© ABB Group
April 15, 2009 | Slide 1
Optimized mine ventilation-on-demand
© ABB Group
April 15, 2009 | Slide 2
Rev. 17
OMVOD benefits
Mine ventilation dynamic design validation tool
© ABB Group
April 15, 2009 | Slide 3
OMVOD benefits
Health and safety
© ABB Group
April 15, 2009 | Slide 4
OMVOD benefits
Health and safety
© ABB Group
April 15, 2009 | Slide 5
OMVOD benefits
Regulatory compliance
© ABB Group
April 15, 2009 | Slide 6
OMVOD benefits
Production enhancement and optimized air distribution
© ABB Group
April 15, 2009 | Slide 7
OMVOD benefits
Optimized energy consumption (ROI)
•PLC
•DCS (surface, underground and
web)
• Fans
• Regulators
• Air quality sensors
• Air flow sensors
© ABB Group
April 15, 2009 | Slide 9
OMVOD
Functional block diagram
19
Air quality 18 Real-time air quality
02 monitoring and measurements
Components alarming
parametric
information 15
Real-time physical air
17 16 11 flow measurements
Physical air flow
Controller
vs. model flow DCS
calibration 12
deviation monitoring Physical fans and
air flow regulators
01 08 04
Air distribution 10
Physics based
optimization Physical output to
ventilation network
fans and air flow
model and dynamic Control modulation regulators
simulation 07
03 •Air flow regulators Workzones, equipment
Modeled process
•Surface fans •Fans and personnel database
measurements 06
•Shafts
•Pressure
•Drifts Air demand
•Velocity
•Draw points calculation
•Flow Control modes
•Ore and waste passes 05
•Temperature Real-time machinery
•Ramps
•Fan speed •Man and personnel tracking
•Fans
•Regulator position •Auto-flow
•Air flow regulators
•Auto-VOD 14
•Ducts 13
•Surface
•Services 09 •Underground Scheduling
•Bulkheads Scheduling
Energy optimization •… Event database
Configuration Database
Configuration menu
© ABB Group
April 15, 2009 | Slide 10
OMVOD
Computing infrastructure
© ABB Group
April 15, 2009 | Slide 11
OMVOD
Tracking Tracking
Surface and OMVOD
Servers
Mesh infrastructure
Battery powered node with directional
Service area
antenna
Shaft Shaft
Draw point
Draw point
mesh network
tracking infrastructure Mesh infrastructure node
With omni-directional
LAN
antenna
to surface
Infrastructure nodes
communication
Ethernet gateway
(Powered 110VAC) Auxiliary
fan
Air flow Mine
regulator level “1”
Infrastructure Door
node
(Battery powered)
Draw point
Draw point
Ramp
infrastructure
© ABB Group
April 15, 2009 | Slide 12
OMVOD
Project Phases
• Mine development plan Comprehensive preliminary assessment of the business
• Mine ventilation layout opportunity, projected savings, scope and costs of implementing
(plan view and detailed level and draw point views)
Phase 1 the full OMVOD solution with the following deliverables
• Equipment list for fans, regulators and machinery and •System Requirements Specification (SRS) and project scope
personnel count Preliminary •Savings Rough Order of Magnitude (ROM)
• Energy costs engineering •Fixed cost for project phases 2a and b
• Interviews with operations and ventilation engineering •ROM for project cost
• System Requirements Review (SRR) and acceptance
• Phase 1 deliverables Phase 2a • Critical Design Review (CDR) and acceptance
• All equipment detailed parametric and behavioral information • Test Plan and Factory Acceptance Testing (FAT) procedures
• Operating scenarios review and acceptance
OMVOD production • FAT and system acceptance
(machinery, shifts, pre-blast, post-blast, scheduling, …)
• Interviews with operations and ventilation engineering detailed engineering • OMVOD ventilation model, controls, optimization, scheduling,
configuration, HMIs and performance analysis capability
© ABB Group
April 15, 2009 | Slide 13