a RETARARDA
B= ZHEN HUA ENGINEERING CO,, LTD.
HB ors trim in 1 hn haa Nth, ne
‘Wer 35) 7 Ha Pa (82) 25120027 Weibel cm
Date 21 February 2018,
Queket | ZHECICSs1/06.030230
YourRet: ~
‘ToDisteibution List By Hand and By Post
Dear Sits,
Contract No. NE/2017/02
‘Tseung Kwan O— Lam Tin Tunnel
Road B2/D4 and Associated Works
Mes
ing Minutes of the SLG Mesting No.t
Puther to SLG Meeting No.1 held on 26 January 2018, we now attach herewith copies of the
‘endorsed TTA drawings and captioned meeting minutes for your retention,
‘Should you require further information, please contact our traffic consultant Mr. Billy Fung at
3105 0730
‘Yours faithfully
For and on behalf of
‘Zhen Ha Engineering Company Limited
‘Shum Fong Sana
Construction Manager
nlSe Lisson Group
LE i hf
Distebutlon ust
wne/2017/02
‘aves ‘tention “Telephone Fax
ul Engineering and Devel
Department Me. Fung
2739 0076
‘Suite 1213 Chinachem Golden Plaza, 77 Samuel 29013529
Mody Road, Tsim sha Tul Eas, Kowloon
‘Hong Keng Police Force
Me KW ti
Kowloon East Operational Base, No.2 St oe 27553582 | 27580609
Yip Street, Kowloon Bay Kowloon
Hong Kong Police Force
owloon East Operational Base, No.2Su | Me Myekok | 27553636 | 2750 4816
Yip Street, Kowloon Bay, Kowloon
“Transport Department
‘ff, Mongkok Government offices, 30 Mc CH. Ma
zsoo 2301 | 2381 3799
|Luen Wan treet, Monglok, Kowloon, Daniel
pone meewke 1 siszosea | 28279237
25/f, MassMutual Tower, 33 Lockhart stephen
‘oad, Wan Chal, Hong Kong
Ms. TK. Kwan
oe sis7aia | 28279237
‘citybus td, -
G/F, 8 Chong Fu Road MrBraintam | 21362019 | 2605 5812
Chai Won, Hong Kong
"New World Fist Bus Services (td
fF, 8 Chong Fu Road Mathur | 21362205 | 21362296
Chai Wan, Hong Kong
Kowloon Motor Bus. Kowloon Bay Depot | say
‘9Potun street, Lai Chi Kok, Kowloon | Operation (Mr. 3406 2745
3406 7010
Wong & Mr Leung)
‘AECOM ‘Me-Simon Yeung | 359580268 | 35966118,
MecKevinWong | 35958043 | 35966218Minutes
Projecttitle Contract Wo. NE/2017/02
‘Teeung Kuan O—Lam Tin Tune! Road P2/D4 and Assoclated Works
Meeting 2" slic acting
Location —__HKPF Trafic Kowloon RMBOMfce
Present Nome Postion
Samet Fn, e7a(e)
‘Ka Wing, Peter (0c, aio THe
Mr Kok Man va ‘ROC, AMO TKE
Me Daniel ma ee
Ms. Florence Kan per
Me Sten Ko sees
Me Sion Yeung sme
Me Fay Lau ne
Ms. Kevin Wong. Re
Me Eugene Lt ne
MW Lok sa
Me icky Hon Subagent
Me i tau se
Meat Yio ce
Me ily Fong Pe
Me ktm Eng
Me Jonny Tam cs
Circulation ‘oThose Attending
tem Deseiption
No
0
aa
ene
‘Time and date
(0230pm_ 26 January 2018
Organization
ceo
HF
HPF
TeINTE, TO
MPD, 70
‘AEcOM (ne/2017/02)
‘RECOM (NE/2015/03)
‘RECOM (NE/2017/02}
‘AEGON (NE/2018/03)
‘ec (ne /2017/02)
‘HEC (Ne/2017/00)
Ze (ne/2017/02),
2c (ne/2037/02)
KF (Waffc Consultant for
‘ne/2017/02)
"Nolan (afc Consultant for
1Ne/2015/03)
wisi (Ne/2015/03)
ation by
‘HEC (NE/2017/02) welcomed al partis joining ths meeting and generally
Introduce the NE/2017/02 project elated state.‘contract mo. ne2017/02
Nanats of 515 Meeting No.1
42
43
aa
aa
32
33
a4
35
36
‘ALCON (NE/2017/02 introduced their tf, neading person lavcharge of
'NE/2015/03), and CEOD representative.
introduced tel representatives.
KP introduced the representatives.
Scone of work
‘HEC (NE/2017/02 bey introduced scope ofthe project and outined TTA
stages
stage a a Po
‘0, 6117019/P0Y88,01
Draw
{2HEC (NE/2017/02) presented the stage 1 TTA scheme for road widening
‘works a Po Yap Roa. This TTA scheme at Po Shun Road cross Po Yap Road
would be incorporated with NE/2015/09's TAs
‘To reminded 2HEC that STLA was granted to WSD for construction works at
‘the junction of Po hun Road cross Po Yap Road, and they hal to seek WSO
‘agreement before crying out the works.
‘AECOM (NE/2017/02) replied that they had cated out 2 jin inspection
with WSD and ZHEC (\E/2017/02} on ste, and noted that WSO was planning
to instal a water meter in the concerned location. AECOM reported that
WSD agreed to cary out the installation of water meter after the
"Ne/2017/02 works had been completed. TD requested AECOM to provide
the wtten ageemert fom WSO for thee information.
TD commented that the TTA Scheme should Include the loading and
unloading area, the éuation and frequency of loadina/unloaing, as well as
ingress / egress of te site, RMO alto reminded ZHEC to allow adequate
‘clearance for thir wos sites, and purchase T2 barter, soa to comply with
the prevaling Code of Practices for Ughtng, ining ana Guarding,
[P¥n: Additonal TI drawing no. 8117019/POYANOCT fs circulated for
tage of T2 bares
stage 2 oad = Draw
10, BIL70R9/POYAKIOGE
‘2HEC (NE/2017/02)oresented the stage 2 TTA Scheme for road widening
‘works a Pa Yap Roa, The exclusive left tur lane from Ching Road to Po
‘Shun Road and cena dlvider at Po Yap Road would be closed under this
‘TA stage. In adalton, footpath along Po Yap Road Is also closed for
"underground uty diversion. 1.5m width of footpath would be maintained,
‘To commented that this TTA Stheme should indude the loading and
Page 203
ate of Meeting
26 January 2018
‘econ
axe
axeContato e/2017702
ar
a8
39
a
5a
unloading area, entrance and ext, Water filed bacies should be paced
along the edges of eee track
TD commented that TTA Scheme should incude the lading and unloading
ara, and the mgress / egress ofthe site. Additonal TTA drawings should be
‘rovded in cae "2 barr are requie.
[Pam Adtinal TTA' drawing no. B117039/PO¥AR/008 1s ckeuated for
‘sage of T2 baer)
TO commented thatthe duration and frequency of lading and unloading
should mark cearly on drawings
TIA Scheme for Tal pits at Po Yap Road — Drawing no
117039/ovan/006
HEC (NE/2017/02) presented the TTA Scheme for tial pits exavation a Po
‘ap Road. There woul be thre trial pits excavation to be caried out. The
duration ofths TA scheme is .5 months
‘p commented tat water fled barr shouldbe placed along the edge of,
evel wack.
TO commented that the works area within cycle track shoul be temporarily
reinstated on Sturdy, Sunday and Public Holidays.
1D commented thatthe workfont onthe cycle track was too long. ZHEC
greed to exlorealtenatives in order to maintain the cele wack during
ial pit eieaation, such a¢ removal of planters and tee relocation, of
Aversion of ele track ont the footpath
{HEC sugested modifying the works area atthe west of Po Shun Road in
order not to affect the cycle track for early commencement of tral pit
‘excavation wetks. TD commented that the proposal shouldbe submitted
Inseparate THA drawings. TO requested and ZHEC agreed to cele to SiG
members the revise TAs for comments
‘The meeting was adjourned at 4:30pm,
408
[I apqroved TTA drawings of ME/2017/00 wil send to NE/POI/O8 fo
ombination of concurrent TAs
Net Meeting
‘The forthcoming meeting i scheduled on & March 2018 a 10:00 a.m at km
718, T Mongtok Government Office.
Page’ of3