KODE
NO. URAIAN PEKERJAAN VOLUME SAT
ANALISA
A PEKERJAAN PERSIAPAN
1 Pengukuran Dan Pasang Bouwplank A1 110.00 M1
B PEKERJAAN TANAH
1 Galian Tanah B1 7.82 M3
C PEKERJAAN BETON
1 Membuat Beton 1 Pc : 3 Ps : 5 Kr Beton Lantai C1 3.01 M3
G PEKERJAAN PLAFOND
1 Rangka Langit - Langit ( 60 x120 ) Cm, Kayu Meranti G1 274.00 M2
2 Pasang Langit - Langit Plywood Tebal 4 mm G2 274.00 M2
3 Pasang List Langit-Langit Kayu Profil G3 275.00 M1
H PEKERJAAN LISTPLANK
1 Pasang Listplank H1 96.00 M1
I PEKERJAAN ATAP
1 Pasang Atap Metal Zincalume Type Multi Roof I1 280.00 M2
2 Pasang Rabung Metal Zincalume Type Multi Roof I2 54.50 M1
KODE
NO. URAIAN PEKERJAAN VOLUME SAT
M PEKERJAAN LISTRIK
1 Pasang Kabel NYA 2 x 2,5 sgmm 214.00 M1
2 Pasang Kabel NYA 1 x 2,5 sgmm 40.00 M1
3 Pasang MCB 4 Ampere 10.00 Bh
4 Pasang Arde Batang Tembaga 1/2 Inc 10.00 M1
5 Pasang Box MCB Kap. 1 MCB 10.00 Bh
6 Pemasangan Fixture Lampu SL 70.00 Bh
7 Pasang Lampu Philip SL 18 Watt 30.00 Bh
8 Pasang Lampu Philip SL 14 Watt 20.00 Bh
9 Pasang Lampu Philip SL 11 Watt 10.00 Bh
10 Pasang Saklar Ganda 20.00 Bh
11 Pasang Saklar Tunggal 30.00 Bh
12 Pasang Stop Kontak 30.00 Bh
37,485.00 4,123,350.00
Jumlah Sub - A 4,123,350.00
74,125.00 579,657.50
Jumlah Sub - B 579,657.50
1,133,504.10 3,411,847.34
Jumlah Sub - C 3,411,847.34
4,145,580.00 18,655,110.00
65,185.00 18,773,280.00
94,362.50 19,816,125.00
151,090.00 39,887,760.00
117,350.00 23,470,000.00
156,925.00 4,174,205.00
Jumlah Sub - D 124,776,480.00
158,875.00 44,485,000.00
Jumlah Sub - E 44,485,000.00
5,366,500.00 13,147,925.00
503,215.00 35,225,050.00
113,675.00 2,946,456.00
175,000.00 2,457,000.00
Jumlah Sub - F 53,776,431.00
68,705.00 18,825,170.00
54,435.00 14,915,190.00
34,275.00 9,425,625.00
Jumlah Sub - G 43,165,985.00
76,575.00 7,351,200.00
Jumlah Sub - H 7,351,200.00
71,740.00 20,087,200.00
32,310.00 1,760,895.00
Jumlah Sub - I 21,848,095.00
34,821.25 6,576,515.38
34,821.25 9,749,950.00
58,407.50 9,491,218.75
43,092.50 6,894,800.00
5,000.00 1,010,000.00
Jumlah Sub - J 33,722,484.13
1,585,915.00 15,859,150.00
1,725,322.50 17,253,225.00
18,087.00 723,480.00
26,487.00 1,324,350.00
18,087.00 361,740.00
58,326.50 1,166,530.00
73,326.50 4,399,590.00
38,437.50 384,375.00
88,437.50 884,375.00
28,125.00 281,250.00
1,500,000.00 7,500,000.00
Jumlah Sub - K 50,138,065.00
525,645.00 21,025,800.00
31,455.63 3,774,675.00
27,607.50 2,760,750.00
30,911.25 1,545,562.50
25,107.50 1,255,375.00
156,411.25 2,884,223.45
128,911.25 314,543.45
25,000.00 1,250,000.00
303,812.50 3,038,125.00
201,537.50 2,015,375.00
Jumlah Sub - L 39,864,429.40
17,500.00 3,745,000.00
12,500.00 500,000.00
112,500.00 1,125,000.00
150,000.00 1,500,000.00
425,000.00 4,250,000.00
37,500.00 2,625,000.00
22,500.00 675,000.00
18,750.00 375,000.00
17,250.00 172,500.00
12,500.00 250,000.00
10,000.00 300,000.00
12,000.00 360,000.00
Jumlah Sub - M 15,877,500.00
100,000.00 2,660,000.00
25,000.00 717,500.00
350,000.00 3,500,000.00
Jumlah Sub - N 6,877,500.00
DAFTAR HARGA DASAR BAHAN DAN UPAH
RUMAH KAYU 10 PINTU
1 2 3
1 Mandor Hari
2 Kepala Tukang Hari
3 Tukang Hari
4 Pekerja Hari
1 2 3
1 Pasir Pasang M³
2 Pasir Beton M³
3 Batu Gunung M³
4 Batu Bata Bh
5 Koral Beton M³
6 Semen PC @ Kg Kg
7 Semen PC @ 50 Kg Sak
1 Papan Bengkirai M³
2 Balok Bengkirai M³
3 Papan Ulin M³
4 Balok Ulin M³
5 Papan Meranti M³
6 Balok Meranti M³
7 Balok Kayu Kelas III M³
8 Playwood 4 mm Lbr
9 Playwood 3 mm Lbr
10 Playwood 9 mm Lbr
11 Lem Kayu Kg
12 Calsiboard 4 mm Lbr
13 List Profil Gyfsum M1
14 List Kayu Profil 4/5 M1
15 Balok Kayu Kelas II M³
1 2 3
IV BAHAN SANITASI
V BAHAN LOGAM
1 Paku Biasa Kg
2 Paku Seng Kg
3 Kaca Reyben 5 mm M2
4 Ware Mesh M6 M2
5 Baja Plat Kg
6 Baja Siku Kg
7 Baja Profil Kg
8 Holow Kerangka Aluminium+Penguat M2
9 Rangka Besi Canal Untuk Perkuatan M2
10 Ramset /Dinabolt Bh
11 Cotton Plester Bh
12 Baut Bh
13 Paku Plywood Kg
14 Paku Ulin Kg
15 Paku Sekrup 31/2" Kg
4 5
115,000.00
110,000.00
105,000.00
95,000.00
HARGA SATUAN
KETERANGAN
(Rp.)
4 5
HARGA SATUAN
KETERANGAN
(Rp.)
4 5
HARGA SATUAN
KETERANGAN
(Rp.)
17,500.00 Terpasang
12,500.00 Terpasang
112,500.00 Terpasang
150,000.00 Terpasang
425,000.00 Terpasang
37,500.00 Terpasang
22,500.00 Terpasang
18,750.00 Terpasang
17,250.00 Terpasang
12,500.00 Terpasang
10,000.00 Terpasang
12,000.00 Terpasang
ANALISA HARGA SATUAN PEKERJAAN
RUMAH KAYU 10 PINTU
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
BAHAN
Kaso 5 x 7 M3
Paku Biasa Kg
Kayu Papan 3 x 20 M3
Mandor Oh
BAHAN
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075 Cement
Portland Kg
Pasir Beton Kg
Koral Beton Kg
Air Liter
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075
Kayu Meranti 5 x 10 M3
Paku 5 Cm - 7 Cm Kg
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Papan 2,5/20 M3
Paku Biasa Kg
Upah Ketam M2
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075
Paku 1 Cm - 2,5 Cm Kg
Pluwood 4 mm Lembar
D PEKERJAAN KAYU ( SNI DT 91 - 0011 - 2007 )
D5 1 M2 Mengerjakan Lantai Papan Kayu Meranti 2,5/20 Diketam TENAGA
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Papan Meranti 2,5/20 M3
Paku Biasa Kg
Upah Ketam M2
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Paku Ulin M3
Upah Ketam M2
E PEKERJAAN KAYU ( SNI DT 91 - 0011 - 2007 )
E1 Memasang 1 M2 Rangka Atap Kayu Meranti TENAGA
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075
Balok 6 x 12 M3
Kaso 5 x 7 Cm M3
Reng 2 x 3 Cm M3
Paku Biasa Kg
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075
Balok Kayu M3
Paku 10 Cm Kg
Lem Kayu Kg
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075Kayu
Papan M3
Paku 1 Cm - 2,5 Cm Kg
Lem Kayu Kg
Plywood 4 mm Lembar
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075Kayu
Papan M3
Lem Kayu Kg
G PEKERJAAN KAYU ( SNI DT 91 - 0011 - 2007 )
G1 Memasang 1 M2 Rangka Plafond 60 x 60 Cm Kayu Kelas - II TENAGA
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075
Kaso 5 x 7 Cm M3
Paku 7 Cm - 10 Cm Kg
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075
Tripleks
M2
Paku Tripleks Kg
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075
List
Kayu Profil M1
Paku Kg
Kepala Tukang Oh
Mandor Oh
Mandor
BAHAN
OH
0,075
Kayu Papan M3
Paku 5 Cm - 7 Cm Kg
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Atap Zincalum M2
Paku Sekrup 31/2" Kg
Kepala Tukang Oh
Mandor Oh
BAHAN
Nok Zincalum Lbr
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Tukang Cat Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Cat Meni Kg
Plamir Kg
Cat Dasar Kg
Cat Kayu Kg
Kepala
Tukang Oh
Mandor
Mandor Oh
OH
0,075
BAHAN
Plamir Kg
Cat Dasar Kg
Cat Tembok Kg
Tukang Cat Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Pelitur Ltr
Pelitur Jadi Ltr
Ampelas Lembar
K PEKERJAAN SANITASI ( RSNI T - 15 - 2002 )
K1 Memasang 1 Buah Kloset Jongkok Porselen TENAGA
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Kloset Jongkok Bh
Semen Portland Kg
Pasir Pasang M3
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Pipa PVC Ø 1/2 " M1
Perlengkapan Ls
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Perlengkapan Ls
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Pipa PVC Ø 11/2 " M1
Perlengkapan Ls
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Pipa PVC Ø 3 " M1
Perlengkapan Ls
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Pipa PVC Ø 4 " M1
Perlengkapan Ls
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Bak Cuci Bh
Asessories %
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Floor Drain Bh
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Seal Tape Bh
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Kunci Tanam Antik Bh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Kunci Tanam KM Bh
L PEKERJAAN KUNCI DAN KACA ( PT T - 30 - 2000 - C )
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Engsel Pintu Bh
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Kepala Tukang Oh
Mandor Oh
BAHAN
Engsel Jendela Bh
L PEKERJAAN KUNCI DAN KACA ( PT T - 30 - 2000 - C )
L5 1 Buah Pasang Kait Angin TENAGA
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Kait Angin Bh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Door Holder Bh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Kaca Polos M2
KODE
URAIAN PEKERJAAN KEBUTUHAN SATUAN
ANALISA
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
BAHAN
Kaca Es M2
Kepala Tukang Oh
Mandor Oh
BAHAN
Grendel Jendela Bh
HARGA DASAR HARGA BAHAN HARGA UPAH JUMLAH HARGA
INDEKS
( RP ) ( RP ) ( RP ) ( RP )
- 74,125.00 74,125.00
Mandor
OH
0,075 1,500.00 230.0 345,000.00
303.57 893.0 271,089.29
Mandor
OH
0,075 2,100,000.00 0.014 29,400.00
28,000.00 0.075 2,100.00
Mandor
OH
0,075 28,000.00 0.030 840.00
85,000.00 0.600 51,000.00
Mandor
OH
0,075 2,100,000.00 0.012 25,200.00
2,100,000.00 0.014 29,400.00
Mandor
OH
0,075 3,500,000.00 1.100 3,850,000.00
28,000.00 1.250 35,000.00
Mandor
OH
0,075 3,750,000.00 0.025 93,750.00
28,000.00 0.030 840.00
Mandor
OH
0,075 3,750,000.00 0.006 22,500.00
19,000.00 0.075 1,425.00
23,925.00 89,750.00 113,675.00
Mandor
OH
0,075 2,100,000.00 0.016 34,230.00
28,000.00 0.250 7,000.00
Mandor
OH
0,075
85,000.00 0.375 31,875.00
Mandor
OH
0,075
22,000.00 1.050 23,100.00
Mandor
OH
0,075 3,750,000.00 0.011 40,500.00
28,000.00 0.100 2,800.00
115,000.000 0.010
-
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN BETON
D PEKERJAAN KONSTRUKSI KAYU
G PEKERJAAN PLAFOND
H PEKERJAAN LISTPLANK
I PEKERJAAN ATAP
II DIBULATKAN
( Rp )
4,123,350.00
579,657.50
3,411,847.34
124,776,480.00
44,485,000.00
53,776,431.00
43,165,985.00
7,351,200.00
21,848,095.00
33,722,484.13
50,138,065.00
39,864,429.40
15,877,500.00
6,877,500.00
449,998,024.37
450,000,000.00
JUMLAH BULAN KE
NO. URAIAN PEKERJAAN HARGA BOBOT I II
(RP) 1 2 3 4 1 2 3 4
A PEKERJAAN PERSIAPAN 4,123,350.00 0.92 0.46 0.46
D PEKERJAAN KONSTRUKSI KAYU 124,776,480.00 27.73 4.62 4.62 4.62 4.62 4.62
E PEKERJAAN RANGKA ATAP 44,485,000.00 9.89 3.30
F PEKERJAAN PINTU DAN JENDELA 53,776,431.00 11.95 2.99 2.99 2.99 2.99
III BOBOT RENCANA MINGGUAN 0.46 0.97 3.37 7.61 9.23 9.23 6.24 7.92
IV BOBOT RENCANA MINGGUAN KOMULATIF 0.5 1.4 4.8 12.4 21.6 30.9 37.1 45.0
BULAN KE -
III IV KET ( % )
1 2 3 4 1 2 3 4
100
80
4.62
3.30 3.30
60
30
2.50 2.50 2.50
3.71 3.71 3.71
20
2.95 2.95 2.95
1.18 1.18 1.18
0
0.51 0.51 0.51
PEMELIHARAAN
7.92 7.00 7.20 9.70 10.89 7.39 4.89 - 120 HARI KALENDER
( Hj.Dara Risky, SE )
Direktur
BILL OF QUANTITY
BANGUNAN : Rumah G 10
SPESIFIKASI : Dinding Kayu
HARGA : Rp -
LUAS BANGUNAN : 355 M2
Harga Per Meter : Rp -
II PEKERJAAN PASANGAN
1 Pasang Tiang Gantung
a. Balok Ulin 10 x 10 x 300 cm M³ 2.85
b. Paku Ulin 4 " Kg 10.00
2 Rangka Dinding
a. Balok Meranti 5 x 10 x 300 cm M³ 9.84
b. Balok Ulin 5 x 10 x 300 cm M³ 3.23
c. Paku biasa 3" Kg 25.00
d. Paku Ulin 3" Kg 7.50
3 Pasangan Papan
a. Pasangan Dinding Papan
a. Papan Meranti 2 x 20 x 300 cm M³ 10.85
b. Papan Ulin 2 x 20 x 300 cm M³ 2.88
c. GRC 4 mm lmbr 15.00
d. Paku Biasa 2.5" Kg 25.00
e. Paku Ulin 2.5" Kg 10.00
f. Paku GRC 1" Kg 2.50
g. Plywood 4 mm lmbr 340.49
h. Paku Plywood Kg 25.00
b. Pasangan Lantai
a. Papan Meranti 2.5 x 20 x 300 cm M³ 9.75
b. Paku Biasa 2.5" Kg 30.00
IV PEKERJAAN PLAFOND
a. Pasang rangka langit-langit 2/3 (120x240) cm M³ 0.72
b. Pasang langit-langit plywood tebal = 4 mm Lbr 152.78
c. Pasang list langit-langit kayu plepet 1/5 cm m' 758.00
d. Paku Biasa 2.5" Kg 20.00
e. Paku plywood Kg 10.00
BILL OF QUANTITY
BANGUNAN : Rumah G 10
SPESIFIKASI : Dinding Kayu
HARGA : Rp -
LUAS BANGUNAN : 355 M2
Harga Per Meter : Rp -
V PEKERJAAN PENGECATAN
Pengecatan Dinding
a. Cat Paragon warna putih @ 20KG pail 20.00
b. kuas Roll Pcs 2.00
c. kuas cat 3" Pcs 5.00
d. Cat Minyak hitam Kg 50.00
e. Tiner Kg 40.00
Ket.
HARGA JUMLAH
VOL SATUAN HARGA KETERANGAN
Kontraktor Rp. Rp.
Rp 5,000,000.00 Rp 30,000,000.00
Rp 6,000,000.00 Rp 37,500,000.00
Rp 38,500.00 Rp 770,000.00
Rp 6,000,000.00 Rp 17,100,000.00
Rp 38,500.00 Rp 385,000.00
Rp 4,500,000.00 Rp 44,280,000.00
Rp 5,000,000.00 Rp 16,150,000.00
Rp 28,000.00 Rp 700,000.00
Rp 38,500.00 Rp 288,750.00
Rp 4,000,000.00 Rp 43,400,000.00
Rp 4,350,000.00 Rp 12,528,000.00
Rp 60,000.00 Rp 900,000.00
Rp 28,000.00 Rp 700,000.00
Rp 38,500.00 Rp 385,000.00
Rp 18,000.00 Rp 45,000.00
Rp 85,000.00 Rp 28,941,650.00
Rp 29,500.00 Rp 737,500.00
Rp 4,000,000.00 Rp 39,000,000.00
Rp 28,000.00 Rp 840,000.00
Rp 4,500,000.00 Rp 36,540,000.00
Rp 4,750,000.00 Rp 11,495,000.00
Rp 28,000.00 Rp 840,000.00
Rp 60,000.00 Rp 19,966,800.00
Rp 34,000.00 Rp 1,700,000.00
Rp 22,000.00 Rp 1,199,000.00
Rp 4,000,000.00 Rp 4,000,000.00
Rp 28,000.00 Rp 280,000.00
Rp 80,000.00 Rp 57,600.00
Rp 54,000.00 Rp 8,250,120.00
Rp 34,000.00 Rp 25,772,000.00
Rp 28,000.00 Rp 560,000.00
Rp 29,500.00 Rp 295,000.00 Rp 385,606,420.00
HARGA JUMLAH
VOL SATUAN HARGA KETERANGAN
Kontraktor Rp. Rp.
Rp 300,000.00 Rp 6,000,000.00
Rp 50,000.00 Rp 100,000.00
Rp 12,000.00 Rp 60,000.00
Rp 45,000.00 Rp 2,250,000.00
Rp 50,000.00 Rp 2,000,000.00
Rp 750,000.00 Rp 1,507,500.00
Rp 350,000.00 Rp 416,500.00
Rp 400,000.00 Rp 400,000.00
Rp 750,000.00 Rp 4,222,500.00
Rp 250,000.00 Rp 585,000.00
Rp 80,000.00 Rp 2,400,000.00
Rp 875,000.00 Rp 875,000.00
Rp 300,000.00 Rp 300,000.00
Rp 22,000.00 Rp 3,080,000.00
Rp 15,000.00 Rp 1,200,000.00
Rp 250,000.00 Rp 12,500,000.00
Rp 12,000.00 Rp 600,000.00
Rp 12,500.00 Rp 625,000.00
Rp 25,000.00 Rp 1,250,000.00
Rp 200,000.00 Rp 3,920,000.00
Rp 15,000.00 Rp 1,050,000.00
Rp 22,500.00 Rp 1,125,000.00
Rp 18,600.00 Rp 372,000.00
Rp 30,000.00 Rp 10,800,000.00
Rp 20,000.00 Rp 800,000.00
Rp 112,500.00 Rp 1,125,000.00
Rp 10,000.00 Rp 200,000.00
Rp 100,000.00 Rp 1,000,000.00
Rp 10,000.00 Rp 300,000.00
Rp 12,500.00 Rp 250,000.00
Rp 12,000.00 Rp 360,000.00
Rp 150,000.00 Rp 1,500,000.00
Rp 375,000.00 Rp 3,750,000.00
Rp 40,000.00 Rp 600,000.00
Rp 27,500.00 Rp 1,100,000.00
Rp 15,000.00 Rp 225,000.00
Rp 12,000.00 Rp 48,000.00
Rp 5,000.00 Rp 10,000.00
Rp 30,000.00 Rp 300,000.00
Rp 20,000.00 Rp 200,000.00
Rp 69,406,500.00
HARGA JUMLAH
VOL SATUAN HARGA KETERANGAN
Kontraktor Rp. Rp.
Rp 25,000.00 Rp 500,000.00
Rp 2,000.00 Rp 40,000.00
Rp 15,000.00 Rp 150,000.00
Rp 4,500,000.00 Rp 9,000,000.00
Rp 20,000.00 Rp 200,000.00
Rp 12,000.00 Rp 120,000.00
Rp 15,000.00 Rp 60,000.00
Rp 17,000.00 Rp 136,000.00
Rp 10,000.00 Rp 200,000.00
Rp 10,000.00 Rp 200,000.00
Rp 12,000.00 Rp 240,000.00
Rp 1,500,000.00 Rp 7,500,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp 6,000,000.00 Rp 6,000,000.00
Rp 38,500.00 Rp 77,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp 6,000,000.00 Rp 6,000,000.00
Rp 38,500.00 Rp 38,500.00
Rp 80,000.00 Rp 592,800.00
Rp 500,000.00 Rp 550,000.00
Rp 650,000.00 Rp 663,000.00
Rp 2,000.00 Rp 582,500.00
Rp 75,000.00 Rp 375,000.00
Rp 500,000.00 Rp 1,500,000.00
Rp 26,250.00 Rp 262,500.00
Rp 44,987,300.00
Tgl : Tgl :
Rp 500,000,220.00