Perhitungan Volume

perhitungan volume tangki bahan bakar HFO (WFO)

whfo = sfoc x BHPx(s/vd)x 10^-6

whfo= 30.8324 ton


dimana
BHP = 2600 kw
SFOC = 186 gr / kWh
S= 759 mil
vs= 12.5 knot
c= 1.05

vhfo= whfo/ρ Hfo ρ= 0.991 ton / m^3


vhfo= 31.11241 m^3

penambahan volume tangki bahan bakar sebesar


4 % dikarenakan kontruksi dan ekspansi panas
( ship design dan contruction ) pada doble bottom
vhfo= (1+0,04) x vhfo
32.35691 m^3

perhitungan tangki bahan bakar MDO

wmdo= (10% - 20%) x vhfo diambil 17%


5.241508 ton 0.17

vdo= wdo/ρm do ρ mdo= 0.85 ton/m^3


6.16648 m^3

penambahan volume tangki bahan bakar sebesar


4 % dikarenakan kontruksi dan ekspansi panas
( ship design dan contruction ) pada doble bottom

vdo= (1+0,04)xvdo
6.41314 m^3

perhitungan tangki lubricatting oil (LO)


Wlo= BHPx LOCx(s/Vd)x1,05 x 10^-6
0.082883 LOC= 0.5
ρLO= 0.92 ton/m3
Vlo= wlo/ρLO
0.09009
perhitungan volume tangki bahan bakar HFO (WFO)

Tangki HFO
N0. Frame y Fs Y x Fs
33 5179 1 5179 1
34 5340 4 21360 4
35 5498 2 10996 2
36 5656 4 22624 4
37 5815 2 11630 2
38 5977 4 23908 4
39 6143 1 6143 2
101840
101.84
dengan jarak interfal h= 600 mm
V tanki = 1/3 x h x Σ1 0.6 m
20.368 m^3

Vtangki = 40.736 m^3


perhitungan tangki bahan bakar MDO
tangki Mdo
no fram y fs y x fs
31 4842 1 4842
31.5 4929 4 19716
32 5014 1 5014
29572
29.572

V tanki = 1/3 x h x Σ1 dengan jarak interfal h= 300


2.9572 0.3
5.9144 m^3

11.8288
perhitungan LO

no fram y fs y x fs
29 3968 1 3968
4062 4 16248
30 4155 1 4155
24371
24.371 h= 300 mm
0.3 m
v 1/3 x h x Σ1
2.4371

v tangki 4.8742

sluge tank
no fram y fs y x fs
27 3777 1 3777
27.5 3681 4 14724
28 3684 1 3684
22185
22.185 h 300
v 1/3 x h x Σ1 0.3
2.2185

v tangki 4.437
wl 0 wl 0.5 wl 1 A
no frame
1 4 1
34 0 0 0 0
34.5 0 0 0 0
35 3189 3189 0 5490 5490 8679
36 3360 3360 0 5656 5656 9016
37 3535 3535 0 5977 5977 9512
38 3712 3712 0 5815 5815 9527
39 3890 3890 0 6143 6143 10033

v 18.65133
37.30267
h 0.5

24.22 24.22
33.43 133.72
37.58 37.58
195.52
mm
m 32.58341

no fram y fs y x fs
29 3968 1 3968
4062 4 16248
30 4155 1 4155
24371
24.371 h= 300 perhitungan volume tan
0.3
v 1/3 x h x Σ1
2.4371 Tangki HFO
N0. Frame
v tangki 4.8742 28
28
29
30
32
32
33
34
35
36
37
38
39

V tanki =

Vtangki =

N0. Frame
AxF
F

0
0
1 8679
4 36064
2 19024
4 38108
1 10033
111908 mm

111.908 m

perhitungan volume tangki bahan bakar HFO (WFO)


Tangki HFO
y Fs Y x Fs
3777 0.5 1888.5
3873 2 7746
3968 1.5 5952
4155 4 16620
4339 2 8678
4520 4 18080
4697 2 9394 1
4873 4 19492 4
5047 2 10094 2
5220 4 20880 4
5393 2 10786 2
5567 4 22268 4
5742 1 5742 2
157620.5
157.6205
dengan jarak interfal h= 600 mm
1/3 x h x Σ1 0.6 m
31.5241 m^3

63.0482 m^3

Tangki HFO
N0. Frame y Fs Y x Fs
29 1 0
30 4 0
32 2 0
32 4 0
33 4697 1 4697 1
34 4873 4 19492 4
35 5047 2 10094 2
36 5220 4 20880 4
37 5393 2 10786 2
38 5567 4 22268 4
39 5742 1 5742 2
93959
93.959
dengan jarak interfal h= 600 mm
V tanki = 1/3 x h x Σ1 0.6 m
18.7918 m^3
Vtangki = 37.5836 m^3

tangki Mdo
no fram y fs y x fs
26 3387 1 3387
27 3584 4 14336
28 3777 1 3777
21500
21.5

V tanki = 1/3 x h x Σ1 dengan jarak interfal h= 600 mm


4.3 0.6 m
8.6 m^3
perhitungan volume tangki bahan bakar HFO (WFO)

Base Line
frame y fs y x fs 33 485 1 485
37 673 1 748 34 520 4 2244
38 748 4 3336 35 561 1 612
39 834 1 834 36 612 4 0
4918 mm
total
4.918 m
h 600 mm
0.6 m
volume 1/2 tanki = (2/3) x h x ( A x Fs) mm
1.9672 m 3
m

volume tangki = 2 x (volume 1/2 tanki)


3.9344 m3

1/2 DB
frame y fs y x fs
37 2521 1 2521
38 2660 4 10640
39 2805 1 2805
15966 mm 33 2026 1 2026
total
15.966 m 34 2141 4 8564
h 600 mm 35 2262 1 2262
0.6 m 36 2388 4 9552
volume 1/2 tanki = (1/3) x h x ( A x Fs)
6.3864 m3

volume tangki = 2 x (volume 1/2 tanki)


12.7728 m3
mm
m
DB
frame y fs y x fs
37 3140 1 3140
38 3264 4 13056
39 3390 1 3390
19586 mm
total
19.586 m
h 600 mm
0.6 m
volume 1/2 tanki = (1/3) x h x ( A x Fs)
7.8344 m3 33 2648 1 2648
34 2770 4 11080
volume tangki = 2 x (volume 1/2 tanki) 35 2892 1 2892
15.6688 m3
36 3016 4 12064

frame y fs y x fs
1 1557.2 1 1557.2
2 4356.4 4 17425.6
3 5534.4 1 5534.4
22527.2 mm
total
22.5272 m
h 1500 mm
1.5 m
volume 1/2 tanki = (1/3) x h x ( A x Fs)
11.2636 m3

volume tangki = 2 x (volume 1/2 tanki)


22.5272 m3
perhitungan tangki bahan bakar MDO perhitungan tangki bahan ba

Base Line Base Line


frame y fs y x fs 30 408 1 408 frame y
35 561 1 561 31 431 4 1724 33 485
35.5 585 4 2340 32 456 1 456 33.5 501
36 612 1 612 34 520
3513 mm
total total
3.513 m
h 300 h
0.3 mm
(1/3) x h x (mA x Fs)
volume 1/2 tanki = 0.7026 m3 volume 1/2 tanki =

2 x (volume 1/2 tanki)


volume tangki = 1.4052 m3 volume tangki =

1/2 DB 1/2 DB
frame y fs y x fs 30 1707 1 1707 frame y
35 2262 1 2262 31 1809 4 7236 33 2026
35.5 2324 4 9296 32 1916 1 1916 33.5 2083
36 2388 1 2388 34 2141
13946 mm
total total
13.946 m
h 300 h
0.3 mm
(1/3) x h x (mA x Fs)
volume 1/2 tanki = 2.7892 m3 volume 1/2 tanki =

2 x (volume 1/2 tanki)


volume tangki = 5.5784 m3 volume tangki =

DB
DB frame y
frame y fs y x fs 30 2287 1 2287 33 2648
35 2892 1 2892 31 2407 4 9628 33.5 2709
35.5 2954 4 11816 32 2527 1 2527 34 2770
36 3016 1 3016
total
16724 mm
total
16.724 m h
h 300
0.3 mm
(1/3) x h x (mA x Fs) volume 1/2 tanki =
volume 1/2 tanki = 3.3448 m3
2 x (volume 1/2 tanki) volume tangki =
volume tangki = 6.6896 m 3

Hasil akhir LO
hasil akhir mdo frame y
frame y fs y x fs 1 300.9
1 402.6 1 402.6 2 1145.5
2 1545.2 4 5110.5 3 1523.4
3 2044.5 1 2044.5
total
7557.6 mm
total
7.5576 m h
h 1500
1.5 mm
(1/3) x h x (mA x Fs) volume 1/2 tanki =
volume 1/2 tanki = 3.7788 m 3

2 x (volume 1/2 tanki) volume tangki =


volume tangki = 7.5576 m 3
ngan tangki bahan baka LO sluge tank
Base Line
frame y fs y x fs
fs y x fs 28 362 31 431 1 431
1 485 28.5 374 31.5 443 4 1772
4 2004 29 385 32 456 1 456
1 520 2859
total
3009 mm 2.859
total
3.009 m h 300
300 0.3 mm
0.3 mm (1/3) x h x m
( A x Fs)
(1/3) x h x m
( A x Fs) volume 1/2 tanki = 0.5718 m3
0.3009 m3
2 x (volume 1/2 tanki)
2 x (volume 1/2 tanki) volume tangki = 1.1436 m3
0.6018 m3
1/2 DB
frame y fs y x fs
fs y x fs 28 1511 31 1809 1 1809
1 2026 28.5 1560 31.5 1862 4 7448
4 8332 29 1608 32 1916 1 1916
1 2141 12293
total
12499 mm 12.293
total
12.499 m h 300
300 0.3 mm
0.3 mm (1/3) x h x m
( A x Fs)
(1/3) x h x m
( A x Fs) volume 1/2 tanki = 2.4586 m3
1.2499 m3
2 x (volume 1/2 tanki)
2 x (volume 1/2 tanki) volume tangki = 4.9172 m3
2.4998 m3

DB
fs y x fs 28 2047 frame y fs y x fs
1 2648 28.5 2107 31 2407 1 2407
4 10836 29 2167 31.5 2467 4 9868
1 2770 32 2527 1 2527
16254 mm 16802
total total
16.254 m 16.802
300 h 300
0.3 mm 0.3 mm
(1/3) x h x m
( A x Fs) (1/3) x h x m
( A x Fs)
1.6254 m3 volume 1/2 tanki = 3.3604 m3

2 x (volume 1/2 tanki) 2 x (volume 1/2 tanki)


3.2508 m3 volume tangki = 0 m3

Hasil Akhir ST
fs y x fs frame y fs y x fs
1 300.9 1 471.5 1 471.5
4 4582 2 1455.5 4 5822
1 1523.4 3 2060.4 1 2060.4
6406.3 mm 8353.9
total total
6.4063 m 8.3539
1500 h 1500
1.5 mm 1.5 mm
(1/3) x h x m
( A x Fs) (1/3) x h x m
( A x Fs)
3.20315 m3 volume 1/2 tanki = 4.17695 m3

2 x (volume 1/2 tanki) 2 x (volume 1/2 tanki)


6.4063 m3 volume tangki = 8.3539 m3
26 316
26.5 327
27 339

mm
m

me 1/2 tanki)

26 1325
26.5 1371
27 1417

mm
m

me 1/2 tanki)

26 1806
26.5 1867
27 1927

mm
m

me 1/2 tanki)
mm
m

me 1/2 tanki)
perhitungan ruang muat

cargo hold 1

wl 1 wl 3,125 Dmld
Frame A fs
1 4 1
40 2185.98 2185.98 5630.17 22520.68 7242.22 7242.22 16995.88 1
44 3410.99 7456356 6449.47 36311612.5 7249.7 52503922 19311.67 4
48 4043.3 13791656 6924.35 44658387.6 7262.16 52648481 20575.38 2
52 4780.58 19329319 7138.37 49428572.3 7274.59 52829237 21663.11 4
56 5952.3 28455446 7224.88 51573866.6 7275.79 52928389 23084.59 1
60 6148.14 36595574 7260.04 52452917.8 7278.16 52954364 23347.98 4
64 6341.86 38990643 7287.85 52910082.5 7294.06 53087336 23615.96 1
TOTAL
volume 1/2 tanki = (1/3) x h x ( A x Fs)
338.522257 m3 h=

volume tangki = 2 x (volume 1/2 tanki)


677.044515 m3
cargo hold 2

wl 1 3.125 Dmld
frame A fs
1 4 1
64 6341.86 6341.86 7287.86 29151.44 6341.86 6341.86 47217.95 1
68 6376.49 7300 7300 29200 7300 7300 49435.6 4
72 6376.49 7300 7300 29200 7300 7300 49435.6 2
76 6376.49 7300 7300 29200 7300 7300 49435.6 4
80 6376.49 7300 7300 29200 7300 7300 49435.6 1
84 6319.44 6319.44 7273.76 29095.04 7294.74 7294.74 48204.47 4
86 6050.01 6050.01 7245 28980 7268.44 7268.44 47740.85 1
TOTAL
volume 1/2 tanki = (1/3) x h x ( A x Fs)
591.009551 m3 h= 3000
3
volume tangki = 2 x (volume 1/2 tanki)
1182.0191 m3

cargo hold 3

wl 1 wl 3.125 Dmld
frame A fs
1 4 1
86 6050.01 6050.01 7245 28980 7268.44 7268.44 47740.85 1
90 5424.25 5424.25 7189.33 28757.32 7218.91 7218.91 49335.57 4
94 4740.06 4740.06 7039.81 28159.24 7193.98 7193.98 47777.83 2
98 4105.32 4105.32 6699.64 26798.56 7145.19 7145.19 45341.81 4
102 3649.18 3649.18 6048 24192 6919.31 6919.31 41422.92 1
106 2839.44 2839.44 5158.31 20633.24 6439.65 6439.65 35645.53 4
110 2265.83 2265.83 4263.1 17052.4 5698.69 5698.69 29811.83 1
TOTAL
volume 1/2 tanki = (1/3) x h x ( A x Fs)
563.42894 h= 3000
3
volume tangki = 2 x (volume 1/2 tanki)
1126.85788

cargo hold 4

wl 1 wl 3.125 Dmld
frame A fs
1 4 1
110 2265.83 2265.83 4263.1 17052.4 5698.69 5698.69 29811.83 1
114 1782.17 1782.17 3495.19 13980.76 4873.09 4873.09 24591.26 4
118 1330.51 1330.51 2786.01 11144.04 4031.63 4031.63 19669.86 2
122 912.23 912.23 2126.12 8504.48 3196.75 3196.75 15031.04 4
126 536.5 536.5 1494.82 5979.28 2361.91 2361.91 10579.25 1
130 294.61 294.61 972.63 3890.52 1641.31 1641.31 6943.174 4
134 195.11 195.11 569.34 2277.36 1075.95 1075.95 4228.534 1
TOTAL
volume 1/2 tanki = (1/3) x h x ( A x Fs)
238.219994 h= 3000
3
volume tangki = 2 x (volume 1/2 tanki)
476.439988
A x fs
3.575
16995.880273
77246.669013
41150.757773
86652.435253
23084.585473
93391.929653
338522.25744 mm
338.52225744 m

3000 mm
3m

A x fs

47217.950587
197742.4
98871.2
197742.4
49435.6
591009.55
591.00955059 mm
1182610.1107 m Cargo Hold 1

mm
m

A x fs

47740.850567
197342.288
95555.650667
181367.23367
41422.91725
563428.94015
563.42894015 mm
1127421.3092 m

mm
m

A x fs

29811.829667
98365.028667
39339.729
60124.159333
10579.24725
238219.99392
238.21999392 mm
476678.20783 m

mm
m
(1/3) x h x = #VALUE!
(1/3) x h x = #VALUE!
0.000 = 677.045
#VALUE!

2985.921
perhitungan blasst

ballast tank 4

wl 0 wl 0.5 wl 1
frame A fs
1 4 1
40 927.28 927.28 2115.61 8462.44 2185.98 2185.98 1929.283 1
44 1445.77 1445.77 2648.91 10595.64 3410.99 3410.99 2575.4 4
48 2098.63 2098.63 3249.11 12996.44 4043.3 4043.3 3189.728 2
52 2907.75 2907.75 4003.07 16012.28 4780.58 4780.58 3950.102 4
56 3814.11 3814.11 4895.92 19583.68 5952.3 5952.3 4891.682 1
60 4462.76 4462.76 5533.15 22132.6 6148.14 6148.14 5457.25 4
64 4735.07 4735.07 5780.63 23122.52 6341.86 6341.86 5699.908 1
TOTAL

volume 1/2 tanki = (1/3) x h x ( A x Fs)


0 h= 5400
5.4
volume tangki = 2 x (volume 1/2 tanki)
0
ballast tank 3

frame wl 0 wl 0.5 wl 1 A fs
1 4 1
64 4735.07 4735.07 5780.63 23122.52 6341.86 6341.86 5699.908 1
68 4795 4795 5836.26 23345.04 6376.49 6376.49 5752.755 4
72 4795 4795 5836.26 23345.04 6376.49 6376.49 5752.755 2
76 4795 4795 5836.26 23345.04 6376.49 6376.49 5752.755 4
80 4795 4795 5836.26 23345.04 6376.49 6376.49 5752.755 1
84 4608.03 4608.03 5640.95 22563.8 6319.44 6319.44 5581.878 4
86 6208 6208 5283.3 21133.2 6050.01 6050.01 5565.202 1
TOTAL
volume 1/2 tanki = (1/3) x h x ( A x Fs)
276058.8 h= 6000
6
volume tangki = 2 x (volume 1/2 tanki)
552117.6

ballast tank 2

frame wl 0 wl 0.5 wl 1 A fs
1 4 1
86 6208 6208 5283.3 21133.2 6050.01 6050.01 5565.202 1
90 4594 4594 4689.78 18759.12 5424.25 5424.25 4796.228 4
94 3046 3046 4039.58 16158.32 4740.06 4740.06 3990.73 2
98 1570 1570 3447.44 13789.76 4105.32 4105.32 3244.18 4
102 1510.95 1510.95 2871.81 11487.24 3649.18 3649.18 2774.562 1
106 931.58 931.58 2309.37 9237.48 2839.44 2839.44 2168.083 4
110 574.64 574.64 1794.28 7177.12 2265.83 2265.83 1669.598 1
TOTAL
volume 1/2 tanki = (1/3) x h x ( A x Fs)
174625.6 h= 5400
5.4
volume tangki = 2 x (volume 1/2 tanki)
349251.1

ballast tank 1

frame wl 0 wl 0.5 wl 1 A fs
1 4 1
110 574.64 574.64 1794.28 7177.12 2265.83 2265.83 1669.598 1
114 388.46 388.46 1355.99 5423.96 1782.17 1782.17 1265.765 4
118 272.68 272.68 1003.59 4014.36 1330.51 1330.51 936.2583 2
122 205.05 205.05 690.41 2761.64 912.23 912.23 646.4867 4
126 175.45 175.45 402.06 1608.24 536.5 536.5 386.6983 1
130 159.44 159.44 224.34 897.36 294.61 294.61 225.235 4
134 142.57 142.57 171 684 195.11 195.11 170.28 1
TOTAL
volume 1/2 tanki = (1/3) x h x ( A x Fs)
41700.99 h= 5400
5.4
volume tangki = 2 x (volume 1/2 tanki)
83401.98
A x fs

1929.28333
10301.6
6379.45667
15800.4067
4891.68167
39302.4283
39.3024283
78644.1591 mm
73.004092 m

mm
m

A x fs wl 0 wl 0.5 wl 1
frame A
1 4 1
5699.90833 110 574.64 574.64 1794.28 7177.12 2265.83 2265.83 1669.598
23011.02 114 388.46 388.46 1355.99 5423.96 1782.17 1782.17 1265.765
11505.51 118 272.68 272.68 1003.59 4014.36 1330.51 1330.51 936.2583
23011.02 122 205.05 205.05 690.41 2761.64 912.23 912.23 646.4867
5752.755 126 175.45 175.45 402.06 1608.24 536.5 536.5 386.6983
68980.21 130 159.44 159.44 224.34 897.36 294.61 294.61 225.235
68.9802133 mm 134 142.57 142.57 171 684 195.11 195.11 170.28
138029.407 m
TOTAL

mm
m

A x fs

5565.20167
19184.9133
7981.46
12976.72
2774.56167
48482.8567
48.4828567 mm
97014.1962 m

mm
m

A x fs

1669.59833
5063.06
1872.51667
2585.94667
386.698333
11577.82
11.57782 mm
23167.2178 m

mm
m
fs A x fs

1 1669.598
4 5063.06
2 1872.517
4 2585.947
1 386.6983
4 11577.82
1 11.57782
23167.22 mm
23.16722 m
bahan bakar HFO bahan bakar mdo
Base Line
Base Line frame y fs
frame y fs y x fs 30 408 1
33 485 1 485 31 431 4
34 520 4 2244 32 456 1
35 561 2 1224 total
36 612 4 2692
37 673 2 1496 h 600
38 748 4 3336 0.6
39 834 1 834 (1/3) x h x ( A x Fs)
total 12311 mm volume 1/2 tanki = 0.5176
12.311 m
h 600 mm 2 x (volume 1/2 tanki)
0.6 m volume tangki = 1.0352
volume 1/2 tanki = (1/3) x h x ( A x Fs)
2.4622 m3 1/2 DB
frame y fs
volume tangki = 2 x (volume 1/2 tanki) 30 1707 1
4.9244 m3 31 1809 4
32 1916 1
1/2 DB
total
frame y fs y x fs
33 2026 1 2026 h 600
34 2141 4 8564 0.6
35 2262 2 4524 (1/3) x h x ( A x Fs)
36 2388 4 9552 volume 1/2 tanki = 2.1718
37 2521 2 5042
38 2660 4 10640 2 x (volume 1/2 tanki)
39 2805 1 2805 volume tangki = 4.3436
0
43153 mm
total
43.153 m DB
h 600 mm frame y fs
0.6 m 30 2287 1
volume 1/2 tanki = (1/3) x h x ( A x Fs) 31 2407 4
8.6306 m3 32 2527 1
total
volume tangki = 2 x (volume 1/2 tanki)
17.2612 m3 h 600
0.6
(1/3) x h x ( A x Fs)
DB volume 1/2 tanki = 2.8884
frame y fs y x fs
33 2648 1 2648 2 x (volume 1/2 tanki)
34 2770 4 11080 volume tangki = 5.7768
35 2892 2 5784
36 3016 4 12064 hasil akhir mdo
37 3140 2 6280 frame y fs
38 3264 4 13056 1 571.6 1
39 3390 1 3390 2 2172.4 4
54302 mm 3 2888.4 1
total
54.302 m
total
h 600 mm
0.6 m h 600
volume 1/2 tanki = (1/3) x h x ( A x Fs) 0.6
10.8604 m3 (1/3) x h x ( A x Fs)
volume 1/2 tanki = 2.42992
volume tangki = 2 x (volume 1/2 tanki)
21.7208 m3 2 x (volume 1/2 tanki)
volume tangki = 4.85984
frame y fs y x fs
1 2462.2 1 2462.2
2 8630.6 4 34522.4
3 10860.4 1 10860.4
total 47845 mm
47.845 m
h 600 mm
0.6 m
(1/3) x h x ( A x Fs)
volume 1/2 tanki = 9.569 m3

2 x (volume 1/2 tanki)


volume tangki = 19.138 m3
lubricating oil Sludge tank
Base Line Base Line
y x fs frame y fs y x fs frame
408 28 362 1 362 26
1724 28.5 374 4 1496 26.5
456 29 385 1 385 27
2588 mm 2243 mm
total total
2.588 m 2.243 m
h 300
mm 0.3 mm
m (1/3) x h x m
( A x Fs)
m3 volume 1/2 tanki = 0.2243 m3 volume 1/2 tanki =

2 x (volume 1/2 tanki) 2 x (volume 1/2 tanki)


m3 volume tangki = 0.4486 m3 volume tangki =

1/2 DB 1/2 DB
y x fs frame y fs y x fs frame
1707 28 1511 1 1511 26
7236 28.5 1560 4 6240 26.5
1916 29 1608 1 1608 27
10859 mm 9359 mm
total total
10.859 m 9.359 m
h 300
mm 0.3 mm
m (1/3) x h x m
( A x Fs)
m 3
volume 1/2 tanki = 0.9359 m3 volume 1/2 tanki =

2 x (volume 1/2 tanki) 2 x (volume 1/2 tanki)


m 3
volume tangki = 1.8718 m3 volume tangki =

DB
frame y fs y x fs DB
y x fs 28 2047 1 2047 frame
2287 28.5 2107 4 8428 26
9628 29 2167 1 2167 26.5
2527 total 12642 mm 27
14442 mm 12.642 m total
14.442 m h 300
0.3 mm
mm (1/3) x h x m
( A x Fs)
m volume 1/2 tanki = 1.2642 m3
m3 volume 1/2 tanki =
2 x (volume 1/2 tanki)
2 x (volume 1/2 tanki) volume tangki = 2.5284 m3
m3 volume tangki =
Hasil akhir LO
frame y fs y x fs Base Line
y x fs 1 224.3 1 224.3 frame
571.6 2 935.9 4 3743.6 1
8689.6 3 1264.2 1 1264.2 2
2888.4 5232.1 mm 3
total
12149.6 mm 5.2321 m total
12.1496 m h 300
0.3 mm
mm (1/3) x h x m
( A x Fs)
m volume 1/2 tanki = 0.52321 m3
m3 volume 1/2 tanki =
2 x (volume 1/2 tanki)
2 x (volume 1/2 tanki) volume tangki = 1.04642 m3
m3 volume tangki =
Sludge tank Sludge tank
Sludge tank Base Line Base Line
frame y fs y x fs frame
y fs y x fs 30 408 1 408 26
316 1 316 30.5 419 4 1724 26.5
327 4 1308 31 431 2 886 27
339 1 339 31.5 443 4 1824 total
1963 mm 32 456 1 456
total
1.963 m 5298 mm
total
h 300 5.298 m
0.3 mm h 300 mm
(1/3) x h x m
( A x Fs) 0.3 m volume 1/2 tanki =
volume 1/2 tanki = 0.1963 m3 volume 1/2 tanki = (1/3) x h x ( A x Fs)
0.5298 m3
2 x (volume 1/2 tanki) volume tangki =
volume tangki = 0.3926 m3 volume tangki = 2 x (volume 1/2 tanki)
1.0596 m3 1/2 DB
frame
y fs y x fs 1/2 DB 26
1325 1 1325 frame y fs y x fs 26.5
1371 4 5484 30 1707 1 1707 27
1417 1 1417 30.5 1758 4 7236 total
8226 mm 31 1809 2 3724
total
8.226 m 31.5 1862 4 7664
h 300 32 1916 1 1916
0.3 mm 22247 mm
total
(1/3) x h x m
( A x Fs) 22.247 m volume 1/2 tanki =
volume 1/2 tanki = 0.8226 m 3
h 300 mm
0.3 m
2 x (volume 1/2 tanki) volume 1/2 tanki = (1/3) x h x ( A x Fs) volume tangki =
volume tangki = 1.6452 m 3
2.2247 m 3

volume tangki = 2 x (volume 1/2 tanki) DB


4.4494 m3 frame
y fs y x fs 26
1806 1 1806 DB 26.5
1867 4 7468 frame y fs y x fs 27
1927 1 1927 30 2287 1 2287 total
11201 mm 30.5 2347 4 9628
11.201 m 31 2407 2 4934
h 300 31.5 2467 4 10108
0.3 mm 32 2527 1 2527
(1/3) x h x m
( A x Fs) 29484 mm volume 1/2 tanki =
total
total
volume 1/2 tanki = 1.1201 m3 29.484 m
h 300 mm
2 x (volume 1/2 tanki) 0.3 m volume tangki =
volume tangki = 2.2402 m3 volume 1/2 tanki = (1/3) x h x ( A x Fs)
2.9484 m3 Base Line
frame
y fs y x fs volume tangki = 2 x (volume 1/2 tanki) 1
280.5 1 280.5 5.8968 m3 2
962.6 4 3850.4 3
1340.1 1 1340.1 total
5471 mm hasil akhir Stank
5.471 m frame y fs y x fs
h 300 1 529.8 1 529.8
0.3 mm 2 2224.7 4 8898.8
(1/3) x h x m
( A x Fs) 3 2948.4 1 2948.4 volume 1/2 tanki =
volume 1/2 tanki = 0.5471 m3 total 12377 mm
12.377 m
2 x (volume 1/2 tanki) h 300 mm volume tangki =
volume tangki = 1.0942 m3 0.3 m
volume 1/2 tanki = (1/3) x h x ( A x Fs)
1.2377 m3

volume tangki = 2 x (volume 1/2 tanki)


2.4754 m3
Sludge tank

y fs y x fs
326 1 326
337 4 1348
349 1 349
2023 mm
2.023 m
h 300 mm
0.3 m
(1/3) x h x ( A x Fs)
volume 1/2 tanki = 0.2023 m3

2 x (volume 1/2 tanki)


volume tangki = 0.4046 m3

y fs y x fs
1425 1 1425
1471 4 5884
1501 1 1501
8810 mm
8.81 m
h 300 mm
0.3 m
(1/3) x h x ( A x Fs)
volume 1/2 tanki = 0.881 m3

2 x (volume 1/2 tanki)


volume tangki = 1.762 m3

y fs y x fs
1906 1 1906
1967 4 7868
2027 1 2027
11801 mm
11.801 m
h 300 mm
0.3 m
(1/3) x h x ( A x Fs)
volume 1/2 tanki = 1.1801 m3
2 x (volume 1/2 tanki)
volume tangki = 2.3602 m3

y fs y x fs
202.3 1 202.3
881 4 3524
1180.1 1 1180.1
4906.4 mm
4.9064 m
h 300 mm
0.3 m
(1/3) x h x ( A x Fs)
volume 1/2 tanki = 0.49064 m3

2 x (volume 1/2 tanki)


volume tangki = 0.98128 m3