Bill of quantities, Scope of Works and specifications for 2 Haffir Dam Water System C

S/n Activity Description Unit L (m) W(m) D(m)

A Main pond
1 Earth work
site clearing to 20 cm depth to remove the m2
loose soil and vegetation &use the
excavated soil for constructing embankment
around the reservoir as shown in the
drawing

Bulk Excavation of the main pond reservoir M3


area and use the excavated soil for
constructing embankment , put & compact
layer by layer not exceeding 2m thickness
around the main pond as shown in the
drawing

Excavation in medium formation 2m up to 4 M3


Deposited of selected soils for construction M3
of soil embankments to height of not
greater than 4 m as shown in the drawings
and compacted to 95% of its dry density
sub total
2 Lining
Filling & compacting the whole floor area 2 m2
of the reservoir including the excavated
embankment with selected soil &
compacting in layers not exceeding 0.5m
thickness
sub total
3 concrete ring for sump
Supply & install 1.2m internal diameter pcs
1.0m depth & 0.05m thickness reinforced
concrete rings downstream of the main
pond for the sump. Cost includes bulk
excavation, carting away lowering of the
rings & connecting it to the out let concrete
pipes and construction of outlet boxes as
shown in the drawing
sub total
4 fence
Fencing around the main pond & silt trap m
using stadium type diamond shaped tension
fencing wires (3/4'' Hexagonal mesh wire )
of at least 1.8 meters high above the ground
level and 10 cm clearance from the ground.
Price includes the costs of all necessary
angle iron 1/2 inch thickness, the tension
wire and other materials and works like
welding, tying with wire, digging for
provision of holes, 0.6 meter

sub total
5 Miscellaneous
Construction of masonry deflector wall as no
shown in the drawing
Construction of masonryto dissipate the
out let chamber ( 100cmx100cmx60cm no
energy
height )of flow of water to the main pond
Construction of guide lines (earth channels ) for diverting the no
surface
sub totalrunoff to the reservoir (50cm width x 70cm depth & 200
Geomemembrane plastic sheet of 0.8mm thick supply and laying m2
one roll of sheet as a width of 6.5m and 75m long
30 cm thick masonry pavement geomembrane edge M2
sub total
Total bill to A

B) Silt trap structure

S/no Description Unit


B1 Earth work
1.1 Site clearing to a depth M2
of 20cm to remove the 3
1.2 Bulk Excavation of the M
silt trap reservoir area
1.3 Ditto but from 1.6 to 2. M3
1.4 Filling under hard core M2
with selected non
1.5 Cart away M3
sub total
2 masonry
40 cm thick basaltic or M2
equivalent stone hard
Averagely 50cm thick M3
Averagely 50cm thick M3
Sub total
3 CONCRETE
5 cm lean concrete 1:3: M2
Dam Water System Constructions
Qty Unit cost Total
cost

14225

12108

12000
11536

4800

8
640

1
3
3

6700
320

Unit L(m) W(m) D(m) Qty Unit cost Total cost

M2 620
M 3
1280
M3 960
M2 800
M3 2240

M2 800
M3 168
M3 24

M2 800
BOQ for dam design
C) inlet and oulet channels ( for main ponds, silt rap and to sump well.
S/NO describtion unit L(m) W(m)
1 earth work
1.1 Site clearing to remove the top loose m2 80 1
soil and vegetation & use the
excavated soil for constructing
embankment around the reservoir as
shown in the drawing
1.2 Excavation of trench for construction
of inlet & out let cannels as shown in
the drawing & use the excavated soil
for constructing embankment around
the reservoir as shown in the drawing
m3 80 1
2 masonry work
2.1 Semi - dressed stone pavement work m2
Joined & pointed with cement sand
mortar 1:2 for the in let canal
80 1
2.2 Ditto but for out let canal (from the silt
trap to the main reservoir m2 4 2
3 Concrete work
3.1 Supply & lay 1000mm in dia concrete
pipe as per the drawing (cost includes
trench excavation. Backfilling the
trench & compacting construction of
concrete cut off collars laying &
joining to the sump ) which is from the
main pond to the sump
m 10

D) Spillway structure
S/NO describtion unit L(m) W(m)
1 Site clearing to remove the top loose
soil and vegetation & use the
excavated soil for constructing
embankment around the reservoir as
shown in the drawing m2 8 0.5
2 Exaction of trench for construction of
over flow canal use the excavated soil
for constructing embankment around
the reservoir as shown in the drawing
m2 8 0.5
3 Filling selected site material &
compact in layers no exceeding 15cm
thickness m2 8 0.5
3 Filling selected site material &
compact in layers no exceeding 15cm
thickness m2 8 0.5
4 Sub total
5 Masonry work
5.1 Semi dressed stone pavement work
joined & pointed with cement sand
mortar 1:3 for the over flow canal m2 8 0.5
sub total
well.
D(m) Qty unit cost total cost

80 $ 5.00 $ 400

0.8 64 $ 10.00 $ 640

80 $ 30.00 $ 2,400

8 $ 20.00 $ 160

200 $ 2,000

D(m) Qty unit cost total cost

4 $ 5.00 $ 20

1 4 $ 10.00 $ 40

0.15 0.6 $ 15.00 $ 9


0.15 0.6 $ 15.00 $ 9
$ 69

4 $ 30.00 $ 34.00
$ 103.00
F) 50 M3 Masonry RCC Sandwich clean water Reservoir
Item No. Description of work Unit L(m) W(m)
1 EARTH WORK
Site clearing up to a depth of 20 cm to remove the top
1.1 soil m2 8 8
Excavation of soil for an average depth of 180 cm
1.2

1.3 Cart away surplus excavated material for an average


distance 100maway from the site
SUB TOTAL
2 MASONRY

40 CM thick basaltic or equivalent hard core well


2.1
rolled, consolidated and blinded with crushed stone

40 cm thick basaltic or equivalent stone masonry wall


2.2 bedded in 1:3 cement sand mortar bedded in 1:3
cement sand mortar
Sub Total
3 CONCRETE WORK

3.1 10 cm thick lean concrete over hard core in class 15


with minimum cement content of 150 kg/m3

3.3 Ditto , but 15 cm thick for cover slab


3.4 10 cm thick concrete sandwiched between masonry
walls.
15 cm thick ring beam concrete in C-25 filled in to
fromwork and vibrated around rod reinforcement.
3.5 Cost of formwork and reinforcement measured
separately.

Reinforcement bars supply, cut, bend and place in


3.6
position as shown on the drawing
dia. 6mm
dia. 10mm
dia. 12mm
dia. 16mm
3.7 Supply and place in position 3/4mm hexagonal mesh
wire for hoop tension
Sub Total
4 FINISHING WORK
4.1 Apply 3 cm thick trawl finish cement screed with 1:3
mix cement sand mortar over the floor slab
Apply minimum 25 mm thick plastering to the internal
4.2 wall of the reservoir with 1:2 mix cement sand mortar
to fine finish to make the reservoir water tight
4.3 Ditto, but to the grade & ringbeam and slab
4.4 Chiesel and Apply pointing to the external wall of the
reservoir with 1:2 mix cement sand mortar
Sub Total
5 Construct 70 cm wide semi dressed stone pavement
around the reservoir
Supply and install B- class G.I. pipe of required
6 diameter with all accessories as shown on the drawing
for overflow, inlet, outlet, drain, vent and internal
ladder

Supply and install steel manhole lid (80*100cm) made


of 4mm thick sheet metal and 25*25mm angle iron
7 reinforced with 14 mm reinforcement bar. Cost to
include supply and application of two coats of antirust
paint.
Construct H.C. Block valve chamber (70cm * 90cm*
8 60 cm internal dimension) and fit with B- class G.I
pipes and European origin fittings, gate valves as
shown on the drawing.
Supply and install best European quality water meter
9 and fittings of the required diameter at the outlet and
inlet of the reservior
Sub Total
10 FORM WORK
Supply and prepare flat iron sheet form work
reinforced with eucalyptus pole bracing in top slab
and ring beam. Costs include supply of all necessary
materials and placing in position.
Sub Total
TOTAL
D(m) Quantity Unit Cost Total cost

$ 64.00 $ 30.00 1920


G) Two Pump sets, Generator and Guard House

Work Description Unit L(m)

1 Earth Work
1.1 site clearing up to a depth of 20cm to remove top vegetative soil m2 8

1.2 Excavation of trench in foundation, minimum of 0.5meter depth m3 40

1.3 Back filling of excavated trench m3 8


1.4 Excavation work up to a depth of 50 cm to reduce level for m3
placing hard core & carting away of exacted soil to a distance
not exceeding 500meter

1.5 Filling under hard core with selected site material & compact in m3
layers not exceeding 15cm thickness as per the recommendation
of the supervising Engineer
Sub total
2 Masonry
2.1 20 cm thick basaltic or equivalent stone Hard core well rolled, m2
consolidated & blinded with crushed stone

2.2 Stone masonry work in cement Sand mortar 1:3in ratio in m3


2.3 foundation
250mm thick cemented stone pavement around the building 1m m2
wide,total
Sub price includes excavation & all materials, including
3 Concrete
3.1 5cm thick Lean concrete work above hard core m2
3.2 RCC work 1:2:4 vibrated in to form work around reinforcement m3
in floor
Ditto butslab
grad beam m3
Ditto top tie beam m3
Ditto but in Lintels m3
ditto but in pump slab m3
Sub total
4 Block work
4.1 20cm thick hallow concrete block wall m2
Sub total
5 Roof work
5.1 Upper & lower truss member of 10cm dia eucalyptus wood M
5.2 ^ell-seasoned & free truss
Vertical & Diagonal of defects
member of 8cm dia eucalyptus m2
wood ,well-seasoned &
5.3 Zigba wood purling 5cm X 7cmfree of defects
fixed to the truss at 90cm C/C M
truss at 90cm C/C
5.4 Roofing with G-28 corrugated iron sheet m2
5.5 Galvanized sheet gutter G-30 ,150 X150mm, price includes M
brackets
5.6 Ditto butand
downtwopipes,120
coats of X60mm
metal paint M
5.7 supply & fix 25 X 200mm facial board M
Sub total
6 Door and window
6.1 Supply & fix locally made metal door , with all necessary iron
monger &
6.2 Supply locks & one coat
fix locally madeofglazed
antirust & two,as
window coats
perof
themetal paint
drawing
800mm
Sub X120mm
total
7 Reinforcement
7.1 Steel reinforcement work according to the structural drawing
price includes cutting, bending, tying, & placing in a position
6mm Kg
10mm Kg
Sub total
8 Finishing
8.1 Plastering in cement sand mortar for internal walls m2
8.2 plastering & tyrolyn render to the external surface m2
8.3 Cement screening in floor m2
Sub total
9 Electricity
9.1 Lights to fed through PVC sheated cable of 2 X 2.5 mm2 in No
thermoplastic
9.2 Flush mountedconduit
socket of 13.3mm
outlet in /under
of 16Amp fed surface
throughincluding
PVC No
sheathed cable
9.3 Fluorescent of laminar
lamp 3 X2.5mm2type in thermoplastic
Philips conduit of
or equivalent
,TMS02/240 with 1X40Watt
Total for One (G)- Generator & Guard House (A)
Total for Two (G)- Generator & Guard House (A*2)
W(m) D(m) QTY Unit Total Price
Price

8 24.6

0.4 0.4 6.4

8 0.6 2
6.9

2.76

13.8

9.78
21.16

14.95
1.31
0.58
0.69
0.31
0.6

50.6
34.5
23
35
28.75
9.2
8.05
9.2

2
1

150
108

46
51.75
13.8

1
2
1
H) BoQ & Specification for elevated two 25m3 Rotos
L(m)
Item Description Unit
A-Sub-structure
1- Excavation&Earth Work
1.1 20cm depth site clearing M2
1.2 Foundation excavation to a depth of 1m M3
1.3 Back fill selected excavated soil M3
1.4 Cart away surplus excavated soil M3
1.5 25cm thick Hard core M2
Sub-Total
2- Concrete Work
2.1 10 cm thick lean concrete over hard core M2
2.2 Concrete C-20 in bottom slab M3
2.3 Form work to bottom slab M2

Reinforcement steel bars price includes cutting,


2.4 bending, placing in position and tying wire
a- 08mm deformed bar kg
b- 012mm deformed bar kg
Sub Total
3- Masonry Work

Average 50cm thick hard basaltic or equivalent stone


masonry foundation wall to a depth of 4m bedded and
3.1 jointed in cement sand mortar 1:4 below N.G.L M3
Sub-Total
B- Super-Structure
1- Concrete Work
1.1 Concrete C-20 on top slab M3
1.2 Form work M2
Reinforcement steel bars price includes cutting,
1.3 bending, placing in position and tying wire
a- 08mm deformed bar kg
b- 012mm deformed bar kg
Sub - Total
two 25m3 Rotos
W(m) D(m) Total
Quantity Rate (ETB) (ETB)

20
14.3
1.8
18.3
17.8

17.8
2.68
3

56
258

21

3.23
11

35.88
87.4