Extend / fill-in scaffold to install and header 1 Pack is already cat A clear is 3/2/2018
pipe 700-WF408. Also modify top handrails this scaffold needed? Mhasard
and ladder access to install pipng running to confirm.
off header. Consutl with Peter V to ensure
scaff is fit for purpose
Flanges 2
Flanges 2
Scaffold modification required install pipe 2
support. Extend scaffold as highlighted.
Consult with Greenie or Degsy (MEC-2 Ch3)
to ensure scaffold is fit for purpose.
Pipe welds. 4
Scaffold reinstatement required to cut and
re weld pipe work. Consult with Degsy
(MEC-2 Ch3) to ensure scaffold is fit for
purpose
Once pipe is fit up, fill in deck below and 4
move handrails to the back of the column
so there is room to weld 780-DW623.
Consult with Gary Mansfield MEC2 CH3 to
ensure scaff is fit for purpose.
100%
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
100%
100%
100%
100%
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508
Err:508