KECAMATAN KOTAWARINGIN
PANGKALAN LADA BARAT
TIM PENGELOLA
DESA Sungai KEGIATAN
Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
RENCANA ANGGARAN
UNIT
BIAYA (RAB)
HARGAGUNA
NO. Benang
Paku 2,5''
PEKERJAAN PEMBANGUNAN
nilonURAIAN rol
kg 2
VOLUME
2
AULA SERBA 6,500 JUMLAH HARGA (Rp.)
18,000
Paku 4'' kg
/SATUAN 3 SATUAN18,000
(Rp.) 13,000
36,000
Pasir
Batu belah m3
m3 12
24 150,000
350,000 54,000
Semen @50kg Standar SNI sak 53 75,000 1,800,000
8,400,000
Ember kerja bh 2 26,500 3,975,000
53,000-
Besi dea 8 mm 12 cm btg 25 40,000
Besi dea 12 mm 12 cm btg 27 130,000 1,000,000--
Kawat bendrat
Batu cor kg
m3 6
2 18,000
600,000 3,510,000
Rp 108,000
1,200,000
KEBUTUHAN PERALATAN
NO. Benang NAMA PERALATAN
nilon VOLUME SATUAN TAHUN KELUARAN
1.
2. Ember kerja 2 rol
bh Tahun
Tahun 2015
2015
-2-
KEBUTUHAN
NO.
1.
2.
3.
4.
5.
NO.
1. Hari
PERALATAN
NAMA PERALATAN
Suwanto N A M A
TIM PENGELOLA KEGIATAN
PEMERINTAH
Jalan Lada
Sungai
KABUPATEN
KECAMATAN
DESA
Lima Desa
Melawen,
Kepala
Tim
Pemegang
Sungai
Sungai
VOLUME KOTAWARINGIN
PANGKALAN
Melawen
Melawen
………………………………..2015
Mengetahui
Desa Sungai
Pengelola
Selaku
Kekuasaan
JABATAN
Keuangan
Ketua :
Melawen
Kegiatan :
LADA
Kode
SATUAN
Pengelolaan
Desa
TPK
BARAT
Pos 74184
2.
3. Purwadi
Sidik
4. Julaikah
5. Sugiono Sekretaris
Anggota
MAKIN TPK
TPK
-3-
M
NTAH
ada PENGELOLA
KABUPATEN
KECAMATAN
DESA
Lima
ENCANA DesaSungai
Sungai
ANGGARAN KEGIATAN
KOTAWARINGIN
PANGKALAN
Melawen
Melawen LADA
Kode
BIAYA BARATSATUAN
HARGA
Pos 74184
(RAB) JUMLAH HARGA
AAN ……………………………………………… (Rp.) (Rp.)
JUMLAH TOTAL
...................................................……………………………………………………………………...
TENAGA KERJA,SPESIALISASI KEBUTUHAN BAHAN DAN PERALATAN
PEKERJAAN #
PENDIDIKAN
SATUAN VOLUME
-4-
M
NTAH
ada PENGELOLA
ungai
KABUPATEN
KECAMATAN
DESA
Lima DesaSungai
Melawen,
Kepala
Sungai KEGIATAN
KOTAWARINGIN
PANGKALAN
Melawen
Melawen LADA
Kode
………………………………..2015
Mengetahui
Desa Sungai
Tim Pengelola
Pemegang :
Melawen
Kegiatan
Selaku
Kekuasaan
Keuangan :
Pengelolaan
Desa
BARAT TAHUN KELUARAN
Pos 74184
………………………….. …………………………..
TANDA TANGAN
MAKIN
-5-
PEMBIAYAAN
Pasal 4
Pembiayaan yang timbul sebagai akibat dari kegiatan Naskah Kesepakatan Kerjasama ini akan diatur
dan dituangkan dalam Perjanjian Pelaksanaan Kerja sama yang akan disusun lebih lanjut dan
ditandatangani oleh pejabat yang ditunjuk / ditugaskan oleh masing-masing pihak.
JANGKA WAKTU
Pasal 5
Naskah Kesepakatan Kerjasama ini berlaku untuk jangka waktu terhitung sejak ditandatangani sampai
dengan Selesai dan dapat diperpanjang, diubah maupun diakhiri atas persetujuan kedua belah pihak
PENUTUP
Pasal 6
1. Naskah Kesepakatan Kerjasama ini dibuat dalam rangkap 2 (dua) asli masing-masing
bermaterai cukup serta mempunyai kekuatan hukum yang sama setelah ditandatangani oleh
kedua pihak dan dibubuhi cap lembaga masing-masing.
2. Hal-hal yang belum diatur dalam Naskah Kesepakatan Kerjasama ini akan diatur kemudian
atas persetujuan kedua pihak.
3. Naskah Kesepakatan Kerjasama ini berlaku sejak ditandatangani dengan ketentuan bahwa
segala sesuatunya akan diperbaiki sebagaimana mestinya apabila dikemudian hari terdapat
kekeliruan.
Nama : MAKIN
Alamat : Desa Sungai Melawen Kec. Pangkalan Lada
Jabatan : Kepala Desa Sungai Melawen
berdasarkan Surat Keputusan No. 140/92/PEMDES.2013 Tanggal 20 Agustus 2013 selanjutnya
PIHAK PERTAMA bertindak untuk dan atas nama Kepala Desaungai Melawen
dan
PIHAK PERTAMA dan PIHAK KEDUA secara bersama-sama menyatakan sepakat dan setuju
Naskah Kesepakatan Kerjasama dengan ketentuan sebagai berikut :
TUJUAN KERJASAMA
Pasal 1
-7-
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA SUNGAI MELAWEN
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
PELAKSANAAN KEGIATAN
Pasal 3
Kesepakatan Kerjasama ini akan ditindak lanjuti dan diatur dalam surat perjanjian yang dib
PERTAMA dan PIHAK KEDUA atau oleh pejabat yang ditunjuk dan diberi wewenang oleh ke
melaksanakan hal tersebut.
PEMBIAYAAN
Pasal 4
Pembiayaan yang timbul sebagai akibat dari kegiatan Naskah Kesepakatan Kerjasama ini
dituangkan dalam Perjanjian Pelaksanaan Kerja sama yang akan disusun lebih lanjut dan dit
pejabat yang ditunjuk / ditugaskan oleh masing-masing pihak.
JANGKA WAKTU
Pasal 5
Naskah Kesepakatan Kerjasama ini berlaku untuk jangka waktu terhitung sejak ditandatangan
………………………………………………….. dan dapat diperpanjang, diubah maupun diakhiri atas persetu
pihak
PENUTUP
Pasal 6
1. Naskah Kesepakatan Kerjasama ini dibuat dalam rangkap 2 (dua) asli masing-masing berma
mempunyai kekuatan hukum yang sama setelah ditandatangani oleh kedua pihak dan dibub
masing-masing.
2. Hal-hal yang belum diatur dalam Naskah Kesepakatan Kerjasama ini akan diatur kemudian
kedua pihak.
3. Naskah Kesepakatan Kerjasama ini berlaku sejak ditandatangani dengan ketentuan bahwa s
akan diperbaiki sebagaimana mestinya apabila dikemudian hari terdapat kekeliruan.
-8-
NTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
M PENGELOLA KEGIATAN
DESA SUNGAI MELAWEN
ada Lima Desa Sungai Melawen Kode Pos 74184
dan
TUJUAN KERJASAMA
Pasal 1
-9-
NTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
M PENGELOLA KEGIATAN
DESA SUNGAI MELAWEN
ada Lima Desa Sungai Melawen Kode Pos 74184
PELAKSANAAN KEGIATAN
Pasal 3
indak lanjuti dan diatur dalam surat perjanjian yang dibuat oleh PIHAK
oleh pejabat yang ditunjuk dan diberi wewenang oleh kedua pihak untuk
PEMBIAYAAN
Pasal 4
kibat dari kegiatan Naskah Kesepakatan Kerjasama ini akan diatur dan
naan Kerja sama yang akan disusun lebih lanjut dan ditandatangani oleh
eh masing-masing pihak.
JANGKA WAKTU
Pasal 5
PENUTUP
Pasal 6
ini dibuat dalam rangkap 2 (dua) asli masing-masing bermaterai cukup serta
ng sama setelah ditandatangani oleh kedua pihak dan dibubuhi cap lembaga
HARI SUWANTO
- 10 -
Pasal 4
JANGKA WAKTU PELAKSANAAN PEKERJAAN
Jangka waktu untuk menyelesaikan pekerjaan adalah ………………………. Hari kerja mulai tanggal
……......................... sampai dengan ………............…….. Sehingga pekerjaan harus selesai dan
diserahkan pada tanggal ……………………….
Pasal 5
FORCE MAJEURE
1. Yang dimaksud dengan force majeure adalah suatu keadaan yang terjadi luar
kemampuan PARA PIHAK yang tidak dapat diperhitungkan sebelumnya.
2. Apabila terjadi keadaan force majeure sebagaimana dimaksud ayat (1) Pasal ini
maka PARA PIHAK terbebas dari kewajiban yang harus dilaksanakan
Pasal 6
SANKSI
Apabila menyelesaikaan pekerjaan melebihi batas waktu yang disepakati maka PIHAK KEDUA
membayar denda sebesar …………% dari nilai pekerjaan dengan nominal sebesar Rp.
50.800.000,- (''Lima puluh juta delapan ratus ribu rupiah )
Pasal 7
KETENTUAN PENUTUP
Perjanjian ini dibuat dalam rangkap 2 (dua) asli masing-masing bermaterai cukup dan
mempunyai kekuatan hukum yang sama untuk dipertanggungjawabkan sesuai
peraturan perundang-undangan yang berlaku.
SAKSI SAKSI
PIHAK KEDUA, PIHAK PERTAMA,
I. Nama : MAKIN
Jabatan : Kepala Desa Sungai Melawen
Alamat : RT.01 RW.01 Desa Sungai Melawen Kec. Pangkalan Lada
Selanjutnya disebut PIHAK PERTAMA
Untuk selanjutnya PIHAK PERTAMA dan PIHAK KEDUA untuk selanjutnya disebut PARA PIHA
Bahwa PARA PIHAK telah sepakat dan setuju untuk mengadakan perjanjian dengan ketentuan s
Pasal 1
RUANG LINGKUP PEKERJAAN
Pasal 2
NILAI PEKERJAAN
Nilai pekerjaan yang disepakati untuk penyelesaian pekerjaan dalam perjanjian ini adalah sebesa
……………………………………… termasuk pajak dan bea materai
Pasal 3
HAK DAN KEWAJIBAN
1. PIHAK PERTAMA menerima hasil pekerjaan sesuai rencana waktu pelaksanaan dan tepat w
3. PIHAK KEDUA berhak atas pembayaran untuk penyelesaian pekerjaan sebagaimana dimaks
- 12 -
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA Sungai Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
Pasal 4
JANGKA WAKTU PELAKSANAAN PEKERJAAN
Jangka waktu untuk menyelesaikan pekerjaan adalah ………………………. Hari kerja mulai tanggal ……...
dengan ………............…….. Sehingga pekerjaan harus selesai dan diserahkan pada tanggal ……………………….
Pasal 5
FORCE MAJEURE
1. Yang dimaksud dengan force majeure adalah suatu keadaan yang terjadi luar kemampu
yang tidak dapat diperhitungkan sebelumnya.
2. Apabila terjadi keadaan force majeure sebagaimana dimaksud ayat (1) Pasal ini maka PARA
dari kewajiban yang harus dilaksanakan
Pasal 6
SANKSI
Apabila menyelesaikaan pekerjaan melebihi batas waktu yang disepakati maka PIHAK KEDUA memba
…………% dari nilai pekerjaan dengan nominal sebesar Rp. ………………………………,- (………………………………………
Pasal 7
KETENTUAN PENUTUP
Perjanjian ini dibuat dalam rangkap 2 (dua) asli masing-masing bermaterai cukup dan mem
hukum yang sama untuk dipertanggungjawabkan sesuai peraturan perundang-undangan yang b
SAKSI SAKSI
PIHAK KEDUA, PIHAK PERTAMA
……………………………… ……………………………
- 13 -
NTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
M PENGELOLA KEGIATAN
DESA Sungai Melawen
ada Lima Desa Sungai Melawen Kode Pos 74184
Pasal 1
RUANG LINGKUP PEKERJAAN
Pasal 2
NILAI PEKERJAAN
- 14 -
NTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
M PENGELOLA KEGIATAN
DESA Sungai Melawen
ada Lima Desa Sungai Melawen Kode Pos 74184
Pasal 4
GKA WAKTU PELAKSANAAN PEKERJAAN
Pasal 5
FORCE MAJEURE
ajeure adalah suatu keadaan yang terjadi luar kemampuan PARA PIHAK
sebelumnya.
jeure sebagaimana dimaksud ayat (1) Pasal ini maka PARA PIHAK terbebas
anakan
Pasal 6
SANKSI
bihi batas waktu yang disepakati maka PIHAK KEDUA membayar denda sebesar
minal sebesar Rp. ………………………………,- (…………………………………………………………..)
Pasal 7
KETENTUAN PENUTUP
HARI SUWANTO
SAKSI
PIHAK PERTAMA,
………………………………
- 15 -
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA Sungai Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
Pada hari ini, Selasa, tanggal 11, bulan April, tahun 2017,
bertempat di Area kantor Desa Sungai Melawen telah dilaksanakan serah terima hasil pekerjaan
AULA SERBA GUNA antara :
I. Nama : MAKIN
Jabatan : Kepala Desa Sungai Melawen
Alamat : Desa Sungai Melawen Kec. Pangkalan Lada
Selanjutnya disebut PIHAK PERTAMA
PIHAK PERTAMA menyatakan bahwa telah menerima hasil pekerjaan berupa Uang Rp.
50.800.000,- (''Lima puluh juta delapan ratus ribu rupiah ) dalam keadaan baik dari
PIHAK KEDUA.
PIHAK PERTAMA menyerahkan hasil pekerjaan berupa Uang Rp. 50.800.000,- (''Lima
puluh juta delapan ratus ribu rupiah ) dalam keadaan baik dari PIHAK KEDUA.
Demikian Berita Acara ini dibuat rangkap 2 (dua) masing-masing bermaterai cukup dan
mempunyai kekuatan hukum yang sama untuk dipertanggungjawabkan sesuai peraturan
perundang-undangan yang berlaku.
A.1. AWAL GAMBAR RENCANA : Pekerjaan Kontruksi di bagian KUDA-KUDA DENGAN KERANGKA KAYU
ATAP GENTENG PRODUK LOKAL,BENTANG KUDA-KUDA SISTEM BALOK KUNCI 12 METER.
A.2. PERUBAHAN REALISASI : Pekerjaan Kontruksi tersebut A.1, DIRUBAH DENGAN KONTRUKSI KUDA-
KUDA BETON,PENALI ANGIN BETON DAN JURAI BETON BERTULANG DENGAN MUTU BETON K.175
SISTEM MELENGKUNG KEATAS.
B.1. ALASAN PERUBAHAN : DIKARENAKAN BANGUNAN AULA SERBA GUNA TERSEBUT SELAIN UNTUK
ACARA-ACARA PERTEMUAN-PERTEMUAN BESAR SECARA UMUM SESUAI KAPASITAS ,RENCANANYA
JUGA UNTUK TEMPAT PELATIHAN/PERTANDINGAN OLAH RAGA BULU TANGKIS DAN OLAH RAGA
LAINNYA SESUAI KAPASITAS,DENGAN HARAPAN TIDAK TERLALU KENA RINTANGAN UNTUK BOLA
LAMBUNG
C.1. UKURAN DIMENSI : UKURAN DIMENSI KHUSUSNYA LUASAN ATAU DENAH TIDAK ADA PERUBAHAN
( TETAP ). UNTUK GAMBAR KASAR DIMENSI BETON PERUBAHAN TERLAMPIR.
Demikian berita acara Perubahan Kontruksi ini di buat agar bisa menjadi perhatian .
PERSETUJUAN :
NO NAMA JABATAN TANDA TANGAN
1
MAKIN KEPALA DESA SUNGAI MELAWEN
Pada hari ini, ……………………….., tanggal …………………………, bulan …………………………, tahun dua ribu lima belas,
bertempat di …………………….......……… telah dilaksanakan serah terima hasil pekerjaan ........................................................
….....................................................................................…………… antara :
I. Nama : MAKIN
Jabatan : Kepala Desa Sungai Melawen
Alamat : Desa Sungai Melawen Kec. Pangkalan Lada
Selanjutnya disebut PIHAK PERTAMA
Demikian Berita Acara ini dibuat rangkap 2 (dua) masing-masing bermaterai cukup dan mempunyai kekuatan
hukum yang sama untuk dipertanggungjawabkan sesuai peraturan perundang-undangan yang berlaku.
- 18 -
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA Sungai Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
Pada hari ini, Selasa, tanggal 11,bulan Mei, tahun 2017, bertempat di Sungai Melawen telah
dilaksanakan pembayaran atas pekerjaan Bangunan Aula Serba Guna :
Pembayaran tersebut disaksikan oleh Makin Jabatan Kepala Desa Sungai Melawen Selaku
Pemegang Kuasa Pengelolaan Keuangan Desa
Demikian Berita Acara ini dibuat rangkap 2 (dua) masing-masing bermaterai cukup dan
mempunyai kekuatan hukum yang sama untuk dipertanggungjawabkan sesuai peraturan
perundang-undangan yang berlaku.
Mengetahui :
Kepala Desa Sungai Melawen
Selaku
Pemegang Kekuasaan Pengelolaan
Keuangan Desa
MAKIN
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA Sungai Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
Pada hari ini, ……………………….., tanggal …………………………, bulan …………………………, tahun ……………………………,
bertempat di …………………………… telah dilaksanakan pembayaran atas pekerjaan ……............................................ .............
………….................................... antara :
I. Nama : Dya Ayu Wulandari
Jabatan : Bendahara Desa Sungai Melawen
Alamat : Desa Sungai Melawen Kec. Pangkalan Lada
Selanjutnya disebut PIHAK PERTAMA
Demikian Berita Acara ini dibuat rangkap 2 (dua) masing-masing bermaterai cukup dan mempunyai kekuatan
hukum yang sama untuk dipertanggungjawabkan sesuai peraturan perundang-undangan yang berlaku.
Mengetahui :
Kepala Desa Sungai Melawen
Selaku
Pemegang Kekuasaan Pengelolaan
Keuangan Desa
MAKIN
- 20 -
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA Sungai Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
SPESIFIKASI KESIMPULAN
TANGGAL NOMOR NOTA
NO. NAMA ITEM PENGELUARAN BARANG YG TELAH (SESUAI / TIDAK
PEMBELIAN PEMBELIAN DIBELI SESUAI)
kwalitas
ATAP 1 baik/standar lokal
Kayu ulinklas 1
Kucen dan pintu jendela kaca 2 kwalitas baik
kwalitas bagus
Pengecatan genteng standar SNI
MAKIN
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA Sungai Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
SPESIFIKASI KESIMPULAN
NAMA ITEM TANGGAL NOMOR NOTA
NO. BARANG YG (SESUAI / TIDAK
PENGELUARAN PEMBELIAN PEMBELIAN
TELAH DIBELI SESUAI)
MAKIN
- 22 -
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA Sungai Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
Mengetahui :
Kepala Desa Sungai Melawen
Selaku
Pemegang Kekuasaan Pengelolaan
Keuangan Desa
MAKIN
PEMERINTAH KABUPATEN KOTAWARINGIN BARAT
KECAMATAN PANGKALAN LADA
TIM PENGELOLA KEGIATAN
DESA Sungai Melawen
Jalan Lada Lima Desa Sungai Melawen Kode Pos 74184
MAKIN
- 24 -
Lampiran I : PERATURAN DE
Nomor : 04 Tahun 2015
Tanggal : 21 Mei 2015
Tentang : ANGGARAN PEN
BELANJA DESA (
KODE
URAIAN VOLUME
REKENING
Rp 1 PENDAPATAN
1.1 PENDAPATAN ASLI DESA
1.1.1 Hasil Usaha Desa
1.1.1.1 Tanah Kas Desa Rp 1 Tahun
1.1.1.2 Hasil Usaha BUM Desa Rp 1 Tahun
1.1.1.3 Dst
- 25 -
KODE
URAIAN VOLUME
REKENING
- 26 -
KODE
URAIAN VOLUME
REKENING
Rp 2 BELANJA
BIDANG PENYELENGGARAAAN PEMERINTAHAN DESA
2.1
(OPERASIONAL)
2.1.1 BELANJA PEGAWAI
2.1.1.1 Penghasilan Tetap (SILTAP) Kepala Desa dan Perangkat Desa
a. Kepala Desa Rp 12 OB
b. Sekretaris Desa Non PNS Rp 12 OB
c. Kaur Pemerintahan Rp 12 OB
d. Kaur Pembangunan Rp 12 OB
e. Kaur Umum Rp 12 OB
f. Staf Keuangan Rp 10 OB
g. Staf administrasi Rp 9 OB
2.1.1.2 Tunjangan
1. Tunjangan Jabatan Kepala Desa dan Perangkat Desa
a. Kepala Desa Rp 12 OB
b. Sekretaris Desa Rp 12 OB
c.Kaur Pemerintah Rp 12 OB
d.Kaur Pembangunan Rp 12 OB
e.Kaur Umum Rp 12 OB
2. Tunjangan Badan Permusyawaratan Desa (BPD)
a. Ketua Rp 12 OB
b. Wakil Ketua Rp 12 OB
c. Sekretaris Rp 12 OB
d. Anggota Rp 24 OB
3. Tunjangan kesehatan Kepala Desa dan Perangkat Desa
a. Kepala Desa Rp 12 OB
b. Sekretaris Desa Rp 12 OB
c. Kaur Pemerintah Rp 12 OB
d. Kaur Pembangunan Rp 12 OB
e. Kaur Umum Rp 12 OB
f. Staf Keuangan Rp 10 OB
g. Staf administrasi Rp 9 OB
4. Tunjangan purna tugas BPD
a. Ketua Rp 1 Periode
b. Wakil Ketua Rp 1 Periode
c. Sekretaris Rp 1 Periode
d. Anggota (2 Orang) Rp 1 Periode
5. Insentif :
a. Kepala Desa Rp 12 OB
- 27 -
KODE
URAIAN VOLUME
REKENING
- 28 -
KODE
URAIAN VOLUME
REKENING
8. Jasa berlangganan
a. Listrik Rp 12 Bulan
b. Koran
c. Air Bersih Rp 12 Bulan
9. Operasional Pemerintah Desa Lainnya
a. Belanja BBM Kendaraan Dinas Rp 3 Unit/thn
b. Belanja alat kebersihan kantor desa
c. Dokumen APBDes Rp 8 Buku
d. Dokumen Pertanggung jawaban APBDes Rp 8 Buku
10. Penyediaan Jasa Keuangan :
a. Honor Pengguna Anggaran Rp 12 OB
b. Honor Pelaksana Teknis Pengelola Keuangan Desa (PTPKD)
> Koordintor ( Sekretaris Desa ) Rp 12 OB
c. Honor Bendahara Keuangan Desa Rp 12 OB
d. Honor Tim Pelaksana Kegiatan (TPK) :
> Ketua Rp 8 OB
> Sekretaris Rp 8 OB
> Anggota Rp 8 OB
e. Insentif Pembersih kantor ( OB ) Rp 12 Bulan
2.1.4 OPERASIONAL RT
a. Tunjangan RT Rp 12 Bulan
b. Insentif RT ( 150.000 x 12 x 10 ) Rp 12 Bulan
- 29 -
KODE
URAIAN VOLUME
REKENING
2.1.7 LANJUTAN PAGAR KANTOR DESA DAN PAPAN NAMA Rp 150 Meter
2.1.7.2 Belanja Barang dan Jasa
a. Operasional TPK
b. Upah Kerja
- 30 -
KODE
URAIAN VOLUME
REKENING
- 31 -
KODE
URAIAN VOLUME
REKENING
a. Operasional TPK
b. Upah Kerja
2.2.2.3 Belanja Modal
a. Bahan Material
- 32 -
KODE
URAIAN VOLUME
REKENING
- 33 -
KODE
URAIAN VOLUME
REKENING
- 34 -
KODE
URAIAN VOLUME
REKENING
SURPLUS / DEFISIT
Rp 3 PEMBIAYAAN DESA
3.1 Penerimaan Pembiayaan
3.1.1 Sisa lebih Perhitungan Anggaran Tahun sebelumnya ( Silpa ) :
3.1.1.1 Silpa yang digunakan pada tahun berjalan (Tahun 2013) Rp 1 Tahun
3.1.1.2 Silpa yang digunakan pada tahun berjalan (Tahun 2014) Rp 1 Tahun
3.1.2 Pencairan Dana Cadangan
3.1.3 Hasil penjualan kekayaan desa yang dipisahkan
3.1.4 Dst
- 35 -
KODE
URAIAN VOLUME
REKENING
JUMLAH PEMBIAYAAN
TAHUI MEN
KEPALA DE
YAN ARI
- 36 -
: PERATURAN DESA NATAI RAYA
: 04 Tahun 2015
: 21 Mei 2015
: ANGGARAN PENDAPATAN DAN
BELANJA DESA ( APBDes ) TAHUN 2015
SUMBER
APBDes 2015
DANA
28,500,000
-
PADesa
PADesa
12,500,000
12,500,000 PADesa
10,000,000
10,000,000 swadaya
6,000,000
6,000,000 PADesa
1,054,222,000
275,000,000 DD
700,429,300 ADD
30,416,300 BHP
11,776,400 BHR
-
Hibah
Kerjasama
- 37 -
SUMBER
APBDes 2015
DANA
bunga
1,082,722,000
- 38 -
SUMBER
APBDes 2015
DANA
569,372,250
186,497,500
119,750,000
30,000,000 ADD
21,000,000 ADD
15,000,000 ADD
15,000,000 ADD
15,000,000 ADD
12,500,000 ADD
11,250,000 ADD
66,747,500
4,800,000 ADD
3,360,000 ADD
2,400,000 ADD
2,400,000 ADD
2,400,000 ADD
7,800,000 ADD
5,400,000 ADD
5,400,000 ADD
7,800,000 ADD
1,500,000 ADD
1,050,000 ADD
750,000 ADD
750,000 ADD
750,000 ADD
625,000 ADD
562,500 ADD
3,000,000 BHR
2,500,000 BHP
2,500,000 BHP
5,000,000 BHP
6,000,000 DBK_Prov
122,810,000
53,670,000
1,500,000 DBK Prov
1,000,000 ADD
- 39 -
SUMBER
APBDes 2015
DANA
500,000 ADD
2,000,000 ADD
600,000 ADD
3,500,000 ADD
2,500,000 Silpa 2013
2,160,000 ADD
3,360,000 ADD
7,500,000 ADD
1,300,000 ADD
- 40 -
SUMBER
APBDes 2015
DANA
1,200,000 ADD
1,000,000 PADesa
1,250,000 ADD
1,000,000 PADesa
1,000,000 ADD
3,600,000 ADD
1,800,000 ADD
3,000,000 ADD
1,200,000 ADD
1,200,000 ADD
800,000 ADD
7,200,000 ADD
69,140,000
20,000,000 ADD
740,000 ADD
5,500,000 ADD
1,800,000 ADD
850,000 ADD
2,500,000 ADD
2,400,000 ADD
11,250,000 ADD
3,600,000 ADD
7,050,000 PADesa
5,550,000 BHR
3,000,000 ADD
500,000 DBK Prov
1,200,000 DBK Prov
3,200,000 DBK Prov
5,000,000
1,750,000 ADD
1,000,000 BHR
1,500,000 ADD
750,000 BHR
26,100,000
8,100,000 DBK Prov
18,000,000 ADD
- 41 -
SUMBER
APBDes 2015
DANA
20,600,000
12,950,000 PADesa
1,150,000 Silpa 2013
5,000,000 PADesa
1,500,000 PADesa
7,350,000
60,269,450 ADD
1,808,000
9,900,000
- 42 -
SUMBER
APBDes 2015
DANA
48,561,450
18,380,300 ADD
551,000
2,150,000
15,679,300
8,855,500 ADD
265,000
1,030,000
7,560,500
50,349,100 ADD
1,510,000
8,300,000
40,539,100
17,902,800 ADD
537,000
5,200,000
12,165,800
45,257,600 ADD
1,357,000
7,465,000
36,435,600
436,457,050
2,400,000 ADD
2,400,000
300,000,000
145,000,000 DD
155,000,000 ADD
- 43 -
SUMBER
APBDes 2015
DANA
9,000,000
43,650,000
247,350,000
99,057,050
75,000,000 DD
24,057,050 ADD
2,971,000
14,400,000
81,686,050
5,000,000 ADD
150,000
725,000
- 44 -
SUMBER
APBDes 2015
DANA
4,125,000
10,000,000 Swadaya
10,000,000
10,000,000 DD
300,000
1,600,000
8,100,000
10,000,000 DD
300,000
1,600,000
8,100,000
55,892,700
9,000,000
3,000,000 ADD
500,000 ADD
500,000 ADD
3,000,000 ADD
2,000,000 ADD
7,000,000 ADD
6,000,000
3,000,000 ADD
1,000,000 ADD
1,000,000 BHP
1,000,000 ADD
9,000,000
- 45 -
SUMBER
APBDes 2015
DANA
3,500,000
500,000 ADD
500,000 ADD
500,000 ADD
500,000 ADD
500,000 ADD
500,000 DBK Prov
500,000 DBK Prov
- 46 -
SUMBER
APBDes 2015
DANA
500,000
20,892,700
19,416,300 BHP
1,476,400 BHR
35,000,000
25,000,000
12,500,000 DD
12,500,000 DD
10,000,000
6,252,000
6,252,000
1,102,974,000
(20,252,000)
20,252,000
14,000,000 Silpa
6,252,000 Silpa
- 47 -
SUMBER
APBDes 2015
DANA
20,252,000
MENGETAHUI
KEPALA DESA NATAI RAYA
- 48 -
Lampiran I : PERATURAN DE
Nomor : 04 Tahun 2015
Tanggal : 21 Mei 2015
Tentang : ANGGARAN PEN
BELANJA DESA (
KODE
URAIAN VOLUME
REKENING
Rp 1 PENDAPATAN
1.1 PENDAPATAN ASLI DESA
1.1.1 Hasil Usaha Desa
1.1.1.1 Tanah Kas Desa Rp 1 Tahun
1.1.1.2 Hasil Usaha BUM Desa Rp 1 Tahun
1.1.1.3 Dst
- 49 -
KODE
URAIAN VOLUME
REKENING
- 50 -
KODE
URAIAN VOLUME
REKENING
Rp 2 BELANJA
BIDANG PENYELENGGARAAAN PEMERINTAHAN DESA
2.1
(OPERASIONAL)
2.1.1 BELANJA PEGAWAI
2.1.1.1 Penghasilan Tetap (SILTAP) Kepala Desa dan Perangkat Desa
a. Kepala Desa Rp 12 OB
b. Sekretaris Desa Non PNS Rp 12 OB
c. Kaur Pemerintahan Rp 12 OB
d. Kaur Pembangunan Rp 12 OB
e. Kaur Umum Rp 12 OB
f. Staf Keuangan Rp 10 OB
g. Staf administrasi Rp 9 OB
2.1.1.2 Tunjangan
1. Tunjangan Jabatan Kepala Desa dan Perangkat Desa
a. Kepala Desa Rp 12 OB
b. Sekretaris Desa Rp 12 OB
c.Kaur Pemerintah Rp 12 OB
d.Kaur Pembangunan Rp 12 OB
e.Kaur Umum Rp 12 OB
2. Tunjangan Badan Permusyawaratan Desa (BPD)
a. Ketua Rp 12 OB
b. Wakil Ketua Rp 12 OB
c. Sekretaris Rp 12 OB
d. Anggota Rp 24 OB
3. Tunjangan kesehatan Kepala Desa dan Perangkat Desa
a. Kepala Desa Rp 12 OB
b. Sekretaris Desa Rp 12 OB
c. Kaur Pemerintah Rp 12 OB
d. Kaur Pembangunan Rp 12 OB
e. Kaur Umum Rp 12 OB
f. Staf Keuangan Rp 10 OB
g. Staf administrasi Rp 9 OB
4. Tunjangan purna tugas BPD
a. Ketua Rp 1 Periode
b. Wakil Ketua Rp 1 Periode
c. Sekretaris Rp 1 Periode
d. Anggota (2 Orang) Rp 1 Periode
5. Insentif :
a. Kepala Desa Rp 12 OB
- 51 -
KODE
URAIAN VOLUME
REKENING
- 52 -
KODE
URAIAN VOLUME
REKENING
8. Jasa berlangganan
a. Listrik Rp 12 Bulan
b. Koran
c. Air Bersih Rp 12 Bulan
9. Operasional Pemerintah Desa Lainnya
a. Belanja BBM Kendaraan Dinas Rp 3 Unit/thn
b. Belanja alat kebersihan kantor desa
c. Dokumen APBDes Rp 8 Buku
d. Dokumen Pertanggung jawaban APBDes Rp 8 Buku
10. Penyediaan Jasa Keuangan :
a. Honor Pengguna Anggaran Rp 12 OB
b. Honor Pelaksana Teknis Pengelola Keuangan Desa (PTPKD)
> Koordintor ( Sekretaris Desa ) Rp 12 OB
c. Honor Bendahara Keuangan Desa Rp 12 OB
d. Honor Tim Pelaksana Kegiatan (TPK) :
> Ketua Rp 8 OB
> Sekretaris Rp 8 OB
> Anggota Rp 8 OB
e. Insentif Pembersih kantor ( OB ) Rp 12 Bulan
2.1.4 OPERASIONAL RT
a. Tunjangan RT Rp 12 Bulan
b. Insentif RT ( 150.000 x 12 x 10 ) Rp 12 Bulan
- 53 -
KODE
URAIAN VOLUME
REKENING
2.1.7 LANJUTAN PAGAR KANTOR DESA DAN PAPAN NAMA Rp 150 Meter
2.1.7.2 Belanja Barang dan Jasa
a. Operasional TPK
b. Upah Kerja
- 54 -
KODE
URAIAN VOLUME
REKENING
- 55 -
KODE
URAIAN VOLUME
REKENING
a. Operasional TPK
b. Upah Kerja
2.2.2.3 Belanja Modal
a. Bahan Material
- 56 -
KODE
URAIAN VOLUME
REKENING
- 57 -
KODE
URAIAN VOLUME
REKENING
- 58 -
KODE
URAIAN VOLUME
REKENING
SURPLUS / DEFISIT
Rp 3 PEMBIAYAAN DESA
3.1 Penerimaan Pembiayaan
3.1.1 Sisa lebih Perhitungan Anggaran Tahun sebelumnya ( Silpa ) :
3.1.1.1 Silpa yang digunakan pada tahun berjalan (Tahun 2013) Rp 1 Tahun
3.1.1.2 Silpa yang digunakan pada tahun berjalan (Tahun 2014) Rp 1 Tahun
3.1.2 Pencairan Dana Cadangan
3.1.3 Hasil penjualan kekayaan desa yang dipisahkan
3.1.4 Dst
- 59 -
KODE
URAIAN VOLUME
REKENING
JUMLAH PEMBIAYAAN
TAHUI MEN
KEPALA DE
YAN ARI
- 60 -
: PERATURAN DESA NATAI RAYA
: 04 Tahun 2015
: 21 Mei 2015
: ANGGARAN PENDAPATAN DAN
BELANJA DESA ( APBDes ) TAHUN 2015
SUMBER
APBDes 2015
DANA
28,500,000
-
PADesa
PADesa
12,500,000
12,500,000 PADesa
10,000,000
10,000,000 swadaya
6,000,000
6,000,000 PADesa
1,054,222,000
275,000,000 DD
700,429,300 ADD
30,416,300 BHP
11,776,400 BHR
-
Hibah
Kerjasama
- 61 -
SUMBER
APBDes 2015
DANA
bunga
1,082,722,000
- 62 -
SUMBER
APBDes 2015
DANA
569,372,250
186,497,500
119,750,000
30,000,000 ADD
21,000,000 ADD
15,000,000 ADD
15,000,000 ADD
15,000,000 ADD
12,500,000 ADD
11,250,000 ADD
66,747,500
4,800,000 ADD
3,360,000 ADD
2,400,000 ADD
2,400,000 ADD
2,400,000 ADD
7,800,000 ADD
5,400,000 ADD
5,400,000 ADD
7,800,000 ADD
1,500,000 ADD
1,050,000 ADD
750,000 ADD
750,000 ADD
750,000 ADD
625,000 ADD
562,500 ADD
3,000,000 BHR
2,500,000 BHP
2,500,000 BHP
5,000,000 BHP
6,000,000 DBK_Prov
122,810,000
53,670,000
1,500,000 DBK Prov
1,000,000 ADD
- 63 -
SUMBER
APBDes 2015
DANA
500,000 ADD
2,000,000 ADD
600,000 ADD
3,500,000 ADD
2,500,000 Silpa 2013
2,160,000 ADD
3,360,000 ADD
7,500,000 ADD
1,300,000 ADD
- 64 -
SUMBER
APBDes 2015
DANA
1,200,000 ADD
1,000,000 PADesa
1,250,000 ADD
1,000,000 PADesa
1,000,000 ADD
3,600,000 ADD
1,800,000 ADD
3,000,000 ADD
1,200,000 ADD
1,200,000 ADD
800,000 ADD
7,200,000 ADD
69,140,000
20,000,000 ADD
740,000 ADD
5,500,000 ADD
1,800,000 ADD
850,000 ADD
2,500,000 ADD
2,400,000 ADD
11,250,000 ADD
3,600,000 ADD
7,050,000 PADesa
5,550,000 BHR
3,000,000 ADD
500,000 DBK Prov
1,200,000 DBK Prov
3,200,000 DBK Prov
5,000,000
1,750,000 ADD
1,000,000 BHR
1,500,000 ADD
750,000 BHR
26,100,000
8,100,000 DBK Prov
18,000,000 ADD
- 65 -
SUMBER
APBDes 2015
DANA
20,600,000
12,950,000 PADesa
1,150,000 Silpa 2013
5,000,000 PADesa
1,500,000 PADesa
7,350,000
60,269,450 ADD
1,808,000
9,900,000
- 66 -
SUMBER
APBDes 2015
DANA
48,561,450
18,380,300 ADD
551,000
2,150,000
15,679,300
8,855,500 ADD
265,000
1,030,000
7,560,500
50,349,100 ADD
1,510,000
8,300,000
40,539,100
17,902,800 ADD
537,000
5,200,000
12,165,800
45,257,600 ADD
1,357,000
7,465,000
36,435,600
436,457,050
2,400,000 ADD
2,400,000
300,000,000
145,000,000 DD
155,000,000 ADD
- 67 -
SUMBER
APBDes 2015
DANA
9,000,000
43,650,000
247,350,000
99,057,050
75,000,000 DD
24,057,050 ADD
2,971,000
14,400,000
81,686,050
5,000,000 ADD
150,000
725,000
- 68 -
SUMBER
APBDes 2015
DANA
4,125,000
10,000,000 Swadaya
10,000,000
10,000,000 DD
300,000
1,600,000
8,100,000
10,000,000 DD
300,000
1,600,000
8,100,000
55,892,700
9,000,000
3,000,000 ADD
500,000 ADD
500,000 ADD
3,000,000 ADD
2,000,000 ADD
7,000,000 ADD
6,000,000
3,000,000 ADD
1,000,000 ADD
1,000,000 BHP
1,000,000 ADD
9,000,000
- 69 -
SUMBER
APBDes 2015
DANA
3,500,000
500,000 ADD
500,000 ADD
500,000 ADD
500,000 ADD
500,000 ADD
500,000 DBK Prov
500,000 DBK Prov
- 70 -
SUMBER
APBDes 2015
DANA
500,000
20,892,700
19,416,300 BHP
1,476,400 BHR
35,000,000
25,000,000
12,500,000 DD
12,500,000 DD
10,000,000
6,252,000
6,252,000
1,102,974,000
(20,252,000)
20,252,000
14,000,000 Silpa
6,252,000 Silpa
- 71 -
SUMBER
APBDes 2015
DANA
20,252,000
MENGETAHUI
KEPALA DESA NATAI RAYA
- 72 -
Err:509
Err:509
73
Pagu Operasional (Maksimal 30%) Err:509 Siltap Err:509
2.1 BIDANG PENYELENGGARAAN PEMERINTAHAN DESA 40% ADD Err:509
2.1.1 BELANJA PEGAWAI Err:509 ADD_1
BELANJA PEGAWAI Err:509 BHP_1
BELANJA PEGAWAI Err:509 BHR_1
BELANJA PEGAWAI DBK Prov_1 Err:509 Err:509
2.1.2 OPERASIONAL PERKANTORAN Err:509 ADD_1
OPERASIONAL PERKANTORAN DBK Prov_1 Err:509
OPERASIONAL PERKANTORAN Err:509 Silpa 2013_1
OPERASIONAL PERKANTORAN Err:509 PADesa_1
OPERASIONAL PERKANTORAN Err:509 BHR_1 Err:509
2.1.3 OPERASIONAL BPD Err:509 BHR_1
OPERASIONAL BPD Err:509 ADD_1 Err:509
2.1.4 OPERASIONAL RT Err:509 ADD_1
OPERASIONAL RT DBK Prov_1 Err:509 Err:509
Sub Total 1 (Operasional - Maksimal 30%) Err:509 Err:509 Err:509
74
2.2 BIDANG PELAKSANAAN PEMBANGUNAN DESA
2.2.1 PENGADAAN SARANA PRASARANA KANTOR BKB Err:509 ADD_2 Err:509
2.2.2 PEMBUATAN SALURAN DRAINASE (600 M) Err:509 ADD_2
PEMBUATAN SALURAN DRAINASE (600 M) Err:509 DD_2 Err:509
2.2.3 PEMBUATAN JALAN COR RT. 1 Err:509 DD_2
PEMBUATAN JALAN COR RT. 1 Err:509 ADD_2 Err:509
2.2.4 PEMELIHARAAN GORONG-GORONG DI RT. 06 & RT. 08 Err:509 ADD_2 Err:509
2.2.5 PENGADAAN/PEMBUATAN TIANG BENDERA Swadaya_2 Rp -
2.2.6 PEMBUATAN KOLAM TK MAKARTI MUKTI SIWI Err:509 DD_2 Err:509
2.2.7 PEMBUATAN KOLAM PAUD Err:509 DD_2 Err:509
Sub Total 2 Err:509 Rp - Err:509
75
2.4. BIDANG PEMBERDAYAAN MASYARAKAT
PELATIHAN PENINGKATAN KAPASITAS PEMERINTAH DESA Err:509
2.4.1 DAN DD_2 Err:509
BPD
2.4.2 KEGIATAN PENANGGULANGAN KEMISKINAN DBK Kab_2 Err:509 Err:509
Sub Total Bidang 4 Err:509 Err:509 Err:509
76
1. PENDAPATAN Err:509 Err:509
2. BELANJA : Kesimpulan :
2.1 BIDANG PENYELENGGARAAN PEMERINTAHAN DESA Err:509 1. Total Pendapatan Err:509
2.2 BIDANG PELAKSANAAN PEMBANGUNAN DESA Err:509 2. Total Pengeluaran Err:509
2.3 BIDANG PEMBINAAN KEMASYARAKATAN Err:509 Err:509
2.4. BIDANG PEMBERDAYAAN MASYARAKAT Err:509
2.5. BELANJA TAK TERDUGA Err:509
TOTAL BELANJA Err:509
SURPLUS Err:509
3. PEMBIAYAAN:
3.1. -
SUB TOTAL PEMBIAYAAN -
GRAND TOTAL Err:509
77
PPn PPh
0.0909090909 1,363,636 204,545 13,431,818 156,818
1,150,000 172,500
KESIMPULAN
TANGGAL NOMOR NOTA SPESIFIKASI BARANG YG (SESUAI /
NO. NAMA ITEM PENGELUARAN PEMBELIAN PEMBELIAN TELAH DIBELI TIDAK
SESUAI)
Kealitas baik
Genteng mantili Tanah liat
Setandart SNI
Cat Genteng Merk Jarum @2.5kg
Mengetahui :
Kepala Desa Sungai Melawen
Selaku
Pemegang Kekuasaan Pengelolaan
Keuangan Desa
MAKIN
SURAT PERMINTAAN PEMBAYARAN ( SPP )
DESA SUNGAI MELAWEN KECAMATAN PANGKALAN LADA
TAHUN ANGGARAN 2017
1 Bidang : Penyelenggaraan Pemerintah Desa
2 Kegiatan : Pembangunan Lanjutan AULA SEBA GUNA
3 Waktu pelaksanaan : ...................... 2017
Rincian pendanaan
1 2 3 4 5 6 7 8 9 10
Sungai Melawen,.......,/......./2017
Pelaksana kegiatan
HARI SUWANTO
PERNYATAAN TANGGUNG JAWAB BELANJA
DESA SUNGAI MELAWEN KECAMATAN PANGKALAN LADA
TAHUN ANGGARAN 2017
1 Bidang : Penyelenggaraan Pemerintah Desa
2 Kegiatan : Pembangunan Lanjutan AULA SEBA GUNA
Jumlah
NO Penerima
Uraian
( Rp )
KEBUTUHAN PERALATAN
NO. NAMA PERALATAN VOLUME SATUAN TAHUN KELUARAN
Kuas 4'' 10 bh Tahun 2017
Mengetahui :
Kepala Desa Sungai Melawen
Selaku
Pemegang Kekuasaan Pengelolaan
Keuangan Desa
MAKIN
Kepengawasan tenaga teknik pekerjaan
Pekerjaan pemasangan atap genteng @ 3 75,000 225,000
Penegecatan atap @ 3 75,000 225,000
-
Sup t o t a l 450,000
Kepengawasan tenaga teknik pekerjaan Bgn.
Pembuatan plang project : Plang bener kerangaka
kayu uk 60x80 cm x tnggi 200 cm di atas permukaan Unit 1 275,000 275,000
tanah
Pekerjaan bawah pondasi dan podasi batu belah @ 75,000 -
Sup t o t a l 275,000
BBM u/Transportasi Kepengawasan tenaga teknik /Agt TPK
Bensin Sat Vol Hrg. Sat Jumlah
Pekerjaan pemasangan atap genteng Ltr 9 9,000 81,000
Penegecatan atap Ltr 6 9,000 54,000
Sup t o t a l 135,000
Merancang gambar dan buat RAB Rencana
Uraian Item pekerjaan Sat Vol Hrg.sat Jumlah
Buat SITE PLANT AREA/istmasi RAB Rencana
@ 1 -
Progres /Rekap LPJ @ 1 122,500 122,500
Sup t o t a l 122,500
3 Kayu 5x5x400 cm klas 2 btg 325 25,000 8,125,000 Steger begisting cor
LAIN - LAIN
Total 202,010,000.00
Budget 202,010,000.00
No URAIAN PEKERJAAN DAN MATERIAL SAT VOL Sat.Harga Tot.Harga Tot.Item Keterangan
2 GALIAN m3
Galian tanah pondasi m3 3.38 -
Urugan tanah (tanah timbun ) m3 -
Batu belah M3 1.69 -
Pasir M3 1.69 -
Semen @50kg Standar SNI Sak 6.75 -
T o t a l - -
2 KONTRUKSI BETON M3
BETON CAKAR AYAM K.175 M3
Lantai kerja Cakar Yam M3 0.1
Batu cor 1:2 M3 0.08 -
Pasir M3 0.08 -
Semen @50kg Standar SNI Sak 0.6 -
Pembesian dan Beton Cakar Ayamm3 0.288 -
Besi beton 10mmX1200 CM btg 8.5 -
Kawat Bendrat kg 2.13 -
Batu cor 1:2 M3 0.2 -
Pasir M3 0.2 -
Semen @50kg Standar SNI Sak 1.4 -
T o t a l - -
BETON SLOF K175 m3
Besi Beton Dea 6mmx1200 cm Btg 5.1 -
Besi Beton Dea 10mmx1200 cm Btg 6.8 -
Kawat bendrat kg 2 -
Batu cor 1:2 M3 0 -
Pasir M3 0 -
Semen @50kg Standar SNI Sak 0 -
T o t a l - -
BETON KOLOM K175(1:2:3) M3
Besi Beton Dea 10mmx1200 cm Btg 11.9 -
Besi beton Dea 6mmX1200 CM Btg 7.9 -
Kawat bendrat Kg 6 -
Batu cor 1:2 M3 0.0 -
Pasir M3 0.0 -
Semen @50kg Standar SNI Sak 0.0 -
T o t a l - -
BETON RING BALOK PRAKTIS K175m3
Besi Beton Dea 6mmx1200 cm Btg 4.7 -
Besi Beton Dea 10mmx1200 cm Btg 6.8 -
Kawat bendrat Kg 4 -
Batu cor 1:2 M3 0 -
Pasir cor M3 0 -
Semen @50kg Standar SNI Sak 0 -
T o t a l - -
6 DAG BETON K175(1:2:3) ( TERAS) M3
Lantai2 Kantor/sarana khusus/teras/kon 0.0
Besi Beton Dea 6mmx1200 cm Btg
Besi Beton Dea 10mmx1200 cm Btg 6 -
Kawat bendrat Kg 1 -
Batu cor 1:2 M3 0 -
Pasir cor M3 0 -
Semen @50kg Standar SNI Sak 1 -
T o t a l - -
7 PERATAPAN RANGKA KAYU KLAS1 ULI M2
ATAP GENTENG TANAH LIAT m2 12,716 1,700 21,617,200
Kayu 6x12x400 cm klas1 ulin Btg 72 180,000 12,960,000
Kayu 5x10x400 cm klas1 ulun Btg 159 125,000 19,875,000
Kayu 5x5x400 cm Btg 325 30,000 9,750,000
Kayu 3x5x400 cm Btg 426 15,000 6,390,000
Papan ulin 2x20x400 cm Lbr 56 65,000 3,640,000
Paku 3'' Kg 5 19,000 95,000
Paku 4'' Kg 15 19,000 285,000
Paku 5'' Kg 25 19,000 475,000
Baut 19mmx12cm+ ring Bh 179 9,000 1,611,000
Baut 19mmx22cm+ ring Bh -
T o t a l 76,698,200 76,698,200
8 PLAFONT m2
PLYWOOD 4mmx122x244 cm Lbr 175 74,400 13,020,000
List profil siku 1,5x5x5x400 cm Btg 75 22,500 1,687,500
Kayu 3x5x400 cm Btg 375 -
Kayu 5x5x400 cm Btg 275 35,000 9,625,000
Paku triplek Lbr 9 30,000 270,000
Paku 3'' Kg 27 19,000 513,000
Paku 4'' Kg 35 19,000 665,000
T o t a l 25,780,500
3 PEKERJAAN DINDING/Acian m2 1142
Batako 9x17x39 cm Bh 3,000 -
Pasir M3 150,000 -
Semen @50kg Standar SNI Sak 75,000 -
PLESTERAN & ACIAN M3 22 -
Pasir M3 22 150,000 3,300,000
Semen @50kg Standar SNI Sak 85 75,000 6,375,000
ACIAN M2 42 -
Semen @50kg Standar SNI SAK 35 75,000 2,625,000
T o t a l 12,300,000 12,300,000
10 PEKERJAAN KUCEN ,PINTU,DAN JENDELA
Kusen kayu ulin 6x12 cm M' 95,000 -
Pintu Ulin pintu tarung 100x250 cm Bh 2 1,900,000 3,800,000
Pintu Ulin 80x210 cm Bh 7 1,500,000 10,500,000
Pintu ulin 70x210 cm Bh 2 1,250,000 2,500,000
Pintu ulin 60x200 cm Bh 1,000,000 -
Jendela Ulin+kaca riben blok
5mm60x200 cm Bh 28 850,000 23,800,000
Jendela Ulin+kaca riben blok 5mm5 Bh 60,000 -
Bowvenligh Bh 2 350,000 700,000
Roster Kaca Kapur Bh 40 75,000 3,000,000
Kunci Slot ESIO Bh 11 350,000 3,850,000
Handel Pintu Fariasi Stainlist Stel 6 450,000 2,700,000
Handel 3'' Bh 37 50,000 1,850,000
Grendel 3'' Bh 28 25,000 700,000
Engsel 5'' Bh 11 75,000 825,000
Engsel 4'' Bh 28 55,000 1,540,000
Hak angin Automatis Bh 6 27,000 162,000
Hak angin Bh 56 35,000 1,960,000
T o t a l 57,887,000
11 PEKERJAAN LANTAI VINISING KERAMIC
Rabat beton 1.3.5 m3 37.2
Batu cor 1:2 M3 26.04 600,000 15,624,000
Pasir M3 14.88 200,000 2,976,000
Semen @50kg Standar SNI Sak 74.4 75,000 5,580,000
Lantai keramik 30x30 cm Motif m2 334 95,000 31,730,000
Pasir M3 12 175,000 2,100,000
Semen @50kg Standar SNI Sak 150 75,000 11,250,000
List keramik kuku macan m' 55 25,000 1,375,000
T o t a l 70,635,000
12 SANITAIR AIR BERSIH DAN AIR KOTOR/SEPTICTANK
Kamar mandi/wc 1 unit
Keramik 20x20 cm kasar Motif m2 3.5 85,000 297,500
Keramik 20x25 cm Motif m2 24 85,000 2,040,000
Pasir M3 4 150,000 600,000
Semen @50kg Standar SNI Sak 16 75,000 1,200,000
List keramik kuku macan Pjg 10 m' 11 25,000 275,000
INSTALANSI AIR BERSIH/KOTOR -
Instalasi air kotor/Septictank
Kloset merk INA Bh 2 210,000 420,000
Pipa PVC AW 4''X400 CM Dus 6 130,000 780,000
Pipa PVC AW 3''X300 CM'' Dus 3 90,000 270,000
Elbow 4'' Bh 2 30,000 60,000
Elbow 3'' Bh 2 25,000 50,000
Batu cor 1:2 M3 1 600,000 600,000
Pasir M3 6 175,000 1,050,000
Semen @50kg Standar SNI Sak 27 78,000 2,106,000
Besi Beton Dea 10mmx1200 cm Btg 6 75,000 450,000
Kawat bendrat Kg 2 18,000 36,000
Batako 9x19x39 cm bh 400 3,000 1,200,000
Batu cor 1:2 M3 1 600,000 600,000
Pasir M3 1 175,000 175,000
Semen @50kg Standar SNI Sak 6 78,000 468,000
Ijuk Kg 2 40,000 80,000
Pipa Galvanish 2x2x2''x60 cm ( T Btg 2 100,000 200,000
Instalasi air bersih -
Menara Air Beton m3 2.765 -
Besi Beton Dea 6mmx1200 cm Btg 22 38,000 836,000
Besi Beton Dea 12mmx1200 cm btg 43.8 95,000 4,161,000
Kawat bendrat kg 12 19,000 228,000
Batu cor 1:2 m3 2.4885 600,000 1,493,100
Pasir m3 2.4885 150,000 373,275
Semen @50kg Standar SNI sak 17.4195 75,000 1,306,463
Pipa PVC AW 1/2''X400 CM'' btg 21 25,000 525,000
Pipa PVC AW 3/4''X400 CM'' btg 10 45,000 450,000
Pipa PVC AW 1''X400 CM'' btg 9 55,000 495,000
Sok Cran PVC 1/2'' Bh 4 8,000 32,000
Elbow 1/2'' Bh 14 3,500 49,000
Siltip Bh 10 3,000 30,000
Kran air 1/2'' Bh 4 25,000 100,000
Lem insarpalas Btl 2 18,000 36,000
Voldrain 3'' Bh 2 25,000 50,000
Voldrain 3/4'''' Bh 2 30,000 60,000
T o t a l 18,769,838
13 INSTALANSI LISTRIK
Meter box standar PLN 10A SNI Set 1 4,000,000 4,000,000
Kabel listrik 2x2,5mm NYM SNI Rol 6 1,400,000 8,400,000
Kabel listrik 3x2,5mm NYM SNI Rol 4 1,900,000 7,600,000
Inbouw DUS Bh 65 3,500 227,500
T Dus ( mangkok listrik ) Bh 293 4,000 1,172,000
Lampu SL 100 W Spiral Pihlip SNI bh 21 150,000 3,150,000
Lampu SL 40 W Spiral Pihlip SNI Bh 6 90,000 540,000
Lampu SL 18 W Spiral Pihlip SNI Bh 4 75,000 300,000
Lampu SL 11 W Spiral Pihlip SNI bh 6 65,000 390,000
Pipa Conduit ( Pipa Listrik ) Btg 85 16,000 1,360,000
Saklar Tunggal Broco Bh 6 18,000 108,000
Saklar Ganda Broco bh 12 18,000 216,000
MCB/BOX Lengkap 2 A Broco U/Dal Set 6 150,000 900,000
Piting lampu Kotak Broco bH 37 18,000 666,000
Besi grond Tembaga 19mmx150 cm Btg 2 200,000 400,000
T o t a l 29,429,500
4 PEKERJAAN PENGECATAN
T o t a l 18,760,000 18,760,000
ALAT KERJA
1 NAMA BARANG
Ember kerja Bh 10 25,000 250,000
Mixser ( molen ) kap 0,25m3 Unit 10,500,000 -
Pemotong Besi kap 19mm Unit 2,250,000 -
Bak cat PVC Bh 55,000 -
Cangkul Bh 80,000 -
Terpal uk.5x7 Bh 175,000 -
Slang air 3/4'' Rol 455,500 -
Kuas rol Bh 30,000 -
Kuas 4'' Bh 8 15,000 120,000
Kuas 2,5'' Bh 9,000 -
Benang Bh 2 6,000 12,000
Sekop Bh 1 75,000 75,000
T o t a l 457,000 457,000
UPAH KERJA
1 NAMA PEKERJAAN
Pekerjaan Galian Pondasi /Cakar ay m3 -
Pekerjaan Pondasi batu bel;ah m' -
Pekerjaan Timbunan m3 -
Pekerjaan Kontruksi beton M3 0.0 375,000 -
Pekerjaan beton rabat lantai/lapngam3 37.2 150,000
Pekerjaan plester dinding
m2 1142 55,000 62,810,000
Pekerjaan Acian dinding m2 1142 5,000 5,710,000
Pekerjaan Plafont m2 400.75 30,000
Pekerjaan Lantai Finising Keramic m2 334.49 45,000
Pekerjaan Pengecatan Dinding m2 1142 5,000
Pekerjaan Perataan tanah tmbun m3 280 2,000 560,000
T o t a l 69,080,000 69,080,000
Kepala Desa Sungai Melawen KAUR Pmbngn/TPK. S.Melawen Sekretaris TPK SM.
LAIN - LAIN
Operasional kegiatan Item 3% 1,746,000 Rp 1,746,000
Total Rp 60,000,000
Rp 60,000,000
Terbilang : #Enam juta rupiah #
( Harga sudah termasuk pajak)
PERNYATAAN TANGGUNG JAWAB BELANJA
DESA SUNGAI MDELAWE KECAMATAN PANGKALAN LADA
TAHUN ANGGARAN 2017
1 Bidang : Penyelenggaraan Pemerintah Desa
2 Kegiatan : Pembangunan Lanjudtan AULA SEBA GUNA
Jumlah
NO Penerima
Uraian
( Rp )
Hari Suwanto
BUKU KAS PEMBANTU KEGIATAN
DESA SUNGAI MELAWEN KECAMATAN PANGKALAN LADA
1 2 3 4 5 6 7 8 9 10
Sungai Melawen,.......,/......./2017
Pelaksana kegiatan
HARI SUWANTO
NOTA PERTIMBANGAN
Yang bertanda tangan di bawah ini :
1 Nama : Hari Suwanto
2 Jabatan : Kaur Pembangunan
Catatan kekurangan :
1 ............................................................................................................................
2 ............................................................................................................................
3 ............................................................................................................................
4 ............................................................................................................................
Hari Suwanto
SURAT PERMINTAAN PEMBAYARAN ( SPP )
DESA SUNGAI MELAWEN KECAMATAN PANGKALAN LADA
Rincian pendanaan
Sungai Melawen.25/04/2017
Sekretaris Desa