I Pekerjaan Persiapan
1 Pengukuran dan Bouplank 1.000 Ls
2 Direksi Keet dan gudang 1.000 Ls
V Pekerjaan Atap
1 Gording, jurai & nok kayu lokal 0.216 m3
2 Rangka Atap (kaso dan reng) lokal 46.640 m2
3 Penutup atap genteng press 46.640 m3
4 Kerpusan termasuk papan reuter 6.000 m1
5 Lisplank atap kayu lokal 10.000 m2
VI Pekerjaan Plafond
1 Plafond Asbes Kerang 44.000 m2
2 List Plafond Kayu Polos 1x3 cm meranti 72.700 m1
XV Pekerjaan Teras
1 Galian Tanah Pondasi 0.288 m3
2 Urugan Pasir Bawah Pondasi t = 5 cm 0.036 m3
3 Pondasi Batu Kali 1 : 7 0.098 m3
4 Urugan Tanah Samping Pondasi 0.029 m3
5 Pondasi Rolaagh 4.500 m'
6 Kolom Praktis Beton 10/10 0.080 m3
7 Ring Balok Beton 10/12 0.054 m3
8 Pasangan Batu Bata Tasraam 1 : 4 0.800 m3
9 Pasangan Batu Bata 1 : 7 6.600 m3
10 Plesteran Dinding Trasraam 1 : 4 1.600 m2
11 Plesteran Dinding 1 : 7 3.300 m2
12 Pengecatan Dinding 4.900 m2
13 Gording,jurai, & nok kayu lokal 6/12 0.043 m3
14 Rangka Atap Kaso kayu Lokal 15.000 m2
15 Genteng Press Penutup atap 15.000 m2
16 Kerpus teramsuk Papan Reuter 3.000 m'
17 Talang BJLS 30 0.288 m2
18 Lisplank atap Kayu Lokal 9.000 m2
19 Plat Leuvel 0.105 m3
TOTAL -
1 M2 PLESTERAN 1PC : 3PS
Pekerja 0.2000 35,000.00 7,000.00
Mandor 0.0100 44,625.00 446.25
Tukang batu 0.2000 39,375.00 7,875.00
Kepala tukang batu 0.0200 44,625.00 892.50
1 KG PENULANGAN BETON
Besi beton 1.0500 kg 11,950.00 12,547.50
Bendrat 0.0150 kg 14,200.00 213.00
1 M2 BONGKAR BEKISTING
Pekerj a 0.0133 35,000.00 465.50
Mandor 0.0013 44,625.00 58.01
Tukang kayu 0.0333 44,625.00 1,486.01
J umlah
Upah di Lt. 2 ( x 1,09 ) 2,190.38
Upah di Lt. 3 ( x 1,12 ) 2,250.67
Upah di Lt. 4 ( x 1,135 ) 2,280.81
1 M3 GORDING
Kayu kamper 1.0500 m3 6,950,000.00 7,297,500.00
Paku 1.1500 kg 14,200.00 16,330.00
1 m2 PASANG PAVING
Pekerja 0.2000 35,000.00 7,000.00
Tukang batu 0.0800 39,375.00 3,150.00
Kepala Tukang 0.0075 44,625.00 334.69
Mandor 0.0120 44,625.00 535.50
8,078.75
24,292.50
25,751.74
26,238.15
26,481.36
16,213.75
6,815.00
23,028.75
24,487.99
24,974.40
25,217.61
692.19
5,276.25
5,968.44
6,443.30
6,601.59
6,680.73
407,118.75
58,279.38
465,398.13
470,643.27
472,391.65
473,265.84
507,150.00
85,868.13
593,018.13
600,746.26
603,322.30
604,610.32
12,760.50
688.14
13,448.64
13,510.58
13,531.22
13,541.54
39,010.00
15,658.13
54,668.13
56,077.36
56,547.10
56,781.97
43,245.80
16,645.13
59,890.93
61,388.99
61,888.34
62,138.02
125,280.00
18,663.75
143,943.75
145,623.49
146,183.40
146,463.36
125,280.00
19,363.75
144,643.75
146,386.49
146,967.40
147,257.86
128,280.00
19,363.75
147,643.75
149,386.49
149,967.40
150,257.86
2,009.53
2,190.38
2,250.67
2,280.81
2,550,089.46
3,056,322.85
3,162,075.97
6,778,289.98
6,844,299.54
6,866,302.72
6,877,304.31
4,114,156.98
4,147,608.13
4,158,758.52
4,164,333.71
4,651,978.67
4,687,905.56
4,699,881.19
4,705,869.00
5,759,339.96
5,799,347.74
5,812,683.67
5,819,351.64
5,203,633.01
5,244,364.54
5,257,941.72
5,264,730.31
5,305,775.62
5,356,195.29
5,373,001.85
5,381,405.13
5,421,228.78
5,472,827.18
5,490,026.64
5,498,626.38
6,558,763.11
6,605,822.59
6,621,509.09
6,629,352.33
6,230,531.55
6,277,864.45
6,293,642.08
6,301,530.90
5,346,430.22
5,398,192.20
5,415,446.19
5,424,073.18
5,834,079.28
5,886,514.17
5,903,992.47
5,912,731.62
4,699,798.24
4,751,091.34
4,768,189.03
4,776,737.88
3,832,376.43
3,865,423.82
3,876,439.61
3,881,947.51
4,449,564.04
4,491,279.18
4,505,184.23
4,512,136.75
5,134,996.58
5,173,927.60
5,186,904.61
5,193,393.11
3,722,888.99
3,755,317.05
3,766,126.40
3,771,531.08
4,295,128.45
4,332,249.53
4,344,623.22
4,350,810.07
2,349,932.78
2,371,923.86
2,379,254.22
2,382,919.39
3,098,199.16
3,129,808.21
3,140,344.56
3,145,612.73
2,077,715.89
2,844,029.79
71,030.00
15,343.13
86,373.13
87,754.01
88,214.30
88,444.45
7,313,830.00
395,237.50
7,709,067.50
7,744,638.88
7,756,496.00
7,762,424.56
70,720.00
19,052.95
89,772.95
91,487.72
92,059.30
92,345.10
209,096.00
121,038.75
330,134.75
341,028.24
344,659.40
346,474.98
840,000.00
2,369,023.17
2,303,435.23
1,845,000.00
510,000.00
13,626,000.00
1,740,000.00
4,890,000.00
1,545,000.00
1,125,000.00
915,000.00
1,845,000.00
2,340,000.00
990,000.00
660,000.00
1,140,000.00
570,000.00
240,000.00
300,000.00
855,000.00
72,004.19
16,441.25
88,445.44
89,925.15
90,418.39
90,665.01
73,927.00
17,975.56
91,902.56
93,520.36
94,059.63
94,329.26
65,927.00
16,441.25
82,368.25
83,847.96
84,341.20
84,587.82
6,126.00
5,169.06
11,295.06
11,760.28
11,915.35
11,992.89
24,180.00
5,169.06
29,349.06
29,814.28
29,969.35
30,046.89
20,852.50
3,167.94
24,020.44
24,305.55
24,400.59
24,448.11
11,020.19
77,120.19
88,140.38
DAFTAR HARGA BAHAN DAN UPAH TENAGA
BAHAN:
Balok konsol
BK1 (30 X 40/60 ) 52.25 7.84 m
5.878125 m3 5.15625
LANTAI 2 ( DUA )
Kolom h.4.25 m Dimensi jumlah ( tiang ) Volume
K2 ( 45 X 45 ) 38 32.70 m3
K4 ( 40 X 40 ) 2 1.36 m3
K5 ( 30 X 30 ) 2 0.77 m3
PLAFOND -2
Luas lt 2 1,360.00 Gypsumboard 1,387.63 m2
+ selasar belakang 122.63
1,482.63
lavatory 35 Calsiboard 304.98 m2
lubang tangga 60.00
95
konsol 269.98
LANTAI 3 (TIGA )
Kolom h.4.25 m Dimensi jumlah ( tiang ) Volume
K3 ( 40 X 40 ) 58 39.44 m3
K4 ( 40 X 40 ) 2 1.36 m3
K5 ( 30 X 30 ) 2 0.77 m3
PLAFOND -3
Luas lt 2 1,360.00 Gypsumboard 1,365.13 m2
+ selasar belakang 122.63
1,482.63
lavatory 35 Calsiboard 250.99 m2
void 22.5
lubang tangga 60.00
117.5
KONSOL
konsol 2.20 m 215.99
genting / usuk reng 215.99 m2
canal 1,805.44 kg
jarum gording Ø 10 mm 59.20 kg
nok konsol 102.85 m'
Listplank 107.25 m'
konsol 4 m
genting / usuk reng 224.70 m2
canal 1,033.06 kg
jarum gording Ø 10 mm 33.30 kg
nok konsol 56.18 m'
Listplank 58.85 m'
LANTAI 4 (EMPAT )
Kolom h.4.25 m Dimensi jumlah ( tiang ) Volume
K4 ( 40 X 40 ) 40 27.20 m3
K5 ( 30 X 30 ) 2 0.77 m3
KERAMIK
keramik 40 x 40
luas lt 4 1,360.00 keramik lt 40 x 40 1,242.50 m2
1,360.00
lubang tangga 4 bh 60.00
void 22.50
lavatory 35.00
117.50
PLAFOND
KONSOL 2.20 m
genting / usuk reng 344.19 m2
canal 2,877.12 kg
jarum gording Ø 10 mm 92.50 kg
nok konsol 156.45 m'
Listplank 163.90 m'
RANGKA BAJA
2 18.14 12.26
2 20.6 12.26
2 23.1 12.26
2 25.5 12.26
2 27.9 12.26
2 30.5 12.26
2 32 12.26
2 35.4 12.26
Profil Jumlah panjang berat ( kg/m )
Jarum gording Ø 10 mm 168 1.5 0.62
2 8.14 12.26
2 10.6 12.26
2 13.1 12.26
2 15.5 12.26
2 17.9 12.26
2 20.5 12.26
2 22 12.26
2 25.4 12.26
Volume
27.5625 m3
24.75 m3
m2
19 bh
m2
m2
m'
m'
m'
volume di lantai
108.525 2
134.685 3
153.3 4
27.12 5
22.776 6
23 bh
volume
133.35
19 bh
12 bh
volume
151.8
31 bh
berat total ( kg )
3,449.60
1,593.90
2,202.20
7,245.70 kg
773.46
820.05
796.75 kg
79.56
142.89
205.97
269.30
332.64
395.97
459.31
467.03
530.37
594.73
656.52
718.31
785.25
823.87
911.41 7,373.14 kg
berat total ( kg )
163.17 163.17 kg
319.2 319.2 kg
661.5 m2
97.5 m
114.6 m
berat total ( kg )
1,724.80
1,593.90
2,202.20
5,520.90 kg
773.46
820.05
796.75 kg
79.56
142.89
205.97
269.30
332.64
395.97
459.31
209.57
272.91
337.27
399.06
460.85
527.79
566.41
653.95 5,313.46 kg
berat total ( kg )
135.975 135.975 kg
212.8 212.8 kg
315 m2
87.5 m
94.6 m