Anda di halaman 1dari 12

CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &

INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA


Issue date: 16/Feb/2016

PRIVATE ENGINEERING OFFICE PROJECTS

Project’s(representative)PICTURE
ENGINEERING VERIFICATION CALCULATION FOR
Gen-set smoke exhaust fans External Static Pressure
EAF-G-01 (Typical 2 NOS)
Construction, Completion & Maintenance of Worker Hospital &
Integrated Health Center at Ras Laffan Industrial Area

PEO PROJECT No.: 11009


Document
QACC-WH-DCA-02-H-066 Revision No.: 0
No.:

Issue Status: For Approval Project Phase: Construction

Prepared by: Reviewed by: Reviewed by: Approved by:

Rajmohon Ahmed El
Name Md.Musthafa Simon Gardener
Rajkumar Singh Ghazouly

Mechanical
Design Manager - MEP Manager - Project Manager -
Job Title Engineer -
ETA QACC QACC
ETA

Signature

Date 16/Feb/2016 16/Feb/2016 16/Feb/2016 16/Feb/2016

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 1 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

Controlled DAR AL-


1 Issued to:
Copy No: HANDASAH

Table of Contents
Section Description Page No.

1 Verification calculation Summary of External static pressure


2 Gen set smoke exhaust fans – EAF-G-01 ( 2 NOS) External static pressure calculation
sheet
3 Supporting Documents
1. Reference List
2. HVAC IFC Schedule
3. HVAC IFC layout

4 Result

Appendix A List and Samples of Standard Forms – Not Applicable -NA-

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 2 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

1. VERIFICATION CALCULATION
SUMMARY OF EAF-G-01
(Typical 2 NOS)EXTERNAL STATIC
PRESSURE CALCULATION

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 3 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

2. ATRIUM FANS EAF-G-01 (Typical 2


NOS)
EXTERNAL STATIC PRESSURE
CALCULATION SHEET

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 4 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3. SUPPORTING
DOCUMENTS

The list of Supporting Documents for This Engineering Verification calculation attached
herein with this submittal as follows:

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 5 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

1. Reference list
2. HVAC IFC Schedule – WHIHC (RLC)
3. HVAC layout – WHIHC (RLC)
4. Datas Used For Calculation – WHIHC (RLC)

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 6 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3.1 REFERENCE LIST

3.1 Reference List

.
Reference Description Reference No.
No
1. M-SCH-EQ-SHT-02
1 AHU Schedule

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 7 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

1. MH100R-CUP-SHT-02 Rev 4A
2 HVAC IFC layout
2. MH100G-CUP-SHT-01 Rev4A

3.2 HVAC IFC SCHEDULE –


WHIHC (RLC)
Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 8 of 12
CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3.3 HVAC IFC LAYOUT -


WHIHC (RLC)

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 9 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3.4 HVAC LAYOUT -


WHIHC (RLC)

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 10 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

3.5 DATAS USED FOR


CALCULATION

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 11 of 12


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 16/Feb/2016

4.RESULT
From the verification calculation, below is the summary of Specified and Calculated (Verified) External
static pressure for GEN-SET SMOKE EXHAUST FANS EAF-G-01 ( Typical for 2 nos) located in
CUP- ROOF

External static pressure (in External


Sl Pascal) static
No. FAN Tag No Location Of FAN pressure to
Design Calculated
be offered,
specified Value
(in pascal)

EAF-G-01
CUP - ROOF
1 ( Typical for 2 200 238 300
nos)

Document No.: QACC-WH-DCA-02-H-066 Rev.0 Page 12 of 12

Anda mungkin juga menyukai