TIME
HR's OPERATIONS
FROM TO
1:00 3:30 2:30 COMMENCED PRELOAD BOW LEG, START STATIC TEST, BOW SETTLED 0.4° & HULL DECK DRAFT 0.5 FT.
4:30 5:30 1:00 LEVEL THE RIG & RAISED HULL DECK TO 2 FT AIR GAP.
MOHAMED HAMDY
G.P.C REPRESENTATIVE
MOHAMED HAMDY