Installation of an FPSO and subsea


hardware in the Mediterranean Sea using
non-specialised
non specialised vessels
UTC - BERGEN
June 2008

Ivar Tveitnes

© 2008 Aker Solutions


Aker Marine Contractors - What we do

Mooring & Floaters SURF Operations

Floatovers Removal

Date Slide 2 © 2008 Aker Marine Contractors part of Aker


Work Areas - Assets

BOA DEEP C

BOA SUB C

TURNTABLE

Date Slide 3 part of Aker


Date Slide 3 © 2008 Aker Marine Contractors
AGENDA
■ Oudna Installation Preface
■ Vessels
■ Installation of Mooring System
■ Installation
I t ll ti off Fl
Flexible
ibl Ri
Risers/Flowlines
/Fl li and
d
Umbilicals
■ Hook-up
Hook up to FPSO
■ Conclusion

Date Slide 4 © 2008 Aker Marine Contractors part of Aker


OUDNA INSTALLATION - PREFACE

■ Tunisian water outside North Africa


■ No offshore bases and limited support
pp infra-structure
■ Specialized installation vessels?
● Large mobilization cost
● Limited
Li it d availability
il bilit
■ Requirements
● Anchor handling (large anchors, heavy chain and fibre ropes)
● Chafe chain and heavy riser guides
● Flexible risers/flowlines and umbilicals

Date Slide 5 © 2008 Aker Marine Contractors part of Aker


Oudna location

IKDAM FPSO

Chafe chain with riser guides


NODE

400 m 239mm polyester rope

800 m 135mm 6.6d chain

Stevpris mk5 29 t

6” Prod; 950m
6

4” Power Fluid 1539m 4” W I ; 1038 m

95mm Umb; 950 m 78mm Umb; 1550 m

Water Injection
j Well
Production Well

Date Slide 6 part of Aker


Date Slide 6 © 2008 Aker Marine Contractors
INSTALLATION VESSEL

MAERSK ’A’ CLASS VESSEL


”Maersk Attender”
Main dimensions = 90.3 x 20.3 m
Free deck = 41.6 x 19.5 m
Winches = 625t(AH)/2 x 400t(tow)
Bollard Pull = 257t (23480 hp)
DP2
70 beds

Date Slide 7 © 2008 Aker Marine Contractors part of Aker


ASSISTING VESSEL

ANCHOR HANDLING VESSEL


”Odin Viking”
(Viking Supply Ships AS)
Main dimensions = 73.9 x 16.9 m
Winches = 400t (AH)
Bollard Pull = 180t
DP2
26 beds

Date Slide 8 © 2008 Aker Marine Contractors part of Aker


DECK LAYOUT

FOR MOORING INSTALLATION


A-FRAME AND 2 X WROV IN ALL
PHASES

CHAIN IN LOCKERS

Date Slide 9 © 2008 Aker Marine Contractors part of Aker


INSTALLATION OF MOORING SYSTEM

Date Slide 10 © 2008 Aker Marine Contractors part of Aker


INSTALLATION OF ”CHAFE CHAIN”

Chafe Chain
installation
frame, 320Te
design load

10 off Guide
Frames

Date Slide 11 © 2008 Aker Marine Contractors part of Aker


MOBILISATION FOR FLEXIBLES INSTALLATION

Deck quadrant

4” PF & 6” Prod
(on 26’ reel)

4” WI (on 26’
reel)

Prod & WI umb

Hub drive on rails

2xTensioner’s
Chute

Buoyancy
elements Working platform

Date Slide 12 part of Aker


Date Slide 12 © 2008 Aker Marine Contractors
MOBILISATION FOR FLEXIBLES INSTALLATION
Setting up Aquatic tensioners ”Dance floor” assembly
and hub-drive systems around deck quadrant Stern chute installation

Round
R d th
the clock
l k mobilisation
bili ti in
i
Seafastening of reels Umbilical reel drive Freeport, Valletta, Malta

Date Slide 13 part of Aker


Date Slide 13 © 2008 Aker Marine Contractors
INSTALLATION OF FLEXIBLE RISERS/FLOWLINES
Cleaning of well-head
hub

1. Preparations

Deployment of Vertical Connection L di off V


Landing Vertical
ti l
tool Connection tool

2 D
2. Deployment
l t off 1
1stt end
d
(subsea end) and tie-in
to x-mas tree

Date Slide 14 © 2008 Aker Marine Contractors part of Aker


INSTALLATION OF FLEXIBLE RISERS/FLOWLINES

Buoyancy section,
including temporary
buoyancy
Installation of
3. Buoyancy Buoyancy
elements
section

4” PF Installation 4” PF around deck-quadrant

4. Paying out
p
product

Date Slide 15 © 2008 Aker Marine Contractors part of Aker


INSTALLATION OF FLEXIBLE RISERS/FLOWLINES

5. Overboarding of
topside end
Pressuretest
Press retest
ongoing before
overboarding

6. Transfer to- and hang-off


i Ch
in Chafe
f Ch
Chain
i hheld
ld b
by
Assisting vessel

Date Slide 16 © 2008 Aker Marine Contractors part of Aker


INSTALLATION OF UMBILICALS

• Reverse lay direction as opposed to


riser/flowlines
• Light weight in water required chain
weights to temporarily weigh down during
installation of buoyancy section
• Umbilical tie-in done by Flying Lead.
WROV – Male-MQC plate connected to
F
Female-MQC
l MQC on x-mas tree t

Date Slide 17 © 2008 Aker Marine Contractors part of Aker


HOOK-UP OF MOORING AND FLEXIBLES TO FPSO

1. Chafe Chain transferred


from Assisting Vessel to
FPSO ’Ikdam’

2. Flexibles transferred one


by one from Assisting All Risers through All Risers through
Guide Frame 10 Guide Frames
Vessel to FPSO ’Ikdam’

3 Testing / comissioning of
3.
flexible flowlines / risers
and umbilicals

Date Slide 18 part of Aker


Date Slide 18 © 2008 Aker Marine Contractors
CONCLUSION

■ Complex marine operations may be performed using standard


large AHTS,
AHTS based on innovative engineering and planning
■ Effective use of available vessels – Installation of Mooring
system and Flexibles using same vessel
■ Solution oriented and dedicated project team consisting of
own personnel and subcontractors
■ The project planning and execution off the operations involved
several challenges…
■ …But;
But; ”WE
WE DID IT!”
IT!

Date Slide 19 © 2008 Aker Marine Contractors part of Aker


Copyright

Copyright of all published material including photographs, drawings and images in this document remains
vested in Aker Solutions and third party contributors as appropriate. Accordingly, neither the whole nor any
part of this document shall be reproduced in any form nor used in any manner without express prior
permission and applicable acknowledgements
acknowledgements. No trademark,
trademark copyright or other notice shall be altered or
removed from any reproduction.

Date Slide 20 © 2008 Aker Marine Contractors part of Aker


Disclaimer

This Presentation includes and is based, inter alia, on forward-looking information and statements that are
subject to risks and uncertainties that could cause actual results to differ. These statements and this
Presentation are based on current expectations, estimates and projections about global economic conditions,
the economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Aker
Solutions ASA’s (including subsidiaries and affiliates) lines of business. These expectations, estimates and
projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates”
or similar expressions. Important factors that could cause actual results to differ materially from those
expectations
p include,, among
g others,, economic and market conditions in the geographic
g g p areas and industries
that are or will be major markets for Aker Solutions’ businesses, oil prices, market acceptance of new products
and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and
such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA
believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no
assurance that
th t th
those expectations
t ti will
ill be
b achieved
hi d or that
th t the
th actual
t l results
lt will
ill b
be as sett outt iin th
the
Presentation. Aker Solutions ASA is making no representation or warranty, expressed or implied, as to the
accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of its
directors, officers or employees will have any liability to you or any other persons resulting from your use.
Aker Solutions
Ak S l ti consists
i t off many legally
l ll independent
i d d t entities,
titi constituting
tit ti th
their
i own separate
t id
identities.
titi Ak
Aker
Solutions is used as the common brand or trade mark for most of these entities. In this presentation we may
sometimes use “Aker Solutions”, “we” or “us” when we refer to Aker Solutions companies in general or where
no useful purpose is served by identifying any particular Aker Solutions company.

Date Slide 21 © 2008 Aker Marine Contractors part of Aker


Thank you for your attention!

Questions?

THANK YOU – QUESTIONS?