1 2 3 4
2.46%
2.46%
2.46%
1 Armature lampu :
- RD 125 PLC SAVY 13W / 86 bh Rp 252,747.00
- Downlight Dia. 6" 18W bh Rp 285,200.00
- RD 175 HRZ PRS 2 X PLC 18W / 86 bh Rp 491,050.00
- RD 175 HRZ PRS 2 X PLC 18W / 84 PRS KACA bh Rp 546,480.00
- RD 3 HALOGEN BAFFLE tanpa box 50W/12V bh Rp 316,250.00
- RM 300 GLOSSY 2 X 18W /54 M4 SAVY bh Rp 977,500.00
- RMI 300 GLOSSY 2 X 36W bh Rp 1,380,000.00
- RMI 300 AP 2 X 36W bh Rp 1,437,500.00
- BL TG 1 X 36W / 54 SAVY bh Rp 273,240.00
- Exit Green 1 X 8W ACR 1MK HUGO bh Rp 1,535,181.00
- Ceilling Light 22 W bh Rp 1,681,300.00
- Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh Rp 1,518,000.00
2 Komponen Panel :
- Pilot Lamp RST+Fuse bh Rp 48,510.00
- Ampere Meter bh Rp 267,498.00
- CT bh Rp 239,085.00
- Volt Meter bh Rp 306,306.00
- SSV bh Rp 189,882.00
- Hz Meter bh Rp 859,320.00
- KW Meter bh Rp 2,541,924.00
- Power Factor (Cos Q) bh Rp 2,127,510.00
- KWH Meter Analog bh Rp 1,386,000.00
- Arrester 3P+N bh Rp 4,296,600.00
- Motorized bh Rp 7,961,877.00
- UVT bh Rp 1,749,132.00
- MCCB 160-400A/4P (50 kA) bh Rp 10,291,600.00
- MCCB 87.5-125A/4P (36 kA) bh Rp 3,005,750.00
- MCCB 100A/3P (25 kA) bh Rp 2,844,600.00
- MCCB 60A/3P (18 kA) bh Rp 868,450.00
- MCCB 30A/3P (18 kA) bh Rp 794,750.00
- MCB 25A/4P (15 kA) bh Rp 905,300.00
- MCB 6A/3P, 6kA bh Rp 366,030.00
- MCB 10A/3P, 6kA bh Rp 366,030.00
- MCB 16A/3P, 6kA bh Rp 366,030.00
- MCB 20A/3P, 6kA bh Rp 387,450.00
- MCB 25A/3P, 6kA bh Rp 393,750.00
- MCB 32A/3P, 6kA bh Rp 400,050.00
- MCB 40A/3P, 6kA bh Rp 428,400.00
- MCB 50A/3P, 6kA bh Rp 614,250.00
- MCB 63A/3P, 6kA bh Rp 758,520.00
- MCB 6A/3P, 10 kA bh Rp 631,260.00
- MCB 10A/3P, 10 Ka bh Rp 631,260.00
- MCB 16A/3P, 10 kA bh Rp 631,260.00
- MCB 20A/3P, 10 kA bh Rp 631,260.00
- MCB 25A/3P, 10 kA bh Rp 631,260.00
- MCB 32A/3P, 10 kA bh Rp 745,290.00
- MCB 40A/3P, 10 kA bh Rp 745,290.00
- MCB 50A/3P, 10 kA bh Rp 833,490.00
bahan me RAB 6
- MCB 63A/3P, 10 kA bh Rp 833,490.00
- MCB 80A/3P, 10 kA bh Rp 1,014,300.00
- MCB 100A/3P, 10 kA bh Rp 1,234,800.00
- MCB 6A/1P, 4,5kA bh Rp 61,110.00
- MCB 10A/1P, 4,5kA bh Rp 61,110.00
- MCB 16A/1P, 4,5kA bh Rp 61,110.00
- MCB 20A/1P, 4,5kA bh Rp 61,110.00
- MCB 25A/3P, 4,5kA bh Rp 344,000.00
- MCB 32A/1P, 4,5kA bh Rp 71,820.00
- MCB 10A/1P,6kA bh Rp 91,980.00
- MCB 16A/1P, 6kA bh Rp 91,980.00
3 Peralatan Instalasi :
- Saklar 1 Gang 1 Way bh Rp 18,150.00
- Saklar 2 Gang 1 Way bh Rp 29,590.00
- Saklar 1 Gang 2 Way bh Rp 22,220.00
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V bh Rp 24,750.00
- Stop Kontak Komputer (UPS) 1 Gang ( 2P+E ) Schuko - 250 V bh Rp 24,750.00
- Stop Kontak Medis (UPS) 1 Gang ( 2P+E ) Schuko - 250 V bh Rp 24,750.00
- Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British Standard w/ Neon S bh Rp 55,440.00
- Industrial Socket 16 A ( 3P+N+E ) IP 44 bh Rp 131,450.00
- Telepon Outlets c/w Cover 1 Gang - 4 Wire bh Rp 58,850.00
- Outlet Data Cat 6 c/w Modular Jack bh Rp 144,960.00
- Outlet Televisi 1 Gang 75 Ohm bh Rp 62,150.00
- Inbow doos plastic boks bh Rp 3,000.00
- Pipa PVC High Impact 20 mm² m' Rp 2,466.00
- Socket Pipa bh Rp 1,200.00
- Tee Doos bh Rp 8,700.00
- Klem Pipa bh Rp 630.00
- Fhiser bh Rp 1,200.00
- Las Doop bh Rp 780.00
- Isolasi ban bh Rp 3,000.00
- Material Bantu + Wiring ls Rp 150,000.00
4 Air Conditioning
- AC Wall Split ( 5.000 bTU/h ) set Rp 3,790,800.00
- AC Wall Split ( 7.000 bTU/h ) set Rp 3,922,800.00
- AC Wall Split ( 9.000 bTU/h ) set Rp 4,078,800.00
- AC Wall Split ( 12.000 bTU/h ) set Rp 5,122,800.00
- AC Wall Split ( 18.000 bTU/h ) set Rp 6,802,800.00
- AC Wall Split ( 24.000 bTU/h ) set Rp 9,598,800.00
- Wall Mounted Exhaust Fan KM/WC, 30 W / 220 V / 420 m3/h set Rp 804,000.00
- Terminal BOX c/w LSA 1 x 10 pairs bh Rp 900,000.00
- Patch Panel Cat5 8 Port / wallmount 2u bh Rp 5,700,000.00
- Patch Panel Cat5 16 Port / wallmount 4u bh Rp 6,000,000.00
- Patch Panel Cat5 24 Port / wallmount 4u bh Rp 9,600,000.00
- AC Split Duct (90.000 bTU/h) unit Rp 71,400,000.00
- Dehumidefire unit Rp 9,900,000.00
- Boster Fan unit Rp 7,800,000.00
- Supply Air Difusher unit Rp 600,000.00
- Rumah Hepafilter unit Rp 11,100,000.00
- Ducting Uk. 250X250 m1 Rp 570,000.00
- Ducting Uk. 350X250 m1 Rp 648,000.00
- Ducting Uk. 450X250 m1 Rp 739,200.00
5 Kabel Instalasi :
- Kabel TR, NYA 1 x 2,5 mm² m' Rp 3,072.00
- Kabel TR, NYA 1 x 4 mm² m' Rp 4,800.00
bahan me RAB 7
- Kabel TR, NYM 2 x 1,5 mm² m' Rp 6,912.00
- Kabel TR, NYM 3 x 2,5 mm² m' Rp 12,480.00
- Kabel TR, NYY 4 x 2,5 mm² m' Rp 19,200.00
- Kabel TR, NYY 4 x 4 mm² m' Rp 28,416.00
- Kabel TR, NYY 4 x 6 mm² m' Rp 38,208.00
- Kabel TR, NYY 4 x 10 mm² m' Rp 67,344.00
- Kabel TR, NYY 4 x 16 mm² m' Rp 115,200.00
- Kabel TR, NYY 4 x 25 mm² m' Rp 172,800.00
- Kabel TR, NYY 4 x 35 mm² m' Rp 230,400.00
- Kabel TR, NYY 4 x 50 mm² m' Rp 307,200.00
- Kabel TR, NYY 4 x 70 mm² m' Rp 422,400.00
- Kabel TR, NYY 4 x 95 mm² m' Rp 662,400.00
- Kabel TR, NYY 4 x 120 mm² m' Rp 720,000.00
- Kabel TR, NYY 4 x 185 mm² m' Rp 1,104,000.00
- Kabel TR, NYMHy 3 x 2.5 mm² m' Rp 19,200.00
- Kabel TR, NYMHy 2 x 1.5 mm² m' Rp 8,640.00
- Kabel TR, NYFGbY 4 x 25 mm² m' Rp 176,400.00
- Kabel TR, NYFGbY 4 x 95 mm² m' Rp 585,600.00
- Kabel TR, NYFGbY 4 x 240 mm² m' Rp 1,449,600.00
- Kabel BC 120 mm² m' Rp 182,400.00
- Kabel BC 95 mm² m' Rp 165,600.00
- Kabel BC 50 mm² m' Rp 72,960.00
- Kabel BC 35 mm² m' Rp 53,760.00
- Kabel BC 25 mm² m' Rp 46,800.00
- Kabel BC 16 mm² m' Rp 24,960.00
- Kabel BC 10 mm² m' Rp 11,904.00
- Kabel BC 6 mm² m' Rp 8,280.00
- ITC Cable 2 x 2 x 0,6 mm² m' Rp 8,300.00
- ITC Cable 10 x 2 x 0,6 mm² m' Rp 25,000.00
- ITC Cable 20 x 2 x 0,6 mm² m' Rp 48,000.00
- UTP Cable 4 Pairs (Cat 5e) m' Rp 11,000.00
- Kabel UTP 4 Pairs (Cat 6) m' Rp 10,500.00
- Kabel Coaxial RG 6 / AWG m' Rp 9,700.00
- Kabel Coaxial RG 11 / AWG m' Rp 1,350.00
- Kabel power NYYHY 2x0.75mm2 m' Rp 9,000.00
- VENT CUP PVC Ø ¾” m' Rp 75,000.00
- VENT CUP PVC Ø 1” m' Rp 10,000.00
5 CCTV Instalasi
- DVR mutiplexer 16 CH 1 Tera byte bh Rp 6,900,000.00
- LCD Tv monitor LG 22" bh Rp 3,000,000.00
- Back Up power suply 5 Kva bh Rp 6,125,000.00
- Surge protection bh Rp 2,795,000.00
- CCD IP PTZ Camera dome IR bh Rp 975,000.00
- CPU computer controller 2 video output bh Rp 10,982,500.00
- Wall Mounted Rack 8U bh Rp 3,000,000.00
- Cantilever Shelf bh Rp 350,000.00
6 Mekanikal & Plumbing
- Tandon Atas Kap. 1.100 ltr set Rp 7,500,000.00
- Pemipaan PVC AW Kelas 10 kg/cm² :
Pipa PVC AW Ø ½” m' Rp 5,500.00
Pipa PVC AW Ø ¾” m' Rp 6,985.00
Pipa PVC AW Ø 1” m' Rp 8,730.00
Pipa PVC AW Ø 1¼” m' Rp 10,065.00
Pipa PVC Aw Ø 1½” m' Rp 11,575.00
Pipa PVC AW Ø 2” m' Rp 20,652.00
bahan me RAB 8
Pipa PVC AW Ø 3” m' Rp 40,750.00
Pipa PVC AW Ø 4” m' Rp 67,600.00
- Gate Valve PVC
Gate Valve PVC Ø ½” bh Rp 13,200.00
Gate Valve PVC Ø ¾” bh Rp 19,200.00
Gate Valve PVC Ø 1” bb Rp 29,400.00
- Tee PVC ( AW )
Tee PVC Ø ½” bh Rp 2,400.00
Tee PVC Ø 1” bh Rp 4,800.00
Tee PVC Ø ¾” x Ø ½" bh Rp 3,000.00
Tee PVC Ø 1” x Ø ½" bh Rp 4,200.00
Tee PVC Ø 1” x Ø ¾" bh Rp 4,800.00
Tee PVC Ø 1½” x Ø 1" bh Rp 9,600.00
- Elbow PVC ( AW )
Elbow PVC Ø ½” bh Rp 3,000.00
Elbow PVC Ø 1” bh Rp 3,600.00
Elbow PVC Ø 2” bh Rp 12,000.00
Elbow PVC Ø 3” bh Rp 18,000.00
Elbow PVC Ø 4” bh Rp 24,000.00
Elbow PVC Ø 4” x Ø 3" bh Rp 26,400.00
Elbow PVC Ø 3” x Ø 2" bh Rp 21,600.00
Elbow PVC Ø 2” x Ø 1" Rp 18,000.00
Elbow PVC 45º Ø 4” bh Rp 30,000.00
Y - Branch PVC Ø 4” bh Rp 42,000.00
- Reducing Socket PVC ( AW )
Reducing Socket PVC Ø 1” x Ø ¾" bh Rp 18,000.00
Reducing Socket PVC Ø ¾” x Ø ½" bh Rp 15,000.00
- CAP PVC ( AW )
CAP PVC Ø ½” bh Rp 3,600.00
CAP PVC Ø ¾” bh Rp 9,600.00
CAP PVC Ø 1” bh Rp 14,400.00
- FAUCET ELBOW PVC ( AW )
FAUCET ELBOW PVC Ø ½” bh Rp 243,600.00
Floor Clean Out Ø 4" bh Rp 235,000.00
- Alat bantu & penunjang ls Rp 75,000.00
- Sewage Pump unit Rp 15,000,000.00
- Bak Kontrol unit Rp 350,000.00
bahan me RAB 9
al
KETERANGAN
Artholite
Artholite
Artholite
Artholite
Artholite
Artholite
Artholite
Artholite
Artholite
Artholite
Artholite
Artholite
Lokal
GAE
GAE
GAE
Tele
GAE
GAE
GAE
Thera
OBO
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
bahan me RAB 10
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
Schneider
-
-
-
-
-
-
Mitshubishi
Mitshubishi
Mitshubishi
Mitshubishi
Mitshubishi
Mitshubishi
Lokal
Lokal
Lokal
Lokal
daikin
Supreme
Supreme
bahan me RAB 11
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Supreme
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Lokal
Toyo
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
bahan me RAB 12
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
bahan me RAB 13
Analisa Harga Satuan Mekanikal Dan Elektrikal
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
1 Pekerja
1 Pekerja hari 1.000 60,000.00
2 Mandor hari 1.000 83,000.00
3 Tukang pipa hari 1.000 73,000.00
4 Kepala tukang pipa hari 1.000 78,200.00
5 Tukang listrik hari 1.000 73,000.00
6 Kepala tukang listrik hari 1.000 78,200.00
7 Tukang AC hari 1.000 73,000.00
8 Kepala tukang AC hari 1.000 78,200.00
9 Test Commissioning ls 1.000 1,500,000.00
1 Pekerjaan Panel
1 unit SDP-PARU, Sub Distribusi Panel Rp 46,945,751.37
Pilot Lamp RST+Fuse bh 3.00 Rp 48,510.00 Rp 145,530.00
Ampere Meter bh 3.00 Rp 267,498.00 Rp 802,494.00
CT bh 3.00 Rp 239,085.00 Rp 717,255.00
Volt Meter bh 1.00 Rp 306,306.00 Rp 306,306.00
SSV bh 1.00 Rp 189,882.00 Rp 189,882.00
MCCB 160-400A/4P (50 kA) bh 1.00 Rp 10,291,600.00 Rp 10,291,600.00
MCCB 87.5-125A/4P (36 kA) bh 3.00 Rp 3,005,750.00 Rp 9,017,250.00
MCCB 60A/3P (18 kA) bh 4.00 Rp 868,450.00 Rp 3,473,800.00
MCCB 30A/3P (18 kA) bh 4.00 Rp 794,750.00 Rp 3,179,000.00
MCB 25A/4P (15 kA) bh 1.00 Rp 905,300.00 Rp 905,300.00
Cu Bar ls 1.00 Rp 4,354,262.55 Rp 4,354,262.55
Material Bantu + Wiring ls 1.00 Rp 150,000.00 Rp 150,000.00
Box Panel bh 1.00 Rp 13,413,071.82 Rp 13,413,071.82
Jumlah Rp 46,945,751.37
1 unit LP-01, Panel Pembagi Penerangan Lantai-01 Rp 3,925,371.31
Pilot Lamp RST+Fuse bh 3.00 Rp 48,510.00 Rp 145,530.00
MCCB 30A/3P (18 kA) bh 1.00 Rp 794,750.00 Rp 794,750.00
MCB 6A/1P, 4,5kA bh 9.00 Rp 61,110.00 Rp 549,990.00
MCB 10A/1P, 4,5kA bh 12.00 Rp 61,110.00 Rp 733,320.00
Cu Bar ls 1.00 Rp 223,540.50 Rp 223,540.50
Material Bantu + Wiring ls 0.30 Rp 1,189,020.50 Rp 356,706.15
Box Panel bh 1.00 Rp 1,121,534.66 Rp 1,121,534.66
Jumlah Rp 3,925,371.31
1 unit LP-02, Panel Pembagi Penerangan Lantai-02 Rp 3,635,982.70
Pilot Lamp RST+Fuse bh 3.00 Rp 48,510.00 Rp 145,530.00
MCCB 30A/3P (18 kA) bh 1.00 Rp 794,750.00 Rp 794,750.00
MCB 6A/1P, 4,5kA bh 9.00 Rp 61,110.00 Rp 549,990.00
MCB 10A/1P, 4,5kA bh 12.00 Rp 61,110.00 Rp 733,320.00
Cu Bar ls 1.00 Rp 223,540.50 Rp 223,540.50
Material Bantu + Wiring ls 1.00 Rp 150,000.00 Rp 150,000.00
Box Panel bh 1.00 Rp 1,038,852.20 Rp 1,038,852.20
Jumlah Rp 3,635,982.70
1 unit PP-AC-01, Panel Pembagi AC Lantai-01 Rp 3,894,023.70
Pilot Lamp RST+Fuse bh 3.00 Rp 48,510.00 Rp 145,530.00
MCCB 60A/3P (18 kA) bh 1.00 Rp 868,450.00 Rp 868,450.00
MCB 10A/1P, 4,5kA bh 9.00 Rp 61,110.00 Rp 549,990.00
MCB 16A/1P, 4,5kA bh 8.00 Rp 61,110.00 Rp 488,880.00
MCB 25A/3P, 4,5kA bh 1.00 Rp 344,000.00 Rp 344,000.00
analisa me RAB 14
Cu Bar ls 1.00 Rp 234,595.50 Rp 234,595.50
Material Bantu + Wiring ls 1.00 Rp 150,000.00 Rp 150,000.00
Box Panel bh 1.00 Rp 1,112,578.20 Rp 1,112,578.20
Jumlah Rp 3,894,023.70
1 unit PP-AC-02, Panel Pembagi AC Lantai-02 Rp 3,318,314.30
Pilot Lamp RST+Fuse bh 3.00 Rp 48,510.00 Rp 145,530.00
MCCB 60A/3P (18 kA) bh 1.00 Rp 868,450.00 Rp 868,450.00
MCB 10A/1P, 4,5kA bh 6.00 Rp 61,110.00 Rp 366,660.00
MCB 16A/1P, 4,5kA bh 9.00 Rp 61,110.00 Rp 549,990.00
Cu Bar ls 1.00 Rp 289,594.50 Rp 289,594.50
Material Bantu + Wiring ls 1.00 Rp 150,000.00 Rp 150,000.00
Box Panel bh 1.00 Rp 948,089.80 Rp 948,089.80
Jumlah Rp 3,318,314.30
analisa me RAB 15
Box Panel bh 1.00 Rp 3,281,784.80 Rp 3,281,784.80
Jumlah Rp 11,486,246.80
2 Armature lampu :
1 bh Downlight Dia. 6" 18W 298,046.67
Downlight Dia. 6" 18W Bh 1.000 285,200.00 285,200.00
Mandor Hr 0.033 83,000.00 2,766.67
Kepala Tukang listrik Hr 0.067 78,200.00 5,213.33
Tukang Hr 0.067 73,000.00 4,866.67
Jumlah 298,046.67
1 bh RMI 300 GLOSSY 2 X 36W 1,392,846.67
RMI 300 GLOSSY 2 X 36W Bh 1.000 1,380,000.00 1,380,000.00
Mandor Hr 0.033 83,000.00 2,766.67
Kepala Tukang listrik Hr 0.067 78,200.00 5,213.33
Tukang Hr 0.067 73,000.00 4,866.67
Jumlah 1,392,846.67
1 bh RMI 300 AP 2 X 36W 1,450,346.67
RMI 300 AP 2 X 36W Bh 1.000 1,437,500.00 1,437,500.00
Mandor Hr 0.033 83,000.00 2,766.67
Kepala Tukang listrik Hr 0.067 78,200.00 5,213.33
Tukang Hr 0.067 73,000.00 4,866.67
Jumlah 1,450,346.67
analisa me RAB 16
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 42,225.00
1 bh Saklar 1 Gang 2 Way 34,855.00
Saklar 1 Gang 2 Way Bh 1.000 22,220.00 22,220.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 34,855.00
1 bh Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V 37,385.00
Stop Kontak Umum 1 Gang ( 2P+E ) Bh 1.000 24,750.00 24,750.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 37,385.00
1 bh Stop Kontak Komputer (UPS) 1 Gang ( 2P+E ) Schuko - 250 V 37,385.00
Stop Kontak Komputer (UPS) 1 GangBh 1.000 24,750.00 24,750.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 37,385.00
1 bh Stop Kontak Medis (UPS) 1 Gang ( 2P+E ) Schuko - 250 V 37,385.00
Stop Kontak Medis (UPS) 1 Gang ( Bh 1.000 24,750.00 24,750.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 37,385.00
1 bh Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British Standard w/ Neon Sign 68,075.00
Stop Kontak AC 1 Gang ( 2P+E ) 13 A Bh 1.000 55,440.00 55,440.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 68,075.00
1 bh Industrial Socket 16 A ( 3P+N+E ) IP 44 144,085.00
Industrial Socket 16 A ( 3P+N+E ) I Bh 1.000 131,450.00 131,450.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 144,085.00
1 bh Telepon Outlets c/w Cover 1 Gang - 4 Wire 71,485.00
Telepon Outlets c/w Cover 1 Gang - Bh 1.000 58,850.00 58,850.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
analisa me RAB 17
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 71,485.00
1 bh Outlet Data Cat 6 c/w Modular Jack 157,595.00
Outlet Data Cat 6 c/w Modular Jack Bh 1.000 144,960.00 144,960.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 157,595.00
1 bh Outlet Televisi 1 Gang 75 Ohm 74,785.00
Outlet Televisi 1 Gang 75 Ohm Bh 1.000 62,150.00 62,150.00
Inbow doos plastic boks Bh 1.000 3,000.00 3,000.00
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 74,785.00
4 Instalasi :
1 ttk Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm² 330,318.33
Kabel TR, NYM 3 x 2,5 mm² m' 15.000 12,480.00 187,200.00
Pipa PVC High Impact 20 mm² m' 15.000 2,466.00 36,990.00
Socket Pipa bh 3.750 1,200.00 4,500.00
Tee Doos bh 2.000 8,700.00 17,400.00
Klem Pipa bh 7.500 630.00 4,725.00
Fhiser bh 15.000 1,200.00 18,000.00
Las Doop bh 2.000 780.00 1,560.00
Isolasi ban bh 0.250 3,000.00 750.00
Mandor hr 0.167 83,000.00 13,833.33
Kepala Tukang listrik hr 0.300 78,200.00 23,460.00
Tukang hr 0.300 73,000.00 21,900.00
Jumlah 330,318.33
1 ttk Instalasi stop kontak, NYM 3 x 2,5 mm² dalam conduit PVC HI 25 mm² 414,123.33
Kabel TR, NYM 3 x 2,5 mm² M' 20.000 12,480.00 249,600.00
Pipa PVC High Impact 20 mm² M' 20.000 2,466.00 49,320.00
Socket Pipa Bh 5.000 1,200.00 6,000.00
Tee Doos Bh 2.000 8,700.00 17,400.00
Klem Pipa Bh 10.000 630.00 6,300.00
Fhiser Bh 20.000 1,200.00 24,000.00
Las Doop Bh 2.000 780.00 1,560.00
Isolasi ban Bh 0.250 3,000.00 750.00
Mandor Hr 0.167 83,000.00 13,833.33
Kepala Tukang listrik Hr 0.300 78,200.00 23,460.00
Tukang Hr 0.300 73,000.00 21,900.00
Jumlah 414,123.33
1 ttk Instalasi Industrial Socket, NYY 4 x 4 mm²+ NYA 4 mm² dalam conduit PVC HI 25 mm² 828,843.33
Kabel TR, NYY 4 x 4 mm² M' 20.000 28,416.00 568,320.00
Kabel TR, NYA 1 x 4 mm² M' 20.000 4,800.00 96,000.00
Pipa PVC High Impact 20 mm² M' 20.000 2,466.00 49,320.00
Socket Pipa Bh 5.000 1,200.00 6,000.00
Tee Doos Bh 2.000 8,700.00 17,400.00
Klem Pipa Bh 10.000 630.00 6,300.00
Fhiser Bh 20.000 1,200.00 24,000.00
analisa me RAB 18
Las Doop Bh 2.000 780.00 1,560.00
Isolasi ban Bh 0.250 3,000.00 750.00
Mandor Hr 0.167 83,000.00 13,833.33
Kepala Tukang listrik Hr 0.300 78,200.00 23,460.00
Tukang Hr 0.300 73,000.00 21,900.00
Jumlah 828,843.33
1 ttk Instalasi Industrial Socket, NYY 4 x 6 mm²+ NYA 4 mm² dalam conduit PVC HI 25 mm² 1,064,403.33
Kabel TR, NYY 4 x 6 mm² M' 25.000 38,208.00 955,200.00
Tee Doos Bh 2.000 8,700.00 17,400.00
Klem Pipa Bh 10.000 630.00 6,300.00
Fhiser Bh 20.000 1,200.00 24,000.00
Las Doop Bh 2.000 780.00 1,560.00
Isolasi ban Bh 0.250 3,000.00 750.00
Mandor Hr 0.167 83,000.00 13,833.33
Kepala Tukang listrik Hr 0.300 78,200.00 23,460.00
Tukang Hr 0.300 73,000.00 21,900.00
Jumlah 1,064,403.33
1 ttk Instalasi stop kontak AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 25 mm² 414,123.33
Kabel TR, NYM 3 x 2,5 mm² M' 20.000 12,480.00 249,600.00
Pipa PVC High Impact 20 mm² M' 20.000 2,466.00 49,320.00
Socket Pipa Bh 5.000 1,200.00 6,000.00
Tee Doos Bh 2.000 8,700.00 17,400.00
Klem Pipa Bh 10.000 630.00 6,300.00
Fhiser Bh 20.000 1,200.00 24,000.00
Las Doop Bh 2.000 780.00 1,560.00
Isolasi ban Bh 0.250 3,000.00 750.00
Mandor Hr 0.167 83,000.00 13,833.33
Kepala Tukang listrik Hr 0.300 78,200.00 23,460.00
Tukang Hr 0.300 73,000.00 21,900.00
Jumlah 414,123.33
1 m' Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² 330,523.33
ITC Cable 2 x 2 x 0,6 mm² m' 20.000 8,300.00 166,000.00
Pipa PVC High Impact 20 mm² m' 20.000 2,466.00 49,320.00
Socket Pipa bh 5.000 1,200.00 6,000.00
Tee Doos bh 2.000 8,700.00 17,400.00
Klem Pipa bh 10.000 630.00 6,300.00
Fhiser bh 20.000 1,200.00 24,000.00
Las Doop bh 2.000 780.00 1,560.00
Isolasi ban bh 0.250 3,000.00 750.00
Mandor hr 0.167 83,000.00 13,833.33
Kepala Tukang listrik hr 0.300 78,200.00 23,460.00
Tukang hr 0.300 73,000.00 21,900.00
Jumlah 330,523.33
1 m' Instalasi Kabel Telepon ITC 10 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² 47,056.60
ITC Cable 10 x 2 x 0,6 mm² m' 1.100 25,000.00 27,500.00
Pipa PVC High Impact 20 mm² m' 1.100 2,466.00 2,712.60
Socket Pipa bh 0.275 1,200.00 330.00
Socket Pipa bh 2.000 1,200.00 2,400.00
Klem Pipa bh 0.550 630.00 346.50
Fhiser bh 1.100 1,200.00 1,320.00
Fhiser bh 2.000 1,200.00 2,400.00
Isolasi ban bh 0.138 3,000.00 412.50
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
analisa me RAB 19
Jumlah 47,056.60
1 m' Instalasi Kabel Telepon ITC 20 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm² 67,556.60
ITC Cable 20 x 2 x 0,6 mm² m' 1.100 48,000.00 52,800.00
Pipa PVC High Impact 20 mm² m' 1.100 2,466.00 2,712.60
Socket Pipa bh 0.275 1,200.00 330.00
Klem Pipa bh 0.550 630.00 346.50
Fhiser bh 1.100 1,200.00 1,320.00
Isolasi ban bh 0.138 3,000.00 412.50
Mandor Hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik Hr 0.050 78,200.00 3,910.00
Tukang Hr 0.050 73,000.00 3,650.00
Jumlah 67,556.60
1 m' Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit PVC HI 20 mm² 26,856.60
UTP Cable 4 Pairs (Cat 5e) m' 1.100 11,000.00 12,100.00
Pipa PVC High Impact 20 mm² m' 1.100 2,466.00 2,712.60
Socket Pipa bh 0.275 1,200.00 330.00
Klem Pipa bh 0.550 630.00 346.50
Fhiser bh 1.100 1,200.00 1,320.00
Isolasi ban bh 0.138 3,000.00 412.50
Mandor hr 0.025 83,000.00 2,075.00
Kepala Tukang listrik hr 0.050 78,200.00 3,910.00
Tukang hr 0.050 73,000.00 3,650.00
Jumlah 26,856.60
1 ttk Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit PVC HI 20 mm² 384,523.33
UTP Cable 4 Pairs (Cat 5e) m' 20.000 11,000.00 220,000.00
Pipa PVC High Impact 20 mm² m' 20.000 2,466.00 49,320.00
Socket Pipa bh 5.000 1,200.00 6,000.00
Tee Doos bh 2.000 8,700.00 17,400.00
Klem Pipa bh 10.000 630.00 6,300.00
Fhiser bh 20.000 1,200.00 24,000.00
Las Doop bh 2.000 780.00 1,560.00
Isolasi ban bh 0.250 3,000.00 750.00
Mandor hr 0.167 83,000.00 13,833.33
Kepala Tukang listrik hr 0.300 78,200.00 23,460.00
Tukang hr 0.300 73,000.00 21,900.00
Jumlah 384,523.33
1 ttk Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PVC HI 20 mm² 530,030.00
Kabel Coaxial RG 6 / AWG m' 20.000 9,700.00 194,000.00
Pipa PVC High Impact 20 mm² m' 20.000 2,466.00 49,320.00
Socket Pipa bh 5.000 1,200.00 6,000.00
Klem Pipa bh 2.000 630.00 1,260.00
Fhiser bh 10.000 1,200.00 12,000.00
Isolasi ban bh 20.000 3,000.00 60,000.00
Mandor bh 2.000 83,000.00 166,000.00
Kepala Tukang listrik bh 0.250 78,200.00 19,550.00
Tukang hr 0.300 73,000.00 21,900.00
Jumlah 530,030.00
1 ttk Instalasi Kabel Feeder MATV Coaxial Cable RG11 dalam conduit PVC HI 20 mm² 1,814,130.00
VENT CUP PVC Ø ¾” m' 20.000 75,000.00 1,500,000.00
Pipa PVC High Impact 20 mm² m' 20.000 2,466.00 49,320.00
Socket Pipa bh 5.000 1,200.00 6,000.00
Klem Pipa bh 2.000 630.00 1,260.00
Fhiser bh 10.000 1,200.00 12,000.00
analisa me RAB 20
Isolasi ban bh 20.000 3,000.00 60,000.00
Mandor bh 2.000 83,000.00 166,000.00
Kepala Tukang listrik bh 0.250 78,200.00 19,550.00
Tukang hr 0.300 73,000.00 21,900.00
Jumlah 1,814,130.00
1 ttk Instalasi Kabel Power CCTV NYYHY 2x0.75mm² dalam conduit PVC HI 20 mm² 514,130.00
VENT CUP PVC Ø 1” m' 20.000 10,000.00 200,000.00
Pipa PVC High Impact 20 mm² m' 20.000 2,466.00 49,320.00
Socket Pipa bh 5.000 1,200.00 6,000.00
Klem Pipa bh 2.000 630.00 1,260.00
Fhiser bh 10.000 1,200.00 12,000.00
Isolasi ban bh 20.000 3,000.00 60,000.00
Mandor bh 2.000 83,000.00 166,000.00
Kepala Tukang listrik bh 0.250 78,200.00 19,550.00
Tukang hr 0.300 73,000.00 21,900.00
Jumlah 514,130.00
5 Instalasi Kabel Feeder Instalasi Tegangan Rendah
1 m' Kabel TR, NYY 4 x 2,5 mm² + NYA 1 x 2,5 mm² 26,230.70
Kabel TR, NYY 4 x 2,5 mm² m' 1.100 19,200.00 21,120.00
Kabel TR, NYA 1 x 2,5 mm² m' 1.100 3,072.00 3,379.20
Mandor Hr 0.005 83,000.00 415.00
Kepala Tukang listrik Hr 0.008 78,200.00 586.50
Tukang Hr 0.010 73,000.00 730.00
Jumlah 26,230.70
1 m' Kabel TR, NYY 4 x 4 mm² + NYA 1 x 2,5 mm² 37,407.20
Kabel TR, NYY 4 x 4 mm² m' 1.100 28,416.00 31,257.60
Kabel TR, NYA 1 x 2,5 mm² m' 1.100 3,072.00 3,379.20
Mandor Hr 0.008 83,000.00 664.00
Kepala Tukang listrik Hr 0.012 78,200.00 938.40
Tukang Hr 0.016 73,000.00 1,168.00
Jumlah 37,407.20
1 m' Kabel TR, NYY 4 x 6 mm² + BC 1 x 6 mm² 55,292.40
Kabel TR, NYY 4 x 6 mm² m' 1.100 38,208.00 42,028.80
Kabel BC 6 mm² m' 1.100 8,280.00 9,108.00
Mandor Hr 0.012 83,000.00 996.00
Kepala Tukang listrik Hr 0.018 78,200.00 1,407.60
Tukang Hr 0.024 73,000.00 1,752.00
Jumlah 55,292.40
1 m' Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm² 90,112.40
Kabel TR, NYY 4 x 10 mm² m' 1.100 67,344.00 74,078.40
Kabel BC 6 mm² m' 1.100 8,280.00 9,108.00
Mandor Hr 0.020 83,000.00 1,660.00
Kepala Tukang listrik Hr 0.030 78,200.00 2,346.00
Tukang Hr 0.040 73,000.00 2,920.00
Jumlah 90,112.40
1 m' Kabel TR, NYY 4 x 16 mm² + BC 1 x 6 mm² 146,909.60
analisa me RAB 21
Kabel TR, NYY 4 x 16 mm² m' 1.100 115,200.00 126,720.00
Kabel BC 6 mm² m' 1.100 8,280.00 9,108.00
Mandor Hr 0.032 83,000.00 2,656.00
Kepala Tukang listrik Hr 0.048 78,200.00 3,753.60
Tukang Hr 0.064 73,000.00 4,672.00
Jumlah 146,909.60
1 m' Kabel TR, NYY 4 x 25 mm² + BC 1 x 16 mm² 153,143.00
Kabel TR, NYY 4 x 16 mm² m' 1.100 115,200.00 126,720.00
Kabel BC 6 mm² m' 1.100 8,280.00 9,108.00
Mandor Hr 0.050 83,000.00 4,150.00
Kepala Tukang listrik Hr 0.075 78,200.00 5,865.00
Tukang Hr 0.100 73,000.00 7,300.00
Jumlah 153,143.00
1 m' Kabel TR, NYY 4 x 35 mm² + BC 1 x 10 mm² 283,849.40
Kabel TR, NYY 4 x 35 mm² m' 1.100 230,400.00 253,440.00
Kabel BC 10 mm² m' 1.100 11,904.00 13,094.40
Mandor Hr 0.050 83,000.00 4,150.00
Kepala Tukang listrik Hr 0.075 78,200.00 5,865.00
Tukang Hr 0.100 73,000.00 7,300.00
Jumlah 283,849.40
analisa me RAB 22
Pipa PVC AW Ø ¾” bh 1.100 6,985.00 7,683.50
Alat bantu & penunjang 0.300 6,985.00 2,095.50
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 12,996.50
1 m' Pipa PVC AW Ø 1” 15,439.50
Pipa PVC AW Ø 1” bh 1.100 8,730.00 9,603.00
Alat bantu & penunjang 0.300 8,730.00 2,619.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 15,439.50
1 m' Pipa PVC AW Ø 1¼” 17,308.50
Pipa PVC AW Ø 1¼” bh 1.100 10,065.00 11,071.50
Alat bantu & penunjang 0.300 10,065.00 3,019.50
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 17,308.50
1 m' Pipa PVC Aw Ø 1½” 19,422.50
Pipa PVC Aw Ø 1½” bh 1.100 11,575.00 12,732.50
Alat bantu & penunjang 0.300 11,575.00 3,472.50
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 19,422.50
1 m' Pipa PVC AW Ø 2” 32,130.30
Pipa PVC AW Ø 2” bh 1.100 20,652.00 22,717.20
Alat bantu & penunjang 0.300 20,652.00 6,195.60
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 32,130.30
analisa me RAB 23
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 21,697.50
1 bh Gate Valve PVC Ø ¾” 30,097.50
Gate Valve PVC Ø ¾” bh 1.100 19,200.00 21,120.00
Alat bantu & penunjang 0.300 19,200.00 5,760.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 30,097.50
1 bh Gate Valve PVC Ø 1” 44,377.50
Gate Valve PVC Ø 1” bh 1.100 29,400.00 32,340.00
Alat bantu & penunjang 0.300 29,400.00 8,820.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 44,377.50
8 Tee PVC ( AW )
1 bh Tee PVC Ø ½” 6,577.50
Tee PVC Ø ½” bh 1.100 2,400.00 2,640.00
Alat bantu & penunjang 0.300 2,400.00 720.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 6,577.50
1 bh Tee PVC Ø 1” 9,937.50
Tee PVC Ø 1” bh 1.100 4,800.00 5,280.00
Alat bantu & penunjang 0.300 4,800.00 1,440.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 9,937.50
1 bh Tee PVC Ø ¾” x Ø ½" 7,417.50
Tee PVC Ø ¾” x Ø ½" bh 1.100 3,000.00 3,300.00
Alat bantu & penunjang 0.300 3,000.00 900.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 7,417.50
1 bh Tee PVC Ø 1” x Ø ½" 9,097.50
Tee PVC Ø 1” x Ø ½" bh 1.100 4,200.00 4,620.00
Alat bantu & penunjang 0.300 4,200.00 1,260.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 9,097.50
analisa me RAB 24
Tee PVC Ø 1½” x Ø 1" bh 1.100 9,600.00 10,560.00
Alat bantu & penunjang 0.300 9,600.00 2,880.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 16,657.50
9 Elbow PVC ( AW )
1 bh Elbow PVC Ø ½” 7,417.50
Elbow PVC Ø ½” bh 1.100 3,000.00 3,300.00
Alat bantu & penunjang 0.300 3,000.00 900.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 7,417.50
1 bh Elbow PVC Ø 1” 8,257.50
Elbow PVC Ø 1” bh 1.100 3,600.00 3,960.00
Alat bantu & penunjang 0.300 3,600.00 1,080.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 8,257.50
1 bh Elbow PVC Ø 2” 20,017.50
Elbow PVC Ø 2” bh 1.100 12,000.00 13,200.00
Alat bantu & penunjang 0.300 12,000.00 3,600.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 20,017.50
1 bh Elbow PVC Ø 3” 28,417.50
Elbow PVC Ø 3” bh 1.100 18,000.00 19,800.00
Alat bantu & penunjang 0.300 18,000.00 5,400.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 28,417.50
1 bh Elbow PVC Ø 4” 36,817.50
Elbow PVC Ø 4” bh 1.100 24,000.00 26,400.00
Alat bantu & penunjang 0.300 24,000.00 7,200.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 36,817.50
1 bh Elbow PVC Ø 4” x Ø 3" 40,177.50
Elbow PVC Ø 4” x Ø 3" bh 1.100 26,400.00 29,040.00
Alat bantu & penunjang 0.300 26,400.00 7,920.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
Jumlah 40,177.50
1 bh Elbow PVC Ø 3” x Ø 2" 33,457.50
Elbow PVC Ø 3” x Ø 2" bh 1.100 21,600.00 23,760.00
Alat bantu & penunjang 0.300 21,600.00 6,480.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 977.50
Mandor Hari 0.005 83,000.00 415.00
analisa me RAB 25
Jumlah 33,457.50
analisa me RAB 26
CAP PVC Ø 1” bh 1.100 14,400.00 15,840.00
Alat bantu & penunjang 0.300 14,400.00 4,320.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 1,016.60
Mandor Hari 0.005 83,000.00 415.00
Jumlah 23,416.60
12 FAUCET ELBOW PVC ( AW )
1 bh FAUCET ELBOW PVC Ø ½” 344,296.60
FAUCET ELBOW PVC Ø ½” bh 1.100 243,600.00 267,960.00
Alat bantu & penunjang 0.300 243,600.00 73,080.00
Tukang pipa Hari 0.025 73,000.00 1,825.00
Kepala tukang pipa Hari 0.013 78,200.00 1,016.60
Mandor Hari 0.005 83,000.00 415.00
Jumlah 344,296.60
13 Air Conditioning
1 unit AC Wall Split ( 5.000 bTU/h ) 3,958,480.00
AC Wall Split ( 5.000 bTU/h ) unit 1.000 3,790,800.00 3,790,800.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 3,958,480.00
1 unit AC Wall Split ( 7.000 bTU/h ) 4,090,480.00
AC Wall Split ( 7.000 bTU/h ) unit 1.000 3,922,800.00 3,922,800.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 4,090,480.00
1 unit AC Wall Split ( 9.000 bTU/h ) 4,246,480.00
AC Wall Split ( 9.000 bTU/h ) unit 1.000 4,078,800.00 4,078,800.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 4,246,480.00
1 unit AC Wall Split ( 12.000 bTU/h ) 5,290,480.00
AC Wall Split ( 12.000 bTU/h ) unit 1.000 5,122,800.00 5,122,800.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 5,290,480.00
1 unit AC Wall Split ( 18.000 bTU/h ) 6,970,480.00
AC Wall Split ( 18.000 bTU/h ) unit 1.000 6,802,800.00 6,802,800.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 6,970,480.00
1 unit AC Wall Split ( 24.000 bTU/h ) 9,766,480.00
AC Wall Split ( 24.000 bTU/h ) unit 1.000 9,598,800.00 9,598,800.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
analisa me RAB 27
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 9,766,480.00
1 unit AC Split Duck ( 90.000 bTU/h ) 71,567,680.00
AC Split Duck ( 90.000 bTU/h ) unit 1.000 71,400,000.00 71,400,000.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 71,567,680.00
1 unit Dehumidefire 10,067,680.00
Dehumidefire unit 1.000 9,900,000.00 9,900,000.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 10,067,680.00
1 unit Boster Fan 7,967,680.00
Boster Fan unit 1.000 7,800,000.00 7,800,000.00
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 7,967,680.00
analisa me RAB 28
Alat bantu & penunjang Ls 1.000 75,000.00 75,000.00
Mandor Hr 0.300 83,000.00 24,900.00
Kepala Tukang listrik Hr 0.400 78,200.00 31,280.00
Tukang Hr 0.500 73,000.00 36,500.00
Jumlah 943,840.00
analisa me RAB 29
analisa me RAB 30
ed
analisa me RAB 31
analisa me RAB 32
analisa me RAB 33
Uraian Jenis Material
Bahan :
Semen portland (40kg) 0.1000 Zak 60,000.00
Pasir Beton 0.0060 m3 280,000.00
Batu Pecah Mesin 1/2 cm 0.0090 m3 275,000.00
Besi Beton (polos/ulir) 3.0000 Kg 25,000.00
Kawat Beton 0.4500 Kg 17,700.00
Kayu meranti bekisting 0.0020 m3 2,800,000.00
Paku Usuk 0.0100 Kg 14,000.00
Jumlah :
Jumlah Harga :
12. 1m1 Pekerjaan Ring Balk (10x15) cm
Tenaga :
Mandor 0.0150 Oh 83,000.00
Kepala Tukang Besi 0.0100 Oh 78,200.00
Tukang Besi 0.0330 Oh 73,000.00
Tukang Batu 0.0330 Oh 73,000.00
Tukang Kayu 0.0330 Oh 73,000.00
Pekerja / Buruh tak terampil 0.2970 Oh 60,000.00
Jumlah :
Bahan :
Semen portland (40kg) 0.1375 Zak 60,000.00
Pasir Beton 0.0090 m3 280,000.00
Batu Pecah Mesin 1/2 cm 0.0150 m3 275,000.00
Besi Beton (polos/ulir) 3.6000 Kg 25,000.00
Kawat Beton 0.0500 Kg 17,700.00
Kayu meranti bekisting 0.0030 m3 2,800,000.00
Paku Usuk 0.0200 Kg 14,000.00
Jumlah :
Jumlah Harga :
13. 1 kg Pekerjaan Pemasangan Besi Profil
Tenaga :
Mandor 0.0003 Oh 83,000.00
Kepala Tukang 0.0060 Oh 78,200.00
Bahan :
Semen PC (Portland Cement) 50 kg 9.8000 Kg 1,500.00
Semen Berwarna Yiyitan 0.1500 Kg 14,350.00
Pasir Pasang 0.0450 m3 270,000.00
Keramik Lantai 40x40 1.0500 m2 75,000.00
Jumlah :
Bahan :
Semen PC (Portland Cement) 40 kg 0.0228 Zak 60,000.00
Semen Berwarna Yiyitan 0.0250 Kg 14,350.00
Pasir Pasang 0.0030 m3 270,000.00
Granite stepnozing 10x60 cm 2.6250 bh 40,700.00
Jumlah :
Jumlah Harga :
32. 1m' Plint Lantai Granite 10x60cm
Tenaga :
Mandor 0.0050 Oh 83,000.00
Kepala Tukang Batu 0.0090 Oh 78,200.00
Tukang Batu 0.0900 Oh 73,000.00
Pekerja / Buruh Tak Terampil 0.0900 Oh 60,000.00
Jumlah :
Bahan :
Semen PC (Portland Cement) 40 kg 0.0228 Zak 60,000.00
Semen Berwarna Yiyitan 0.0250 Kg 14,350.00
Pasir Pasang 0.0030 m3 270,000.00
Plint Lantai Granite 10x60cm 2.6250 bh 35,400.00
Jumlah :
Jumlah Harga :
33. 1m' Hospital Plint Granite 20x10cm
Tenaga :
Mandor 0.0050 Oh 83,000.00
Kepala Tukang Batu 0.0090 Oh 78,200.00
Tukang Batu 0.0900 Oh 73,000.00
Pekerja / Buruh Tak Terampil 0.0900 Oh 60,000.00
Jumlah :
Bahan :
Semen PC (Portland Cement) 40 kg 0.0228 Zak 60,000.00
Semen Berwarna Yiyitan 0.0250 Kg 14,350.00
Pasir Pasang 0.0030 m3 270,000.00
Hospital Plint Granite 20x10cm 1.0500 m' 122,000.00
Jumlah :
Jumlah Harga :
34. 1m2 pengecatan tembok dalam
Kepala Tukang Cat 0.0063 Oh 78,200.00
Mandor 0.0025 Oh 83,000.00
Pekerja / Buruh Tak Terampil 0.0200 Oh 60,000.00
Tukang Cat 0.0630 Oh 73,000.00
Cat tembok dasar 0.5000 kg 19,000.00
Cat penutup 2 kali 0.2600 kg 19,000.00
Plamur 0.1000 kg 17,000.00
Jumlah :
35. 1m2 pengecatan tembok luar
Kepala Tukang Cat 0.0063 Oh 78,200.00
Mandor 0.0025 Oh 83,000.00
Pekerja Terampil 0.0200 Oh 60,000.00
Tukang Cat 0.0630 Oh 73,000.00
Cat tembok dasar 0.3000 kg 58,000.00
Cat penutup 2 kali 0.2000 kg 58,000.00
44. 1m2 Dinding Partisi Lapis Timbal 1,3mm(Pasang Kembali) +Rangka Besi Hollow 40,
Mandor 0.0750 Oh 83,000.00
Kepala Tukang Kayu 0.0450 Oh 78,200.00
Tukang Kayu 0.4500 Oh 73,000.00
Pekerja/Buruh Tak Terampil 0.1500 Oh 60,000.00
Metas Stud 4.2000 m' 35,000.00
Gypsum Tebal 12 mm lapis timbal 0.6944Lembar 107,400.00
Paku Sekrup 28.0000 Buah 600.00
Jumlah :
45. 1 m2 Daun Pintu Panil (Kayu Kamper)
Mandor 0.0500 Oh 83,000.00
Kepala Tukang Kayu 0.3000 Oh 78,200.00
Tukang Kayu 3.0000 Oh 73,000.00
Kayu Kamper (Papan) 0.0400 m3 9,500,000.00
Skrup 25.0000 Buah 600.00
Jumlah :
46. 1 stel Pemasangan engsel pintu
Pekerja / Buruh Tak Terampil 0.0150 Oh 60,000.00
Tukang Kayu 0.1500 Oh 73,000.00
Kepala tukang 0.0150 Oh 78,200.00
Mandor 0.0008 Oh 83,000.00
Engsel Kuningan ARCH Asli (Untuk Pintu) 1.0000 stel 35,200.00
Jumlah :
47. 1 stel Pemasangan engsel pintu Double Action
Pekerja / Buruh Tak Terampil 0.0150 Oh 60,000.00
Tukang Kayu 0.1500 Oh 73,000.00
Kepala tukang 0.0150 Oh 78,200.00
Mandor 0.0008 Oh 83,000.00
engsel pintu Double Action 1.0000 stel 135,000.00
Jumlah :
48. 1 stel Pemasangan Flush bold atas bawah
Pekerja / Buruh Tak Terampil 0.0150 Oh 60,000.00
Tukang Kayu 0.1500 Oh 73,000.00
Kepala tukang 0.0150 Oh 78,200.00
JML HARGA
6
415.00
782.00
7,300.00
6,000.00
14,497.00
19,600.00
57,600.00
528.00
77,728.00
92,225.00
6,889.00
2,189.60
20,075.00
99,000.00
128,153.60
489,000.00
134,568.00
148,940.00
772,508.00
900,661.60
6,889.00
2,189.60
20,075.00
99,000.00
128,153.60
556,500.00
139,440.00
213,400.00
909,340.00
1,037,493.60
24.90
54.74
511.00
420.00
Analisa Harga Satuan Pekerjaan -56-
1,010.64
12,075.00
265.50
12,340.50
13,351.14
2,739.00
2,580.60
24,090.00
39,600.00
69,009.60
112,000.00
5,600.00
960.00
180,000.00
22,700.00
46,200.00
367,460.00
436,469.60
2,739.00
2,580.60
24,090.00
39,600.00
69,009.60
112,000.00
5,600.00
960.00
150,000.00
68,100.00
46,200.00
382,860.00
451,869.60
2,190,922.07
2,711,217.60
1,037,493.60
5,939,633.27
2,002,671.00
3,928,226.40
1,037,493.60
6,968,391.00
2,336,449.50
5,237,635.20
1,037,493.60
8,611,578.30
6,640.00
747.00
469.20
1,460.00
1,460.00
1,460.00
10,800.00
16,396.20
6,000.00
1,680.00
2,475.00
75,000.00
7,965.00
5,600.00
140.00
98,860.00
115,256.20
1,245.00
782.00
2,409.00
2,409.00
2,409.00
17,820.00
27,074.00
8,250.00
2,520.00
4,125.00
90,000.00
885.00
8,400.00
280.00
114,460.00
141,534.00
24.90
469.20
13,200.00
2,284.00
15,484.00
20,016.10
1,245.00
782.00
7,300.00
18,000.00
27,327.00
10,800.00
25,276.83
49,000.00
85,076.83
112,403.83
2,490.00
1,564.00
14,600.00
36,000.00
21,600.00
76,516.50
98,000.00
250,770.50
1,245.00
782.00
7,300.00
18,000.00
27,327.00
12,150.00
17,027.12
49,000.00
78,177.12
105,504.12
1,245.00
1,173.00
10,950.00
18,000.00
31,368.00
6,210.00
13,676.23
19,886.23
1,245.00
1,173.00
10,950.00
18,000.00
31,368.00
7,020.00
9,120.42
16,140.42
47,508.42
830.00
782.00
7,300.00
12,000.00
20,912.00
5,716.75
5,716.75
26,628.75
8,760.00
8,760.00
3,510.00
750.00
4,260.00
13,020.00
415.00
391.00
3,650.00
6,000.00
10,456.00
29,320.20
264.00
29,584.20
40,040.20
415.00
391.00
3,650.00
6,000.00
10,456.00
23,660.00
264.00
830.00
1,564.00
7,300.00
30,000.00
39,694.00
60,500.00
5,400.00
65,900.00
105,594.00
249.00
391.00
3,650.00
3,000.00
7,290.00
20,452.00
1,050.00
21,502.00
28,792.00
1,079.00
1,016.60
9,125.00
15,000.00
26,220.60
17,238.20
1,865.50
12,150.00
346,500.00
377,753.70
403,974.30
1,079.00
1,016.60
9,125.00
15,000.00
26,220.60
14,700.00
2,152.50
12,150.00
78,750.00
107,752.50
747.00
1,329.40
12,410.00
10,200.00
24,686.40
262,500.00
26,250.00
288,750.00
313,436.40
747.00
1,329.40
12,410.00
10,200.00
299,250.00
26,250.00
350,186.40
1,079.00
1,016.60
9,490.00
15,600.00
27,185.60
17,590.00
2,152.50
12,150.00
68,250.00
100,142.50
127,328.10
1,079.00
1,016.60
9,490.00
15,600.00
27,185.60
17,590.00
2,152.50
12,150.00
84,000.00
115,892.50
143,078.10
415.00
703.80
6,570.00
5,400.00
1,368.00
358.75
810.00
106,837.50
109,374.25
122,463.05
415.00
703.80
6,570.00
5,400.00
13,088.80
1,368.00
358.75
810.00
92,925.00
95,461.75
108,550.55
415.00
703.80
6,570.00
5,400.00
13,088.80
1,368.00
358.75
810.00
128,100.00
130,636.75
143,725.55
492.66
207.50
1,200.00
4,599.00 ###
9,500.00
4,940.00
1,700.00
22,639.16
492.66
207.50
1,200.00
4,599.00 ###
17,400.00
11,600.00
492.66
207.50
1,200.00
4,599.00 ###
32,760.00
1,275.00
3,300.00
43,834.16
65,751.24
207.50
492.66
4,599.00
1,200.00
34,560.00
40,851.66
183.43
336.26
3,139.00
2,580.00
113,300.00
1,200.00
2,100.00
122,838.69
183.43
336.26
3,139.00
2,580.00
99,000.00
1,200.00
2,100.00
108,538.69
3,139.00
2,580.00
94,500.00
2,400.00
2,100.00
104,719.00
3,139.00
2,580.00
36,750.00
2,400.00
2,100.00
46,969.00
6,225.00
4,150.00
23,460.00
219,000.00
380,000.00
15,000.00
641,610.00
900.00
10,950.00
1,173.00
62.25
35,200.00
48,285.25
900.00
10,950.00
1,173.00
62.25
135,000.00
148,085.25
900.00
10,950.00
1,173.00
600.00
36,500.00
391.00
207.50
175,000.00
212,698.50
6,000.00
7,300.00
782.00
415.00
107,500.00
15,120.00
137,117.00
6,000.00
7,300.00
782.00
415.00
4,000,000.00
15,120.00
4,029,617.00
6,000.00
7,300.00
782.00
415.00
150,000.00
15,120.00
179,617.00
7,017,033.59
4,475,250.00
193,141.00
500,000.00
1,000,000.00
###
764,056.65
17,116.55
444,643.01
199,756.08
106,950.00
313,085.25
400,000.00
48,285.25
212,698.50
780,025.68
16,454.04
2,003,363.06
431,783.31
144,855.75
35,650.00
313,085.25
400,000.00
48,285.25
212,698.50
4,386,200.84
655,958.60
38,228.22
1,212,642.90
441,210.89
444,255.75
48,285.25
313,085.25
400,000.00
48,285.25
212,698.50
3,814,650.61
655,958.60
1,212,642.90
144,855.75
35,650.00
48,285.25
212,698.50
2,310,091.00
646,131.51
1,212,642.90
144,855.75
48,285.25
2,051,915.41
3,515.64
1,245,493.33
209,420.47
72,427.88
1,530,857.32
36,004,800.00
45,000,900.00
###
36,004,800.00
31,525,630.50
###
1,456,866.86
1,324,201.08
506,784.43
1,212,642.90
144,855.75
35,650.00
48,285.25
212,698.50
3,485,117.91
975,339.20
630,240.13
1,605,579.33
965,512.10
534,010.35
521,263.99
225,000.00
35,650.00
2,281,436.45
1,036,758.54
748,212.58
1,784,971.12
821,790.84
490,462.18
1,312,253.02
1,009,734.03
455,862.50
425,189.36
225,000.00
35,650.00
2,151,435.89
1,454,410.09
642,094.85
2,096,504.94
862,327.60
477,570.24
250,601.64
225,000.00
35,650.00
1,851,149.48
1,252,954.64
961,652.79
960,304.33
450,000.00
71,300.00
3,696,211.76
894,265.66
257,999.35
33,539.52
1,185,804.53
7,340,840.11
1,109,265.41
2,434,061.81
450,000.00
71,300.00
###
1,178,023.04
520,985.71
644,196.37
225,000.00
35,650.00
2,603,855.12
270,245.12
230,102.02
23,134.67
225,000.00
71,300.00
819,781.81
283,685.04
283,685.04
481,527.66
1,212,642.90
144,855.75
35,650.00
48,285.25
212,698.50
2,135,660.06
244.02
3,007.60
92,820.00
92,820.00
101,370.46
13,280.00
78.20
80,300.00
198,000.00
291,658.20
3,427,000.00
205,620.00
3,632,620.00
3,924,278.20
8,300.00
11,730.00
105,850.00
72,000.00
197,880.00
1,779,050.00
8,976.00
10,554.00
2,700.00
1,801,280.00
1,999,160.00
2,346.00
10,950.00
13,296.00
293,250.00
10,000.00
303,250.00
316,546.00
2,346.00
10,950.00
13,296.00
293,250.00
10,000.00
303,250.00
316,546.00
2,346.00
10,950.00
293,250.00
10,000.00
303,250.00
316,546.00
Bahan :
Semen portland (40kg) 0.1000 Zak 60,000.00
Pasir Beton 0.0060 m3 280,000.00
Batu Pecah Mesin 1/2 cm 0.0090 m3 275,000.00
Besi Beton (polos/ulir) 3.0000 Kg 25,000.00
Kawat Beton 0.4500 Kg 17,700.00
Kayu meranti bekisting 0.0020 m3 2,800,000.00
Paku Usuk 0.0100 Kg 14,000.00
Jumlah :
Jumlah Harga :
12. 1m1 Pekerjaan Ring Balk (10x15) cm
Tenaga :
Mandor 0.0150 Oh 83,000.00
Kepala Tukang Besi 0.0100 Oh 78,200.00
Tukang Besi 0.0330 Oh 73,000.00
Tukang Batu 0.0330 Oh 73,000.00
Tukang Kayu 0.0330 Oh 73,000.00
Pekerja / Buruh tak terampil 0.2970 Oh 60,000.00
Jumlah :
Bahan :
Semen portland (40kg) 0.1375 Zak 60,000.00
Pasir Beton 0.0090 m3 280,000.00
Batu Pecah Mesin 1/2 cm 0.0150 m3 275,000.00
Besi Beton (polos/ulir) 3.6000 Kg 25,000.00
Kawat Beton 0.0500 Kg 17,700.00
Kayu meranti bekisting 0.0030 m3 2,800,000.00
Paku Usuk 0.0200 Kg 14,000.00
Jumlah :
Jumlah Harga :
13. 1 kg Pekerjaan Pemasangan Besi Profil
Tenaga :
Mandor 0.0003 Oh 83,000.00
Kepala Tukang 0.0060 Oh 78,200.00
Bahan :
Semen PC (Portland Cement) 50 kg 9.8000 Kg 1,500.00
Semen Berwarna Yiyitan 0.1500 Kg 14,350.00
Pasir Pasang 0.0450 m3 270,000.00
Keramik Lantai 40x40 1.0500 m2 75,000.00
Jumlah :
Bahan :
Semen PC (Portland Cement) 40 kg 0.0228 Zak 60,000.00
Semen Berwarna Yiyitan 0.0250 Kg 14,350.00
Pasir Pasang 0.0030 m3 270,000.00
Granite stepnozing 10x60 cm 2.6250 bh 40,700.00
Jumlah :
Jumlah Harga :
32. 1m' Plint Lantai Granite 10x60cm
Tenaga :
Mandor 0.0050 Oh 83,000.00
Kepala Tukang Batu 0.0090 Oh 78,200.00
Tukang Batu 0.0900 Oh 73,000.00
Pekerja / Buruh Tak Terampil 0.0900 Oh 60,000.00
Jumlah :
Bahan :
Semen PC (Portland Cement) 40 kg 0.0228 Zak 60,000.00
Semen Berwarna Yiyitan 0.0250 Kg 14,350.00
Pasir Pasang 0.0030 m3 270,000.00
Plint Lantai Granite 10x60cm 2.6250 bh 35,400.00
Jumlah :
Jumlah Harga :
33. 1m' Hospital Plint Granite 20x10cm
Tenaga :
Mandor 0.0050 Oh 83,000.00
Kepala Tukang Batu 0.0090 Oh 78,200.00
Tukang Batu 0.0900 Oh 73,000.00
Pekerja / Buruh Tak Terampil 0.0900 Oh 60,000.00
Jumlah :
Bahan :
Semen PC (Portland Cement) 40 kg 0.0228 Zak 60,000.00
Semen Berwarna Yiyitan 0.0250 Kg 14,350.00
Pasir Pasang 0.0030 m3 270,000.00
Hospital Plint Granite 20x10cm 1.0500 m' 122,000.00
Jumlah :
Jumlah Harga :
34. 1m2 pengecatan tembok dalam
Kepala Tukang Cat 0.0063 Oh 78,200.00
Mandor 0.0025 Oh 83,000.00
Pekerja / Buruh Tak Terampil 0.0200 Oh 60,000.00
Tukang Cat 0.0630 Oh 73,000.00
Cat tembok dasar 0.5000 kg 19,000.00
Cat penutup 2 kali 0.2600 kg 19,000.00
Plamur 0.1000 kg 17,000.00
Jumlah :
35. 1m2 pengecatan tembok luar
Kepala Tukang Cat 0.0063 Oh 78,200.00
Mandor 0.0025 Oh 83,000.00
Pekerja Terampil 0.0200 Oh 60,000.00
Tukang Cat 0.0630 Oh 73,000.00
Cat tembok dasar 0.3000 kg 58,000.00
Cat penutup 2 kali 0.2000 kg 58,000.00
44. 1m2 Dinding Partisi Lapis Timbal 1,3mm(Pasang Kembali) +Rangka Besi Hollow 40,
Mandor 0.0750 Oh 83,000.00
Kepala Tukang Kayu 0.0450 Oh 78,200.00
Tukang Kayu 0.4500 Oh 73,000.00
Pekerja/Buruh Tak Terampil 0.1500 Oh 60,000.00
Metas Stud 4.2000 m' 35,000.00
Gypsum Tebal 12 mm lapis timbal 0.6944Lembar 107,400.00
Paku Sekrup 28.0000 Buah 600.00
Jumlah :
45. 1 m2 Daun Pintu Panil (Kayu Kamper)
Mandor 0.0500 Oh 83,000.00
Kepala Tukang Kayu 0.3000 Oh 78,200.00
Tukang Kayu 3.0000 Oh 73,000.00
Kayu Kamper (Papan) 0.0400 m3 9,500,000.00
Skrup 25.0000 Buah 600.00
Jumlah :
46. 1 stel Pemasangan engsel pintu
Pekerja / Buruh Tak Terampil 0.0150 Oh 60,000.00
Tukang Kayu 0.1500 Oh 73,000.00
Kepala tukang 0.0150 Oh 78,200.00
Mandor 0.0008 Oh 83,000.00
Engsel Kuningan ARCH Asli (Untuk Pintu) 1.0000 stel 35,200.00
Jumlah :
47. 1 stel Pemasangan engsel pintu Double Action
Pekerja / Buruh Tak Terampil 0.0150 Oh 60,000.00
Tukang Kayu 0.1500 Oh 73,000.00
Kepala tukang 0.0150 Oh 78,200.00
Mandor 0.0008 Oh 83,000.00
engsel pintu Double Action 1.0000 stel 135,000.00
Jumlah :
48. 1 stel Pemasangan Flush bold atas bawah
Pekerja / Buruh Tak Terampil 0.0150 Oh 60,000.00
Tukang Kayu 0.1500 Oh 73,000.00
Kepala tukang 0.0150 Oh 78,200.00
JML HARGA
6
415.00
782.00
7,300.00
6,000.00
14,497.00
19,600.00
57,600.00
528.00
77,728.00
92,225.00
6,889.00
2,189.60
20,075.00
99,000.00
128,153.60
489,000.00
134,568.00
148,940.00
772,508.00
900,661.60
6,889.00
2,189.60
20,075.00
99,000.00
128,153.60
556,500.00
139,440.00
213,400.00
909,340.00
1,037,493.60
24.90
54.74
511.00
420.00
Analisa Harga Satuan Pekerjaan -90-
1,010.64
12,075.00
265.50
12,340.50
13,351.14
2,739.00
2,580.60
24,090.00
39,600.00
69,009.60
112,000.00
5,600.00
960.00
180,000.00
22,700.00
46,200.00
367,460.00
436,469.60
2,739.00
2,580.60
24,090.00
39,600.00
69,009.60
112,000.00
5,600.00
960.00
150,000.00
68,100.00
46,200.00
382,860.00
451,869.60
2,190,922.07
2,711,217.60
1,037,493.60
5,939,633.27
2,002,671.00
3,928,226.40
1,037,493.60
6,968,391.00
2,336,449.50
5,237,635.20
1,037,493.60
8,611,578.30
6,640.00
747.00
469.20
1,460.00
1,460.00
1,460.00
10,800.00
16,396.20
6,000.00
1,680.00
2,475.00
75,000.00
7,965.00
5,600.00
140.00
98,860.00
115,256.20
1,245.00
782.00
2,409.00
2,409.00
2,409.00
17,820.00
27,074.00
8,250.00
2,520.00
4,125.00
90,000.00
885.00
8,400.00
280.00
114,460.00
141,534.00
24.90
469.20
13,200.00
2,284.00
15,484.00
20,016.10
1,245.00
782.00
7,300.00
18,000.00
27,327.00
10,800.00
25,276.83
49,000.00
85,076.83
112,403.83
2,490.00
1,564.00
14,600.00
36,000.00
21,600.00
76,516.50
98,000.00
250,770.50
1,245.00
782.00
7,300.00
18,000.00
27,327.00
12,150.00
17,027.12
49,000.00
78,177.12
105,504.12
1,245.00
1,173.00
10,950.00
18,000.00
31,368.00
6,210.00
13,676.23
19,886.23
1,245.00
1,173.00
10,950.00
18,000.00
31,368.00
7,020.00
9,120.42
16,140.42
47,508.42
830.00
782.00
7,300.00
12,000.00
20,912.00
5,716.75
5,716.75
26,628.75
8,760.00
8,760.00
3,510.00
750.00
4,260.00
13,020.00
415.00
391.00
3,650.00
6,000.00
10,456.00
29,320.20
264.00
29,584.20
40,040.20
415.00
391.00
3,650.00
6,000.00
10,456.00
23,660.00
264.00
830.00
1,564.00
7,300.00
30,000.00
39,694.00
60,500.00
5,400.00
65,900.00
105,594.00
249.00
391.00
3,650.00
3,000.00
7,290.00
20,452.00
1,050.00
21,502.00
28,792.00
1,079.00
1,016.60
9,125.00
15,000.00
26,220.60
17,238.20
1,865.50
12,150.00
346,500.00
377,753.70
403,974.30
1,079.00
1,016.60
9,125.00
15,000.00
26,220.60
14,700.00
2,152.50
12,150.00
78,750.00
107,752.50
747.00
1,329.40
12,410.00
10,200.00
24,686.40
262,500.00
26,250.00
288,750.00
313,436.40
747.00
1,329.40
12,410.00
10,200.00
299,250.00
26,250.00
350,186.40
1,079.00
1,016.60
9,490.00
15,600.00
27,185.60
17,590.00
2,152.50
12,150.00
68,250.00
100,142.50
127,328.10
1,079.00
1,016.60
9,490.00
15,600.00
27,185.60
17,590.00
2,152.50
12,150.00
84,000.00
115,892.50
143,078.10
415.00
703.80
6,570.00
5,400.00
1,368.00
358.75
810.00
106,837.50
109,374.25
122,463.05
415.00
703.80
6,570.00
5,400.00
13,088.80
1,368.00
358.75
810.00
92,925.00
95,461.75
108,550.55
415.00
703.80
6,570.00
5,400.00
13,088.80
1,368.00
358.75
810.00
128,100.00
130,636.75
143,725.55
492.66
207.50
1,200.00
4,599.00 ###
9,500.00
4,940.00
1,700.00
22,639.16
492.66
207.50
1,200.00
4,599.00 ###
17,400.00
11,600.00
492.66
207.50
1,200.00
4,599.00 ###
32,760.00
1,275.00
3,300.00
43,834.16
65,751.24
207.50
492.66
4,599.00
1,200.00
34,560.00
40,851.66
183.43
336.26
3,139.00
2,580.00
113,300.00
1,200.00
2,100.00
122,838.69
183.43
336.26
3,139.00
2,580.00
99,000.00
1,200.00
2,100.00
108,538.69
3,139.00
2,580.00
94,500.00
2,400.00
2,100.00
104,719.00
3,139.00
2,580.00
36,750.00
2,400.00
2,100.00
46,969.00
6,225.00
4,150.00
23,460.00
219,000.00
380,000.00
15,000.00
641,610.00
900.00
10,950.00
1,173.00
62.25
35,200.00
48,285.25
900.00
10,950.00
1,173.00
62.25
135,000.00
148,085.25
900.00
10,950.00
1,173.00
600.00
36,500.00
391.00
207.50
175,000.00
212,698.50
6,000.00
7,300.00
782.00
415.00
107,500.00
15,120.00
137,117.00
6,000.00
7,300.00
782.00
415.00
4,000,000.00
15,120.00
4,029,617.00
6,000.00
7,300.00
782.00
415.00
150,000.00
15,120.00
179,617.00
7,017,033.59
4,475,250.00
193,141.00
500,000.00
1,000,000.00
###
764,056.65
17,116.55
444,643.01
199,756.08
106,950.00
313,085.25
400,000.00
48,285.25
212,698.50
780,025.68
16,454.04
2,003,363.06
431,783.31
144,855.75
35,650.00
313,085.25
400,000.00
48,285.25
212,698.50
4,386,200.84
655,958.60
38,228.22
1,212,642.90
441,210.89
444,255.75
48,285.25
313,085.25
400,000.00
48,285.25
212,698.50
3,814,650.61
655,958.60
1,212,642.90
144,855.75
35,650.00
48,285.25
212,698.50
2,310,091.00
646,131.51
1,212,642.90
144,855.75
48,285.25
2,051,915.41
3,515.64
1,245,493.33
209,420.47
72,427.88
1,530,857.32
36,004,800.00
45,000,900.00
###
36,004,800.00
31,525,630.50
###
1,456,866.86
1,324,201.08
506,784.43
1,212,642.90
144,855.75
35,650.00
48,285.25
212,698.50
3,485,117.91
975,339.20
630,240.13
1,605,579.33
965,512.10
534,010.35
521,263.99
225,000.00
35,650.00
2,281,436.45
1,036,758.54
748,212.58
1,784,971.12
821,790.84
490,462.18
1,312,253.02
1,009,734.03
455,862.50
425,189.36
225,000.00
35,650.00
2,151,435.89
1,454,410.09
642,094.85
2,096,504.94
862,327.60
477,570.24
250,601.64
225,000.00
35,650.00
1,851,149.48
1,252,954.64
961,652.79
960,304.33
450,000.00
71,300.00
3,696,211.76
894,265.66
257,999.35
33,539.52
1,185,804.53
7,340,840.11
1,109,265.41
2,434,061.81
450,000.00
71,300.00
###
1,178,023.04
520,985.71
644,196.37
225,000.00
35,650.00
2,603,855.12
270,245.12
230,102.02
23,134.67
225,000.00
71,300.00
819,781.81
283,685.04
283,685.04
481,527.66
1,212,642.90
144,855.75
35,650.00
48,285.25
212,698.50
2,135,660.06
244.02
3,007.60
92,820.00
92,820.00
101,370.46
13,280.00
78.20
80,300.00
198,000.00
291,658.20
3,427,000.00
205,620.00
3,632,620.00
3,924,278.20
8,300.00
11,730.00
105,850.00
72,000.00
197,880.00
1,779,050.00
8,976.00
10,554.00
2,700.00
1,801,280.00
1,999,160.00
2,346.00
10,950.00
13,296.00
293,250.00
10,000.00
303,250.00
316,546.00
2,346.00
10,950.00
13,296.00
293,250.00
10,000.00
303,250.00
316,546.00
2,346.00
10,950.00
293,250.00
10,000.00
303,250.00
316,546.00
I. PEKERJAAN PENDAHULUAN
1 Pekerjaan Uitzet + Bowplank 86.00 m1 92,225.00
Sub. Total
II. PEKERJAAN ARSITEKTURAL
II. 1. PEKERJAAN ARSITEKTURAL LANTAI 1
II. 1. 1. PEKERJAAN BETON NON STRUKTURAL
1 Beton Kolom Praktis Uk. 11X11cm 224.70 m1 115,256.20
2 Beton Balok Latei Uk. 10X15cm 46.70 m1 141,534.00
Sub. Total
II. 1. 2. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. 1 Bata Merah, 1Pc : 3Ps 52.40 m2 250,770.50
2 Pas. 1/2 Bata Merah t=150cm, 1Pc : 3Ps 141.08 m2 112,403.83
3 Pas. 1/2 Bata Merah, 1Pc : 5Ps 399.57 m2 105,504.12
4 Plesteran Halus tbl=1,5cm t=150cm, 1Pc : 3Ps 282.15 m2 51,254.23
5 Plesteran Halus tbl=1,5cm t=150cm, 1Pc : 5Ps 799.14 m2 47,508.42
6 Acian Dinding 1,081.29 m2 26,628.75
7 Acian Beton 692.94 m2 26,628.75
8 Benangan Dinding 547.24 m1 13,020.00
9 Benangan Beton 892.44 m1 13,020.00
10 Pas. Railling Tangga Pipa Stainless 2" 22.00 m1 101,370.46
11 Saluran Beton Untuk Cable Trench 1.87 m3 5,939,633.27
Sub. Total
II. 1. 3. PEKERJAAN KUSEN
1 Pasang Kusen P1 1.00 unit 13,185,424.59
2 Pasang Kusen P2 1.00 unit 2,506,591.29
3 Pasang Kusen P3 2.00 unit 4,386,200.84
4 Pasang Kusen P4 4.00 unit 3,814,650.61
5 Pasang Kusen P5 4.00 unit 2,310,091.00
6 Pasang Kusen PT1 1.00 unit 2,051,915.41
7 Pasang Kusen PT2 2.00 unit 1,530,857.32
8 Pasang Kusen PB1 1.00 unit 81,005,700.00
9 Pasang Kusen PB2 3.00 unit 67,530,430.50
10 Pasang Kusen PS1 1.00 unit 2,135,660.06
11 Pasang Kusen J1 2.00 unit 1,605,579.33
12 Pasang Kusen J2 1.00 unit 2,281,436.45
13 Pasang Kusen J3 1.00 unit 1,784,971.12
14 Pasang Kusen J4 2.00 unit 1,312,253.02
-107
15 Pasang Kusen J5 1.00 unit 2,151,435.89
16 Pasang Kusen J6 1.00 unit 2,096,504.94
17 Pasang Kusen J7 1.00 unit 1,851,149.48
18 Pasang Kusen JX1 2.00 unit 283,685.04
19 Pasang Kusen BV 1.00 unit 819,781.81
Sub. Total
II. 1. 4. PEKERJAAN PARTISI
Pas. Dinding Partisi Lapis Timbal 1,3mm +Rangka Besi
1 39.60 m2 374,782.89
Hollow 40,40,1,2 + Penutup Gypsum 12mm
Pas. Dinding Partisi Lapis Timbal 1,3mm(Pasang Kembali)
2 41.80 m2 289,977.33
+Rangka Besi Hollow 40,40,1,2 + Penutup Gypsum 12mm
3 Pas. Dinding Partisi Gypsum 12mm + Rangka Metal Stud 14.34 m2 250,602.33
Sub. Total
II. 1. 5. PEKERJAAN PENUTUP LANTAI
1 Beton Rabat+ Addictive + Trowel, tbl=3cm 4.75 m3 705,788.32
2 Pas. Granite Tile Uk. 60X60cm Polos - Polished Fin. Warna 186.10 m2 403,974.30
3 Pas. Granite Tile Uk. 60X60cm Polos - Polished Fin. Warna 77.82 m2 403,974.30
4 Pas. Granite Tile Uk. 60X60cm Polos - Polished Fin. Warna 29.36 m2 403,974.30
5 Pas. Lantai Vinil Flooring (Type Anti Bacteria) 103.94 m2 350,186.40
6 Pas. Lantai Vinil Flooring (Type Anti Static) 53.47 m2 313,436.40
7 Pas. Alumunium Curve Cornering 90.23 m1 104,719.00
8 Pas. Alumunium Ending profile 110.73 m1 46,969.00
9 Pas. Keramik Lantai Uk. 30X30cm - Unpolish 30.94 m2 127,328.10
10 Pas. Keramik Dinding Uk. 30X30cm 58.88 m2 143,078.10
11 Pas. Granite Stepnozing Tangga 10x60cm 27.00 m1 122,463.05
12 Pas. Plint Lantai Granite 10x60cm 74.10 m1 108,550.55
13 Pas. Hospital Plint Granite 20x10cm 141.96 m1 143,725.55
Sub. Total
II. 1. 6. PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Hollow 20.40.4 363.12 m2 105,594.00
2 Pas. Plafond Gypsum 9mm 321.89 m2 40,040.20
3 Pas. Plafond Kalsiboard 4,5mm 41.24 m2 34,380.00
4 Pas. List Gypsum t=7cm 342.12 m1 28,792.00
Sub. Total
II. 1. 7. PEKERJAAN PENGECATAN
1 Pengecatan Interior Anti Bakteri 329.39 m2 65,751.24
2 Pengecatan Interior 368.31 m2 22,639.16
3 Pengecatan Eksterior 409.72 m2 38,799.16
4 Pengecatan Plafond Gypsum 321.89 m2 22,639.16
5 Pengecatan Plafond Kalsiboard 41.24 m2 22,639.16
6 Pengecatan Plafond Expose 61.82 m2 22,639.16
7 Waterproofing deck kanopy 23.01 m2 40,851.66
Sub. Total
II. 1. 8. PEKERJAAN SANITAIR
1 Pas. Kran 1.00 unit 316,546.00
2 Pas. Kran Sink 2.00 unit 316,546.00
-108
3 Pas. Kran +Jet Washer 2.00 unit 316,546.00
4 Pas. Kitchen Sink 2.00 unit 2,730,000.00
5 Pas. Washtafel 12.00 unit 1,999,160.00
6 Pas. Klosed Duduk 2.00 unit 3,924,278.20
7 Pas. Floor Drain 2.00 unit 359,100.00
8 Pas. Cermin Datar 4.52 m2 468,750.00
9 Pas. Stainless Steel Grab Bar 2.00 unit 2,270,000.00
10 Balok Meja Beton, Uk. 10X20cm 0.20 m3 6,968,391.00
11 Plat Meja Beton tbl=10cm 1.14 m3 5,939,633.27
12 Keramik Meja Beton Uk. 30X30cm 6.33 m2 127,328.10
Sub. Total
II. 2. PEKERJAAN ARSITEKTURAL LANTAI 2
II. 2. 1. PEKERJAAN PASANGAN DAN PLESTERAN
1 Rabat Beton Bawah Lantai, tbl=10cm 24.13 m3 900,661.60
2 Plesteran Halus tbl=1,5cm t=150cm, 1Pc : 3Ps 29.79 m2 51,254.23
3 Plesteran Halus tbl=1,5cm, 1Pc : 5Ps 1,264.94 m2 47,508.42
4 Acian Dinding 1,294.73 m2 26,628.75
5 Acian Beton 747.86 m2 26,628.75
6 Benangan Dinding 492.63 m1 13,020.00
7 Benangan Beton 903.16 m1 13,020.00
8 Pas. Railling Tangga Pipa Stainless 2" 22.00 m1 101,370.46
Sub. Total
II. 2. 2. PEKERJAAN KUSEN
1 Pasang Kusen P2 1.00 unit 2,506,591.29
2 Pasang Kusen P3 2.00 unit 4,386,200.84
3 Pasang Kusen P4 3.00 unit 3,814,650.61
4 Pasang Kusen P5 4.00 unit 2,310,091.00
5 Pasang Kusen PT1 1.00 unit 2,051,915.41
6 Pasang Kusen PT2 1.00 unit 1,530,857.32
7 Pasang Kusen PS1 1.00 unit 2,135,660.06
8 Pasang Kusen J2 1.00 unit 2,281,436.45
9 Pasang Kusen J7 1.00 unit 1,851,149.48
10 Pasang Kusen J7' 1.00 unit 1,851,149.48
11 Pasang Kusen J8 1.00 unit 3,874,959.46
12 Pasang Kusen J9 2.00 unit 3,696,211.76
13 Pasang Kusen J10 1.00 unit 1,185,804.53
14 Pasang Kusen J11 1.00 unit 11,405,467.34
16 Pasang Kusen BV 2.00 unit 819,781.81
Sub. Total
II. 2. 3. PEKERJAAN PARTISI
1 Pas. Dinding Partisi Gypsum 12mm + Rangka Metal Stud 11.47 m2 250,602.33
Sub. Total
II. 2. 4. PEKERJAAN PENUTUP LANTAI
1 Beton Rabat+ Addictive + Trowel, tbl=3cm 12.14 m3 705,788.32
2 Pas. Granite Tile Uk. 60X60cm Polos - Polished Fin. Warna 237.09 m2 403,974.30
3 Pas. Lantai Vinil Flooring (Type Anti Bacteria) 81.27 m2 350,186.40
4 Pas. Lantai Vinil Flooring (Type Anti Static) 30.80 m2 313,436.40
-109
5 Pas. Alumunium Curve Cornering 152.87 m2 104,719.00
6 Pas. Alumunium Ending profile 152.87 m1 46,969.00
7 Pas. Keramik Lantai Uk. 30X30cm - Unpolish 4.14 m2 127,328.10
8 Pas. Keramik Dinding Uk. 30X30cm 39.12 m2 143,078.10
9 Pas. Granite Stepnozing Tangga 10x60cm 27.00 m1 122,463.05
10 Pas. Plint Lantai Granite 10x60cm 58.65 m1 108,550.55
11 Pas. Hospital Plint Granite 20x10cm 132.42 m1 143,725.55
Sub. Total
II. 2. 5. PEKERJAAN PLAFOND
1 Pasangan Rangka Plafond Hollow 20.40.4 205.34 m2 105,594.00
2 Pas. Plafond Gypsum 9mm 152.86 m2 40,040.20
3 Pas. Plafond Kalsiboard 4,5mm 52.49 m2 34,380.00
4 Pas. List Gypsum t=7cm 156.62 m1 28,792.00
Sub. Total
II. 2. 6. PEKERJAAN PENGECATAN
1 Pengecatan Interior Anti Bakteri 187.84 m1 65,751.24
2 Pengecatan Interior 684.11 m2 22,639.16
3 Pengecatan Eksterior 340.89 m2 38,799.16
4 Pengecatan Plafond Gypsum 152.86 m2 22,639.16
5 Pengecatan Plafond Kalsiboard 52.49 m2 22,639.16
6 Waterproofing deck atap 34.42 m2 40,851.66
Sub. Total
II. 2. 7. PEKERJAAN SANITAIR
1 Pas. Kran 1.00 unit 316,546.00
2 Pas. Kran Sink 2.00 unit 316,546.00
3 Pas. Kran +Jet Washer 2.00 unit 316,546.00
4 Pas. Kitchen Sink 2.00 unit 2,730,000.00
5 Pas. Washtafel 2.00 unit 1,999,160.00
6 Pas. Klosed Duduk 2.00 unit 3,924,278.20
7 Pas. Floor Drain 2.00 unit 359,100.00
8 Pas. Cermin Datar 0.54 m2 468,750.00
9 Pas. Stainless Steel Grab Bar 2.00 unit 2,270,000.00
10 Balok Meja Beton, Uk. 10X20cm 0.12 m3 6,968,391.00
11 Plat Meja Beton tbl=10cm 0.78 m3 5,939,633.27
12 Keramik Meja Beton Uk. 30X30cm 4.50 m2 127,328.10
Sub. Total
II. 3. PEKERJAAN ARSITEKTURAL LANTAI 3
II. 3. 1. PEKERJAAN BETON NON STRUKTURAL
1 Beton Kolom Praktis Uk. 11X11cm 129.50 m1 115,256.20
2 Beton Balok Latei Uk. 10X15cm 45.10 m1 141,534.00
3 Beton Balok Uk. 15X20cm 1.42 m3 141,534.00
Sub. Total
II. 3. 2. PEKERJAAN PASANGAN DAN PLESTERAN
1 Rabat Beton Bawah Lantai, tbl=10cm 16.32 m3 900,661.60
2 Pas. 1/2 Bata Merah t=150cm, 1Pc : 3Ps 74.01 m2 112,403.83
3 Pas. 1/2 Bata Merah t=150cm, 1Pc : 5Ps 364.50 m2 105,504.12
4 Plesteran Halus tbl=1,5cm t=150cm, 1Pc : 3Ps 148.02 m2 51,254.23
-110
5 Plesteran Halus tbl=1,5cm t=150cm, 1Pc : 5Ps 729.00 m2 47,508.42
6 Acian Dinding 877.02 m2 26,628.75
7 Acian Beton 432.00 m2 26,628.75
8 Benangan Dinding 435.47 m1 13,020.00
9 Benangan Beton 256.00 m1 13,020.00
Sub. Total
II. 3. 3. PEKERJAAN KUSEN
1 Pasang Kusen P5 1.00 unit 2,310,091.00
2 Pasang Kusen PT1 1.00 unit 2,051,915.41
3 Pasang Kusen PT2 3.00 unit 1,530,857.32
4 Pasang Kusen PS1 1.00 unit 2,135,660.06
5 Pasang Kusen J2 1.00 unit 2,281,436.45
6 Pasang Kusen J7 1.00 unit 1,851,149.48
7 Pasang Kusen J7' 2.00 unit 1,851,149.48
8 Pasang Kusen J9 3.00 unit 3,696,211.76
9 Pasang Kusen J11 1.00 unit 11,405,467.34
10 Pasang Kusen J12 1.00 unit 2,603,855.12
11 Pasang Kusen BV 3.00 unit 819,781.81
Sub. Total
II. 3. 4. PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai Uk. 30X30cm - Unpolish 5.97 m2 127,328.10
2 Pas. Keramik Dinding Uk. 30X30cm 78.03 m2 143,078.10
3 Pas. Plint Lantai Granite 10x60cm 260.35 m1 108,550.55
Sub. Total
II. 3. 5. PEKERJAAN PLAFOND
1 Pasangan Rangka Plafond Hollow 20.40.4 388.70 m2 105,594.00
2 Pas. Plafond Kalsiboard 4,5mm 388.70 m2 34,380.00
3 Pas. List Gypsum t=7cm 362.14 m1 28,792.00
Sub. Total
II. 3. 6. PEKERJAAN PENGECATAN
1 Pengecatan Interior 234.92 m2 22,639.16
2 Pengecatan Eksterior 442.84 m2 38,799.16
3 Pengecatan Plafond Kalsiboard 388.70 m2 22,639.16
4 Waterproofing deck atap 141.20 m2 40,851.66
Sub. Total
II. 3. 7. PEKERJAAN SANITAIR
1 Pas. Kran Sink 1.00 unit 316,546.00
2 Pas. Kran +Jet Washer 3.00 unit 316,546.00
3 Pas. Kitchen Sink 1.00 unit 2,730,000.00
4 Pas. Washtafel 2.00 unit 1,999,160.00
5 Pas. Klosed Duduk 4.00 unit 3,924,278.20
6 Pas. Floor Drain 4.00 unit 359,100.00
7 Pas. Cermin Datar 0.54 m2 468,750.00
8 Pas. Stainless Steel Grab Bar 1.00 unit 2,270,000.00
9 Balok Meja Beton, Uk. 10X20cm 0.07 m3 6,968,391.00
10 Plat Meja Beton tbl=10cm 0.39 m3 5,939,633.27
11 Keramik Meja Beton Uk. 30X30cm 1.95 m2 127,328.10
-111
Sub. Total
III. PEKERJAAN ELEKTRIKAL
III. 1. PEKERJAAN PANEL
1 SDP-PARU, Sub Distribusi Panel 1.00 Unit 46,945,751.37
2 LP-01, Panel Pembagi Penerangan Lantai-01 1.00 Unit 3,925,371.31
3 LP-02, Panel Pembagi Penerangan Lantai-02 1.00 Unit 3,635,982.70
4 LP-03, Panel Pembagi Penerangan Lantai-03 1.00 Unit 3,635,982.70
5 PP-AC-01, Panel Pembagi AC Lantai-01 1.00 Unit 3,894,023.70
6 PP-AC-02, Panel Pembagi AC Lantai-02 1.00 Unit 3,318,314.30
7 PP-AC-03, Panel Pembagi AC Lantai-03 1.00 Unit 3,318,314.30
8 PP-LAB, Panel Peralatan Laboratorium 1.00 Unit 3,179,854.30
9 PP-CT SCANT, Panel Peralatan CT SCANT 1.00 Unit 11,341,201.90
10 PP-RONTGEN, Panel Peralatan Rontgen 1.00 Unit 11,341,201.90
11 PP-FLUOROSCOPY, Panel Peralatan Fluoroscopy 1.00 Unit 11,486,246.80
Sub. Total
III. 2. PEKERJAAN KABEL FEEDER
1 Dari Panel LVMDP Eksisting ke SDP - R. PARU
Kabel TR, NYY 4 x 120 mm² + BC 95 mm² 75.00 m' 1,042,394.00
2 Dari SDP - PARU ke LP-01
Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm² 20.00 m' 90,112.40
3 Dari SDP - PARU ke LP-02
Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm² 30.00 m' 90,112.40
4 Dari SDP - PARU ke LP-03
Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm² 40.00 m' 90,112.40
5 Dari SDP - PARU ke P.AC-01
Kabel TR, NYY 4 x 16 mm² + BC 1 x 6 mm² 20.00 m' 146,909.60
6 Dari SDP - PARU ke P.AC-02
Kabel TR, NYY 4 x 16 mm² + BC 1 x 6 mm² 30.00 m' 146,909.60
7 Dari SDP - PARU ke P.AC-03
Kabel TR, NYY 4 x 16 mm² + BC 1 x 6 mm² 40.00 m' 146,909.60
8 Dari SDP - PARU ke PP.CT SCANT
Kabel TR, NYY 4 x 50 mm² + BC 1 x 25 mm² 35.00 m' 424,030.00
9 Dari SDP - PARU ke PP.RONTGEN
Kabel TR, NYY 4 x 50 mm² + BC 1 x 25 mm² 20.00 m' 424,030.00
10 Dari SDP - PARU ke PP.FLOUROSCOPY
Kabel TR, NYY 4 x 50 mm² + BC 1 x 25 mm² 20.00 m' 424,030.00
11 Dari SDP - PARU ke PP.LAB
Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm² 40.00 m' 146,909.60
-112
- Ceilling Light 22 W 5.00 bh 1,694,146.67
2 Peralatan Instalasi :
- Saklar 1 Gang 1 Way 12.00 bh 30,785.00
- Saklar 2 Gang 1 Way 10.00 bh 42,225.00
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V 28.00 bh 37,385.00
- Stop Kontak Medis (UPS) 1 Gang ( 2P+E ) Schuko - 250 V 6.00 bh 37,385.00
Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British
- 9.00 bh 68,075.00
Standard w/ Neon Sign
- Industrial Socket 16 A ( 3P+N+E ) IP 44 1.00 bh 144,085.00
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC 77.00 ttk 330,318.33
4 Instalasi stop kontak, NYM 3 x 2,5 mm² dalam conduit PVC 34.00 ttk 414,123.33
Instalasi stop kontak AC, NYM 3 x 2,5 mm² dalam conduit
5 9.00 ttk 414,123.33
PVC HI 25 mm²
6 Instalasi stop kontak AC, NYY 4 x 6 mm² (AC Split Duct) 1.00 ttk 1,064,403.33
6 Ceiling Mounted Exhaust Fan KM/WC, 30 W / 220 V / 420 m 2.00 set 804,000.00
Instalasi Ceiling Mounted Exhaust Fan, NYM 3 x 2,5 mm²
7 2.00 ttk 414,123.33
dalam conduit PVC HI 20 mm²
Sub. Total
III. 3. 2. PEKERJAAN INSTALASI PENERANGAN LANTAI 2
1 Armature lampu :
- Downlight Dia. 6" 18W 20.00 bh 298,046.67
- RMI 300 GLOSSY 2 X 36W 57.00 bh 1,392,846.67
- Ceilling Light 22 W 5.00 bh 1,694,146.67
2 Peralatan Instalasi :
- Saklar 1 Gang 1 Way 10.00 bh 30,785.00
- Saklar 2 Gang 1 Way 8.00 bh 42,225.00
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V 27.00 bh 37,385.00
Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British
- 9.00 bh 68,075.00
Standard w/ Neon Sign
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC 82.00 ttk 330,318.33
4 Instalasi stop kontak, NYM 3 x 2,5 mm² dalam conduit PVC 27.00 ttk 414,123.33
5 Instalasi stop kontak AC, NYM 3 x 2,5 mm² dalam conduit 9.00 ttk 414,123.33
6 Ceiling Mounted Exhaust Fan KM/WC, 30 W / 220 V / 420 m 2.00 set 804,000.00
Instalasi Ceiling Mounted Exhaust Fan, NYM 3 x 2,5 mm²
7 2.00 ttk 414,123.33
dalam conduit PVC HI 20 mm²
Sub. Total
III. 3. 3. PEKERJAAN INSTALASI PENERANGAN LANTAI 3
1 Armature lampu :
- Downlight Dia. 6" 18W 36.00 bh 298,046.67
- RMI 300 GLOSSY 2 X 36W 31.00 bh 1,392,846.67
- Ceilling Light 22 W 8.00 bh 1,694,146.67
2 Peralatan Instalasi :
- Saklar 1 Gang 1 Way 11.00 bh 30,785.00
- Saklar 2 Gang 1 Way 8.00 bh 42,225.00
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V 21.00 bh 37,385.00
Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British
- 10.00 bh 68,075.00
Standard w/ Neon Sign
3 Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC 75.00 ttk 330,318.33
-113
4 Instalasi stop kontak, NYM 3 x 2,5 mm² dalam conduit PVC 21.00 ttk 414,123.33
5 Instalasi stop kontak AC, NYM 3 x 2,5 mm² dalam conduit 10.00 ttk 414,123.33
6 Ceiling Mounted Exhaust Fan KM/WC, 30 W / 220 V / 420 m 4.00 set 804,000.00
Instalasi Ceiling Mounted Exhaust Fan, NYM 3 x 2,5 mm²
7 4.00 ttk 414,123.33
dalam conduit PVC HI 20 mm²
8 Test Commissioning 1.00 ls 1,500,000.00
Sub. Total
-114
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e)
4 6.00 ttk 384,523.33
dalam conduit PVC HI 20 mm²
Sub. Total
IV. 2. 3. PEKERJAAN INSTALASI DATA / LAN LANTAI 3
1 Patch Panel Cat5 8 Port / wallmount 2u 1.00 bh 5,700,000.00
2 Peralatan Instalasi :
- Outlet Data Cat 6 c/w Modular Jack 5.00 bh 144,960.00
Instalasi power wallmount, NYM 3 x 2,5 mm² dalam conduit
3 1.00 ttk 414,123.33
PVC HI 20 mm²
Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e)
4 5.00 ttk 384,523.33
dalam conduit PVC HI 20 mm²
5 Test Commissioning 1.00 ls 1,500,000.00
Sub. Total
IV. 3. PEKERJAAN INSTALASI CCTV
IV. 3. 1. PEKERJAAN INSTALASI CCTV LANTAI 1
1 Peralatan utama Pekerjaan CCTV
- DVR mutiplexer 16 CH 1 Tera byte 1.00 unit 6,900,000.00
- LCD Tv monitor 22" 1.00 unit 3,000,000.00
- Back Up power suply 5 Kva 1.00 unit 6,125,000.00
- Surge protection 1.00 bh 2,795,000.00
- CPU computer controller 2 video output 1.00 unit 10,982,500.00
- Wall Mounted Rack 8U 1.00 unit 3,000,000.00
- Cantilever Shelf 1.00 unit 350,000.00
2 Instalasi kabel Power NYYHY 2x0.75mm² dalam Conduit PVC HI 20 mm²
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V 4.00 bh 24,750.00
Instalasi Kabel Power CCTV NYYHY 2x0.75mm² dalam
- 4.00 ttk 514,130.00
conduit PVC HI 20 mm²
3 Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PVC HI 20 mm²
- CCD IP PTZ Camera dome IR 4.00 bh 975,000.00
- Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PV 4.00 ttk 530,030.00
Sub. Total
IV. 3. 2. PEKERJAAN INSTALASI CCTV LANTAI 2
1 Instalasi kabel Power NYYHY 2x0.75mm² dalam Conduit PVC HI 20 mm²
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V 2.00 bh 24,750.00
Instalasi Kabel Power CCTV NYYHY 2x0.75mm² dalam
- 2.00 ttk 514,130.00
conduit PVC HI 20 mm²
2 Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PVC HI 20 mm²
- CCD IP PTZ Camera dome IR 2.00 bh 975,000.00
- Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PV 2.00 ttk 530,030.00
Sub. Total
IV. 3. 3. PEKERJAAN INSTALASI CCTV LANTAI 3
1 Instalasi kabel Power NYYHY 2x0.75mm² dalam Conduit PVC HI 20 mm²
- Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V 2.00 bh 24,750.00
Instalasi Kabel Power CCTV NYYHY 2x0.75mm² dalam
- 2.00 ttk 514,130.00
conduit PVC HI 20 mm²
2 Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PVC HI 20 mm²
- CCD IP PTZ Camera dome IR 2.00 bh 975,000.00
- Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PV 2.00 ttk 530,030.00
-115
3 Test Commissioning 1.00 ls 1,500,000.00
Sub. Total
V. PEKERJAAN MEKANIKAL
V. 1. PEKERJAAN INSTALASI AIR BERSIH
V. 1. 1. PEKERJAAN INSTALASI AIR BERSIH LANTAI 1
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Pipa PVC AW Ø ½” 22.00 m' 10,917.50
- Pipa PVC AW Ø ¾” 22.00 m' 12,996.50
- Pipa PVC AW Ø 1” 33.00 m' 15,439.50
- Pipa PVC AW Ø 1” (Penarikan Dari Pompa Eksisting) 20.00 m' 15,439.50
- Pipa PVC Aw Ø 1½” 22.00 m' 19,422.50
2 Gate Valve PVC
- Gate Valve PVC Ø 1” 1.00 bh 44,377.50
3 Tee PVC ( AW )
- Tee PVC Ø 1” x Ø ½" 5.00 bh 9,097.50
- Tee PVC Ø 1” x Ø ¾" 1.00 bh 9,937.50
4 Elbow PVC ( AW )
- Elbow PVC Ø ½” 15.00 bh 7,417.50
- Elbow PVC Ø 1” 1.00 bh 8,257.50
5 Reducing Socket PVC ( AW )
- Reducing Socket PVC Ø 1” x Ø ¾" 1.00 bh 28,456.60
- Reducing Socket PVC Ø ¾” x Ø ½" 1.00 bh 24,256.60
6 Cap PVC ( AW )
- Cap PVC Ø ½” 1.00 bh 8,296.60
- Cap PVC Ø ¾” 1.00 bh 16,696.60
- Cap PVC Ø 1” 2.00 bh 23,416.60
7 Faucet Elbow PVC ( AW )
- Faucet Elbow PVC Ø ½” 15.00 bh 344,296.60
Sub. Total
V. 1. 2. PEKERJAAN INSTALASI AIR BERSIH LANTAI 2
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Pipa PVC AW Ø ½” 30.00 m' 10,917.50
- Pipa PVC AW Ø ¾” 30.00 m' 12,996.50
- Pipa PVC AW Ø 1” 41.00 m' 15,439.50
2 Gate Valve PVC
- Gate Valve PVC Ø ½” 1.00 bh 21,697.50
- Gate Valve PVC Ø ¾” 1.00 bh 30,097.50
- Gate Valve PVC Ø 1” 1.00 bh 44,377.50
3 Tee PVC ( AW )
- Tee PVC Ø ½” 1.00 bh 6,577.50
- Tee PVC Ø ¾” x Ø ½" 2.00 bh 7,417.50
- Tee PVC Ø 1” x Ø ½" 3.00 bh 9,097.50
- Tee PVC Ø 1” x Ø ¾" 1.00 bh 9,937.50
4 Elbow PVC ( AW )
- Elbow PVC Ø ½” 6.00 bh 7,417.50
- Elbow PVC Ø 1” 1.00 bh 8,257.50
-116
5 Reducing Socket PVC ( AW )
- Reducing Socket PVC Ø 1” x Ø ¾" 1.00 bh 28,456.60
- Reducing Socket PVC Ø ¾” x Ø ½" 1.00 bh 24,256.60
6 Cap PVC ( AW )
- Cap PVC Ø ¾” 2.00 bh 16,696.60
7 Faucet Elbow PVC ( AW )
- Faucet Elbow PVC Ø ½” 6.00 bh 344,296.60
Sub. Total
V. 1. 3. PEKERJAAN INSTALASI AIR BERSIH LANTAI 3
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Pipa PVC AW Ø ½” 35.00 m' 10,917.50
- Pipa PVC AW Ø ¾” 40.00 m' 12,996.50
- Pipa PVC AW Ø 1” 46.00 m' 15,439.50
2 Gate Valve PVC
- Gate Valve PVC Ø ½” 1.00 bh 21,697.50
- Gate Valve PVC Ø ¾” 1.00 bh 30,097.50
- Gate Valve PVC Ø 1” 1.00 bh 44,377.50
3 Tee PVC ( AW )
- Tee PVC Ø ½” 1.00 bh 6,577.50
- Tee PVC Ø ¾” x Ø ½" 2.00 bh 7,417.50
- Tee PVC Ø 1” x Ø ½" 3.00 bh 9,097.50
- Tee PVC Ø 1” x Ø ¾" 1.00 bh 9,937.50
4 Elbow PVC ( AW )
- Elbow PVC Ø ½” 6.00 bh 7,417.50
- Elbow PVC Ø 1” 1.00 bh 8,257.50
5 Reducing Socket PVC ( AW )
- Reducing Socket PVC Ø 1” x Ø ¾" 2.00 bh 8,257.50
- Reducing Socket PVC Ø ¾” x Ø ½" 1.00 bh 24,256.60
6 Cap PVC ( AW )
- Cap PVC Ø ¾” 2.00 bh 28,456.60
7 Faucet Elbow PVC ( AW )
- Faucet Elbow PVC Ø ½” 6.00 bh 16,696.60
8 Tandon Air Bersih 1.1 m3 3.00 ls 7,500,000.00
9 Test Commissioning 1.00 ls 1,500,000.00
Sub. Total
-117
6 Elbow PVC Ø 3” x Ø 2" 3.00 bh 33,457.50
7 Elbow PVC Ø 2” x Ø 1" 3.00 bh 28,417.50
8 Elbow PVC 45º Ø 4” 3.00 bh 45,217.50
9 Y - Branch PVC Ø 4” 2.00 bh 62,017.50
10 Floor Clean Out Ø 4" 3.00 bh 235,000.00
11 Sewage Pump 3.00 unit 15,000,000.00
12 Bak Kontrol 3.00 unit 350,000.00
Sub. Total
V. 2. 2. PEKERJAAN INSTALASI AIR BEKAS, KOTOR & VENT LANTAI 2
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Pipa PVC AW Ø 4” 30.00 m' 97,857.50
- Pipa PVC AW Ø 3” 20.00 m' 60,267.50
- Pipa PVC AW Ø 2” 20.00 m' 32,130.30
2 Elbow PVC Ø 4” 3.00 bh 36,817.50
3 Elbow PVC Ø 3” 3.00 bh 28,417.50
4 Elbow PVC Ø 2” 3.00 bh 20,017.50
5 Elbow PVC Ø 4” x Ø 3" 3.00 bh 40,177.50
6 Elbow PVC Ø 3” x Ø 2" 3.00 bh 33,457.50
7 Elbow PVC Ø 2” x Ø 1" 3.00 bh 28,417.50
8 Elbow PVC 45º Ø 4” 3.00 bh 45,217.50
9 Y - Branch PVC Ø 4” 2.00 bh 62,017.50
10 Floor Clean Out Ø 4" 3.00 bh 235,000.00
Sub. Total
V. 2. 3. PEKERJAAN INSTALASI AIR BEKAS, KOTOR & VENT LANTAI 3
1 Pemipaan PVC AW Kelas 10 kg/cm² :
- Pipa PVC AW Ø 4” 40.00 m' 97,857.50
- Pipa PVC AW Ø 3” 40.00 m' 60,267.50
- Pipa PVC AW Ø 2” 35.00 m' 32,130.30
2 Elbow PVC Ø 4” 3.00 bh 36,817.50
3 Elbow PVC Ø 3” 3.00 bh 28,417.50
4 Elbow PVC Ø 2” 3.00 bh 20,017.50
5 Elbow PVC Ø 4” x Ø 3" 3.00 bh 40,177.50
6 Elbow PVC Ø 3” x Ø 2" 3.00 bh 33,457.50
7 Elbow PVC Ø 2” x Ø 1" 3.00 bh 28,417.50
8 Elbow PVC 45º Ø 4” 3.00 bh 36,817.50
9 Y - Branch PVC Ø 4” 2.00 bh 45,217.50
10 Floor Clean Out Ø 4" 3.00 bh 235,000.00
11 Test Commissioning 1.00 ls 1,500,000.00
Sub. Total
-118
- AC Split Duck ( 90.000 bTU/h ) 1.00 Unit 71,567,680.00
2 Instalasi indoor AC, NYM 3 x 2,5 mm² dalam conduit PVC H 8.00 ttk 414,123.33
3 Dehumidefire 1.00 Unit 10,067,680.00
4 Boster Fan 1.00 Unit 7,967,680.00
5 Supply Air Difusher 5.00 Unit 767,680.00
6 Rumah Hepafilter 1.00 Unit 11,267,680.00
7 Ducting Uk. 250X250 11.00 m1 766,180.00
8 Ducting Uk. 350X250 10.00 m1 848,080.00
9 Ducting Uk. 450X250 6.00 m1 943,840.00
Sub. Total
VI. 2. PEKERJAAN INSTALASI AIR CONDITIONING ( AC ) LANTAI 2
1 Peralatan Utama
- AC Wall Split ( 12.000 bTU/h ) 5.00 Unit 5,290,480.00
- AC Wall Split ( 24.000 bTU/h ) 4.00 Unit 9,766,480.00
2 Instalasi indoor AC, NYM 3 x 2,5 mm² dalam conduit PVC H 9.00 ttk 414,123.33
3 Test Commissioning 1.00 ls 1,500,000.00
Sub. Total
-119
Pagu
selisih
rekap
-120
ANGGARAN BIAYA
JML HARGA
(Rp)
6
7,931,350.00 86.000 m1
7,931,350.00
25,898,068.14 224.700 m1
6,609,637.80 46.700 m1
32,507,705.94
13,140,374.20 52.400 m2
15,857,932.34 141.074 m2
42,156,281.23 399.567 m2
14,461,379.58 282.148 m2
37,965,874.76 799.135 m2
28,793,401.09 1081.283 m2
18,452,126.03 692.936 m2
7,125,064.80 547.233 m1
11,619,568.80 892.431 m1
2,230,150.12 21.995 m1
11,107,114.22 1.869 m3
202,909,267.17
-121
2,151,435.89 1.000 unit
2,096,504.94 1.000 unit
1,851,149.48 1.000 unit
567,370.07 2.000 unit
819,781.81 1.000 unit
357,197,980.10
14,841,402.40 39.600 m2
12,121,052.53 41.800 m2
3,593,637.46 14.336 m2
30,556,092.39
3,352,494.50 4.748 m3
75,179,617.23 186.098 m2
31,437,280.03 77.818 m2
11,860,685.45 29.352 m2
36,398,374.42 103.940 m2
16,759,444.31 53.465 m2
9,448,795.37 90.230 m1
5,200,877.37 110.730 m1
3,939,531.41 30.940 m2
8,424,438.53 58.877 m2
3,306,502.35 27.000 m1
8,043,595.76 74.100 m1
20,403,279.08 141.960 m1
233,754,915.79
38,343,293.28 363.112 m2
12,888,539.98 321.881 m2
1,417,831.20 41.232 m2
9,850,319.04 342.120 m1
62,499,983.50
21,657,800.94 329.389 m2
8,338,229.02 368.301 m2
15,896,791.84 409.720 m2
7,287,319.21 321.881 m2
933,638.96 41.232 m2
1,399,552.87 61.815 m2
939,996.70 23.003 m2
56,453,329.54
-122
633,092.00 2.000 unit
5,460,000.00 2.000 unit
23,989,920.00 12.000 unit
7,848,556.40 2.000 unit
718,200.00 2.000 unit
2,118,750.00 4.520 m2
4,540,000.00 2.000 unit
1,393,678.20 0.193 m3
6,771,181.93 1.140 m3
805,986.87 6.330 m2
55,229,003.41
21,732,964.41 24.122 m3
1,526,863.36 29.790 m2
60,095,294.47 1264.938 m2
34,477,041.49 1294.728 m2
19,914,576.98 747.859 m2
6,414,042.60 492.628 m1
11,759,143.20 903.160 m1
2,230,150.12 21.995 m1
158,150,076.62
2,874,408.76 11.468 m2
2,874,408.76
8,568,270.14 12.132 m3
95,778,266.79 237.083 m2
28,459,648.73 81.268 m2
9,653,841.12 30.798 m2
-123
16,008,393.53 152.865 m2
7,180,151.03 152.865 m1
527,138.33 4.133 m2
5,597,215.27 39.120 m2
3,306,502.35 27.000 m1
6,366,489.76 58.650 m1
19,032,137.33 132.420 m1
200,478,054.38
21,682,671.96 205.340 m2
6,120,544.97 152.858 m2
1,804,606.20 52.483 m2
4,509,403.04 156.620 m1
34,117,226.17
12,350,712.92 187.837 m1
15,487,675.75 684.107 m2
13,226,245.65 340.889 m2
3,460,622.00 152.858 m2
1,188,329.51 52.483 m2
1,406,114.14 34.413 m2
47,119,699.96
14,925,677.90 129.500 m1
6,383,183.40 45.100 m1
200,978.28 1.418 m3
21,509,839.58
14,698,797.31 16.311 m3
8,319,007.46 74.010 m2
38,456,251.74 364.495 m2
7,586,650.38 148.020 m2
-124
34,633,634.54 728.991 m2
23,353,946.33 877.011 m2
11,503,620.00 432.000 m2
5,669,819.40 435.470 m1
3,333,120.00 256.000 m1
147,554,847.15
760,148.76 5.965 m2
11,164,384.14 78.030 m2
28,261,135.69 260.350 m1
40,185,668.59
41,044,387.80 388.700 m2
13,363,506.00 388.700 m2
10,426,734.88 362.140 m1
64,834,628.68
5,318,391.47 234.912 m2
17,181,820.01 442.832 m2
8,799,841.49 388.700 m2
5,768,254.39 141.194 m2
37,068,307.37
-125
30,703,675.94
9,835,540.00 33.000 bh
54,321,020.00 39.000 bh
-126
8,470,733.33 5.000 bh
369,420.00 12.000 bh
422,250.00 10.000 bh
1,046,780.00 28.000 bh
224,310.00 6.000 bh
612,675.00 9.000 bh
144,085.00 1.000 bh
25,434,511.67 77.000 ttk
14,080,193.33 34.000 ttk
122,189,278.33
5,960,933.33 20.000 bh
79,392,260.00 57.000 bh
8,470,733.33 5.000 bh
307,850.00 10.000 bh
337,800.00 8.000 bh
1,009,395.00 27.000 bh
612,675.00 9.000 bh
140,522,436.67
10,729,680.00 36.000 bh
43,178,246.67 31.000 bh
13,553,173.33 8.000 bh
338,635.00 11.000 bh
337,800.00 8.000 bh
785,085.00 21.000 bh
680,750.00 10.000 bh
-127
8,696,590.00 21.000 ttk
4,141,233.33 10.000 ttk
3,216,000.00 4.000 set
1,500,000.00 1.000 ls
113,587,561.67
900,000.00 1.000 ls
357,425.00 5.000 bh
2,910,041.67
900,000.00 1.000 ls
357,425.00 5.000 bh
2,910,041.67
900,000.00 1.000 ls
214,455.00 3.000 bh
1,500,000.00 1.000 ls
3,606,025.00
5,700,000.00 1.000 bh
1,159,680.00 8.000 bh
10,349,990.00
5,700,000.00 1.000 bh
869,760.00 6.000 bh
-128
2,307,140.00 6.000 ttk
9,291,023.33
5,700,000.00 1.000 bh
724,800.00 5.000 bh
1,500,000.00 1.000 ls
10,261,540.00
99,000.00 4.000 bh
3,900,000.00 4.000 bh
2,120,120.00 4.000 ttk
41,328,140.00
49,500.00 2.000 bh
1,950,000.00 2.000 bh
1,060,060.00 2.000 ttk
4,087,820.00
49,500.00 2.000 bh
1,950,000.00 2.000 bh
1,060,060.00 2.000 ttk
-129
1,500,000.00 1.000 ls
5,587,820.00
44,377.50 1.000 bh
45,487.50 5.000 bh
9,937.50 1.000 bh
111,262.50 15.000 bh
8,257.50 1.000 bh
28,456.60 1.000 bh
24,256.60 1.000 bh
8,296.60 1.000 bh
16,696.60 1.000 bh
46,833.20 2.000 bh
5,164,449.00 15.000 bh
7,280,007.60
21,697.50 1.000 bh
30,097.50 1.000 bh
44,377.50 1.000 bh
6,577.50 1.000 bh
14,835.00 2.000 bh
27,292.50 3.000 bh
9,937.50 1.000 bh
44,505.00 6.000 bh
8,257.50 1.000 bh
-130
28,456.60 1.000 bh
24,256.60 1.000 bh
33,393.20 2.000 bh
2,065,779.60 6.000 bh
3,709,903.00
21,697.50 1.000 bh
30,097.50 1.000 bh
44,377.50 1.000 bh
6,577.50 1.000 bh
14,835.00 2.000 bh
27,292.50 3.000 bh
9,937.50 1.000 bh
44,505.00 6.000 bh
8,257.50 1.000 bh
16,515.00 2.000 bh
24,256.60 1.000 bh
56,913.20 2.000 bh
100,179.60 6.000 bh
22,500,000.00 3.000 ls
1,500,000.00 1.000 ls
26,017,631.40
-131
100,372.50 3.000 bh
85,252.50 3.000 bh
135,652.50 3.000 bh
124,035.00 2.000 bh
705,000.00 2.000 bh
45,000,000.00 2.000 unit
1,050,000.00 2.000 unit
57,253,158.50
-132
71,567,680.00 1.000 Unit
3,312,986.67 8.000 ttk
10,067,680.00 1.000 Unit
7,967,680.00 1.000 Unit
3,838,400.00 5.000 Unit
11,267,680.00 1.000 Unit
8,427,980.00 11.000 m1
8,480,800.00 10.000 m1
5,663,040.00 6.000 m1
171,129,766.67
1.000 unit
690,000,000.00
50,990,614.43 2547.480 kg
19,293,518.79 963.900 kg
3,771,033.24 188.400 kg
800,000.00 16.000 bh
6,750,000.00 540.000 bh
2,750,000.00 10.000 ttk
720,623.28 17.640 m2
775,075,789.74
488,000.00 1.000 ls
6,000,000.00 4.000 m1
3,856,182,072.78
385,618,207.28
-133
4,241,800,280.06
4,241,800,000.00
4,350,000,000.00
108,200,000.00
-
-
-134
FOTO BAHAN MATERIAL BANGUNAN MINGGU KE 1
1 PEKERJAA UMUM
- Semen Semen / Portland Cement (PC) Holcim Gresik Tiga Roda -
Semen Instan (Mortar) MU Primer MortarBostik -
- Pasir Pasir Pasangan Lumajang - - -
- Bekisting Multipleks - - - -
Rangka Kayu Meranti - - - -
2 PEKERJAAN STRUKTUR
2.1 Pekerjaan Beton Non Struktur
a. Beton Ready Mix Mutu Beton K - 225 Holcim Indosipa Merak Jaya Jatim Ready Mix
b. Beton Site Mix Mutu Beton K - 225 - - - -
2.2 Pekerjaan Grouting dan repair beton Lihat RKS Sika Bond Fosroc LockfixBASF Masterf-
3 PEKERJAAN ARSITEKTUR
3.1 Pekerjaan Pasangan Non Struktural
a. Louvers Alumunium tebal 1 mm Alexindo Alutama Indal -
3.3 Pekerjaan Plesteran dan acian semen Semen / Portland Cement (PC) Holcim Gresik - -
Semen Instan (Mortar) MU Primer MortarBostik -
Pasir Pasangan Lumajang - - -
4 PEKERJAAN (M-E-P)
KETERANGAN
Merk Ina
KETERANGAN
Pas. Dinding Partisi Lapis Timbal 1,3mm +Rangka Besi Hollow 40,40,1,2 + Penutup Gypsum 12mm
Pas. Dinding Partisi Lapis Timbal 1,3mm(Pasang Kembali) +Rangka Besi Hollow 40,40,1,2 + Penutup Gypsum 12mm
ve PVC Ø ½”
ve PVC Ø ¾”
ve PVC Ø 1”
Ø ¾” x Ø ½"
Ø 1” x Ø ½"
Ø 1” x Ø ¾"
g Socket PVC ( AW )
g Socket PVC Ø 1” x Ø ¾"
g Socket PVC Ø ¾” x Ø ½"
lbow PVC ( AW )
lbow PVC Ø ½”
Air Bersih 1.1 m3
mmissioning
Lt. 3
Armature lampu :
Downlight Dia. 6" 18W
RMI 300 GLOSSY 2 X 36W
Ceilling Light 22 W
Peralatan Instalasi :
Saklar 1 Gang 1 Way
Saklar 2 Gang 1 Way
( 2P+E ) Schuko - 250 V Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V
P+E ) 13 A - 3 Pin British Standard w/ Neon Sign Stop Kontak AC 1 Gang ( 2P+E ) 13 A - 3 Pin British Standard w/ Neon Sign
3 x 2,5 mm² dalam conduit PVC HI 20 mm² Instalasi penerangan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm²
3 x 2,5 mm² dalam conduit PVC HI 25 mm² Instalasi stop kontak, NYM 3 x 2,5 mm² dalam conduit PVC HI 25 mm²
YM 3 x 2,5 mm² dalam conduit PVC HI 25 mm² Instalasi stop kontak AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 25 mm²
an KM/WC, 30 W / 220 V / 420 m3/h Ceiling Mounted Exhaust Fan KM/WC, 30 W / 220 V / 420 m3/h
xhaust Fan, NYM 3 x 2,5 mm² dalam conduit PVC HI 2 Instalasi Ceiling Mounted Exhaust Fan, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm²
Test Commissioning
Lt. 3
Terminal BOX c/w LSA 1 x 10 pairs
Peralatan Instalasi :
Telepon Outlets c/w Cover 1 Gang - 4 Wire
0.6 mm² dalam conduit PVC Instalasi Kabel Telepon ITC 2 x 2 x 0.6 mm² dalam conduit PVC HI 20 mm²
Test Commissioning
Lt. 3
allmount 2u Patch Panel Cat5 8 Port / wallmount 2u
Peralatan Instalasi :
Outlet Data Cat 6 c/w Modular Jack
NYM 3 x 2,5 mm² dalam conduit PVC HI 20 m Instalasi power wallmount, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm²
UTP Cable 4 Pairs (Cat 5e) dalam conduit PVC Instalasi Kabel Data / LAN UTP Cable 4 Pairs (Cat 5e) dalam conduit PVC HI 20 mm²
Test Commissioning
Lt. 3
Y 2x0.75mm² dalam Conduit PVC HI 20 mm² Instalasi kabel Power NYYHY 2x0.75mm² dalam Conduit PVC HI 20 mm²
( 2P+E ) Schuko - 250 V Stop Kontak Umum 1 Gang ( 2P+E ) Schuko - 250 V
NYYHY 2x0.75mm² dalam conduit PVC HI 20 Instalasi Kabel Power CCTV NYYHY 2x0.75mm² dalam conduit PVC HI 20 mm²
al Cable RG6 dalam conduit PVC HI 20 mm² Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PVC HI 20 mm²
CCD IP PTZ Camera dome IR
al Cable RG6 dalam conduit PVC HI 20 mm² Instalasi Kabel CCTV Coaxial Cable RG6 dalam conduit PVC HI 20 mm²
Test Commissioning
/ Neon Sign
HI 25 mm²
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteranga
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
Suplier
Tiga Roda
Ex. Lokal
Ex. Lokal
Ex. Lokal
Ex. Lokal
Ex. Lokal
Ex. Lokal
Catatan
yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteranga
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
Suplier
Ex. Lokal
Tiga Roda
Ex. Lokal
Catatan
yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteranga
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
D Tidak disetujui
Suplier
Catatan
yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
1 Addictive Lokal - BQ
2 Trowel Lokal - BQ
3 Granit Tile 60 x 60 Polos - Polished Essenza Warna Type 1 Spek RKS
4 Granit Tile 60 x 60 Polos - Polished Essenza Warna Type 2 Spek RKS
5 Granit Tile 60 x 60 Polos - Polished Essenza Warna Type 3 Spek RKS
6 Vinil Flooring Tajima Anti Bacteria Spek RKS
7 Vinil Flooring Tajima Anti Static Spek RKS
8 Alumunium Curve Cornering Lokal - BQ
9 Alumunium Ending Profile Lokal - BQ
10 Keramik lantai 30 x 30 - Unpolish Asia - Spek RKS
11 Keramik Dinding 30 x 30 Asia - Spek RKS
12 Granit Stepnozing tangga 10 x 60 Essenza - Spek RKS
13 Plint Lantai Granit 10 x 60 Essenza - Spek RKS
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteranga
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
D Tidak disetujui
Suplier
Lokal
Lokal
Essenza
Essenza
Essenza
Tajima
Tajima
Lokal
Lokal
Asia
Asia
Essenza
Essenza
Catatan
yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteranga
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
D Tidak disetujui
Suplier
Ex. Galvalum
Ex. Lokal
Ex. Lokal
Ex. Lokal
Kalsiboard
Ex. Lokal
Ex. Lokal
Catatan
yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
1 Rangka Profil C Stud 75mm Metal Stud Metal Stud - Spek RKS
2 Gypsum Tebal 12 mm lapis timbal Ex. Kalsiboard - Spek RKS
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteranga
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Suplier
Metal Stud
Ex. Kalsiboard
Catatan
yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteranga
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Suplier
Catatan
yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
1 Kran air
2 Kran Sink
3 Kran + Jet Washer
4 Kitchen Zink
5 Wastafel
6 Kloset Duduk
7 Floor Drain
8 Cermin Datar
9 Stainless steel grab bar
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteranga
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Suplier
Catatan
yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
KODE ME (MEKANIKAL)
Kontruksi Pembangunan Gedung
Nama Proyek
Rumah Sakit Paru Mangunharjo -
LEMBAR PERSETUJUAN BAHAN Lokasi Jl. Yos Sudarso No. 108 - 112 Mad
Paket Kerja Kontruksi Pembangunan Gedung
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
1 Pipa PVC AW Ø ½”
2 Pipa PVC AW Ø ¾”
3 Pipa PVC AW Ø 1”
4 Pipa PVC AW Ø 1” (Penarikan Dari Pompa Eksisting)
5 Pipa PVC Aw Ø 1½”
6 Gate Valve PVC
7 Gate Valve PVC Ø 1”
8 Tee PVC ( AW )
9 Tee PVC Ø 1” x Ø ½"
10 Tee PVC Ø 1” x Ø ¾"
11 Elbow PVC ( AW )
12 Elbow PVC Ø ½”
13 Elbow PVC Ø 1”
14 Reducing Socket PVC ( AW )
15 Reducing Socket PVC Ø 1” x Ø ¾"
16 Reducing Socket PVC Ø ¾” x Ø ½"
17 Cap PVC ( AW )
18 Cap PVC Ø ½”
19 Cap PVC Ø ¾”
20 Cap PVC Ø 1”
21 Faucet Elbow PVC ( AW )
22 Faucet Elbow PVC Ø ½”
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteran
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Catatan
n/Alat yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UJUAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
KODE ME (MEKANIKAL)
Kontruksi Pembangunan Gedung
Nama Proyek
Rumah Sakit Paru Mangunharjo -
LEMBAR PERSETUJUAN BAHAN Lokasi Jl. Yos Sudarso No. 108 - 112 Mad
Paket Kerja Kontruksi Pembangunan Gedung
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
1 Pipa PVC AW Ø 4”
2 Pipa PVC AW Ø 4”
3 Pipa PVC AW Ø 3”
4 Pipa PVC AW Ø 2”
5 Elbow PVC Ø 4”
6 Elbow PVC Ø 3”
7 Elbow PVC Ø 2”
8 Elbow PVC Ø 4” x Ø 3"
9 Elbow PVC Ø 3” x Ø 2"
10 Elbow PVC Ø 2” x Ø 1"
11 Elbow PVC 45º Ø 4”
12 Y - Branch PVC Ø 4”
13 Floor Clean Out Ø 4"
14 Sewage Pump
15 Bak Kontrol
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteran
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Catatan
n/Alat yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UJUAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
KODE ME (MEKANIKAL)
Kontruksi Pembangunan Gedung
Nama Proyek
Rumah Sakit Paru Mangunharjo -
LEMBAR PERSETUJUAN BAHAN Lokasi Jl. Yos Sudarso No. 108 - 112 Mad
Paket Kerja Kontruksi Pembangunan Gedung
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteran
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Instalasi indoor AC, NYM 3 x 2,5 mm² dalam conduit PVC HI 20 mm²
Catatan
n/Alat yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UJUAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
KODE EL (ELEKTRIKAL)
Kontruksi Pembangunan Gedung
Nama Proyek
Rumah Sakit Paru Mangunharjo -
LEMBAR PERSETUJUAN BAHAN Lokasi Jl. Yos Sudarso No. 108 - 112 Mad
Paket Kerja Kontruksi Pembangunan Gedung
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
1 SDP-PARU
2 LP-01
3 LP-02
4 LP-03
5 PP-AC-01
6 PP-AC-02
7 PP-AC-03
8 PP-LAB
9 PP-CT SCANT
10 PP-RONTGEN
11 PP-FLUOROSCOPY
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteran
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
Menyetujui Diperiksa
Suplier
Catatan
n/Alat yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UJUAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
KODE EL (ELEKTRIKAL)
Kontruksi Pembangunan Gedung
Nama Proyek
Rumah Sakit Paru Mangunharjo -
LEMBAR PERSETUJUAN BAHAN Lokasi Jl. Yos Sudarso No. 108 - 112 Mad
Paket Kerja Kontruksi Pembangunan Gedung
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
Kabel Feeder :
1 Dari Panel LVMDP Eksisting ke SDP - R. PARU 6 Kabel TR, NYY 4 x 16 mm² + BC 1 x 6 mm²
Kabel TR, NYY 4 x 120 mm² + BC 95 mm² Dari SDP - PARU ke P.AC-03
Dari SDP - PARU ke LP-01 7 Kabel TR, NYY 4 x 16 mm² + BC 1 x 6 mm²
2 Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm² Dari SDP - PARU ke PP.CT SCANT
Dari SDP - PARU ke LP-02 8 Kabel TR, NYY 4 x 50 mm² + BC 1 x 25 mm²
3 Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm² Dari SDP - PARU ke PP.RONTGEN
Dari SDP - PARU ke LP-03 9 Kabel TR, NYY 4 x 50 mm² + BC 1 x 25 mm²
4 Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm² Dari SDP - PARU ke PP.FLOUROSCOPY
Dari SDP - PARU ke P.AC-01 10 Kabel TR, NYY 4 x 50 mm² + BC 1 x 25 mm²
5 Kabel TR, NYY 4 x 16 mm² + BC 1 x 6 mm² Dari SDP - PARU ke PP.LAB
Dari SDP - PARU ke P.AC-02 11 Kabel TR, NYY 4 x 10 mm² + BC 1 x 6 mm²
Dari Panel LVMDP Eksisting ke SDP - Gedung Eksis
12 Kabel TR, NYFGBY 4 x 25 mm² + BC 16 mm²
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteran
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Catatan
n/Alat yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UJUAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
KODE EL (ELEKTRIKAL)
Kontruksi Pembangunan Gedung
Nama Proyek
Rumah Sakit Paru Mangunharjo -
LEMBAR PERSETUJUAN BAHAN Lokasi Jl. Yos Sudarso No. 108 - 112 Mad
Paket Kerja Kontruksi Pembangunan Gedung
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keteran
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Supreme
Clipsal
Clipsal
lokal
Lokal
Lokal
Lokal
Lokal
Catatan
n/Alat yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
INDRA MULYAWAN, S.T
Project Manager
Nomor AM / 001 - ELT / BTS / V / 2016
Tanggal SENIN, 30 MEI 2016
Hal 1
Lampiran 3
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keterang
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Catatan
at yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keterang
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Catatan
at yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keterang
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Catatan
at yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA
KODE ELEVATOR
Kontruksi Pembangunan Gedung
Nama Proyek
Rumah Sakit Paru Mangunharjo
LEMBAR PERSETUJUAN BAHAN Lokasi Jl. Yos Sudarso No. 108 - 112 Ma
Paket Kerja Kontruksi Pembangunan Gedung
Referensi
No. Uraian Jenis Material/Peralatan Merk Type (BQ, Spek, DWG)
A Disetujui Semua Material bahan/Alat yang didatangkan harus sesuai dengan data keterang
Spesifikasi Teknis dan juga sesuai gambar kerja.
B Disetujui dengan catatan
C Harap ajukan contoh lagi
D Tidak disetujui
Menyetujui Diperiksa
Suplier
Fuji
Catatan
at yang didatangkan harus sesuai dengan data keterangan terlampir, dan mengacuh pada referensi BQ /
UAN INI HARUS DIAJUKAN MAX. 7 HARI SEBELUM PEMAKAIAN
Diajukan oleh :
Kontraktor Pelaksana
PT. BHARATA TEKNIKA SEJAHTERA