I. UPAH KERJA
1 Pekerja Org/ Hr Rp 90,000.00
2 Tukang Batu/Kayu/Besi/Cat Org/ Hr Rp 145,000.00
3 Kepala Tukang Org/ Hr Rp 175,000.00
4 Mandor Org/ Hr Rp 175,000.00

II. BAHAN - BAHAN

1 Pasir Urug m3 Rp 125,400.00


2 Tanah Urug m3 Rp 107,500.00
3 Pasir Pasang m3 Rp 125,400.00
4 Pasir Beton Kg Rp 125,400.00
5 Kerikil Beton Kg Rp 152,200.00
6 Batu Kali/Bela m3 Rp 168,900.00
7 Batu Bata Bh Rp 1,200.00
8 Batako Bh Rp 2,000.00
9 Semen Protland Kg Rp 1,180.00
10 Semen Warna Kg Rp 1,600.00
11 Kapur Kg Rp 2,500.00
12 Kuku Keramik Polos Bh Rp 1,000.00
13 Kramik Ukuran 30 x 30 cm Bh Rp 6,861.11
14 Kramik Ukuran 20 x 20 cm Bh Rp 2,080.00
15 Atap Genteng Metal Lbr Rp 42,500.00
16 Bubungan Atap Genteng Metal Bh Rp 27,500.00
17 Seng Gelomang Lbr Rp 53,300.00
18 Seng Plat m1 Rp 15,000.00
19 Besi Strip tebal 5 mm Kg Rp 50,000.00
20 Besi Beton Polos Kg Rp 9,500.00
21 Benrat Kg Rp 15,000.00
22 Kayu Kelas II m3 Rp 3,510,000.00
23 Kayu Kelas III m3 Rp 1,690,000.00
24 Kaca Bening t : 5 mm m2 Rp 75,000.00
25 Balok Kayu Btng Rp 25,000.00
26 Tripleks 3 mm Lbr Rp 38,000.00
27 Teakwood Lbr Rp 65,000.00
28 Playwood Lbr Rp 95,000.00
29 List Plafond m1 Rp 5,500.00
30 Paku Biasa Kg Rp 15,000.00
31 Paku Biasa 1/2'' - 1'' Kg Rp 15,000.00
32 Paku Atap Genteng Metal Kg Rp 22,500.00
33 Paku Seng Kg Rp 25,000.00
34 Paku Tripleks Kg Rp 20,000.00
35 Kloset Jongkok Unit Rp 350,000.00
ARGA BAHAN DAN UPAH

Ket.
36 Wastafel Unit Rp 300,000.00
37 Floor drain Bh Rp 35,000.00
38 Pipa PVC 1/2 M1 Rp 5,775.00
39 Pipa Gip 3/4" M1 Rp 7,625.00
40 Pipa PVC AW Dia. 3/4" M1 Rp 3,500.00
41 Kran Air Bh Rp 20,000.00
42 Bugel, Angker, Mur, Baut Kg Rp 75,000.00
43 Dempul Kayu Kg Rp 12,500.00
44 Meni Kayu Kg Rp 15,000.00
45 Cat Tembok Kg Rp 12,000.00
46 Plamur Tembok Kg Rp 13,500.00
47 Vernis/Politur Kg Rp 40,000.00
48 Residu Ltr Rp 15,000.00
49 Cat Kayu Kg Rp 35,000.00
50 Minyak Cat Ltr Rp 15,000.00
51 Lem Kayu Kg Rp 20,000.00
52 Cet Seng Kg Rp 12,500.00
53 Kuas Kg Rp 20,000.00
54 Kabel Instalasi Rol Rp 150,000.00
55 Sekring Box Unit Rp 175,000.00
56 Stop Kontak Bh Rp 30,000.00
57 Saklar Ganda Bh Rp 25,000.00
58 Saklar Tunggal Bh Rp 17,500.00
59 Lampu XL 18 Watt Bh Rp 75,000.00
60 Lampu XL 11 Watt Bh Rp 67,500.00
61 Lampu TL 10 Watt Bh Rp 55,000.00
62 Lampu Downlike Bh Rp 65,000.00
63 Kertas Pasir Lbr Rp 15,000.00
64 Pas. Kunci Gembok Pintu Trali Besi Bh Rp 100,000.00
65 Pas. Engsel Pintu Trali Besi Bh Rp 55,000.00
66 Kunci Tanam Bh Rp 75,000.00
67 Engsel Pintu Bh Rp 17,500.00
68 Engsel Jendela Bh Rp 12,500.00
69 Kunci Pintu 2 Slaag Bh Rp 150,000.00
70 Kunci Pintu 1 Slaag Bh Rp 75,000.00
71 Grendel Pintu Bh Rp 17,500.00
72 Grendel Jendela Bh Rp 12,500.00
73 Hak Angin Bh Rp 7,500.00
74 Tarikan Jendela Bh Rp 5,000.00
75 Pipa Diameter 3" M1 Rp 16,000.00
76 Pipa Diameter 3/4" M1 Rp 7,500.00
77 Kabel Listrik SR. 4 x 16 M1 Rp 19,000.00
78 Tiang Listrik T 9 m Btg Rp 4,000,000.00
79 Tinag Listrik T 7 m Btg Rp 3,025,360.00
80 Tiang Listrik T 12 m Btg Rp 4,750,000.00
81 Air Ltr Rp 25.00
ENGGINER ESTIMATE (EE)

DAFTAR ANALISA HARGA SATUA


Pekerjaan :
Lokasi :
Tahun Anggaran :

No. URAIAN PEKERJAAN Satuan

1 2 3

A. PEKERJAAN TANAH DAN PASIR


1 An. SNI. 6.1. 1 M3 Galian Tanah Sedalam 1 m
Pekerja Org/Hari
Mandor Org/Hari
Jumlah
2 An. SNI. 6.9. 1 M Urugan Kembali Galian Tanah Sedalam 1 m
3

Pekerja Org/Hari
Mandor Org/Hari
Jumlah
3 An. SNI. 6.11. 1 M Urugan Pasir
3

Pasir Urug m3
Pekerja Org/Hari
Mandor Org/Hari

B. PEKERJAAN PONDASI
1 An. SNI 6.3. Memasang 1 m3 Pondasi Batu Bela Camp. 1 Pc : 5 Ps
Batu Bela / Batu Kali m3
Semen Protland Kg
Pasir Pasang m3
Pekerja Org/Hari
Tukang Batu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari

2 An. SNI 6.9. Memasang 1 m3 Pondasi Batu Kosong (anstamping)


Batu Bela / Batu Kali m3
Pasir Pasang m3
Pekerja Org/Hari
Tukang Batu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari

C. PEKERJAAN STRUKTUR BETON


1 An. SNI 6.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175).
Semen Protland Kg
Pasir Beton Kg
Krikil (maksimum 30 mm) Kg
Air Ltr
Pekerja Org/Hari
Tukang Batu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari

2 An. SNI 6.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175).
Semen Protland Kg
Pasir Beton Kg
Krikil (maksimum 30 mm) Kg
Air Ltr
Pekerja Org/Hari
Tukang Batu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari
HARGA SATUAN

Harga Bahan Upah Kerja Jumlah Harga


Koefisien (Rp) (Rp) (Rp)

4 5 6 7

0.750 Rp 90,000.00 Rp 67,500.00


0.025 Rp 175,000.00 Rp 4,375.00
Jumlah Rp 71,875.00

0.250 Rp 90,000.00 Rp 22,500.00


0.008 Rp 175,000.00 Rp 1,458.33
Jumlah Rp 23,958.33

1.200 Rp 125,400.00 Rp 150,480.00


0.300 Rp 90,000.00 Rp 27,000.00
0.010 Rp 175,000.00 Rp 1,750.00
Rp 179,230.00

1.200 Rp 168,900.00 Rp 202,680.00


136.000 Rp 1,180.00 Rp 160,480.00
0.544 Rp 125,400.00 Rp 68,217.60
1.500 Rp 90,000.00 Rp 135,000.00
0.750 Rp 145,000.00 Rp 108,750.00
0.075 Rp 175,000.00 Rp 13,125.00
0.075 Rp 175,000.00 Rp 13,125.00
Rp 701,377.60

1.200 Rp 168,900.00 Rp 202,680.00


0.432 Rp 125,400.00 Rp 54,172.80
0.780 Rp 90,000.00 Rp 70,200.00
0.390 Rp 145,000.00 Rp 56,550.00
0.039 Rp 175,000.00 Rp 6,825.00
0.039 Rp 175,000.00 Rp 6,825.00
Rp 397,252.80
326.000 Rp 1,180.00 Rp 384,680.00
760.000 Rp 71.43 Rp 54,286.80
1029.000 Rp 92.59 Rp 95,275.11
212.000 Rp 25.00 Rp 5,300.00
1.650 Rp 90,000.00 Rp 148,500.00
0.275 Rp 145,000.00 Rp 39,875.00
0.028 Rp 175,000.00 Rp 4,900.00
0.083 Rp 175,000.00 Rp 14,525.00
Rp 747,342

326.000 Rp 1,180.00 Rp 384,680.00


760.000 Rp 71.43 Rp 54,286.80
1029.000 Rp 92.59 Rp 95,275.11
212.000 Rp 25.00 Rp 5,300.00
1.650 Rp 90,000.00 Rp 148,500.00
0.275 Rp 145,000.00 Rp 39,875.00
0.028 Rp 175,000.00 Rp 4,900.00
0.083 Rp 175,000.00 Rp 14,525.00
Rp 747,342
CATATAN : (SNI 7394:2008 - ICS 91.010.20 - Badan Standardisasi Nasional)
a. Bobot isi pasir = 1400 Kg/m3
b. Bobot Isi Krikil = 1350 Kg/m3
3 An. SNI 6.21. Memasang 1 m2 bekisting untuk sloof
Kayu kelas III m3
Paku 5 cm – 10 cm Kg
Minyak bekisting Ltr
Pekerja Org/Hari
Tukang Kayu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari

4 An. SNI. 1 Kg Pekerjaan Pembesian dengan Besi Polos


Besi Beton Polos Kg
Kawat Beton Kg
Pekerja Org/Hari
Tukang Besi Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari
Jumlah
5 An. Praktis 1 M Upah Menyiram Bongkar Bekisting
2

Pekerja Org/Hari
Jumlah

6 An. Praktis 1 M3 Pekerjaan Sloof Ukuran (15 x 20 cm) Dengan Besi 120 Kg
Cor Beton M3
Bekisting M2
Besi Beton Kg
Perawatan dan Membongkar Cetakan Ls
Jumlah
7 An. Praktis 1 M3 Pekerjaan Kolom Kayu Ukuran (20 x 20 cm)
Balok kayu Kelas II m3
Besi strip tebal 5 mm Kg
Paku 12 cm Kg
Pekerja Org/Hari
Tukang Kayu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari
Jumlah
D. PEKERJAAN KONSTRUKSI KAYU
1 An. SNI 6.15. Memasang 1 m3 konstruksi Kuda - Kuda + gordeng, kayu kelas II
Balok kayu Kelas II m3
Besi strip tebal 5 mm Kg
Paku 12 cm Kg
Pekerja Org/Hari
Tukang Kayu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari

2 An. SNI. 1 M1 Pekerjaan Lisplang Papan Ukuran 2 x (3x20) kayu Kelas II


Papan Kayu Kelas II m3
Paku 5 cm dan 7 cm Kg
Pekerja Org/Hari
Tukang Kayu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari
Rp 71.43
Rp 92.59

0.045 Rp 1,690,000.00 Rp 76,050.00


0.300 Rp 15,000.00 Rp 4,500.00
0.100 Rp 750.00 Rp 75.00
0.520 Rp 90,000.00 Rp 46,800.00
0.260 Rp 145,000.00 Rp 37,700.00
0.026 Rp 175,000.00 Rp 4,550.00
0.026 Rp 175,000.00 Rp 4,550.00
Rp 174,225.00

1.050 Rp 9,500.00 Rp 9,975.00


0.015 Rp 15,000.00 Rp 225.00
0.007 Rp 90,000.00 Rp 630.00
0.007 Rp 145,000.00 Rp 1,015.00
0.0007 Rp 175,000.00 Rp 122.50
0.0003 Rp 175,000.00 Rp 52.50
Jumlah Rp 12,020.00

2.000 Rp 90,000.00 Rp 180,000.00


Jumlah Rp 180,000.00

1.000 Rp 747,341.9 Rp 747,341.91


8.000 Rp 174,225.00 Rp 1,393,800.00
120.000 Rp 12,020.00 Rp 1,442,400.00
1.000 Rp 180,000.00 Rp 180,000.00
Jumlah Rp 3,763,542

1.100 Rp 3,510,000.00 Rp 3,861,000.00


15.000 Rp 50,000.00 Rp 750,000.00
3.000 Rp 15,000.00 Rp 45,000.00
2.400 Rp 90,000.00 Rp 216,000.00
7.200 Rp 145,000.00 Rp 1,044,000.00
0.720 Rp 175,000.00 Rp 126,000.00
0.120 Rp 175,000.00 Rp 21,000.00
Jumlah Rp 6,063,000.00

1.100 Rp 3,510,000.00 Rp 3,861,000.00


15.000 Rp 50,000.00 Rp 750,000.00
3.000 Rp 15,000.00 Rp 45,000.00
2.400 Rp 90,000.00 Rp 216,000.00
7.200 Rp 145,000.00 Rp 1,044,000.00
0.720 Rp 175,000.00 Rp 126,000.00
0.120 Rp 175,000.00 Rp 21,000.00
Rp 6,063,000.00

0.015 Rp 3,510,000.00 Rp 52,650.00


0.060 Rp 15,000.00 Rp 900.00
0.150 Rp 90,000.00 Rp 13,500.00
0.250 Rp 145,000.00 Rp 36,250.00
0.0250 Rp 175,000.00 Rp 4,375.00
0.07500 Rp 175,000.00 Rp 13,125.00
Rp 120,800.00
E. PEKERJAAN LANGIT - LANGIT DAN ATAP
1 An. SNI 6.36. 1 m2 Pekerjaan Atap Seng Gelombang
Atap Seng Gelombang Lbr
Paku Seng Kg
Pekerja Org/Hari
Tukang Kayu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari
Jumlah
2 An. Praktis. 1 m Pasang Bubungan / Jurai Seng Plat L = 30 cm
1

Kayu Kelas III m3


Seng Plat Lbr
Paku Seng Kg
Pekerja Org/Hari
Tukang Kayu Org/Hari
Kepala Tukang Org/Hari
Mandor Org/Hari
Jumlah
F PEKERJAAN PENGECETAN
1 An. SNI. 1 M2 Pekerjaan Pengecatan Kayu (satu lapis Plamir), 1 Lapis Cat Dasar)
Cat Meni Kg
Plamir Kg
Cat Dasar Kg
Cat Penutup 2x Kg
Pekerja Org/Hari
Tukang Cat Org/Hari
Kepala Tukang Cat Org/Hari
Mandor Org/Hari
Jumlah
2 An. SNI. 1 M Peleburan Bidang Kayu dengan Cat Residu Atau Ter
2

Ter Residu Ltr


Pekerja Org/Hari
Mandor Org/Hari
Jumlah

Mengetahui
Kepala Badan Pemberdayaan
Masyarakat dan Pemerintah Desa
Kabupaten Parigi Moutong

Drs, M.S Tombolotutu


Nip. 196204121996031001
Drs, M.S Tombolotutu
Nip. 196204121996031001
0.700 Rp 53,300.00 Rp 37,310.00
0.020 Rp 25,000.00 Rp 500.00
0.150 Rp 90,000.00 Rp 13,500.00
0.007 Rp 145,000.00 Rp 1,015.00
0.008 Rp 175,000.00 Rp 1,400.00
0.008 Rp 175,000.00 Rp 1,400.00
Jumlah Rp 55,125.00

0.0012 Rp 1,690,000.00
1.100 Rp 15,000.00 Rp 16,500.00
0.004 Rp 25,000.00 Rp 100.00
0.150 Rp 90,000.00 Rp 13,500.00
0.007 Rp 145,000.00 Rp 1,015.00
0.008 Rp 175,000.00 Rp 1,400.00
0.008 Rp 175,000.00 Rp 1,400.00
Jumlah Rp 33,915.00

0.200 Rp 35,000.00 Rp 7,000.00


0.150 Rp 13,500.00 Rp 2,025.00
0.170 Rp 12,000.00 Rp 2,040.00
0.260 Rp 12,000.00 Rp 3,120.00
0.070 Rp 90,000.00 Rp 6,300.00
0.009 Rp 145,000.00 Rp 1,305.00
0.006 Rp 175,000.00 Rp 1,050.00
0.0025 Rp 175,000.00 Rp 437.50
Jumlah Rp 23,277.50

0.350 Rp 15,000.00 Rp 5,250.00


0.100 Rp 90,000.00 Rp 9,000.00
0.0060 Rp 175,000.00 Rp 1,050.00
Jumlah Rp 15,300.00

Parigi, Maret 2011


Di Buat Oleh
KEPALA DINAS PEKERJAAN UMUM
Wilayah Kab. Parigi Moutong

SAIFUL ANWAR, ST
Nip. 19760419 200312 1 006
SAIFUL ANWAR, ST
Nip. 19760419 200312 1 006
ENGGINER ESTIMATE (EE)

RENCANA ANGGARAN BIAYA FISIK

Pekerjaan :
Lokasi :
Tahun Anggaran :

No. Uraian Pekerjaan Satuan Volume

1 2 3 4

II. PEKERJAAN TANAH


1 Pek. Galian Tanah Pondasi m3 0.48
2 Pek. Urugan Tanah m3 48.86
3 Pek. Urugan Pasir Bawah Pondasi + Lantai m3 19.29

III. PEKERJAAN PONDASI


1 Pek. Pasangan Pondasi Batu Kali Campuran 1 Pc : 5 Ps m3 1.20

IV. PEKERJAAN KOLOM


1 Pek. Sloof 15 x 20 Cm m3 0.24
2 Pek. Kolom 15 x 15 cm m 3
0.04
3 Pek. Plesteran + Aci m4 13.60
4 Pek. Plat Beton Bertulang t= 10 Cm m 5
0.04

V. PEKERJAAN MANHOLE
1 Pek. Manhole 60 x 60 Cm (Besi) Ls 1.00

V. PEKERJAAN PALMBING
1 Pipa 3/4 Ls 1.00
2 Pipa 1/2 Ls 1.00
3 Stop karn 1/2 Ls 5.00
4 Lem Pipa + Solasi Pipa Ls 1.00

VII. PEKERJAAN PENGECETAN


1 Pengecetan Dinding Bak m2 13.60
BIAYA FISIK

Harga Satuan Jumlah Harga


(Rp.) (Rp.)
5 6

Rp 71,875.00 Rp 34,500.00
###
Rp 23,958.33 Rp 1,170,535.71 0
Rp 179,230.00 Rp 3,456,578.57
###
Rp 4,661,614.29

Rp 701,377.60 Rp 841,653.12 0
Rp 841,653.12

Rp 3,763,541.91 Rp 903,250.06
Rp 6,063,000.00 Rp 231,909.75
###

Rp 231,909.75

Rp 700,000.00 Rp 700,000.00
Rp 700,000.00

Rp 700,000.00 Rp 700,000.00
Rp 700,000.00 Rp 700,000.00
Rp 700,000.00 Rp 3,500,000.00
Rp 700,000.00 Rp 700,000.00
Rp 700,000.00

Rp 23,277.50 Rp 316,574.00 1
Rp 316,574.00

Rp 7,451,751.16
###
###
HARGA SATUAN BAHAN
T.A 2018

No. URAIAN SAT HARGA 2018

1 2 3 4

I. BAHAN BANGUNAN
1. Tanah dan Pasir
Pasir Urug M3 125,400
Pasir Pasang M3 125,400
Pasir Beton / Cor M3 125,400
Sirtu M3 125,400
Pasir Plester M3 125,400
Tanah Urug M3 107,500

2. Kerikil
Batu Pecah 1-2 M3 232,900
Batu Pecah 2 - 3 M3 232,900
Batu Pecah 3 - 5 M3 232,900
Batu pecah 3 - 8 M3 232,900
Batu Pecah 5 - 7 (Manual) M3 197,000
Batu Pecah 1 - 2 (Manual) M3 197,000
Batu Pecah 2 - 3 (Manual) M3 197,000
Batu Pecah 3 - 5 (Manual) M3 197,000
Kerikil Sungai M3 152,200
Abu batu M3

3. Batu-Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 168,900
Batu karang
Batu Sikat Kg 4,000
Batu Alam M² 187,500
Batu Andesit Lokal Palu
Batu Andesit Lokal Palu ( RTA) M² 160,000

4. Batu Cetak
Batu Bata Besar Bh 1,200
Batu Bata Kecil Bh 1,000
Batako Pres Bh -
Roster Beton 20/20 Bh 11,000
Roster Beton 25/25 Bh 16,000
Roster Beton 20/40 Bh 27,000
Paving Blok 8 Cm Bh 3,000
Paving Blok 5 Cm Bh 1,000
Casting 20/40 Bh -
Casting 40/50 Bh -
Casting 60/45 Bh -
Paving kotak Bh
Kanstin multi Bh
Kanstin sutan raja Bh
Kanstin trotoar Bh
Kanstin U Bh
Kanstin KIV Bh
Batako Biasa Bh 2,000

4.a Beton Ready Mix


Beton K 125 M³ 779,000
Beton K 175 M³ 882,000
Beton K 200 M³ 898,000
Beton K 225 M³ 908,000
Beton K 250 M³ 935,000
Beton K 275 M³ 962,000
Beton K 300 M³ 1,043,000
Beton K 350 M³ 1,172,000
Beton K 400 M³ 1,236,000
Beton K 450 M³ 1,344,000
Beton K 500 M³ 1,398,000
No. URAIAN SAT HARGA 2018

1 2 3 4

5. Kapur
Kapur Mil Kg 35,000
6. Semen
Semen Tonasa (50 kg) Zak 59,000
Tiga Roda Zak 58,000
Semen Putih Zak 65,000
Semen Warna Kg -

II. BAHAN ATAP


1. Seng Gelombang Besar
BJLS 0.18 Bagus Lbr 47,500
BJLS 0.20 Biasa Lbr 46,800
BJLS 0.22 Lbr -

2. Seng Gelombang Kecil


BJLS 0.18 Bagus Lbr -
BJLS 0.20 Biasa Lbr 46,250
BJLS 0.22 Lbr -

3. Seng Plat
BJLS 0.18/ 30 Cm M 11,000
BJLS 0.20/ 40 Cm M 27,100
BJLS 0.3/ 40 Cm M -
BJLS 90x180x0.20 M -
BJLS 90x180x0.30 M -

4. Seng Plastik
Plastik Gelombang Kecil Lbr 32,500
Plastik Gelombang Besar Lbr 90,000

5. Batu Cetak Press


Genteng Tanah Bh -
Genteng Beton Bh -
Genteng Kodok Bh -
Genteng Metal Tebal Bh 42,000
Genteng Metal Tipis Bh 31,000
Genteng Keramik -
Genteng Keramik Glazur -
Nok Genteng Keramik
Nok Genteng Keramik Glazur
Bubungan Genteng Bh -
Rangka Atap baja Ringan :
Kaso metal c.75.75 Bh 83,000
Kaso metal c.75.100 Bh 65,000
Reng R.40.45 Bh 54,000
Reng R.32.45 Bh 41,600
Baut Bh 300

Atap 2 x 5 Multi Color (0,40) Lbr -


Sok jempol crystal (1,7/pjg) Lbr 53,000
Nok raja mc Bh -
Nok ratu kc Bh 18,000
Nok sultan crystal Bh 18,000
Nok putri kc Bh 18,750
Tutup nok ratu kc Bh -
Tutup nok raja mc Bh -
Lisplank Nusa Plang ( 0,20 x 4 m ) Bh -

III. BAHAN KAYU


Kayu Kelas I M3 3,000,000
Kayu Kelas II M3 2,500,000.00
Kayu Kelas III M3 1,700,000.00
Kayu Kelas IV M3 1,433,300
Dolken (Tiang Perancah) 4 m Btg 15,000
No. URAIAN SAT HARGA 2018

1 2 3 4

IV. BAHAN BAMBU


Bambu Besar 15 - 20 cm Btg -
Ijuk Ikat -
V. BUIS BETON
1. Pipa Buis Beton Bertulang
Dia. 30 cm Panjang 1 m' ( Besi ) Bh -
Dia. 60 cm Panjang 1 m' Bh -
Dia. 70 cm Panjang 1 m' Bh -
Dia. 80 cm Panjang 0,5 m' Bh -
Dia. 100 cm Panjang 0,5 m' Bh -
Dia. 30 cm Panjang 1,00 m' Bh -

2. Pipa Buis Beton Tanpa Tulang


Dia. 20 cm Panjang 1 m' Bh -
Dia. 30 cm Panjang 1 m' Bh -
Dia. 40 cm Panjang 1 m' Bh -
Dia. 50 cm Panjang 1 m' Bh -
Dia. 80 cm Panjang 0,5 m' Bh -
Dia. 100 cm Panjang 0,5 m' Bh -

3 U DITCH
Uk 30 x 50 x 8 Panjang 120 Cm (K 350) Bh 473,500
Uk 40 x 40 x 8 Panjang 120 Cm (K 350) Bh 442,200
Uk 40 x 50 x 8 Panjang 120 Cm (K 350) Bh 544,400
Uk 60 x 70 x 8 Panjang 120 Cm (K 350) Bh 680,100
Uk 80 x 100 x 10 Panjang 120 Cm (K 350) Bh 923,400
Uk 100 x 100 x 10 Panjang 120 Cm (K 350) Bh 1,119,000

4 PLAT PENUTUP
Uk 30 x 50 x 8 Panjang 120 Cm (K 350) Bh 129,400
Uk 40 x 40 x 8 Panjang 120 Cm (K 350) Bh 139,800
Uk 40 x 50 x 8 Panjang 120 Cm (K 350) Bh 139,800
Uk 60 x 70 x 8 Panjang 120 Cm (K 350) Bh 219,300
Uk 80 x 100 x 10 Panjang 120 Cm (K 350) Bh 327,000
Uk 100 x 100 x 12 Panjang 120 Cm (K 350) Bh 424,500

5 PLAT PELINTAS
Uk 30 x 50 x 10 Panjang 120 Cm (K 350) Bh 190,600
Uk 40 x 40 x 10 Panjang 120 Cm (K 350) Bh 225,500
Uk 40 x 50 x 10 Panjang 120 Cm (K 350) Bh 225,500
Uk 60 x 70 x 10 Panjang 120 Cm (K 350) Bh 356,900
Uk 80 x 100 x 12 Panjang 120 Cm (K 350) Bh 554,800
Uk 100 x 100 x 15 Panjang 120 Cm (K 350) Bh 817,700

6 BOX CULVERT
Uk 40 x 40 x 15 Panjang 120 Cm (K 350) Bh 3,151,100
Uk 60 x 60 x 20 Panjang 120 Cm (K 350) Bh 4,556,400
Uk 80 x 80 x 20 Panjang 120 Cm (K 350) Bh 5,937,200
Uk 100 x 100 x 20 Panjang 120 Cm (K 350) Bh 7,315,200
Uk 100 x 150 x 20 Panjang 120 Cm (K 350) Bh 9,157,600
Uk 150 x 150 x 20 Panjang 120 Cm (K 350) Bh 11,673,100
Uk 200 x 200 x 20 Panjang 120 Cm (K 350) Bh 16,095,600

VI BAHAN LANTAI / KERAMIK


1. Tegel Keramik
Plint Keramik M' -
Tegel Keramik Uk. 6 x 20 cm Dos -
Tegel Keramik Uk. 20 x 20 cm Dos 61,000
Tegel Keramik Uk. 20 x 25 cm Dos 58,300
Tegel Keramik Uk. 30 x 30 cm Dos 51,200
Tegel Keramik Uk. 30 x 60 cm (Warna) Dos 117,500
Tegel Keramik Uk. 25 x 40 cm (Warna) Dos 78,100
Tegel Keramik Uk. 40 x 40 cm (warna) Dos 63,000
Tegel Keramik Uk. 50 x 50 cm (warna) Dos 85,000
Tegel Keramik Uk. 60 x 60 cm (warna) Dos 140,000
Granite Tile 40 x 40 cm Dos -
Plint Granite Tile 10 x 40 cm Lbr -
No. URAIAN SAT HARGA 2018

1 2 3 4

VII. BAHAN BESI


Besi Polos Kg 9,300.00
Besi Ulir Kg -
1. Besi Beton Polos Uk. 4 mm SNI Btg -
Besi Beton Polos Uk. 6 mm SNI Btg 27,100
Besi Beton Polos Uk. 8 mm SNI Btg 45,000
Besi Beton Polos Uk. 10 mm SNI Btg 68,300
Besi Beton Polos Uk. 12 mm SNI Btg 98,000
Besi Beton Polos Uk. 14 mm SNI Btg 134,000
Besi Beton Polos Uk. 16 mm SNI Btg 185,000
Besi Beton Polos Uk. 19 mm SNI Btg 230,000
Besi Beton Ulir Uk. 10 mm SNI Btg -
Besi Beton Ulir Uk. 13 mm SNI Btg 130,000
Besi Beton Ulir Uk. 16 mm SNI Btg 192,000
Besi Beton Ulir Uk. 19 mm SNI Btg 275,000
Besi Beton Ulir Uk. 32 mm SNI Btg -

2. Besi Plat Uk. 120 x 120 cm


Tebal 1,2 mm Lbr -
Tebal 1,4 mm Lbr 447,000
Tebal 2 mm Lbr 550,000
Tebal 3 mm Lbr 775,000
Besi plat 2 mm bordes Lbr 700,000
Besi plat polos 2mm Lbr 600,000
Besi plat 1,4 mm Bordes Lbr 500,000
Besi plat polos 1,4mm Lbr 400,000

3. Besi Siku
Ukuran : 30 x 3 mm - 6 m' Btg 55,000
Ukuran : 40 x 3 mm - 6 m' Btg 43,000
Ukuran : 40 x 4 mm - 6 m' Btg 105,000
Ukuran : 50 x 5 mm - 6 m' Btg 190,000
Ukuran : 60 x 6 mm - 6 m' Btg 325,000
Ukuran : 70 x 6 mm - 6 m' Btg 275,000

4. Kawat
Kawat Ikat Beton Kg 25,000
Kawat Duri Roll 85,000
Kawat Nyamuk dari Logam M 23,300
Kawat Nyamuk dari Plastik M 16,800
Kawat Jaringan / Ayakan M 31,600
Kawat Harmonika Roll 600,000
Kawat Bronjong (50 kg/roll) 3 mm Roll 780,000
Kawat Bronjong (50 kg/roll) 4 mm Roll 790,000
Kawat Bronjong Pabrikasi (50 kg/roll) 3,4 mm Roll -
Kawat Bronjong (50 kg/roll) Roll 850,000

VIII. BAHAN LANGIT - LANGIT


1. Tripleks Ukuran :
120 x 240 x 3,0 mm Lbr 47,300
120 x 240 x 5,0 mm Lbr 81,600
120 x 240 x 4,0 mm (Lapis Aluminium) Lbr -
120 x 240 x 4,0 mm Lbr 60,000
120 x 240 x 9,0 mm Lbr 110,000
Lisplank merek SIKA 2x20x4 Lbr 48,000
HPL Lbr 180,000

2. Teakwood Ukuran :
120 x 240 x 4 mm Lbr -
Gipsum 9 mm Lbr 73,700
List Profil 10 Cm Gypsum M' -
Rangka Plafond Metal Furing M² -

3. Multiplex Ukuran :
122 x 240 x 5 mm Lbr -
122 x 240 x 10 mm Lbr -
120 x 240 x 12 mm Lbr -
120 x 240 x 15 mm Lbr 147,500
IX. BAHAN PIPA
Dia. 1/2" PVC Panjang 4 m' Btg 23,100
Dia. 3/4" PVC Panjang 4 m' Btg 30,500
Dia. 1" PVC Panjang 4 m' Btg 41,200
Dia. 1 1/4" PVC Panjang 4 m' Btg 50,300
Dia. 1 1/2" PVC Panjang 4 m' Btg 58,800
Dia. 2" PVC Panjang 4 m' Btg 68,300
No. URAIAN SAT HARGA 2018

1 2 3 4

Dia. 2 1/2" PVC Panjang 4 m' Btg 90,000


Dia. 3" PVC Panjang 4 m' Btg 120,100
Dia. 4" PVC Panjang 4 m' Btg 179,100
Pipa Galvanized (SNI) 6 M Pipa Gip Ø ½" Btg 261,400
Pipa Galvanized (SNI) 6 M Pipa Gip Ø ¾" Btg 319,000
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 1" Btg 446,100
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 1¼" Btg 539,200
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 1 ½" Btg 630,600
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 2" Btg 786,200
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 2 ½" Btg 1,045,000
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 3" Btg 1,333,200
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 4" Btg 1,889,400
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 5" Btg -
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 6" Btg 3,454,100
Pipa Galvanized (SNI) 6 M Pipa Gip Ø 12" Btg -
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 1 ½" Btg 186,000
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 2" Btg 219,900
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 3" Btg 459,700
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 4" Btg 668,000
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 5" Btg 1,149,100
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 6" Btg 1,425,700
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 8" Btg -
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 10" Btg -
Pipa PVC (SNI S.12.5) 6 M Pipa PVC Ø 12" Btg -
Pipa PVC (SNI S.10) 6 M Pipa PVC Ø 1" Btg 125,600
Pipa PVC (SNI S.10) 6 M Pipa PVC Ø 3" Btg 553,900
Pipa PVC (SNI S.10) 6 M Pipa PVC Ø 4" Btg 826,900
Pipa PVC (SNI S.10) 6 M Pipa PVC Ø 6" Btg 1,752,200
Water Mour Gip Ø ½" Btg 12,000
Water Mour Gip Ø ¾" Btg 15,000
Water Mour Gip Ø 1" Btg 24,000
Water Mour Gip Ø 1¼" Btg 34,500
Water Mour Gip Ø 1 ½" Btg 44,000
Water Mour Gip Ø 2" Btg 66,000
Water Mour Gip Ø 2 ½" Btg 102,000
Water Mour Gip Ø 3" Btg 181,500
Water Mour Gip Ø 4" Btg 347,000
Reducer Gip Ø 1¼" x 1" Btg 8,750
Reducer Gip Ø 1½" x 1¼" Btg 16,000
Reducer Gip Ø 2" x 1½" Btg 51,000
Reducer Gip Ø 3" x 2" Btg 44,500
Pipa HDPE 6 M ø ½" Btg -
Pipa HDPE 6 M Ø ¾" Btg -
Pipa HDPE 6 M Ø 1" Btg -
Pipa HDPE 6 M Ø 2" Btg -
Pipa HDPE 6 M Ø 3" Btg -
Pipa HDPE 6 M Ø 4" Btg -
Pipa HDPE 6 M Ø 6" PN 10. X6 UNION Btg -
Pipa HDPE 6 M Ø 8" PN 10.X6 UNION Btg -
Dop Gip Ø ½" Btg 5,000
Dop Gip Ø ¾" Bh 7,500
Dop PVC Ø 1 ½" Bh 9,750
Dop PVC Ø 2" Bh 18,250
Dop PVC Ø 3" Bh 24,600
Dop PVC Ø 4" Bh 109,000
Dop PVC Ø 6" Bh 256,500
Flanged Steel Ø 2" Bh 43,300
Flanged Steel Ø 3" Bh 62,000
Flanged Steel Ø 4" Bh 72,300
Flanged Steel Ø 6" Bh 147,600
Flanged Steel Ø 8" Bh 240,000
Blind Flanged Steel Ø 3" Bh 138,000
Blind Flanged Steel Ø 4" Bh 314,500
Double Flanged Bend CI Ø 2" x 90° Bh 357,500
No. URAIAN SAT HARGA 2018

1 2 3 4

Double Flanged Bend CI Ø 2" x 45° Bh 275,000


Double Flanged Bend CI Ø 3" x 90° Bh 450,000
Double Flanged Bend CI Ø 3" x 45° Bh 377,500
Double Flanged Bend CI Ø 4" x 90° Bh 670,000
Double Flanged Bend CI Ø 4" x 45° Bh 575,000
Double Flanged Bend CI Ø 6" x 90° Bh 835,000
Double Flanged Bend CI Ø 6" x 45° Bh 935,000
All Flanged Tee CI Ø 2" x 2" Bh 415,000
All Flanged Tee CI Ø 3" x 3" Bh 546,500
All Flanged Tee CI Ø 4" x 4" Bh 624,500
Double Flanged Gate Valve CI Ø 8" Bh 4,403,000
Double Flanged Gate Valve CI Ø 6" Bh 2,476,000
Double Flanged Gate Valve CI Ø 4" Bh 1,193,000
Double Flanged Gate Valve CI Ø 3" Bh 995,600
Double Flanged Gate Valve CI Ø 2" Bh 598,600
Stop Kran Bronze Ø ½" Bh 31,600
Stop Kran Bronze Ø ¾" Bh 43,600
Stop Kran Bronze Ø 1" Bh 59,500
Stop Kran Bronze Ø 1 ½" Bh 236,300
Stop Kran Bronze Ø 2" Bh 338,000
Stop Kran Bronze Ø 3" Bh 916,300
Tap Kran Bronze Ø ½" Bh -
Check Valve Bronze Ø ½" Bh 69,000
Check Valve Bronze Ø ¾" Bh 94,600
Klamp sadle CI Ø 6" x 1" Bh 92,000
Klamp sadle CI Ø 4" x 1" Bh 57,000
Klamp sadle CI Ø 4" x ¾" Bh 52,500
Klamp sadle CI Ø 3" x ½" Bh 36,500
Klamp sadle CI Ø 2" x ¾" Bh 25,500
Klamp sadle CI Ø 2" x ½" Bh 24,000
Klamp sadle CI Ø 1½" x ½" Bh 21,500
Giboult Joint Ø 3" Bh 159,500
Giboult Joint Ø 4" Bh 208,500
Giboult Joint Ø 6" Bh 457,500
Giboult Joint Ø 8" Bh 730,500
Air Relief Valve CI Ø ¾" Bh 187,500
Air Relief Valve CI Ø 1" Bh 189,000
Air Relief Valve CI Ø 2" Bh 855,500
Water Meter Ø ½" Bh 312,500
Double Socket PVC Ø 3" Bh 84,000
Double Socket PVC Ø 4" Bh 119,000
Double Socket Reducer PVC Ø 3" x 2" Bh 139,000
Flanged Socket PVC Ø 2" Bh 249,000
Flanged Socket PVC Ø 3" Bh 289,300
Flanged Socket PVC Ø 4" Bh 371,000
Flanged Socket PVC Ø 6" Bh 697,300
Flanged Socket PVC Ø 8" Bh 1,313,000
Flanged Spigot PVC Ø 2" Bh 217,000
Flanged Spigot PVC Ø 3" Bh 273,300
Flanged Spigot PVC Ø 4" Bh 347,600
Flanged Spigot PVC Ø 6" Bh 660,600
Flanged Spigot PVC Ø 8" Bh 1,128,300
Socket spigot Reducer PVC Ø 8" x 6" Bh 632,000
Socket spigot Reducer PVC Ø 6" x 4" Bh 339,600
Socket spigot Reducer PVC Ø 6" x 3" Bh -
Socket spigot Reducer PVC Ø 6" x 2" Bh -
Socket spigot Reducer PVC Ø 4" x 3" Bh 193,000
Socket spigot Reducer PVC Ø 4" x 2" Bh 179,600
Socket spigot Reducer PVC Ø 3" x 2" Bh 117,000
Socket spigot Reducer PVC Ø 2" x 1½" Bh 30,500
Socket spigot Reducer PVC Ø 1½" x 1" Bh 13,000
Socket spigot Bend PVC Ø 2" x 90° Bh 80,000
Socket spigot Bend PVC Ø 2" x 45° Bh 67,000
Socket spigot Bend PVC Ø 3" x 90° Bh 154,600
Socket spigot Bend PVC Ø 3" x 45° Bh 133,000
Socket spigot Bend PVC Ø 4" x 90° Bh 224,000
Socket spigot Bend PVC Ø 4" x 45° Bh 200,000
Socket spigot Bend PVC Ø 4" x 22 ½° Bh -
Socket spigot Bend PVC Ø 4" x 11 ¼° Bh -
Socket spigot Bend PVC Ø 6" x 90° Bh 640,000
Socket spigot Bend PVC Ø 6" x 45° Bh 595,300
All Socket Tee PVC Ø 1½" x 1" Bh 23,300
All Socket Tee PVC Ø 2" x 1" Bh 69,300
All Socket Tee PVC Ø 2" x 1½" Bh 64,300
All Socket Tee PVC Ø 2" x 2" Bh 85,000
No. URAIAN SAT HARGA 2018

1 2 3 4

All Socket Tee PVC Ø 3" x 2" Bh 147,700


All Socket Tee PVC Ø 3" x 3" Bh 259,800
All Socket Tee PVC Ø 3" x 1½" Bh 107,300
All Socket Tee PVC Ø 4" x 4" Bh 245,100
All Socket Tee PVC Ø 4" x 3" Bh 227,400
All Socket Tee PVC Ø 6" x 6" Bh 665,000
All Socket Tee PVC Ø 6" x 4" Bh 486,300
All Socket Tee PVC Ø 6" x 3" Bh 621,500
All Socket Tee PVC Ø 6" x 2" Bh 451,500
All Socket Tee PVC Ø 8" x 6" Bh -
All Socket Tee PVC Ø 8" x 8" Bh 1,539,500
All Socket Tee PVC Ø 8" x 4" Bh -
All Socket Tee PVC Ø 8" x 3" Bh -
All Socket Tee PVC Ø 8" x 2" Bh -
Valve Socket PVC Ø 1" Bh 6,250
Valve Socket PVC Ø 1 ½" Bh 11,600
Valve Socket PVC Ø 2" Bh 21,300
Valve Socket PVC Ø 3" Bh 42,400
Faucet Socket PVC Ø 1 ½" Bh 12,000
Faucet Socket PVC Ø 2" Bh 26,800
Faucet Socket PVC Ø 3" Bh 44,000
Flanged Spigot Long Bend PVC Ø 3" x 90° Bh -
All Socket Tee Gip Ø 2" Bh 42,000
Double Socket Bend Gip Ø 2" x 45° Bh 56,600
Double Socket Bend PVC Ø 2" x 45° Bh 199,000
Double Socket Bend PVC Ø 4" x 45° Bh 264,000
Double Socket Bend PVC Ø 3" x 45° Bh 354,000
Bend PVC 90 Deg Ø 2" Bh 195,000
Bend PVC 90 Deg Ø 3" Bh 13,000
Bend PVC 45 Deg Ø 2" Bh 22,000
Bend PVC 45 Deg Ø 3" Bh 27,000
Paking Karet Ø 2" Bh 20,600
Paking Karet Ø 3" Bh 14,500
Paking Karet Ø 4" Bh 16,000
Spaner Besi Ø 20 mm Bh 45,000
Klem Kuku Anjing/Macan Ø 16 mm Bh 4,000
Pengelasan Flanged Ø 6" Bh 60,000
Pengelasan Flanged Ø 4" Bh 40,000
Pengelasan Flanged Ø 3" Bh 30,000
Pengelasan Flanged Ø 2" Bh 20,000
Sock Uk. 1/2" GIP Bh 5,500
Sock Uk. 3/4" GIP Bh 4,750
Sock Uk. 1" GIP Bh 6,000
Sock Uk. 1/2" GIP Lurus Bh -
Sock Uk. 3/4" GIP Lurus Bh -
Sock Uk. 1" GIP Lurus Bh -
Sock Uk. 1 1/4" GIP Bh 11,900
Sock Uk. 1 1/2" GIP Lurus Bh -
Sock Uk. 2" Lurus GIP Bh 28,000
Sock Uk. 2 1/2" Lurus GIP Bh 58,500
Sock Uk. 3" Lurus GIP Bh 93,500
Sock Uk. 4" Lurus GIP Bh 167,000
Knie Uk. 1/2" GIP Bh 4,600
Knie Uk. 3/4" GIP Bh 5,100
Knie Uk. 1" GIP Bh 8,100
Knie Uk. 1 1/4" GIP Bh 15,500
Knie Uk. 1 1/2" GIP Bh 25,200
Knie Uk. 2" GIP Bh 33,000
Knie Uk. 2 1/2" GIP Bh 63,000
Knie Uk. 3" GIP Bh 46,500
Tee Uk. 1/2" GIP Bh 5,700
Tee Uk. 3/4" GIP Bh 6,800
Tee Uk. 1" GIP Bh 11,300
Tee Uk. 1 1/4" GIP Bh 19,000
Tee Uk. 1 1/2" GIP Bh 27,500
Tee Uk. 2" GIP Bh 23,500
Tee Uk. 2 1/2" GIP Bh 8,000
Double Neple Uk. 1 1/4" GIP Bh 12,300
Double Neple Uk. 1/2" GIP Bh 5,600
Double Neple Uk. 3/4" GIP Bh 6,500
No. URAIAN SAT HARGA 2018

1 2 3 4

Double Neple Uk. 1" GIP Bh 8,500


Double Neple Uk. 1 1/4" Bh -
Double Neple Uk. 1 1/2" GIP Bh 18,200
Double Neple Uk. 2" GIP Bh 21,200
Double Neple Uk. 2 1/2" Bh 40,000
Sock Uk. 1/2" PVC Bh 4,100
Sock Uk. 3/4" PVC Bh 6,000
Sock Uk. 1" PVC Bh 8,500
Sok T PVC Uk. 1" Bh 11,000
Sok T 3/4" PVC Bh 7,500
Sok T 1/2" PVC Bh 4,500
Sok Lurus 1/2" PVC Bh 3,500
Sok Lurus 3/4" PVC Bh 5,000
Sok T 3/4" Bh -
Sok T 1/2" Bh -
Sok Lurus 1/2" Bh -
Sok Lurus 3/4" Bh -
Water Mur 1" Bh -
Water Mur 3/4" Bh -
Water Mur 1/2" Bh -
Sok Lurus 3/4" Bh -
Water Mur 1" Bh -
Water Mur ¾" Bh -
Water Mur ½" Bh -
Kran 1/2" Bh 8,500
Kran 3/4" Bh 16,000
Oper Slok 1 1/4 x 1 " PVC Bh 15,000
Oper Slok 1 x 3/4" PVC Bh 7,000
Oper Slok 3/4 x 1/2" PVC Bh 5,000
Oper Slok 1 x 3/4 Bh -
Oper Slok 3/4 x 1/2" PVC Bh -
Stop Kran 1" Bh -
Stop Kran 1/2" Bh -
Stop Kran 3/4" Bh -
Knie Uk. 1/2" PVC Bh 3,000
Knie Uk. 3/4" PVC Bh 4,000
Knie Uk. 1 1/4" PVC Bh 7,000
Knie Uk. 1 1/2" PVC Bh 12,000
Knie Uk. 2" PVC Bh 19,000
Knie Uk. 2 1/2" PVC Bh 28,000
Knie Uk. 3" PVC Bh 49,000
Knie Uk. 4" PVC Bh 95,000
Tee Uk. 1/2" PVC Bh 3,500
Tee Uk. 3/4" PVC Bh 6,000
Tee Uk. 1" PVC Bh 11,000
Tee Uk. 1 1/4" PVC Bh 15,000
Tee Uk. 1 1/2" PVC Bh 15,000
Tee Uk. 2" PVC Bh 23,000
Tee Uk. 2 1/2" PVC Bh 37,500
Tee Uk. 3" PVC Bh 61,000
Tee Uk. 4" PVC Bh 121,000
Double Neple Uk. 1/2" PVC Bh 2,000
Double Neple Uk. 3/4" PVC Bh 3,000
Double Neple Uk. 1" PVC Bh 4,000
Double Neple Uk. 1 1/4" PVC Bh -
Double Neple Uk. 1 1/2" PVC Bh -
Double Neple Uk. 2" PVC Bh -
Double Neple Uk. 2 1/2" PVC Bh -
Pipa PVC SNI Ø 1 1/2 S - 10 SCJ Btg 191,100
Pipa PVC SNI Ø 2 - 50 S - 10 RRJ Btg 322,700
Pipa PVC SNI Ø 3 - 75 S - 10 RRJ Btg 642,000
Pipa PVC SNI Ø 4 - 100 S - 10 RRJ Btg 960,000
Pipa PVC SNI Ø 6 - 150 S - 10 RRJ Btg 2,006,000
Pipa PVC SNI Ø 1 1/2 - 40 S - 12,5 SCJ Btg 165,000
Pipa PVC SNI Ø 2 - 50 S - 12,5 RRJ Btg 265,000
Pipa PVC SNI Ø 3 - 75 S - 12,5 RRJ Btg 532,000
Pipa PVC SNI Ø 4 - 100 S - 12,5 RRJ Btg 780,000
Pipa PVC SNI Ø 6 - 150 S - 12,5 RRJ Btg 1,642,000
Pipa Hope Ø 1/2" Btg 8,500
Pipa Hope Ø 3/4" Btg 9,500
Pipa Hope Ø 1" Btg 17,000
Pipa Hope PN.10 Ø 2" Btg 182,000
Pipa Hope PN.10 Ø 3" Btg 358,000
Pipa Hope PN.10 Ø 4" Btg 536,000
Pipa Hope PN.10 Ø 6" Btg 723,000
Pipa Hope PN.10 Ø 8" Btg 1,205,500
No. URAIAN SAT HARGA 2018

1 2 3 4

X. BAHAN FINISHING
1. Cat Kayu
Cat Glotex Kg 57,000
Cat Kayu Dasar Kg 45,300
Politur Kg 49,600
Meni Besi Kg 41,700
Meni Kayu Kg 35,500
Dempul Kayu Kg 36,600
Kertas Pasir Lbr 7,700
Pisau Dempul Bh 10,300
Afdur Kg -
Altex Kg 48,200
Vernis Kg 58,800
Lem Kayu Klg 27,000
Lem Silikon Klg 36,600
Minyak Cat Ltr 31,000
Minyak Bekisting Ltr -
Cat Besi Kg 58,800
Cat Seng Kg 171,800
Residu Ltr 190,000
Seal Tape Bh 11,200
Wood Filter Kg 35,000
Cat genteng Kg
2. Cat Tembok
Ria / Vinilex 20 Kg 495,000
Avitex / Dulux 25 Kg 476,000
No Drop 1 Kg 52,700
Kolter (cat anti karat) 10 Kg 190,000
Plamur Tembok 5 Kg 55,000
Cat Luar Tembok 5 Kg -
Paragon 20 kg -

XI. BAHAN PENGGANTUNG


1. Kunci - Kunci :
Kunci Tanam Royal 1 Slag Set 290,000
Kunci Tanam Royal 2 Slag Set 358,500
Kunci Tanam 808 (sejenis) Set 62,500
Kunci Tanam Kuda terbang Set 192,000
Kunci Tanam Yale Set -
Kunci Tanam Angin Kait Set 10,000
Grendel Uk. Kecil Bh 23,600
Grendel Uk. Sedang Bh 27,200
Engsel Kupu - Kupu Psg 23,000
Engsel Kupu - Kupu Gardu Psg 127,000
Engsel Nilon Ring Pintu Psg 60,600
Engsel jendela Psg 24,300
Haag Angin Baut Mur Psg 56,600

2. Paku - Pakuan
Paku Beton 1" - 2" Bh 15,500
Paku Beton 2,5" - 3,5" Bh 15,800
Paku Beton 4" - 6" Dos 69,600
Paku tripleks Kg 25,000
Paku Biasa 1" - 2" Kg 18,600
Paku Biasa 2,5" - 3,5" Kg 17,600
Paku Biasa 4" - 6" Kg 17,600
Rangka Nako per sisir dan Terali /Sisir -
Paku Tindis Dos 20,000
Paku Seng Kg 50,000
Paku Gipsum Kg 27,500
Paku Skrup Dos -

XII. BAHAN LISTRIK


1. Macam -macam Kabel
NYM 2 x 1,5 mm Rol 700,000
NYM 2 x 2,5 mm Rol 723,300
NYM 3 x 1,5 mm Rol 1,000,000
NYM 3 x 2,5 mm Rol 1,425,000
NYY 2 x 1,5 mm Rol 950,000
NYY 2 x 2,5 mm Rol 1,300,000
NYA 1 x 1,5 mm Rol 195,000
NYA 1 x 2,5 mm Rol 305,000
NYA 1 x 4 mm Rol 535,000
NYY 1 x 50 mm2 M 72,500
NYY 1 x 70 mm2 M 97,500
NYY 1 x 95 mm2 M 140,000
No. URAIAN SAT HARGA 2018

1 2 3 4

NYY 1 x 120 mm2 M 180,000


NYY 1 x 150 mm2 M 210,000
NYAF 1 x 6.0 mm Rol -
NYYYHY 2 x 1,5 mm Rol 975,000
NYYYHY 2 x 2,5 mm Rol 1,350,000
NYYYHY 4 x 1,5 mm M 2,250,000
NYYYHY 4 x 2,5 mm M 40,000
NYYYHY 4 x 4,0 mm M 42,000
Schoen / SKT (95 mm2) Bh 35,000
Schoen / SKT (120 mm2) Bh 65,000
Kawat BC 6 mm M -
Kawat BC 50 mm M -
Kawat BC Per Kg M -
Konduktor/Kawat AAAC 70 mm2 M -
Box Panel PVC isi 4 MCB Legran Bh 35,000
MCB 6 A Legran Bh 58,500
MCB 4 A Legran Bh 52,500
Kabel Telephone 4 x 0,5 mm m' 4,000
Outlet TV Broco Bh 54,000
Tembaga Kg 60,000
Outlet Telephone Broco Bh 50,000
Down Light / PLC 13 W Bh 60,000
Fitting Plafond + Lampu SL Panasonic Bh 47,500
2. Saklar / Sekring
Saklar Single Bh 19,600
Saklar Double Bh 24,700
Saklar Triple Bh 41,500
Stop Kontak + Instalasi Bh 33,500
Sekring Kas Kosong DN 2 G Bh 12,500
Sekring Kas Kosong DN 3 G Bh 5,000
Sekring Kas Kosong DN 4 G Bh 35,000
Instalasi Ttk -
Bateray Basah NS70 Ah Bh -

3. Lampu Pijar
5 Watt Bh 37,500
10 - 40 Watt / 32 watt Bh 7,000
60 - 100 Watt / 40 watt Bh 11,500

Balon Lampu 'TL


TL.Biasa 20 watt philips Bh -
TL.Biasa 40 watt Bh -
TL 2 x 18 watt grille Panasonic Bh -
TL 2 x 36 watt grille Panasonic Bh -

Lampu TL (Perset)
10 - 20 Watt (Model Keranjang) Bh -
20 - 40 Watt (Model Keranjang) Bh -
40 - 60 Watt (Model Keranjang) Bh -

XIII. BAHAN KACA


Kaca Bening 3 mm 152 x 122 M2 130,000
Kaca Bening 5 mm 152 x 122 M2 180,000
Kaca Rayband 3 mm 152 x 122 M2 140,000
Kaca Rayband 5 mm 152 x 122 M2 190,000
Kaca Pintu Temper standar 12mm uk. 210 x 90 Lbr 1,700,000
Kaca Gambar Berwarna 5mm M' 1,650,000
Kaca Kabur 5mm M' 225,000
Kaca Kabur 3mm M' 100,000

XIV. BAHAN SANITAIR


1. Closet
Closet Duduk Standar Ex. INA Set 976,000
Closet Duduk Lokal Set 506,000
Closet Jongkok Standar Ex. INA Set 240,000
2. Meja Dapur
Wastafel Standar Ex. KIA Set -
Wastafel Standar Ex. INA Set 110,000
Selang Wastavel Bh 31,700
Kran Wastavel Bh 120,000
Bak Cuci Piring Teraso Set -
Bak Cuci Piring Stainless Steel 1 Lobang Set 240,000
Bak Cuci Piring Stainless Steel 2 Lobang Set 646,000
No. URAIAN SAT HARGA 2018

1 2 3 4

3. Bak Mandi
Bak Mandi Viber Glass Bh 325,000
4. Pompa Air
Nasional 125 watt Panasonic Set 413,300
Nasional 250 watt Panasonic Set 693,300
5. Tangki Air Viber Glass
Model Apolo 550 Liter Bh 875,000
1000 Liter EXEL Bh 1,300,000
Urinoir Type U 57 M ex. Toto Bh 1,743,500
Shower Spray Type THX 20 NBPIV ex. Toto Unt 1,500,000
Shower Set Type TX 423 SZ ex. Toto Unt 75,000
Floordrain TX 1B ex. Toto Bh -
Tempat Sabun S 11 N ex. Toto Bh -
Kran Zink T 30 AR13NV7N ex. Toto Bh -
Kitchen Zink Hwaco 1L Unt 250,000
Kran Dinding Type T 23 B13V7N ex. Toto Bh 59,000
Klep Ø 3/4" ex. Onda Bh -
Pelampung Otomatis Bh -
Roof Drain Metal Bh -
Mesin Jet Pump Kap. 250 watt Bh -
Mesin Pompa Tekan Kap. 150 watt Bh -

BAHAN BAJA
Besi Beton U-24 Btg -
Besi Tempa M2 460,000
Kawat beton Kg 24,000
Rangka atap baja ringan M2 192,000
Rangka atap baja ringan C 75.75 Btg 84,000
Reng 32.45 Btg 42,000
Paku baja ring :
Paku baja Bh 200
Paku atap Bh 400

XVI. BAHAN LAIN - LAIN


Premium (SPBU) Ltr 6,400
Premium (Industri) Ltr -
Solar (SPBU) Ltr 5,100
Solar (Industri) Ltr 7,400
Minyak Tanah Ltr -
Minyak Pelumas Ltr -
Aspal Curah Kg -
Aspal ESSO 150 Kg 9,700
Aspal IRAN 180 Kg -
Aspal SHELL 150 Kg 9,700
Aspal PERTAMINA 150 Kg 9,000
Laston M3 -
Sand sheet Ton -
Aspal Emulsi 200/210 Kg 8,700

Kwas No 1" Bh 3,700


Kwas No 2" Bh 6,500
Kwas No 3" Bh 8,000
Kwas No 4" Bh 15,000
Sumur Pompa Tangan Terpasang Bh -
Reservoir Air Rangka Baja 1 m3 Kubik 7,500,000
Septictank dan Rembesan 1 m3 Bh -
Mata Geregaji Besi Bh 16,600
Mata Bor Besi Bh 21,600
Martil (Palu-Palu) Bh 55,000
Kunci Inggris 12" Bh 73,300
Kunci Inggris 10" Bh 60,800
Gurindah 1 set Bh 291,600
Otomatis Dap Bh 150,000
Otomatis Tower Bh 75,000
Soda Api Bh 22,500
Selang 1/2" Bh 94,000
Gergaji Kayu Bh 51,600
Cok Kabel Roll Bh 35,000
Batu Asah Bh 20,000
Pemotong kaca Bh 37,500
Sarung Tangan Bh 7,800
Sepatu Boot Bh 83,300
Bor Listrik Bh -
Perangkap tikus Bh -
No. URAIAN SAT HARGA 2018

1 2 3 4

Timbangan Barang Bh -
Kandang Kucing Bh -
Betel Bh 20,000
Ram Nyamuk Bh -
Baut 17 + ring Bh -
Isolasi Bh -
Isolasi Pipa Bh -
Isolasi kabel besar Bh
Siku Kecil Btg -
Siku Besar Btg -
Lembar Seri M3 -
Lembar Seri Ikat -
Lembar Seri Ikat -
Lembar Seri Ikat -
ACP Seven PF (Dalam) Lbr -
ACP Seven PDV (Luar) Lbr -
Lem silikon Lbr -
Lem Pipa
Sok Drat
Meter Elektrik
Kunci Pintu Besar Set -
Kunci Pintu Kecil Set -
Syphon Bh -
Pipa 1" Btg -
Pipa 3/4" Btg -
Pipa 1/2" Btg -
Pipa 2" Btg -
Pipa 3" Btg -
Bak air plastik kapasitas 1100 Ltr Bh 1,250,000
Menara air tinggi 3m :
isi 1 tangki air Bh 4,000,000
isi 2 tangki air Bh 6,000,000
Menara air tinggi 6 m :
isi 1 tangki air Bh 7,500,000
isi 2 tangki air Bh 11,250,000
Pintu plastik tebal Bh 850,000

XVII BAHAN ALUMINIUM


Kusen Aluminium 4' Btg 225,000
Kusen Aluminium 3/4' Btg -
Rangka Pintu Aluminium ( Sliding) 223,000
Kusen & Pintu PVC Toilet Bh 350,000
Daun Pintu Aluminium Btg 354,000
Bingkai Pintu Aluminium Btg 190,000
Bingkai Jendela Aluminium Btg 135,000
Door Stoper Bh -
Door Stoper Bh -
Slot Tanam Bh -
Engsel Bh 71,000
Handle pintu Bh 152,000
Selinder 113,000
Door Stoper Lbr 44,000
Door closer Lbr 140,000
Slot Tanam btg 154,000
Kait Angin 41,000

BAHAN ALUMINIUM
Ceklokan 6m Btg -
Balang besi Btg -
Karet 078 B Rol ± 20 m Rol -
Lem Silikon Don Corning 300 gr Gr -
1/2 x 3/4 Jendela Btg -
Ripat ± 1000 bh Dos -
Spilogt L Btg -
Alcopan 122 x 244
Pintu Aluminium / dmu
Profil M3" 6m
ENGSEL
Engsel tanam pintu -
Kaca pintu -
STAINLES
Holow Steinlis 2x4 -
Holow Bib 2x4 -
4x4 -
Stainles L' -

No. URAIAN SAT HARGA 2018

1 2 3 4

Water Profing Anti Bocor tile granit -


Dak cat anti bocor aqua tile -

XVIII LISTRIK
Biaya pemasangan listrik 900 va 896,000
Biaya pemasangan listrik 1300 va 1,274,000
Biaya pemasangan listrik 2200 va 2,274,000
Biaya pemasangan listrik 3500 va 3,391,500
Biaya pemasangan listrik 4400 va 4,263,600

XIX PAGAR
Biaya pemasangan pagar Holow 1,1 mm M2 350,000
Biaya pemasangan pagar Holow 1,2 mm M2 400,000
Biaya pemasangan pagar Holow 1,4 mm M2 500,000
Biaya pemasangan pagar Holow 1,7 mm M2 550,000
Biaya pemasangan pagar Holow 2 mm M2 600,000
Biaya pemasangan pintu besi Holow 1,1 mm M2 400,000
Biaya pemasangan pintu besi Holow 1,2 mm M2 450,000
Biaya pemasangan pintu besi Holow 1,4 mm M2 550,000
Biaya pemasangan pintu besi Holow 1,7 mm M2 600,000
Biaya pemasangan pintu besi Holow 2 mm M2 650,000

KEPALA DINAS PEKERJA


KOTA PALU

Ir. SINGGIH B. PRASETYO


Pembina Utama M
Nip. 19641111 199703
ARGA SATUAN BAHAN
T.A 2018

Kenaikan harga akibat kebijakan


pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5

61,900
60,900
68,200

49,800
49,100
-

-
48,500
-
-

11,500
284,500
-
-
-

34,100
94,500
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5

-
-
64,000
61,200
53,700
123,300
82,000
66,100
89,200
147,000
-
-
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5

9,700
-
-
28,400
47,200
71,700
102,900
140,700
194,200
241,500
-
136,500
201,600
288,700
-

-
469,300
577,500
813,700
735,000
630,000
525,000
420,000

-
57,750
45,150
110,250
199,500
341,250
288,750

26,200
89,200
24,400
17,600
33,100
630,000
819,000
829,500
-
892,500

49,600
85,600
-
63,000
115,500
50,400
189,000

-
77,300
-
-

-
-
-
154,800
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5
Kenaikan Harga akibat kebijakan
pemerintah untuk menetapkan rute
container dalam kota
5

KEPALA DINAS PEKERJAAN UMUM


KOTA PALU

Ir. SINGGIH B. PRASETYO, M.Eng, Sc


Pembina Utama Muda
Nip. 19641111 199703 1 003
ENGGINER ESTIMATE (EE)

RENCANA ANGGARAN BIAYA FASUM

Satuan Kerja : #REF!


Pekerjaan : #REF!
Lokasi : #REF!
Tahun Anggaran : #REF!
1 PERENCANAAN RUMAH DINAS KAPOLSEK PELING TENGAH POLRES BANGKEP T.54 (FASUM)
Harga Satuan
No. Uraian Pekerjaan Satuan Volume (Rp.)
1 2 3 4 5

I. PEKERJAAN INSTALASI AIR


1 Pek. Pembuatan Sumur Tanah Ls 1.00 Rp 1,187,500.00
2 Pek Pipa Air Tanah Ls 1.00 Rp 1,000,000.00
3 Pek. Instalasi Air Bersih Diameter 3/4" m1 6.00 Err:509
4 Pek. Mesin Pompa 150 Watt + Besi Pengaman/Gembok Ls 1.00 Rp 1,000,000.00
5 Asseccories Pipa Ls 1.00 Rp 100,000.00

II. PEKERJAAN LISTRIK


1 Beli Mesin Genset 1500 Watt + Asesoris Ls 1.00 Rp 2,420,000.00

III. PEKERJAAN PAGAR DEPAN KANTOR SEPANJANG 6.75 M1


1 Pek. Galian Pondasi m3 2.11 Rp 71,875.00
2 Pek Urugan Pondasi Bh 0.70 Rp 23,958.33
3 Pek. Urugan Pasir Bawah Pondasi m3 0.27 Rp 179,230.00
4 Pek. Pas. Pondasi Batu Kosong m3 0.79 Rp 397,252.80
5 Pek. Pas. Pondasi Batu Kali Camp. 1 Pc : 5 Ps m3 2.38 Rp 701,377.60
6 Pek. Susunan 1/2 Batako Camp. 1 : 5 Bh 8.13 Err:509
7 Pek. Plesteran Dinding Camp. 1 Pc : 5 Ps m2 16.26 Err:509
8 Pek. Acian Dinding Camp. 1 Pc : 7 Kpr m2 16.26 Err:509
9 Pek. Pengecetan Tembok m2 16.26 Err:509
10 Pek. Kolom 20 x 30 cm (Besi 125 Kg) m3 0.10 Rp 6,063,000.00
11 Pek. Kolom Praktis 15 x 15 cm ( Besi = 100 Kg) m3 0.03 Err:509
12 Pek. Sloof 15 x 20 (Besi = 110 Kg) m3 0.20 Rp 3,763,541.91
13 Pek. Reng Balok 15 x 20 (Besi = 110 Kg) m3 0.20 Err:509

IV. PEK. LAIN-LAIN / AKHIR


1 Pembersihan Akhir Ls 1.00 Rp 241,500.00

JUMLAH REAL COST PEKERJAAN (Dipindahkan Ke Rekapitulasi Total Fasum………)

#REF!
#REF!
#REF!

#REF!
Direktur,-
ASUM

KEP T.54 (FASUM)


Jumlah Harga
(Rp.)
6

Rp 1,187,500.00
Rp 1,000,000.00
Err:509
Rp 1,000,000.00
Rp 100,000.00
Err:509

Rp 2,420,000.00
Rp 2,420,000.00

Rp 151,656.25
Rp 16,850.69
Rp 48,392.10
Rp 313,829.71
Rp 1,669,278.69
Err:509
Err:509
Err:509
Err:509
Rp 618,426.00
Err:509
Rp 752,708.38
Err:509
Err:509

Rp 241,500.00
Rp 241,500.00
Err:509
ENGGINER ESTIMATE (EE)

REKAPITULASI TOTAL
RENCANA ANGGARAN BIAYA FASUM

Satuan Kerja : #REF!


Pekerjaan : #REF!
Lokasi : #REF!
Tahun Anggaran : #REF!

1 PERENCANAAN RUMAH DINAS KAPOLSEK PELING TENGAH POLRES BANGKEP T.54 (FASUM)

NO URAIAN PEKERJAAN FASUM

I PEKERJAAN INSTALASI AIR


II. PEKERJAAN LISTRIK
III. PEKERJAAN PAGAR DEPAN KANTOR SEPANJANG 6.75 M1
IV. PEK. LAIN-LAIN / AKHIR

A. JUMLAH REAL KOST PEKERJAAN FASUM


B. PPN 10 %
C. JUMLAH TOTAL
D. DIBULATKAN
Terbilang :
Dua Belas Juta Empat Ratus Lima Belas Ribu Rupiah,-

Mengetahui :
Panti Sosial Bina Grahita Nipotowe Palu
Kepala,

Dra. Hj. Muliana


NIP.170 010 493
OTAL
BIAYA FASUM

POLRES BANGKEP T.54 (FASUM)

HARGA SATUAN FASUM

Err:509
Rp 2,420,000.00
Err:509
Rp 241,500.00

Err:509
Err:509
Err:509
Err:509

piah,-

0
0
0

0
0
ENGGINER ESTIMATE (EE)

RENCANA ANGGARAN BIAYA FISIK

Satuan Kerja : #REF!


Pekerjaan : Perencanaan Rumah Dinas Staf Polsek Peling Tengah Polres Bangkep T.38. 4 Pintu
Lokasi : #REF!
Tahun Anggaran : #REF!

I. PERENCANAAN RUMAH DINAS STAF POLSEK PELING TENGAH POLRES BANGKEP T.38. 4 PINTU (FISIK)

Harga Satuan
No. Uraian Pekerjaan Satuan Volume (Rp.)
1 2 3 4 5

I. PEKERJAAN PENDAHULUAN
1 Pek. Pengukuran dan Pas. Bouplank Ls 1.00 Rp 1,000,000.00
2 Papan Nama Proyek Ls 1.00 Rp 500,000.00
3 Pembersihan Lokasi Ls 1.00 Rp 800,000.00

II. PEKERJAAN TANAH


1 Pek. Galian Tanah Pondasi m3 67.56 Rp 71,875.00
2 Pek. Urugan Tanah m3
77.00 Rp 23,958.33
3 Pek. Urugan Pasir Bawah Pondasi + Lantai m3
9.55 Rp 179,230.00

III. PEKERJAAN PONDASI


1 Pek. Pasangan Batu Kosong m3 22.80 Rp 397,252.80
2 Pek. Pasangan Pondasi Batu Kali Campuran 1 Pc : 5 Ps m3
76.00 Rp 701,377.60

IV. PEKERJAAN DINDING DAN PLESTERAN


1 Pas. Dinding 1/2 Batako Camp. 1 Pc : 5 Ps m2 390.63 Err:509
2 Pas. Dinding 1/2 Batako Camp. 1 Pc : 3 Ps m2
79.60 Err:509
3 Pas. Roster Bh 16.00 Rp 15,000.00
4 Pek. Plesteran Dinding Camp. 1 Pc : 5 Ps m2
781.26 Err:509
5 Pek. Plesteran Dinding Camp. 1 Pc : 3 Ps m2
159.20 Err:509
6 Pek. Plesteran Kaki Pondasi Camp. 1 Pc : 3 Ps m2
17.33 Err:509
7 Pek. Acian Dinding Camp. 1 Pc : 7 Kpr m2
940.46 Err:509

V. PEKERJAAN PASANG KRAMIK LANTAI DAN DINDING


1 Pas. Kramik Lantai Ukuran 30 x 30 cm m2 144.50 Err:509
2 Pas. Kramik Lantai Km/Wc Ukuran 20 x 20 cm m2 19.00 Err:509
3 Pas. Kramik Dinding Ukuran 20 x 20 cm m2
41.81 Err:509

VI. PEKERJAAN BETON BERTULANG


1 Pek. Kolom Teras (Besi 125 Kg/m3) m3 1.55 Rp 6,063,000.00
2 Pek. Kolom Praktis 15 x 15 Cm (Besi 110 Kg/m3) m3 4.69 Err:509
3 Pek. Sloof 15 x 20 Cm (Besi 120 Kg/m )
3 m3 4.06 Rp 3,763,541.91
4 Pek. Ring Balok 15 x 20 Cm (Besi 120 Kg/m )
3 m3 5.10 Err:509
5 Pek. Beton Tumbuk Campuran 1 Pc : 2 Ps : 3 Krk m3 8.95 Rp 747,341.91
SIK

Bangkep T.38. 4 Pintu

4 PINTU (FISIK)

Jumlah Harga
(Rp.)
6

Rp 1,000,000.00
Rp 500,000.00
Rp 800,000.00
Rp 2,300,000.00

Rp 4,855,875.00
Rp 1,844,791.67
Rp 1,711,646.50
Rp 8,412,313.17

Rp 9,057,363.84
Rp 53,304,697.60
Rp 62,362,061.44

Err:509
Err:509
Rp 240,000.00
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

Rp 9,397,650.00
Err:509
Rp 15,279,980.15
Err:509
Rp 6,688,710.09
Err:509
VII. PEKERJAAN KAP/KUDA-KUDA/GORDING/ATAP/PLAFOND
1 Pek. Kuda-kuda + Gording m3 6.87 Rp 6,063,000.00
2 Pas. Papan Listplank (3 x 25) cm m 1
144.68 Err:509
3 Pas. Atap Seng Gelombnag m2 327.59 Rp 55,125.00
4 Pas. Bubungan/Jurai Seng Plat m1 108.68 Rp 33,915.00
5 Pek. Rangka Plafond m2 259.87 Err:509
6 Pek. Penutup Plafond Tripleks 3 mm m 2
259.87 Err:509
7 Pek. Beugel/Angker/Mur/Baut Kuda-kuda Ls 1.00 Rp 500,000.00

VIII. PEKERJAAN PASANG KUSEN, DAUN PINTU & JENDELA


1 Pas. Kosen Pintu, Jendela dan Ventilasi m3 3.14 Err:509
2 Pas. Daun Pintu Panil m 2
20.16 Err:509
3 Pas. Daun Pintu Teakwood m 2
12.04 Err:509
4 Pas. Pintu Km/Wc Set 4.00 Rp 250,000.00
5 Pas. Daun Jendela Jungkit m2 26.93 Err:509

IX. PEKERJAAN KUNCI DAN ALAT PEGGANTUNG


1 Pas. Kunci Pintu 2 Slaag Bh 20.00 Err:509
2 Pas. Engsel Pintu Bh 28.00 Err:509
3 Pas. Engsel Jendela Bh 18.00 Err:509
4 Pas. Grendel Jendela Bh 9.00 Err:509
5 Pas. Tarikan Jendela Bh 9.00 Err:509
6 Pas. Hak Angin Bh 18.00 Err:509

X. PEKERJAAN PENGECETAN
1 Pengecetan Dinding Tembok m2 940.46 Err:509
2 Pengecetan Plafond Tripleks m 2
259.87 Err:509
3 Pengecetan Atap Seng Gelombnag m 2
327.59 Err:509
4 Pengecetan Kayu m 2
138.69 Rp 23,277.50
5 Vernis Pintu Teakwood m 2
24.08 Err:509
6 Pengecetan Kaki Pondasi m 2
17.33 Err:509
7 Residu Kuda-Kuda m2 100.00 Err:509

XI. PEKERJAAN SANITASI


1 Pek. Pembuatan Saptiktank dan Peresapan Bh 2.00 Rp 1,500,000.00
2 Pek. Pemasangan Kloset Jongkok Bh 4.00 Err:509
3 Pek. Pemasangan Floor Drain Bh 8.00 Err:509
4 Pek. Pemasangan Instalasi Air Bersih Bh 50.00 Err:509
5 Pek. Pemasangan Instalasi Air Kotor Bh 35.00 Err:509
Rp 41,652,810.00
Err:509
Rp 18,058,398.75
Rp 3,685,882.20
Err:509
Err:509
Rp 500,000.00
Err:509

Err:509
Err:509
Err:509
Rp 1,000,000.00
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Rp 3,228,356.48
Err:509
Err:509
Err:509
Err:509

Rp 3,000,000.00
Err:509
Err:509
Err:509
Err:509
Err:509
XII. PEKERJAAN INSTALASI LISTRIK
1 Instalasi Listrik Ttk 36.00 Rp 72,000.00
2 Sekring Box Bh 1.00 Rp 175,000.00
3 Lampu XL 18 Watt Bh 16.00 Err:509
4 Lampu XL 11 Watt Bh 20.00 Err:509
5 Saklar Ganda Bh 12.00 Err:509
6 Saklar Tunggal Bh 8.00 Err:509
7 Stop Kontak Bh 16.00 Err:509

XIII. PEK. LAIN-LAIN / AKHIR


1 As Build Drawing dan Dokumentasi Ls 1.00 Rp 736,500.00
2 Pembersihan Akhir Ls 1.00 Rp 550,000.00

JUMLAH REAL COST PEKERJAAN FISIK (Dipindahkan Ke Rekapitulasi Total Fisik…………)

0
0
0

0
0
Rp 2,592,000.00
Rp 175,000.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Rp 736,500.00
Rp 550,000.00
Rp 1,286,500.00

Err:509
ENGGINER ESTIMATE (EE)

REKAPITULASI TOTAL FISIK

Satuan Kerja : #REF!


Pekerjaan : Perencanaan Rumah Dinas Staf Polsek Peling Tengah Polres Bangkep T.38. 4 Pi
Lokasi : #REF!
Tahun Anggaran : #REF!

I. PERENCANAAN RUMAH DINAS STAF POLSEK PELING TENGAH POLRES BANGKEP T.38. 4 PINTU (FISIK)

NO URAIAN PEKERJAAN FISIK

I PEKERJAAN PENDAHULUAN
II. PEKERJAAN TANAH
III. PEKERJAAN PONDASI
IV. PEKERJAAN DINDING DAN PLESTERAN
V. PEKERJAAN PASANG KRAMIK LANTAI DAN DINDING
VI. PEKERJAAN BETON BERTULANG
VII. PEKERJAAN KAP/KUDA-KUDA/GORDING/ATAP/PLAFOND
VIII. PEKERJAAN PASANG KUSEN, DAUN PINTU & JENDELA
IX. PEKERJAAN KUNCI DAN ALAT PEGGANTUNG
X. PEKERJAAN PENGECETAN
XI. PEKERJAAN SANITASI
XII. PEKERJAAN INSTALASI LISTRIK
XIII. PEK. LAIN-LAIN / AKHIR

A. JUMLAH REAL KOST PEKERJAAN FISIK


B. PPN 10 %
C. JUMLAH TOTAL
D. DIBULATKAN
Terbilang :
Tiga Ratus Empat Puluh Empat Juta Dua Ratus Delapan Puluh Tujuh Ribu Rupiah,-

Mengetahui :
Panti Sosial Bina Grahita Nipotowe Palu
Kepala,
Dra. Hj. Muliana
NIP.170 010 493
TAL FISIK

k Peling Tengah Polres Bangkep T.38. 4 Pintu

OLRES BANGKEP T.38. 4 PINTU (FISIK)

HARGA SATUAN FISIK

Rp 2,300,000.00
Rp 8,412,313.17
Rp 62,362,061.44
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Rp 1,286,500.00

Err:509
Err:509
Err:509
Err:509

Delapan Puluh Tujuh Ribu Rupiah,-

0
0
0
0
0
ENGGINER ESTIMATE (EE)

RENCANA ANGGARAN BIAYA FASUM

Satuan Kerja : #REF!


Pekerjaan : Perencanaan Rumah Dinas Staf Polsek Peling Tengah Polres Bangkep T.38. 4 Pintu
Lokasi : #REF!
Tahun Anggaran : #REF!
I. PERENCANAAN RUMAH DINAS STAF POLSEK PELING TENGAH POLRES BANGKEP T.38. 4 PINTU (FASUM)

Harga Satuan
No. Uraian Pekerjaan Satuan Volume (Rp.)
1 2 3 4 5

I. PEKERJAAN INSTALASI AIR


1 Pek. Pembuatan Sumur Tanah Ls 1.00 Rp 1,850,000.00
2 Pek Pipa Air Tanah Ls 1.00 Rp 1,300,000.00
3 Pek. Instalasi Air Bersih Diameter 3/4" m1 20.00 Err:509
4 Pek. Mesin Pompa 150 Watt + Besi Pengaman/Gembok Ls 1.00 Rp 1,000,000.00
5 Asseccories Pipa Ls 1.00 Rp 100,000.00

II. PEKERJAAN LISTRIK


1 Beli Mesin Genset 4000 Watt + Asesoris Unit 1.00 Rp 8,750,000.00

III. PEKERJAAN PAGAR DEPAN KANTOR SEPANJANG 23.5 M1


1 Pek. Galian Pondasi m3 7.42 Rp 71,875.00
2 Pek Urugan Pondasi Bh 2.47 Rp 23,958.33
3 Pek. Urugan Pasir Bawah Pondasi m3 0.93 Rp 179,230.00
4 Pek. Pas. Pondasi Batu Kosong m3 2.74 Rp 397,252.80
5 Pek. Pas. Pondasi Batu Kali Camp. 1 Pc : 5 Ps m3 8.33 Rp 701,377.60
6 Pek. Susunan 1/2 Batako Camp. 1 : 5 Bh 28.40 Err:509
7 Pek. Plesteran Dinding Camp. 1 Pc : 5 Ps m2 56.80 Err:509
8 Pek. Acian Dinding Camp. 1 Pc : 7 Kpr m2 56.80 Err:509
9 Pek. Pengecetan Tembok m2 56.80 Err:509
10 Pek. Kolom 20 x 30 cm (Besi 125 Kg) m3 0.36 Rp 6,063,000.00
11 Pek. Kolom Praktis 15 x 15 cm ( Besi = 100 Kg) m3 0.11 Err:509
12 Pek. Sloof 15 x 20 (Besi = 110 Kg) m3 0.70 Rp 3,763,541.91
13 Pek. Reng Balok 15 x 20 (Besi = 110 Kg) m3 0.70 Err:509

IV. PEK. LAIN-LAIN / AKHIR


1 Pembersihan Akhir Ls 1.00 Rp 500,000.00

JUMLAH REAL COST PEKERJAAN (Dipindahkan Ke Rekapitulasi Total Fasum…………)


0
0
0

0
Direktur,-
FASUM

Polres Bangkep T.38. 4 Pintu

T.38. 4 PINTU (FASUM)

Jumlah Harga
(Rp.)
6

Rp 1,850,000.00
Rp 1,300,000.00
Err:509
Rp 1,000,000.00
Rp 100,000.00
Err:509

Rp 8,750,000.00
Rp 8,750,000.00

Rp 533,312.50
Rp 59,256.94
Rp 166,683.90
Rp 1,088,472.67
Rp 5,842,475.41
Err:509
Err:509
Err:509
Err:509
Rp 2,182,680.00
Err:509
Rp 2,634,479.34
Err:509
Err:509

Rp 500,000.00
Rp 500,000.00
Err:509
ENGGINER ESTIMATE (EE)

REKAPITULASI TOTAL
RENCANA ANGGARAN BIAYA FASUM
Satuan Kerja : #REF!
Pekerjaan : Perencanaan Rumah Dinas Staf Polsek Peling Tengah Polres Bangkep T.38. 4
Lokasi : #REF!
Tahun Anggaran : #REF!

I. PERENCANAAN RUMAH DINAS STAF POLSEK PELING TENGAH POLRES BANGKEP T.38. 4 PINTU (F

NO URAIAN PEKERJAAN

I PEKERJAAN INSTALASI AIR


II. PEKERJAAN LISTRIK
III. PEKERJAAN PAGAR DEPAN KANTOR SEPANJANG 23.5 M1
IV. PEK. LAIN-LAIN / AKHIR

A. JUMLAH REAL KOST PEKERJAAN FASUM


B. PPN 10 %
C. JUMLAH TOTAL
D. DIBULATKAN
Terbilang :
Tiga Puluh Lima Juta Empat Puluh Enam Ribu Rupiah,-

Mengetahui :
Panti Sosial Bina Grahita Nipotowe Palu
Kepala,

Dra. Hj. Muliana


NIP.170 010 493
OTAL
BIAYA FASUM

k Peling Tengah Polres Bangkep T.38. 4 Pintu

H POLRES BANGKEP T.38. 4 PINTU (FASUM)

HARGA SATUAN

Err:509
Rp 8,750,000.00
Err:509
Rp 500,000.00

Err:509
Err:509
Err:509
Err:509

upiah,-

0
0
0

0
0
ENGGINER ESTIMATE (EE)

REKAPITULASI TOTAL
RENCANA ANGGARAN BIAYA (FISIK + FASUM)

Err:509 : Err:509
Pekerjaan : Perencanaan Rumah Dinas Staf Polsek Peling Tengah Polres Bangkep T.38. 4 Pintu
II. 0
Lokasi : 0
Tahun Anggaran : #REF!

NO PEKERJAAN

I. PERENCANAAN RUMAH DINAS STAF POLSEK PELING TENGAH POLRES


BANGKEP T.38. 4 PINTU (FISIK)

II. PERENCANAAN RUMAH DINAS STAF POLSEK PELING TENGAH POLRES


BANGKEP T.38. 4 PINTU (FASUM)

1 JUMLAH REAL KOST PEKERJAAN (FISIK + FASUM)


Terbilang :
Tiga Ratus Delapan Puluh Lima Juta Empat Ratus Enam Ribu Rupiah,-

Mengetahui :
Panti Sosial Bina Grahita Nipotowe Palu
Kepala,
OTAL
(FISIK + FASUM)

ngah Polres Bangkep T.38. 4 Pintu

HARGA SATUAN

Err:509

Err:509

Err:509

Enam Ribu Rupiah,-

0
0
0

0
0
ENGINEER ESTIMATE (EE).

REKAPITULASI TOTAL
RENCANA ANGGARAN BIAYA (FISIK + FASUM)
### :###
Pekerjaan : 0
Lokasi : 0
Tahun Anggaran : #REF!

NO PEKERJAAN

I. #REF!

II. PERENCANAAN RUMAH DINAS KAPOLSEK PELING TENGAH POLRES


BANGKEP T.54 (FASUM)

1 JUMLAH REAL KOST PEKERJAAN


Terbilang :
Seratus Tiga Puluh Enam Juta Dua Ratus Tujuh Ribu Rupiah,-

Mengetahui :
Panti Sosial Bina Grahita Nipotowe Palu
Kepala,
OTAL
(FISIK + FASUM)

HARGA SATUAN

#REF!

Err:509

Err:509

u Rupiah,-

0
0
0

0
0

Anda mungkin juga menyukai