SUPPLEMENT #15
Engineering Division
1. INSTRUMENTATION
1.1 General
1.1.1.1 The Contractor shall supply all the elements for sensing,
conditioning and transmitting signals from the equipment within
the Scope of Supply, as required, to assure safe, reliable and
economic manual and automatic operation.
-1-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
- For field or indoor-mounted instruments: the instrument
identification tag number shall be stamped on a stainless
steel tag and shall be attached to the instrument with rust-
proof wire.
* manufacturer’s name,
* model number,
* serial number;
* additional information, such as voltage, frequency, etc.
-2-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
1.1.2.1.6 P&I Diagram
1.1.3.3 The Contractor shall furnish the Purchaser with the necessary
storage instructions required to maintain the original condition of
the instruments before installation and until the equipment is
placed in service.
-3-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
- Type or catalog number, if listed.
- Short description including service and on what device it is
mounted.
- Date shipped.
- Shipping details.
1.2.1 Instruments
-4-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
Concerning an inland Power Station, a salt laden
atmosphere is not relevant.
1.2.1.2 Painting
-5-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
1.2.1.4 Calibration Requirement
-6-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
Signal:
- Field Bus is acceptable only for the auxiliary system (not the
major system) and based on Purchaser's approval).
Power Supply:
Electrical Connection:
Supply:
Signal:
-7-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
- The Instrument air quality will be according to ISA Standard
ANSI MC11.1-1975-ISA S7.3.
1.2.2 Installation
-8-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
The Purchaser will ensure the competent installation according
to a high quality practice and with professional engineering.
1.2.2.4.1 The Contractor shall use the best technical means and
engineering skills to install all field instruments to assure a safe
and reliable operation of the equipment with the best overall
performance.
1.2.2.4.3 The Contractor shall supply manifold valves for each pressure
and differential pressure instruments.
For pressure transmitters the manifold should be of a direct type.
For pressure measurement a two-valve manifold (shut-off and
test) and for differential pressure measurement a five-valve
manifold (two shut-off, two test and one equalizer) are required.
For sea-water the manifolds shall be assembled with separate
ball valves. All manifolds should be equipped with 1/2” N.P.T.F.
process connections. All manifolds should have mounting hols.
-9-
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
- When a thermowell with thermocouple or RTD is used, its tip
shall be mounted approximately 1/2” below the center line of
the process pipe.
- 10 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
1.2.2.7 Boss Sizes for Primary Points - Table A (wherever applicable)
(*) Major Systems are: MS, FW, CD, CR, HR, ME, LE, HE.
- 11 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
1.2.2.8 Required Instruments Process Connections - Table B (wherever
applicable) (cont.)
INDICATOR ½” N.P.T.M.
P INDICATOR W/DIAPHRAGM SEAL ½” N.P.T.M.
R INDICATOR W/MANIFOLD ½” N.P.T.F.
E SWITCH ¼” N.P.T.F.
S SWITCH W/DIAPHRAGM SEAL ¼” N.P.T.F.
S SWITCH W/MANIFOLD ½” N.P.T.F.
U TRANSMITTER ¼” N.P.T.F.
R TRANS. W/DIAPHRAGM SEAL ½” N.P.T.M.
E TRANS. W/MANIFOLD ½” N.P.T.F.
CONTROLLER ¼” N.P.T.M.
CONTROLLER WITH DIAPHRAGM SEAL ½” N.P.T.M.
CONTROLLER W/MANIFOLD ½” N.P.T.F.
D INDICATOR ¼” N.P.T.M.
I INDICATOR W/DIAPHRAGM SEAL ½” N.P.T.M.
F P INDICATOR W/MANIFOLD ½” N.P.T.F.
F R SWITCH ¼” N.P.T.F.
E E SWITCH W/DIAPHRAGM SEAL ¼” N.P.T.F.
R S SWITCH W/MANIFOLD ½” N.P.T.F.
E S TRANSMITTER ¼” N.P.T.F.
N U TRANS. W/DIAPHRAGM SEAL ½” N.P.T.M
T R TRANS. W/MANIFOLD ½” N.P.T.F.
I E CONTROLLER ¼” N.P.T.M
A CONTROLLER W/DIAPHRAGM SEAL ½” N.P.T.M.
L CONTROLLER W/MANIFOLO ½” N.P.T.F.
F
L INDICATOR (THERMAL) ¾” N.P.T.M
O
W SWITCH (THERMAL) ¾” N.P.T.M
- 12 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
1.3 Specific Technical Requirement
1.3.1 Instruments
1.3.1.2 Switches
1.3.1.3 Temperature
- 13 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
1.3.1.4 Pressure
1.3.1.5 Flow
- 14 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
e. Complete design data shall be furnished by the Contractor
for each flow element. Design data shall be subject to
review by the Purchaser.
1.3.1.6 Actuators
1.3.1.6.1 General
- 15 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
e. The Actuator diaphragm area (and spring) shall be sufficient
to close against the maximum differential pressure
encountered in the process when the valve is closed.
- 16 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
- 17 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
c. Switching mode: Normal open (de-energized).
1.3.2.2 The Contractor shall provide all the material tubing, piping,
fittings, valves, manifold, etc., necessary for installation works,
according to I.E.C.’s installation standards mentioned below and
according to document XX0/M3-006-CS0002-00 last and
updated revision “Instrumentation Piping Code”.
Those will be appendices Supplements “D”. Dwgs. will be
provided after Contract award. (Sample No. 2 is attached as a
part of Supplement "D").
- 18 -
THE ISRAEL ELECTRIC CORPORATION LTD. SUPPLEMENT #15
Engineering Division
which describe configuration, dimensions, etc., will be given to
the Contractor by the Purchaser.
Quantities of the above will be the Contractor’s responsibility,
taking into consideration at least a three-month supply time.
- 19 -