1) INTRODUCTION:
Your company has bagged a lucrative contract to construct a
housing colony for an industrial Group to be located in Western
Maharashtra in a coastal belt. You as a project manager have been
asked by the company to evolve Organization Structure with
following conditions.
2) SCOPE OF WORK:
Housing colony consists of 10 bungalows for senior executives.
20 Apartments in 5 buildings. 100 dwellings for white collar workers
and 300 dwellings for blue collar workers. Colony will have market
and entertainment complex.
Reg.no.-217-03-11-50899-2193 Page 2
PGP CM(PGCM11)
3) FUNCTIONS:
The functions of manager provide a useful structure for
organizing management knowledge. Usually functions can be defined
in classification of planning, organizing, stuffing, leading and
controlling.
3.1) Planning:
3.2) Objectives:
Reg.no.-217-03-11-50899-2193 Page 3
PGP CM(PGCM11)
3.3) Organizing:
Reg.no.-217-03-11-50899-2193 Page 4
PGP CM(PGCM11)
3.4) Staffing:
3.5) Leading:
3.6) Controlling:
a. Site establishment
b. Labour colony development.
6. Mobilization of Plant & machinery.
7. Construction work.
a. Shell & core.
b. Finishing and interior work
8. Services work- Plumbing, electrical, fire fighting
9. Billing work
10. Landscaping work
11. Quality control work
12. Safety work
13. Cleaning and handover work
14. Store and material stacking work
15. Administrative work
Reg.no.-217-03-11-50899-2193 Page 8
PGP CM(PGCM11)
Reg.no.-217-03-11-50899-2193 Page 9
PGP CM(PGCM11)
Directors
of Firms
Administra
tion (HO)
Project
Coordinator
General
Manager
Project
Manager
Jr. Jr.
Engineer Engineer
Supervisor Supervisor
Project manager:
As shown in the organization chart project manager
is the leader for all activities and effective communication
system. Resident engineer is reporting to the project
manager following different department works under
supervision of resident engineer.
Responsibility
Plan each and every activity as per time limit given
by the client. Preparing bar chart, material schedule,
making labour schedule, preparing plant, machinery
schedule, achieving better quality in minimum cost is the
main aim of this department.
Responsibility
Execution of work as per drawings, plans and
specifications is main work of execution department. In
this department Sr. Execution engineer and gang of junior
engineers are appointed.
Responsibility
Inspection of material and goods coming on site,
intimate or instruct to respective department (material
order) by maintaining material inward, outward registers
making GRN, storing and housing all material on site in
proper place as per the site condition and handover
Reg.no.-217-03-11-50899-2193 Page 13
PGP CM(PGCM11)
Responsibility
Checking of all material coming to site and testing as
per requirement (lab test). Making and verifying mix
design of material going to use for site execution,
inspection and checking of all activities of execution work
regarding quality norms and condition, testing of work
executed like sample testing (cube testing) non destructive
testing making of audit report maintaining material testing,
mix design, concrete testing, audit test resister on site is
the main work of this department.
Responsibility
Checking of all drawing and specification regarding
site, estimating and surveying quantity of each work
activity separately, calculating material required, quantity,
labour required for each and every activity is the work
of this department.
Reg.no.-217-03-11-50899-2193 Page 14
PGP CM(PGCM11)
Responsibility
Checking of all bills quoted by sub contractor or
contractor (R.A.bills or final bills) as per their site
executed work. Making of payment of sub contractors is
the main works of billing department. Keeping total
money expenditure regarding site, checking of
departmental labour bill, making payment of all site office
related staff and helper is the main work of account
department.
Responsibility
Our site is huge type of construction therefore there
is requirement of number of services delay due to absence
of any services is very dangerous. Arrangement
of electrical supply, water supply, making and repairing of
any construction equipment and machinery, electrical
equipment is the main work of this department
Reg.no.-217-03-11-50899-2193 Page 15
PGP CM(PGCM11)
Responsibility
Making safety working environment, safety for all
workers and stuff, improving and applying all safety
instructions on site is the main work of this department.
Cleaning of site office, maintenance, cleaning of labour
camp periodically, making arrangement of potable water,
and good latrine and WC facility on site is main work of
the health department.
Responsibility
Supervision and arrange all site office requirement
facilities, supervision of site security guards, checking
their registers, keeping site office inward and outward
is the main work of this department. Admin in charge and
there will be other staffs are doing this job.
Reg.no.-217-03-11-50899-2193 Page 16
PGP CM(PGCM11)
6) RECOMMENDATIONS:
The data available is inadequate, since there are no details
regarding the finance available for the project. If it had been
given, it would have been more feasible to decide the strength of
manpower and would also help for better resource allocation of
the project.
7) BIBLIOGRAPHY/READINGS:
1. Management in organization- NICMAR text book
2. Economics and management in civil engineering.