RAB Lamella Sedimen
RAB Lamella Sedimen
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4
UPAH
1 Mandor HOK 80,000.00
BAHAN
I BAHAN TANAH / PASIR
1 Tanah Urug m3 75,000.00
2 Pasir Urug m3 100,000.00
3 Pasir Cor m3 198,000.00
4 Pasir Lokal / Pasir Kali m3 90,000.00
5 Pasir Batu/ Sirtu Alam Hitam m3
126,500.00
6 Pasir Pasang m3
154,000.00
7 Pedel m3
70,000.00
8 Pasir Grosok m3
137,500.00
9 Pasir Ayak Beton m3 198,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4
II BAHAN BATU
1 Batu Brongkol m3 89,200.00
2 Batu Kali hitam m3
105,500.00
3 Kerikil kali m3
65,200.00
4 Kerikil hias m3 54,400.00
5 Batu Pecah 3-5 mesin m3 254,900.00
6 Batu Pecah 2-3 mesin m3
278,200.00
7 Batu Pecah 1-2 mesin m3
289,100.00
8 Batu Pecah 1/2-1 mesin m3
219,400.00
9 Batu Pecah 5/7, 6/8 tangan m3
99,900.00
10 Batu Pecah 3/5 tangan m3 111,700.00
11 Batu Belah 20/25 tangan m3 71,700.00
12 Batu Belah 15/20 tangan m3 79,400.00
13 Batu Bata Kw. 1 bj 1,100.00
14 Batu Bata Kw. 2 bj 750.00
15 Batu Putih Lokal / kumbung bj 1,000.00
16 Batu Putih Lokal Umpak 24x24 cm bj 5,000.00
17 Batu Putih Lokal Umpak 24x48 cm bj 10,000.00
18 Pavingstone Segiempat tb. 5 Cm (K.100) m2 38,000.00
19 Pavingstone Segiempat tb. 6 Cm (K.200) m2
50,000.00
20 Pavingstone Segiempat tb. 6 Cm (K.300) m2
58,000.00
21 Pavingstone Segiempat tb. 8 Cm (K.300) m2
77,000.00
22 Pavingstone Segiempat tb. 6 Cm (K.300) warna m2
64,500.00
23 Pavingstone Segiempat tb. 8 Cm (K.300) warna m2 85,000.00
24 Pavingstone Segienam Abu - abu 6 cm K 200 m2 50,000.00
25 Pavingstone Segienam Abu - abu 6 cm K 300 m2 58,000.00
26 Pavingstone Segienam tb. 6 cm K 300 warna m2
65,000.00
27 Pavingstone Segienam Abu - abu 6 cm tanpa K m2
40,000.00
28 Pavingstone Segienam tb. 6 cm tanpa K warna m2
45,000.00
29 Paving Uskup tb. 6 Cm (K.200) bj 5,500.00
30 Paving Uskup tb. 6 Cm (K.300) bj 7,500.00
31 Paving Uskup tb. 8 Cm (K.300) bj 10,000.00
32 Kanstin uk. 10x20x40 K.225 bj 17,000.00
33 Kerep uk. 0175x0,2x0,3x0,6 bj 51,000.00
34 Batu Palimanan uk.10/20 kasar m2
75,000.00
35 Batu Palimanan uk. 5/20 m2
75,000.00
36 Batu Palimanan uk. 10/10 m2 75,000.00
37 Batu Palimanan uk.15/15 halus m2 80,000.00
38 Batu Palimanan uk.15/30 m2 90,000.00
39 Batu Palimanan uk.20/20 halus m2
90,000.00
40 Batu Palimanan uk.20/30 halus m2
100,000.00
41 Batu Palimanan uk. 20/40 m2
110,000.00
42 Batu Palimanan uk. 25/25 m2
110,000.00
43 Batu Palimanan uk. 30/30 m2 110,000.00
44 Batu Palimanan Hijau Segala Ukuran m2 95,000.00
45 Batu Candi m2
123,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4
IV BAHAN KAPUR
1 Kapur Bubuk / Kapur Pasang kg 2,850.00
2 Kapur Gamping kg 3,200.00
V BAHAN BESI
1 Besi Beton Polos (tulangan) kg 10,500.00
2 Besi Beton Ulir (tulangan) kg 11,250.00
3 Baja Konstruksi kg 14,000.00
4 Plat baja kg 12,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4
VI BAHAN KAYU
1 Ky. Jati balok ( Macam-macam Ukuran kelas 1 ) m3 17,160,000.00
2 Ky. Jati Papan ( Macam-macam Ukuran kelas 1 ) m 3
22,660,000.00
3 Ky. Jati Usuk m3 8,755,000.00
4 Ky. Jati Reng m3 7,210,000.00
5 Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. I m3 8,497,500.00
6 Ky. Kamper Papan 2/20, 3/20 = 4m kw. I m 3
9,913,800.00
7 Ky. Kamper Usuk 5/7, 4/6 = 4m kw. I m 3
6,312,500.00
8 Ky. Kamper Reng 2/3, 3/5 = 4m kw. I m 3
5,665,000.00
9 Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. II m 3
7,364,500.00
10 Ky. Kamper Papan 2/20, 3/20 = 4m kw. II m3 9,064,000.00
11 Ky. Kamper Usuk 5/7, 4/6 = 4m kw. II m3 5,098,500.00
12 Ky. Kamper Reng 2/3, 3/5 = 4m kw. II m 3
4,447,100.00
13 Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. I m 3
9,913,800.00
14 Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. I m 3
11,896,500.00
15 Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. I m 3
7,364,500.00
16 Ky. Bengkirai Reng kw. I m3 6,514,800.00
17 Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. II m3 7,647,800.00
18 Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. II m3 8,497,500.00
19 Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. II m 3
5,098,500.00
20 Ky. Bengkirai Reng kw. II m 3
4,892,500.00
21 Ky. Meranti Balok 8/12, 6/12 = 4 m kw. I m 3
5,098,500.00
22 Ky. Meranti Papan 2/20, 3/20 = 4 m kw. I m 3
5,117,400.00
23 Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. I m3 4,532,000.00
24 Ky. Meranti Balok 8/12, 6/12 = 4 m kw. II m3 4,550,900.00
25 Ky. Meranti Papan 2/20, 3/20 = 4 m kw. II m 3
4,815,300.00
26 Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. II m 3
3,701,100.00
27 Ky. Meranti Reng m 3
3,122,900.00
28 Ky. Papan Begesting 2/20 = 4 m (meranti) m 3
3,605,000.00
29 Ky. Acuan / cetakan m3 3,059,100.00
30 Dolken dia. 16X19 cm Pj. 4m bt 204,000.00
31 Dolken dia. 8 cm Pj. 4m bt 41,200.00
32 Bongkotan Pj. 3 m bt 22,200.00
33 Ky. Gelam Balok 6/12 & 8/12 m 3
6,231,500.00
34 Kayu profil lb. 5 cm m' 9,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4
IX BAHAN KERAMIK
1 Keramik 10x20 cm KW 1 m2 45,500.00
2 Keramik Kembang 20x20 cm Kw. I Mulia m2
48,600.00
3 Keramik Kembang 20x20 cm Kw. I Asia m2
49,800.00
4 Keramik Polos 20x20 Kw. I Mulia m2 44,500.00
5 Keramik Polos 20x20 Kw. I Asia m2 48,600.00
6 Keramik Motif 20x25 KW 1 Roman m2 51,000.00
7 Keramik Motif 20x25 KW 1 Mulia m2
50,950.00
8 Keramik Motif 20x25 Kw. I Kobin m2
50,300.00
9 Keramik Motif 20x25 Kw. I Yupiter m2
51,000.00
10 Keramik Motif 20x25 Kw. I Asia m2
59,300.00
11 Keramik Polos 20x25 Kw. I Mulia m2 44,420.00
12 Keramik Polos 20x25 Kw. I Asia m2 47,400.00
13 Keramik Motif 25x40 Kw. I KIA m2
66,350.00
14 Keramik Motif 25x40 Kw. I IKAD m2
61,600.00
15 Keramik Motif 25x40 Kw. I ACANDRA m2
53,900.00
16 Keramik Motif 25x40 Kw. I Asia m2
72,900.00
17 Keramik Motif 25x25 Kw. I KIA m2 52,000.00
18 Keramik Sembur (kasar) 30x30 cm KW 1 Mulia m2 38,200.00
19 Keramik Sembur (kasar) 30x30 cm KW 1 Asia m2 43,750.00
20 Keramik Polos ( 30x30 cm ) KW 1 Mulia m2
43,900.00
21 Keramik Polos ( 30x30 cm ) KW 1 Roman m2
47,400.00
22 Keramik Polos ( 30x30 cm ) KW 1 Asia m2
47,400.00
23 Keramik Motif 30x30 Kw. I Mulia m2
51,000.00
24 Keramik Motif 30x30 Kw. I Yupiter m2 52,800.00
25 Keramik Motif 30x30 Kw. I Asia m2 52,200.00
26 Keramik Motif 30x30 Kw. I Arwana m2
48,000.00
27 Keramik Motif ( 40x40 cm ) KW 1 Platinum m2
65,800.00
28 Keramik Motif ( 40x40 cm ) KW 1 Yupiter m2
60,500.00
29 Keramik Motif Kasar ( 40x40 cm ) KW 1 Yupiter m2
64,500.00
30 Keramik Motif ( 40x40 cm ) KW 1 Arwana m2 59,900.00
31 Keramik Motif ( 40x40 cm ) KW 1 Masterina m2 78,200.00
32 Keramik Motif ( 40x40 cm ) KW 1 Garuda m2 53,400.00
33 Keramik Polos ( 40x40 cm ) KW 1 MAS m2
56,300.00
34 Keramik Kembang 50x50 cm KW 1 Milan m2
91,300.00
35 Keramik Motif 50x50 cm KW 1 Milan m2
87,100.00
36 Keramik Motif 50x50 cm KW 1 Platinum m2
77,600.00
37 Keramik Motif 60x60 cm KW 1 Platinum m2 137,400.00
38 Keramik Motif 40x60 cm KW 1 Platinum m2 131,217.00
39 Keramik Motif 60x60 cm KW 1 Platinum motif m2
157,600.00
40 Keramik Motif 60x60 cm KW 1 Platinum Strata Erena m2
157,600.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4
XI BAHAN GENTENG
1 Genteng Pres lokal (Penthol) bj 1,700.00
2 Genteng Bubungan Pres lokal bj 3,300.00
3 Genteng Beton Besar isi 9,5 (buah) polos bj 3,800.00
4 Genteng Beton Kecil Isi 12 ( buah ) bj 2,900.00
5 Bubungan Beton bj 8,700.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4
XX BAHAN CAT
1 Cat Kayu / Besi (Emco) warna muda kg 60,000.00
2 Cat Kayu / Besi (Emco) warna tua kg 65,000.00
3 Cat Tembok 5 Kg (Paragon) Galon 72,500.00
4 Cat Tembok 5 Kg (Decolith) Galon 77,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4
3 Ganco Bh 32,500.00
4 Keranjang Bh 12,500.00
4 1 M3 Bongkar dinding
(SNI 03-2835-04)
Upah kerja
Pekerja 6.667 Org 55,000.00 366,685.00
Mandor 0.033 Org 80,000.00 2,640.00
Analog biaya 1 m3 Jumlah 369,325.00
Analog biaya 1 m2 Jumlah 44,320.77
9 1 M3 Urugan pasir
(SNI DT 91-0006-2007-09)
Bahan
Pasir urug 1.200 m3 100,000.00 120,000.00
Jumlah (1) 120,000.00
Upah kerja
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 17,300.00
Jumlah (1+2) 137,300.00
10 1 M3 Urugan tanah
(SNI DT 91-0006-2007-10)
Bahan
Tanah urug 1.200 m3 75,000.00 90,000.00
Jumlah (1) 90,000.00
Upah kerja
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 17,300.00
Jumlah (1+2) 107,300.00
11 1 M3 Urugan sirtu
(SNI DT 91-0006-2007-11)
Bahan
Sirtu 1.200 m3 126,500.00 151,800.00
Jumlah (1) 151,800.00
Upah kerja
Pekerja 0.250 Org 55,000.00 13,750.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
12 1 M3 Urugan pedel
(SNI DT 91-0006-2007-12)
Bahan
Urugan pedel 1.200 m3 70,000.00 84,000.00
Jumlah (1) 84,000.00
Upah kerja
Pekerja 0.250 Org 55,000.00 13,750.00
Mandor 0.025 Org 80,000.00 2,000.00
Jumlah (2) 15,750.00
Jumlah (1+2) 99,750.00
22 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 3Kp : 10Ps
(SNI DT 91-0009-2007-17)
Bahan
Bata merah kw. 2 70.000 bh 750.00 52,500.00
PC / Semen 4.500 kg 1,600.00 7,200.00
Kapus pasang 0.015 m3 2,850.00 42.75
Pasir pasang 0.050 m3 154,000.00 7,700.00
Jumlah (1) 67,442.75
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 92,892.75
8 1 M2 Plesteran Ciprat
(SNI DT 91-0010-2007-08)
Bahan
PC / Semen 4.320 kg 1,600.00 6,912.00
Pasir pasang 0.006 m3 154,000.00 924.00
Jumlah (1) 7,836.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 33,286.00
9 1 M2 Acian
(SNI DT 91-0010-2007-09)
Bahan
PC / Semen 3.250 kg 1,600.00 5,200.00
Jumlah (1) 5,200.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 19,550.00
Jumlah (1+2) 24,750.00
14 1 M3 Begesting pondasi
(SNI DT 91-0008-2007-14)
Bahan
Kayu papan begesting 0.200 m3 3,605,000.00 721,000.00
Paku 1.500 Kg 14,000.00 21,000.00
Minyak begesting 0.400 Ltr 25,600.00 10,240.00
Jumlah (1) 752,240.00
Upah kerja
Tukang kayu 1.300 Org 70,000.00 91,000.00
K. Tukang kayu 0.130 Org 75,000.00 9,750.00
Pekerja 2.600 Org 55,000.00 143,000.00
Mandor 0.122 Org 80,000.00 9,760.00
Jumlah (2) 253,510.00
Jumlah (1+2) 1,005,750.00
15 1 M3 Begesting sloof
(SNI DT 91-0008-2007-15)
Bahan
Kayu papan begesting 0.160 m3 3,605,000.00 576,800.00
Paku 1.800 Kg 14,000.00 25,200.00
Minyak begesting 0.600 Ltr 25,600.00 15,360.00
Jumlah (1) 617,360.00
Upah kerja
Tukang kayu 1.560 Org 70,000.00 109,200.00
K. Tukang kayu 0.156 Org 75,000.00 11,700.00
Pekerja 2.600 Org 55,000.00 143,000.00
Mandor 0.120 Org 80,000.00 9,600.00
Jumlah (2) 273,500.00
Jumlah (1+2) 890,860.00
Jumlah 2,493,774.72
Jumlah 4,629,310.72
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
(SNI DT 91-0008-2007-47b)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting balok 0.500 m3 2,719,939.00 1,359,969.50
Besi beton polos 130 kg 130.000 Kg 12,224.50 1,589,185.00
Jumlah 3,975,989.22
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
9 1 M3 Pasang gordeng
(SNI DT 91-0011-2007-09)
Bahan
Balok kayu kamper 1.100 m3 7,364,500.00 8,100,950.00
Paku 3.000 Kg 14,000.00 42,000.00
Besi setrip 15.000 Kg 12,000.00 180,000.00
Jumlah (1) 8,322,950.00
Upah kerja
Tukang kayu 7.200 Org 70,000.00 504,000.00
K. Tukang kayu 0.720 Org 75,000.00 54,000.00
Pekerja 2.400 Org 55,000.00 132,000.00
Mandor 0.120 Org 80,000.00 9,600.00
Jumlah (2) 699,600.00
Jumlah (1+2) 9,022,550.00
60 1 M2 Daun pintu dobel teakwood lapis triplek aluminium rangka kayu bengkirai
(SNI DT 91-0011-2007-60)
Bahan
Kayu bengkirai papan 0.0250 m3 8,497,500.00 212,437.50
Teakwood tb. 4 mm (uk. 1,10 x 2,10 m) 0.5000 lbr 70,000.00 35,000.00
Triplek lapis aluminium tb. 4 mm 0.5000 lbr 95,000.00 47,500.00
Lem kayu 0.5000 Kg 14,850.00 7,425.00
Paku 0.030 Kg 14,000.00 420.00
Jumlah (1) 302,782.50
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
Upah kerja
Tukang kayu 2.000 Org 70,000.00 140,000.00
K. Tukang kayu 0.200 Org 75,000.00 15,000.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 190,400.00
Jumlah (1+2) 493,182.50
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 34,763.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
11 1 M2 Waterproofing
(SNI P.C.11)
Bahan
Waterproof 0.470 Kg 46,000.00 21,620.00
Kuas 0.020 Bh 12,100.00 242.00
Jumlah (1) 21,862.00
Upah kerja
Tukang cat 0.060 Org 65,000.00 3,900.00
K. Tukang cat 0.006 Org 70,000.00 420.00
Pekerja 0.060 Org 55,000.00 3,300.00
Mandor 0.003 Org 80,000.00 240.00
Jumlah (2) 7,860.00
Jumlah (1+2) 29,722.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
13 1 M2 Pengecatan genteng
(SNI P.C.13)
Bahan
Cat genteng 0.260 Kg 24,200.00 6,292.00
Kuas 0.010 Bh 12,100.00 121.00
Jumlah (1) 6,413.00
Upah kerja
Tukang cat 0.063 Org 65,000.00 4,095.00
K. Tukang cat 0.0063 Org 70,000.00 441.00
Pekerja 0.020 Org 55,000.00 1,100.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,836.00
Jumlah (1+2) 12,249.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 163,430.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
3 1 Bh Pasang Urinoir
(SNI.S.03)
Bahan
Urinoir 1.000 Bh 990,000.00 990,000.00
Perlengkapan 0.300 % 297,000.00
Jumlah (1) 1,287,000.00
Upah kerja
Tukang batu 1.000 Org 70,000.00 70,000.00
K. Tukang batu 0.100 Org 75,000.00 7,500.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.100 Org 80,000.00 8,000.00
Jumlah (2) 140,500.00
Jumlah (1+2) 1,427,500.00
4a 1 Bh Pasang Wastafel
(SNI.S.04a)
Bahan
Wastafel 1.000 Bh 175,000.00 175,000.00
Perlengkapan 12.000 % 21,000.00
PC / Semen 6.000 Kg 1,600.00 9,600.00
Pasir pasang 0.010 m3 154,000.00 1,540.00
Jumlah (1) 207,140.00
Upah kerja
Tukang batu 1.450 Org 70,000.00 101,500.00
K. Tukang batu 0.150 Org 75,000.00 11,250.00
Pekerja 1.200 Org 55,000.00 66,000.00
Mandor 0.100 Org 80,000.00 8,000.00
Jumlah (2) 186,750.00
Jumlah (1+2) 393,890.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4
50 1 M3 Beton balok K-250 (uk. 30/60; 30/70; 30/80) (SNI DT 91-0008-2007-50) 5,048,258.62
51 1 M3 Beton plat dack lantai K-225 tb. 10 dan 12 cm (SNI DT 91-0008-2007-51) 4,078,163.22
52 1 M3 Beton plat dack lantai K-250 tb. 10 dan 12 cm (SNI DT 91-0008-2007-52) 4,096,442.62
53 1 M3 Beton tangga K-225 (SNI DT 91-0008-2007-53) 4,159,839.97
54 1 M3 Beton tangga K-250 (SNI DT 91-0008-2007-54) 4,178,119.37
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4
55 1 M3 Beton plat cetak dibawah K-175 (tutup saluran) (SNI DT 91-0008-2007-55) 2,738,623.44
56 1 M3 Beton plat cetak dibawah K-200 (tutup saluran) (SNI DT 91-0008-2007-56) 2,776,542.14
57 1 M3 Beton plat cetak dibawah K-225 (tutup saluran) (SNI DT 91-0008-2007-57) 2,805,599.72
No. Macam Pekerjaan Satuan Kuantitas Harga Satuan Jumlah Harga (Rp.)
I BAHAN
1 Gedek lbr 0.458
2 Bongkotan bambu bh 0.800
3 Kawat kg 0.185
II TENAGA
1 Mandor org/hr 0.019
2 Kep. Tukang kayu org/hr 0.003
3 Tukang kayu org/hr 0.023
4 Pekerja org/hr 0.259
III ALAT
1 Alat pelancip / pisau besar unit 0.040
2 Bodem bh 0.015
Jumlah ....
IV Harga satuan pekerjaan per - M2
No. Macam Pekerjaan Satuan Kuantitas Harga Satuan Jumlah Harga (Rp.)
I BAHAN
1 Gedek lbr 0.458 60,500.00 27,729.17
2 Bongkotan bambu bh 0.800 22,200.00 17,760.00
3 Kawat kg 0.185 16,000.00 2,960.00
II TENAGA
1 Mandor org/hr 0.019 80,000.00 1,520.00
2 Kep. Tukang kayu org/hr 0.003 75,000.00 187.50
3 Tukang kayu org/hr 0.023 70,000.00 1,610.00
4 Pekerja org/hr 0.259 55,000.00 14,258.75
III ALAT
1 Alat pelancip / pisau besar unit 0.040 30,000.00 1,200.00
2 Bodem bh 0.015 80,000.00 1,200.00
1 2 3 4
Ir. S A T R I Y O
Pembina Tingkat I
NIP. 19590405 199003 1 005
RENCANA ANGGARAN BIAYA ( RAB )
Nama Kegiatan : Pembangunan Lamella Sedimentation
Nama Pekerjaan : Pembangunan Lamella Sedimentation
Lokasi :-
Tahun : 2015
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pasang Bowplank 1.00 Ls 3,500,000.00 3,500,000.00
2 Pek. Pembersihan Lokasi 1.00 Ls 3,000,000.00 3,000,000.00
3 Mob Demob Alat, pekerja, dan material 1.00 Ls 2,500,000.00 2,500,000.00
TOTAL 9,000,000.00
II. PEKERJAAN TANAH
1 Pek. Gali Tanah 55.06 m3 43,250.00 2,381,431.50
2 Pek. Bor Strous dia. 30 - 300 cm 40.00 Titik 175,000.00 7,000,000.00
3 Pek. Urug Tanah Kembali 16.52 m3 12,975.00 214,328.84
4 Pek. Urug Sirtu Padat CBR 50 T. 50 cm 23.94 m3 167,550.00 4,011,147.00
5 Pek. Urug Pasir Dibawah Pondasi T. 10 cm 4.79 m3 137,300.00 657,392.40
TOTAL 14,264,299.74
III. PEKERJAAN BETON
1 Pek. Lantai Kerja 1pc : 2psr : 4krl 2.79 m3 822,455.94 2,292,801.55
2 Pek. Plat Setempat t. 40 cm (K. 225) 19.15 m3 3,499,524.72 67,022,897.44
3 Pek. Strous dia. 30 - 300 cm (K. 225) 8.48 m3 2,493,774.72 21,142,222.08
4 Sloof 25/40 (K. 225) 3.15 m3 3,812,492.22 12,009,350.49
TOTAL 102,467,271.55
IV. PEKERJAAN PASANGAN
1 Pek. Steel Grating 7.00 m2 750,000.00 5,250,000.00
2 Pek. Pasang Rilling (Sesuai Gambar) 43.50 m2 425,000.00 18,487,500.00
3 Pek. Pasang Tangga Inspeksi (Sesuai Gambar) 7.10 m2 425,000.00 3,015,375.00
TOTAL 26,752,875.00
V. PEKERJAAN BAJA
1 Pek. Kolom UNP 125.65.6 2535.28 Kg 24,290.00 61,581,951.20
2 Pek. Siku L 50.50.5 1983.00 Kg 24,290.00 48,167,070.00
3 Pek. Balok UNP 125.65.6 2074.32 Kg 24,290.00 50,385,232.80
4 Pek. Plat Simpul T. 6 mm 247.28 Kg 21,990.00 5,437,577.25
5 Pek. Angkur dia. 16 mm 160.00 Bh 35,000.00 5,600,000.00
TOTAL 171,171,831.25
VI. PEKERJAAN PENGECATAN
1 Pek. Cat Meni Besi 258.21 m2 18,521.00 4,782,353.71
TOTAL 4,782,353.71
VII. PEKERJAAN PERPIPAAN
1 Pek. GI dia. 16" 50.00 m1 2,772,916.67 138,645,833.33
2 Pek. GI dia. 10" 50.00 m1 945,312.50 47,265,625.00
3 Pek. GI dia. 4" 50.00 m1 240,173.50 12,008,675.00
TOTAL 197,920,133.33
REKAPITULASI ANGGARAN BIAYA ( REKAP )
Nama Kegiatan : Pembangunan Lamella Sedimentation
Nama Pekerjaan : Pembangunan Lamella Sedimentation
Lokasi :-
Tahun : 2015
JUMLAH Rp 526,358,764.58
PPN 10% Rp 52,635,876.46
TOTAL (Jumlah & PPN 10%) Rp 578,994,641.04
DIBULATKAN Rp 578,994,000.00
Terbilang :
Lima Ratus Tujuh Puluh Delapan Juta Sembilan Ratus Sembilan Puluh Empat Ribu Rupiah