DAFTAR HARGA UPAH KERJA & BAHAN BANGUNAN

TAHUN ANGGARAN : 2015

HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

UPAH
1 Mandor HOK 80,000.00

2 Kepala Tukang Gali Tanah HOK 70,000.00

3 Kepala Tukang Batu HOK 75,000.00

4 Kepala Tukang Kayu HOK 75,000.00

5 Kepala Tukang Besi HOK 75,000.00

6 Kepala Tukang Cat HOK 70,000.00

7 Kepala Tukang Listrik HOK 75,000.00

8 Kepala Tukang Pipa HOK 75,000.00

9 Tukang Gali Tanah HOK 65,000.00

10 Tukang Batu HOK 70,000.00

11 Tukang Kayu HOK 70,000.00

12 Tukang Besi HOK 70,000.00

13 Tukang Cat HOK 65,000.00

14 Tukang Listrik HOK 70,000.00

15 Tukang Aspal HOK 65,000.00

16 Tukang Politur HOK 65,000.00

17 Tukang Pipa HOK 65,000.00

18 Pekerja HOK 55,000.00

19 Buruh Terampil HOK 60,000.00

20 Buruh Tak Terampil HOK 50,000.00

21 Operator Terampil HOK 80,000.00

22 Pembantu Operator HOK 60,000.00

23 Sopir Terampil HOK 75,000.00

24 Pembantu Sopir HOK 55,000.00

25 Masinis HOK 70,000.00

26 Kernet HOK 55,000.00

27 Penjaga HOK 55,000.00

BAHAN
I BAHAN TANAH / PASIR
1 Tanah Urug m3 75,000.00
2 Pasir Urug m3 100,000.00
3 Pasir Cor m3 198,000.00
4 Pasir Lokal / Pasir Kali m3 90,000.00
5 Pasir Batu/ Sirtu Alam Hitam m3
126,500.00
6 Pasir Pasang m3
154,000.00
7 Pedel m3
70,000.00
8 Pasir Grosok m3
137,500.00
9 Pasir Ayak Beton m3 198,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

II BAHAN BATU
1 Batu Brongkol m3 89,200.00
2 Batu Kali hitam m3
105,500.00
3 Kerikil kali m3
65,200.00
4 Kerikil hias m3 54,400.00
5 Batu Pecah 3-5 mesin m3 254,900.00
6 Batu Pecah 2-3 mesin m3
278,200.00
7 Batu Pecah 1-2 mesin m3
289,100.00
8 Batu Pecah 1/2-1 mesin m3
219,400.00
9 Batu Pecah 5/7, 6/8 tangan m3
99,900.00
10 Batu Pecah 3/5 tangan m3 111,700.00
11 Batu Belah 20/25 tangan m3 71,700.00
12 Batu Belah 15/20 tangan m3 79,400.00
13 Batu Bata Kw. 1 bj 1,100.00
14 Batu Bata Kw. 2 bj 750.00
15 Batu Putih Lokal / kumbung bj 1,000.00
16 Batu Putih Lokal Umpak 24x24 cm bj 5,000.00
17 Batu Putih Lokal Umpak 24x48 cm bj 10,000.00
18 Pavingstone Segiempat tb. 5 Cm (K.100) m2 38,000.00
19 Pavingstone Segiempat tb. 6 Cm (K.200) m2
50,000.00
20 Pavingstone Segiempat tb. 6 Cm (K.300) m2
58,000.00
21 Pavingstone Segiempat tb. 8 Cm (K.300) m2
77,000.00
22 Pavingstone Segiempat tb. 6 Cm (K.300) warna m2
64,500.00
23 Pavingstone Segiempat tb. 8 Cm (K.300) warna m2 85,000.00
24 Pavingstone Segienam Abu - abu 6 cm K 200 m2 50,000.00
25 Pavingstone Segienam Abu - abu 6 cm K 300 m2 58,000.00
26 Pavingstone Segienam tb. 6 cm K 300 warna m2
65,000.00
27 Pavingstone Segienam Abu - abu 6 cm tanpa K m2
40,000.00
28 Pavingstone Segienam tb. 6 cm tanpa K warna m2
45,000.00
29 Paving Uskup tb. 6 Cm (K.200) bj 5,500.00
30 Paving Uskup tb. 6 Cm (K.300) bj 7,500.00
31 Paving Uskup tb. 8 Cm (K.300) bj 10,000.00
32 Kanstin uk. 10x20x40 K.225 bj 17,000.00
33 Kerep uk. 0175x0,2x0,3x0,6 bj 51,000.00
34 Batu Palimanan uk.10/20 kasar m2
75,000.00
35 Batu Palimanan uk. 5/20 m2
75,000.00
36 Batu Palimanan uk. 10/10 m2 75,000.00
37 Batu Palimanan uk.15/15 halus m2 80,000.00
38 Batu Palimanan uk.15/30 m2 90,000.00
39 Batu Palimanan uk.20/20 halus m2
90,000.00
40 Batu Palimanan uk.20/30 halus m2
100,000.00
41 Batu Palimanan uk. 20/40 m2
110,000.00
42 Batu Palimanan uk. 25/25 m2
110,000.00
43 Batu Palimanan uk. 30/30 m2 110,000.00
44 Batu Palimanan Hijau Segala Ukuran m2 95,000.00
45 Batu Candi m2
123,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

46 Ornamen Batu Paras uk. 40/40 bh 48,000.00


47 Ornamen Batu Paras uk. 30/30 bh 35,000.00
48 Ornamen Batu Paras uk. 25/25 bh 28,000.00
49 Ornamen Batu Paras uk. 20/40 bh 35,000.00
50 Ornamen Batu Paras uk. 20/20 bh 25,000.00
51 Ornamen Batu Paras uk. 15/15 bh 16,000.00
52 Ornamen Batu Paras uk. 10/15 bh 18,000.00
53 Ornamen Batu Paras uk. 10/10 bh 11,000.00
54 Batu Gilang Hitam / Lempeng m2
40,000.00
55 Batu Raen Hitam bj 400.00
56 Batu Raen Kuning / Putih bj 300.00
57 Batu Candi Alur m2 135,000.00
58 Batu Alur Andesit m2 135,000.00
59 Beton alur 20X40 cm m2
70,000.00
60 Lis Batu Alam 40 cm bh 18,000.00
61 Lis Batu 5 x 4 x 40 btg 20,000.00
62 Lis Batu 8 x 4 x 40 btg 35,000.00
63 Roster Terawang Merah (Fabrikasi) 10 x 20 cm bh 3,550.00
64 Roster Terawang Merah (Fabrikasi) 20 x 20 cm bh 7,500.00
65 Roster Terawang Merah (Fabrikasi) 30 x 30 cm bh 12,000.00
66 Roster Beton 25 x 25 cm bh 10,000.00
67 Roster Beton 30 x 30 cm bh 12,000.00
68 Roster Beton 40 x 40 cm bh 18,000.00
69 Roster Beton 20 x 40 cm bh 10,000.00
70 Roster Beton 30 x 60 cm bh 23,000.00
71 Roster Beton 30 x 70 cm bh 30,000.00
72 Batu Alur Marmer 20x20 cm m2
125,000.00
73 Batu Alur Marmer 30x30 cm m2
135,000.00
74 Batu Alur Marmer 40x40 cm m2
150,000.00

III BAHAN SEMEN / PC


1 Semen 40 kg Gresik kg 1,600.00
2 Semen Putih 40 kg Tiga Roda kg 2,650.00
3 Semen Warna kg 11,840.00
4 Semen 40 kg Holcim kg 1,450.00
5 Semen 40 kg Bosowa kg 1,450.00

IV BAHAN KAPUR
1 Kapur Bubuk / Kapur Pasang kg 2,850.00
2 Kapur Gamping kg 3,200.00

V BAHAN BESI
1 Besi Beton Polos (tulangan) kg 10,500.00
2 Besi Beton Ulir (tulangan) kg 11,250.00
3 Baja Konstruksi kg 14,000.00
4 Plat baja kg 12,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

5 Kawat Beton / Bendrat kg 16,000.00


6 Besi Siku 4 x 4 KS 6 m kg 9,000.00
7 Besi Siku 5 x 5 KS 6 m kg 9,000.00
8 Besi Setrip 3/4 tb. 4mm pj. 6 m kg 12,000.00
9 Besi Setrip tb. 2mm kg 12,000.00
10 Besi Sheet Pile (400mm x 100mm X 10,5mm X 12m) kg 13,500.00
11 Aluminium coklat / brown 4" YKK ljr 225,000.00
12 Canal C 75. 2 mm (6 m) ljr 88,000.00
13 Canal C 100. 2 mm (6 m) ljr 121,000.00
14 Canal C 125. 2 mm (6 m) ljr 143,000.00
15 Canal C 150. 2 mm (6 m) ljr 160,000.00
16 Usuk Metal 57 Tebal 0,25 mm Panjang 6 m ljr 29,000.00
17 Usuk Metal 57 Tebal 0,50 mm Panjang 6 m ljr 55,000.00
18 Rafter/Reng Royal 0,5 mm 6 m' (uk. 25 x 40 x 37 mm) ljr 37,000.00
19 Kawat Bronjong ( dia. 42,7 mm ) BMG 10 kg 18,000.00
20 Bronjong Pabrikasi Ø 2.70 Uk.2 x 1 x 0.5 Bh 183,250.00
21 Bronjong Pabrikasi Ø 2.70 Uk.3 x 1 x 0.5 Bh 260,000.00
22 Bronjong Pabrikasi Ø 2.70 Uk.2 x 1 x 1 Bh 255,750.00
23 Bronjong Pabrikasi Ø 2.70 Uk.2 x 1.5 x 0.5 Bh 237,000.00
24 Bronjong Pabrikasi Ø 2.70 Uk.3 x 1.5 x 0.5 Bh 341,750.00
25 Bronjong Pabrikasi Ø 2.70 Uk.4 x 1x0,5 Bh 319,750.00
26 Bronjong Pabrikasi Ø 2.70 Uk.3 x 1x1 Bh 351,250.00
27 Bronjong Pabrikasi Ø 2.70 Uk.4 x 1x1 Bh 467,250.00
28 Galvanis 2 x 4 (1,4 mm) 4m Ljr 49,000.00
29 Galvanis 4 x 4 (1,4 mm) 6m Ljr 72,000.00
30 Galvanis 5 x 5 (1,4 mm) 6m Ljr 92,000.00
31 Galvanis 5 x 5 (1,6 mm) 6m Ljr 110,000.00
32 Galvanis 5 x 5 (1,8 mm) 6m Ljr 143,000.00
33 Galvalum 3 x 3 (1,6 mm) 6m Ljr 57,000.00
34 Galvalum 3 x 6 (1,6 mm) 6m Ljr 104,000.00
35 Galvalum 2 x 4 (1,6 mm) 6m Ljr 57,000.00
36 Galvalum 2 x 4 (1,8 mm) 6m Ljr 62,000.00
37 Galvalum 4 x 4 (1,6 mm) 6m Ljr 82,000.00
38 Galvalum 5 x 5 (1,6 mm) 6m Ljr 104,000.00
39 Galvalum 6 x 6 (1,8 mm) 6m Ljr 153,000.00
40 Galvalum T. 0,75 mm m1 17,500.00
41 Atap Zincalum ex. Spandex/Setara T. 0,45 mm m2 112,320.00
42 Atap Rooftop Lebar 770 mm, Tebal 10 mm Lbr 130,000.00
43 Wuwung Rooftop lebar 350 mm, Panjang 770 mm Lbr 80,000.00
44 Atap Zinc Alum Coated U375. 0,30mm TCT Lbr 30,000.00
45 Atap Zinc Alum Coated U375. 0,35mm TCT Lbr 42,000.00
46 Angkur dia. 16 - 19 mm bh 40,625.00
47 Jarum keras dia. 16 mm bh 55,500.00
48 Pemasangan Atap Policarbonat ranga besi bulat stainless Steel m2 540,000.00
49 Pemasangan Reng Usuk Galvalum m2 93,500.00
50 Lisplank Calsiplank/woodplank 0,9/20 cm m' 21,000.00
51 Lisplank Calsiplank/woodplank 0,9/30 cm m' 26,250.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

52 Tangga Monyet m' 85,000.00


HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

53 Kusen Aluminium 4"brown ex. YKK / setara m' 145,000.00


54 Slimar Aluminium 3" brown ex. YKK / setara m' 135,000.00
55 Slimar Aluminium 4" brown ex. YKK / setara m' 162,000.00
56 Rel Pintu Geser Aluminium m' 85,000.00
57 Hollow/Metal Furring 2 x 4 (1,6 mm) 6m ljr 82,000.00
58 Hollow/Metal Furring 4 ljr 95,500.00

VI BAHAN KAYU
1 Ky. Jati balok ( Macam-macam Ukuran kelas 1 ) m3 17,160,000.00
2 Ky. Jati Papan ( Macam-macam Ukuran kelas 1 ) m 3
22,660,000.00
3 Ky. Jati Usuk m3 8,755,000.00
4 Ky. Jati Reng m3 7,210,000.00
5 Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. I m3 8,497,500.00
6 Ky. Kamper Papan 2/20, 3/20 = 4m kw. I m 3
9,913,800.00
7 Ky. Kamper Usuk 5/7, 4/6 = 4m kw. I m 3
6,312,500.00
8 Ky. Kamper Reng 2/3, 3/5 = 4m kw. I m 3
5,665,000.00
9 Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. II m 3
7,364,500.00
10 Ky. Kamper Papan 2/20, 3/20 = 4m kw. II m3 9,064,000.00
11 Ky. Kamper Usuk 5/7, 4/6 = 4m kw. II m3 5,098,500.00
12 Ky. Kamper Reng 2/3, 3/5 = 4m kw. II m 3
4,447,100.00
13 Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. I m 3
9,913,800.00
14 Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. I m 3
11,896,500.00
15 Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. I m 3
7,364,500.00
16 Ky. Bengkirai Reng kw. I m3 6,514,800.00
17 Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. II m3 7,647,800.00
18 Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. II m3 8,497,500.00
19 Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. II m 3
5,098,500.00
20 Ky. Bengkirai Reng kw. II m 3
4,892,500.00
21 Ky. Meranti Balok 8/12, 6/12 = 4 m kw. I m 3
5,098,500.00
22 Ky. Meranti Papan 2/20, 3/20 = 4 m kw. I m 3
5,117,400.00
23 Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. I m3 4,532,000.00
24 Ky. Meranti Balok 8/12, 6/12 = 4 m kw. II m3 4,550,900.00
25 Ky. Meranti Papan 2/20, 3/20 = 4 m kw. II m 3
4,815,300.00
26 Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. II m 3
3,701,100.00
27 Ky. Meranti Reng m 3
3,122,900.00
28 Ky. Papan Begesting 2/20 = 4 m (meranti) m 3
3,605,000.00
29 Ky. Acuan / cetakan m3 3,059,100.00
30 Dolken dia. 16X19 cm Pj. 4m bt 204,000.00
31 Dolken dia. 8 cm Pj. 4m bt 41,200.00
32 Bongkotan Pj. 3 m bt 22,200.00
33 Ky. Gelam Balok 6/12 & 8/12 m 3
6,231,500.00
34 Kayu profil lb. 5 cm m' 9,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

VII BAHAN PIPA / PARALON / PVC


1 Pipa PVC 1/2" AW ljr 25,000.00
2 Pipa PVC 3/4" AW ljr 30,000.00
3 Pipa PVC 1" AW ljr 45,000.00
4 Pipa PVC 1 1/4" AW ljr 60,000.00
5 Pipa PVC 1 1/2" AW ljr 67,000.00
6 Pipa PVC 2" AW ljr 90,000.00
7 Pipa PVC 2,5" AW ljr 105,000.00
8 Pipa PVC 3" AW ljr 110,000.00
9 Pipa PVC 4" AW ljr 190,000.00
10 Pipa PVC 6" AW ljr 545,000.00
11 Pipa PVC 8" AW ljr 865,000.00
12 Pipa PVC 3/4" D ljr 22,000.00
13 Pipa PVC 1" D ljr 29,000.00
14 Pipa PVC 1 1/4" D ljr 30,000.00
15 Pipa PVC 1,5" D ljr 35,000.00
16 Pipa PVC 2" D ljr 45,000.00
17 Pipa PVC 2,5" D ljr 65,000.00
18 Pipa PVC 3" D ljr 86,000.00
19 Pipa PVC 4" D ljr 130,000.00
20 Pipa PVC 5/8" C ljr 18,300.00
21 Pipa PVC 2" C ljr 40,000.00
22 Pipa PVC 2,5" C ljr 49,000.00
23 Pipa PVC 3" C ljr 55,000.00
24 Pipa PVC 4" C ljr 70,000.00
25 Talang PVC dia. 4" = 4m ljr 75,000.00
26 Knee PVC dia. 3/4" bh 5,000.00
27 Klem PVC bh 850.00
28 Socket PVC dia. 3/4" bh 2,000.00
29 Lem PVC Isarflas kaleng 10,000.00
30 Seal Tape bh 2,500.00
31 Pipa GI Φ 1/2" Medium A Ljr 157,700.00
32 Pipa GI Φ 3/4" Medium A Ljr 214,700.00
33 Pipa GI Φ 1" Medium A Ljr 470,000.00
34 Pipa Galvanis GI Φ 2" Medium A Ljr 539,000.00
35 Pipa Galvanis GI Φ 3" Medium A Ljr 973,300.00
36 Pipa Galvanis GI Φ 4" Medium A Ljr 1,221,000.00
37 Pipa Galvanis GI Φ 6" Medium A Ljr 2,039,000.00
38 Pipa Galvanis GI Φ 8" Medium A Ljr 3,202,000.00
39 Pipa Galvanis GI Φ 10" Medium A Ljr 4,621,300.00
40 Pipa Galvanis GI Φ 12" Medium A Ljr 6,957,800.00
41 Pipa Galvanis GI Φ 2" Medium B Ljr 357,100.00
42 Pipa Galvanis GI Φ 3" Medium B Ljr 637,600.00
43 Pipa Galvanis GI Φ 4" Medium B Ljr 799,600.00
44 Pipa Galvanis GI Φ 6" Medium B Ljr 1,681,900.00
45 Pipa Galvanis GI Φ 8" Medium B Ljr 2,802,800.00
46 Pipa Galvanis GI Φ 10" Medium B Ljr 4,537,500.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

47 Pipa Galvanis GI Φ 12" Medium B Ljr 6,655,000.00


HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

VIII BAHAN TEGEL


1 Tegel abu-abu 20x20 cm m2 42,000.00
2 Tegel Plin abu 15x20 cm m2
38,500.00
3 Tegel wafel 20x20 cm m2 42,000.00

IX BAHAN KERAMIK
1 Keramik 10x20 cm KW 1 m2 45,500.00
2 Keramik Kembang 20x20 cm Kw. I Mulia m2
48,600.00
3 Keramik Kembang 20x20 cm Kw. I Asia m2
49,800.00
4 Keramik Polos 20x20 Kw. I Mulia m2 44,500.00
5 Keramik Polos 20x20 Kw. I Asia m2 48,600.00
6 Keramik Motif 20x25 KW 1 Roman m2 51,000.00
7 Keramik Motif 20x25 KW 1 Mulia m2
50,950.00
8 Keramik Motif 20x25 Kw. I Kobin m2
50,300.00
9 Keramik Motif 20x25 Kw. I Yupiter m2
51,000.00
10 Keramik Motif 20x25 Kw. I Asia m2
59,300.00
11 Keramik Polos 20x25 Kw. I Mulia m2 44,420.00
12 Keramik Polos 20x25 Kw. I Asia m2 47,400.00
13 Keramik Motif 25x40 Kw. I KIA m2
66,350.00
14 Keramik Motif 25x40 Kw. I IKAD m2
61,600.00
15 Keramik Motif 25x40 Kw. I ACANDRA m2
53,900.00
16 Keramik Motif 25x40 Kw. I Asia m2
72,900.00
17 Keramik Motif 25x25 Kw. I KIA m2 52,000.00
18 Keramik Sembur (kasar) 30x30 cm KW 1 Mulia m2 38,200.00
19 Keramik Sembur (kasar) 30x30 cm KW 1 Asia m2 43,750.00
20 Keramik Polos ( 30x30 cm ) KW 1 Mulia m2
43,900.00
21 Keramik Polos ( 30x30 cm ) KW 1 Roman m2
47,400.00
22 Keramik Polos ( 30x30 cm ) KW 1 Asia m2
47,400.00
23 Keramik Motif 30x30 Kw. I Mulia m2
51,000.00
24 Keramik Motif 30x30 Kw. I Yupiter m2 52,800.00
25 Keramik Motif 30x30 Kw. I Asia m2 52,200.00
26 Keramik Motif 30x30 Kw. I Arwana m2
48,000.00
27 Keramik Motif ( 40x40 cm ) KW 1 Platinum m2
65,800.00
28 Keramik Motif ( 40x40 cm ) KW 1 Yupiter m2
60,500.00
29 Keramik Motif Kasar ( 40x40 cm ) KW 1 Yupiter m2
64,500.00
30 Keramik Motif ( 40x40 cm ) KW 1 Arwana m2 59,900.00
31 Keramik Motif ( 40x40 cm ) KW 1 Masterina m2 78,200.00
32 Keramik Motif ( 40x40 cm ) KW 1 Garuda m2 53,400.00
33 Keramik Polos ( 40x40 cm ) KW 1 MAS m2
56,300.00
34 Keramik Kembang 50x50 cm KW 1 Milan m2
91,300.00
35 Keramik Motif 50x50 cm KW 1 Milan m2
87,100.00
36 Keramik Motif 50x50 cm KW 1 Platinum m2
77,600.00
37 Keramik Motif 60x60 cm KW 1 Platinum m2 137,400.00
38 Keramik Motif 40x60 cm KW 1 Platinum m2 131,217.00
39 Keramik Motif 60x60 cm KW 1 Platinum motif m2
157,600.00
40 Keramik Motif 60x60 cm KW 1 Platinum Strata Erena m2
157,600.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

41 Granito ( 40x40 cm ) KW 1 Indogres m 2


163,500.00
42 Granito 40 x 40 cm Masterina KW. 1 Salsa m 2
220,000.00
43 Granito 40 x 40 cm Masterina KW. 1 Cristas Black m 2
264,800.00
44 Granito 40 x 40 cm Masterina KW. 1 Nory m 2
196,000.00
45 Granito 40 x 40 cm Masterina KW. 1 Cristas Bried m2 286,400.00
46 Granito 60 x 60 cm Kw. 1 m2 290,200.00
47 Granito 60 x 60 cm KW. 1 Salsa m 2
280,500.00
48 Granito 60 x 60 cm KW. 1 Aurora m 2
260,300.00
49 Granito 60 x 60 cm KW. 1 Esenza m 2
236,900.00
50 Granito 60 x 60 cm KW. 1 Palazo m 2
240,800.00
51 Granito 60 x 60 cm KW. 1 Zeina m2 255,000.00
52 Marmer 100 x 100 cm m2 538,400.00
53 Mozaik Kaca RM Black 1 Dos 10 Lbr lbr 215,400.00
54 Border list 5x20 cm bj 5,400.00
55 Border list 7x20 cm bj 7,500.00
56 Border list 8x25 cm bj 10,700.00
57 Border list 8x25 cm Dinasty bj 8,300.00
58 Kuku Macan Polos bj 1,000.00
59 Kuku Macan Ulir / Kembang bj 1,100.00
60 Roster Keramik (Besar) bh 47,400.00
61 Roster Keramik (Kecil) bh 34,400.00
62 Glass Block kecil 20x20 cm bh 19,600.00
63 Glass Block besar bh 23,650.00

X BAHAN BUIS BETON


1 Buis beton bulat dia. 15 cm panjang 1 m bh 33,000.00
2 Buis beton bulat dia. 20 cm panjang 1 m bh 41,000.00
3 Buis beton bulat dia. 30 cm panjang 1 m bh 52,250.00
4 Buis beton bulat dia. 40 cm panjang 1 m bh 75,000.00
5 Buis beton bulat dia. 50 cm panjang 1 m bh 95,000.00
6 Buis beton bulat dia. 60 cm panjang 0,5 m bh 90,750.00
7 Buis beton bulat dia. 70 cm panjang 0,5 m bh 88,850.00
8 Buis beton bulat dia. 80 cm panjang 0,5 m bh 100,650.00
9 Buis beton bulat dia. 100 cm panjang 0,5 m bh 187,000.00
10 Buis beton U 15 cm panjang 1 m bh 19,250.00
11 Buis beton U 20 cm panjang 1 m bh 25,000.00
12 Buis beton U 30 cm panjang 1 m bh 38,500.00
13 Buis beton U 40 cm panjang 1 m bh 39,000.00
14 Buis beton U 50 cm panjang 1 m bh 50,000.00
15 Buis beton U 60 cm panjang 1 m bh 55,000.00

XI BAHAN GENTENG
1 Genteng Pres lokal (Penthol) bj 1,700.00
2 Genteng Bubungan Pres lokal bj 3,300.00
3 Genteng Beton Besar isi 9,5 (buah) polos bj 3,800.00
4 Genteng Beton Kecil Isi 12 ( buah ) bj 2,900.00
5 Bubungan Beton bj 8,700.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

6 Genteng Jatiwangi isi 14,5 Bj/m2 bj 6,200.00


7 Wuwung Jatiwangi 3,5/m' bj 13,200.00
8 Genteng Karangpilang Goodyear isi 14,5 bh bj 6,800.00
9 Bubungan Karangpilang goodyear bj 11,000.00
10 Genteng Keramik KIA Kecil bj 9,800.00
11 Bubungan Keramik KIA bj 18,200.00
12 Genteng Abadi Maridional Jatiwangi isi 14,5 bj/m2 bj 5,200.00
13 Genteng Model Kluntung Jatiwangi isi 20 Bj/m2 bj 2,500.00
14 Jatiwangi Morando Atlas isi 21 bh (bakar gas) bj 2,800.00
15 Jatiwangi Morando Atlas isi 21 bh (bakar kayu) bj 2,100.00
16 Genteng Pres Super mutiara soka Kebumen isi 25 bh bj 2,100.00
17 Bubungan mutiara sokka kebumen bj 3,300.00
18 Genteng Tanah Liat (Mantili) bj 1,900.00
19 Ornamen Wuwung sedang bh 38,500.00
20 Ornamen Wuwung besar bh 69,900.00

XII BAHAN ASBES


1 Asbes Gel. Kecil 3,05 x 1,05 # 4 mm ( ex. Gresik ) lbr 110,000.00
2 Asbes Gel. Besar 3,05 x 1,05 # 4 mm ( ex.Gresik ) lbr 130,000.00
3 Asbes Plat 1 x 1 m Gresik lbr 15,000.00
4 Asbes Plat 1 x 1 m Atrisco lbr 18,000.00
5 Nok Asbes Gelombang Besar Atrisco bj 60,000.00
6 Nok Asbes Gelombang Kecil Atrisco bj 35,000.00
7 Papan Gibsum lbr 56,000.00
8 List gybsum 7 - 10 cm m' 10,000.00
9 Casting kg 11,000.00

XIII BAHAN KACA


1 Kaca Polos / Bening 3 mm m2 53,000.00
2 Kaca Polos 5 mm m2 76,000.00
3 Kaca Polos 8 mm m2 170,000.00
4 Kaca Rayban 5 mm (Asahimas) m2 88,000.00
5 Kaca Rayban 8 mm (Asahimas) m2 190,000.00
6 Kaca Es 5 mm m2 120,000.00
7 Kaca Cermin 2 mm m2 90,000.00
8 Kaca Cermin 3 mm m2 113,000.00
9 Kaca Cermin 5 mm m2 175,000.00

XIV BAHAN TRIPLEK


1 Triplek 122 x 244 x 4 mm lbr 60,000.00
2 Triplek 122 x 244 x 5 mm lbr 70,000.00
3 Triplek 122 x 244 x 8 mm lbr 95,000.00
4 Triplek 110 x 210 x 3 mm lbr 55,000.00
5 Teakwood 122 x 244 x 4 mm lbr 80,000.00
6 Teakwood 110 x 210 x 4 mm lbr 70,000.00
7 Kalsibout Uk. 2,44 x 1,22 m x 3,5 mm lbr 61,250.00
8 Tripleks Lapis Aluminium lbr 95,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

9 Multiplek / Plywood tb. 8 mm lbr 135,000.00


HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

XV BAHAN SENG GELOMBANG


1 Seng Gel. BJLS 30.30 # 3 m lbr 120,000.00
2 Seng Gel. BJLS 30.30 # 1,8 m lbr 76,000.00
3 Seng Plat datar BJLS 30.45 # 1 m 8mm m' 50,000.00
4 Seng Gel. BJLS 0,2 x 80 # 3 m lbr 68,000.00

XVI BAHAN ALAT PENGGANTUNG & PENGUNCI


1 Kunci Merk Kuda Terbang 2 X putar (pegangan besar) unit 64,400.00
2 Kunci Merk Anchor 2 X putar (pegangan besar) unit 96,300.00
3 Kunci Merk Union 2 X putar (pegangan besar) unit 90,800.00
4 Kunci Merk Safire 2 X putar (pegangan besar) unit 150,000.00
5 Kunci Merk Muller 3 X putar (tanpa pegangan) unit 46,800.00
6 Engsel pintu kuning set 22,000.00
7 Engsel Nylon ARCH Asli (pintu) set 19,300.00
8 Engsel jendela Nylon ARCH set 8,800.00
9 Engsel jendela kuning set 12,500.00
10 Grendel besar bh 22,600.00
11 Grendel pintu panjang bh 30,800.00
12 Grendel jendela (kecil) bh 6,000.00
13 Grendel jendela (sedang) bh 12,400.00
14 Grendel Pring Kenit Kuningan bh 10,300.00
15 Hak Angin Panjang putih (Cantolan) stel 19,800.00
16 Hak Angin Sikutan stel 10,300.00
17 Holder / Handle / Pegangan Pintu set 101,800.00
18 Besi Gembok set 9,400.00
19 Rolling Door Aluminium m2 500,000.00
20 Door Closed Solid bh 237,500.00
21 Door Closed Gradino bh 348,500.00
22 Door Closed Belleza bh 575,000.00
23 Floor Hinge Solid bh 786,500.00
24 Floor Hinge Belleza bh 916,300.00
25 Floor Hinge Solid (1 pintu) unit 1,485,000.00
26 Floor Hinge Belleza (1 pintu) unit 1,663,200.00

XVII BAHAN SANITASI


1 Kloset Jongkok Porselin warna muda (INA) bh 160,000.00
2 Kloset Jongkok Porselin warna putih (INA) bh 140,000.00
3 Kloset Duduk Porselin Warna Muda (INA) set 935,000.00
4 Kloset Duduk Porselin Komplit (Monoblok) INA set 1,237,500.00
5 Kloset Duduk Porselin Komplit (Monoblok) TOTO set 1,705,000.00
6 Sarangan Air / Avour (Stainlessteel) set 68,750.00
7 Kurasan Air Kuningan bh 17,600.00
8 Avour biasa / plastik set 17,875.00
9 Kurasan Air Plastik bh 10,000.00
10 Kran Air dia. 3/4" Sedang (besi) bh 23,100.00
11 Kran Air dia. 3/4" Sedang (plastik) bh 14,300.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

12 Kran Air dia. 3/4" Sedang (kuningan) bh 30,250.00


13 Kran Air Wastafel bh 66,000.00
14 Kran Air model Angsa bh 37,125.00
15 Urinoir INA bh 990,000.00
16 Sink Stainlees steel (1 bak cuci) Royal bh 176,000.00
17 Sink Stainlees steel (2 bak cuci) Royal bh 332,750.00
18 Bak Mandi Fiberglass bh 220,000.00
19 Wastafel Besar INA putih bh 147,400.00
20 Wastafel Besar Pink bh 175,000.00
21 Tempat Sabun Keramik bh 18,700.00
22 Profil Tank Fiberglass 650 ltr bh 814,000.00
23 Profil Tank Fiberglass 1100 ltr bh 1,255,650.00
24 Pintu PVC Maspion (kaca) unit 244,750.00
25 Pintu PVC Maspion (polos) unit 159,500.00
26 Kloset duduk (Duty) bh 305,000.00
27 Pintu PVC Royal polos bh 180,000.00
28 Pintu PVC Royal Galvalum bh 150,000.00
29 Under Cover Lavatory Ex. TOTO bh 350,000.00
30 Jet Washer Ex. TOTO bh 235,000.00
31 Avour biasa / Stenless set 68,750.00

XVIII BAHAN PAKU


1 Paku Reng kg 14,000.00
2 Paku Usuk kg 14,000.00
3 Paku Triplek kg 16,000.00
4 Paku Seng kg 23,000.00
5 Paku Jembatan bj 14,300.00
6 Paku Kalsibout kg 25,000.00
7 Paku Sumbat bj 3,000.00
8 Paku Beton bj 3,000.00
9 Paku Asbes / paku payung bj 500.00
10 Paku 7 - 11 cm kg 14,000.00
11 Sekrup kg 30,000.00
12 Baut screw driver 6 x 20 (1500 bh) dos 155,500.00
13 Baut screw driver 6 x 32 (1000 bh) dos 138,000.00
14 Baut Denabol bj 5,000.00

XIX BAHAN LISTRIK


1 Lampu TL 10 watt komplit bh 48,000.00
2 Lampu TL 18 / 20 watt komplit bh 85,000.00
3 Lampu TL 36 / 40 watt komplit bh 100,650.00
4 Lampu downlight 18 watt bh 85,000.00
5 Saklar tunggal bh 15,500.00
6 Saklar ganda bh 18,500.00
7 Stop kontak bh 18,500.00
8 Pipa paralon dia. 5/8 ljr 15,500.00
9 Isolator bh 11,550.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

10 T dos PVC bh 350.00


11 Fiting plafon bh 4,000.00
12 Sekring Otomatis 6 Amp bh 110,000.00
13 Sekring Otomatis 10 Amp bh 120,000.00
14 MCB 1 Phasa 6 Amp bh 55,000.00
15 MCB 1 Phasa 10 Amp bh 60,000.00
16 MCB 3 Phasa 10 Amp bh 250,000.00
17 Lampu Essential 5 watt bh 28,985.00
18 Lampu Essential 8 watt bh 30,745.00
19 Lampu Essential 11 watt bh 33,935.00
20 Lampu Essential 14 watt bh 35,695.00
21 Lampu Essential 18 watt bh 38,885.00
22 Lampu Essential 23 watt bh 43,285.00
23 Lampu Spot Light 100 W (warna) PNR 38/80 watt bh 110,000.00
24 Kawat Gorunding BC 16 mm2 m' 25,025.00
25 Kawat Gorunding BC 25 mm2 m' 57,725.00
26 Dop Pijar 10 watt bh 4,500.00
27 Dop Pijar 15 watt bh 5,000.00
28 Dop Pijar 25 watt bh 5,500.00
29 Dop Pijar 40 watt bh 6,000.00
30 Dop Pijar 100 watt bh 6,500.00
31 Dop Pijar warna 5 watt bh 4,000.00
32 Kabel NYA 1 x 1,5 mm2 (Eterna/Hakiki) m' 2,500.00
33 Kabel NYA 1 x 2,5 mm2 (Eterna/Hakiki) m' 5,440.00
34 Kabel NYA 1 x 4 mm2 (Eterna/Hakiki) m' 4,500.00
35 Kabel NYM 2 x 1,5 mm2 (Eterna/Hakiki) m' 6,560.00
36 Kabel NYM 2 x 2,5 mm2 (Eterna/Hakiki) m' 9,500.00
37 Kabel NYM 2 x 4 mm2 (EternaHakiki) m' 13,000.00
38 Kabel NYM 2 x 6 mm2 (Eterna/Hakiki) m' 17,120.00
39 Kabel NYM 3 x 1,5 mm2 (Eterna/Hakiki) m' 10,000.00
40 Kabel NYM 3 x 2,5 mm2 (Eterna/Hakiki) m' 12,000.00
41 Kabel NYM 3 x 4 mm2 (Eterna/Hakiki) m' 17,360.00
42 Kabel NYM 3 x 6 mm2 (Eterna/Hakiki) m' 23,760.00
43 Kabel NYM 4 x 4 mm2 (Eterna/Hakiki) m' 22,360.00
44 Kabel NYY 2 x 1,5 mm2 (Eterna/Hakiki) m' 10,000.00
45 Kabel NYY 2 x 2,5 mm2 (Eterna/Hakiki) m' 12,500.00
46 Kabel NYY 2 x 4 mm2 (Eterna/Hakiki) m' 16,600.00
47 Kabel NYY 2 x 6 mm2 (Eterna/Hakiki) m' 21,000.00
48 Kabel NYY 3 x 1,5 mm2 (Eterna/Hakiki) m' 11,500.00
49 Kabel NYY 3 x 2,5 mm2 (Eterna/Hakiki) m' 15,350.00
50 Kabel NYY 3 x 4 mm2 (Eterna/Hakiki) m' 20,960.00
51 Kabel NYY 3 x 6 mm2 (Eterna/Hakiki) m' 27,780.00
52 Kabel NYY 4 x 4 mm2 (Eterna/Hakiki) m' 25,500.00
53 Kabel NYY 4 x 6 mm2 (Eterna/Hakiki) m' 33,500.00
54 Kabel NYY 4 x 10 mm2 (Eterna/Hakiki) m' 56,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

55 Kabel Twisted 2 x 10 mm2 SPLN m' 7,000.00


56 Kabel Twisted 4 x 10 mm2 SPLN m' 12,500.00
57 Kabel Twisted 4 x 16 mm2 SPLN m' 16,000.00
58 Kabel NYAF 0,8 mm2 m' 3,500.00
59 Kabel NYAF 1.5 mm2 m' 5,500.00
60 Kabel NYAF 6 mm2 m' 16,000.00
61 Ground Rood besar 1,5 M bh 89,000.00
62 Skun Kabel uk. 10 mm2 Bh 3,500.00
63 Skun Kabel uk. 16 mm2 Bh 6,000.00
64 Lampu Selang 2 Jalur (Shinyoku) Rool 2,500,000.00
65 Lampu Selang 3 Jalur (shinyoku) Rool 2,850,000.00
66 Lampu Mercury HPLN 125 Watt (Philips) bh 49,750.00
67 Lampu Mercury HPLN 250 Watt (Philips) bh 54,700.00
68 Lampu Mercury ML 160 Watt (Philips) bh 39,900.00
69 Lampu Mercury ML 250 Watt (Philips) bh 57,800.00
70 Lampu Natrium SON H 250 Watt/220 bh 235,000.00
71 Lampu Natrium SON E 150 Watt (Philips) bh 118,000.00
72 Lampu HPI-T 250 Watt (Philips) bh 230,000.00
73 Lampu HPI-T 400 Watt (Philips) bh 700,000.00
74 Lampu HPI-T 1000 Watt (Philips) bh 1,075,000.00
75 Lampu Halogen 250 Watt ( Komplit ) bh 125,000.00
76 Lampu Halogen 300 Watt ( komplit ) bh 125,000.00
77 Lampu Halogen 500 Watt ( Komplit ) bh 125,000.00
78 DOP Lombok 15 Watt bh 6,000.00
79 DOP Lombok 25 Watt bh 6,000.00
80 Lampu TL 10 Watt bh 8,000.00
81 Lampu TL 18 / 20 Watt bh 13,500.00
82 Lampu TL 36 / 40 Watt bh 16,000.00
83 Ignitor ( untuk lampu HPI-T 250 W ) bh 49,000.00
84 Ignitor ( untuk lampu HPI-T 400 W ) bh 50,750.00
85 Ignitor ( untuk lampu HPI-T 1000 W ) bh 60,375.00
86 Kapasitor ( untuk lampu HPI-T 250 W ) bh 53,000.00
87 Kapasitor ( untuk lampu HPI-T 400 W ) bh 56,000.00
88 Kapasitor ( untuk lampu HPI-T 1000 W ) bh 135,000.00
89 Trafo TL 10 Watt bh 33,500.00
90 Trafo TL 18 / 20 Watt bh 38,000.00
91 Trafo TL 36 / 40 Watt bh 40,000.00
92 Trafo 125 Watt bh 135,000.00
93 Trafo 250 Watt BHL(philips) bh 255,000.00
94 Trafo 400 Watt BHL (philips) bh 318,500.00
95 Trafo 1000 Watt (philips) bh 1,895,000.00
96 Trafo 250 Watt BSN (Philips) bh 258,600.00
97 Kontaktor 25 Amp bh 325,700.00
98 Kontaktor 30 Amp bh 373,000.00
99 Kontaktor 40 Amp bh 405,000.00
100 Kontaktor 63 Amp bh 620,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

101 MCB 1 Phasa 2 Amp bh 55,000.00


102 MCB 1 Phasa 4 Amp bh 55,000.00
103 MCB 1 Phasa 16 Amp bh 71,000.00
104 MCB 1 Phasa 35 Amp bh 85,000.00
105 MCB 1 Phasa 40 - 63 Amp bh 106,000.00
106 MCB 3 Phasa 16 Amp bh 260,000.00
107 MCB 3 Phasa 20 Amp bh 265,000.00
108 MCB 3 Phasa 35 Amp bh 300,000.00
109 MCB 3 Phasa 40 Amp bh 315,000.00
110 MCB 3 Phasa 50 - 63 Amp bh 440,000.00
111 Service Clamp (ekor buaya) uk.kecil bh 31,000.00
112 Service Clamp ( ekor buaya ) uk.besar bh 44,000.00
113 Perching Kedap Air ( SPLN ) bh 13,000.00
114 Kap Lampu ( untuk lampu Mercury 250 Wath ) iwata bh 410,000.00
115 Kap Lampu ( lampu Halogen 250 Wath ) bh 118,000.00
116 Kap Lampu ( untuk lampu Halogen 300 Wath ) bh 175,000.00
117 Kap Lampu ( untuk lampu Halogen 500 Watt ) bh 178,000.00
118 Kap Lampu ( untuk lampu HPI-T 250 Watt ) bh 1,477,500.00
119 Kap Lampu ( untuk lampu HPI-T 400 Watt ) bh 2,350,000.00
120 Kap Lampu ( untuk lampu HPI-T 1000 Watt ) bh 2,865,000.00
121 Timer Switch Otomatis bh 500,000.00
122 Photocell 3 Amp (selcon) bh 75,000.00
123 Photocell 6 Amp (selcon) bh 80,000.00
124 Stainless Steel bh 305,000.00
125 Yuke bh 4,125.00
126 Box Panel lengkap terminal block uk. 30 x 40 x 20 cm bh 839,500.00
127 Box Panel lengkap terminal block uk. 40 x 60 x 20 cm bh 1,088,000.00
128 Box Panel lengkap terminal block uk. 50 x 70 x 20 cm bh 1,273,000.00
129 Tiang PJU Octagonal (single arm) tinggi 9 m B.2.10 bh 3,850,000.00
130 Tiang PJU Octagonal (double arm) tinggi 9 m B.2.10 bh 4,950,000.00
131 Lampu Indikator / R S T set 65,000.00
132 Doraldost Besar bh 35,000.00
133 LC + Suspension Komplit bh 53,000.00
134 Strength Hook bh 9,000.00
135 Klem Kabel no. 9 mm pak 12,000.00
136 Klem Kabel no. 10 mm pak 14,000.00
137 Klem Kabel no. 12 mm pak 20,000.00
138 Klem Kabel no. 17 mm pak 32,000.00
139 Bolamp diameter 17,00 cm (Criystolite) bh 105,950.00
140 Bolamp diameter 22,5 cm (Criystolite) bh 110,000.00
141 Bolamp diameter 30 cm (Criystolite) bh 136,500.00
142 Bolamp diameter 35 cm (Criystolite) bh 140,000.00
143 Pitingan 25 A SPLN 125 Wath (Keramik) bh 40,000.00
144 Pitingan 25 A SPLN 250 Wath (Keramik) bh 30,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

145 Sekering Otomatis 4 Amp bh 92,000.00


146 Sekering Otomatis 16 Amp bh 137,500.00
147 Sekering Otomatis 20 Amp bh 127,000.00
148 Sekering Otomatis 25 Amp bh 135,000.00
149 Lampu Selang Kotak 3 Jalur (Shinyoku) Rool 2,600,000.00
150 Kap. Lampu bulat stainless uk.besar Bh 92,000.00
151 Tang Potong stenlis Bh 162,000.00
152 Tang Baisa stenlis Bh 162,000.00
153 Obeng Tespen Bh 23,000.00
154 Kabel Banled Uk. 4 x 70 mm mtr 92,500.00
155 Kabel Banled Uk. 4 x 50 mm mtr 66,000.00
156 Kabel Banled Uk. 4 x 35 mm mtr 53,000.00
157 Kabel Banled Uk. 4 x 25 mm mtr 44,500.00
158 Kap Lampu High Presure Sodium SON-T 250 W (komplit) unit 2,915,000.00
159 Tiang Octagonal sigle arm 7 M Bentangan 1,8 m bh 2,866,600.00
160 Tiang Octagonal doble arm 7 M Bentangan 1,8 m bh 3,753,750.00
161 Lampu Essential Jumbo 45 Watt (Philips) bh 230,000.00
162 Lampu Essential Jumbo 65 Watt (Philips) bh 261,000.00
163 Breaker 100 Amp. (MG) bh 1,687,500.00
164 Breaker 50 Amp. (MG) bh 1,599,000.00
165 Breaker 63 Amp. (MG) bh 503,700.00
166 Dop Son-T 250 Wath (phlips) bh 151,800.00
167 Box Panel 800 x 600 x 400 mm set 4,500,000.00
168 MCCB 50 A 3P/18 KA bh 1,140,000.00
169 MCB 32 A 3P/16 KA bh 450,000.00
170 MCB 25 A 3P/16 KA bh 432,000.00
171 Ampere Meter bh 540,000.00
172 Volt Meter bh 660,000.00
173 Indicator Lamp bh 90,000.00
174 Selector Switch bh 90,000.00
175 Curent Trafo 250/5A bh 420,000.00
176 Box Panel 600 x 500 x 200 mm set 1,500,000.00
177 MCB 10 A 1P/6 KA bh 78,000.00
178 MCB 6 A 1P/6 KA bh 72,000.00
179 Lampu RD 125 PLC 13W / 84 bh 195,000.00
180 Lampu RD 150 PLC 18W / 84/86 bh 205,000.00
181 Lampu RM 300 GLOSSY 2 X 18W / 82/84/86 M4 bh 530,000.00
182 Lampu RM 300 GLOSSY 2 X 36W / 82/84/86 M4 bh 920,000.00
183 Lampu RM 300 2 X 18W / 82/84/86 ACR bh 538,000.00
184 Emergency Kit c/w Battery & Charge Min. 2 Hours Backup bh 752,000.00
185 Lampu SCB 32 ACR TLC 32W bh 305,000.00

XX BAHAN CAT
1 Cat Kayu / Besi (Emco) warna muda kg 60,000.00
2 Cat Kayu / Besi (Emco) warna tua kg 65,000.00
3 Cat Tembok 5 Kg (Paragon) Galon 72,500.00
4 Cat Tembok 5 Kg (Decolith) Galon 77,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

5 Cat Tembok 5 Kg (Catylac) Galon 102,000.00


6 Cat Tembok 5 Kg (Dulux) Galon 170,000.00
7 Cat Tembok 5 Kg (Vinilex) Galon 102,000.00
8 Cat Tembok 5 Kg (Nippon Paint) Galon 85,000.00
9 Waterproof (No Drop) kg 46,000.00
10 Minyak Cat / Thiner B ltr 20,000.00
11 Meni Kayu kg 24,000.00
12 Meni besi kg 21,000.00
13 Plamir Kayu Pedang kg 27,500.00
14 Cat Biru Berlin EMCO kg 57,000.00
15 Cat Hitam Gading EMCO kg 56,000.00
16 Cat Putih seng EMCO kg 45,000.00
17 Cat Kolam Rettar kg 72,000.00
18 Cat Genteng biasa (Auitek) Galon 121,000.00
19 Cat Genteng biasa (Paragon/Avitex) Galon 128,700.00
20 Cat Genteng Super Gloss Galon 222,750.00
21 Kertas Gosok 02 lbr 4,000.00
22 Spiritus ltr 13,475.00
23 Serlaag India ( Warna Kuning Tua Tipis ) kg 75,350.00
24 Batu Kambang kg 26,400.00
25 Kain Pop kg 27,500.00
26 Kuas 4" bh 12,100.00
27 Roll (untuk mengecat) bh 14,300.00
28 Lem kayu kg 14,850.00
29 Soda api kg 22,550.00
30 Vernis ltr 22,550.00
31 Politur ltr 70,400.00
32 Politur tua ltr 55,550.00
33 Dempul / Wood filter kg 52,200.00
34 Pewarna / Wood sten kg 57,200.00
35 Melamine Seanding sealer kg 57,200.00
36 Melamin lack (glass / dop) kg 46,200.00
37 Compound kaleng 38,500.00
38 Propan stone care ltr 58,300.00
39 Minyak Begesting ltr 25,600.00

XXI BAHAN LAIN - LAIN


1 Solar ( Umum ) ltr 6,400.00
2 Gemuk / Grase ( Stempet ) kg 15,000.00
3 Gemuk / Grase ( Alat Berat ) kg 40,000.00
4 Dek Baut bh 10,000.00
5 Teer kg 10,000.00
6 Bron Ach kg 30,000.00
7 Minyak Tanah ( umum ) ltr 10,000.00
8 Premium ltr 6,700.00
9 Aspal Curah kg 10,700.00
10 Aspal Drum kg 13,500.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

11 Minyak Solar (Industri) ltr 11,600.00


12 Minyak Tanah (Industri) ltr 12,500.00
13 Kayu Bakar m3 214,500.00
14 Minyak Pelumas ltr 26,500.00
15 Oli SAE 40 ltr 29,000.00
16 Stempet kg 15,000.00
17 Compressor jam 125,000.00
18 Alat Bantu set 75,000.00
19 Gedek Guling (2 x 1,2 m) lbr 60,500.00
20 Bambu Petung ljr 25,000.00
21 Timah Hitam kg 22,000.00
22 Plat L kg 17,000.00
23 Plat U ( KAVEL ) kg 17,000.00
24 Karung Plastik ( Glangsing ) lbr 5,500.00
25 Ijuk kg 7,500.00
26 Agregat kelas A m3 275,000.00
27 Agregat kelas B m3 253,000.00
28 Minipile Uk. 20 x 20 cm K.350 m' 112,000.00
29 Minipile Uk. 25 x 25 cm K.350 m' 150,000.00
30 Geomembran 1,50 mm m2 55,000.00
31 Geotextile Non Woven 350 gr m2 22,000.00
32 Pengelasan cm 900.00

XXII BAHAN BESI WEREMESH


A WEREMESH BRC STANDAR SNI BESI BETON U50
1 M4 (2100 x 5400 mm) Lbr 149,000.00
2 M5 (2100 x 5400 mm) Lbr 222,000.00
3 M6 (2100 x 5400 mm) Lbr 312,000.00
4 M7 (2100 x 5400 mm) Lbr 425,000.00
5 M8 (2100 x 5400 mm) Lbr 555,000.00
6 M9 (2100 x 5400 mm) Lbr 720,000.00
7 M10 (2100 x 5400 mm) Lbr 888,000.00
8 M12 (2100 x 5400 mm) Lbr 1,293,000.00
B WEREMESH NON SNI MERK BRC
1 M5 (4,5 mm) (2100 x 5400 mm) Lbr 176,000.00
2 M6 (5,2 mm) (2100 x 5400 mm) Lbr 244,000.00
3 M6 (5,5 mm) (2100 x 5400 mm) Lbr 262,000.00
4 M6 (5,6 mm) (2100 x 5400 mm) Lbr 282,000.00
5 M7 (6,5 mm) (2100 x 5400 mm) Lbr 366,000.00
6 M8 (7,2 mm) (2100 x 5400 mm) Lbr 462,000.00
7 M8 (7,5 mm) (2100 x 5400 mm) Lbr 487,000.00
8 M8 (7,6 mm) (2100 x 5400 mm) Lbr 514,000.00
9 M10 (9,5 mm) (2100 x 5400 mm) Lbr 801,000.00
10 M12 (11,5 mm) (2100 x 5400 mm) Lbr 1,247,000.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

XXIII BAHAN GRC


A GRC BOARD
1 GRC Board 5 mm (1220 x 2440 mm) Lbr 86,000.00
2 GRC Board 6 mm (1220 x 2440 mm) Lbr 108,000.00
3 GRC Board 8 mm (1220 x 2440 mm) Lbr 178,000.00
4 GRC Board 10 mm (1220 x 2440 mm) Lbr 234,000.00
B SUPERPANEL
1 Superpanel 9 mm (1220 x 2440 mm) Lbr 265,000.00
2 Superpanel 12 mm (1220 x 2440 mm) Lbr 380,000.00
3 Superpanel 15 mm (1220 x 2440 mm) Lbr 512,000.00
C SUPERPLANK
1 Superplank 9 mm (75 x 2440 mm) Btg 22,500.00
2 Superplank 9 mm (85 x 2440 mm) Btg 25,000.00
3 Superplank 9 mm (100 x 2440 mm) Btg 27,500.00
4 Superplank 9 mm (200 x 2440 mm) Btg 49,000.00
5 Superplank 9 mm (300 x 2440 mm) Btg 71,000.00
D SIMPLEPLANK
1 Simpleplank 8 MM (100 x 2440 mm) Btg 21,000.00
2 Simpleplank 8 MM (200 x 2440 mm) Btg 40,000.00
3 Simpleplank 8 MM (300 x 2440 mm) Btg 58,000.00

XXIV BAHAN PAGAR BRC


1 Dia 6 Type FP90-EP2 (90 x 240 Cm) Lbr 185,000.00
2 Dia 6 Type FP120-EP2 (120 x 240 Cm) Lbr 225,000.00
3 Dia 8 Type FP120-EP4* (120 x 240 Cm) Lbr 360,000.00
4 Dia 6 Type FP150-EP2 (150 x 240 Cm) Lbr 250,000.00
5 Dia 6 Type FP175-EP2* (175 x 240 Cm) Lbr 295,000.00
6 Dia 7 Type FP175-EP3 (175 x 240 Cm) Lbr 380,000.00
7 Dia 6 Type FP190-EP2* (190 x 240 Cm) Lbr 300,000.00
8 Dia 7 Type FP190-EP3 (190 x 240 Cm) Lbr 400,000.00
9 Dia 8 Type FP190-EP4* (190 x 240 Cm) Lbr 535,000.00

XXV ALAT BANTU


1 Bodem Bh 80,000.00

2 Tang Pemotong Kawat Bh 44,000.00

3 Ganco Bh 32,500.00
4 Keranjang Bh 12,500.00

5 Alat Pelancip / Pisau Besar Bh 30,000.00


6 Alat Bantu Set 78,650.00
HARGA SATUAN
NO. NAMA BAHAN BANGUNAN SATUAN
(Rp.)
1 2 3 4

XXVI BAHAN SUMUR BOR

1 Pipa naik PVC Ø 8" (jambang) m1 317,500.00


2 Pipa naik PVC Ø 6" m1 194,650.00

3 Pipa Screen PVC Ø 6" m1 1,092,100.00

4 Reduser Ø 8" x 6" bh 830,100.00


5 Pipa piezometer GI Ø 1" m1 39,425.00

6 Centuring guides dipasang tiap 20 m kedalam set 75,000.00


7 Gravel pack 0.5 x 1 mm m3 279,000.00

8 Bahan kimia grease untuk pembersihan sumur kg 27,500.00


ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN : 2015

HARGA SATUAN JUMLAH HARGA


NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

PEKERJAAN PERSIAPAN (SNI 03-2835-2002)


1 1 M2 Bongkar atap / genteng
(SNI 03-2835-01)
Upah kerja
Pekerja 0.040 Org 55,000.00 2,200.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah 2,360.00

2 1 M2 Bongkar rangka atap


(SNI 03-2835-02)
Upah kerja
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.020 Org 80,000.00 1,600.00
Jumlah 9,850.00

3 1 M2 Bongkar plafond + rangka


(SNI 03-2835-03)
Upah kerja
Pekerja 0.035 Org 55,000.00 1,925.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah 2,085.00

4 1 M3 Bongkar dinding
(SNI 03-2835-04)
Upah kerja
Pekerja 6.667 Org 55,000.00 366,685.00
Mandor 0.033 Org 80,000.00 2,640.00
Analog biaya 1 m3 Jumlah 369,325.00
Analog biaya 1 m2 Jumlah 44,320.77

5 1 M3 Bongkar beton bertulang


(SNI 03-2835-05)
Upah kerja
Pekerja 6.667 Org 55,000.00 366,685.00
Mandor 0.333 Org 80,000.00 26,640.00
Jumlah 393,325.00

6 1 M2 Bongkar keramik lantai


(SNI 03-2835-06)
Upah kerja
Pekerja 0.120 Org 55,000.00 6,600.00
Mandor 0.020 Org 80,000.00 1,600.00
Jumlah 8,200.00

7 1 Bh Bongkar kosen pintu dan jendela


(SNI 03-2835-07)
Upah kerja
Pekerja 1.200 Org 55,000.00 66,000.00
Mandor 0.080 Org 80,000.00 6,400.00
Jumlah 72,400.00

8 1 Ttk Bor strous dia. 30cm T>3m


(SNI 03-2835-08)
Sewa alat bantu strous pile 1.200 jam 75,000.00 90,000.00
Upah kerja
Pekerja 1.200 Org 55,000.00 66,000.00
Mandor 0.060 Org 80,000.00 4,800.00
Jumlah 160,800.00

8 1 Ttk Bor strous dia. 25cm L=3m


(SNI 03-2835-08.a)
Upah kerja
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.050 Org 80,000.00 4,000.00
Jumlah 59,000.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

9 1 M' Pengukuran dan pas. bowplank


(SNI 03-2835-09)
Bahan
Kayu papan begesting 2/20 0.007 m3 3,605,000.00 25,235.00
Kayu meranti 5/7 0.012 m3 3,701,100.00 44,413.20
Paku 0.020 kg 14,000.00 280.00
Jumlah (1) 69,928.20
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 83,578.20

10 1 M2 Pembuatan gudang semen & alat-alat


(SNI 03-2835-10)
Bahan
Kayu balok meranti 0.2100 m3 4,550,900.00 955,689.00
Dolken kayu f 8 / 400 cm 1.7000 btg 41,200.00 70,040.00
Paku 0.3000 kg 14,000.00 4,200.00
PC / Semen 10.5000 kg 1,600.00 16,800.00
Pasir cor 0.0300 m3 198,000.00 5,940.00
Kerikil / Batu pecah 2-3 cm hitam 0.0500 m3 278,200.00 13,910.00
Seng gelombang BJLS 30 1.5000 lbr 76,000.00 114,000.00
Jumlah (1) 1,180,579.00
Upah kerja
Tukang kayu 2.000 Org 70,000.00 140,000.00
K. Tukang kayu 0.200 Org 75,000.00 15,000.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.050 Org 80,000.00 4,000.00
Jumlah (2) 214,000.00
Jumlah (1+2) 1,394,579.00

11 1 M' Pagar sementara dari seng gelombang tinggi 2 m


(SNI 03-2835-11)
Bahan
Kayu balok meranti 0.0720 m3 4,550,900.00 327,664.80
Dolken kayu f 8 / 400 cm 1.2500 btg 41,200.00 51,500.00
Paku 0.0600 Kg 14,000.00 840.00
PC / Semen 2.5000 Kg 1,600.00 4,000.00
Pasir cor 0.0050 m3 198,000.00 990.00
Kerikil / Batu pecah 2-3 cm hitam 0.0090 m3 278,200.00 2,503.80
Seng gelombang BJLS 30 1.2000 lbr 76,000.00 91,200.00
Jumlah (1) 478,698.60
Upah kerja
Tukang kayu 0.200 Org 70,000.00 14,000.00
K. Tukang kayu 0.020 Org 75,000.00 1,500.00
Pekerja 0.400 Org 55,000.00 22,000.00
Mandor 0.020 Org 80,000.00 1,600.00
Jumlah (2) 39,100.00
Jumlah (1+2) 517,798.60

12 1 M2 Pembersihan lokasi & perataan


(SNI 03-2835-12)
Upah kerja
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.050 Org 80,000.00 4,000.00
Jumlah 9,500.00

PEKERJAAN TANAH (SNI DT 91-0006-2007)


1 1 M3 Galian tanah pondasi (s/d 1 m)
(SNI DT 91-0006-2007-01)
Upah kerja
Pekerja 0.750 Org 55,000.00 41,250.00
Mandor 0.025 Org 80,000.00 2,000.00
Jumlah 43,250.00

2 1 M3 Galian tanah pondasi (s/d 2 m)


(SNI DT 91-0006-2007-02)
Upah kerja
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Pekerja 0.900 Org 55,000.00 49,500.00


Mandor 0.045 Org 80,000.00 3,600.00
Jumlah 53,100.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

3 1 M3 Galian tanah pondasi (s/d 3 m)


(SNI DT 91-0006-2007-03)
Upah kerja
Pekerja 1.050 Org 55,000.00 57,750.00
Mandor 0.067 Org 80,000.00 5,360.00
Jumlah 63,110.00

4 1 M3 Galian tanah berbatu


(SNI DT 91-0006-2007-04)
Upah kerja
Pekerja 1.052 Org 55,000.00 57,860.00
Mandor 0.104 Org 80,000.00 8,320.00
Jumlah 66,180.00

5 1 M3 Galian tanah keras (s/d 1 m)


(SNI DT 91-0006-2007-05)
Upah kerja
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.032 Org 80,000.00 2,560.00
Jumlah 57,560.00

6 1 M3 Galian tanah cadas (s/d 1 m)


(SNI DT 91-0006-2007-06)
Upah kerja
Pekerja 1.500 Org 55,000.00 82,500.00
Mandor 0.060 Org 80,000.00 4,800.00
Jumlah 87,300.00

7 1 M3 Galian tanah lumpur (s/d 1 m)


(SNI DT 91-0006-2007-07)
Upah kerja
Pekerja 1.200 Org 55,000.00 66,000.00
Mandor 0.045 Org 80,000.00 3,600.00
Jumlah 69,600.00

8 1 M3 Urugan tanah kembali


(SNI DT 91-0006-2007-08)
Upah kerja
Pekerja 0.225 Org 55,000.00 12,375.00
Mandor 0.008 Org 80,000.00 600.00
Jumlah 12,975.00

9 1 M3 Urugan pasir
(SNI DT 91-0006-2007-09)
Bahan
Pasir urug 1.200 m3 100,000.00 120,000.00
Jumlah (1) 120,000.00
Upah kerja
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 17,300.00
Jumlah (1+2) 137,300.00

10 1 M3 Urugan tanah
(SNI DT 91-0006-2007-10)
Bahan
Tanah urug 1.200 m3 75,000.00 90,000.00
Jumlah (1) 90,000.00
Upah kerja
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 17,300.00
Jumlah (1+2) 107,300.00

11 1 M3 Urugan sirtu
(SNI DT 91-0006-2007-11)
Bahan
Sirtu 1.200 m3 126,500.00 151,800.00
Jumlah (1) 151,800.00
Upah kerja
Pekerja 0.250 Org 55,000.00 13,750.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Mandor 0.025 Org 80,000.00 2,000.00


Jumlah (2) 15,750.00
Jumlah (1+2) 167,550.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

12 1 M3 Urugan pedel
(SNI DT 91-0006-2007-12)
Bahan
Urugan pedel 1.200 m3 70,000.00 84,000.00
Jumlah (1) 84,000.00
Upah kerja
Pekerja 0.250 Org 55,000.00 13,750.00
Mandor 0.025 Org 80,000.00 2,000.00
Jumlah (2) 15,750.00
Jumlah (1+2) 99,750.00

13 1 M3 Membuang tanah sejauh 30 m


(SNI DT 91-0006-2007-13)
Upah kerja
Pekerja 0.330 Org 55,000.00 18,150.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah 18,950.00

14 1 M3 Pek. Striping tebing tinggi 1 m


(SNI DT 91-0006-2007-14)
Upah kerja
Pekerja 0.050 Org 55,000.00 2,750.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah 3,150.00

PEKERJAAN PONDASI (SNI DT 91-0007-2007)


1 1 M3 Pasang aanstampeng
(SNI DT 91-0007-2007-01)
Bahan
Batu kali / brongkol 1.200 m3 89,200.00 107,040.00
Pasir urug 0.432 m3 100,000.00 43,200.00
Jumlah (1) 150,240.00
Upah kerja
Tukang batu 0.390 Org 70,000.00 27,300.00
K. Tukang batu 0.039 Org 75,000.00 2,925.00
Pekerja 0.780 Org 55,000.00 42,900.00
Mandor 0.039 Org 80,000.00 3,120.00
Jumlah (2) 76,245.00
Jumlah (1+2) 226,485.00

2 1 M3 Pasang pondasi batu kali / brongkol 1Pc : 3Kp : 10Ps


(SNI DT 91-0007-2007-02)
Bahan
Batu kali / brongkol 1.200 m3 89,200.00 107,040.00
PC / Semen 61.000 kg 1,600.00 97,600.00
Kapur pasang 0.147 m3 2,850.00 418.95
Pasir pasang 0.492 m3 154,000.00 75,768.00
Jumlah (1) 280,826.95
Upah kerja
Tukang batu 0.600 Org 70,000.00 42,000.00
K. Tukang batu 0.060 Org 75,000.00 4,500.00
Pekerja 1.500 Org 55,000.00 82,500.00
Mandor 0.075 Org 80,000.00 6,000.00
Jumlah (2) 135,000.00
Jumlah (1+2) 415,826.95

3 1 M3 Pasang pondasi batu kali / brongkol 1Pc : 3Ps


(SNI DT 91-0007-2007-03)
Bahan
Batu kali / brongkol 1.200 m3 89,200.00 107,040.00
PC / Semen 202.000 kg 1,600.00 323,200.00
Pasir pasang 0.485 m3 154,000.00 74,690.00
Jumlah (1) 504,930.00
Upah kerja
Tukang batu 0.600 Org 70,000.00 42,000.00
K. Tukang batu 0.060 Org 75,000.00 4,500.00
Pekerja 1.500 Org 55,000.00 82,500.00
Mandor 0.075 Org 80,000.00 6,000.00
Jumlah (2) 135,000.00
Jumlah (1+2) 639,930.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

4 1 M3 Pasang pondasi batu kali / brongkol 1Pc : 4Ps


(SNI DT 91-0007-2007-04)
Bahan
Batu kali / brongkol 1.200 m3 89,200.00 107,040.00
PC / Semen 163.000 kg 1,600.00 260,800.00
Pasir pasang 0.520 m3 154,000.00 80,080.00
Jumlah (1) 447,920.00
Upah kerja
Tukang batu 0.600 Org 70,000.00 42,000.00
K. Tukang batu 0.060 Org 75,000.00 4,500.00
Pekerja 1.500 Org 55,000.00 82,500.00
Mandor 0.075 Org 80,000.00 6,000.00
Jumlah (2) 135,000.00
Jumlah (1+2) 582,920.00

5 1 M3 Pasang pondasi batu kali / brongkol 1Pc : 5Ps


(SNI DT 91-0007-2007-05)
Bahan
Batu kali / brongkol 1.200 m3 89,200.00 107,040.00
PC / Semen 136.000 kg 1,600.00 217,600.00
Pasir pasang 0.544 m3 154,000.00 83,776.00
Jumlah (1) 408,416.00
Upah kerja
Tukang batu 0.600 Org 70,000.00 42,000.00
K. Tukang batu 0.060 Org 75,000.00 4,500.00
Pekerja 1.500 Org 55,000.00 82,500.00
Mandor 0.075 Org 80,000.00 6,000.00
Jumlah (2) 135,000.00
Jumlah (1+2) 543,416.00

PEKERJAAN DINDING (SNI DT 91-0009-2007)


1 1 M2 Pasang bata kumbung tbl. 1 bata camp. 1Pc:3Kp:10Ps
(An.D.01)
Bahan
Batu kumbung 100.0000 bh 1,000.00 100,000.00
PC / Semen 10.0800 kg 1,600.00 16,128.00
Kapur pasang 0.0275 m3 2,850.00 78.38
Pasir pasang 0.0925 m3 154,000.00 14,245.00
Jumlah (1) 130,451.38
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 181,351.38

2 1 M2 Pasang bata kumbung tbl. 1 bata camp. 1Pc : 4Ps


(An.D.02)
Bahan
Batu kumbung 100.000 bh 1,000.00 100,000.00
PC / Semen 26.550 kg 1,600.00 42,480.00
Pasir pasang 0.093 m3 154,000.00 14,322.00
Jumlah (1) 156,802.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 207,702.00

3 1 M2 Pasang bata kumbung tbl. 1/2 bata camp. 1Pc:3Kp:10Ps


(An.D.03)
Bahan
Batu kumbung 50.0000 bh 1,000.00 50,000.00
PC / Semen 4.5000 kg 1,600.00 7,200.00
Kapur pasang 0.0150 m3 2,850.00 42.75
Pasir pasang 0.0500 m3 154,000.00 7,700.00
Jumlah (1) 64,942.75
Upah kerja
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Tukang batu 0.100 Org 70,000.00 7,000.00


K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 90,392.75
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

4 1 M2 Pasang bata kumbung tbl. 1/2 bata camp. 1Pc : 4Ps


(An.D.04)
Bahan
Batu kumbung 50.000 bh 1,000.00 50,000.00
PC / Semen 11.500 kg 1,600.00 18,400.00
Pasir pasang 0.043 m3 154,000.00 6,622.00
Jumlah (1) 75,022.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 100,472.00

5 1 M2 Pasang bata merah tbl 1 bata camp. 1Pc : 2Ps


(SNI DT 91-0009-2007-01)
Bahan
Bata merah kw. 1 140.000 bj 1,100.00 154,000.00
PC / Semen 43.500 kg 1,600.00 69,600.00
Pasir pasang 0.080 m3 154,000.00 12,320.00
Jumlah (1) 235,920.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 286,820.00

6 1 M2 Pasang bata merah tbl 1 bata camp. 1Pc : 2Ps


(SNI DT 91-0009-2007-02)
Bahan
Bata merah kw. 2 140.000 bh 750.00 105,000.00
PC / Semen 43.500 kg 1,600.00 69,600.00
Pasir pasang 0.080 m3 154,000.00 12,320.00
Jumlah (1) 186,920.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 237,820.00

7 1 M2 Pasang bata merah tbl 1 bata camp. 1Pc : 3Ps


(SNI DT 91-0009-2007-03)
Bahan
Bata merah kw. 1 140.000 bh 1,100.00 154,000.00
PC / Semen 32.950 kg 1,600.00 52,720.00
Pasir pasang 0.091 m3 154,000.00 14,014.00
Jumlah (1) 220,734.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 271,634.00

8 1 M2 Pasang bata merah tbl 1 bata camp. 1Pc : 3Ps


(SNI DT 91-0009-2007-04)
Bahan
Bata merah kw. 2 140.000 bh 750.00 105,000.00
PC / Semen 32.950 kg 1,600.00 52,720.00
Pasir pasang 0.091 m3 154,000.00 14,014.00
Jumlah (1) 171,734.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Mandor 0.030 Org 80,000.00 2,400.00


Jumlah (2) 50,900.00
Jumlah (1+2) 222,634.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

9 1 M2 Pasang bata merah tbl 1 bata camp. 1Pc : 4Ps


(SNI DT 91-0009-2007-05)
Bahan
Bata merah kw. 1 140.000 bh 1,100.00 154,000.00
PC / Semen 26.550 kg 1,600.00 42,480.00
Pasir pasang 0.093 m3 154,000.00 14,322.00
Jumlah (1) 210,802.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 261,702.00

10 1 M2 Pasang bata merah tbl 1 bata camp. 1Pc : 4Ps


(SNI DT 91-0009-2007-06)
Bahan
Bata merah kw. 2 140.000 bh 750.00 105,000.00
PC / Semen 26.550 kg 1,600.00 42,480.00
Pasir pasang 0.093 m3 154,000.00 14,322.00
Jumlah (1) 161,802.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 212,702.00

11 1 M2 Pasang bata merah tbl 1 bata camp. 1Pc : 5Ps


(SNI DT 91-0009-2007-07)*
Bahan
Bata merah kw. 1 140.000 bh 1,100.00 154,000.00
PC / Semen 22.200 kg 1,600.00 35,520.00
Pasir pasang 0.102 m3 154,000.00 15,708.00
Jumlah (1) 205,228.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 256,128.00

12 1 M2 Pasang bata merah tbl 1 bata camp. 1Pc : 5Ps


(SNI DT 91-0009-2007-07)
Bahan
Bata merah kw. 2 140.000 bh 750.00 105,000.00
PC / Semen 22.200 kg 1,600.00 35,520.00
Pasir pasang 0.102 m3 154,000.00 15,708.00
Jumlah (1) 156,228.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 207,128.00

13 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 3 Kp : 10Ps


(SNI DT 91-0009-2007-08)
Bahan
Bata merah kw. 2 140.000 bh 750.00 105,000.00
PC / Semen 10.080 kg 1,600.00 16,128.00
Kapur pasang 0.0275 m3 2,850.00 78.38
Pasir pasang 0.0925 m3 154,000.00 14,245.00
Jumlah (1) 135,451.38
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Pekerja 0.600 Org 55,000.00 33,000.00


Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 50,900.00
Jumlah (1+2) 186,351.38
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

14 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 2Ps


(SNI DT 91-0009-2007-09)
Bahan
Bata merah kw. 1 70.000 bh 1,100.00 77,000.00
PC / Semen 18.950 kg 1,600.00 30,320.00
Pasir pasang 0.038 m3 154,000.00 5,852.00
Jumlah (1) 113,172.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 138,622.00

15 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 2Ps


(SNI DT 91-0009-2007-10)
Bahan
Bata merah kw. 2 70.000 bh 750.00 52,500.00
PC / Semen 18.950 kg 1,600.00 30,320.00
Pasir pasang 0.038 m3 154,000.00 5,852.00
Jumlah (1) 88,672.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 114,122.00

16 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 3Ps


(SNI DT 91-0009-2007-11)
Bahan
Bata merah kw. 1 70.000 bh 1,100.00 77,000.00
PC / Semen 14.370 kg 1,600.00 22,992.00
Pasir pasang 0.040 m3 154,000.00 6,160.00
Jumlah (1) 106,152.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 131,602.00

17 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 3Ps


(SNI DT 91-0009-2007-12)
Bahan
Bata merah kw. 2 70.000 bh 750.00 52,500.00
PC / Semen 14.370 kg 1,600.00 22,992.00
Pasir pasang 0.040 m3 154,000.00 6,160.00
Jumlah (1) 81,652.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 107,102.00

18 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 4Ps


(SNI DT 91-0009-2007-13)
Bahan
Bata merah kw. 1 70.000 bh 1,100.00 77,000.00
PC / Semen 11.500 kg 1,600.00 18,400.00
Pasir pasang 0.043 m3 154,000.00 6,622.00
Jumlah (1) 102,022.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Mandor 0.015 Org 80,000.00 1,200.00


Jumlah (2) 25,450.00
Jumlah (1+2) 127,472.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

19 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 4Ps


(SNI DT 91-0009-2007-14)
Bahan
Bata merah kw. 2 70.000 bh 750.00 52,500.00
PC / Semen 11.500 kg 1,600.00 18,400.00
Pasir pasang 0.043 m3 154,000.00 6,622.00
Jumlah (1) 77,522.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 102,972.00

20 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 5Ps


(SNI DT 91-0009-2007-15)
Bahan
Bata merah kw. 1 70.000 bh 1,100.00 77,000.00
PC / Semen 9.680 kg 1,600.00 15,488.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 99,418.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 124,868.00

21 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 5Ps


(SNI DT 91-0009-2007-16)
Bahan
Bata merah kw. 2 70.000 bh 750.00 52,500.00
PC / Semen 9.680 kg 1,600.00 15,488.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 74,918.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 100,368.00

22 1 M2 Pasang bata merah tbl 1/2 bata camp. 1Pc : 3Kp : 10Ps
(SNI DT 91-0009-2007-17)
Bahan
Bata merah kw. 2 70.000 bh 750.00 52,500.00
PC / Semen 4.500 kg 1,600.00 7,200.00
Kapus pasang 0.015 m3 2,850.00 42.75
Pasir pasang 0.050 m3 154,000.00 7,700.00
Jumlah (1) 67,442.75
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 92,892.75

23 1 M2 Pasang dinding roster terawang 11x22 cm camp. 1Pc : 3Ps


(SNI DT 91-0009-2007-18)
Bahan
Roster terawang 11 x 22 cm 30.000 bh 3,550.00 106,500.00
PC / Semen 14.000 kg 1,600.00 22,400.00
Pasir pasang 0.032 m3 154,000.00 4,928.00
Jumlah (1) 133,828.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Pekerja 0.300 Org 55,000.00 16,500.00


Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 159,278.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

24 1 M2 Pasang batu tempel hitam


(An.D.05)
Bahan
Batu tempel hitam 1.100 m2 40,000.00 44,000.00
PC / Semen 11.750 kg 1,600.00 18,800.00
Pasir pasang 0.035 m3 154,000.00 5,390.00
Jumlah (1) 68,190.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 131,815.00

25 1 M2 Pasang batu palimanan 15x15 cm halus


(An.D.06)
Bahan
Batu palimanan 15x15 cm halus 1.100 m2 80,000.00 88,000.00
PC / Semen 11.750 kg 1,600.00 18,800.00
Pasir pasang 0.035 m3 154,000.00 5,390.00
Jumlah (1) 112,190.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 175,815.00

26 1 M2 Pasang beton alur


(An.D.07)
Bahan
Beton alur 20x40 cm 1.100 m2 70,000.00 77,000.00
PC / Semen 11.750 kg 1,600.00 18,800.00
Pasir pasang 0.035 m3 154,000.00 5,390.00
Jumlah (1) 101,190.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 164,815.00

27 1 M2 Pasang batu candi


(An.D.08)
Bahan
Batu candi 1.100 m2 123,000.00 135,300.00
PC / Semen 11.750 kg 1,600.00 18,800.00
Pasir pasang 0.035 m3 154,000.00 5,390.00
Jumlah (1) 159,490.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 223,115.00

28 1 M2 Pasang batu andesit


(An.D.09)
Bahan
Batu andesit 1.100 m2 135,000.00 148,500.00
PC / Semen 11.750 kg 1,600.00 18,800.00
Pasir pasang 0.035 m3 154,000.00 5,390.00
Jumlah (1) 172,690.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Mandor 0.030 Org 80,000.00 2,400.00


Jumlah (2) 63,625.00
Jumlah (1+2) 236,315.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

PEKERJAAN PLESTERAN (SNI DT 91-0010-2007)


1 1 M2 Plesteran tbl. 1,5 cm camp. 1Pc : 2Ps
(SNI DT 91-0010-2007-01)
Bahan
PC / Semen 10.224 kg 1,600.00 16,358.40
Pasir pasang 0.020 m3 154,000.00 3,080.00
Jumlah (1) 19,438.40
Upah kerja
Tukang batu 0.150 Org 70,000.00 10,500.00
K. Tukang batu 0.015 Org 75,000.00 1,125.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 23,425.00
Jumlah (1+2) 42,863.40

2 1 M2 Plesteran tbl. 1,5 cm camp. 1Pc : 3Ps


(SNI DT 91-0010-2007-02)
Bahan
PC / Semen 7.776 kg 1,600.00 12,441.60
Pasir pasang 0.023 m3 154,000.00 3,542.00
Jumlah (1) 15,983.60
Upah kerja
Tukang batu 0.150 Org 70,000.00 10,500.00
K. Tukang batu 0.015 Org 75,000.00 1,125.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 23,425.00
Jumlah (1+2) 39,408.60

3 1 M2 Plesteran tbl. 1,5 cm camp. 1Pc : 4Ps


(SNI DT 91-0010-2007-03)
Bahan
PC / Semen 6.240 kg 1,600.00 9,984.00
Pasir pasang 0.024 m3 154,000.00 3,696.00
Jumlah (1) 13,680.00
Upah kerja
Tukang batu 0.150 Org 70,000.00 10,500.00
K. Tukang batu 0.015 Org 75,000.00 1,125.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 23,425.00
Jumlah (1+2) 37,105.00

4 1 M2 Plesteran tbl. 1,5 cm camp. 1Pc : 5Ps


(SNI DT 91-0010-2007-04)
Bahan
PC / Semen 5.184 kg 1,600.00 8,294.40
Pasir pasang 0.026 m3 154,000.00 4,004.00
Jumlah (1) 12,298.40
Upah kerja
Tukang batu 0.150 Org 70,000.00 10,500.00
K. Tukang batu 0.015 Org 75,000.00 1,125.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 23,425.00
Jumlah (1+2) 35,723.40

5 1 M2 Plesteran tbl. 2 cm camp. 1Pc : 3Ps


(SNI DT 91-0010-2007-05)
Bahan
PC / Semen 10.368 kg 1,600.00 16,588.80
Pasir pasang 0.031 m3 154,000.00 4,774.00
Jumlah (1) 21,362.80
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.260 Org 55,000.00 14,300.00
Mandor 0.013 Org 80,000.00 1,040.00
Jumlah (2) 30,840.00
Jumlah (1+2) 52,202.80
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

6 1 M2 Plesteran tbl. 2 cm camp. 1Pc : 4Ps


(SNI DT 91-0010-2007-06)
Bahan
PC / Semen 8.320 kg 1,600.00 13,312.00
Pasir pasang 0.032 m3 154,000.00 4,928.00
Jumlah (1) 18,240.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.260 Org 55,000.00 14,300.00
Mandor 0.013 Org 80,000.00 1,040.00
Jumlah (2) 30,840.00
Jumlah (1+2) 49,080.00

7 1 M2 Plesteran tbl. 2 cm camp. 1Pc : 5Ps


(SNI DT 91-0010-2007-07)
Bahan
PC / Semen 6.912 kg 1,600.00 11,059.20
Pasir pasang 0.035 m3 154,000.00 5,390.00
Jumlah (1) 16,449.20
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.020 Org 75,000.00 1,500.00
Pekerja 0.260 Org 55,000.00 14,300.00
Mandor 0.013 Org 80,000.00 1,040.00
Jumlah (2) 30,840.00
Jumlah (1+2) 47,289.20

8 1 M2 Plesteran Ciprat
(SNI DT 91-0010-2007-08)
Bahan
PC / Semen 4.320 kg 1,600.00 6,912.00
Pasir pasang 0.006 m3 154,000.00 924.00
Jumlah (1) 7,836.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 25,450.00
Jumlah (1+2) 33,286.00

9 1 M2 Acian
(SNI DT 91-0010-2007-09)
Bahan
PC / Semen 3.250 kg 1,600.00 5,200.00
Jumlah (1) 5,200.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 19,550.00
Jumlah (1+2) 24,750.00

10 1 M' Benangan sudut


(SNI DT 91-0010-2007-10)
Bahan
PC / Semen 0.200 kg 1,600.00 320.00
Pasir pasang 0.013 m3 154,000.00 2,002.00
Jumlah (1) 2,322.00
Upah kerja
Tukang batu 0.070 Org 70,000.00 4,900.00
K. Tukang batu 0.005 Org 75,000.00 375.00
Pekerja 0.050 Org 55,000.00 2,750.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 8,425.00
Jumlah (1+2) 10,747.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

11 1 M2 Finishing siar pasangan bata merah


(SNI DT 91-0010-2007-11)
Bahan
PC / Semen 3.108 kg 1,600.00 4,972.80
Jumlah (1) 4,972.80
Upah kerja
Tukang batu 0.075 Org 70,000.00 5,250.00
K. Tukang batu 0.0075 Org 75,000.00 562.50
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.008 Org 80,000.00 640.00
Jumlah (2) 14,702.50
Jumlah (1+2) 19,675.30

12 1 M2 Finishing siar pasangan bata kali


(SNI DT 91-0010-2007-12)
Bahan
PC / Semen 6.340 kg 1,600.00 10,144.00
Pasir pasang 0.012 m3 154,000.00 1,848.00
Jumlah (1) 11,992.00
Upah kerja
Tukang batu 0.150 Org 70,000.00 10,500.00
K. Tukang batu 0.015 Org 75,000.00 1,125.00
Pekerja 0.300 Org 55,000.00 16,500.00
Mandor 0.015 Org 80,000.00 1,200.00
Jumlah (2) 29,325.00
Jumlah (1+2) 41,317.00

PEKERJAAN BETON (SNI DT 91-0008-2007)


1 1 M3 Rabat beton 1Pc : 3Ps : 5Krl
(SNI DT 91-0008-2007-01)
Bahan
PC / Semen 218.000 kg 1,600.00 348,800.00
Pasir cor 0.520 m3 198,000.00 102,960.00
Kerikil / Batu pecah 2-3 cm hitam 0.870 m3 278,200.00 242,034.00
Jumlah (1) 693,794.00
Upah kerja
Tukang batu 0.250 Org 70,000.00 17,500.00
K. Tukang batu 0.025 Org 75,000.00 1,875.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.080 Org 80,000.00 6,400.00
Jumlah (2) 116,525.00
Jumlah (1+2) 810,319.00

2 1 M3 Lantai kerja 1Pc : 2Ps : 4Krl


(SNI DT 91-0008-2007-02)
Bahan
PC / Semen 230.0000 kg 1,600.00 368,000.00
Pasir cor 0.6379 m3 198,000.00 126,304.20
Kerikil / Batu pecah 2-3 cm hitam 0.7607 m3 278,200.00 211,626.74
Jumlah (1) 705,930.94
Upah kerja
Tukang batu 0.250 Org 70,000.00 17,500.00
K. Tukang batu 0.025 Org 75,000.00 1,875.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.080 Org 80,000.00 6,400.00
Jumlah (2) 116,525.00
Jumlah (1+2) 822,455.94

3 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-100


(SNI DT 91-0008-2007-03)
Bahan
PC / Semen 247.0000 kg 1,600.00 395,200.00
Pasir cor 0.6207 m3 198,000.00 122,898.60
Kerikil / Batu pecah 2-3 cm hitam 0.7400 m3 278,200.00 205,868.00
Jumlah (1) 723,966.60
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Jumlah (1+2) 842,706.60


HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

4 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-125


(SNI DT 91-0008-2007-04)
Bahan
PC / Semen 276.0000 kg 1,600.00 441,600.00
Pasir cor 0.5914 m3 198,000.00 117,097.20
Kerikil / Batu pecah 2-3 cm hitam 0.7496 m3 278,200.00 208,538.72
Jumlah (1) 767,235.92
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
Jumlah (1+2) 885,975.92

5 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-150


(SNI DT 91-0008-2007-05)
Bahan
PC / Semen 299.0000 kg 1,600.00 478,400.00
Pasir cor 0.5707 m3 198,000.00 112,998.60
Kerikil / Batu pecah 2-3 cm hitam 0.7533 m3 278,200.00 209,568.06
Jumlah (1) 800,966.66
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
Jumlah (1+2) 919,706.66

6 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-175


(SNI DT 91-0008-2007-06)
Bahan
PC / Semen 326.0000 kg 1,600.00 521,600.00
Pasir cor 0.5428 m3 198,000.00 107,474.40
Kerikil / Batu pecah 2-3 cm hitam 0.7622 m3 278,200.00 212,044.04
Jumlah (1) 841,118.44
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
Jumlah (1+2) 959,858.44

7 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-200


(SNI DT 91-0008-2007-07)
Bahan
PC / Semen 352.0000 kg 1,600.00 563,200.00
Pasir cor 0.5221 m3 198,000.00 103,375.80
Kerikil / Batu pecah 2-3 cm hitam 0.7637 m3 278,200.00 212,461.34
Jumlah (1) 879,037.14
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
Jumlah (1+2) 997,777.14

8 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-225


(SNI DT 91-0008-2007-08)
Bahan
PC / Semen 371.0000 kg 1,600.00 593,600.00
Pasir cor 0.4986 m3 198,000.00 98,722.80
Kerikil / Batu pecah 2-3 cm hitam 0.7756 m3 278,200.00 215,771.92
Jumlah (1) 908,094.72
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Mandor 0.083 Org 80,000.00 6,640.00


Jumlah (2) 118,740.00
Jumlah (1+2) 1,026,834.72
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

9 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-250


(SNI DT 91-0008-2007-09)
Bahan
PC / Semen 384.0000 kg 1,600.00 614,400.00
Pasir cor 0.4943 m3 198,000.00 97,871.40
Kerikil / Batu pecah 2-3 cm hitam 0.7696 m3 278,200.00 214,102.72
Jumlah (1) 926,374.12
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
Jumlah (1+2) 1,045,114.12

10 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-275


(SNI DT 91-0008-2007-10)
Bahan
PC / Semen 406.0000 kg 1,600.00 649,600.00
Pasir cor 0.4886 m3 198,000.00 96,742.80
Kerikil / Batu pecah 2-3 cm hitam 0.7600 m3 278,200.00 211,432.00
Jumlah (1) 957,774.80
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
Jumlah (1+2) 1,076,514.80

11 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-300


(SNI DT 91-0008-2007-11)
Bahan
PC / Semen 413.0000 Kg 1,600.00 660,800.00
Pasir cor 0.4864 m3 198,000.00 96,307.20
Kerikil / Batu pecah 2-3 cm hitam 0.7563 m3 278,200.00 210,402.66
Jumlah (1) 967,509.86
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
Jumlah (1+2) 1,086,249.86

12 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-325


(SNI DT 91-0008-2007-12)
Bahan
PC / Semen 439.0000 kg 1,600.00 702,400.00
Pasir cor 0.4786 m3 198,000.00 94,762.80
Kerikil / Batu pecah 2-3 cm hitam 0.7452 m3 278,200.00 207,314.64
Jumlah (1) 1,004,477.44
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 118,740.00
Jumlah (1+2) 1,123,217.44

13 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-350


(SNI DT 91-0008-2007-13)
Bahan
PC / Semen 448.0000 kg 1,600.00 716,800.00
Pasir cor 0.4764 m3 198,000.00 94,327.20
Kerikil / Batu pecah 2-3 cm hitam 0.7407 m3 278,200.00 206,062.74
Jumlah (1) 1,017,189.94
Upah kerja
Tukang batu 0.275 Org 70,000.00 19,250.00
K. Tukang batu 0.028 Org 75,000.00 2,100.00
Pekerja 1.650 Org 55,000.00 90,750.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Mandor 0.083 Org 80,000.00 6,640.00


Jumlah (2) 118,740.00
Jumlah (1+2) 1,135,929.94
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

14 1 M3 Begesting pondasi
(SNI DT 91-0008-2007-14)
Bahan
Kayu papan begesting 0.200 m3 3,605,000.00 721,000.00
Paku 1.500 Kg 14,000.00 21,000.00
Minyak begesting 0.400 Ltr 25,600.00 10,240.00
Jumlah (1) 752,240.00
Upah kerja
Tukang kayu 1.300 Org 70,000.00 91,000.00
K. Tukang kayu 0.130 Org 75,000.00 9,750.00
Pekerja 2.600 Org 55,000.00 143,000.00
Mandor 0.122 Org 80,000.00 9,760.00
Jumlah (2) 253,510.00
Jumlah (1+2) 1,005,750.00

15 1 M3 Begesting sloof
(SNI DT 91-0008-2007-15)
Bahan
Kayu papan begesting 0.160 m3 3,605,000.00 576,800.00
Paku 1.800 Kg 14,000.00 25,200.00
Minyak begesting 0.600 Ltr 25,600.00 15,360.00
Jumlah (1) 617,360.00
Upah kerja
Tukang kayu 1.560 Org 70,000.00 109,200.00
K. Tukang kayu 0.156 Org 75,000.00 11,700.00
Pekerja 2.600 Org 55,000.00 143,000.00
Mandor 0.120 Org 80,000.00 9,600.00
Jumlah (2) 273,500.00
Jumlah (1+2) 890,860.00

16a 1 M3 Begesting kolom


(SNI DT 91-0008-2007-16a)
Bahan
Kayu papan begesting 0.320 m3 3,605,000.00 1,153,600.00
Paku 3.200 Kg 14,000.00 44,800.00
Minyak begesting 1.600 Ltr 25,600.00 40,960.00
Kayu meranti usuk 5/7 0.120 m3 3,701,100.00 444,132.00
Multiplek 9 mm 2.800 Lbr 135,000.00 378,000.00
Jumlah (1) 2,061,492.00
Upah kerja
Tukang kayu 1.300 Org 70,000.00 91,000.00
K. Tukang kayu 0.132 Org 75,000.00 9,900.00
Pekerja 2.600 Org 55,000.00 143,000.00
Mandor 0.122 Org 80,000.00 9,760.00
Jumlah (2) 253,660.00
Jumlah (1+2) 2,315,152.00

16b 1 M3 Begesting kolom ( uk. 40/40 ; 30/30 ; 25/25 )


(SNI DT 91-0008-2007-16b)
Bahan
Kayu papan begesting 0.200 m3 3,605,000.00 721,000.00
Paku 3.200 Kg 14,000.00 44,800.00
Minyak begesting 1.600 Ltr 25,600.00 40,960.00
Kayu meranti usuk 5/7 0.120 m3 3,701,100.00 444,132.00
Multiplek 9 mm 2.800 Lbr 135,000.00 378,000.00
Jumlah (1) 1,628,892.00
Upah kerja
Tukang kayu 1.300 Org 70,000.00 91,000.00
K. Tukang kayu 0.132 Org 75,000.00 9,900.00
Pekerja 2.600 Org 55,000.00 143,000.00
Mandor 0.122 Org 80,000.00 9,760.00
Jumlah (2) 253,660.00
Jumlah (1+2) 1,882,552.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

17a 1 M3 Begesting balok


(SNI DT 91-0008-2007-17a)
Bahan
Kayu papan begesting 0.320 m3 3,605,000.00 1,153,600.00
Paku 3.200 Kg 14,000.00 44,800.00
Minyak begesting 1.600 Ltr 25,600.00 40,960.00
Multiplek 9 mm 2.800 Lbr 135,000.00 378,000.00
Kayu meranti usuk 5/7 0.140 m3 3,701,100.00 518,154.00
Dolken dia. 8 cm / 4m 16.000 Btg 41,200.00 659,200.00
Jumlah (1) 2,794,714.00
Upah kerja
Tukang kayu 1.650 Org 70,000.00 115,500.00
K. Tukang kayu 0.165 Org 75,000.00 12,375.00
Pekerja 3.300 Org 55,000.00 181,500.00
Mandor 0.155 Org 80,000.00 12,400.00
Jumlah (2) 321,775.00
Jumlah (1+2) 3,116,489.00

17b 1 M3 Begesting balok ( Uk. 25/40 ; 30/50 )


(SNI DT 91-0008-2007-17b)
Bahan
Kayu papan begesting 0.210 m3 3,605,000.00 757,050.00
Paku 3.200 Kg 14,000.00 44,800.00
Minyak begesting 1.600 Ltr 25,600.00 40,960.00
Multiplek 9 mm 2.800 Lbr 135,000.00 378,000.00
Kayu meranti usuk 5/7 0.140 m3 3,701,100.00 518,154.00
Dolken dia. 8 cm / 4m 16.000 Btg 41,200.00 659,200.00
Jumlah (1) 2,398,164.00
Upah kerja
Tukang kayu 1.650 Org 70,000.00 115,500.00
K. Tukang kayu 0.165 Org 75,000.00 12,375.00
Pekerja 3.300 Org 55,000.00 181,500.00
Mandor 0.155 Org 80,000.00 12,400.00
Jumlah (2) 321,775.00
Jumlah (1+2) 2,719,939.00

18 1 M3 Begesting plat lantai dack


(SNI DT 91-0008-2007-18)
Bahan
Kayu papan begesting 0.320 m3 3,605,000.00 1,153,600.00
Paku 3.200 Kg 14,000.00 44,800.00
Minyak begesting 1.600 Ltr 25,600.00 40,960.00
Kayu meranti usuk 5/7 0.120 m3 3,701,100.00 444,132.00
Multiplek 9 mm 2.800 Lbr 135,000.00 378,000.00
Dolken dia. 8 cm / 4m 25.000 Btg 41,200.00 1,030,000.00
Jumlah (1) 3,091,492.00
Upah kerja
Tukang kayu 1.650 Org 70,000.00 115,500.00
K. Tukang kayu 0.165 Org 75,000.00 12,375.00
Pekerja 3.300 Org 55,000.00 181,500.00
Mandor 0.155 Org 80,000.00 12,400.00
Jumlah (2) 321,775.00
Jumlah (1+2) 3,413,267.00

19 1 M3 Begesting untuk tangga


(SNI DT 91-0008-2007-19)
Bahan
Kayu papan begesting 0.250 m3 3,605,000.00 901,250.00
Paku 3.000 Kg 14,000.00 42,000.00
Minyak begesting 1.200 Ltr 25,600.00 30,720.00
Kayu meranti usuk 5/7 0.105 m3 3,701,100.00 388,615.50
Multiplek 9 mm 2.500 Lbr 135,000.00 337,500.00
Dolken dia. 8 cm / 4m 14.000 Btg 41,200.00 576,800.00
Jumlah (1) 2,276,885.50
Upah kerja
Tukang kayu 1.650 Org 70,000.00 115,500.00
K. Tukang kayu 0.165 Org 75,000.00 12,375.00
Pekerja 3.300 Org 55,000.00 181,500.00
Mandor 0.155 Org 80,000.00 12,400.00
Jumlah (2) 321,775.00
Jumlah (1+2) 2,598,660.50
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

20 1 M3 Begesting untuk plat (cetak di darat)


(SNI DT 91-0008-2007-20)
Bahan
Kayu papan begesting 0.0400 m3 3,605,000.00 144,200.00
Paku 1.500 Kg 14,000.00 21,000.00
Minyak begesting 0.600 Ltr 25,600.00 15,360.00
Jumlah (1) 180,560.00
Upah kerja
Tukang kayu 1.300 Org 70,000.00 91,000.00
K. Tukang kayu 0.130 Org 75,000.00 9,750.00
Pekerja 2.600 Org 55,000.00 143,000.00
Mandor 0.122 Org 80,000.00 9,760.00
Jumlah (2) 253,510.00
Jumlah (1+2) 434,070.00

21 1 Kg Besi beton polos


(SNI DT 91-0008-2007-21)
Bahan
Besi beton polos 1.050 Kg 10,500.00 11,025.00
Kawat bendrat 0.015 Kg 16,000.00 240.00
Jumlah (1) 11,265.00
Upah kerja
Tukang besi 0.0070 Org 70,000.00 490.00
K. Tukang besi 0.0007 Org 75,000.00 52.50
Pekerja 0.0070 Org 55,000.00 385.00
Mandor 0.0004 Org 80,000.00 32.00
Jumlah (2) 959.50
Jumlah (1+2) 12,224.50

22 1 M3 Pondasi Footplat Beton Bertulang K-175


(SNI DT 91-0008-2007-22)
Cor beton 1Pc : 2Ps : 3Krl K-175 1.000 m3 959,858.44 959,858.44
Begesting pondasi 1.000 m3 1,005,750.00 1,005,750.00
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 3,432,548.44
23 1 M3 Pondasi Footplat Beton Bertulang K-200
(SNI DT 91-0008-2007-23)
Cor beton 1Pc : 2Ps : 3Krl K-200 1.000 m3 997,777.14 997,777.14
Begesting pondasi 1.000 m3 1,005,750.00 1,005,750.00
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 3,470,467.14

24 1 M3 Pondasi Footplat Beton Bertulang K-225


(SNI DT 91-0008-2007-24)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting pondasi 1.000 m3 1,005,750.00 1,005,750.00
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 3,499,524.72

25 1 M3 Pondasi Footplat Beton Bertulang K-250


(SNI DT 91-0008-2007-25)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting pondasi 1.000 m3 1,005,750.00 1,005,750.00
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 3,517,804.12

26 1 M3 Pondasi Strous Beton Bertulang K-175


(SNI DT 91-0008-2007-26)
Cor beton 1Pc : 2Ps : 3Krl K-175 1.000 m3 959,858.44 959,858.44
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 2,426,798.44

27 1 M3 Pondasi Strous Beton Bertulang K-200


(SNI DT 91-0008-2007-27)
Cor beton 1Pc : 2Ps : 3Krl K-200 1.000 m3 997,777.14 997,777.14
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 2,464,717.14

28 1 M3 Pondasi Strous Beton Bertulang K-225


(SNI DT 91-0008-2007-28)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Jumlah 2,493,774.72

29 1 M3 Pondasi Strous Beton Bertulang K-250


(SNI DT 91-0008-2007-29)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 2,512,054.12
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

30 1 M3 Sloof Beton Bertulang K-200 (uk. 15/15; 15/20)


(SNI DT 91-0008-2007-30)
Cor beton 1Pc : 2Ps : 3Krl K-200 1.000 m3 997,777.14 997,777.14
Begesting sloof 1.000 m3 890,860.00 890,860.00
Besi beton polos 130 kg 130.000 Kg 12,224.50 1,589,185.00
Jumlah 3,477,822.14

31a 1 M3 Sloof Beton Bertulang K-225 (uk. 20/25; 20/30)


(SNI DT 91-0008-2007-31a)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting sloof 1.000 m3 890,860.00 890,860.00
Besi beton polos 140 kg 140.000 Kg 12,224.50 1,711,430.00
Jumlah 3,629,124.72

31b 1 M3 Sloof Beton Bertulang K-225 (uk. 20/30)


(SNI DT 91-0008-2007-31a)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting sloof 1.000 m3 890,860.00 890,860.00
Besi beton polos 165 kg 165.000 Kg 12,224.50 2,017,042.50
Jumlah 3,934,737.22

32a 1 M3 Sloof Beton Bertulang K-225 (uk. 20/40; 30/40)


(SNI DT 91-0008-2007-32a)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting sloof 1.000 m3 890,860.00 890,860.00
Besi beton polos 150 kg 150.000 Kg 12,224.50 1,833,675.00
Jumlah 3,751,369.72

32b 1 M3 Sloof Beton Bertulang K-225 (uk. 25/40)


(SNI DT 91-0008-2007-32b)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting sloof 1.000 m3 890,860.00 890,860.00
Besi beton polos 155 kg 155.000 Kg 12,224.50 1,894,797.50
Jumlah 3,812,492.22
33 1 M3 Sloof Beton Bertulang K-250 (uk. 20/25; 20/30)
(SNI DT 91-0008-2007-33)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting sloof 1.000 m3 890,860.00 890,860.00
Besi beton polos 140 kg 140.000 Kg 12,224.50 1,711,430.00
Jumlah 3,647,404.12

34 1 M3 Sloof Beton Bertulang K-250 (uk. 20/40; 30/40)


(SNI DT 91-0008-2007-34)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting sloof 1.000 m3 890,860.00 890,860.00
Besi beton polos 150 kg 150.000 Kg 12,224.50 1,833,675.00
Jumlah 3,769,649.12

35 1 M3 Kolom praktis beton bertulang K-175 (uk. 11/11; 15/15)


(SNI DT 91-0008-2007-35)
Cor beton 1Pc : 2Ps : 3Krl K-175 1.000 m3 959,858.44 959,858.44
Begesting kolom 0.250 m3 2,315,152.00 578,788.00
Besi beton polos 130 kg 130.000 Kg 12,224.50 1,589,185.00
Jumlah 3,127,831.44

36 1 M3 Kolom beton bertulang K-200 (uk. 15/25; 15/30; 20/30)


(SNI DT 91-0008-2007-36)
Cor beton 1Pc : 2Ps : 3Krl K-200 1.000 m3 997,777.14 997,777.14
Begesting kolom 0.500 m3 2,315,152.00 1,157,576.00
Besi beton polos 150 kg 150.000 Kg 12,224.50 1,833,675.00
Jumlah 3,989,028.14

37 1 M3 Kolom beton bertulang K-225 (uk. 15/25; 15/30; 20/30)


(SNI DT 91-0008-2007-37)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting kolom 0.500 m3 2,315,152.00 1,157,576.00
Besi beton polos 150 kg 150.000 Kg 12,224.50 1,833,675.00
Jumlah 4,018,085.72

38 1 M3 Kolom beton bertulang K-225 (uk. 20/40; 30/40)


(SNI DT 91-0008-2007-38)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting kolom 0.500 m3 2,315,152.00 1,157,576.00
Besi beton polos 200 kg 200.000 Kg 12,224.50 2,444,900.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Jumlah 4,629,310.72
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

39 1 M3 Kolom beton bertulang K-250 (uk. 20/40; 30/40)


(SNI DT 91-0008-2007-39)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting kolom 0.500 m3 2,315,152.00 1,157,576.00
Besi beton polos 200 kg 200.000 Kg 12,224.50 2,444,900.00
Jumlah 4,647,590.12

40a 1 M3 Kolom beton bertulang K-225 (uk. 30/50; 35/50)


(SNI DT 91-0008-2007-40a)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting kolom 0.500 m3 2,315,152.00 1,157,576.00
Besi beton polos 225 kg 225.000 Kg 12,224.50 2,750,512.50
Jumlah 4,934,923.22

40b 1 M3 Kolom beton bertulang K-225 (uk. 40/40 ; 30/30 ; 25/25 )


(SNI DT 91-0008-2007-40b)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting kolom 0.500 m3 1,882,552.00 941,276.00
Besi beton polos 140 kg 140.000 Kg 12,224.50 1,711,430.00
Jumlah 3,679,540.72

41 1 M3 Kolom beton bertulang K-250 (uk. 30/50; 35/50)


(SNI DT 91-0008-2007-41)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting kolom 0.500 m3 2,315,152.00 1,157,576.00
Besi beton polos 225 kg 225.000 Kg 12,224.50 2,750,512.50
Jumlah 4,953,202.62

42 1 M3 Kolom beton bertulang K-225 (uk. 30/60; 35/60; 40/70)


(SNI DT 91-0008-2007-42)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting kolom 0.500 m3 2,315,152.00 1,157,576.00
Besi beton polos 250 kg 250.000 Kg 12,224.50 3,056,125.00
Jumlah 5,240,535.72

43 1 M3 Kolom beton bertulang K-250 (uk. 30/60; 35/60; 40/70)


(SNI DT 91-0008-2007-43)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting kolom 0.500 m3 2,315,152.00 1,157,576.00
Besi beton polos 250 kg 250.000 Kg 12,224.50 3,056,125.00
Jumlah 5,258,815.12

44 1 M3 Beton ring balok K-175 (uk. 15/15; 15/20)


(SNI DT 91-0008-2007-44)
Cor beton 1Pc : 2Ps : 3Krl K-175 1.000 m3 959,858.44 959,858.44
Begesting balok 0.250 m3 3,116,489.00 779,122.25
Besi beton polos 110 kg 110.000 Kg 12,224.50 1,344,695.00
Jumlah 3,083,675.69

45 1 M3 Beton balok K-200 (uk. 15/20; 15/30; 20/30)


(SNI DT 91-0008-2007-45)
Cor beton 1Pc : 2Ps : 3Krl K-200 1.000 m3 997,777.14 997,777.14
Begesting balok 0.500 m3 3,116,489.00 1,558,244.50
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 4,022,961.64

46 1 M3 Beton balok K-225 (uk. 15/30; 20/30)


(SNI DT 91-0008-2007-46)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting balok 0.500 m3 3,116,489.00 1,558,244.50
Besi beton polos 120 kg 120.000 Kg 12,224.50 1,466,940.00
Jumlah 4,052,019.22

47a 1 M3 Beton balok K-225 (uk. 25/40; 30/50)


(SNI DT 91-0008-2007-47a)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting balok 0.500 m3 3,116,489.00 1,558,244.50
Besi beton polos 150 kg 150.000 Kg 12,224.50 1,833,675.00
Jumlah 4,418,754.22

47b 1 M3 Beton balok K-225 (uk. 25/40; 30/50)


HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

(SNI DT 91-0008-2007-47b)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting balok 0.500 m3 2,719,939.00 1,359,969.50
Besi beton polos 130 kg 130.000 Kg 12,224.50 1,589,185.00
Jumlah 3,975,989.22
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

48 1 M3 Beton balok K-225 (uk. 30/60; 30/70; 30/80)


(SNI DT 91-0008-2007-48)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting balok 0.500 m3 3,116,489.00 1,558,244.50
Besi beton polos 200 kg 200.000 Kg 12,224.50 2,444,900.00
Jumlah 5,029,979.22

49 1 M3 Beton balok K-250 (uk. 25/40; 30/50)


(SNI DT 91-0008-2007-49)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting balok 0.500 m3 3,116,489.00 1,558,244.50
Besi beton polos 150 kg 150.000 Kg 12,224.50 1,833,675.00
Jumlah 4,437,033.62

50 1 M3 Beton balok K-250 (uk. 30/60; 30/70; 30/80)


(SNI DT 91-0008-2007-50)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting balok 0.500 m3 3,116,489.00 1,558,244.50
Besi beton polos 200 kg 200.000 Kg 12,224.50 2,444,900.00
Jumlah 5,048,258.62

51 1 M3 Beton plat lantai K-225 tb. 10 dan 12 cm


(SNI DT 91-0008-2007-51)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting lantai 0.500 m3 3,413,267.00 1,706,633.50
Besi beton polos 110 kg 110.000 Kg 12,224.50 1,344,695.00
Jumlah 4,078,163.22

52 1 M3 Beton plat lantai K-250 tb. 10 dan 12 cm


(SNI DT 91-0008-2007-52)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting lantai 0.500 m3 3,413,267.00 1,706,633.50
Besi beton polos 110 kg 110.000 Kg 12,224.50 1,344,695.00
Jumlah 4,096,442.62

53 1 M3 Beton tangga K-225


(SNI DT 91-0008-2007-53)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting tangga 0.500 m3 2,598,660.50 1,299,330.25
Besi beton polos 150 kg 150.000 Kg 12,224.50 1,833,675.00
Jumlah 4,159,839.97

54 1 M3 Beton tangga K-250


(SNI DT 91-0008-2007-54)
Cor beton 1Pc : 2Ps : 3Krl K-250 1.000 m3 1,045,114.12 1,045,114.12
Begesting tangga 0.500 m3 2,598,660.50 1,299,330.25
Besi beton polos 150 kg 150.000 Kg 12,224.50 1,833,675.00
Jumlah 4,178,119.37

55 1 M3 Beton plat cetak dibawah K-175 (tutup saluran)


(SNI DT 91-0008-2007-55)
Cor beton 1Pc : 2Ps : 3Krl K-175 1.000 m3 959,858.44 959,858.44
Begesting plat (cetak di darat) 1.000 m3 434,070.00 434,070.00
Besi beton polos 110 kg 110.000 Kg 12,224.50 1,344,695.00
Jumlah 2,738,623.44

56 1 M3 Beton plat cetak dibawah K-200 (tutup saluran)


(SNI DT 91-0008-2007-56)
Cor beton 1Pc : 2Ps : 3Krl K-200 1.000 m3 997,777.14 997,777.14
Begesting plat (cetak di darat) 1.000 m3 434,070.00 434,070.00
Besi beton polos 110 kg 110.000 Kg 12,224.50 1,344,695.00
Jumlah 2,776,542.14

57 1 M3 Beton plat cetak dibawah K-225 (tutup saluran)


(SNI DT 91-0008-2007-57)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 1,026,834.72 1,026,834.72
Begesting plat (cetak di darat) 1.000 m3 434,070.00 434,070.00
Besi beton polos 110 kg 110.000 Kg 12,224.50 1,344,695.00
Jumlah 2,805,599.72
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

PEKERJAAN KAYU (SNI DT 91-0011-2007)


BAHAN KAYU KAMPER
1 1 M3 Pasang kusen pintu dan jendela
(SNI DT 91-0011-2007-01)
Bahan
Balok kayu kamper 1.100 m3 7,364,500.00 8,100,950.00
Paku 1.250 Kg 14,000.00 17,500.00
Lem kayu 1.000 Kg 14,850.00 14,850.00
Jumlah (1) 8,133,300.00
Upah kerja
Tukang kayu 21.000 Org 70,000.00 1,470,000.00
K. Tukang kayu 2.100 Org 75,000.00 157,500.00
Pekerja 7.000 Org 55,000.00 385,000.00
Mandor 0.350 Org 80,000.00 28,000.00
Jumlah (2) 2,040,500.00
Jumlah (1+2) 10,173,800.00

2 1 M2 Pasang jalusi mati kusen


(SNI DT 91-0011-2007-02)
Bahan
Kayu kamper papan 0.060 m3 9,064,000.00 543,840.00
Paku 0.150 Kg 14,000.00 2,100.00
Jumlah (1) 545,940.00
Upah kerja
Tukang kayu 2.000 Org 70,000.00 140,000.00
K. Tukang kayu 0.200 Org 75,000.00 15,000.00
Pekerja 0.500 Org 55,000.00 27,500.00
Mandor 0.025 Org 80,000.00 2,000.00
Jumlah (2) 184,500.00
Jumlah (1+2) 730,440.00

3 1 M2 Pasang daun pintu / jendela panil


(SNI DT 91-0011-2007-03)
Bahan
Kayu kamper papan 0.040 m3 9,064,000.00 362,560.00
Lem kayu 0.500 Kg 14,850.00 7,425.00
Jumlah (1) 369,985.00
Upah kerja
Tukang kayu 2.500 Org 70,000.00 175,000.00
K. Tukang kayu 0.250 Org 75,000.00 18,750.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.050 Org 80,000.00 4,000.00
Jumlah (2) 252,750.00
Jumlah (1+2) 622,735.00
4 1 M2 Pasang daun pintu / jendela kaca bening rangka kayu kamper
(SNI DT 91-0011-2007-04)
Bahan
Kayu kamper papan 0.024 m3 9,064,000.00 217,536.00
Lem kayu 0.300 Kg 14,850.00 4,455.00
Kaca bening 5 mm 1.000 m2 76,000.00 76,000.00
Jumlah (1) 297,991.00
Upah kerja
Tukang kayu 3.000 Org 70,000.00 210,000.00
K. Tukang kayu 0.300 Org 75,000.00 22,500.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.050 Org 80,000.00 4,000.00
Jumlah (2) 291,500.00
Jumlah (1+2) 589,491.00

5 1 M2 Pasang daun pintu / jendela kaca rayban rangka kayu kamper


(SNI DT 91-0011-2007-05)
Bahan
Kayu kamper papan 0.024 m3 9,064,000.00 217,536.00
Lem kayu 0.300 Kg 14,850.00 4,455.00
Kaca rayban 5 mm 1.000 m2 88,000.00 88,000.00
Jumlah (1) 309,991.00
Upah kerja
Tukang kayu 3.000 Org 70,000.00 210,000.00
K. Tukang kayu 0.300 Org 75,000.00 22,500.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.050 Org 80,000.00 4,000.00
Jumlah (2) 291,500.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Jumlah (1+2) 601,491.00


HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

6 1 M2 Pasang daun pintu / jendela krepyak kayu kamper


(SNI DT 91-0011-2007-06)
Bahan
Kayu kamper papan 0.064 m3 9,064,000.00 580,096.00
Lem kayu 0.500 Kg 14,850.00 7,425.00
Jumlah (1) 587,521.00
Upah kerja
Tukang kayu 3.000 Org 70,000.00 210,000.00
K. Tukang kayu 0.300 Org 75,000.00 22,500.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.050 Org 80,000.00 4,000.00
Jumlah (2) 291,500.00
Jumlah (1+2) 879,021.00

7 1 M3 Pasang kuda-kuda expose


(SNI DT 91-0011-2007-07)
Bahan
Balok kayu kamper kw. 1 1.200 m3 8,497,500.00 10,197,000.00
Paku 5.600 Kg 14,000.00 78,400.00
Besi setrip 15.000 Kg 12,000.00 180,000.00
Jumlah (1) 10,455,400.00
Upah kerja
Tukang kayu 20.000 Org 70,000.00 1,400,000.00
K. Tukang kayu 2.000 Org 75,000.00 150,000.00
Pekerja 6.000 Org 55,000.00 330,000.00
Mandor 0.300 Org 80,000.00 24,000.00
Jumlah (2) 1,904,000.00
Jumlah (1+2) 12,359,400.00
8 1 M3 Pasang kuda-kuda
(SNI DT 91-0011-2007-08)
Bahan
Balok kayu kamper 1.100 m3 7,364,500.00 8,100,950.00
Paku 5.600 Kg 14,000.00 78,400.00
Besi setrip 15.000 Kg 12,000.00 180,000.00
Jumlah (1) 8,359,350.00
Upah kerja
Tukang kayu 12.000 Org 70,000.00 840,000.00
K. Tukang kayu 1.200 Org 75,000.00 90,000.00
Pekerja 4.000 Org 55,000.00 220,000.00
Mandor 0.200 Org 80,000.00 16,000.00
Jumlah (2) 1,166,000.00
Jumlah (1+2) 9,525,350.00

9 1 M3 Pasang gordeng
(SNI DT 91-0011-2007-09)
Bahan
Balok kayu kamper 1.100 m3 7,364,500.00 8,100,950.00
Paku 3.000 Kg 14,000.00 42,000.00
Besi setrip 15.000 Kg 12,000.00 180,000.00
Jumlah (1) 8,322,950.00
Upah kerja
Tukang kayu 7.200 Org 70,000.00 504,000.00
K. Tukang kayu 0.720 Org 75,000.00 54,000.00
Pekerja 2.400 Org 55,000.00 132,000.00
Mandor 0.120 Org 80,000.00 9,600.00
Jumlah (2) 699,600.00
Jumlah (1+2) 9,022,550.00

10 1 M2 Pasang usuk dan reng (genteng pres)


(SNI DT 91-0011-2007-10)
Bahan
Usuk kayu kamper 4/6 0.012 m3 5,098,500.00 61,182.00
Reng kayu kamper 2/3 0.0036 m3 4,447,100.00 16,009.56
Paku usuk 0.250 Kg 14,000.00 3,500.00
Jumlah (1) 80,691.56
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 94,341.56
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

11 1 M2 Pasang usuk dan reng (genteng beton/monier)


(SNI DT 91-0011-2007-11)
Bahan
Usuk kayu kamper 5/7 0.014 m3 5,098,500.00 71,379.00
Reng kayu kamper 3/4 0.0057 m3 4,447,100.00 25,348.47
Paku usuk 0.250 Kg 14,000.00 3,500.00
Jumlah (1) 100,227.47
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 113,877.47

12 1 M2 Pasang rangka plafond 50x100 cm


(SNI DT 91-0011-2007-12)
Bahan
Kayu kamper 4/6 0.0154 m3 5,098,500.00 78,516.90
Paku usuk 0.200 Kg 14,000.00 2,800.00
Jumlah (1) 81,316.90
Upah kerja
Tukang kayu 0.250 Org 70,000.00 17,500.00
K. Tukang kayu 0.025 Org 75,000.00 1,875.00
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.075 Org 80,000.00 6,000.00
Jumlah (2) 33,625.00
Jumlah (1+2) 114,941.90

13 1 M2 Pasang rangka plafond 60x120 cm


(SNI DT 91-0011-2007-13)
Bahan
Kayu kamper 4/6 0.0142 m3 5,098,500.00 72,398.70
Paku usuk 0.250 Kg 14,000.00 3,500.00
Jumlah (1) 75,898.70
Upah kerja
Tukang kayu 0.300 Org 70,000.00 21,000.00
K. Tukang kayu 0.030 Org 75,000.00 2,250.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 35,050.00
Jumlah (1+2) 110,948.70
14 1 M' Pasang papan lisplank 3/20
(SNI DT 91-0011-2007-14)
Bahan
Kayu kamper papan 0.0108 m3 9,064,000.00 97,891.20
Paku usuk 0.100 Kg 14,000.00 1,400.00
Jumlah (1) 99,291.20
Upah kerja
Tukang kayu 0.200 Org 70,000.00 14,000.00
K. Tukang kayu 0.025 Org 75,000.00 1,875.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 21,775.00
Jumlah (1+2) 121,066.20

15 1 M' Pasang papan lisplank 3/30


(SNI DT 91-0011-2007-15)
Bahan
Kayu kamper papan 0.0110 m3 9,064,000.00 99,704.00
Paku usuk 0.100 Kg 14,000.00 1,400.00
Jumlah (1) 101,104.00
Upah kerja
Tukang kayu 0.200 Org 70,000.00 14,000.00
K. Tukang kayu 0.020 Org 75,000.00 1,500.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 21,400.00
Jumlah (1+2) 122,504.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

16 1 M' Pasang lisplank Calsiplank/Woodplank 2x0,9/30


(SNI DT 91-0011-2007-16)
Bahan
Calsiplank/Woodplank 2x0,9/30 2.1000 m1 26,250.00 55,125.00
Paku usuk 0.100 Kg 14,000.00 1,400.00
Jumlah (1) 56,525.00
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.050 Org 55,000.00 2,750.00
Mandor 0.003 Org 80,000.00 200.00
Jumlah (2) 10,700.00
Jumlah (1+2) 67,225.00

17 1 M' Pasang lisplank Calsiplank/Woodplank 0,9/30


(SNI DT 91-0011-2007-17)
Bahan
Calsiplank/Woodplank 0,9/30 1.0500 m1 26,250.00 27,562.50
Paku usuk 0.050 Kg 14,000.00 700.00
Jumlah (1) 28,262.50
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.050 Org 55,000.00 2,750.00
Mandor 0.003 Org 80,000.00 200.00
Jumlah (2) 10,700.00
Jumlah (1+2) 38,962.50

PEMBUATAN DAUN PINTU LAPIS


58 1 M2 Daun pintu dobel triplek rangka kayu bengkirai
(SNI DT 91-0011-2007-58)
Bahan
Kayu bengkirai papan 0.0250 m3 8,497,500.00 212,437.50
Triplek tb. 4 mm (uk. 1,10 x 2,10 m) 1.0000 lbr 55,000.00 55,000.00
Lem kayu 0.5000 Kg 14,850.00 7,425.00
Paku 0.030 Kg 14,000.00 420.00
Jumlah (1) 275,282.50
Upah kerja
Tukang kayu 2.000 Org 70,000.00 140,000.00
K. Tukang kayu 0.200 Org 75,000.00 15,000.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 190,400.00
Jumlah (1+2) 465,682.50

59 1 M2 Daun pintu dobel teakwood rangka kayu bengkirai


(SNI DT 91-0011-2007-59)
Bahan
Kayu bengkirai papan 0.0250 m3 8,497,500.00 212,437.50
Teakwood tb. 4 mm (uk. 1,10 x 2,10 m) 1.0000 lbr 70,000.00 70,000.00
Lem kayu 0.5000 Kg 14,850.00 7,425.00
Paku 0.030 Kg 14,000.00 420.00
Jumlah (1) 290,282.50
Upah kerja
Tukang kayu 2.000 Org 70,000.00 140,000.00
K. Tukang kayu 0.200 Org 75,000.00 15,000.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 190,400.00
Jumlah (1+2) 480,682.50

60 1 M2 Daun pintu dobel teakwood lapis triplek aluminium rangka kayu bengkirai
(SNI DT 91-0011-2007-60)
Bahan
Kayu bengkirai papan 0.0250 m3 8,497,500.00 212,437.50
Teakwood tb. 4 mm (uk. 1,10 x 2,10 m) 0.5000 lbr 70,000.00 35,000.00
Triplek lapis aluminium tb. 4 mm 0.5000 lbr 95,000.00 47,500.00
Lem kayu 0.5000 Kg 14,850.00 7,425.00
Paku 0.030 Kg 14,000.00 420.00
Jumlah (1) 302,782.50
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Upah kerja
Tukang kayu 2.000 Org 70,000.00 140,000.00
K. Tukang kayu 0.200 Org 75,000.00 15,000.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 190,400.00
Jumlah (1+2) 493,182.50
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

61 1 M2 Pas. Dinding pemisah dobel teakwood rangka kayu bengkirai


(SNI DT 91-0011-2007-61)
Bahan
Kayu bengkirai balok 6/12 0.0280 m3 7,647,800.00 214,138.40
Teakwood tb. 4 mm (uk. 1,20 x 2,40 m) 0.8600 lbr 80,000.00 68,800.00
Lem kayu 0.5600 Kg 14,850.00 8,316.00
Paku 0.150 Kg 14,000.00 2,100.00
Jumlah (1) 293,354.40
Upah kerja
Tukang kayu 0.450 Org 70,000.00 31,500.00
K. Tukang kayu 0.045 Org 75,000.00 3,375.00
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.008 Org 80,000.00 640.00
Jumlah (2) 43,765.00
Jumlah (1+2) 337,119.40

62 1 M2 Pas. Dinding pemisah dobel triplek rangka kayu bengkirai


(SNI DT 91-0011-2007-62)
Bahan
Kayu bengkirai balok 6/12 0.0280 m3 7,647,800.00 214,138.40
Triplek tb. 4 mm (uk. 1,20 x 2,40 m) 0.8600 lbr 60,000.00 51,600.00
Lem kayu 0.5600 Kg 14,850.00 8,316.00
Paku 0.150 Kg 14,000.00 2,100.00
Jumlah (1) 276,154.40
Upah kerja
Tukang kayu 0.450 Org 70,000.00 31,500.00
K. Tukang kayu 0.045 Org 75,000.00 3,375.00
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.008 Org 80,000.00 640.00
Jumlah (2) 43,765.00
Jumlah (1+2) 319,919.40

PEKERJAAN PERBAIKAN KAYU


63 1 M3 Pasang kuda-kuda kayu lama
(SNI DT 91-0011-2007-63)
Bahan
Paku 5.600 Kg 14,000.00 78,400.00
Besi setrip 15.000 Kg 12,000.00 180,000.00
Jumlah (1) 258,400.00
Upah kerja
Tukang kayu 12.000 Org 70,000.00 840,000.00
K. Tukang kayu 1.200 Org 75,000.00 90,000.00
Pekerja 4.000 Org 55,000.00 220,000.00
Mandor 0.200 Org 80,000.00 16,000.00
Jumlah (2) 1,166,000.00
Jumlah (1+2) 1,424,400.00

64 1 M3 Pasang gordeng kayu lama


(SNI DT 91-0011-2007-64)
Bahan
Paku 3.000 Kg 14,000.00 42,000.00
Besi setrip 15.000 Kg 12,000.00 180,000.00
Jumlah (1) 222,000.00
Upah kerja
Tukang kayu 7.200 Org 70,000.00 504,000.00
K. Tukang kayu 0.720 Org 75,000.00 54,000.00
Pekerja 2.400 Org 55,000.00 132,000.00
Mandor 0.120 Org 80,000.00 9,600.00
Jumlah (2) 699,600.00
Jumlah (1+2) 921,600.00

65 1 M2 Pasang usuk kayu lama + reng kayu baru (bengkirai)


(SNI DT 91-0011-2007-65)
Bahan
Reng kayu bengkirai 2/3 0.0036 m3 4,892,500.00 17,613.00
Paku usuk 0.250 Kg 14,000.00 3,500.00
Jumlah (1) 21,113.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 34,763.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

PEKERJAAN LANGIT-LANGIT (SNI DT 91-0013-2007)


1 1 M2 Pas. Plafond Eternit
(SNI DT 91-0013-2007-01)
Bahan
Eternit 100 x 100 cm tb. 3,5 mm 1.100 lbr 18,000.00 19,800.00
Paku 0.010 lbr 25,000.00 250.00
Jumlah (1) 20,050.00
Upah kerja
Tukang kayu 0.070 Org 70,000.00 4,900.00
K. Tukang kayu 0.007 Org 75,000.00 525.00
Pekerja 0.030 Org 55,000.00 1,650.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah (2) 7,235.00
Jumlah (1+2) 27,285.00

2 1 M2 Pas. Plafond Kalsiboard


(SNI DT 91-0013-2007-02)
Bahan
Kalsiboard tb. 3,5 mm 0.375 lbr 61,250.00 22,968.75
Paku 0.030 lbr 25,000.00 750.00
Jumlah (1) 23,718.75
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.070 Org 55,000.00 3,850.00
Mandor 0.004 Org 80,000.00 320.00
Jumlah (2) 11,920.00
Jumlah (1+2) 35,638.75

3 1 M' Pasang list plafond kayu profil


(SNI DT 91-0013-2007-03)
Bahan
Kayu profil 1.050 m' 9,000.00 9,450.00
Paku 0.010 Kg 14,000.00 140.00
Jumlah (1) 9,590.00
Upah kerja
Tukang kayu 0.050 Org 70,000.00 3,500.00
K. Tukang kayu 0.005 Org 75,000.00 375.00
Pekerja 0.050 Org 55,000.00 2,750.00
Mandor 0.003 Org 80,000.00 240.00
Jumlah (2) 6,865.00
Jumlah (1+2) 16,455.00

4 1 M' Pasang list gypsum 7 - 10 cm


(SNI DT 91-0013-2007-04)
Bahan
List gypsum 7 cm 1.050 m' 10,000.00 10,500.00
Casting 0.150 Kg 11,000.00 1,650.00
Jumlah (1) 12,150.00
Upah kerja
Tukang kayu 0.060 Org 70,000.00 4,200.00
K. Tukang kayu 0.006 Org 75,000.00 450.00
Pekerja 0.060 Org 55,000.00 3,300.00
Mandor 0.003 Org 80,000.00 240.00
Jumlah (2) 8,190.00
Jumlah (1+2) 20,340.00

5 1 M2 Pasang plafond kalsiboard + rangka galvalum


(SNI DT 91-0013-2007-05)
Bahan
Besi galvalum 4/4 4.400 m' 15,566.67 68,493.33
Besi galvalum 2/4 1.000 m' 13,166.67 13,166.67
Kalsiboard tb. 3,5 mm 0.364 Lbr 61,250.00 22,295.00
Sekrup 0.210 Kg 30,000.00 6,300.00
Jumlah (1) 110,255.00
Upah kerja
Tukang kayu 0.050 Org 70,000.00 3,500.00
K. Tukang kayu 0.005 Org 75,000.00 375.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 9,775.00
Jumlah (1+2) 120,030.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

6 1 M2 Pasang plafond Gypsumboard + rangka Metal Furring


(SNI DT 91-0013-2007-06)
Bahan
Besi Metal Furring 4/4 4.400 m' 15,916.67 70,033.33
Besi Metal Furring 2/4 1.000 m' 13,666.67 13,666.67
Gypsumboard tb. 3,5 mm 0.364 Lbr 61,250.00 22,295.00
Sekrup 0.210 Kg 30,000.00 6,300.00
Jumlah (1) 112,295.00
Upah kerja
Tukang kayu 0.050 Org 70,000.00 3,500.00
K. Tukang kayu 0.005 Org 75,000.00 375.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 9,775.00
Jumlah (1+2) 122,070.00

PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 Pasang genteng pres (penthol)
(SNI 03-3436-2002-01)
Bahan
Genteng pres (penthol) 21.000 bj 1,700.00 35,700.00
Jumlah (1) 35,700.00
Upah kerja
Tukang kayu 0.075 Org 70,000.00 5,250.00
K. Tukang kayu 0.008 Org 75,000.00 600.00
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.008 Org 80,000.00 640.00
Jumlah (2) 14,740.00
Jumlah (1+2) 50,440.00

2 1 M' Pasang Bubungan genteng pres


(SNI 03-3436-2002-02)
Bahan
Bubungan genteng pres 5.000 bj 3,300.00 16,500.00
PC / Semen 8.000 Kg 1,600.00 12,800.00
Pasir pasang 0.032 m3 154,000.00 4,928.00
Jumlah (1) 34,228.00
Upah kerja
Tukang kayu 0.200 Org 70,000.00 14,000.00
K. Tukang kayu 0.020 Org 75,000.00 1,500.00
Pekerja 0.400 Org 55,000.00 22,000.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah (2) 37,660.00
Jumlah (1+2) 71,888.00

3 1 M2 Pasang genteng beton besar


(SNI 03-3436-2002-03)
Bahan
Genteng beton besar 10.500 bj 3,800.00 39,900.00
Jumlah (1) 39,900.00
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 19,550.00
Jumlah (1+2) 59,450.00

4 1 M2 Pasang genteng beton kecil


(SNI 03-3436-2002-04)
Bahan
Genteng beton kecil 12.000 bj 2,900.00 34,800.00
Jumlah (1) 34,800.00
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 19,550.00
Jumlah (1+2) 54,350.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

5 1 M' Pasang bubungan genteng beton


(SNI 03-3436-2002-05)
Bahan
Bubungan genteng beton 3.500 bj 8,700.00 30,450.00
PC / Semen 10.800 Kg 1,600.00 17,280.00
Pasir pasang 0.032 m3 154,000.00 4,928.00
Jumlah (1) 52,658.00
Upah kerja
Tukang kayu 0.200 Org 70,000.00 14,000.00
K. Tukang kayu 0.020 Org 75,000.00 1,500.00
Pekerja 0.400 Org 55,000.00 22,000.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah (2) 37,660.00
Jumlah (1+2) 90,318.00

6 1 M2 Pasang genteng ex. Jatiwangi


(SNI 03-3436-2002-06)
Bahan
Genteng ex. Jatiwangi 14.500 bj 6,200.00 89,900.00
Jumlah (1) 89,900.00
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 19,550.00
Jumlah (1+2) 109,450.00

7 1 M' Pasang Bubungan genteng Jatiwangi


(SNI 03-3436-2002-07)
Bahan
Bubungan genteng Jatiwangi 3.500 bj 13,200.00 46,200.00
PC / Semen 10.800 Kg 1,600.00 17,280.00
Pasir pasang 0.032 m3 154,000.00 4,928.00
Jumlah (1) 68,408.00
Upah kerja
Tukang kayu 0.200 Org 70,000.00 14,000.00
K. Tukang kayu 0.020 Org 75,000.00 1,500.00
Pekerja 0.400 Org 55,000.00 22,000.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah (2) 37,660.00
Jumlah (1+2) 106,068.00

8 1 M2 Pasang genteng keramik


(SNI 03-3436-2002-08)
Bahan
Genteng keramik 14.500 bj 9,800.00 142,100.00
Jumlah (1) 142,100.00
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 19,550.00
Jumlah (1+2) 161,650.00

9 1 M' Pasang Bubungan genteng keramik


(SNI 03-3436-2002-09)
Bahan
Bubungan genteng keramik 3.500 bj 18,200.00 63,700.00
PC / Semen 10.800 Kg 1,600.00 17,280.00
Pasir pasang 0.032 m3 154,000.00 4,928.00
Jumlah (1) 85,908.00
Upah kerja
Tukang kayu 0.200 Org 70,000.00 14,000.00
K. Tukang kayu 0.020 Org 75,000.00 1,500.00
Pekerja 0.400 Org 55,000.00 22,000.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah (2) 37,660.00
Jumlah (1+2) 123,568.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

10 1 M2 Pasang genteng ex. Goodyear


(SNI 03-3436-2002-10)
Bahan
Genteng ex. Goodyear 14.500 bj 6,800.00 98,600.00
Jumlah (1) 98,600.00
Upah kerja
Tukang kayu 0.075 Org 70,000.00 5,250.00
K. Tukang kayu 0.008 Org 75,000.00 600.00
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.008 Org 80,000.00 640.00
Jumlah (2) 14,740.00
Jumlah (1+2) 113,340.00

11 1 M' Pasang Bubungan ex. Goodyear


(SNI 03-3436-2002-11)
Bahan
Bubungan ex. Goodyear 5.000 bj 11,000.00 55,000.00
PC / Semen 10.800 Kg 1,600.00 17,280.00
Pasir pasang 0.032 m3 154,000.00 4,928.00
Jumlah (1) 77,208.00
Upah kerja
Tukang kayu 0.200 Org 70,000.00 14,000.00
K. Tukang kayu 0.020 Org 75,000.00 1,500.00
Pekerja 0.400 Org 55,000.00 22,000.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah (2) 37,660.00
Jumlah (1+2) 114,868.00

12 1 Bh Pasang aksesoris atap/mahkota


(SNI 03-3436-2002-12)
Bahan
Aksesoris atap/mahkota 1.000 bh 69,900.00 69,900.00
PC / Semen 2.160 Kg 1,600.00 3,456.00
Pasir pasang 0.006 m3 154,000.00 924.00
Jumlah (1) 74,280.00
Upah kerja
Tukang kayu 0.040 Org 70,000.00 2,800.00
K. Tukang kayu 0.004 Org 75,000.00 300.00
Pekerja 0.080 Org 55,000.00 4,400.00
Mandor 0.002 Org 80,000.00 160.00
Jumlah (2) 7,660.00
Jumlah (1+2) 81,940.00

13 1 M2 Pasang atap asbes gelombang kecil


(SNI 03-3436-2002-13)
Bahan
Asbes gelombang kecil 0.350 Lbr 110,000.00 38,500.00
Paku payung / Sekrup 0.120 Kg 30,000.00 3,600.00
Jumlah (1) 42,100.00
Upah kerja
Tukang kayu 0.060 Org 70,000.00 4,200.00
K. Tukang kayu 0.007 Org 75,000.00 525.00
Pekerja 0.140 Org 55,000.00 7,700.00
Mandor 0.007 Org 80,000.00 560.00
Jumlah (2) 12,985.00
Jumlah (1+2) 55,085.00

14 1 M2 Pasang atap asbes gelombang besar


(SNI 03-3436-2002-14)
Bahan
Asbes gelombang besar 0.350 Lbr 130,000.00 45,500.00
Paku payung / Sekrup 0.120 Kg 30,000.00 3,600.00
Jumlah (1) 49,100.00
Upah kerja
Tukang kayu 0.060 Org 70,000.00 4,200.00
K. Tukang kayu 0.007 Org 75,000.00 525.00
Pekerja 0.140 Org 55,000.00 7,700.00
Mandor 0.007 Org 80,000.00 560.00
Jumlah (2) 12,985.00
Jumlah (1+2) 62,085.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

15 1 M' Pasang bubung asbes gelombang besar


(SNI 03-3436-2002-15)
Bahan
Nok asbes gelombang besar 1.100 bj 60,000.00 66,000.00
Paku payung / Sekrup 0.200 Kg 30,000.00 6,000.00
Jumlah (1) 72,000.00
Upah kerja
Tukang kayu 0.125 Org 70,000.00 8,750.00
K. Tukang kayu 0.013 Org 75,000.00 975.00
Pekerja 0.084 Org 55,000.00 4,620.00
Mandor 0.004 Org 80,000.00 320.00
Jumlah (2) 14,665.00
Jumlah (1+2) 86,665.00

16 1 M' Pasang bubung asbes gelombang kecil


(SNI 03-3436-2002-16)
Bahan
Nok asbes gelombang kecil 1.100 bj 35,000.00 38,500.00
Paku payung / Sekrup 0.200 Kg 30,000.00 6,000.00
Jumlah (1) 44,500.00
Upah kerja
Tukang kayu 0.125 Org 70,000.00 8,750.00
K. Tukang kayu 0.013 Org 75,000.00 975.00
Pekerja 0.084 Org 55,000.00 4,620.00
Mandor 0.004 Org 80,000.00 320.00
Jumlah (2) 14,665.00
Jumlah (1+2) 59,165.00

17 1 M2 Pasang genteng pres lama


(SNI 03-3436-2002-17)
Upah kerja
Tukang kayu 0.075 Org 70,000.00 5,250.00
K. Tukang kayu 0.008 Org 75,000.00 600.00
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.008 Org 80,000.00 640.00
Jumlah 14,740.00

18 1 M2 Pasang genteng beton lama


(SNI 03-3436-2002-18)
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah 19,550.00

19 1 M2 Pasang atap Zincalum Ex. Spandex/setara T. 0,45 mm


(SNI 03-3436-2002-19)
Bahan
Atap Zincalum Ex. Spandex/Setara T. 0,45 mm 1.050 m2 112,320.00 117,936.00
Accessories 0.050 117,936.00 5,896.80
Jumlah (1) 123,832.80
Upah kerja
Tukang kayu 0.060 Org 70,000.00 4,200.00
K. Tukang kayu 0.007 Org 75,000.00 525.00
Pekerja 0.140 Org 55,000.00 7,700.00
Mandor 0.007 Org 80,000.00 560.00
Jumlah (2) 12,985.00
Jumlah (1+2) 136,817.80

PEKERJAAN BESI DAN ALUMINIUM (SNI DT 91-0014-2007)


1 1 M' Pasang talang datar / jurai
(SNI DT 91-0014-2007-01)
Bahan
Seng BJLS 30 1.050 m' 50,000.00 52,500.00
Paku 0.015 Kg 14,000.00 210.00
Kayu meranti papan 0.019 m3 4,815,300.00 91,490.70
Jumlah (1) 144,200.70
Upah kerja
Tukang besi 0.400 Org 70,000.00 28,000.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

K. Tukang besi 0.025 Org 75,000.00 1,875.00


Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 41,675.00
Jumlah (1+2) 185,875.70
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

2 1 M' Pasang talang 1/2 lingkaran dia. 15 cm


(SNI DT 91-0014-2007-02)
Bahan
Seng BJLS 30 1.050 m' 50,000.00 52,500.00
Paku 0.010 Kg 14,000.00 140.00
Besi setrip 0.500 Kg 12,000.00 6,000.00
Jumlah (1) 58,640.00
Upah kerja
Tukang besi 0.300 Org 70,000.00 21,000.00
K. Tukang besi 0.030 Org 75,000.00 2,250.00
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.007 Org 80,000.00 560.00
Jumlah (2) 32,060.00
Jumlah (1+2) 90,700.00

3 1 Kg Pasang rangka kuda-kuda besi baja WF


(SNI DT 91-0014-2007-03)
Bahan
Besi baja konstruksi / WF 1.150 Kg 14,000.00 16,100.00
Jumlah (1) 16,100.00
Upah kerja
Tukang las 0.060 Org 70,000.00 4,200.00
K. Tukang las 0.006 Org 75,000.00 450.00
Pekerja 0.060 Org 55,000.00 3,300.00
Mandor 0.003 Org 80,000.00 240.00
Jumlah (2) 8,190.00
Jumlah (1+2) 24,290.00

4 1 M2 Pasang Rolling Door aluminium


(SNI DT 91-0014-2007-04)
Bahan
Rolling Door aluminium 1.050 m2 341,250.00 358,312.50
Perlengkapan 10.000 % 35,831.25
Jumlah (1) 394,143.75
Upah kerja
Tukang besi 1.000 Org 70,000.00 70,000.00
K. Tukang besi 0.100 Org 75,000.00 7,500.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.050 Org 80,000.00 4,000.00
Jumlah (2) 136,500.00
Jumlah (1+2) 530,643.75

5 1 M2 Pasang Terali besi


(SNI DT 91-0014-2007-05)
Bahan
Besi setrip tb. 2mm 6.177 kg 12,000.00 74,124.00
Pengelasan 27.080 cm 900.00 24,372.00
Jumlah (1) 98,496.00
Upah kerja
Tukang besi 1.670 Org 70,000.00 116,900.00
K. Tukang besi 0.167 Org 75,000.00 12,525.00
Pekerja 1.670 Org 55,000.00 91,850.00
Mandor 0.083 Org 80,000.00 6,640.00
Jumlah (2) 227,915.00
Jumlah (1+2) 326,411.00

6 1 M' Pasang Kusen aluminium 4" coklat (brown)


(SNI DT 91-0014-2007-06)
Bahan
Aluminium coklat/ brown 4" YKK 1.250 m' 225,000.00 281,250.00
Jumlah (1) 281,250.00
Upah kerja
Tukang besi 0.200 Org 70,000.00 14,000.00
K. Tukang besi 0.020 Org 75,000.00 1,500.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.001 Org 80,000.00 80.00
Jumlah (2) 26,580.00
Jumlah (1+2) 307,830.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

7 1 Kg Pasang Plat Baja


(SNI DT 91-0014-2007-07)
Bahan
Plat baja 1.150 12,000.00 13,800.00
Jumlah (1) 13,800.00
Upah kerja
Tukang las 0.060 70,000.00 4,200.00
Kep. Tukang 0.006 75,000.00 450.00
Pekerja 0.060 55,000.00 3,300.00
Mandor 0.003 80,000.00 240.00
Jumlah (2) 8,190.00
Jumlah (1+2) 21,990.00

8 1 Kg Pasang Besi Ikatan


(SNI DT 91-0014-2007-08)
Bahan
Besi Ikatan 1.150 10,500.00 12,075.00
Jumlah (1) 12,075.00
Upah kerja
Tukang las 0.060 70,000.00 4,200.00
Kep. Tukang 0.006 75,000.00 450.00
Pekerja 0.060 55,000.00 3,300.00
Mandor 0.003 80,000.00 240.00
Jumlah (2) 8,190.00
Jumlah (1+2) 20,265.00

9 1 M2 Pasang Rolling Griil aluminium


(SNI DT 91-0014-2007-09)
Bahan
Rolling Griil Aluminium 1.050 m2 510,000.00 535,500.00
Perlengkapan 10.000 % 53,550.00
Jumlah (1) 589,050.00
Upah kerja
Tukang besi 0.500 Org 70,000.00 35,000.00
K. Tukang besi 0.050 Org 75,000.00 3,750.00
Pekerja 0.500 Org 55,000.00 27,500.00
Mandor 0.025 Org 80,000.00 2,000.00
Jumlah (2) 68,250.00
Jumlah (1+2) 657,300.00

10 1 M2 Pasang Rangka Atap Galvalum T. 0,75 mm


(SNI DT 91-0014-2007-10)
Bahan 9,350.00
Galvalum T. 0,75 mm 10.090 m1 14,600.00 147,314.00
Reng Galvalum T. 0,45 mm 4.150 m1 9,350.00 38,802.50
Perlengkapan 2.500 % 4,652.91
Jumlah (1) 190,769.41
Upah kerja
Tukang besi 0.113 Org 70,000.00 7,875.00
K. Tukang besi 0.011 Org 75,000.00 843.75
Pekerja 0.113 Org 55,000.00 6,187.50
Mandor 0.006 Org 80,000.00 450.00
Jumlah (2) 15,356.25
Jumlah (1+2) 206,125.66

11 1 M2 Pasang Rangka Plafond Hollow 2/4 - 4/4


(SNI DT 91-0014-2007-11)
Bahan
Hollow 2/4 2.400 m1 13,666.67 32,800.00
Hollow 44 0.550 m1 15,916.67 8,754.17
Perlengkapan 2.000 % 831.08
Jumlah (1) 42,385.25
Upah kerja
Tukang besi 0.100 Org 70,000.00 7,000.00
K. Tukang besi 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 56,035.25
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

PEKERJAAN PLITURAN DAN PENGECATAN (SNI P.C)


1 1 M2 Menggosok dan mendempul kayu
(SNI P.C.01)
Bahan
Dempul / Plamir 0.080 kg 27,500.00 2,200.00
Minyak Cat 0.020 ltr 20,000.00 400.00
Batu kambang 0.010 kg 26,400.00 264.00
Jumlah (1) 2,864.00
Upah kerja
Tukang cat 0.040 Org 65,000.00 2,600.00
Kep. Tukang cat 0.004 Org 70,000.00 280.00
Pekerja 0.040 Org 55,000.00 2,200.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,280.00
Jumlah (1+2) 8,144.00

2 1 M2 Pelaburan bidang kayu dengan politur


(SNI P.C.02)
Bahan
Politur 0.522 Ltr 70,400.00 36,748.80
Kertas gosok 2.000 Lbr 4,000.00 8,000.00
Jumlah (1) 44,748.80
Upah kerja
Tukang cat 0.060 Org 65,000.00 3,900.00
Kep. Tukang cat 0.016 Org 70,000.00 1,120.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,220.00
Jumlah (1+2) 49,968.80

3 1 M2 Pelaburan bidang kayu dengan melamin


(SNI P.C.03)
Bahan
Dempul/wood filter 0.1429 Kg 52,200.00 7,459.38
Pewarna/wood sten 0.2000 Kg 57,200.00 11,440.00
Melamin Seanding sealler 0.5000 Kg 57,200.00 28,600.00
Melamin lack (glass/dop) 0.2000 Kg 46,200.00 9,240.00
Thinner B 2.5000 Ltr 20,000.00 50,000.00
Kertas gosok 2.0000 Lbr 4,000.00 8,000.00
Compound 0.2000 Klng 38,500.00 7,700.00
Alat bantu (compressor) 1.000 Ls 3,000.00 3,000.00
Jumlah (1) 125,439.38
Upah kerja
Tukang cat 0.090 Org 65,000.00 5,850.00
Kep. Tukang cat 0.009 Org 70,000.00 630.00
Pekerja 0.075 Org 55,000.00 4,125.00
Mandor 0.0250 Org 80,000.00 2,000.00
Jumlah (2) 12,605.00
Jumlah (1+2) 138,044.38

4 1 M2 Pelaburan bidang kayu dengan vernis


(SNI P.C.04)
Bahan
Vernis 0.150 Ltr 22,550.00 3,382.50
Dempul / Plamir 0.050 Kg 27,500.00 1,375.00
Kertas gosok 0.100 Lbr 4,000.00 400.00
Kuas 0.010 Bh 12,100.00 121.00
Jumlah (1) 5,278.50
Upah kerja
Tukang cat 0.160 Org 65,000.00 10,400.00
Kep. Tukang cat 0.016 Org 70,000.00 1,120.00
Pekerja 0.160 Org 55,000.00 8,800.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 20,520.00
Jumlah (1+2) 25,798.50
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

5 1 M2 Pengecatan Kayu baru


(SNI P.C.05)
Bahan
Cat kayu 0.430 Kg 60,000.00 25,800.00
Meni Kayu 0.200 Kg 24,000.00 4,800.00
Minyak cat 0.300 Ltr 20,000.00 6,000.00
Plamir kayu 0.150 Kg 27,500.00 4,125.00
Kertas gosok 0.250 Lbr 4,000.00 1,000.00
Kuas 0.035 Bh 12,100.00 423.50
Jumlah (1) 42,148.50
Upah kerja
Tukang cat 0.009 Org 65,000.00 585.00
K. Tukang cat 0.006 Org 70,000.00 420.00
Pekerja 0.070 Org 55,000.00 3,850.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,055.00
Jumlah (1+2) 47,203.50

6 1 M2 Pengecatan Kayu lama


(SNI P.C.06)
Bahan
Cat kayu 0.340 Kg 60,000.00 20,400.00
Minyak cat 0.300 Ltr 20,000.00 6,000.00
Plamir kayu 0.150 Kg 27,500.00 4,125.00
Kuas 0.035 Bh 12,100.00 423.50
Jumlah (1) 30,948.50
Upah kerja
Tukang cat 0.075 Org 65,000.00 4,875.00
K. Tukang cat 0.0075 Org 70,000.00 525.00
Pekerja 0.070 Org 55,000.00 3,850.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 9,450.00
Jumlah (1+2) 40,398.50

7a 1 M2 Pengecatan dinding baru


(SNI P.C.07a)
Bahan
Cat dinding 0.360 Kg 14,500.00 5,220.00
Plamir dinding 0.100 Kg 27,500.00 2,750.00
Kertas gosok 0.500 Lbr 4,000.00 2,000.00
Rol 0.010 Bh 14,300.00 143.00
Jumlah (1) 10,113.00
Upah kerja
Tukang cat 0.063 Org 65,000.00 4,095.00
K. Tukang cat 0.0063 Org 70,000.00 441.00
Pekerja 0.020 Org 55,000.00 1,100.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,836.00
Jumlah (1+2) 15,949.00

7b 1 M2 Pengecatan dinding baru Ex Catilac / Setara


(SNI P.C.07b)
Bahan
Cat dinding 0.360 Kg 20,400.00 7,344.00
Plamir dinding 0.100 Kg 27,500.00 2,750.00
Kertas gosok 0.500 Lbr 4,000.00 2,000.00
Rol 0.010 Bh 14,300.00 143.00
Jumlah (1) 12,237.00
Upah kerja
Tukang cat 0.063 Org 65,000.00 4,095.00
K. Tukang cat 0.0063 Org 70,000.00 441.00
Pekerja 0.020 Org 55,000.00 1,100.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,836.00
Jumlah (1+2) 18,073.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

7c 1 M2 Pengecatan dinding baru Ex Dulux Weatershield / Setara


(SNI P.C.07c)
Bahan
Cat dinding 0.360 Kg 34,000.00 12,240.00
Plamir dinding 0.100 Kg 27,500.00 2,750.00
Kertas gosok 0.500 Lbr 4,000.00 2,000.00
Rol 0.010 Bh 14,300.00 143.00
Jumlah (1) 17,133.00
Upah kerja
Tukang cat 0.063 Org 65,000.00 4,095.00
K. Tukang cat 0.0063 Org 70,000.00 441.00
Pekerja 0.020 Org 55,000.00 1,100.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,836.00
Jumlah (1+2) 22,969.00

8 1 M2 Pengecatan dinding lama


(SNI P.C.08)
Bahan
Cat dinding 0.300 Kg 14,500.00 4,350.00
Kertas gosok 0.500 Lbr 4,000.00 2,000.00
Rol 0.010 Bh 14,300.00 143.00
Jumlah (1) 6,493.00
Upah kerja
Tukang cat 0.042 Org 65,000.00 2,730.00
K. Tukang cat 0.0042 Org 70,000.00 294.00
Pekerja 0.028 Org 55,000.00 1,540.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 4,764.00
Jumlah (1+2) 11,257.00

9 1 M2 Mengikis / mengerok permukaan cat tembok lama


(SNI P.C.09)
Bahan
Soda api 0.050 Kg 22,550.00 1,127.50
Jumlah (1) 1,127.50
Upah kerja
Pekerja 0.150 Org 55,000.00 8,250.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 8,450.00
Jumlah (1+2) 9,577.50

10 1 M2 Finish batu alam / Coating


(SNI P.C.10)
Bahan
Propan stone care 0.600 Ltr 58,300.00 34,980.00
Kuas 0.035 Bh 12,100.00 423.50
Jumlah (1) 35,403.50
Upah kerja
Tukang cat 0.060 Org 65,000.00 3,900.00
K. Tukang cat 0.006 Org 70,000.00 420.00
Pekerja 0.060 Org 55,000.00 3,300.00
Mandor 0.003 Org 80,000.00 240.00
Jumlah (2) 7,860.00
Jumlah (1+2) 43,263.50

11 1 M2 Waterproofing
(SNI P.C.11)
Bahan
Waterproof 0.470 Kg 46,000.00 21,620.00
Kuas 0.020 Bh 12,100.00 242.00
Jumlah (1) 21,862.00
Upah kerja
Tukang cat 0.060 Org 65,000.00 3,900.00
K. Tukang cat 0.006 Org 70,000.00 420.00
Pekerja 0.060 Org 55,000.00 3,300.00
Mandor 0.003 Org 80,000.00 240.00
Jumlah (2) 7,860.00
Jumlah (1+2) 29,722.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

12 1 M2 Pengecatan permukaan baja dengan meni besi


(SNI P.C.12)
Bahan
Meni besi 0.100 Kg 21,000.00 2,100.00
Kuas 0.010 Bh 12,100.00 121.00
Jumlah (1) 2,221.00
Upah kerja
Tukang cat 0.200 Org 65,000.00 13,000.00
K. Tukang cat 0.020 Org 70,000.00 1,400.00
Pekerja 0.020 Org 55,000.00 1,100.00
Mandor 0.010 Org 80,000.00 800.00
Jumlah (2) 16,300.00
Jumlah (1+2) 18,521.00

13 1 M2 Pengecatan genteng
(SNI P.C.13)
Bahan
Cat genteng 0.260 Kg 24,200.00 6,292.00
Kuas 0.010 Bh 12,100.00 121.00
Jumlah (1) 6,413.00
Upah kerja
Tukang cat 0.063 Org 65,000.00 4,095.00
K. Tukang cat 0.0063 Org 70,000.00 441.00
Pekerja 0.020 Org 55,000.00 1,100.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,836.00
Jumlah (1+2) 12,249.00

14 1 M2 Pengecatan Besi baru


(SNI P.C.14)
Bahan
Cat besi 0.340 Kg 60,000.00 20,400.00
Meni besi 0.100 Kg 21,000.00 2,100.00
Minyak cat 0.300 Ltr 20,000.00 6,000.00
Kuas 0.035 Bh 12,100.00 423.50
Jumlah (1) 28,923.50
Upah kerja
Tukang cat 0.009 Org 65,000.00 585.00
K. Tukang cat 0.006 Org 70,000.00 420.00
Pekerja 0.070 Org 55,000.00 3,850.00
Mandor 0.0025 Org 80,000.00 200.00
Jumlah (2) 5,055.00
Jumlah (1+2) 33,978.50

PEK. PENUTUP LANTAI & DINDING (SNI DT 91-0012-2007)


1 1 M2 Pasang tegel abu-abu uk. 20x20 cm
(SNI DT 91-0012-2007-01)
Bahan
Tegel abu-abu 20x20 1.050 m2 42,000.00 44,100.00
PC / Semen 10.400 Kg 1,600.00 16,640.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 67,670.00
Upah kerja
Tukang batu 0.130 Org 70,000.00 9,100.00
K. Tukang batu 0.013 Org 75,000.00 975.00
Pekerja 0.270 Org 55,000.00 14,850.00
Mandor 0.014 Org 80,000.00 1,120.00
Jumlah (2) 26,045.00
Jumlah (1+2) 93,715.00

2 1 M2 Pasang keramik lantai 20 x 20 kasar (KM/WC)


(SNI DT 91-0012-2007-02)
Bahan
Keramik 20x20 kasar 1.050 m2 48,600.00 51,030.00
PC / Semen 10.400 Kg 1,600.00 16,640.00
Semen warna 0.450 Kg 11,840.00 5,328.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 79,928.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Pekerja 0.620 Org 55,000.00 34,100.00


Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 143,553.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

3 1 M2 Pasang keramik 20 x 20 polos


(SNI DT 91-0012-2007-03)
Bahan
Keramik 20x20 polos 1.050 m2 44,500.00 46,725.00
PC / Semen 10.400 Kg 1,600.00 16,640.00
Semen warna 0.450 Kg 11,840.00 5,328.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 75,623.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 139,248.00

4 1 M2 Pasang keramik 30 x 30 polos


(SNI DT 91-0012-2007-04)
Bahan
Keramik 30x30 polos 1.050 m2 43,900.00 46,095.00
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.500 Kg 11,840.00 17,760.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 86,785.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 150,410.00

5 1 M2 Pasang keramik 30 x 30 motif


(SNI DT 91-0012-2007-05)
Bahan
Keramik 30x30 motif 1.050 m2 51,000.00 53,550.00
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.500 Kg 11,840.00 17,760.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 94,240.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 157,865.00

6 1 M2 Pasang keramik 30 x 30 kasar


(SNI DT 91-0012-2007-06)
Bahan
Keramik 30x30 kasar 1.050 m2 43,750.00 45,937.50
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.500 Kg 11,840.00 17,760.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 86,627.50
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 150,252.50
7 1 M2 Pasang keramik 40 x 40 polos
(SNI DT 91-0012-2007-07)
Bahan
Keramik 40x40 polos 1.050 m2 56,300.00 59,115.00
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.500 Kg 11,840.00 17,760.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 99,805.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 163,430.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

8 1 M2 Pasang keramik 40 x 40 motif (Platinum)


(SNI DT 91-0012-2007-08)
Bahan
Keramik 40x40 motif 1.050 m2 65,800.00 69,090.00
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.500 Kg 11,840.00 17,760.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 109,780.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 173,405.00

9a 1 M2 Pasang keramik 40 x 40 motif (Yupiter)


(SNI DT 91-0012-2007-09a)
Bahan
Keramik 40x40 motif 1.050 m2 60,500.00 63,525.00
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.500 Kg 11,840.00 17,760.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 104,215.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 167,840.00

9b 1 M2 Pasang keramik 40 x 40 motif Kasar (Yupiter)


(SNI DT 91-0012-2007-09b)
Bahan
Keramik 40x40 motif kasar 1.050 m2 64,500.00 67,725.00
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.500 Kg 11,840.00 17,760.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 108,415.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 172,040.00

10 1 M2 Pasang keramik 50 x 50 motif


(SNI DT 91-0012-2007-10)
Bahan
Keramik 50x50 motif 1.050 m2 77,600.00 81,480.00
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.350 Kg 11,840.00 15,984.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 120,394.00
Upah kerja
Tukang batu 0.350 Org 70,000.00 24,500.00
K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 184,019.00

11a 1 M2 Pasang keramik 60 x 60 motif


(SNI DT 91-0012-2007-11a)
Bahan
Keramik 60x60 motif 1.050 m2 137,400.00 144,270.00
PC / Semen 10.000 Kg 1,600.00 16,000.00
Semen warna 1.250 Kg 11,840.00 14,800.00
Pasir pasang 0.045 m3 154,000.00 6,930.00
Jumlah (1) 182,000.00
Upah kerja
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Tukang batu 0.350 Org 70,000.00 24,500.00


K. Tukang batu 0.035 Org 75,000.00 2,625.00
Pekerja 0.620 Org 55,000.00 34,100.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 63,625.00
Jumlah (1+2) 245,625.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

11b 1 M2 Pasang keramik Dinding 20 x 40 motif


(SNI DT 91-0012-2007-11b)
Bahan
Keramik 20x40 motif Ex. Platinum / setara 1.050 m2 55,930.00 58,726.50
PC / Semen 11.380 Kg 1,600.00 18,208.00
Semen warna 0.400 Kg 11,840.00 4,736.00
Pasir pasang 0.042 m3 154,000.00 6,468.00
Jumlah (1) 88,138.50
Upah kerja
Tukang batu 0.450 Org 70,000.00 31,500.00
K. Tukang batu 0.045 Org 75,000.00 3,375.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 70,275.00
Jumlah (1+2) 158,413.50

12 1 M2 Pasang keramik dinding 20 x 25 polos


(SNI DT 91-0012-2007-12)
Bahan
Keramik 20x25 polos 1.050 m2 44,420.00 46,641.00
PC / Semen 11.380 Kg 1,600.00 18,208.00
Semen warna 0.400 Kg 11,840.00 4,736.00
Pasir pasang 0.042 m3 154,000.00 6,468.00
Jumlah (1) 76,053.00
Upah kerja
Tukang batu 0.450 Org 70,000.00 31,500.00
K. Tukang batu 0.045 Org 75,000.00 3,375.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 70,275.00
Jumlah (1+2) 146,328.00

13 1 M2 Pasang keramik dinding 20 x 25 motif (Kobin)


(SNI DT 91-0012-2007-13)
Bahan
Keramik 20x25 motif 1.050 m2 50,300.00 52,815.00
PC / Semen 11.380 Kg 1,600.00 18,208.00
Semen warna 0.400 Kg 11,840.00 4,736.00
Pasir pasang 0.042 m3 154,000.00 6,468.00
Jumlah (1) 82,227.00
Upah kerja
Tukang batu 0.450 Org 70,000.00 31,500.00
K. Tukang batu 0.045 Org 75,000.00 3,375.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 70,275.00
Jumlah (1+2) 152,502.00

14 1 M2 Pasang keramik dinding 20 x 25 motif (Mulia)


(SNI DT 91-0012-2007-14)
Bahan
Keramik 20x25 motif 1.050 m2 50,950.00 53,497.50
PC / Semen 11.380 Kg 1,600.00 18,208.00
Semen warna 0.400 Kg 11,840.00 4,736.00
Pasir pasang 0.042 m3 154,000.00 6,468.00
Jumlah (1) 82,909.50
Upah kerja
Tukang batu 0.450 Org 70,000.00 31,500.00
K. Tukang batu 0.045 Org 75,000.00 3,375.00
Pekerja 0.600 Org 55,000.00 33,000.00
Mandor 0.030 Org 80,000.00 2,400.00
Jumlah (2) 70,275.00
Jumlah (1+2) 153,184.50

15 1 M' Pasang keramik border dinding 5x20


(SNI DT 91-0012-2007-15)
Bahan
Keramik border 5x20 5.000 Bh 5,400.00 27,000.00
PC / Semen 0.570 Kg 1,600.00 912.00
Semen warna 0.013 Kg 11,840.00 153.92
Pasir pasang 0.0015 m3 154,000.00 231.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Jumlah (1) 28,296.92


Upah kerja
Tukang batu 0.090 Org 70,000.00 6,300.00
K. Tukang batu 0.009 Org 75,000.00 675.00
Pekerja 0.090 Org 55,000.00 4,950.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 12,325.00
Jumlah (1+2) 40,621.92
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

16 1 M' Pasang keramik border dinding 8x25


(SNI DT 91-0012-2007-16)
Bahan
Keramik border 8x25 4.000 Bh 10,700.00 42,800.00
PC / Semen 0.570 Kg 1,600.00 912.00
Semen warna 0.013 Kg 11,840.00 153.92
Pasir pasang 0.0015 m3 154,000.00 231.00
Jumlah (1) 44,096.92
Upah kerja
Tukang batu 0.090 Org 70,000.00 6,300.00
K. Tukang batu 0.009 Org 75,000.00 675.00
Pekerja 0.090 Org 55,000.00 4,950.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 12,325.00
Jumlah (1+2) 56,421.92

17 1 M' Pasang keramik border dinding 7x20


(SNI DT 91-0012-2007-17)
Bahan
Keramik border 7x20 5.000 Bh 7,500.00 37,500.00
PC / Semen 0.570 Kg 1,600.00 912.00
Semen warna 0.013 Kg 11,840.00 153.92
Pasir pasang 0.0015 m3 154,000.00 231.00
Jumlah (1) 38,796.92
Upah kerja
Tukang batu 0.090 Org 70,000.00 6,300.00
K. Tukang batu 0.009 Org 75,000.00 675.00
Pekerja 0.090 Org 55,000.00 4,950.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 12,325.00
Jumlah (1+2) 51,121.92

PEKERJAAN KUNCI DAN KACA (SNI K.K)


1 1 Bh Pasang kunci tanam 2 X putar (pegangan besar)
(SNI K.K.01)
Bahan
Kunci tanam 2 x putar 1.000 Bh 90,800.00 90,800.00
Jumlah (1) 90,800.00
Upah kerja
Tukang kayu 0.600 Org 70,000.00 42,000.00
K. Tukang kayu 0.060 Org 75,000.00 4,500.00
Jumlah (2) 46,500.00
Jumlah (1+2) 137,300.00

2 1 Bh Pasang kunci tanam (tanpa pegangan)


(SNI K.K.02)
Bahan
Kunci tanam (tanpa pegangan) 1.000 Bh 46,800.00 46,800.00
Jumlah (1) 46,800.00
Upah kerja
Tukang kayu 0.600 Org 70,000.00 42,000.00
K. Tukang kayu 0.060 Org 75,000.00 4,500.00
Jumlah (2) 46,500.00
Jumlah (1+2) 93,300.00

3 1 Set Pasang engsel pintu


(SNI K.K.03)
Bahan
Engsel pintu 1.000 Set 19,300.00 19,300.00
Jumlah (1) 19,300.00
Upah kerja
Tukang kayu 0.150 Org 70,000.00 10,500.00
K. Tukang kayu 0.015 Org 75,000.00 1,125.00
Jumlah (2) 11,625.00
Jumlah (1+2) 30,925.00

4 1 Set Pasang engsel jendela


(SNI K.K.04)
Bahan
Engsel jendela 1.000 Set 8,800.00 8,800.00
Jumlah (1) 8,800.00
Upah kerja
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Tukang kayu 0.150 Org 70,000.00 10,500.00


K. Tukang kayu 0.015 Org 75,000.00 1,125.00
Jumlah (2) 11,625.00
Jumlah (1+2) 20,425.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

5 1 Set Pasang handle pintu


(SNI K.K.05)
Bahan
Holder / pegangan pintu 1.000 Set 101,800.00 101,800.00
Jumlah (1) 101,800.00
Upah kerja
Tukang kayu 0.600 Org 70,000.00 42,000.00
K. Tukang kayu 0.060 Org 75,000.00 4,500.00
Jumlah (2) 46,500.00
Jumlah (1+2) 148,300.00

6 1 Bh Pasang grendel pintu


(SNI K.K.06)
Bahan
Grendel pintu besar 1.000 Bh 22,600.00 22,600.00
Jumlah (1) 22,600.00
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Jumlah (2) 7,750.00
Jumlah (1+2) 30,350.00

7 1 Bh Pasang grendel jendela


(SNI K.K.07)
Bahan
Grendel jendela 1.000 Bh 12,400.00 12,400.00
Jumlah (1) 12,400.00
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Jumlah (2) 7,750.00
Jumlah (1+2) 20,150.00

8 1 Set Pasang hak angin jendela


(SNI K.K.08)
Bahan
Hak angin jendela (cantolan) 1.000 Set 19,800.00 19,800.00
Jumlah (1) 19,800.00
Upah kerja
Tukang kayu 0.100 Org 70,000.00 7,000.00
K. Tukang kayu 0.010 Org 75,000.00 750.00
Jumlah (2) 7,750.00
Jumlah (1+2) 27,550.00

9 1 M2 Pasang kaca bening tb. 5mm


(SNI K.K.09)
Bahan
Kaca bening tb. 5mm 1.100 m2 76,000.00 83,600.00
Jumlah (1) 83,600.00
Upah kerja
Tukang kayu 0.150 Org 70,000.00 10,500.00
K. Tukang kayu 0.015 Org 75,000.00 1,125.00
Pekerja 0.015 Org 55,000.00 825.00
Mandor 0.0075 Org 80,000.00 600.00
Jumlah (2) 13,050.00
Jumlah (1+2) 96,650.00

10 1 M2 Pasang kaca rayband tb. 5mm


(SNI K.K.10)
Bahan
Kaca rayband tb. 5mm 1.100 m2 88,000.00 96,800.00
Jumlah (1) 96,800.00
Upah kerja
Tukang kayu 0.150 Org 70,000.00 10,500.00
K. Tukang kayu 0.015 Org 75,000.00 1,125.00
Pekerja 0.015 Org 55,000.00 825.00
Mandor 0.0075 Org 80,000.00 600.00
Jumlah (2) 13,050.00
Jumlah (1+2) 109,850.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

11 1 M2 Pasang kaca Cermin tb. 5mm


(SNI K.K.11)
Bahan
Kaca Cermin tb. 5mm 1.100 m2 175,000.00 192,500.00
Jumlah (1) 192,500.00
Upah kerja
Tukang kayu 0.150 Org 70,000.00 10,500.00
K. Tukang kayu 0.015 Org 75,000.00 1,125.00
Pekerja 0.015 Org 55,000.00 825.00
Mandor 0.0075 Org 80,000.00 600.00
Jumlah (2) 13,050.00
Jumlah (1+2) 205,550.00

PEKERJAAN SANITASI (SNI S.)


1 1 Bh Pasang kloset duduk monoblok
(SNI.S.01)
Bahan
Kloset duduk monoblok 1.000 Bh 1,705,000.00 1,705,000.00
Perlengkapan 0.060 % 102,300.00
Jumlah (1) 1,807,300.00
Upah kerja
Tukang batu 1.100 Org 70,000.00 77,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 1.100 Org 55,000.00 60,500.00
Mandor 0.160 Org 80,000.00 12,800.00
Jumlah (2) 151,050.00
Jumlah (1+2) 1,958,350.00

2 1 Bh Pasang kloset jongkok porselen


(SNI.S.02)
Bahan
Kloset jongkok porselen 1.000 Bh 160,000.00 160,000.00
PC / Semen 6.000 Kg 1,600.00 9,600.00
Pasir pasang 0.010 m3 154,000.00 1,540.00
Jumlah (1) 171,140.00
Upah kerja
Tukang batu 1.500 Org 70,000.00 105,000.00
K. Tukang batu 1.500 Org 75,000.00 112,500.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.160 Org 80,000.00 12,800.00
Jumlah (2) 285,300.00
Jumlah (1+2) 456,440.00

3 1 Bh Pasang Urinoir
(SNI.S.03)
Bahan
Urinoir 1.000 Bh 990,000.00 990,000.00
Perlengkapan 0.300 % 297,000.00
Jumlah (1) 1,287,000.00
Upah kerja
Tukang batu 1.000 Org 70,000.00 70,000.00
K. Tukang batu 0.100 Org 75,000.00 7,500.00
Pekerja 1.000 Org 55,000.00 55,000.00
Mandor 0.100 Org 80,000.00 8,000.00
Jumlah (2) 140,500.00
Jumlah (1+2) 1,427,500.00

4a 1 Bh Pasang Wastafel
(SNI.S.04a)
Bahan
Wastafel 1.000 Bh 175,000.00 175,000.00
Perlengkapan 12.000 % 21,000.00
PC / Semen 6.000 Kg 1,600.00 9,600.00
Pasir pasang 0.010 m3 154,000.00 1,540.00
Jumlah (1) 207,140.00
Upah kerja
Tukang batu 1.450 Org 70,000.00 101,500.00
K. Tukang batu 0.150 Org 75,000.00 11,250.00
Pekerja 1.200 Org 55,000.00 66,000.00
Mandor 0.100 Org 80,000.00 8,000.00
Jumlah (2) 186,750.00
Jumlah (1+2) 393,890.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

4b 1 Bh Pasang Under Cover Lavatory Ex TOTO / Setara


(SNI.S.04b)
Bahan
Under Cover Lavatory 1.000 Bh 350,000.00 350,000.00
Perlengkapan 12.000 % 42,000.00
PC / Semen 6.000 Kg 1,600.00 9,600.00
Pasir pasang 0.010 m3 154,000.00 1,540.00
Jumlah (1) 403,140.00
Upah kerja
Tukang batu 1.450 Org 70,000.00 101,500.00
K. Tukang batu 0.150 Org 75,000.00 11,250.00
Pekerja 1.200 Org 55,000.00 66,000.00
Mandor 0.100 Org 80,000.00 8,000.00
Jumlah (2) 186,750.00
Jumlah (1+2) 589,890.00

5 1 Bh Pasang Sink Stainles steel (1 bak)


(SNI.S.05)
Bahan
Sink Stainles steel (1 bak) 1.000 Bh 176,000.00 176,000.00
Perlengkapan (water dran + accesoris) 12.000 % 21,120.00
Jumlah (1) 197,120.00
Upah kerja
Tukang batu 0.300 Org 70,000.00 21,000.00
K. Tukang batu 0.030 Org 75,000.00 2,250.00
Pekerja 0.030 Org 55,000.00 1,650.00
Mandor 0.0015 Org 80,000.00 120.00
Jumlah (2) 25,020.00
Jumlah (1+2) 222,140.00

6 1 Bh Pasang Kran air biasa (sedang)


(SNI.S.06)
Bahan
Kran air 1.000 Bh 23,100.00 23,100.00
Seal tape 0.025 Bh 577.50
Jumlah (1) 23,677.50
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 37,327.50

7 1 Bh Pasang Kran wastafel


(SNI.S.07)
Bahan
Pasang Kran wastafel 1.000 Bh 66,000.00 66,000.00
Seal tape 0.025 Bh 1,650.00
Jumlah (1) 67,650.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 81,300.00

8a 1 Bh Pasang Kran model angsa


(SNI.S.08a)
Bahan
Kran model angsa 1.000 Bh 37,125.00 37,125.00
Seal tape 0.025 Bh 928.13
Jumlah (1) 38,053.13
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 51,703.13
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

8b 1 Bh Pasang Jet Washer Ex. TOTO/Setara


(SNI.S.08b)
Bahan
Jet Washer 1.000 Bh 235,000.00 235,000.00
Seal tape 0.025 Bh 5,875.00
Jumlah (1) 240,875.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 254,525.00

9a 1 Bh Pasang avour / floordrain


(SNI.S.09a)
Bahan
Avour 1.000 Bh 17,875.00 17,875.00
Jumlah (1) 17,875.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 31,525.00

9b 1 Bh Pasang avour / floordrain Stenless


(SNI.S.09b)
Bahan
Avour/Floordrain Stenless 1.000 Bh 68,750.00 68,750.00
Jumlah (1) 68,750.00
Upah kerja
Tukang batu 0.100 Org 75,000.00 7,500.00
K. Tukang batu 0.010 Org 65,000.00 650.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 14,050.00
Jumlah (1+2) 82,800.00

10 1 Bh Pasang Bak mandi fiberglass / plastik


(SNI.S.10)
Bahan
Bak mandi fiberglass / plastik 1.000 Bh 220,000.00 220,000.00
Perlengkapan 18.000 % 39,600.00
Jumlah (1) 259,600.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.100 Org 55,000.00 5,500.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 13,650.00
Jumlah (1+2) 273,250.00

11 1 Bh Membuat bak kontrol pasangan batu bata


(Uk. 30x30 cm tinggi 35 cm)
(SNI.S.11)
Bahan
Batu bata kw. 2 14.500 Bj 750.00 10,875.00
Besi beton 1.600 Kg 10,500.00 17,400.00
Pasir cor 0.060 m3 198,000.00 1,044.00
PC / Semen 44.000 Kg 1,600.00 70,400.00
Pasir pasang 0.070 m3 154,000.00 10,780.00
Kerikil / Batu pecah 2-3 cm hitam 0.070 m3 278,200.00 19,474.00
Jumlah (1) 129,973.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.010 Org 55,000.00 550.00
Mandor 0.005 Org 80,000.00 400.00
Jumlah (2) 8,700.00
Jumlah (1+2) 138,673.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

12 1 M' Pasang PVC 1/2" AW


(SNI.S.12)
Bahan
Pipa PVC 1/2" AW 1.200 m' 6,250.00 7,500.00
Perlengkapan 35.000 % 2,625.00
Jumlah (1) 10,125.00
Upah kerja
Tukang pipa 0.060 Org 65,000.00 3,900.00
K. Tukang pipa 0.006 Org 75,000.00 450.00
Pekerja 0.036 Org 55,000.00 1,980.00
Mandor 0.0018 Org 80,000.00 144.00
Jumlah (2) 6,474.00
Jumlah (1+2) 16,599.00

13 1 M' Pasang PVC 3/4" AW


(SNI.S.13)
Bahan
Pipa PVC 3/4" AW 1.200 m' 7,500.00 9,000.00
Perlengkapan 35.000 % 3,150.00
Jumlah (1) 12,150.00
Upah kerja
Tukang pipa 0.060 Org 65,000.00 3,900.00
K. Tukang pipa 0.006 Org 75,000.00 450.00
Pekerja 0.036 Org 55,000.00 1,980.00
Mandor 0.0018 Org 80,000.00 144.00
Jumlah (2) 6,474.00
Jumlah (1+2) 18,624.00

14 1 M' Pasang PVC 1" AW


(SNI.S.14)
Bahan
Pipa PVC 1" AW 1.200 m' 11,250.00 13,500.00
Perlengkapan 35.000 % 4,725.00
Jumlah (1) 18,225.00
Upah kerja
Tukang pipa 0.060 Org 65,000.00 3,900.00
K. Tukang pipa 0.006 Org 75,000.00 450.00
Pekerja 0.036 Org 55,000.00 1,980.00
Mandor 0.0018 Org 80,000.00 144.00
Jumlah (2) 6,474.00
Jumlah (1+2) 24,699.00

15 1 M' Pasang PVC 1,5" AW


(SNI.S.15)
Bahan
Pipa PVC 1,5" AW 1.200 m' 16,750.00 20,100.00
Perlengkapan 35.000 % 7,035.00
Jumlah (1) 27,135.00
Upah kerja
Tukang pipa 0.060 Org 65,000.00 3,900.00
K. Tukang pipa 0.006 Org 75,000.00 450.00
Pekerja 0.036 Org 55,000.00 1,980.00
Mandor 0.0018 Org 80,000.00 144.00
Jumlah (2) 6,474.00
Jumlah (1+2) 33,609.00

16 1 M' Pasang PVC 2" AW


(SNI.S.16)
Bahan
Pipa PVC 2" AW 1.200 m' 22,500.00 27,000.00
Perlengkapan 35.000 % 9,450.00
Jumlah (1) 36,450.00
Upah kerja
Tukang pipa 0.090 Org 65,000.00 5,850.00
K. Tukang pipa 0.009 Org 75,000.00 675.00
Pekerja 0.054 Org 55,000.00 2,970.00
Mandor 0.0027 Org 80,000.00 216.00
Jumlah (2) 9,711.00
Jumlah (1+2) 46,161.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

17 1 M' Pasang PVC 3" AW


(SNI.S.17)
Bahan
Pipa PVC 3" AW 1.200 m' 27,500.00 33,000.00
Perlengkapan 35.000 % 11,550.00
Jumlah (1) 44,550.00
Upah kerja
Tukang pipa 0.135 Org 65,000.00 8,775.00
K. Tukang pipa 0.0135 Org 75,000.00 1,012.50
Pekerja 0.081 Org 55,000.00 4,455.00
Mandor 0.0041 Org 80,000.00 328.00
Jumlah (2) 14,570.50
Jumlah (1+2) 59,120.50

18 1 M' Pasang PVC 4" AW


(SNI.S.18)
Bahan
Pipa PVC 4" AW 1.200 m' 47,500.00 57,000.00
Perlengkapan 35.000 % 19,950.00
Jumlah (1) 76,950.00
Upah kerja
Tukang pipa 0.135 Org 65,000.00 8,775.00
K. Tukang pipa 0.0135 Org 75,000.00 1,012.50
Pekerja 0.081 Org 55,000.00 4,455.00
Mandor 0.0041 Org 80,000.00 328.00
Jumlah (2) 14,570.50
Jumlah (1+2) 91,520.50

19 1 M' Pasang Pipa GI dia. 1/2" medium A


(SNI.S.19)
Bahan
Pipa GI dia. 1/2" medium A 1.200 m' 26,283.33 31,540.00
Perlengkapan 35.000 % 11,039.00
Jumlah (1) 42,579.00
Upah kerja
Tukang pipa 0.090 Org 65,000.00 5,850.00
K. Tukang pipa 0.009 Org 75,000.00 675.00
Pekerja 0.054 Org 55,000.00 2,970.00
Mandor 0.027 Org 80,000.00 2,160.00
Jumlah (2) 11,655.00
Jumlah (1+2) 54,234.00

20 1 M' Pasang Pipa GI dia. 3/4" medium A


(SNI.S.20)
Bahan
Pipa GI dia. 3/4" medium A 1.200 m' 35,783.33 42,940.00
Perlengkapan 35.000 % 15,029.00
Jumlah (1) 57,969.00
Upah kerja
Tukang pipa 0.090 Org 65,000.00 5,850.00
K. Tukang pipa 0.009 Org 75,000.00 675.00
Pekerja 0.054 Org 55,000.00 2,970.00
Mandor 0.027 Org 80,000.00 2,160.00
Jumlah (2) 11,655.00
Jumlah (1+2) 69,624.00

21 1 M' Pasang Pipa GI dia. 1" medium A


(SNI.S.21)
Bahan
Pipa GI dia. 1" medium A 1.200 m' 78,333.33 94,000.00
Perlengkapan 35.000 % 32,900.00
Jumlah (1) 126,900.00
Upah kerja
Tukang pipa 0.090 Org 65,000.00 5,850.00
K. Tukang pipa 0.009 Org 75,000.00 675.00
Pekerja 0.054 Org 55,000.00 2,970.00
Mandor 0.027 Org 80,000.00 2,160.00
Jumlah (2) 11,655.00
Jumlah (1+2) 138,555.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

22 1 M' Pasang Pipa GI dia. 2" medium A


(SNI.S.22)
Bahan
Pipa GI dia. 2" medium A 1.200 m' 89,833.33 107,800.00
Perlengkapan 35.000 % 37,730.00
Jumlah (1) 145,530.00
Upah kerja
Tukang pipa 0.090 Org 65,000.00 5,850.00
K. Tukang pipa 0.009 Org 75,000.00 675.00
Pekerja 0.054 Org 55,000.00 2,970.00
Mandor 0.027 Org 80,000.00 2,160.00
Jumlah (2) 11,655.00
Jumlah (1+2) 157,185.00

23 1 M' Pasang Pipa GI dia. 3" medium A


(SNI.S.23)
Bahan
Pipa GI dia. 3" medium A 1.200 m' 162,216.67 194,660.00
Perlengkapan 35.000 % 68,131.00
Jumlah (1) 262,791.00
Upah kerja
Tukang pipa 0.180 Org 65,000.00 11,700.00
K. Tukang pipa 0.018 Org 75,000.00 1,350.00
Pekerja 0.180 Org 55,000.00 9,900.00
Mandor 0.0054 Org 80,000.00 432.00
Jumlah (2) 23,382.00
Jumlah (1+2) 286,173.00

24 1 M' Pasang Pipa GI dia. 4" medium A


(SNI.S.24)
Bahan
Pipa GI dia. 4" medium A 1.200 m' 203,500.00 244,200.00
Perlengkapan 35.000 % 85,470.00
Jumlah (1) 329,670.00
Upah kerja
Tukang pipa 0.225 Org 65,000.00 14,625.00
K. Tukang pipa 0.0225 Org 75,000.00 1,687.50
Pekerja 0.135 Org 55,000.00 7,425.00
Mandor 0.0068 Org 80,000.00 544.00
Jumlah (2) 24,281.50
Jumlah (1+2) 353,951.50

25 1 M' Pasang Pipa GI dia. 2" medium B


(SNI.S.25)
Bahan
Pipa GI dia. 2" medium B 1.200 m' 59,516.67 71,420.00
Perlengkapan 35.000 % 24,997.00
Jumlah (1) 96,417.00
Upah kerja
Tukang pipa 0.090 Org 65,000.00 5,850.00
K. Tukang pipa 0.009 Org 75,000.00 675.00
Pekerja 0.054 Org 55,000.00 2,970.00
Mandor 0.027 Org 80,000.00 2,160.00
Jumlah (2) 11,655.00
Jumlah (1+2) 108,072.00

26 1 M' Pasang Pipa GI dia. 3" medium B


(SNI.S.26)
Bahan
Pipa GI dia. 3" medium B 1.200 m' 106,266.67 127,520.00
Perlengkapan 35.000 % 44,632.00
Jumlah (1) 172,152.00
Upah kerja
Tukang pipa 0.180 Org 65,000.00 11,700.00
K. Tukang pipa 0.018 Org 75,000.00 1,350.00
Pekerja 0.180 Org 55,000.00 9,900.00
Mandor 0.0054 Org 80,000.00 432.00
Jumlah (2) 23,382.00
Jumlah (1+2) 195,534.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

27 1 M' Pasang Pipa GI dia. 4" medium B


(SNI.S.27)
Bahan
Pipa GI dia. 4" medium B 1.200 m' 133,266.67 159,920.00
Perlengkapan 35.000 % 55,972.00
Jumlah (1) 215,892.00
Upah kerja
Tukang pipa 0.225 Org 65,000.00 14,625.00
K. Tukang pipa 0.0225 Org 75,000.00 1,687.50
Pekerja 0.135 Org 55,000.00 7,425.00
Mandor 0.0068 Org 80,000.00 544.00
Jumlah (2) 24,281.50
Jumlah (1+2) 240,173.50

28 1 Unit Pembuatan septictank


(SNI.S.28)
Galian tanah 9.460 m3 53,100.00 502,326.00
Urugan tanah kembali 2.370 m3 12,975.00 30,750.75
Urugan pasir 0.430 m3 137,300.00 59,039.00
Pas. bata merah tbl. 1/2 bata 1Pc : 3Ps 10.740 m2 107,102.00 1,150,275.48
Plesteran 1 : 3 21.480 m2 39,408.60 846,496.73
Beton balok 0.027 m3 3,083,675.69 83,259.24
Beton plat 0.200 m3 2,776,542.14 555,308.43
Pasang pipa besi dia.1" 1.000 m' 78,333.33 78,333.33
Pasang pipa PVC 3" 4.340 m' 59,120.50 256,582.97
Jumlah 3,562,371.93

29 1 Unit Pembuatan resapan


(SNI.S.29)
Galian tanah 7.812 m3 53,100.00 414,817.20
Urugan tanah kembali 1.953 m3 12,975.00 25,340.18
Urugan pasir 0.250 m3 137,300.00 34,325.00
Beton plat 0.076 m3 2,776,542.14 211,017.20
Pasangan bata kosong 7.975 m2 226,485.00 1,806,217.88
Pasangan ijuk 16.986 Kg 7,500.00 127,395.00
Plesteran 4.950 m2 39,408.60 195,072.57
Pas. bata merah tbl. 1/2 bata 1Pc : 3Ps 2.475 m2 107,102.00 265,077.45
Kerikil 0.580 m3 278,200.00 161,356.00
Jumlah 3,240,618.47

30 1m Saluran Buis Beton U dia. 20 cm Tertutup


(SNI.S.30)
Galian tanah 0.250 m3 43,250.00 10,812.50
Urugan tanah kembali 0.025 m3 12,975.00 324.38
Urugan pasir 0.025 m3 137,300.00 3,432.50
Pas. Batu Bata 1pc : 5psr 1.050 m2 124,868.00 131,111.40
Plester 1pc : 5psr 1.050 m2 35,723.40 37,509.57
Plat Deker t. 6 cm 0.035 m3 2,805,599.72 98,195.99
Buis Beton U dia. 20 cm 1.000 bh 25,000.00 25,000.00
Jumlah 306,386.34

31 1m Saluran Buis Beton U dia. 20 cm Tebuka


(SNI.S.31)
Galian tanah 0.250 m3 43,250.00 10,812.50
Urugan tanah kembali 0.025 m3 12,975.00 324.38
Urugan pasir 0.025 m3 137,300.00 3,432.50
Pas. Batu Bata 1pc : 5psr 1.050 m2 124,868.00 131,111.40
Plester 1pc : 5psr 1.050 m2 35,723.40 37,509.57
Buis Beton U dia. 20 cm 1.000 bh 25,000.00 25,000.00
Jumlah 208,190.35

PEKERJAAN PAVING STONE (An. Pav.)


1 1 M2 Pasang paving segiempat4 tb. 6 cm K-200
(An.Pav.1)
Bahan
Paving segi 4 tb. 6 cm K-200 1.000 m2 50,000.00 50,000.00
Pasir urug 0.050 m3 100,000.00 5,000.00
Jumlah (1) 55,000.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
Pekerja 0.400 Org 55,000.00 22,000.00
Jumlah (2) 36,000.00
Jumlah (1+2) 91,000.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

2 1 M2 Pasang paving segiempat tb. 6 cm K-300


(An.Pav.2)
Bahan
Paving segi 4 tb. 6 cm K-300 1.000 m2 58,000.00 58,000.00
Pasir urug 0.050 m3 100,000.00 5,000.00
Jumlah (1) 63,000.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
Pekerja 0.400 Org 55,000.00 22,000.00
Jumlah (2) 36,000.00
Jumlah (1+2) 99,000.00

3 1 M2 Pasang paving segiempat tb. 8 cm K-300


(An.Pav.3)
Bahan
Paving segi 4 tb. 8 cm K-300 1.000 m2 77,000.00 77,000.00
Pasir urug 0.050 m3 100,000.00 5,000.00
Jumlah (1) 82,000.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
Pekerja 0.400 Org 55,000.00 22,000.00
Jumlah (2) 36,000.00
Jumlah (1+2) 118,000.00

4 1 M2 Pasang paving segiempat tb. 5 cm K-100


(An.Pav.4)
Bahan
Paving segi 4 tb. 5 cm K-100 1.000 m2 38,000.00 38,000.00
Pasir urug 0.050 m3 100,000.00 5,000.00
Jumlah (1) 43,000.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
Pekerja 0.400 Org 55,000.00 22,000.00
Jumlah (2) 36,000.00
Jumlah (1+2) 79,000.00

5 1 M2 Pasang paving segienam tb. 6 cm K-200


(An.Pav.5)
Bahan
Paving segi 6 tb. 6 cm K-200 1.000 m2 50,000.00 50,000.00
Pasir urug 0.050 m3 100,000.00 5,000.00
Jumlah (1) 55,000.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
Pekerja 0.400 Org 55,000.00 22,000.00
Jumlah (2) 36,000.00
Jumlah (1+2) 91,000.00

6 1 M2 Pasang paving segienam tb. 6 cm K-300


(An.Pav.6)
Bahan
Paving segi 6 tb. 6 cm K-300 1.000 m2 58,000.00 58,000.00
Pasir urug 0.050 m3 100,000.00 5,000.00
Jumlah (1) 63,000.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
Pekerja 0.400 Org 55,000.00 22,000.00
Jumlah (2) 36,000.00
Jumlah (1+2) 99,000.00

7 1 M' Pasang paving uskup / stoper tb. 6 cm K-200


(An.Pav.7)
Bahan
Paving uskup tb. 6 cm K-200 3.340 Bj 5,500.00 18,370.00
Pasir urug 0.010 m3 100,000.00 1,000.00
Jumlah (1) 19,370.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.001 Org 80,000.00 80.00
Jumlah (2) 25,830.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Jumlah (1+2) 45,200.00


HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

8 1 M' Pasang paving uskup / stoper tb. 6 cm K-300


(An.Pav.8)
Bahan
Paving uskup tb. 6 cm K-300 3.340 Bj 7,500.00 25,050.00
Pasir urug 0.010 m3 100,000.00 1,000.00
Jumlah (1) 26,050.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.001 Org 80,000.00 80.00
Jumlah (2) 25,830.00
Jumlah (1+2) 51,880.00

9 1 M' Pasang paving uskup / stoper tb. 8 cm K-300


(An.Pav.9)
Bahan
Paving uskup tb. 8 cm K-300 3.340 Bj 10,000.00 33,400.00
Pasir urug 0.010 m3 100,000.00 1,000.00
Jumlah (1) 34,400.00
Upah kerja
Tukang batu 0.200 Org 70,000.00 14,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.001 Org 80,000.00 80.00
Jumlah (2) 25,830.00
Jumlah (1+2) 60,230.00

10 1 M' Pasang Kanstin Uk. 10x20x40 cm K-225


(An.Pav.10)
Bahan
Kanstin Uk. 10x20x40 cm K-225 2.500 Bj 17,000.00 42,500.00
Pasir urug 0.030 m3 100,000.00 3,000.00
Spesi sambungan 1.000 Ls 2,000.00 2,000.00
Jumlah (1) 47,500.00
Upah kerja
Tukang batu 0.100 Org 70,000.00 7,000.00
K. Tukang batu 0.010 Org 75,000.00 750.00
Pekerja 0.200 Org 55,000.00 11,000.00
Mandor 0.008 Org 80,000.00 640.00
Jumlah (2) 19,390.00
Jumlah (1+2) 66,890.00

PEKERJAAN LISTRIK (An. Lis.)


1 1 Ttk Instalasi titik lampu
(An. Lis.01)
Bahan
Kabel NYA 2 x 2,5 mm 10.000 m' 2,500.00 25,000.00
Pipa paralon 5/8 1.000 Ljr 15,500.00 15,500.00
Isolator 0.500 Bh 11,550.00 5,775.00
Fiting plafon 1.000 Bh 4,000.00 4,000.00
T dos PVC 1.000 Bh 350.00 350.00
Jumlah (1) 50,625.00
Upah kerja
Tukang Listrik 0.500 Org 70,000.00 35,000.00
K. Tukang Listrik 0.050 Org 75,000.00 3,750.00
Pekerja 0.300 Org 55,000.00 16,500.00
Jumlah (2) 55,250.00
Jumlah (1+2) 105,875.00

2 1 Ttk Instalasi stop kontak


(An. Lis.02)
Bahan
Kabel NYA 2 x 2,5 mm 10.000 m' 2,500.00 25,000.00
Pipa paralon 5/8 1.000 Ljr 15,500.00 15,500.00
Isolator 0.500 Bh 11,550.00 5,775.00
T dos PVC 1.000 Bh 350.00 350.00
Jumlah (1) 46,625.00
Upah kerja
Tukang Listrik 0.500 Org 70,000.00 35,000.00
K. Tukang Listrik 0.050 Org 75,000.00 3,750.00
Pekerja 0.300 Org 55,000.00 16,500.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

Jumlah (2) 55,250.00


Jumlah (1+2) 101,875.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5

3 1 Bh Pasang stop kontak


(An. Lis.03)
Bahan
Stop kontak 1.000 Bh 18,500.00 18,500.00
Jumlah (1) 18,500.00
Upah kerja
Tukang Listrik 0.050 Org 70,000.00 3,500.00
K. Tukang Listrik 0.020 Org 75,000.00 1,500.00
Pekerja 0.001 Org 55,000.00 55.00
Jumlah (2) 5,055.00
Jumlah (1+2) 23,555.00

4 1 Bh Pasang saklar ganda


(An. Lis.04)
Bahan
Saklar ganda 1.000 Bh 18,500.00 18,500.00
Jumlah (1) 18,500.00
Upah kerja
Tukang Listrik 0.050 Org 70,000.00 3,500.00
K. Tukang Listrik 0.020 Org 75,000.00 1,500.00
Pekerja 0.001 Org 55,000.00 55.00
Jumlah (2) 5,055.00
Jumlah (1+2) 23,555.00

5 1 Bh Pasang saklar tunggal


(An. Lis.05)
Bahan
Saklar tunggal 1.000 Bh 15,500.00 15,500.00
Jumlah (1) 15,500.00
Upah kerja
Tukang Listrik 0.050 Org 70,000.00 3,500.00
K. Tukang Listrik 0.020 Org 75,000.00 1,500.00
Pekerja 0.001 Org 55,000.00 55.00
Jumlah (2) 5,055.00
Jumlah (1+2) 20,555.00

6 1 Bh Pasang lampu Essential 18 watt


(An. Lis.06)
Bahan
Lampu SL 18 watt 1.000 Bh 38,885.00 38,885.00
Jumlah (1) 38,885.00
Upah kerja
Tukang Listrik 0.050 Org 70,000.00 3,500.00
K. Tukang Listrik 0.020 Org 75,000.00 1,500.00
Pekerja 0.001 Org 55,000.00 55.00
Jumlah (2) 5,055.00
Jumlah (1+2) 43,940.00

7 1 Bh Pasang lampu TL 1X20 watt


(An. Lis.07)
Bahan
lampu TL 1X20 watt 1.000 Bh 85,000.00 85,000.00
Jumlah (1) 85,000.00
Upah kerja
Tukang Listrik 0.050 Org 70,000.00 3,500.00
K. Tukang Listrik 0.020 Org 75,000.00 1,500.00
Pekerja 0.001 Org 55,000.00 55.00
Jumlah (2) 5,055.00
Jumlah (1+2) 90,055.00

8 1 Bh Pasang Lampu Down Light 18 watt


(An. Lis.08)
Bahan
Lampu Down Light PL 18 Watt 1.000 Bh 85,000.00 85,000.00
Jumlah (1) 85,000.00
Upah kerja
Tukang Listrik 0.050 Org 70,000.00 3,500.00
K. Tukang Listrik 0.020 Org 75,000.00 1,500.00
Pekerja 0.001 Org 55,000.00 55.00
Jumlah (2) 5,055.00
Jumlah (1+2) 90,055.00
HARGA SATUAN JUMLAH HARGA
NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
ANALISA HARGA SATUAN PEKERJAAN
PINTU DAN JENDELA

HARGA SATUAN JUMLAH HARGA


NO. U RAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5
1 1 UNIT PINTU TYPE P1
(SNI DT 91-0011-2007-30-1)
Kusen aluminium 4" brown ex. YKK 7.320 m1 145,000.00 1,061,400.00
Slimar aluminium 3" brown ex. YKK 2.600 m1 135,000.00 351,000.00
Kaca Polos 5 mm 0.190 m2 96,650.00 18,363.50
Pintu Double Triplek Finishing Duco 1.000 Unit 512,250.75 512,250.75
Kunci Tanam 2x putar (komplit handle) 1.000 set 137,300.00 137,300.00
Engsel Pintu 3.000 set 30,925.00 92,775.00
Engsel Jendela 2.000 set 20,425.00 40,850.00
Grendel Jendela 1.000 set 20,150.00 20,150.00
Hak Angin 1.000 Set 27,550.00 27,550.00
Jumlah (1) 2,261,639.25

2 1 UNIT KUSEN PINTU TYPE PJ


(SNI DT 91-0011-2007-30-2)
Kusen aluminium 4" brown ex. YKK 15.960 m1 145,000.00 2,314,200.00
Slimar aluminium 3" brown ex. YKK 16.040 m1 135,000.00 2,165,400.00
Kaca Polos 5 mm 2.030 m2 96,650.00 196,199.50
Pintu Double Triplek Finishing Duco 1.000 Unit 512,250.75 512,250.75
Kunci Tanam 2x putar (komplit handle) 1.000 Set 137,300.00 137,300.00
Engsel Pintu 3.000 set 30,925.00 92,775.00
Engsel Jendela 4.000 set 20,425.00 81,700.00
Grendel Jendela 2.000 set 20,150.00 40,300.00
Hak Angin 2.000 Set 27,550.00 55,100.00
Jumlah (1) 5,595,225.25
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN : 2015

KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

PEKERJAAN PERSIAPAN (SNI 03-2835-2002)


1 1 M2 Bongkar atap / genteng (SNI 03-2835-01) 2,360.00
2 1 M2 Bongkar rangka atap (SNI 03-2835-02) 9,850.00
3 1 M2 Bongkar plafond + rangka (SNI 03-2835-03) 2,085.00
4 1 M3 Bongkar dinding Analog biaya 1 m3 (SNI 03-2835-04) 369,325.00
Analog biaya 1 m2 44,320.77
5 1 M3 Bongkar beton bertulang (SNI 03-2835-05) 393,325.00
6 1 M2 Bongkar keramik lantai (SNI 03-2835-06) 8,200.00
7 1 Bh Bongkar kosen pintu dan jendela (SNI 03-2835-07) 72,400.00
8 1 Ttk Bor strous dia. 30cm T>3m (SNI 03-2835-08) 160,800.00
9 1 Ttk Bor strous dia. 25cm L=3m (SNI 03-2835-08.a) 59,000.00
10 1 M' Pengukuran dan pas. bowplank (SNI 03-2835-09) 83,578.20
11 1 M2 Pembuatan gudang semen & alat-alat (SNI 03-2835-10) 1,394,579.00
12 1 M' Pagar sementara dari seng gelombang tinggi 2 m (SNI 03-2835-11) 517,798.60
13 1 M2 Pembersihan lokasi & perataan (SNI 03-2835-12) 9,500.00

PEKERJAAN TANAH (SNI DT 91-0006-2007)


1 1 M3 Galian tanah pondasi (s/d 1 m) (SNI DT 91-0006-2007-01) 43,250.00
2 1 M3 Galian tanah pondasi (s/d 2 m) (SNI DT 91-0006-2007-02) 53,100.00
3 1 M3 Galian tanah pondasi (s/d 3 m) (SNI DT 91-0006-2007-03) 63,110.00
4 1 M3 Galian tanah berbatu (SNI DT 91-0006-2007-04) 66,180.00
5 1 M3 Galian tanah keras (s/d 1 m) (SNI DT 91-0006-2007-05) 57,560.00
6 1 M3 Galian tanah cadas (s/d 1 m) (SNI DT 91-0006-2007-06) 87,300.00
7 1 M3 Galian tanah lumpur (s/d 1 m) (SNI DT 91-0006-2007-07) 69,600.00
8 1 M3 Urugan tanah kembali (SNI DT 91-0006-2007-08) 12,975.00
9 1 M3 Urugan pasir (SNI DT 91-0006-2007-09) 137,300.00
10 1 M3 Urugan tanah (SNI DT 91-0006-2007-10) 107,300.00
11 1 M3 Urugan sirtu (SNI DT 91-0006-2007-11) 167,550.00
12 1 M3 Urugan pedel (SNI DT 91-0006-2007-12) 99,750.00
13 1 M3 Membuang tanah sejauh 30 m (SNI DT 91-0006-2007-13) 18,950.00
14 1 M3 Pek. Striping tebing tinggi 1 m (SNI DT 91-0006-2007-14) 3,150.00

PEKERJAAN PONDASI (SNI DT 91-0007-2007)


1 1 M3 Pasang aanstampeng (SNI DT 91-0007-2007-01) 226,485.00
2 1 M3 Pasang pondasi batu kali / brongkol 1Pc : 3Kp : 10Ps (SNI DT 91-0007-2007-02) 415,826.95
3 1 M3 Pasang pondasi batu kali / brongkol 1Pc : 3Ps (SNI DT 91-0007-2007-03) 639,930.00
4 1 M3 Pasang pondasi batu kali / brongkol 1Pc : 4Ps (SNI DT 91-0007-2007-04) 582,920.00
5 1 M3 Pasang pondasi batu kali / brongkol 1Pc : 5Ps (SNI DT 91-0007-2007-05) 543,416.00

PEKERJAAN DINDING (SNI DT 90-0009-2007)


1 1 M2 Pasang bata kumbung tbl. 1 bata camp. 1Pc:3Kp:10Ps (An.D.01) 181,351.38
2 1 M2 Pasang bata kumbung tbl. 1 bata camp. 1Pc : 4Ps (An.D.02) 207,702.00
3 1 M2 Pasang bata kumbung tbl. 1/2 bata camp. 1Pc:3Kp:10Ps (An.D.03) 90,392.75
4 1 M2 Pasang bata kumbung tbl. 1/2 bata camp. 1Pc : 4Ps (An.D.04) 100,472.00
5 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 2Ps kw. 1 (SNI DT 91-0009-2007-01) 286,820.00
6 1 M2 Pasang bata merah tbl .1 bata camp. 1Pc : 2Ps kw. 2 (SNI DT 91-0009-2007-02) 237,820.00
7 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 3Ps kw. 1 (SNI DT 91-0009-2007-03) 271,634.00
8 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 3Ps kw. 2 (SNI DT 91-0009-2007-04) 222,634.00
9 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 4Ps kw. 1 (SNI DT 91-0009-2007-05) 261,702.00
10 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 4Ps kw. 2 (SNI DT 91-0009-2007-06) 212,702.00
11 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 5Ps kw. 1 (SNI DT 91-0009-2007-07)* 256,128.00
12 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 5Ps kw. 2 (SNI DT 91-0009-2007-07) 207,128.00
13 1 M2 Pasang bata merah tbl. 1 bata camp. 1Pc : 3 Kp : 10Ps kw. 2 (SNI DT 91-0009-2007-08) 186,351.38
14 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 2Ps kw. 1 (SNI DT 91-0009-2007-09) 138,622.00
15 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 2Ps kw. 2 (SNI DT 91-0009-2007-10) 114,122.00
16 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 3Ps kw. 1 (SNI DT 91-0009-2007-11) 131,602.00
17 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 3Ps kw. 2 (SNI DT 91-0009-2007-12) 107,102.00
18 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 4Ps kw. 1 (SNI DT 91-0009-2007-13) 127,472.00
19 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 4Ps kw. 2 (SNI DT 91-0009-2007-14) 102,972.00
20 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 5Ps kw. 1 (SNI DT 91-0009-2007-15) 124,868.00
21 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 5Ps kw. 2 (SNI DT 91-0009-2007-16) 100,368.00
22 1 M2 Pasang bata merah tbl. 1/2 bata camp. 1Pc : 3Kp : 10Ps kw. 2 (SNI DT 91-0009-2007-17) 92,892.75
23 1 M2 Pasang dinding roster terawang 11x22 cm camp. 1Pc : 3Ps (SNI DT 91-0009-2007-18) 159,278.00
24 1 M2 Pasang batu tempel hitam (An.D.05) 131,815.00
25 1 M2 Pasang batu palimanan 15x15 cm halus (An.D.06) 175,815.00
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

26 1 M2 Pasang beton alur (An.D.07) 164,815.00


27 1 M2 Pasang batu candi (An.D.08) 223,115.00
28 1 M2 Pasang batu andesit (An.D.09) 236,315.00
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

PEKERJAAN PLESTERAN (SNI DT 91-0010-2007)


1 1 M2 Plesteran tbl. 1,5 cm camp. 1Pc : 2Ps (SNI DT 91-0010-2007-01) 42,863.40
2 1 M2 Plesteran tbl. 1,5 cm camp. 1Pc : 3Ps (SNI DT 91-0010-2007-02) 39,408.60
3 1 M2 Plesteran tbl. 1,5 cm camp. 1Pc : 4Ps (SNI DT 91-0010-2007-03) 37,105.00
4 1 M2 Plesteran tbl. 1,5 cm camp. 1Pc : 5Ps (SNI DT 91-0010-2007-04) 35,723.40
5 1 M2 Plesteran tbl. 2 cm camp. 1Pc : 3Ps (SNI DT 91-0010-2007-05) 52,202.80
6 1 M2 Plesteran tbl. 2 cm camp. 1Pc : 4Ps (SNI DT 91-0010-2007-06) 49,080.00
7 1 M2 Plesteran tbl. 2 cm camp. 1Pc : 5Ps (SNI DT 91-0010-2007-07) 47,289.20
8 1 M2 Plesteran Ciprat (SNI DT 91-0010-2007-08) 33,286.00
9 1 M2 Acian (SNI DT 91-0010-2007-09) 24,750.00
10 1 M' Benangan sudut (SNI DT 91-0010-2007-10) 10,747.00
11 1 M2 Finishing siar pasangan bata merah (SNI DT 91-0010-2007-11) 19,675.30
12 1 M2 Finishing siar pasangan bata kali (SNI DT 91-0010-2007-12) 41,317.00

PEKERJAAN BETON (SNI DT 91-0008-2007)


1 1 M3 Rabat beton 1Pc : 3Ps : 5Krl (SNI DT 91-0008-2007-01) 810,319.00
2 1 M3 Lantai kerja 1Pc : 2Ps : 4Krl (SNI DT 91-0008-2007-02) 822,455.94
3 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-100 (SNI DT 91-0008-2007-03) 842,706.60
4 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-125 (SNI DT 91-0008-2007-04) 885,975.92
5 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-150 (SNI DT 91-0008-2007-05) 919,706.66
6 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-175 (SNI DT 91-0008-2007-06) 959,858.44
7 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-200 (SNI DT 91-0008-2007-07) 997,777.14
8 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-225 (SNI DT 91-0008-2007-08) 1,026,834.72
9 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-250 (SNI DT 91-0008-2007-09) 1,045,114.12
10 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-275 (SNI DT 91-0008-2007-10) 1,076,514.80
11 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-300 (SNI DT 91-0008-2007-11) 1,086,249.86
12 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-325 (SNI DT 91-0008-2007-12) 1,123,217.44
13 1 M3 Cor beton 1Pc : 2Ps : 3Krl K-350 (SNI DT 91-0008-2007-13) 1,135,929.94
14 1 M3 Begesting pondasi (SNI DT 91-0008-2007-14) 1,005,750.00
15 1 M3 Begesting sloof (SNI DT 91-0008-2007-15) 890,860.00
16a 1 M3 Begesting kolom (SNI DT 91-0008-2007-16a) 2,315,152.00
16b 1 M3 Begesting kolom ( uk. 40/40 ; 30/30 ; 25/25 ) (SNI DT 91-0008-2007-16b) 1,882,552.00
17a 1 M3 Begesting balok (SNI DT 91-0008-2007-17a) 3,116,489.00
17b 1 M3 Begesting balok ( Uk. 25/40 ; 30/50 ) (SNI DT 91-0008-2007-17b) 2,719,939.00
18 1 M3 Begesting plat lantai dack (SNI DT 91-0008-2007-18) 3,413,267.00
19 1 M3 Begesting untuk tangga (SNI DT 91-0008-2007-19) 2,598,660.50
20 1 M3 Begesting untuk plat (cetak di darat) (SNI DT 91-0008-2007-20) 434,070.00
21 1 Kg Besi beton polos (SNI DT 91-0008-2007-21) 12,224.50
22 1 M3 Pondasi Footplat Beton Bertulang K-175 (SNI DT 91-0008-2007-22) 3,432,548.44
23 1 M3 Pondasi Footplat Beton Bertulang K-200 (SNI DT 91-0008-2007-23) 3,470,467.14
24 1 M3 Pondasi Footplat Beton Bertulang K-225 (SNI DT 91-0008-2007-24) 3,499,524.72
25 1 M3 Pondasi Footplat Beton Bertulang K-250 (SNI DT 91-0008-2007-25) 3,517,804.12
26 1 M3 Pondasi Strous Beton Bertulang K-175 (SNI DT 91-0008-2007-26) 2,426,798.44
27 1 M3 Pondasi Strous Beton Bertulang K-200 (SNI DT 91-0008-2007-27) 2,464,717.14
28 1 M3 Pondasi Strous Beton Bertulang K-225 (SNI DT 91-0008-2007-28) 2,493,774.72
29 1 M3 Pondasi Strous Beton Bertulang K-250 (SNI DT 91-0008-2007-29) 2,512,054.12
30 1 M3 Sloof Beton Bertulang K-200 (uk. 15/15; 15/20) (SNI DT 91-0008-2007-30) 3,477,822.14
31a 1 M3 Sloof Beton Bertulang K-225 (uk. 20/25; 20/30) (SNI DT 91-0008-2007-31a) 3,629,124.72
31b 1 M3 Sloof Beton Bertulang K-225 (uk. 20/30) (SNI DT 91-0008-2007-31a) 3,934,737.22
32a 1 M3 Sloof Beton Bertulang K-225 (uk. 20/40; 30/40) (SNI DT 91-0008-2007-32a) 3,751,369.72
32b 1 M3 Sloof Beton Bertulang K-225 (uk. 25/40) (SNI DT 91-0008-2007-32b) 3,812,492.22
33 1 M3 Sloof Beton Bertulang K-250 (uk. 20/25; 20/30) (SNI DT 91-0008-2007-33) 3,647,404.12
34 1 M3 Sloof Beton Bertulang K-250 (uk. 20/40; 30/40) (SNI DT 91-0008-2007-34) 3,769,649.12
35 1 M3 Kolom praktis beton bertulang K-175 (uk. 11/11; 15/15) (SNI DT 91-0008-2007-35) 3,127,831.44
36 1 M3 Kolom beton bertulang K-200 (uk. 15/25; 15/30; 20/30) (SNI DT 91-0008-2007-36) 3,989,028.14
37 1 M3 Kolom beton bertulang K-225 (uk. 15/25; 15/30; 20/30) (SNI DT 91-0008-2007-37) 4,018,085.72
38 1 M3 Kolom beton bertulang K-225 (uk. 20/40; 30/40) (SNI DT 91-0008-2007-38) 4,629,310.72
39 1 M3 Kolom beton bertulang K-250 (uk. 20/40; 30/40) (SNI DT 91-0008-2007-39) 4,647,590.12
40a 1 M3 Kolom beton bertulang K-225 (uk. 30/50; 35/50) (SNI DT 91-0008-2007-40a) 4,934,923.22
40b 1 M3 Kolom beton bertulang K-225 (uk. 40/40; 30/30 ; 25/25) (SNI DT 91-0008-2007-40b) 3,679,540.72
41 1 M3 Kolom beton bertulang K-250 (uk. 30/50; 35/50) (SNI DT 91-0008-2007-41) 4,953,202.62
42 1 M3 Kolom beton bertulang K-225 (uk. 30/60; 35/60; 40/70) (SNI DT 91-0008-2007-42) 5,240,535.72
43 1 M3 Kolom beton bertulang K-250 (uk. 30/60; 35/60; 40/70) (SNI DT 91-0008-2007-43) 5,258,815.12
44 1 M3 Beton ring balok K-175 (uk. 15/15; 15/20) (SNI DT 91-0008-2007-44) 3,083,675.69
45 1 M3 Beton balok K-200 (uk. 15/20; 15/30; 20/30) (SNI DT 91-0008-2007-45) 4,022,961.64
46 1 M3 Beton balok K-225 (uk. 15/30; 20/30) (SNI DT 91-0008-2007-46) 4,052,019.22
47a 1 M3 Beton balok K-225 (uk. 25/40; 30/50) (SNI DT 91-0008-2007-47a) 4,418,754.22
47b 1 M3 Beton balok K-225 (uk. 25/40; 30/50) (SNI DT 91-0008-2007-47b) 3,975,989.22
48 1 M3 Beton balok K-225 (uk. 30/60; 30/70; 30/80) (SNI DT 91-0008-2007-48) 5,029,979.22
49 1 M3 Beton balok K-250 (uk. 25/40; 30/50) (SNI DT 91-0008-2007-49) 4,437,033.62
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

50 1 M3 Beton balok K-250 (uk. 30/60; 30/70; 30/80) (SNI DT 91-0008-2007-50) 5,048,258.62
51 1 M3 Beton plat dack lantai K-225 tb. 10 dan 12 cm (SNI DT 91-0008-2007-51) 4,078,163.22
52 1 M3 Beton plat dack lantai K-250 tb. 10 dan 12 cm (SNI DT 91-0008-2007-52) 4,096,442.62
53 1 M3 Beton tangga K-225 (SNI DT 91-0008-2007-53) 4,159,839.97
54 1 M3 Beton tangga K-250 (SNI DT 91-0008-2007-54) 4,178,119.37
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

55 1 M3 Beton plat cetak dibawah K-175 (tutup saluran) (SNI DT 91-0008-2007-55) 2,738,623.44
56 1 M3 Beton plat cetak dibawah K-200 (tutup saluran) (SNI DT 91-0008-2007-56) 2,776,542.14
57 1 M3 Beton plat cetak dibawah K-225 (tutup saluran) (SNI DT 91-0008-2007-57) 2,805,599.72

PEKERJAAN KAYU (SNI DT 91-0011-2007)


BAHAN KAYU KAMPER
1 1 M3 Pasang kusen pintu dan jendela (SNI DT 91-0011-2007-01) 10,173,800.00
2 1 M2 Pasang jalusi mati kusen (SNI DT 91-0011-2007-02) 730,440.00
3 1 M2 Pasang daun pintu / jendela panil (SNI DT 91-0011-2007-03) 622,735.00
4 1 M2 Pasang daun pintu / jendela kaca bening rangka kayu kamper (SNI DT 91-0011-2007-04) 589,491.00
5 1 M2 Pasang daun pintu / jendela kaca rayban rangka kayu kamper (SNI DT 91-0011-2007-05) 601,491.00
6 1 M2 Pasang daun pintu / jendela krepyak kayu kamper (SNI DT 91-0011-2007-06) 879,021.00
7 1 M3 Pasang kuda-kuda expose (SNI DT 91-0011-2007-07) 12,359,400.00
8 1 M3 Pasang kuda-kuda (SNI DT 91-0011-2007-08) 9,525,350.00
9 1 M3 Pasang gordeng (SNI DT 91-0011-2007-09) 9,022,550.00
10 1 M2 Pasang usuk dan reng (genteng pres) (SNI DT 91-0011-2007-10) 94,341.56
11 1 M2 Pasang usuk dan reng (genteng beton/monier) (SNI DT 91-0011-2007-11) 113,877.47
12 1 M2 Pasang rangka plafond 50x100 cm (SNI DT 91-0011-2007-12) 114,941.90
13 1 M2 Pasang rangka plafond 60x120 cm (SNI DT 91-0011-2007-13) 110,948.70
14 1 M' Pasang papan lisplank 3/20 (SNI DT 91-0011-2007-14) 121,066.20
15 1 M' Pasang papan lisplank 3/30 (SNI DT 91-0011-2007-15) 122,504.00

PEMBUATAN DAUN PINTU LAPIS


58 1 M2 Daun pintu dobel triplek rangka kayu bengkirai (SNI DT 91-0011-2007-58) 465,682.50
59 1 M2 Daun pintu dobel teakwood rangka kayu bengkirai (SNI DT 91-0011-2007-59) 480,682.50
60 1 M2 Daun pintu dobel teakwood lapis triplek aluminium rangka kayu bengkirai (SNI DT 91-0011-2007-60) 493,182.50
61 1 M2 Pas. Dinding pemisah dobel teakwood rangka kayu bengkirai (SNI DT 91-0011-2007-61) 337,119.40
62 1 M2 Pas. Dinding pemisah dobel triplek rangka kayu bengkirai (SNI DT 91-0011-2007-62) 319,919.40

PEKERJAAN PERBAIKAN KAYU


63 1 M3 Pasang kuda-kuda kayu lama (SNI DT 91-0011-2007-63) 1,424,400.00
64 1 M3 Pasang gordeng kayu lama (SNI DT 91-0011-2007-64) 921,600.00
65 1 M2 Pasang usuk kayu lama + reng kayu baru (bengkirai) (SNI DT 91-0011-2007-65) 34,763.00

PEKERJAAN LANGIT-LANGIT (SNI DT 91-0013-2007)


1 1 M2 Pas. Plafond Eternit (SNI DT 91-0013-2007-01) 27,285.00
2 1 M2 Pas. Plafond Kalsiboard (SNI DT 91-0013-2007-02) 35,638.75
3 1 M' Pasang list plafond kayu profil (SNI DT 91-0013-2007-03) 16,455.00
4 1 M' Pasang list gypsum 7 - 10 cm (SNI DT 91-0013-2007-04) 20,340.00
5 1 M2 Pasang plafond kalsiboard + rangka besi hollow (SNI DT 91-0013-2007-05) 120,030.00
5 1 M2 Pasang plafond Gypsumboard + rangka Metal Furring (SNI DT 91-0013-2007-06) 122,070.00

PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 Pasang genteng pres (penthol) (SNI 03-3436-2002-01) 50,440.00
2 1 M' Pasang Bubungan genteng pres (SNI 03-3436-2002-02) 71,888.00
3 1 M2 Pasang genteng beton besar (SNI 03-3436-2002-03) 59,450.00
4 1 M2 Pasang genteng beton kecil (SNI 03-3436-2002-04) 54,350.00
5 1 M' Pasang Bubungan genteng beton (SNI 03-3436-2002-05) 90,318.00
6 1 M2 Pasang genteng ex. Jatiwangi (SNI 03-3436-2002-06) 109,450.00
7 1 M' Pasang Bubungan genteng Jatiwangi (SNI 03-3436-2002-07) 106,068.00
8 1 M2 Pasang genteng keramik (SNI 03-3436-2002-08) 161,650.00
9 1 M' Pasang Bubungan genteng keramik (SNI 03-3436-2002-09) 123,568.00
10 1 M2 Pasang genteng ex. Goodyear (SNI 03-3436-2002-10) 113,340.00
11 1 M' Pasang Bubungan ex. Goodyear (SNI 03-3436-2002-11) 114,868.00
12 1 Bh Pasang aksesoris atap/mahkota (SNI 03-3436-2002-12) 81,940.00
13 1 M2 Pasang atap asbes gelombang kecil (SNI 03-3436-2002-13) 55,085.00
14 1 M2 Pasang atap asbes gelombang besar (SNI 03-3436-2002-14) 62,085.00
15 1 M' Pasang bubung asbes gelombang besar (SNI 03-3436-2002-15) 86,665.00
16 1 M' Pasang bubung asbes gelombang kecil (SNI 03-3436-2002-16) 59,165.00
17 1 M2 Pasang genteng pres lama (SNI 03-3436-2002-17) 14,740.00
18 1 M2 Pasang genteng beton lama (SNI 03-3436-2002-18) 19,550.00

PEKERJAAN BESI DAN ALUMINIUM (SNI DT 91-0014-2007)


1 1 M' Pasang talang datar / jurai (SNI DT 91-0014-2007-01) 185,875.70
2 1 M' Pasang talang 1/2 lingkaran dia. 15 cm (SNI DT 91-0014-2007-02) 90,700.00
3 1 Kg Pasang rangka kuda-kuda besi baja WF (SNI DT 91-0014-2007-03) 24,290.00
4 1 M2 Pasang Rolling Door aluminium (SNI DT 91-0014-2007-04) 530,643.75
5 1 M2 Pasang Terali besi (SNI DT 91-0014-2007-05) 326,411.00
6 1 M' Pasang Kusen aluminium 4" coklat (brown) YKK (SNI DT 91-0014-2007-06) 307,830.00
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

7 1 Kg Pasang Plat Baja (SNI DT 91-0014-2007-07) 21,990.00


8 1 Kg Pasang Besi Ikatan (SNI DT 91-0014-2007-08) 20,265.00
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

PEKERJAAN PLITURAN DAN PENGECATAN (SNI P.C)


1 1 M2 Menggosok dan mendempul kayu (SNI P.C.01) 8,144.00
2 1 M2 Pelaburan bidang kayu dengan politur (SNI P.C.02) 49,968.80
3 1 M2 Pelaburan bidang kayu dengan melamin (SNI P.C.03) 138,044.38
4 1 M2 Pelaburan bidang kayu dengan vernis (SNI P.C.04) 25,798.50
5 1 M2 Pengecatan Kayu baru (SNI P.C.05) 47,203.50
6 1 M2 Pengecatan Kayu lama (SNI P.C.06) 40,398.50
7a 1 M2 Pengecatan dinding baru (SNI P.C.07a) 15,949.00
7b 1 M2 Pengecatan dinding baru Ex Catilac / Setara (SNI P.C.07b) 18,073.00
7c 1 M2 Pengecatan dinding baru Ex Dulux Weatershield / Setara (SNI P.C.07c) 22,969.00
8 1 M2 Pengecatan dinding lama (SNI P.C.08) 11,257.00
9 1 M2 Mengikis / mengerok permukaan cat tembok lama (SNI P.C.09) 9,577.50
10 1 M2 Finish batu alam / Coating (SNI P.C.10) 43,263.50
11 1 M2 Waterproofing (SNI P.C.11) 29,722.00
12 1 M2 Pengecatan permukaan baja dengan meni besi (SNI P.C.12) 18,521.00
13 1 M2 Pengecatan genteng (SNI P.C.13) 12,249.00
14 1 M2 Pengecatan Besi baru (SNI P.C.14) 33,978.50

PEK. PENUTUP LANTAI & DINDING (SNI DT 91-0012-2007)


1 1 M2 Pasang tegel abu-abu uk. 20x20 cm (SNI DT 91-0012-2007-01) 93,715.00
2 1 M2 Pasang keramik lantai 20 x 20 kasar (KM/WC) (SNI DT 91-0012-2007-02) 143,553.00
3 1 M2 Pasang keramik 20 x 20 polos (SNI DT 91-0012-2007-03) 139,248.00
4 1 M2 Pasang keramik 30 x 30 polos (SNI DT 91-0012-2007-04) 150,410.00
5 1 M2 Pasang keramik 30 x 30 motif (SNI DT 91-0012-2007-05) 157,865.00
6 1 M2 Pasang keramik 30 x 30 kasar (SNI DT 91-0012-2007-06) 150,252.50
7 1 M2 Pasang keramik 40 x 40 polos (SNI DT 91-0012-2007-07) 163,430.00
8 1 M2 Pasang keramik 40 x 40 motif (Platinum) (SNI DT 91-0012-2007-08) 173,405.00
9a 1 M2 Pasang keramik 40 x 40 motif (Yupiter) (SNI DT 91-0012-2007-09a) 167,840.00
9b 1 M2 Pasang keramik 40 x 40 motif Kasar (Yupiter) (SNI DT 91-0012-2007-09b) 172,040.00
10 1 M2 Pasang keramik 50 x 50 motif (SNI DT 91-0012-2007-10) 184,019.00
11a 1 M2 Pasang keramik 60 x 60 motif (SNI DT 91-0012-2007-11a) 245,625.00
11b 1 M2 Pasang keramik dinding 20 x 40 motif (SNI DT 91-0012-2007-11b) 158,413.50
12 1 M2 Pasang keramik dinding 20 x 25 polos (SNI DT 91-0012-2007-12) 146,328.00
13 1 M2 Pasang keramik dinding 20 x 25 motif (Kobin) (SNI DT 91-0012-2007-13) 152,502.00
14 1 M2 Pasang keramik dinding 20 x 25 motif (Mulia) (SNI DT 91-0012-2007-14) 153,184.50
15 1 M' Pasang keramik border dinding 5x20 (SNI DT 91-0012-2007-15) 40,621.92
16 1 M' Pasang keramik border dinding 8x25 (SNI DT 91-0012-2007-16) 56,421.92
17 1 M' Pasang keramik border dinding 7x20 (SNI DT 91-0012-2007-17) 51,121.92

PEKERJAAN KUNCI DAN KACA (SNI K.K)


1 1 Bh Pasang kunci tanam 2 X putar (pegangan besar) (SNI K.K.01) 137,300.00
2 1 Bh Pasang kunci tanam (tanpa pegangan) (SNI K.K.02) 93,300.00
3 1 Set Pasang engsel pintu (SNI K.K.03) 30,925.00
4 1 Set Pasang engsel jendela (SNI K.K.04) 20,425.00
5 1 Set Pasang Holder / pegangan pintu (SNI K.K.05) 148,300.00
6 1 Bh Pasang grendel pintu (SNI K.K.06) 30,350.00
7 1 Bh Pasang grendel jendela (SNI K.K.07) 20,150.00
8 1 Set Pasang hak angin jendela (SNI K.K.08) 27,550.00
9 1 M2 Pasang kaca bening tb. 5mm (SNI K.K.09) 96,650.00
10 1 M2 Pasang kaca rayband tb. 5mm (SNI K.K.10) 109,850.00
1 1 M2 Pasang kaca Cermin tb. 5mm (SNI K.K.11) 205,550.00

PEKERJAAN SANITASI (SNI S.)


1 1 Bh Pasang kloset duduk monoblok (SNI.S.01) 1,958,350.00
2 1 Bh Pasang kloset jongkok porselen (SNI.S.02) 456,440.00
3 1 Bh Pasang Urinoir (SNI.S.03) 1,427,500.00
4a 1 Bh Pasang Wastafel (SNI.S.04a) 393,890.00
4b 1 Bh Pasang Under Cover Lavatory Ex TOTO / Setara (SNI.S.04b) 589,890.00
5 1 Bh Pasang Sink Stainles steel (1 bak) (SNI.S.05) 222,140.00
6 1 Bh Pasang Kran air biasa (sedang) (SNI.S.06) 37,327.50
7 1 Bh Pasang Kran wastafel (SNI.S.07) 81,300.00
8a 1 Bh Pasang Kran model angsa (SNI.S.08a) 51,703.13
8b 1 Bh Pasang Jet Washer Ex. TOTO/Setara (SNI.S.08b) 254,525.00
9a 1 Bh Pasang avour / floordrain (SNI.S.09a) 31,525.00
9b 1 Bh Pasang avour / floordrain Stenless (SNI.S.09b) 82,800.00
10 1 Bh Pasang Bak mandi fiberglass / plastik (SNI.S.10) 273,250.00
11 1 Bh Membuat bak kontrol pasangan batu bata (SNI.S.11) 138,673.00
12 1 M' Pasang PVC 1/2" AW (SNI.S.12) 16,599.00
13 1 M' Pasang PVC 3/4" AW (SNI.S.13) 18,624.00
14 1 M' Pasang PVC 1" AW (SNI.S.14) 24,699.00
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

15 1 M' Pasang PVC 1,5" AW (SNI.S.15) 33,609.00


16 1 M' Pasang PVC 2" AW (SNI.S.16) 46,161.00
17 1 M' Pasang PVC 3" AW (SNI.S.17) 59,120.50
KODE HARGA
NO. U RAIAN
ANALISA (Rp.)
1 2 3 4

18 1 M' Pasang PVC 4" AW (SNI.S.18) 91,520.50


19 1 M' Pasang Pipa GI dia. 1/2" medium A (SNI.S.19) 54,234.00
20 1 M' Pasang Pipa GI dia. 3/4" medium A (SNI.S.20) 69,624.00
21 1 M' Pasang Pipa GI dia. 1" medium A (SNI.S.21) 138,555.00
22 1 M' Pasang Pipa GI dia. 2" medium A (SNI.S.22) 157,185.00
23 1 M' Pasang Pipa GI dia. 3" medium A (SNI.S.23) 286,173.00
24 1 M' Pasang Pipa GI dia. 4" medium A (SNI.S.24) 353,951.50
25 1 M' Pasang Pipa GI dia. 2" medium B (SNI.S.25) 108,072.00
26 1 M' Pasang Pipa GI dia. 3" medium B (SNI.S.26) 195,534.00
27 1 M' Pasang Pipa GI dia. 4" medium B (SNI.S.27) 240,173.50
28 1 Unit Pembuatan septictank (SNI.S.28) 3,562,371.93
29 1 Unit Pembuatan resapan (SNI.S.29) 3,240,618.47

PEKERJAAN PAVING STONE (An. Pav.)


1 1 M2 Pasang paving segi 4 tb. 6 cm K-200 (An.Pav.1) 91,000.00
2 1 M2 Pasang paving segi 4 tb. 6 cm K-300 (An.Pav.2) 99,000.00
3 1 M2 Pasang paving segi 4 tb. 8 cm K-300 (An.Pav.3) 118,000.00
4 1 M2 Pasang paving segi 4 tb. 5 cm K-100 (An.Pav.4) 79,000.00
5 1 M2 Pasang paving segi 6 tb. 6 cm K-200 (An.Pav.5) 91,000.00
6 1 M2 Pasang paving segi 6 tb. 6 cm K-300 (An.Pav.6) 99,000.00
7 1 M' Pasang paving uskup / stoper tb. 6 cm K-200 (An.Pav.7) 45,200.00
8 1 M' Pasang paving uskup / stoper tb. 6 cm K-300 (An.Pav.8) 51,880.00
9 1 M' Pasang paving uskup / stoper tb. 8 cm K-300 (An.Pav.9) 60,230.00
10 1 M' Pasang Kanstin Uk. 10x20x40 cm K-225 (An.Pav.10) 66,890.00

PEKERJAAN LISTRIK (An. Lis.)


1 1 Ttk Instalasi titik lampu (An. Lis.01) 105,875.00
2 1 Ttk Instalasi stop kontak (An. Lis.02) 101,875.00
3 1 Bh Pasang stop kontak (An. Lis.03) 23,555.00
4 1 Bh Pasang saklar ganda (An. Lis.04) 23,555.00
5 1 Bh Pasang saklar tunggal (An. Lis.05) 20,555.00
6 1 Bh Pasang lampu Essential 18 watt (An. Lis.06) 43,940.00
7 1 Bh Pasang lampu TL 1X20 watt (An. Lis.07) 90,055.00
8 1 Bh Pasang Lampu Down Light 18 watt (An. Lis.08) 90,055.00
Analis : DPU PENGAIRAN PROPINSI JATIM Kode : II.1
Uraian Pekerjaan : Pemasangan trucuk dan gedek

No. Macam Pekerjaan Satuan Kuantitas Harga Satuan Jumlah Harga (Rp.)
I BAHAN
1 Gedek lbr 0.458
2 Bongkotan bambu bh 0.800
3 Kawat kg 0.185
II TENAGA
1 Mandor org/hr 0.019
2 Kep. Tukang kayu org/hr 0.003
3 Tukang kayu org/hr 0.023
4 Pekerja org/hr 0.259
III ALAT
1 Alat pelancip / pisau besar unit 0.040
2 Bodem bh 0.015

Jumlah ....
IV Harga satuan pekerjaan per - M2

Analis : DPU PENGAIRAN PROPINSI JATIM Kode : II.1


Uraian Pekerjaan : Pemasangan trucuk dan gedek

No. Macam Pekerjaan Satuan Kuantitas Harga Satuan Jumlah Harga (Rp.)
I BAHAN
1 Gedek lbr 0.458 60,500.00 27,729.17
2 Bongkotan bambu bh 0.800 22,200.00 17,760.00
3 Kawat kg 0.185 16,000.00 2,960.00
II TENAGA
1 Mandor org/hr 0.019 80,000.00 1,520.00
2 Kep. Tukang kayu org/hr 0.003 75,000.00 187.50
3 Tukang kayu org/hr 0.023 70,000.00 1,610.00
4 Pekerja org/hr 0.259 55,000.00 14,258.75
III ALAT
1 Alat pelancip / pisau besar unit 0.040 30,000.00 1,200.00
2 Bodem bh 0.015 80,000.00 1,200.00

Jumlah .... 68,425.42


IV Harga satuan pekerjaan per - M2 68,425.00
USULAN HARGA SATUAN UNTUK PENYUSUNAN HPS
TAHUN ANGGARAN : 2015

HARGA SATUAN RENCANA HARGA


NO. NAMA BAHAN BANGUNAN SATUAN
APBD 2015 SATUAN HPS 2015

1 2 3 4

1 Semen 40 kg Gresik Zak 64,000.00 63,000.00

2 Besi Beton Polos (tulangan) kg 9,000.00 8,700.00

KETERANGAN : Harga Bahan Riil ditambah keuntungan 10%

Tuban, Pebruari 2015

Kepala Bidang Tata Ruang dan Pemukiman

Ir. S A T R I Y O
Pembina Tingkat I
NIP. 19590405 199003 1 005
RENCANA ANGGARAN BIAYA ( RAB )
Nama Kegiatan : Pembangunan Lamella Sedimentation
Nama Pekerjaan : Pembangunan Lamella Sedimentation
Lokasi :-
Tahun : 2015

NO. URAIAN PEKERJAAN VOLUME HARGA SAT ( Rp. ) JUMLAH ( Rp. )


1 2 4 5 ('= 4 x 5)

I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pasang Bowplank 1.00 Ls 3,500,000.00 3,500,000.00
2 Pek. Pembersihan Lokasi 1.00 Ls 3,000,000.00 3,000,000.00
3 Mob Demob Alat, pekerja, dan material 1.00 Ls 2,500,000.00 2,500,000.00
TOTAL 9,000,000.00
II. PEKERJAAN TANAH
1 Pek. Gali Tanah 55.06 m3 43,250.00 2,381,431.50
2 Pek. Bor Strous dia. 30 - 300 cm 40.00 Titik 175,000.00 7,000,000.00
3 Pek. Urug Tanah Kembali 16.52 m3 12,975.00 214,328.84
4 Pek. Urug Sirtu Padat CBR 50 T. 50 cm 23.94 m3 167,550.00 4,011,147.00
5 Pek. Urug Pasir Dibawah Pondasi T. 10 cm 4.79 m3 137,300.00 657,392.40
TOTAL 14,264,299.74
III. PEKERJAAN BETON
1 Pek. Lantai Kerja 1pc : 2psr : 4krl 2.79 m3 822,455.94 2,292,801.55
2 Pek. Plat Setempat t. 40 cm (K. 225) 19.15 m3 3,499,524.72 67,022,897.44
3 Pek. Strous dia. 30 - 300 cm (K. 225) 8.48 m3 2,493,774.72 21,142,222.08
4 Sloof 25/40 (K. 225) 3.15 m3 3,812,492.22 12,009,350.49
TOTAL 102,467,271.55
IV. PEKERJAAN PASANGAN
1 Pek. Steel Grating 7.00 m2 750,000.00 5,250,000.00
2 Pek. Pasang Rilling (Sesuai Gambar) 43.50 m2 425,000.00 18,487,500.00
3 Pek. Pasang Tangga Inspeksi (Sesuai Gambar) 7.10 m2 425,000.00 3,015,375.00
TOTAL 26,752,875.00
V. PEKERJAAN BAJA
1 Pek. Kolom UNP 125.65.6 2535.28 Kg 24,290.00 61,581,951.20
2 Pek. Siku L 50.50.5 1983.00 Kg 24,290.00 48,167,070.00
3 Pek. Balok UNP 125.65.6 2074.32 Kg 24,290.00 50,385,232.80
4 Pek. Plat Simpul T. 6 mm 247.28 Kg 21,990.00 5,437,577.25
5 Pek. Angkur dia. 16 mm 160.00 Bh 35,000.00 5,600,000.00
TOTAL 171,171,831.25
VI. PEKERJAAN PENGECATAN
1 Pek. Cat Meni Besi 258.21 m2 18,521.00 4,782,353.71
TOTAL 4,782,353.71
VII. PEKERJAAN PERPIPAAN
1 Pek. GI dia. 16" 50.00 m1 2,772,916.67 138,645,833.33
2 Pek. GI dia. 10" 50.00 m1 945,312.50 47,265,625.00
3 Pek. GI dia. 4" 50.00 m1 240,173.50 12,008,675.00
TOTAL 197,920,133.33
REKAPITULASI ANGGARAN BIAYA ( REKAP )
Nama Kegiatan : Pembangunan Lamella Sedimentation
Nama Pekerjaan : Pembangunan Lamella Sedimentation
Lokasi :-
Tahun : 2015

NO. URAIAN PEKERJAAN JUMLAH

I. PEKERJAAN PERSIAPAN Rp 9,000,000.00


II. PEKERJAAN TANAH Rp 14,264,299.74
III. PEKERJAAN BETON Rp 102,467,271.55
IV. PEKERJAAN PASANGAN Rp 26,752,875.00
V. PEKERJAAN BAJA Rp 171,171,831.25
VI. PEKERJAAN PENGECATAN Rp 4,782,353.71
VII. PEKERJAAN PERPIPAAN Rp 197,920,133.33

JUMLAH Rp 526,358,764.58
PPN 10% Rp 52,635,876.46
TOTAL (Jumlah & PPN 10%) Rp 578,994,641.04
DIBULATKAN Rp 578,994,000.00

Terbilang :
Lima Ratus Tujuh Puluh Delapan Juta Sembilan Ratus Sembilan Puluh Empat Ribu Rupiah