DATA STRUKTUR

Bentang Balok (L) = 9.5 m 9500


Bentang Plat (Lx) = 3.75 m 3750
Bentang Plat (Ly) = 9.5 m 9500
Lebar Balok (b) = 350 mm
Tinggi Balok (h) = 650 mm
Dead Load (DL) = 23.7 kN/m
Live Load (LL) = 21.235 kN/m
Beban (Qu) = 33.18 kN/m
Beban (Qu) = 62.416 kN/m
62.416
Momen Ultimit Negatif (Mu-) = 469.4203333333 kNm
Momen Ultimit Positif (Mu+) = 234.7101666667 kNm
Gaya Geser Positif (Vu+) = 296.476 kN 296476
Gaya Geser Negatif (Vu-) = -296.476 kN -296476

DATA MATERIAL
f'c = 25 Mpa
f'y ulir = 380 MPa
f'y polos = 220 Mpa
ß= 0.85
Σc = 0.003
Es = 200000
Pb = 40
Sb = 25
Ɣ= 0.5
d tul = 25 mm 10
d tul susut = 10 mm
d tul sengkang = 10 mm
s= 300 mm

DAERAH TUMPUAN
A. Tulangan Tumpuan
RASIO TULANGAN
ϼb = 0.0291017723
ϼ maks = 0.0218263292
ϼ= 0.0145508861
m= 17.8823529412

GAYA PERLAWANAN
R₁ = 4.8099587411 Mpa
MOMEN NOMIAL
Mn = 586775416.666667 Nmm
bd² = 121991777.527479 mm

D PERLU
d perlu = 590.379485 mm
ds = 62.5 mm
d' = 62.5 mm
h perlu = 652.879485 mm
h pakai = 650 mm

TINGGI EFEKTIF
d desak = 587.5 mm
d tarik = 587.5 mm

B. Tulangan Desak
KONTROL PERENCANAAN
Cb = 359.693877551 mm
a maks = 229.304847 mm

586775417 = 7438 a
586775417 = 4369531.3 a
157788.3473 = 1175 a
0 = -157788.3473

a₁ = 1020.3601421488 mm
a₂ = 154.6398578512 mm
a pakai = 154.6398578512 mm
OK

GAYA PERLAWANAN
R₂ = 2.4049793706 Mpa
m₁ = 290532781.306231 Nmm
m₂ = 296242635.360436 Nmm

LUAS TULANGAN DESAK


As' = 1484.9254905285 mm²
As' d tul = 490.625 mm²

JUMLAH TULANGAN DESAK


n= 3.0265997259 buah
n pakai = 4 buah
As' ada = 1962.5 mm²
OK

TULANGAN TEKAN 4D25


C. Tulangan Tarik
LUAS TULANGAN TARIK
ϼb = 0.0072754431
As = 2980.9384722014 mm²

JUMLAH TULANGAN
n= 6.0757981599
n pakai = 7 buah
As ada = 3434.375 mm²
OK

TULANGAN TARIK 6D25

D. Kontrol Momen Tersedia (Mg-)


As' ada = 1962.5 mm²
As ada = 3434.375 mm²

Cs = 1177500 (c - 62,5)/c
Cc= 6321.88 c
Ts = 1305062.5

6321.88 c + 1177500
6321.88 c² + 1177500
6321.875 c² + -127563
1 c² + -20.1780

c₁ = 118.4537057673 mm
c₂ = -98.2757522329 mm
c pakai = 118.4537057673 mm
a= 100.6856499022 mm
fs' = 283.420626167 Mpa
Mg- = 694261707.2139 MPa
0,8Mg- = 555.4093657711 MPa
OK

E. Kontrol Rasio
ϼ' ada = 0.0095440729
ϼ ada = 0.0167021277
∆ϼ = 0.0071580547
OK

F. Kontrol Momen Tersedia (Mg+)


As' ada = 981.25 mm²
As ada = 1471.875 mm²
Cs = 588750 (c - 62,5)/c
Cc= 6321.88 c
Ts = 559312.5

6321.88 c + 588750
6321.88 c² + 588750
6321.88 c² + 29437.500
1 c² + 4.6565

c₁ = 73.9999093334 mm
c₂ = -78.656360149 mm
c pakai = 73.9999093334 mm
a= 62.8999229334 mm
fs' = 93.2426223519 Mpa
Mg+ = 308164834.9168 MPa
0,8Mg+ = 246.5318679334 MPa
OK

DAERAH LAPANGAN
A. Tulangan Desak
KONTROL PERENCANAAN
Mu+ = 234.7101666667 kNm
Mn = 293387708.333333 Nmm
Cb = 359.693877551 mm
a maks = 229.304847 mm

293387708.3 = 7437.5 a
293387708.3 = 4369531.25 a
78894.17367 = 1175 a
0 = -78894.1737

a₁ = 1103.5058878836 mm
a₂ = 71.4941121164 mm
a pakai = 71.4941121164 mm
OK

GAYA PERLAWANAN
R₂ = 2.4049793706
m₁ = 290532781.3062 Nmm
m₂ = 2854927.02710 Nmm

LUAS TULANGAN DESAK


As' = 14.3104111634 mm²
As' d tul = 490.625 mm²

JUMLAH TULANGAN DESAK


n= 0.029167717 buah
n pakai = 2 buah
As' ada = 981.25 mm²
OK

TULANGAN TEKAN 2D25

B. Tulangan Tarik
LUAS TULANGAN TARIK
ϼb = 0.0072754431
As = 1399.3091022784 mm²

JUMLAH TULANGAN
n= 2.8520949855
n pakai = 3 buah
As ada = 1471.875 mm²
OK

TULANGAN TEKAN 3D25

C. Kontrol Momen Tersedia (Mn)


As' ada = 981.25 mm²
As ada = 1471.875 mm²
a= 75.2016806723 mm
Mn = 307565473.7395 Nmm
0,8Mn = 246052378.9916 Nmm
OK

D. Tulangan Susut
As st = 455.0000 mm²
As tul = 78.500 mm²
n= 5.7961783439 buah
n pakai = 6 buah
TULANGAN SUSUT 5D10

E. Kontrol Momen Kapasitas Positif (Mpr+)


As' ada = 981.25 mm²
As ada = 1471.875 mm²

Cc = 6321.875 c
Cs = 588750.000 (c - 62,5)/c
Ts = 699140.6250 Mpa

6321.88 c + 588750
6321.88 c² + 588750
6321.88 c² + -110390.625
1 c² + -17.4617

c₁ = 85.5214122704 mm
c₂ = -68.0597217118 mm
c pakai = 85.5214122704 mm
a= 72.6932004298 mm
fs' = 161.5133215827 Mpa
Mpr+ = 381188812.2230 MPa
0,8Mpr- = 304951049.7784 MPa
OK

F. Kontrol Momen Kapasitas Negatif (Mpr-)


As' ada = 1962.5 mm²
As ada = 3434.375 mm²

Cc = 6321.88 c
Cs = 1177500 (c - 62,5)/c
Ts = 1631328.13 Mpa

6321.88 c + 1177500
6321.88 c² + 1177500
6321.88 c² + -453828.125
1 c² + -71.7870

c₁ = 149.601296181 mm
c₂ = -77.8143461068 mm
c pakai = 149.601296181 mm
a= 127.1611017538 mm
fs' = 349.3337227 Mpa
Mpr- = 855425323.0774 MPa
0,8Mpr- = 684.340258462 MPa
OK

SENGKANG
A. Perhitungan Gaya Ultimit
GAYA GESER AKIBAT GEMPA
Ve = 130.169908979 kN

GAYA GESER ULTIMIT


mm
mm
mm

N
N

mm
x (587,5 - 0,5a)
- 3718.75 a²
- 1 a²
+ 1175 a -1 a²
(c - 62,5)/c -1305062.5 = 0
c -73593750 -1305063 c = 0
c -73593750 = 0
c -11641.1270 = 0
(c - 62,5)/c -559312.5 = 0
c -36796875 -559313 c = 0
c -36796875 = 0
c -5820.5635 = 0

x (587,5 - 0,5a)
- 3718.75 a²
- 1 a²
+ 1175 a -1 a²
(c - 62,5)/c -699140.6 = 0
c -36796875 -699140.6 c = 0
c -36796875 = 0
c -5820.5635 = 0

(c - 62,5)/c -1631328.125 = 0
c -73593750 -1631328.13 c = 0
c -73593750 = 0
c -11641.1270 = 0
DATA STRUKTUR
Bentang Balok (L) = 9m 9000
Bentang Plat (Lx) = 4.15 m 4150
Bentang Plat (Ly) = 9m 9000
Lebar Balok (b) = 300 mm 300
Tinggi Balok (h) = 600 mm 600
Dead Load (DL) = 22.45 kN/m
Live Load (LL) = 20.075 kN/m
Beban (Qu) = 31.43 kN/m
Beban (Qu) = 59.06 kN/m
59.06
Momen Ultimit Negatif (Mu-) = 398.655 kNm
Momen Ultimit Positif (Mu+) = 199.3275 kNm
Gaya Geser Positif (Vu+) = 265.770 kN 265770
Gaya Geser Negatif (Vu-) = -265.770 kN -265770

DATA MATERIAL
f'c = 25 Mpa
f'y ulir = 380 MPa
f'y polos = 220 Mpa
ß= 0.85
Σc = 0.003
Es = 200000
Pb = 40
Sb = 25
Ɣ= 0.5
d tul = 25 mm 10
d tul susut = 10 mm
d tul sengkang = 10 mm
s= 300 mm

DAERAH TUMPUAN
A. Tulangan Tumpuan
RASIO TULANGAN
ϼb = 0.0291017723 pmin = 0.003684211
ϼ maks = 0.0218263292
ϼ= 0.0145508861
m= 17.8823529412

GAYA PERLAWANAN
R₁ = 4.8099587411 Mpa
MOMEN NOMIAL
Mn = 498318750 Nmm
bd² = 103601460.390263 mm

D PERLU
d perlu = 587.654832 mm
ds = 62.5 mm
d' = 62.5 mm
h perlu = 650.154832 mm
h pakai = 600 mm

TINGGI EFEKTIF
d desak = 537.5 mm
d tarik = 537.5 mm

B. Tulangan Desak
KONTROL PERENCANAAN
Cb = 329.0816326531 mm
a maks = 209.789541 mm

498318750 = 6375 a
498318750 = 3426562.5 a
156335.2941 = 1075 a
0 = -156335.2941

a₁ = 901.6029468191 mm
a₂ = 173.3970531809 mm
a pakai = 173.3970531809 mm
OK

GAYA PERLAWANAN
R₂ = 2.4049793706 Mpa
m₁ = 208444071.384034 Nmm
m₂ = 289874678.6 Nmm

LUAS TULANGAN DESAK


As' = 1605.9538981494 mm²
As' d tul = 490.625 mm²

JUMLAH TULANGAN DESAK


n= 3.2732818306 buah
n pakai = 4 buah
As' ada = 1962.500 mm²
OK

TULANGAN TEKAN 4D25


C. Tulangan Tarik
LUAS TULANGAN TARIK
ϼb = 0.0072754431
As = 2779.1190935039 mm²

JUMLAH TULANGAN
n= 5.66444656
n pakai = 6 buah
As ada = 2943.75 mm²
OK

TULANGAN TARIK 6D25

D. Kontrol Momen Tersedia (Mg-)


As' ada = 1962.5 mm²
As ada = 2943.750 mm²

Cs = 1177500 (c - 62,5)/c
Cc= 5418.75 c
Ts = 1118625

5418.75 c + 1177500
5418.75 c² + 1177500
5418.75 c² + 58875
1 c² + 10.8651

c₁ = 111.2329240202 mm
c₂ = -122.0979759233 mm
c pakai = 111.2329240202 mm
a= 94.5479854172 mm
fs' = 262.8696015112 Mpa
Mg- = 540524250.5104 MPa
0,8Mg- = 432.4194004083 MPa
OK

E. Kontrol Rasio
ϼ' ada = 0.0121705426
ϼ ada = 0.018255814
∆ϼ = 0.0060852713
OK

F. Kontrol Momen Tersedia (Mg+)


As' ada = 981.25 mm²
As ada = 1471.875 mm²
Cs = 588750 (c - 62,5)/c
Cc= 5418.7500 c
Ts = 559312.5

5418.75 c + 588750
5418.75 c² + 588750
5418.75 c² + 29437.500
1 c² + 5.4325

c₁ = 79.7339372908 mm
c₂ = -85.1664632424 mm
c pakai = 79.7339372908 mm
a= 67.7738466972 mm
fs' = 129.6858367444 Mpa
Mg+ = 278035953.9745 MPa
0,8Mg+ = 222.4287631796 MPa
OK

DAERAH LAPANGAN
A. Tulangan Desak
KONTROL PERENCANAAN
Mu+ = 199.3275 kNm
Mn = 249159375 Nmm
Cb = 329.0816326531 mm
a maks = 209.789541 mm

249159375.0 = 6375 a
249159375.0 = 3426562.50 a
78167.64706 = 1075 a
0 = -78167.6471

a₁ = 996.5627440135 mm
a₂ = 78.4372559865 mm
a pakai = 78.4372559865 mm
OK

GAYA PERLAWANAN
R₂ = 2.4049793706
m₁ = 208444071.3840 Nmm
m₂ = 40715303.61597 Nmm

LUAS TULANGAN DESAK


As' = 225.5695491189 mm²
As' d tul = 490.625 mm²

JUMLAH TULANGAN DESAK


n= 0.4597595906 buah
n pakai = 2 buah
As' ada = 981.25 mm²
OK

TULANGAN TEKAN 2D25

B. Tulangan Tarik
LUAS TULANGAN TARIK
ϼb = 0.0072754431
As = 1315.8881760898 mm²

JUMLAH TULANGAN
n= 2.6820650723
n pakai = 3 buah
As ada = 1471.875 mm²
OK

TULANGAN TEKAN 3D25

C. Kontrol Momen Tersedia (Mn)


As' ada = 981.25 mm²
As ada = 1471.875 mm²
a= 87.7352941176 mm
Mn = 276094745.4044 Nmm
0,8Mn = 220875796.3235 Nmm
OK

D. Tulangan Susut
As st = 360.0000 mm²
As tul = 78.500 mm²
n= 4.5859872611 buah
n pakai = 5 buah
TULANGAN SUSUT 5D10

E. Kontrol Momen Kapasitas Positif (Mpr+)


As' ada = 981.25 mm²
As ada = 1471.875 mm²

Cc = 5418.75 c
Cs = 588750.000 (c - 62,5)/c
Ts = 699140.6250 Mpa

5418.75 c + 588750
5418.75 c² + 588750
5418.75 c² + -110390.625
1 c² + -20.3720

c₁ = 93.2185806837 mm
c₂ = -72.8466083654 mm
c pakai = 93.2185806837 mm
a= 79.2357935812 mm
fs' = 197.719685014 Mpa
Mpr+ = 343650192.1171 MPa
0,8Mpr- = 274920153.6937 MPa
OK

F. Kontrol Momen Kapasitas Negatif (Mpr-)


As' ada = 1962.5 mm²
As ada = 2943.750 mm²

Cc = 5418.75 c
Cs = 1177500 (c - 62,5)/c
Ts = 1398281.25 Mpa

5418.75 c + 1177500
5418.75 c² + 1177500
5418.75 c² + -220781.250
1 c² + -40.7439

c₁ = 138.6780674066 mm
c₂ = -97.9341227699 mm
c pakai = 138.6780674066 mm
a= 117.8763572956 mm
fs' = 329.5895400 Mpa
Mpr- = 666860166.3554 MPa
0,8Mpr- = 533.4881330843 MPa
OK

SENGKANG
A. Perhitungan Gaya Ultimit
GAYA GESER AKIBAT GEMPA
Ve = 112.2789287192 kN

GAYA GESER ULTIMIT


mm
mm
mm

N
N

mm
x (587,5 - 0,5a)
- 3187.5 a²
- 1 a²
+ 1075 a -1 a²
(c - 62,5)/c -1118625 = 0
c -73593750 -1118625 c = 0
c -73593750 = 0
c -13581.3149 = 0
(c - 62,5)/c -559312.5 = 0
c -36796875 -559313 c = 0
c -36796875 = 0
c -6790.6574 = 0

x (537,5 - 0,5a)
- 3187.50 a²
- 1 a²
+ 1075 a -1 a²
(c - 62,5)/c -699140.6 = 0
c -36796875 -699140.6 c = 0
c -36796875 = 0
c -6790.6574 = 0

(c - 62,5)/c -1398281.25 = 0
c -73593750 -1398281.25 c = 0
c -73593750 = 0
c -13581.3149 = 0