Anda di halaman 1dari 34

ZXMW NR8250 Quick

Installation & Commissioning


Guide
ZXMW NR8250 Quick Installation & Commissioning Guide

LEGAL INFORMATION

By accepting this certain document of ZTE CORPORATION you agree to the following terms. If you do
not agree to the following terms, please notice that you are not allowed to use this document.

Copyright © 2015 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer,
distribution, use or disclosure of this document or any portion of this document, in any form by any
means, without the prior written consent of ZTE CORPORATION is prohibited.

are registered trademarks of ZTE CORPORATION. ZTE’s company name, logo and product
names referenced herein are either trademarks or registered trademarks of ZTE CORPORATION.
Other product and company names mentioned herein may be trademarks or trade names of their
respective owners. Without the prior written consent of ZTE CORPORATION or the third party owner
thereof, anyone’s access to this document should not be construed as granting, by implication,
estoppel or otherwise, any license or right to use any marks appearing in the document.

The design of this product complies with requirements of environmental protection and personal
security. This product shall be stored, used or discarded in accordance with product manual, relevant
contract or laws and regulations in relevant country (countries).

This document is provided “as is” and “as available”. Information contained in this document is subject
to continuous update without further notice due to improvement and update of ZTE CORPORATION’s
products and technologies.

ZTE CORPORATION

Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
Website: http://dms.zte.com.cn
Email: TSM.Aftersales@zte.com.cn
ZXMW NR8250 Quick Installation & Commissioning Guide

1 Overview

1.1 Outdoor Installation Schematic Diagram

In this text, as SRU, for example.


1+0 Buckle Installation 1+1 Buckle Installation

2+0 Buckle Installation

1+0 Separate Installation (Single-Polarization) 1+1 Separate Installation(Single-Polarization)

2+0 Separate Installation (Dual-Polarization) 2+2 Separate Installation (Dual-Polarization)

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 1(5)
ZXMW NR8250 Quick Installation & Commissioning Guide

1.2 Installation Tools and Auxiliary Material

Antistatic wrist glove Antistatic wrist strap Wire stripper Crimper

Crystal-connector Grounding
Wire punchdown tool Hex wrench
crimper resistance tester

Spanner Claw hammer Plier Paper knife

Crowbar Telescope Pulley Hand file

Marking pen Hoisting cable Tape Sleeve

2 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Multimeter Screwdriver Compass GPS

Percussion drill Vacuum Cleaner Horizontal ruler Safety Helmet

PVC insulating tape Waterproof cement Lubricant

1.3 Installation Flow

Start

IDU Installation

ODU Installation

Power cable
Protective grounding cable
Cable Installation
IF cable
Signal cable

Antenna Adjustment

Installation Check

Power- on/off

Commissioning

End

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 3(7)
ZXMW NR8250 Quick Installation & Commissioning Guide

2 Pre-installation Check
SN Check Point Picture Check Key Point

Equipment List:
According to when unpacking
Check the case of equipment list
1 installation None inventory goods, microwave
parts devices delivery when IDU,
ODU, and is Antenna separate
packaging

Under the
BLVD port is available and
secondary
2 current equipment meet
electric power
Microwave power combined.
supply

1. Existing rack has mounting


space
3 Rack
2. The new vertical mounting
racks degree <3 ‰

1. Tower hosts meet the


requirements.
4 Iron Tower
2. Tower has enough space for
installation.

4 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

3 Equipment Installation

3.1 IDU Installation


Step Picture Installation Note

Install the floating nuts on the IDU


1
installation position of rack.

2 Insert the IDU on the rack.

3 Fasten 4*screws on the rack.

3.2 ODU Installation

Caution:

For antennas larger than 1.2m, reinforcing poles are needed for windproof.

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 5(9)
ZXMW NR8250 Quick Installation & Commissioning Guide

Step Picture Installation Note

1+0 Buckle Installation


1 Align the antenna interface of
the ODU with the feeder
source, insert it into the
waveguide interface of the
antenna, and verify that the
screw hole on the ODU is
aligned with the corresponding
screw hole on the antenna

1+1 Buckle Installation


1 Install the combiner on the
feeder source of the antenna

2 Install two ODUs on the two


sides of the combiner

2+0 Buckle Installation

1 Install the OMT on the feeder


source of the antenna

6 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Step Picture Installation Note

2 Install two ODUs on the two


sides of the OMT

3 After ODU is installed, use


polarization adjustment
assembly to slightly adjust
horizontal or vertical position of
OMT (adjustment range is ±
5°).

1+0 Separate Installation (Single-Polarization)

1 Install the ODU installation


bracket on the pole

2 Install the ODU on the ODU


installation bracket

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 7(11)
ZXMW NR8250 Quick Installation & Commissioning Guide

Step Picture Installation Note

3 Install the UDR end of the


flexible waveguide on the
single-polarized antenna, and
install the PDR end of it on the
ODU installation bracket

1+1 Separate Installation (Single-Polarization)

1 Install the combiner on the


ODU installation bracket

2 Install the two ODUs on the


combiner

3 None Install the UDR end of the


flexible waveguide on the
single-polarized antenna, and
install the PDR end of it on the
ODU installation bracket

8 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Step Picture Installation Note

2+0 Separate Installation (Dual-Polarization)

1 Install two ODU installation


brackets on the pole

2 Install two ODUs on the two


ODU installation brackets
respectively

3 Install the UDR ends of the two


flexible waveguides on the
dual-polarized antenna, and
install the PDR ends of the two
flexible waveguides on the two
ODU installation brackets
respectively

2+2 Separate Installation (Dual-Polarization)

1 Install the two combiners on


the two ODU installation
brackets respectively

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 9(13)
ZXMW NR8250 Quick Installation & Commissioning Guide

Step Picture Installation Note

2 Install the four ODUs on the


two combiners respectively

3 None Install the UDR ends of the two


flexible waveguides on the
dual-polarized antenna, and
install the PDR ends of the two
flexible waveguides on the two
ODU installation brackets
respectively

3.3 Cable Installation

3.3.1 Installing the Protective Grounding Cable


Step Picture Installation Note

Grounding cable installation for IDU.


1.Grounding Nut
2.IDU Grounding Point
1
Note:
The cross-sectional area of the IDU protective
2
grounding cable is 10 mm .

10 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Grounding cable installation for ODU.


1. Grounding screw (ground)
2 2. Grounding Cable
The cross-sectional area of the ODU
2
protective grounding cable is 16 mm .

3.3.2 Installing the Power Cable


Step Picture Installation Note

1 Prepare the cable terminal.

Connect the cable on the IDU end


Note:
The -48 V power cable and the IDU share
a grounding point. Before installing the
power cable, installation personnel should
first loosen the screws, and then install the
two grounding terminals on the grounding
point.
Test the -48VGND of IDU Power Board,
2
and the other to public grounding line of
the rack which the IDU installed. If the
display resistance is less than 10Ω , the
connection is correct.
Test the -48V core of cable of IDU Power
Board, and the other to public grounding
line of the rack which the IDU installed. If
the display resistance is more than 1kΩ ,
the connection is correct.

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 11(15)
ZXMW NR8250 Quick Installation & Commissioning Guide

Step Picture Installation Note

3 Connect the cable on the DCDB end

3.3.3 Installing Signal Cable


Step Picture Installation Note

1 Install 75Ω E1 cable.

2 Install 120Ω E1 cable.

3 Install Ethernet cable.

Installing the XPIC Cross-Connect Cables in


2+0 Mode
In the 2+0 XPIC cross-connect cable
4
installation mode, RMUC boards are inserted
into slot 3 and slot 4, or slot 5 and slot 6, or
slot 7 and slot 8. Refer to Table 3-1

12 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Installing the XPIC Cross-Connect Cables in


2+2 Mode
In the 2+2 XPIC cross-connect cable
installation mode, RMUC boards are inserted
5
in slot 5, 6, 7, and 8. The RMUC boards in
slot 5 and slot 7 are cross-connected, and the
RMUC boards in slot 6 and slot 8 are
cross-connected. Refer to Table 3-2

Table 3-1 2+0 XPIC Connection

XPIC Cross-Connect Cable No. RMU RMU

1 X_IN X_OUT

2 X_OUT X_IN

Table 3-2 2+2 XPIC Connection

XPIC Cross-Connect
RMUC (Slot 5) RMUC(Slot 6) RMUC(Slot 7) RMUC(Slot 8)
Cable No.

1 X_IN - X_OUT -

2 X_OUT - X_IN -

3 - X_IN - X_OUT

4 - X_OUT - X_IN

3.3.4 Installing the Optical Fiber


Step Picture Installation Note

1 Insert or check the optical module.

2 Install the optical fiber

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 13(17)
ZXMW NR8250 Quick Installation & Commissioning Guide

3.3.5 Installing Intermediate Frequency Cable


Step Picture Installation Note

Prepare the IF cable connector.


Caution:
To protect the N-type connector,
installation personnel can only use
hand or torque wrench to fasten the
N-type connector. The N-type
1 connector can be a straight connector
or a bending connector.
To protect the N-type connector and
IF interface, it is prohibited to use the
N-type connector of IF cable or the IF
interface of ODU as a fulcrum when
routing or bending the IF cable.

Connect IF cable on the ODU end.


After Connected, refer to AppB
Waterproofing an Outdoor Connector.
2 In accordance with the designed
distance between the IDU and an
ODU, cut the IF cable with a margin
from three meters to five meters.

A: The IF cable is higher than the lower edge of the


feeder window

Routing the IF Cable Indoors


Caution:
3
After the IF cable test is passed,
B: The IF cable is lower than the lower edge of the
waterproof the feeder window.
feeder window

14 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Step Picture Installation Note

4 Connect IF cable on the IDU end.

Grounding the IF Cable


5 Please Refer to AppA Grounding the
IF Cable.

4 Antenna Adjustment

4.1 Adjusting the Polarization Mode of an Antenna


Context

A feeder source supports two polarization modes:

 Vertical polarization.

The polarization arrow on the feeder source is aligned with the mark "V" on the
antenna.
Picture Note

1. Alignment pin of the feeder


source
2. Polarization mark arrow
3. Screw
4. Feeder source

 Horizontal polarization:

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 15(19)
ZXMW NR8250 Quick Installation & Commissioning Guide

The polarization arrow on the feeder source is aligned with the mark "H" on the
antenna.

Step

1. Loosen the four screws on the feeder source.

2. Rotate the feeder source 90°clockwise.

Figure 4-1 Adjusting Vertical Polarization to Horizontal Polarization

3. Fasten the four screws on the feeder source.

Note:

The horizontal polarization adjustment uses the same method as the vertical polarization
adjustment. Users can perform adjustment in accordance with the actual requirement.

4.2 Adjusting the Azimuth of an Antenna


Context

 The range of antenna azimuth fine adjustment is ±15°.

16 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

 If the fine adjustment range is not big enough, users can change the position of the
anti-falling angle steel and continue the adjustment. The U-type clamp must be used
to fix the bracket in adjusting the anti-falling angle steel position.

 The installation components that must be adjusted during antenna azimuth


adjustment.
Picture Note

Antenna Adjustment Installation Components


1. Azimuth fine-adjustment
bolt
2. Fine-adjustment bolt and
nut
3. Bracket-connection bolt
4. Nut on the U-type clamp
5. U-type clamp

Step

1. Perform a coarse adjustment of the antenna azimuth.

i. Disassemble the azimuth fine-adjustment bolt and the bracket-connection bolt.

ii. Loosen the nut on the U-type clamp and the fixing screw above the reinforcing
pole.

iii. Use hand to push the antenna or reinforcing pole gently, and adjust the
antenna azimuth around the pole.

Caution:

During the adjustment, be very careful not to make the clamp fall from the anti-falling angle
steel lest any accident might occur.

2. In accordance with the circuit design, determine the antenna azimuth through
visualization or a compass, and adjust the antenna azimuth.

3. After the adjustment is completed, fasten all components that are loosened.

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 17(21)
ZXMW NR8250 Quick Installation & Commissioning Guide

4.3 Adjusting the Down tilt of an Antenna


Context

 The range of antenna downtilt fine adjustment is ±10°.

 The installation components that must be adjusted during antenna downtilt


adjustment.
Picture Note

1. Downtilt fine-adjustment screw


2. Downtilt fine-adjustment nut
3. Downtilt fixing bolt

Step

1. Loosen the downtilt fixing bolts.

2. Rotate the downtilt fine-adjustment nut on the downtilt fine-adjustment screw.

3. Adjust the antenna downtilt, and fasten the downtilt fine-adjustment nut tightly.

5 Installation Check
SN Checking Items Result
The antenna, combiner, ODU installation bracket and ODU are within the
lightning rod's protection range. The protection angle of the antenna's lightning □Pass
1
rod must be less than 45°. In areas with high mountains or frequent □Fail
thunderstorm, the protection angle must be less than 30°.

If the IF cable is shorter than 20 m, it must be grounded at the first two


grounding points, as mentioned above.
If the IF cable is longer than 20 m but shorter than 60 m, it must be grounded at □Pass
2
the three grounding points, as mentioned above. □Fail
If the IF cable is longer than 60 m, an additional grounding point must be made
for every additional 20 m IF cable.

18 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

SN Checking Items Result

Waterproof and sealing handling must be performed for all outdoor connectors □Pass
3
and grounding clips in accordance with the specification. □Fail

The IF cable is not folded or twisted, and the shielding layer is not bare. After □Pass
4
the IF cable is led out of ODU, make the waterproof bend for it. □Fail

The cabinet's grounding cable, IDU's and ODU's grounding cable are □Pass
5
connected properly. □Fail

6 Power-On and Power-Off

6.1 Power-On Procedure

Start

Turn all switches on IDU to OFF

Turn on the Power distribution cabinet


connected the IDU

Measure the voltage inputted to the No Troubleshoot the


cabinet see whether it is between -
power supply faults
40 V DC and -60 V DC
Yes
Turn off the Power distribution cabinet
connected the IDU

Connect the IDU power cable to the power


supply

Turn on the Power distribution cabinet


connected to the IDU

Turn all switches on IDU to ON

End

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 19(23)
ZXMW NR8250 Quick Installation & Commissioning Guide

6.2 Power-Off Procedure

Start

Yes
Whether there is any Back up the data and implement
data to be backed up? performance statistics

No
Turn off the power cabinet
connected to the IDU

End

7 Commissioning

7.1 Data Preparation

 If the project has a DLD or LLD file, all date sources are from DLD or LLD file.

 If the project is not DLD file, data sources, respectively from the DO, Link Summary,
and Service Planning Table.

 Before commissioning, please check the connection of the E1 line impedance and
inserted board of impedance match, if not match, please refer to the Hardware
Installation Guide to complete the corresponding impedance E1 jump line.

 In this document, the commissioning only contains basic wireless parameters and
IDU network configuration, other services configuration refer to Configuration Guide.

7.2 Site commissioning


Step Configuration Description

Please input the login IP in IE browser address bar, enter the login page.
1 The IP address is:192.168.X.16 or 192.254.X.16
Note: x represents the slot number of master RCU board, its value is 1 or 2.

20 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Step Configuration Description


Web browser: Microsoft Internet Explorer 7, 8 or 9. Internet Explorer 8 is recommended.

Enter admin in User Name and Password, click LOGIN to log in to WEB LMT.

Initial configuration: Select Setup > System > Parameter. Configure Site ID/NE ID/Device IP
address/Subnet Mask/Default Gateway.
Sources of Data: Site ID and NE ID taken from Link Summary, Device IP address/Subnet
Mask/Default Gateway taken from Service Planning Table

 Initial configuration: Select Setup > System > Time, configure Time Zone Management.
4
Select local time zone in Time Zone Management drop-down box.

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 21(25)
ZXMW NR8250 Quick Installation & Commissioning Guide

Step Configuration Description

System Time Management: Set the local time and date.

Summer Time Management: Enable the Summer Time, and sets the start time and end time
of the DST system.

Configuring Board: Select Setup > Shelf. The shelf and board configuration page is displayed.
Based on the physical boards actually inserted in Indoor Unit (IDU)'s slots, set the following
information for each Slot NO.: Board Type.
Sources of Data: DO Bills

Configuring the Connection Between NE and NMS: Select Setup > NMS. The NMS
6
configuration page is displayed.

22 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Step Configuration Description


Enter the network management VLAN ID, and then click Apply.
Select the required bandwidth, and then click Apply.
Sources of Data: Service Planning Table

Configuring the PLA Function (Only Used XPIC Link):


1. Select Radio Link > PLA. The PLA configuration page is displayed.

2. Click Add. The PLA Configuration dialog box is displayed.


3. From the PLA Type drop-down list, select the PLA type to be configured, Such as Basic
PLA.
4. Select Aggregation Direction. The aggregation direction should be configured to two
7
through four.
5. From the Master Port drop-down list, select a master port. Select the default value.
6. Click Apply.

Configuring the XPIC Function (Only Used XPIC Link):


8 Select Radio Link > XPIC. In the right pane, click Add. The XPIC Configuration dialog box is
displayed.

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 23(27)
ZXMW NR8250 Quick Installation & Commissioning Guide

Step Configuration Description


Set XPIC Status to Enable.
Set the polarization direction of the RMUC/RMUH transmit unit. For the RMUC/RMUH
transmit units in the same XPIC group, the polarization directions should be H and V
respectively.
Select Auto to the XPIC Mode, and click Apply.
Sources of Data: Service Planning Table

Transmission Unit Information: Select Radio Link > Basic Configuration. Select slot number
of the desired configuration in Transmission Unit Name. Set Name/Link ID in Transmission
Unit Information. click Apply.
Sources of Data: Service Planning Table and Link summary

Work Mode Configuration


Configure the work mode for transmit units 5 and 6 in the radio link configuration page. The
9 Bandwidth in work mode must be the same.
For RMUC, the bandwidth can be 28 M, 40 M, or 56 M.
For RMUH, the bandwidth can be 7 M, 14 M, 28 M, 40 M, or 56 M.
Sources of Data: Link Summary。

RF Parameter Configuration: Ensure that the Current Tx frequency and Set Tx Frequency are
the same, and Current TX Power and Set Tx Power are the same.
Select frequency space in T/R Spacing. If select Other in T/R Spacing, you need set channel
frequency in RX Frequency Configuration.
Sources of Data: Link summary

24 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

Step Configuration Description

7.3 Configuration Check


Step Configuration Description

Select Radio Link > Basic Configuration > RF Parameter Configuration, the RF
Parameter Configuration is displayed. Check whether Current RSL and both ends reception
level and the design of the Link Summary value consistent. (RSL should be 3 dB more or less
than the design value.)

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 25(29)
ZXMW NR8250 Quick Installation & Commissioning Guide

Check RMUX board panel lights, if the LINK light for the green normally on, shows that the link
is normal.

Select Radio Link >Neighbor NE, the Neighbor NE is displayed. Check the opposite end NE
information, and click the opposite end NE IP Address, If you can log in to the end of the IDU
equipment, it indicates that the link has been properly opened.

Check link XPI value for XPIC configuration. Follow customers’ requirements on XPI value
(normally not lower than 25).
Select Performance > XPIC > 15 Min, the XPIC 15minute Performance statistics is displayed.
Select slot number in Position and query date in Date, click Query.

If the link is invalid while configurations are correct, please use ETP-Debugger tool to collect
5
IDU information and feedback to troubleshooting staff of microwave product support team.

26 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

AppA Grounding the IF Cable


The following describes the antenna grounding requirements:

 If the antenna is installed on the metal tower, the IF cable should be grounded at a
point about 1-2 m below the ODU, and then be grounded at a point 1.5 m before the
bent part where the cable is routed downwards along the tower. Before the IF cable
is led into the equipment room, the cable must also be grounded at a grounding
point.

 If the IF cable is shorter than 20 m, it must be grounded at the first two grounding
points, as mentioned above.

 If the IF cable is longer than 20 m but shorter than 60 m, it must be grounded at the
three grounding points, as mentioned above.

 If the IF cable is longer than 60 m, an additional grounding point must be made for
every additional 20 m IF cable.

1. Select a proper position to install the grounding clip, and cut the IF cable sheath in
accordance with the grounding clip size. The following figure shows the structure of
the grounding clip.

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 27(31)
ZXMW NR8250 Quick Installation & Commissioning Guide

1. Grounding terminal 2. Grounding cable 3. IF cable 4. Grounding cable clamp spring 5. Outer copper wire of the IF

cable 6. Copper sheet of the grounding cable

2. Route the down-lead of the grounding clip connected by the IF cable towards the
grounding network, and verify that the included angle between the grounding cable
and the IF cable must be not more than 15°.

3. Waterproof and seal the connection part between the grounding clip and the IF
cable in "1+3+3" mode, which involves one layer of PVC insulating tape, three
layers of waterproof cement, and three layers of insulating tape.

28 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.


ZXMW NR8250 Quick Installation & Commissioning Guide

AppB Waterproofing an Outdoor Connector


 The waterproof handling for an outdoor connector is often described as the "1+3+3"
mode. In other words, the connector is wrapped with one layer of PVC insulating
tape, three layers of waterproof cement, and three layers of PVC insulating tape.

 The waterproof handling tapes are wrapped on the connector until 3-5 cm below it.
step Picture Note

Insert the IF cable into the


1
ODU and fasten the cable.

Wrap the connector with one


2 layer of PVC insulating tape
from bottom to top.

ZTE Confidential Proprietary © 2015 ZTE Corporation. All rights reserved. 29(33)
ZXMW NR8250 Quick Installation & Commissioning Guide

step Picture Note

Wrap the connector with three


layers of waterproof cement in
the following manner:
from bottom to top, from top to
bottom, and from bottom to
3 top.
Wrap three layers of PVC
insulating tape in the following
manner: from bottom to top,
from top to bottom, and from
bottom to top.

Waterproof cement PVC insulating tape

Use anti-ultraviolet cable ties


4 to bind the two ends of the
tape tightly

1. Anti-ultraviolet cable tie

30 © 2015ZTE CORPORATION. All rights reserved. ZTE Confidential & Proprietary.

Anda mungkin juga menyukai