The document summarizes construction progress for several pipeline projects. It provides details on activities, quantities completed and outstanding, productivity targets, and recommended actions. Several areas are behind schedule, including piping and civil works at JB sites. Additional resources like specialized welders are recommended to help meet deadlines.
The document summarizes construction progress for several pipeline projects. It provides details on activities, quantities completed and outstanding, productivity targets, and recommended actions. Several areas are behind schedule, including piping and civil works at JB sites. Additional resources like specialized welders are recommended to help meet deadlines.
The document summarizes construction progress for several pipeline projects. It provides details on activities, quantities completed and outstanding, productivity targets, and recommended actions. Several areas are behind schedule, including piping and civil works at JB sites. Additional resources like specialized welders are recommended to help meet deadlines.
Total Day No Area Activity Unit QTY Remark per Day per Day Completion Effective day Recommendation Total Progress Remaining### ### ### ### ### ###Remaining 6 Piping JB Today 3/9/2018 Pipe Spool 1/22/2018 End date 2/15/2018 Welding Dia-Inch 454.5 416.5 38 38 24 1.6 48 0.791666667 No of date -22.00 Penambahan welder khusus untuk JB Sandblasting + Primery M2 17.4 15.0 2.4 1/24/2018 Friday Holiday -0.857142857 NPD 40% status material Komplit Painting (Top Coat) M2 17.4 15 2.421 1/24/2018 -21.14 Pipe Support Installation Ea 45 10 35 1/27/2018 Pipe Spool Installation Ea 39 0 39 3/6/2018 Effective Day -12.68571429
Piping JB (CPP) Today 3/9/2018
Pipe Spool End date 2/15/2018 Welding Dia-Inch 818 780 38 38 24 1.6 72 0.527777778 3/9/2018 No of date -22.00 Penambahan welder khusus untuk JB Sandblasting M2 0 4.3 1/31/2018 Friday Holiday -0.857142857 NPD 40% status material Komplit Painting M2 0 1/31/2018 -21.14 Pipe Support Installation Ea 0 2/15/2018 Pipe Spool Installation Ea 0 2/15/2018 Effective Day -12.68571429
Pipeline JB Today 3/9/2018
Ja Stringing Mtr 9800 9800 0 m End date 2/7/2018 b Welding Joint 817 808 9 o 9 2 4.5 10 0.9 2/6/2018 No of date -30.00 NPD 40% Penambahan welder khusus untuk Pipeline JB B NDT Joint 817 808 9 a 9 Friday Holiday -2 l FJC Joint 817 808 9 e 9 -28.00 Trenching Mtr 9600 9555 45 45 1/23/2018 Lowering Mtr 9800 9755 45 45 1/24/2018 Effective day -16.8 Cable Pulling 1/25/2018 Backfill Mtr 9600 9555 45 45 180 0.3 500 0.09 1/27/2018 CIVIL JB (Receiver & Metering) Today 3/9/2018 Excavation M3 0 1/28/2018 End date 1/22/2018 Penambahan Tim di area JB dan Penambahan Molen Lean Concrete M3 0.86 0.86 0 1/29/2018 No of date -46.00 NPD 40% terkendala akses jalan Install Rebar Ton 0 2/1/2018 Friday Holiday -4.285714286 Install Formwork M2 0 2/4/2018 -41.71 Pouring Concrete M3 8.9 0 8.9 2.9 3.115 2/5/2018 1/16/2018 Concrete Curing Time Lot 1 0 1 2/22/2018 2/1/2018 Effective day -25.02857143
CIVIL JB (Anchorblock) Today 3/9/2018
Excavation M3 0 End date 1/22/2018 Lean Concrete M3 0.31 0.31 0 No of date -46.00 NPD 40% Install Rebar Ton 0 Friday Holiday -1.764705882 Install Formwork M2 0 -44.24 Pouring Concrete M3 5.29 5.29 0 2.9 0 1/16/2018 Concrete Curing Time Lot 1 0 1 2/1/2018 Effective day -26.54117647
CIVIL JB Pipe Support OUTSTANDING :
Footing Pcs 44 43 1 Pedestal Pcs 59 49 10
CIVIL CPP Today 3/9/2018
Excavation M3 23.34 23.34 0 End date 1/22/2018 Selesai di COR untuk JB, JR1, dan AR Lean Concrete M3 23.34 23.34 0 No of date -46.00 NPD 40% Install Rebar Ton 0 Friday Holiday -4.285714286 Install Formwork M2 0 -41.71 Pouring Concrete M3 323 322.568 0.43 2.857142857 0.1512 1/16/2018 Concrete Curing Time Lot 1 1 2/1/2018 Effective day -25.02857143
CIVIL CPP TOTAL OUTSTANDING :
Footing Pcs 42 42 0 Productivity Total Day Productivity Target Total Day No Area Activity Unit QTY Remark per Day per Day Completion Effective day Recommendation Pedestal Pcs 82 82 0
Piping JR-1 (CPP) Today 3/9/2018
Pipe Spool 2/11/2018 End date 2/15/2018 Welding Joint 274.75 264.75 10 10 24 0.4166667 72 0.138888889 No of date -22.00 NPD 40% status material Komplit Sandblasting M2 190.9 116.9 74 74 2/13/2018 Friday Holiday -0.857142857 Painting M2 190.9 116.9 74 74 2/13/2018 -21.14 Pipe Support Installation Ea TBA 0 0 2/8/2018 Pipe Spool Installation Ea TBA 0 0 2/15/2018 Effective Day -12.68571429 Piping JR-1 Today 3/9/2018 Pipe Spool 2/11/2018 End date 2/15/2018 Welding Dia-Inch 1928.5 1888.5 40 40 24 1.6666667 72 0.555555556 No of date -22.00 NPD 40% status material Komplit Sandblasting M2 0 2/13/2018 Friday Holiday -0.857142857 Painting M2 0 2/13/2018 -21.14 Pipe Support Installation Ea 111 31 80 2/8/2018 Pipe Spool Installation Ea 124 48 76 2/15/2018 Effective Day -12.68571429 Trunkline JR1 Today 3/9/2018 Stringing Mtr 2800 2800 0 End of date 2/20/2018 Welding Joint 233 233 0 5 0 20 0 No of date -17.00 NPD 40% NDT Joint 233 233 0 Friday Holiday -0.142857143 FJC Joint 233 233 0 -16.86 Trenching Mtr 2800 2800 0 Lowering Mtr 2800 2800 0 Effective day -6.742857143 Backfill Mtr 2800 2800 0 0 1/15/2018
CIVIL JR-1 (Pig Launcer) Today 3/9/2018 Sudah selesai
Excavation M3 5.26 5.26 0 End date 1/15/2018 Lean Concrete M3 0.52 0.52 0 No of date -53 NDP 40% Install Rebar Ton 0.57 0.57 0 Friday Holiday -5.285714286 Install Formwork M2 9.24 9.24 0 -47.71428571 Pouring Concrete M3 5.29 5.29 0 36.78 2.857142857 0 Concrete Curing Time Lot 1 1 0 1/15/2018 Effective Day -28.62857143
CIVIL JR-1 TOTAL OUTSTANDING :
Footing Pcs 64 64 0 Area 1 29 29 0 Area 2 32 32 0 Area 3 3 3 0 Pedestal Pcs 64 64 0 Area 1 29 29 0 Area 2 32 32 0 Area 3 3 3 0
Trunkline AS Today 3/9/2018
Stringing Mtr 7000 7000 0 End date 3/1/2018 Penambahan welder Welding Joint 583 576 7 5 1.4 7 1 No of date -8.00 NPD 40% NDT Joint 583 530 53 Friday Holiday 1 FJC Joint 583 536 47 -9.00 Trenching Mtr 7000 5514 1486 Lowering Mtr 7000 5936 1064 Effective Day -5.4 Cable Pulling Backfill Mtr 7000 5445 1555 Piping AS Today 3/9/2018 Pipe Spool End date 3/1/2018 Penambahan welder Welding (Claded & SS) Dia-Inch 5872.5 205 5667.5 5831.5 4 1468.125 192 29.51822917 No of date -8.00 40% progress pertanggal 23 jan Welding (CS ) Dia-Inch 250 250 Sandblasting M2 8800 1100 7700 Friday Holiday 0.8571428571 Painting M2 8800 1100 7700 -8.86 * DB (FAB) Productivity Total Day Productivity Target Total Day No Area Activity Unit QTY Remark per Day per Day Completion Effective day Recommendation Pipe Spool Installation Ea Pipe Valves Installation Ea Effective Day -5.314285714
CIVIL AS TOTAL OUTSTANDING :
Footing Pcs 166 90 76 Pedestal Pcs 191 46 145
CIVIL JR-1 (Anchorblock) J
u A Today 3/9/2018 Concrete Curing Time masih berjalan sampai 24 Jan 18 Excavation M3 7.8 7.8 0 l u l u End of date 3/1/2018 R r Lean Concrete M3 0.352 0.352 0 a R No of date -8.00 NPD 40% y a Install Rebar Ton 0.783 0.783 0 u m Friday Holiday 1.1428571429 1 b Install Formwork M2 10 10 0 o -9.14 n Pouring Concrete M3 6 6 0 g 52.16 2.857142857 0 2/22/2018 Concrete Curing Time Lot 1 0 1 3/1/2018 Effective day -5.485714286 J u l u ELECTRICAL Power Cable CPP to Alur Siwah Cluster A R a y Trenching m e 2 Laying Cable m 7296 1500 5796 Splicing Joint Backfiiling m 7296 350 6946 Termination point
ELECTRICAL Power Cable CPP to Alur Rambong
Trenching m Laying Cable m 14936 290 14646 Splicing Joint Backfilling m 14936 700 14236 Termination point ELCETRICAL FO CPP to Jambo Balee Trenching m 19624 19624 0 Completed Laying Cable m 19624 19624 0 Completed Splicing Joint 2 2 Backfilling m 9712 8100 1612 Termination point 2 2 ELECTRICAL FO Cable CPP to Alur Siwah Cluster A Trenching m Laying Cable m 14592 3000 11592 Splicing Joint Backfilling m 7296 350 6946 Termination point ELECTRICAL FO CPP to Alur Rambong Trenching m Laying Cable m 28872 1400 27472 Splicing Joint backfilling m 14936 530 14406 Termination point CIVIL AR TOTAL OUTSTANDING : Footing Pcs 77 0 77 Pedestal Pcs 84 0 84 ELECTRICAL Power Cable CPP to Jambo Balee Trenching m 9712 9712 0 Today 3/9/2018 Completed Laying Cable m 9712 9712 0 End of date 1/26/2018 Completed Splicing Joint 20 20 No of date -42 NPD 40% Menerapkan Jam kerja lembur Backfilling m 9712 8100 1612 300 5.3733333 1500 1.074666667 1/26/2018 Friday Holiday -3.714285714 penambahan Utility ( 6 Excavator, 2 Water Pump, 4 Dump Truck Kecil, 1 unit tower light) Termination point 2 2 -38.28571429 merubah metode Kerja Ohm meter / multi tester belum ada yg tersertifikasi REMAINING CONSTRUCTION WORK Pipeline & Trunkline Disipline Description Unit Remaining Status Piping Test Pack JR1 Test Pack 1 0 Test Pack 2 4 Completed Test Pack 3 4 Completed Test Pack 4 4 Completed Test Pack 5 1 Test Pack 6 20 JB Test Pack 1 Test Pack 2 CPP JR1 Test Pack 1 0 CPP JB Test Pack 1 9 Test Pack 2 11 Test Pack 3 9 JB Pipe Spool Installation ea 39 Pipe Support ea 35 JR1 Pipe Spool Installation ea 76 Pipe Support ea 83 CPP Pipe Spool Installation ea 67 Pipe Support ea 26 AS Pipe Spool Installation ea Pipe Support ea AR Pipe Spool Installation ea Pipe Support ea PIPELINE Trunkline JR1 Welding Joint 0 NDT Joint 0 FJC Joint 0 Trenching Mtr 0 Lowering Mtr 0 Backfill Mtr 0 Pipeline JB Welding Joint 4 NDT Joint 4 FJC Joint 4 Trenching Mtr 20 Lowering Mtr 20 Backfill Mtr 20 Disipline Description Unit Remaining Status CPP JR1 Welding Dia-Inch 10 Sandblasting M2 74 Painting M2 74 Pipe Support Installation Ea 80 Pipe Spool Installation Ea 76 JB Welding Dia-Inch 19 Sandblasting M2 Painting M2 Pipe Support Installation Ea 35 Pipe Spool Installation Ea 39 E&I Power Cable CPP to Jambo Balee Laying Cable m 0 Completed Splicing point 2 FO CPP to Jambo Balee Laying Cable m 0 Completed Splicing point 20 CIVIL CIVIL JR-1 Footing Area 1 Pcs 0 Area 2 Pcs 0 Area 3 Pcs 0 Pedestal Area 1 Pcs 0 Area 2 Pcs 0 Area 3 Pcs 0 CIVIL JB Metering Pipe Support Footing Pcs 1 Pedestal Pcs 0 Anchor Block Pcs 0 Pouring Concrete Complete Cathodic Protection JB Cad Weld point 1 Install Test Box ea Install Groundbed Anodes ea Install Tranformer Rectifier ea Termination point Cathodic Protection JR Disipline Description Unit Remaining Status Cad Weld point 0 Install Test Box ea Disipline Description Unit Remaining Status Install Groundbed Anodes ea Install Tranformer Rectifier ea Termination point Cathodic Protection AR Cad Weld point 15 Install Test Box ea Install Groundbed Anodes ea Install Tranformer Rectifier ea Termination point CIVIL CPP Pipe Support Footing Pcs 0 Completed Pedestal Pcs 0 Completed Anchor Block Pcs 0 Pouring Concrete Complete, Curing Time Description Column1 Column2 Unit Total To Day Cummulative Pipeline Welding JB Joint 850 0 850 JR1 Joint 233 0 233 AS Joint 583 0 577 AR Joint 1,241 12 985 JR 38 Joint 100 0 51 JR 40 Joint 141 0 27 Lowering JB m 10,200 0 10,200 JR1 m 2,800 0 2,800 AS m 7,000 0 5,924 AR m 14,900 1260 6,921 JR 38 m 1,200 0 - JR 40 m 1,700 0 - Civil Work Footing AS Pcs 166 0 98 AR Pcs 77 0 - JR 38 Pcs JR 40 Pcs Pedestal AS Pcs 196 8 64 AR Pcs 84 0 - JR 38 Pcs JR 40 Pcs Piping Work Spool Fabrication JB Ea JR1 Ea 124 0 48 AS Ea AR Ea JR 38 Ea JR 40 Ea Field Install JB Ea 39 0 - JR1 Ea 124 0 48 AS Ea AR Ea JR 38 Ea JR 40 Ea Electrical Instrument Pouling Cable JB m 9,700 0 9,700 JR1 m AS m 7,296 0 1,500 AR m 14,936 0 1,500 JR 38 m JR 40 m Cathodic JB Ea 13 0 13 JR1 Ea 7 0 7 AS Ea 15 0 5 AR Ea 20 0 10 JR 38 Ea JR 40 Ea Temination JB Point JR1 Point AS Point AR Point JR 38 Point JR 40 Point Mechanical Completion Hydrotest Trunkline JB Pack 3 2 2 JR1 Pack 6 2 5 AS Pack AR Pack JR 38 Pack JR 40 Pack Hydrotest Pipeline JB Line Check JR1 Line Check AS Line Check AR Line Check JR 38 Line Check JR 40 Line Check Remaining