A Main pond
1 Earth work
site clearing to 20 cm depth to remove the m2
loose soil and vegetation &use the
excavated soil for constructing embankment
around the reservoir as shown in the
drawing
sub total
5 Miscellaneous
Construction of masonry deflector wall as no
shown in the drawing
Construction of masonryto dissipate the
out let chamber ( 100cmx100cmx60cm no
energy
height )of flow of water to the main pond
Construction of guide lines (earth channels ) for diverting the no
surface
sub totalrunoff to the reservoir (50cm width x 70cm depth & 200
Geomemembrane plastic sheet of 0.8mm thick supply and laying m2
one roll of sheet as a width of 6.5m and 75m long
30 cm thick masonry pavement geomembrane edge M2
sub total
Total bill to A
14225
12108
12000
11536
4800
8
640
1
3
3
6700
320
M2 620
M 3
1280
M3 960
M2 800
M3 2240
M2 800
M3 168
M3 24
M2 800
BOQ for dam design
C) inlet and oulet channels ( for main ponds, silt rap and to sump well.
S/NO describtion unit L(m) W(m)
1 earth work
1.1 Site clearing to remove the top loose m2 80 1
soil and vegetation & use the
excavated soil for constructing
embankment around the reservoir as
shown in the drawing
1.2 Excavation of trench for construction
of inlet & out let cannels as shown in
the drawing & use the excavated soil
for constructing embankment around
the reservoir as shown in the drawing
m3 80 1
2 masonry work
2.1 Semi - dressed stone pavement work m2
Joined & pointed with cement sand
mortar 1:2 for the in let canal
80 1
2.2 Ditto but for out let canal (from the silt
trap to the main reservoir m2 4 2
3 Concrete work
3.1 Supply & lay 1000mm in dia concrete
pipe as per the drawing (cost includes
trench excavation. Backfilling the
trench & compacting construction of
concrete cut off collars laying &
joining to the sump ) which is from the
main pond to the sump
m 10
D) Spillway structure
S/NO describtion unit L(m) W(m)
1 Site clearing to remove the top loose
soil and vegetation & use the
excavated soil for constructing
embankment around the reservoir as
shown in the drawing m2 8 0.5
2 Exaction of trench for construction of
over flow canal use the excavated soil
for constructing embankment around
the reservoir as shown in the drawing
m2 8 0.5
3 Filling selected site material &
compact in layers no exceeding 15cm
thickness m2 8 0.5
3 Filling selected site material &
compact in layers no exceeding 15cm
thickness m2 8 0.5
4 Sub total
5 Masonry work
5.1 Semi dressed stone pavement work
joined & pointed with cement sand
mortar 1:3 for the over flow canal m2 8 0.5
sub total
well.
D(m) Qty unit cost total cost
80 $ 5.00 $ 400
80 $ 30.00 $ 2,400
8 $ 20.00 $ 160
200 $ 2,000
4 $ 5.00 $ 20
1 4 $ 10.00 $ 40
4 $ 30.00 $ 34.00
$ 103.00
F) 50 M3 Masonry RCC Sandwich clean water Reservoir
Item No. Description of work Unit L(m) W(m)
1 EARTH WORK
Site clearing up to a depth of 20 cm to remove the top
1.1 soil m2 8 8
Excavation of soil for an average depth of 180 cm
1.2
1 Earth Work
1.1 site clearing up to a depth of 20cm to remove top vegetative soil m2 8
1.5 Filling under hard core with selected site material & compact in m3
layers not exceeding 15cm thickness as per the recommendation
of the supervising Engineer
Sub total
2 Masonry
2.1 20 cm thick basaltic or equivalent stone Hard core well rolled, m2
consolidated & blinded with crushed stone
8 24.6
8 0.6 2
6.9
2.76
13.8
9.78
21.16
14.95
1.31
0.58
0.69
0.31
0.6
50.6
34.5
23
35
28.75
9.2
8.05
9.2
2
1
150
108
46
51.75
13.8
1
2
1
H) BoQ & Specification for elevated two 25m3 Rotos
L(m)
Item Description Unit
A-Sub-structure
1- Excavation&Earth Work
1.1 20cm depth site clearing M2
1.2 Foundation excavation to a depth of 1m M3
1.3 Back fill selected excavated soil M3
1.4 Cart away surplus excavated soil M3
1.5 25cm thick Hard core M2
Sub-Total
2- Concrete Work
2.1 10 cm thick lean concrete over hard core M2
2.2 Concrete C-20 in bottom slab M3
2.3 Form work to bottom slab M2
20
14.3
1.8
18.3
17.8
17.8
2.68
3
56
258
21
3.23
11
35.88
87.4