Item

Description of Work Quantity Rate Unit Total


No

Dismantling Cement Concrete / Stone masonry /


Brickwork and carefully stacking the serviceable
1 materialincluding disposal and conveyance of 4.50 618.79 Cum 2785.00
unserviceable materialwithin a lead of 1 KM as
directed
Earthworkby excavation
the departmental authorities.
for structures as per drawing
and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious material
2 29.00 180.93 Cum 5247.00
and disposal upto a lead of 50 m, dressing of sides
and bottom and backfilling in trenches with
excavated suitable material as per Technical
Specification
Carting away305
the MORD
surplus/ 304 MORTHearth from the
excavated
work site within a lead of ------ km beyond initial
3 lead including loading, unloading and conveyance 23.20 182.85 Cum 4242.00
but excluding stacking charges etc., complete for
roads/drains
Filling in foundation trenches as per drawing and
technical specification Clause 305.3.9 MORD & 304
4 15.00 1354.34 Cum 20315.00
MORTH for foundations of cc drains/buildings using
filling Quarry dust
Plain cement concrete (1:4:8) using 40mm m/c SS5
HBG including machine mixing, laying, compacting,
5 44.40 4645.24 Cum 206249.00
finishing, curing etc for foundations of CC drains and
culverts
Construction of un-reinforced, plain cement
concrete pavement, thickness as per design, over a
prepared sub base, with OPC M30 (Grade), coarse
and fine aggregates conforming to IS : 383,
maximum in a concrete mixer of not less than 0.2
cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side
formwork (steel channel, laying and fixing wedges,
6 steel plates including levelling the formwork as per 94.00 7262.40 Cum 682666.00
drawing), spreading the concrete with sholvels,
rakes, compacted using plate vibrators and finished
in continuous operation & curing of concrete slabs
for 14- days, curing compound (where specified)
and water finishing to lines and grade as per
Standard specifications excluding cost of polythene
sheet and bitumen joints

Supply and delivery of polythin sheet including all


7 600.00 12.00 Sqm 7200.00
cost and conveyance of all materials
Providing of Joint Sealant with Bituminous sealing
compound Grade A for expansion and construction
8 135.00 8.18 Rmt 1104.00
joints including all charges and filling with sand/saw
dust
Providing of expansion Joints using 25mm thick
silslex Capcell HD - 100 including cutting and
9 9.00 1222.02 Sqm 10998.00
keeping in place directed by the departmental
authorities
QuotedRate ( Req
Parent Row
if Item Rate only)

-1

-1

-1

-1

-1

-1

-1

-1

-1

Anda mungkin juga menyukai