLLED COPY IF NOT VIEWED THROUGH EDM


ISSUE RECORD

D2 05/04/2007 Approved for Design AMS PJG SR LC


D1 01/02/2007 Approved for Design PJG AE LC
B1 08/12/2006 Issued for ITC PJG MI LC
Project
Rev Date Revision Description Prepared Checked Approved
Approved
LNG Plant Project
Environmental and Utility Datasheet
Document No: 157883-000-PE-DS-0001 Revision D2

This document is primarily intended to be issued as part of equipment Material Requisitions to


instruct vendors on the project requirements for environmental and utilities.

INPUTS
Document Number Title Status
Project Design Data (Addendum 5) Rev 4

REVISION NOTES & HOLDS


Revision Description of Changes and Holds

B1 Hold Seismic data


This document replaces Project Design Data Sheet 6825-0-MJ0D-0003 Rev 1

D1 Utility data updated


Sesimic Categories added

D2 Changes marked in left-hand column.


- Site location coordinates updated
- Electrical notes added

Note: The latest version of this document is in EDM. Any prints are uncontrolled.

Printed on 05/04/2007 11:47 Page 2 of 5


Title Environmental and Utility Datasheet
LNG Plant Project Number 157883-000-PE-DS-0001 Rev D2
Project No. 157883 Doc ID 946
D2 05/04/07 AFD AMS PJG SR
CB&I D1 01/02/07 AFD PJG AE LC
Rev Date Purpose of Issue By Chk Appr
Rev SITE DATA UTILITY DATA
D2 Site Location North N 8,535,226.93 N 2000000* Instrument Air
D2 (Note 1) East E 359,481.73 E 3000000*
Site Elevation Main site 135m MSWL Air Quality Oil and Dust Free
Jetty 8m MSWL Dew Point -40°C @ atmospheric pressure
Conditions at User Temperature Pressure
METEOROLOGICAL DATA °C barg
Barametric Pressure @135m Elev Emerg. Oper. Actuator Sizing Amb. 4
- Maximum 998 mbar Min Operating Amb 7
- Minimum 992 mbar Norm Operating 40 8
Max Operating 40 9
Ambient Temperature Mechanical Design 55 10
- Maximum 29 °C Nitrogen
- Average (Dry Bulb) 18 °C Nitrogen Composition 99.99% Nitrogen
- Minimum 11 °C O2<5ppm, CO2<1ppm, H2O<1ppm, Other HC: None
Nitrogen Quality Oil and Dust Free
Relative Humidity Conditions at User Temperature Pressure
- Maximum 100 % °C barg
- Minimum 60 % Normal Operating Amb 6
Mechanical Design 55 10
Solar Heating Temperature Process Water (Not for cooling)
- ANSI sun metal Temperature 55 °C Conditions at User Temperature Pressure
Air Cooler Design Temperature °C barg
- AGR Regen Ovrhd Condenser 30 °C Minimum Operating 11 3
- Process Air Cooled Exchangers 19 °C Normal Operating Amb 5
- Utility/Aux Air Cooled Exchangers 24-11 °C Maximum Operating Amb 6.5
Mechanical Design 0 / 55 11
Rainfall Demin Water (Not for cooling)
- Site design rate 5 mm/hr Conditions at User Temperature Pressure
- One month maximum 10 mm °C barg
Minimum Operating 11 3
Air Contamination Fog, Dust, Saline Normal Operating Amb 3
Marine Environment Maximum Operating Amb 4
Wind Mechanical Design 0 / 100 8
- Basic Wind Speed (Vb) 40.2 m/s ** Potable Water (Not for cooling)
- Site Wind Speed 75 Kph ** Conditions at User Temperature Pressure
- Exposure Category C °C barg
Minimum Operating 11 1.3
Normal Operating Amb 4
Seismic See Page 5 Maximum Operating Amb 5
- Seismic Zone Mechanical Design 0 / 55 9
- Peak Ground Accel.
- Vertical Ground Accel.
- Seismic Criteria
NOTES ELECTRICAL DATA
D2 * Refer to Plot Plan Overall Site 157883-000-PI-PP-0001 See next page
D2 ** Equipment Design shall comply with 157883-000-CV-SP-007
Design Requirements for Wind Loads
D2

Page 3 of 5
Title Environmental and Utility Datasheet
LNG Plant Project Number 157883-000-PE-DS-0001 Rev D2
Project No. 157883 Doc ID 946
D2 05/04/07 AFD AMS PJG SR
CB&I D1 01/02/07 AFD PJG AE LC
Rev Date Purpose of Issue By Chk Appr
Rev ELECTRICAL DATA

EQUIPMENT TYPE NOMINAL SYSTEM UTILISATION


Motors Below 1hp (0.75kW) O GV
380Y/220 O G 60 Hz
220 V, 1-phase,
Below 1hp
D2 (0.75kW)(Critical 480 V 460 V, 3-phase, 60 Hz
P (0.75kW)
1hp S toi 200hp
)
(150kW) 480 V 460 V, 3-phase, 60 Hz
Above 200hp (150kW)
to 5000hp (3730kW) 4.16 kV 4.0 kV, 3-phase, 60 Hz
Above 5000hp
(3730kW) Refer to Purchaser
1hp (0.75kW) to 1400hp
(1044kW) Controlled
with AFD 480 V 460 V, 3-phase, 60 Hz
Above 1400hp
(1044kW) Controlled
with AFD 4.16 kV 4.0 kV, 3-phase, 60 Hz
Heaters 2 kW and Below 380Y/220 V 220 V, 1-phase, 60 Hz
Above 2 kW 480 V 480 V, 3-phase, 60 Hz
Lighting & small power users All 380Y/220 V 220 V, 1-phase, 60 Hz
Welding Outlets All 480 V 480 V, 3-phase, 60 Hz
Instruments External Power Type 380Y/220 V 220 V, 1-phase, 60 Hz
CONTROL SUPPLIES
4.16kV Motors 120 V, 1-phase, 60 Hz
480V Motors 120 V, 1-phase, 60 Hz
Circuit breakers 125V DC solidly earthed
UPS SUPPLIES
AC UPS 220 V, 1-phase, 60 Hz, solidly earthed
Switchgear Close and Trip 125V DC solidly earthed

D2 Note: The 4.0kV and 460V Utilisation voltages for motors are 3 phase, 3 wire.

a) 13.8 kV neutrals will be high resistance earthed.


b) 4.16kV neutrals will be low resistance earthed.
c) 480V system neutrals will be high resistance earthed.
d) 380V system neutrals will be solidly earthed.

e) All equipment with the exception of motors shall be suitable for continuous operation at ±10% of system voltage coincident
with ± 2% of system frequency unless otherwise stated on a data sheet or specification. Motors shall be suitable for
continuous operation at ± 5% coincident with ± 2% of system frequency. Momentary system disturbances, for example
during short circuit, load rejection or motor starting, will result in voltage and frequency variation in excess of steady
state values. All equipment shall be designed to ensure that connected loads can ride through the following
transients, which can occur during normal system operation, without damage.
• Overvoltage of 20% for 2 seconds
• Voltage dip of 20% for 10 seconds
• Frequency variation of ± 10% for 10 seconds

f) UPS Systems Voltage and Frequency Variations:


• 220V UPS supply ± 1% voltage and ± 1% frequency
• 125V DC ± 10%

D2 g) The electrical system phase sequence is Anticlockwise 1, 2, 3.

Page 4 of 5
Title Environmental and Utility Datasheet
LNG Plant Project Number 157883-000-PE-DS-0001 Rev D2
Project No. 157883 Doc ID 946
D2 05/04/07 AFD AMS PJG SR
CB&I D1 01/02/07 AFD PJG AE LC
Rev Date Purpose of Issue By Chk Appr
Rev SEISMIC DATA

The categories are based on the following sections in specification Proposed Earthquake Design Approach
157883-000-CV-SP-0008 :
Category Definition:
I Non Critical Non LNG Related Structures, Systems and Components
II Non Critical Non LNG Related Structures, Systems and Components located in hazardous areas
III Critical Non LNG Related Structures, Systems and Components
IV LNG Related Structures, Systems and Components
D2 V Buildings*
VI Marine Topsides Structures, Systems and Components

* Buildings are further categorized dependent of their functional requirements.

Page 5 of 5