Anda di halaman 1dari 2

WELL CONTROL DATA SHEET for VERTICAL WELLS Wt. & Wt.

METHOD
Well Name: ??? Location: ??? Rig: ??? Date: 99-10-22 Engineer:
Well TD ft 12000 Hole Size in 7 7/8 Drill Collars OD in 6 1/4 Drill Collar Length
Drill Pipe OD in 4 1/2 Drill Pipe ID in 3 7/8 Drill Pipe Wt. lb/ft 16.4 Mud Weight p
Last Csg ID in 8 1/8 Csg Wt. Lb/ft 24.00 Last Csg Set at TD ft 9000 Leak Off Gradient psi
SIDPP psi 500 SICP psi 1040 Pit Gain bbl 20.0
Pump Efficiency 96.0% Slow P.strks/min 1 Slow Speed P.Pressure psi 700 Mud Tank Volume b
Pump Liner Sz in 5 1/2 Pump Rod Sz in 0 Stroke Length in 12 Working Pumps
VOLUMES and PUMPING TIMEs
Length ft bbl/ft Capacity gal/ft bbl Volume gal Time (min) Pump Strokes
Drill Pipe 12000 0.0146 0.613 175.0 7352 1986 1986
OH Annulus 3000 0.0406 1.704 121.7 5112 1381 1381
Csg Annulus 9000 0.0445 1.867 400.1 16805 4539 4539
Hole Totals 696.9 29269 7905 7905
Mud Tanks 800.0 33600 9075 9075
TOTAL MUD 1496.9 62869 16980 16980
Baryte Vol. Gain 61.0 2563 692 692
### ### CALCULATIONS for KILLING THE WELL Pump Output= 0.0846
Initial Kick Fluid Gradient: 0.072 psi/ft I. C. Pressure (RSPP + SIDDP) = 1200
Possible Kick type: Gas Final Circulating Pressure = 737
Hydrostatic Pressure at TD = 9360 psi Mud Wt. Increase = 0.80
Formation Press = 9860 psi Kill Mud Wt. = 15.80
Csg Shoe Fracture Pressure = 9000 psi Baryte Addition = 1.45
MACP with Original mud in csg = 1986 psi Total Baryte = 90912
New MACP with Kill Mud = 1610 psi Number of 40kg Sacks Required = 1031
Csg Shoe Pressure at Shut-in = 8055 psi Mixing Rate of = 0.06 40kg Sacks/min or
Csg Shoe Pressure with kick at Csg Shoe = 7966 psi Volume Gain from Baryte Addition = 61.0
Rate of D.P. Pressure Drop from Surface to the Bit = 10 psi per 43 strokes
< Pump Strokes, Time in Minutes, D.P. Pressure (in psi) Reduction Schedule > Bit < Steady D.P. Press to
1200 ICP 1154 1107 1061 1015 969 922 876 830 784 737 FCP 737
strokes 0 199 397 596 794 993 1191 1390 1588 1787 1986 bit 2676
D R ILL PIP E P R E S S U R E , p s i

min 0 199 397 596 794 993 1191 1390 1588 1787 1986 2676

1300
11 5 4 p si

DRILL PIPE PRESSURE REDUCTION SCHEDULE


11 0 7 p si

1 0 6 1 p si

1200
1 0 1 5 p si

1100
9 6 9 p si

9 2 2 p si

8 7 6 p si

1000
8 3 0 p si

7 8 4 p si

900
7 3 7 p si

7 3 7 p si
800

700

600
PUMP STROKES
500
0 199 397 596 794 993 1191 1390 1588 1787 1986 2676 336
KICK at Csg SHOE GAS to SURFACE
500
500 1040 1200 1040 737 1017 0 1017 944
944 951 737
737 1922

Csg Csg
8055
8055 Shoe Pump is Kill Mud at Old Mud Wt. 7966
7966 Shoe at Pump Stks
The Well is started the Bit. 5919
5919
Shut-in & and I.C. and Final Pump's Off Kick's out
Pressures Pressure Circulating and the at Pump Stks at Pump Stks
Pump Stks Stabilized Pump Stks established Pump Stks Pressure Pump Stks Well is Pump Stks 3366
3366 Pump Stks 7905
7905
set @ 0 40 1986 is in Effect 1986 Shut-in 1100 New MACP 4757
4757 Kill Mud's up
OD
????
Collar Length ft 600
Mud Weight ppg 15.00
Gradient psi/ft 1.00
BOP psi 5000
ank Volume bbl 800
rking Pumps No 1 pump

ump Strokes
1986
1381
4539
7905
9075
16980
692
bbl/min
psi
psi
ppg
ppg
ppg
lbs
sacks
5 lbs/min
bbls

y D.P. Press to Surface >


737 737
3366 csg 7905
3366 7905

EDULE
7 3 7 p si

7 3 7 p si

7 3 7 p si

2676 3366 7905

0
0 0
0

The Pump
Stopped
and the
Well is
Pump Stks SHUT-IN
7905

Anda mungkin juga menyukai